M 52/367
Register summary
- Holders
- Catalyst (Marymia) Pty Ltd, Dampier (Plutonic) Pty Ltd
- Part of
- Catalyst Metals Limited (ASX:CYL) as at 2026-06-30
- Local government
- Shire of Meekatharra
- Application received
- 12 Mar 1993
- Commenced
- 10 June 1993
- Expiry
- 9 June 2035
- Term
- 21 Years (Renewed)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A128008 | 2021 | Aic Mines Limited | Marymia | <1% | Partial Surrender Report E52/3027 Marymia Project for the period ending 30/06/2021 |
| A123106 | 2020 | Vango Mining Limited | Marymia | 1% | Annual Report for the Marymia Gold Project C93/2018 for the period 1 January 2019 to 31 December 2019 |
| A123468 | 2020 | Billabong Gold Pty Ltd | Plutonic | <1% | Plutonic Project C94/1999 Annual Mineral Exploration Report for the period ending 31/12/2019 |
| A124520 | 2020 | Billabong Gold Pty Ltd | P52/1394 | <1% | Final Surrender Report for Prospecting Licence P52/1394 |
| A124965 | 2020 | Aic Resources Limited | Three Rivers | <1% | Three Rivers - Annual Technical Report C84/2016 for the period ending 30 June 2020 |
80 more reports
| A125546 | 2020 | Billabong Gold Pty Ltd | Plutonic - Marymia | <1% | Prospecting Licence P52/1563 Final Surrender Report, Plutonic - Marymia Project, for the period ending 25/11/2 |
| A119558 | 2019 | Vango Mining Limited | Marymia | 1% | Annual Report for the Marymia Gold Project C93/2018 for the period 1 January 2018 to 31 December 2018 |
| A119841 | 2019 | Billabong Gold Pty Ltd | Plutonic - Marymia | <1% | Plutonic / Marymia Annual Mineral Exploration Report For the Period 1 January 2018 to 31 December 2018 |
| A120555 | 2019 | Aic Resources Limited | Three Rivers | <1% | Annual report Three Rivers project (C84/2016) for the period 1 July 2018 to 30 June 2019 E 52/03027,E 52/03154 |
| A116353 | 2018 | Billabong Gold Pty Ltd | Plutonic - Marymia | <1% | Annual Mineral Exploration Report for the Plutonic/Marymia Group C94/1999 For the Period 1 January 2017 to 31 |
| A116602 | 2018 | Dampier (Plutonic) Pty Ltd | Plutonic Dome | 1.3% | Plutonic Dome Project - Combined Annual Report - C226/2011, 01 January 2017 to 31 December 2017 |
| A117257 | 2018 | Aic Resources Limited | Three Rivers | <1% | Three Rivers Project Combined Reporting Number C84/2016 Annual Report for the period 01/07/2017 - 30/06/2018, |
| A112759 | 2017 | Dampier (Plutonic) Pty Ltd | Plutonic Dome | 1.2% | Combined Annual Report - C226/2011 Plutonic Dome Gold Project for the period 01/01/2016 to 31/12/2016 |
| A114343 | 2017 | Aic Resources Limited | Three Rivers | <1% | Three Rivers Project C84/2016 Annual Report for the period 1 July 2016 to 30 June 2017 |
| A112361 | 2017 | Billabong Gold Pty Ltd | Plutonic | <1% | Annual Mineral Exploration Report for the Plutonic Group C94/1999 For the Period 1 January 2016 to 31 December |
| A108642 | 2016 | Vango Mining Limited | Plutonic Dome | 1.1% | Annual Exploration Report for C226/2011, The Plutonic Dome Project from 01/01/2015 to 31/12/2015 |
| A110421 | 2016 | Cosmopolitan Minerals Limited | Three Rivers | <1% | Three Rivers E52/03171, E52/03154, E52/03027 Annual Report for the period 20 October 2015 to 19 October 2016 |
| A108562 | 2016 | Northern Star Resources Ltd | Plutonic | <1% | Annual Mineral Exploration Report for the Plutonic Group C94/1999 for the period 1 January 2015 to 31 December |
| A105239 | 2015 | Vango Mining Limited | Plutonic Dome | <1% | Annual Exploration Report for C226/2011, The Plutonic Dome Project from 01/01/2014 to 31/12/2014, E52/2071.... |
| A105369 | 2015 | Northern Star Resources Ltd | Plutonic | <1% | Plutonic Project C94/1999 Annual Report to the Department of Mines and Petroleum for the period 01/01/14 to 31 |
| A101717 | 2014 | Northern Star Resources Ltd | Plutonic | <1% | PLUTONIC PROJECT ANNUAL REPORT to the Department of Mines and Petroleum for the period 01/01/13 to 31/12/13 fo |
| A97128 | 2013 | Dampier Gold Ltd | Plutonic Dome | <1% | Combined Annual Report for the period 1 January 2012 to 31 December 2012 Plutonic Dome Project C226/2012, E52/ |
| A97197 | 2013 | Barrick (Plutonic) Ltd | Plutonic / Marymia | <1% | Plutonic / Marymia Project, Annual Report for the period 1st January2012 to 31st December 2012, M52/148-150,17 |
| A101570 | 2013 | Ord River Resources Ltd | Plutonic Dome | <1% | C226/2011 ANNUAL EXPLORATION REPORT Reporting Period 01/01/2013 to 31/12/2013 |
| A93152 | 2012 | Dampier Gold Ltd | Plutonic Dome | <1% | Combined Annual Report for the period 1 January 2011 to 31 December 2011 Plutonic Dome Project C226/2011 |
| A93217 | 2012 | Barrick (Plutonic) Ltd | Plutonic - Marymia | <1% | PROJECT 6490 MARYMIA PROJECT PROJECT 6520 PLUTONIC PROJECT PROJECT 6523 PLUTONIC EXTENDED PROJECT PROJECT 6530 |
| A96094 | 2012 | Thundelarra Exploration Ltd | Marymia | <1% | Annual and Final Report, Marymia Project E52/2262, for the period 22 July 2010 to 7 September 2012, Peak Hill, |
| A89778 | 2011 | Barrick (Plutonic) Ltd | Plutonic - Marymia | <1% | Marymia Project, Plutonic Project, Plutonic Extended Project, Freshwater Project, Annual Report, Period 1 Janu |
| A91436 | 2011 | Thundelarra Exploration | Marymia - Doolgunna | <1% | Annual Technical Report, Marymia Project Doolgunna, E52/2262, for the period 22 July 2010 to 21 July 2011, Pea |
| A86710 | 2010 | Barrick (Plutonic) Ltd | Plutonic / Marymia | <1% | 6490 MARYMIA PROJECT 6520 PLUTONIC PROJECT 6523 PLUTONIC EXTENDED Project 6530 FRESHWATER PROJECT ANNUAL REPO |
| A81899 | 2009 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | <1% | PROJECT 6490 MARYMIA PROJECT, PROJECT 6520 PLUTONIC PROJECT, PROJECT 6523 PLUTONIC EXTENDED PROJECT, PROJECT 6 |
| A77831 | 2008 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | <1% | Annual Report Period 1 January 2007 - 31 December 2007 Technical Report No. 1257 Plutonic/ Marymia Project |
| A74697 | 2007 | Barrick Gold Of Australia Ltd | Marymia/ Plutonic | <1% | Marymia/ Plutonic Project C94/1999 Annual Report Period 1 January 2006 - 31 December 2006 (Peak Hill) |
| A72015 | 2006 | Barrick Gold Of Australia Ltd | Marymia, Plutonic, Plutonic Extended & F | <1% | Marymia, Plutonic, Plutonic Extended & Freshwater Projects, Annual Report, Period 1 January 2005 to 31 Decembe |
| A70185 | 2005 | Barrick Gold Of Australia Ltd | Plutonic/ Marymia | <1% | Annual Report Period 1 January 2004 to 31 December 2004 Technical Report No. 1152 Projects 6490 - Marymia, 652 |
| A70061 | 2005 | Barrick Gold Of Australia Ltd | Marymia | <1% | Project 6490, Marymia, E52/1445, Surrender report for the period 19/11/99 - 18/11/04. (Peak Hill) Report 1151 |
| A68298 | 2004 | Barrick Gold Of Australia Ltd | Marymia / Plutonic / Plutonic Extended / | <1% | Annual Report for the period 01/01/2003-31/12/2003 Marymia Project,Plutonic Project,Plutonic Extended Project, |
| A66308 | 2003 | Barrick Gold Of Australia Ltd | Plutonic | <1% | Annual Report period 1 January 2002 - 31 December 2002 Project 6490 Marymia Project 6520 Plutonic Project 6523 |
| A67807 | 2003 | Barrick Gold Of Australia Ltd | Marymia | <1% | Marymia Project, Partial Surrender Report for the period 18th November 1999 to 17th November 2003, E52/1445. [ |
| A64818 | 2002 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | <1% | Plutonic/Marymia M52/148-150, M52/170-171, M52/183, M52/185 M52/217-220, M52/222-223, M52/226-235, M52/246-247 |
| A65893 | 2002 | Barrick Gold Of Australia Ltd | Marymia | <1% | Marymia Project, Partial Surrender Report for the period 19th November 1999 to 18th November 2002, E52/1445. [ |
| A64505 | 2002 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | <1% | Annual Report Period 1 January 2001 - 31 December 2001. Vertification Report Technical Report No. 1024. Projec |
| A62465 | 2001 | Homestake Gold Of Australia Ltd | Marymia | <1% | Project 6490 Marymia Project 6520 Plutonic Project 6523 Plutonic Extended Project 6530 Freshwater M52/148-150, |
| A60012 | 2000 | Homestake Gold Of Australia Ltd | Plutonic/ Marymia | <1% | Project 6490,Marymia, Project 6520, Plutonic, Project 6523, Plutonic Extended, Project 6530, Freshwater, M52/1 |
| A60176 | 2000 | Homestake Gold Of Australia Ltd | Plutonic - Freshwater - Marymia | <1% | Project 520, Plutonic, Project 523, Plutonic Extended, Project 530, Freshwater, Project 490, Marymia, M52/148- |
| A57727 | 1999 | Homestake Gold Of Australia Ltd | Marymia | <1% | Marymia Exploration - Project 6490 - Technical Report No.812 01/01/98 - 31/12/98 M52/183, 185, 217-220, 226-23 |
| A57474 | 1999 | Homestake Gold Of Australia Ltd | Plutonic | <1% | PRojecr 520 - Plutonic. Project 523 - Plutonic Extended. Project 530 - Freshwater. Annual Report 01/01/98-31/1 |
| A57678 | 1999 | Homestake Gold Of Australia Ltd | Plutonic | <1% | Development Drilling Annual Report For the Period 1/01/1998 to 31/12/98, M52/148-150,170,171,222-223,263-264,2 |
| A53884 | 1998 | Plutonic Operations Ltd | Plutonic - Freshwater | <1% | Project 520 - Plutonic, Project 523 - Plutonic Extended, Project 530 - Freshwater. 01/01/1997 - 31/12/1997 M52 |
| A54916 | 1998 | Resolute Ltd | Jiminya | 2.4% | Jiminya Project P52/884 E52/1052 M52/367 M52/590-593 MLA52/670-672 Annual report on Exploration for period 01 |
| A55340 | 1998 | Resolute Ltd | Jiminya | <1% | Jiminya Project, E52/633 Partial Relinquishment Report, 1998 |
| A55342 | 1998 | Resolute Ltd | Plutonic Bore | <1% | Plutonic Bore Joint Venture, 01/01/97 - 31/03/98 M52/217-220, 226-232, 246-247, 257, 259, 303-304, 320-323 |
| A55849 | 1998 | Resolute Ltd | Marymia | <1% | Marymia Gold Project - 06/1998 Three Year Proposed Exploration Program E52/634-635, 747, 823-826, 1052 |
| A50964 | 1997 | Plutonic Operations Ltd | Plutonic | <1% | Plutonic Operations M52/148 to M52/150 M52/170 M52//171 M52/222 M52/223 M52/305 M52/306 M52/368 to M52/370 P52 |
| A50281 | 1997 | Plutonic Operations Ltd | Plutonic - Freshwater | <1% | Project 520 Plutonic Project 523 Plutonic Extended Project 530 Freshwater M52/148 to M52/150 M 52/170 M52/171 |
| A47312 | 1996 | Plutonic Operations Ltd | Plutonic - Freshwater | <1% | Project 520 Plutonic Project and Project 523 Plutonic Extended Project and Project 530 Freshwater M52/148 to M |
| A48393 | 1996 | Resolute Samantha Ltd | Plutonic Bore | <1% | Plutonic Bore( JV) Project, Annual Report for period 01/01/1995 to 31/12/1995, M52/218-220, M52/226-232 M52/24 |
| A43761 | 1995 | Plutonic Operations Ltd | Plutonic - Freshwater | <1% | Annual report Project 520: Plutonic M52/148 to M52/150 and Project 523 Plutonic Extended M52/170 and M52/171 M |
| A47530 | 1995 | Resolute Resources Ltd | Jiminya Poo | <1% | Report for Jiminya Pool E52/342 Exploration for period 16/03/93 to 30/06/95 |
| A40062 | 1994 | Battle Mountain Australia Inc | Plutonic Bore | <1% | Annual Report for the period 01/01/93-31/12/93 Plutonic Bore JV Project M52/217-220,225-232,246-247,257-259 M5 |
| A38548 | 1993 | Resolute Resources Ltd | Marymia | <1% | E52/342. Partial surrender report |
| A37565 | 1993 | Battle Mountain Australia Inc | Plutonic Bore | <1% | Annual Report for the Period 01/01/92 - 31/12/92 Plutonic Bore Project |
| A38054 | 1993 | Resolute Resources Ltd | Marymia | <1% | Annual report for the period 01/92-12/92 Marymia Project |
| A38353 | 1993 | Stockdale Prospecting Ltd | Marymia | <1% | Annual report for the period 16/03/92-15/03/93 Peak Hill Project E52/342 |
| A39017 | 1993 | Stockdale Prospecting Ltd | Peak Hill | <1% | Annual report for the period 09/08/92-08/08/93 Peak Hill Project E52/633 |
| A41775 | 1993 | Stockdale Prospecting Ltd | Peak Hill | <1% | Annual Report for the period 01/01/92-11/10/93 Peak Hill Project E52/322,342,633-635 |
| A35335 | 1992 | Resolute Resources Ltd | Marymia | <1% | E52/342 PARTIAL SURRENDER REPORT |
| A35168 | 1992 | Battle Mountain Australia Inc | Plutonic Bore | <1% | Annual Report for the period 01/01/89-31/12/91 Plutonic Bore Project E52/184,195 M52/217-220,225-232,246-247,2 |
| A37926 | 1992 | Plutonic Operations Ltd | Plutonic Extended - Freshwater | <1% | Annual Report for the period 01/01/92-31/12/92 Plutonic Extended Project 523 M52/170-171,222-223,263-264 Fresh |
| A32634 | 1991 | Resolute Resources Ltd | Jiminya Pool | <1% | Progress Report - Jiminya Pool E52/342 Period May 1990 to December 1990 (R Report) |
| A34790 | 1991 | Resolute Resources Ltd | Marymia - Keillor | <1% | Non-statutory Report : R Report for the period 01/01/1991 to 31/12/1991, Interpretation of Aeromagnetic Data , |
| A30777 | 1990 | Resolute Resources Ltd | Jiminya Pool | <1% | Jiminya Pool E52/342 Technical Report No:9 May 1990 |
| A32633 | 1990 | Resolute Resources Ltd | Marymia | <1% | Marymia Area WA Interpretation of Aeromagnetic (1990) Data (R Report for 1990; E52/158,320,322,342,352; M52/18 |
| A28050 | 1989 | Resolute Resources Ltd | Marymia | <1% | Marymia Gold Project : Regional review February 1989 E52/288, E52/317, E52/320, E52/322, E52/342 and E52/352 R |
| A6794 | 1977 | International Nickel Aust Ltd | Crows Nest Well | 1.6% | Crows Nest Well Project, Non-statutory Report: Final Report, March 1977, MC52/253-272, 282, 298-305, 309-310, |
| A7406 | 1977 | Amax Exploration Aust Inc | Beering Unna Tank | <1% | Beering Unna Tank Project, Non-statutory Report: Final Report , December 1977, TR70/6405H. |
| A5785 | 1975 | International Nickel Aust Ltd | Crows Nest Well | 1.7% | Annual report, Crows Nest Well Claim Group (including Macdonald Option), For the period 1st January 1974 to 31 |
| A5301 | 1974 | International Nickel Aust Ltd | Nabberu - Crows Nest Well | 1.8% | Nabberu Project - Crows Nest Well, [Annual report] for the period 1st January - 31st December 1973, MC52/253 . |
| A4080 | 1973 | International Nickel Aust Ltd | Crows Nest Well | <1% | Crows Nest Well Project, Annual Report for the period 1st January 1972 to 31st December 1972, MC52/253-272, 28 |
| A3221 | 1972 | International Nickel Aust Ltd | Crows Nest Well | <1% | Crow's Nest Well Project, Non-statutory Report for the period 15th December 1969 to 31st December 1971, MC52/ |
| A40525 | 1753 | Plutonic Operations Ltd | Plutonic - Barramundi - Freshwater - Gol | <1% | Annual Report for the Period 01/01/93 - 31/12/93 Plutonic/Barramundi/Freshwater/Goldfish/Perch/Redfin/Trout Pr |
| A53746 | 1753 | Plutonic Operations Ltd | Plutonic - Freshwater | <1% | Project 520-Plutonic, Project 523-Plutonic Extended, Project 530-Freshwater, Annual Report 01/01/97 - 31/12/97 |
| A28047 | 1753 | Resolute Resources Ltd | Marymia | <1% | Marymia Gold Project : Regional overview 18 November 1988 Resolute Resources E52/157, E52/158, E52/184, E52/19 |
| A43695 | 1753 | Battle Mountain Australia Inc | Plutonic Bore | <1% | Plutonic Bore Joint Venture Project, M52/217-220, M52/225-232, M52/246-247, M52/257-259, M52/303-304 M52/320-3 |
| A51858 | 1753 | Resolute Ltd | Plutonic Bore | <1% | Plutonic Bore Joint Venture M52/217 to M52/220 M52/226 to M52/232 M52/246 M52/247 M52/257 M52/259 M52/303 M52/ |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 9 years · 9 June 2035
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 52/367 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 52/367? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.