L 25/53
Register summary
- Holder
- Black Cat (Kal East) Pty Ltd
- Part of
- Black Cat Syndicate Limited (ASX:BC8) as at 2026-06-30
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 22 Oct 2015
- Commenced
- 14 Apr 2016
- Expiry
- 13 Apr 2037
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A146233 | 2025 | Orange Minerals Nl | Majestic | 1.6% | Combined Surrender Report for Tenements P25/2660-2661, P25/2663-2667 and P25/2671, Majestic Project, for the P |
| A147795 | 2025 | Orange Minerals Nl | Majestic | 2.9% | Combined Surrender Report for Tenements P25/2361 and P26/4470, Majestic Project, for the Period 14/11/2017 to |
| A137782 | 2023 | Black Cat (Kal East) Pty Ltd | Goddards | 1.3% | Final Surrender for the Goddards Project P25/2684 for the period ending 19/10/2023 |
| A123215 | 2020 | Mining Investments Australia Pty Ltd | Majestic | <1% | Annual Mineral Exploration Report for Combined Reporting Group No. C49/2019, Majestic Project, for the Period |
| A123494 | 2020 | Ardea Resources Limited | Bulong | <1% | Annual Report Bulong Project C224/1995, 1 January 2019 to 31 December 2019 |
116 more reports
| A125373 | 2020 | Silver Lake Resources Limited | Mount Monger | <1% | Combined Annual Report on Mt Monger Project C72/2004 for the period ending 30/06/2020 |
| A121773 | 2019 | Silver Lake Resources Limited | Mount Monger | <1% | Combined Annual Report on Mt Monger Project - C72/2004 for the period 1 July 2018 to 30 June 2019 |
| A119605 | 2019 | Ardea Resources Limited | Bulong | <1% | Bulong Project C224/1995 Annual Report for the period 1 January 2018 to 31 December 2018 |
| A120673 | 2019 | Mining Investments Australia Pty Ltd | Majestic | 3.6% | Annual Mineral Exploration Report for Tenement P25/2343, as part of the Majestic Project, for the Period 6th J |
| A121449 | 2019 | Aruma Resources Limited | Goddard Dam | <1% | Annual Report for C164/2016 Goddard Dam Project for the period 1 September 2018 to 31 August 2019, P25/02388, |
| A122025 | 2019 | Aruma Resources Limited | Goddard Dam | <1% | Final Surrender Report for Goddard Dam P25/2202, P25/2203 and P25/2204 for the period 7 October 2011 to 6 Octo |
| A116727 | 2018 | Southern Gold Limited | Bulong East | <1% | C224/1995 Bulong East Project Comined Report for the period 1 January 2017 to 31 December 2017, M25/00059, M25 |
| A117532 | 2018 | Aruma Resources Limited | GODDARD DAM | 1.8% | FINAL SURRENDER REPORT for P25/2089 to P25/2094 inclusive, GODDARD DAM PROJECT, 02 August 2010 - 27 July 2018 |
| A118055 | 2018 | Silver Lake Resources Limited | Mount Monger | <1% | Combined Annual Report on Mount Monger Project C72/2004 for 1 July 2017 to 30 June 2018 |
| A118087 | 2018 | Aruma Resources Limited | Goddard Dam | <1% | Annual Report for C164/2016 Goddard Dam for the period 1 September 2017 to 31 August 2018, P25/02153, P25/0220 |
| A112728 | 2017 | Southern Gold Limited | Bulong East | <1% | Bulong East Project C224/1995 Annual Report for the period 01/01/2016 - 31/12/2016, M 25/00059, M 25/00134, M |
| A114883 | 2017 | Silver Lake Resources Limited | Mount Monger | <1% | Combined Annual Report on Mt Monger Project C72/2004 for the period 1 July 2016 to 30 June 2017 |
| A115084 | 2017 | Aruma Exploration Pty Ltd | Goaddard Dam | 1% | Annual Report for C164/2016 Goddard Dam for the period 01/09/2016 - 31/08/2017, P25/02089, P25/02090, P25/0209 |
| A108574 | 2016 | Silver Lake Resources Ltd | Mount Monger | <1% | Surrender Report for Mt Monger Tenements P25/1897, P25/1898, P25/1899, P25/1900, P25/1903, P25/1904, P25/1905 |
| A108656 | 2016 | Silver Lake Resources Limited | Mt Monger | <1% | Final Surrender Report for Mt Monger tenements P25/1880-5, 1890-2, 1894, 1968-9, 26/3502-21, 3415-6, 3423-5, 3 |
| A108680 | 2016 | Southern Gold Limited | Bulong East | <1% | Bulong East Project C224/1995, Annual Report for the period 1 January 2015 to 31 December 2015 |
| A109816 | 2016 | Silver Lake Resources Limited | Mount Monger | <1% | Mount Monger Project Combined Annual Report on Mt Monger Project C72/2004 for 1 July 2015 to 30 June 2016 |
| A105074 | 2015 | Southern Gold Ltd | Clinker Hill | <1% | Annual Report for P25/2126 - P25/2142, P25/2155, P25/2156, P26/3762, P26/3781 - P26/3783 C193/2010 ‘Clinker Hi |
| A105543 | 2015 | Southern Gold Ltd | Bulong East | <1% | Combined Annual Report for M25/59, M25/111, M25/134, M25/145, M25/161-162, M25/171, M25/206-210, M25/220, M25/ |
| A107034 | 2015 | Aruma Resources Limited | Glandore | <1% | C93/2000 Glandore Project Annual Report for the period 1 September 2014 to 31 August 2015 |
| A107152 | 2015 | Silver Lake Resources Limited | Mt Monger | <1% | ANNUAL REPORT For the Period 1 July 2014 to 30 June 2015 MT MONGER Combined Annual Report on Mt Monger Project |
| A100857 | 2014 | Southern Gold Ltd | Clinker Hill | <1% | Clinker Hill Project, Annual Report for the period 17/11/2012 to 16/11/2013,P25/2126-2142, 2155-2156, P26/3762 |
| A101490 | 2014 | Southern Gold Ltd | Bulong East | <1% | Combined Annual Report for C Number: 224/1995 ‘Bulong East Project’ For the period 1st January 2013 to 31st De |
| A102932 | 2014 | Silver Lake Resources Limited | Greater Monger | <1% | Greater Monger Project, Annual Report for the period 01/05/2013 to 30/04/2014, E25/208; M25/350; P25/1897-1905 |
| A103104 | 2014 | Silver Lake Resources Limited | Mount Monger North 2 | 1.1% | Mt Monger North 2 Project, Annual Report for the period 14/04/2013 to 13/04/2014, P25/1880-1885. [C126/2008] |
| A103384 | 2014 | Southern Gold Ltd | Clinker Hill | <1% | Final Report for P25/2126-2130, P25/2132-2133, P25/2136, P25/2138-41, P25/2155-2156, P26/3762, P26/3781 - P26/ |
| A103782 | 2014 | Aruma Resources Ltd | Glandore | <1% | Annual Technical Report C93/2000 – Glandore Project for the period ended 31/08/2014, M25/327, 329, 330, P25/20 |
| A98746 | 2013 | Silver Lake Resources Ltd | Greater Monger | <1% | Combined Annual Report on Greater Monger Project – C108/2001 for period 1 May 2012 to 30 April 2013, E25/208.. |
| A99732 | 2013 | Aruma Resources Ltd | Glandore | <1% | Annual Technical Report C93/2000 – Glandore Project for the period 01/09/2012 to 31/08/2013 (M25/327, 329, 33 |
| A96657 | 2013 | Southern Gold Ltd | Clinker Hill | <1% | Annual Report for P25/2126 - P25/2142, P25/2155, P25/2156, P26/3762, P26/3781 - P26/3783 C193/2010 ‘Clinker Hi |
| A98407 | 2013 | Silver Lake Resources Ltd | Mount Monger North 2 | 1.1% | Mt Monger North 2 Project, Annual Report for the period 14th April 2012 to 13th April 2013, P25/1880-1885. [C1 |
| A98822 | 2013 | Integra Mining Ltd | Randalls | <1% | Integra Mining Magnetotelluric Survey 30/11/2012 |
| A93253 | 2012 | Southern Gold Ltd | Bulong East | <1% | Combined Annual Report for ‘Bulong East Project’ C224/1995 for the period 1st January 2011 to 31st December 20 |
| A97363 | 2012 | Southern Gold Ltd | Bulong East | <1% | Combined Annual Report for M25/59, M25/111, M25/134, M25/145, M25/161, M25/162, M25/171, M25/206-210, M25/220, |
| A94342 | 2012 | Integra Mining Ltd | Mount Monger North 2 | 1.1% | Combined Annual Report Mt Monger North 2 Project – C126/2008 for period 14 April 2011 to 13 April 2012, P25/18 |
| A95913 | 2012 | Aruma Resources Ltd | Glandore | <1% | Glandore Project, Annual Report for the period 01/09/2011 to 31/08/2012, M25/327, 329, 330; P25/2073-2076,2089 |
| A92876 | 2012 | Southern Gold Ltd | Clinker Hill | <1% | Clinker Hill Project, Annual Report for the period 17th November 2010 to 16th November 2011, P25/2126-2142, 21 |
| A89960 | 2011 | Heron Resources Ltd | Bulong | <1% | Combined annual report for the period 1 January 2010 to 31 December 2010, Bulong Project, C224/1995 |
| A94097 | 2011 | Integra Mining Ltd | Greater Monger | <1% | Combined Annual Report on Greater Monger Project – C108/2001 for period 1 May 2011 to 30 April 2012, E25/208, |
| A89222 | 2011 | Integra Mining Ltd | Mount Monger North | <1% | Combined Annual Report on Mt Monger North Project – C181/2007 for period 21 November 2009 to 20 November 2010 |
| A90802 | 2011 | Integra Mining Ltd | Mount Monger North 2 | 1.1% | Combined Annual Report Mt Monger North 2 Project – C126/2008 for period 14 April 2010 to 13 April 2011, P25/18 |
| A88943 | 2011 | Integra Mining Ltd | Mount Monger North | <1% | Surrender Report for Mt Monger North Tenements P25/1519, P25/1520, P25/1521 for the period 21 November 2006 to |
| A90579 | 2011 | Integra Mining Ltd | Greater Monger | <1% | Combined Annual Report on Greater Monger Project – C108/2001 for period 1 May 2010 to 30 April 2011 |
| A91818 | 2011 | Aruma Resources Ltd | Glandore | <1% | Annual Technical Report C93/2000 – Glandore Project for the period 01/09/2010 to 31/08/2011 |
| A85558 | 2010 | Integra Mining Ltd | Mount Monger North | <1% | Mt Monger North, Annual Report for the period 21st November 2008 to 20th November 2009, P25/1519, P25/1520, P2 |
| A87247 | 2010 | Integra Mining Ltd | Greater Monger | <1% | Combined Annual Report on Greater Monger Project – C108/2001 for period 1 May 2009 to 30 April 2010 |
| A87292 | 2010 | Integra Mining Ltd | Mount Monger North 2 | 1.1% | Combined Annual Report on Mt Monger North Project 2 – C126/2008 for period 14 April 2009 to 13 April 2010 |
| A88238 | 2010 | Aruma Resources Ltd | Glandore | <1% | Annual Technical Report C93/2000 – Glandore P25/1581-1590 incl, P25/1620, P25/1806-1807 incl, P25/2073-2076 in |
| A86572 | 2010 | Heron Resources Ltd | Bulong | <1% | Annual report for the period 1 January 2009 to 31 December 2009, Bulong Project, C224/1995, E25/250, M25/59, M |
| A82327 | 2009 | Integra Mining Ltd | Greater Monger | <1% | Combined Annual Report on Greater Monger Project – C108/2001 for period 1 May 2008 to 30 April 2009 |
| A82371 | 2009 | Rubicon Resources Ltd | BULONG-MANOR | 2% | BULONG-MANOR PROJECT COMBINED REPORT M25/123, SURRENDER REPORT 7TH APRIL 1994 TO 24TH APRIL 2009 |
| A82660 | 2009 | Integra Mining Ltd | Mt Monger North 2 | 1.1% | Combined Annual Report on Mt Monger North Project 2 – C126/2008 for period 14 April 2008 to 13 April 2009, P25 |
| A76997 | 2008 | Integra Mining Ltd | Mount Monger North | <1% | Mt Monger North, Combined Annual Report on Mt Monger North Project C181/2007 for period 21 November 2006 to 20 |
| A78247 | 2008 | Rubicon Resources Ltd | Bulong-Manor | 1.8% | BULONG-MANOR PROJECT COMBINED REPORT C137/1999 M25/123, P25/1841 ANNUAL REPORT 1 JANUARY 2007 TO 31 DECEMBER 2 |
| A78446 | 2008 | Fairstar Resources Ltd | Morelands Find | 3.7% | Annual Report for the period 16.03. 07 to 15.03.08, Moreland s Find M25/152 |
| A80241 | 2008 | Integra Mining Ltd | Mount Monger North | <1% | Mt Monger North, Combined Annual Report on Mt Monger North Project – C181/2007 for period 21 November 2007 to |
| A77762 | 2008 | Inco Resources (Australia) Pty Ltd | Bulong | <1% | BULONG PROJECT C224/1995, E25/250....M25/59...P27/1754 to P27/1761, Combined Annual Report C224/1995, |
| A78163 | 2008 | Newcrest Mining Ltd | Mount Monger | <1% | Mt Monger (JV) Project, Annual Report for the period ending 30 April 2008, C108/2001. |
| A81471 | 2008 | Vale Inco Australia Limited Partnership | Bulong | <1% | BULONG PROJECT C224/1995 FOR THE PERIOD 1 JANUARY 2008 – 31 DECEMBER 2008 |
| A81701 | 2008 | Rubicon Resources Ltd | BULONG-MANOR | 1.8% | BULONG-MANOR PROJECT COMBINED REPORT C137/1999 M25/123, P25/1841, EAST COOLGARDIE MINERAL FIELD, ANNUAL REPORT |
| A74679 | 2007 | Inco Australia Ltd | Bulong | <1% | Bulong Project C224/1995 Comb Annual Report for the Period 1 Jan 2006 - 31 Dec 2006 (Kurnalpi) |
| A74757 | 2007 | Heron Resources Ltd | Bulong-Manor | <1% | Bulong - Manor Project C137/1999 Annual Report for the Period 01 Jan 2006 - 31 Dec 2006 (Kurnalpi) |
| A75496 | 2007 | Fairstar Resources Ltd | Morelands Find | 3.7% | Morelands Find Project, Annual Report for the period ending 15th March 2007 M25/152 - |
| A74538 | 2007 | Mr Holiday R | Kanowna | 22% | Kanowna Project M25/26 Annual Report for the Period 17/12/2005 to 16/12/2006 (Kurnalpi) |
| A75185 | 2007 | Newcrest Mining Ltd | Mount Monger | <1% | Mt Monger (JV) Project, Annual Report for the period ending 30th April 2004, E25/197,E25/203,E25/208........ |
| A73282 | 2006 | Solomon (Australia) Pty Ltd | Emu Dam | <1% | Emu Dam Project Annual Technical Report, P25/1604-1606,1612-1613,1621-1623, Period Ending 31 December 2005, G |
| A72377 | 2006 | Heron Resources Ltd | Bulong | <1% | Bulong Project Combined Report C224/1995, Annual Report, 1 January 2004 to 31 December 2005, (Kurnalpi). |
| A72436 | 2006 | Newcrest Mining Ltd | Mount Monger / Jews/ Credo | <1% | Monger JV Annual Technical Report, Period Ending 30 April 2006, Combined Reporting No. C108/2001, (Newcrest Re |
| A70671 | 2005 | Newcrest Operations Ltd | Mount Monger | <1% | Monger JV Annual Report to the Dept of Industry and Resources for the period 01/05/2004 to 30/04/2005. DOIR Gr |
| A68050 | 2004 | Bulong Operations Pty Ltd | Bulong | <1% | Combined Annual Report C224/95 1st January 2003 to 31st dece mber 2003 E25/67, E27/72, E27/94 etc |
| A68758 | 2004 | Newcrest Mining Ltd | Mount Monger | <1% | Mt Monger (JV) Project, Annual Report for the period 01/05/2003 to 30/04/2004 , C108/2001. |
| A66309 | 2003 | Bulong Operations Pty Ltd | Bulong | <1% | Combined Annual Report C224/95 for the period 1 January 2002 to 31 December 2002 E25/67, E27/72,94, L27/55-56, |
| A66939 | 2003 | Placer Dome Asia Pacific Ltd | Greater Monger | <1% | Annual Report for the period 01/05/2002 to 30/04/2003 C108/2001: E25/202 M25/117 M26/148,197,248-249,357,364,3 |
| A64757 | 2002 | Bulong Operations Pty Ltd | Bulong | <1% | Combined Annual Report C224/95 1st January 2001 - 31st December 2001 Exploration Licences 25/67, 27/72, 27/94 |
| A65401 | 2002 | Auriongold Exploration Pty Ltd | Greater Monger | <1% | Greater Monger Project Annual Report 01/05/2001 - 30/04/2002 C108/2001 Tenement/s P25/1503-1506, 1509/1509, 15 |
| A60502 | 2000 | Preston Resources Nl | Bulong | <1% | Bulong W.A. Combined Report C224/1995 for 1998 and 1999 (M25/134 P25/1042 P25/1044 P25/1045 P25/1049 to P25/10 |
| A55022 | 1998 | Manor Resources Nl | Bulong | <1% | Bulong, Annual Report 09/06/1998 Manor Resources NL M25/19, M25/32, M25/36, M25/58, M25/59, M25/64, M25/81, |
| A52404 | 1998 | Roebuck Resources Nl | Glandore | <1% | The Glandore Project Comprising M25/73, M25/86, M25/88, M25/90, M25/95, M25/98, M25/134, M25/135,and Prospecti |
| A53791 | 1998 | Roebuck Resources Nl | Emu Dam - Lake Yindarlgooda | 1.2% | Emu Dam - Lake Yindarlgooda Project, Annual Report for the period 01/01/1997 to 31/12/1997, M25/93,,107, 118, |
| A55062 | 1998 | Gindalbie Gold Nl | Morelands Find | 3.7% | Morelands Find Project, M25/152, Annual Report on mineral exploration for the 12 Months Ending 14/03/98 |
| A57019 | 1998 | Red Back Mining Nl | Majestic North | <1% | Majestic Project Mining LEases: 25/113, 119, 120 and Prospecting Licences: 25/914, 915, 916, 917, 1056, 1147, |
| A50700 | 1997 | Roebuck Resources Nl | Lake Yindarlgooda - Emu Dam | <1% | Annual Report for the period 24 May 1996 to end February 1997 on the Lake Yindarlgooda Project Emu Dam Prospec |
| A51826 | 1997 | Roebuck Resources Nl | Glandore | <1% | The Glandore Project, M25/73 M25/74 M25/86 M25/88 M25/90 M25/95 M25/98 M25/134 and M25/135 and Prospecting Lic |
| A51827 | 1997 | Roebuck Resources Nl | Emu Dam | 1.4% | The Lake Yindarlgooda Projec Emu Dam Prospect Eastern Goldfields Province Western Australia Comprising Mining |
| A51264 | 1997 | Gindalbie Gold Nl | Morelands Find | 3.7% | Moreland's Find Project Combined Technical Report Tenements M25/152 period reported 15/03/96 to 14/03/97 |
| A53237 | 1997 | Red Back Mining Nl | Majestic | <1% | Mining Leases : 25/113,119,120, (143,159,211,212-withdrawn) Prospecting Licences : 25/914-917,1056, 1147, 1148 |
| A47423 | 1996 | Western Mining Corporation Ltd | Lake Yindarlgooda | <1% | Annual report for the period 1 January 1995 to 31 December 1995 The Lake Yindarlgooda Joint Venture Project Ex |
| A46741 | 1996 | Homestake Australia Ltd | Majestic | <1% | Annual Report Majestic Joint Venture 1 January 1995 to 31 December 1995. M25/ 113, 119 - 120, P25/914-917, 105 |
| A43481 | 1995 | Western Mining Corporation Ltd | Majestic | <1% | Annual Report for the period 1 January 1994 to 31 December 1994. Majestic Project, P 25/910-917, 931-933, 936, |
| A43697 | 1995 | Cyprus Gold Australia Corporation | Bulong | <1% | Bulong (JV) Project , Annual Report for the period March 1,1994 to February 28,1995 E25/85,E25/90,P25/1125 to |
| A44678 | 1995 | Western Mining Corporation Ltd | Glandore | <1% | Annual report for the period 1 January 1994 to 31 December 1994 Glandore Project Mining Leases M25/73 M25/74 M |
| A44679 | 1995 | Western Mining Corporation Ltd | Lake Yindarlgooda | <1% | Annual Report for the period 1/1/1994 to 31/12/1994 Lake Yindarlgooda Joint Venture E25/58, M25/131-124 |
| A47480 | 1995 | Western Mining Corporation Ltd | Glandore | <1% | Annual Report for the period 1 January 1995 to 31 December 1995 , Glandore Project, M25/73 M25/74 M25/86 M25/ |
| A40425 | 1994 | Western Mining Corporation Ltd | Majestic | <1% | Annual Report for the period 01/01/93-31/12/93 ,Majestic Project. |
| A40895 | 1994 | Aurora Gold Ltd | Lake Yindarlgooda | <1% | Annual Report for the period 01/01/93-31/12/93 Lake Yindarlgooda Project M25/93,107 P25/921,959,985-986,1053-1 |
| A40973 | 1994 | Cyprus Gold Australia Corporation | Bulong | <1% | Annual report for the period 01/03/93-28/02/94 Bulong JV Project E25/85 P25/1125-1136 P25/1192 |
| A41245 | 1994 | Western Mining Corporation Ltd | Lake Yindarlgooda | <1% | Annual Report for the Period 01/01/93 -31/12/93, Lake Yindarlgooda Project, P25/926-930,934-935,937,939-94 4,9 |
| A37558 | 1993 | Western Mining Corporation Ltd | Lake Yindarlgooda | <1% | Annual Report for the period 01/01/90-31/12/92 Lake Yindarlgooda JV Project E25/58 P25/926-930,934-935,937,939 |
| A38266 | 1993 | Western Mining Corporation Ltd | Majestic | <1% | Three year report for the period 1 January 1990 to 31 December 1992, The Majestic Project, P25/495, P25/496, P |
| A35677 | 1992 | Ashton Gold Wa Ltd | Lake Yindarlgooda | <1% | Annual Report for the period 01/01/91-31/12/91 Lake Yindarlgooda Project, M25/93, P25/921,959,984-986,1053-105 |
| A38418 | 1992 | Ashton Gold Wa Ltd | Lake Yindalgooda | <1% | Annual Report for the period 01/01/92-31/12/92 Lake Yindarlgooda Project M25/93 P25/875,921,959,984-986 P25/10 |
| A33579 | 1991 | Ashton Gold Wa Ltd | Lake Yindarlgooda | <1% | Annual Report for the period 01/01/90-31/12/90, Lake Yindarlgooda Project ,M25/93 P25/875,921,984-986,959,1053 |
| A26060 | 1988 | Fimiston Mining Ltd | Emu Dam | <1% | Annual Report for the period 07/01/88-06/01/89, Emu Dam Project, P25/625 |
| A128 | 1976 | Western Mining Corporation Ltd | Morelands | 1.3% | Morelands Project, Non-statutory Report: Electro-Sounding Data Sheets;IP & Resistivity Survey, & Plans,(circa) |
| A5980 | 1975 | Great Boulder Mines Ltd | Bulong | 3.1% | Bulong Project, Non-statutory Report: Summary Report, May 1975, MC25/1091-1093. |
| A5983 | 1975 | Great Boulder Mines Ltd | Boorara - Bulong - Golden Ridge | 3.1% | Boorara - Bulong - Golden Ridge Project, Non-statutory Report: Geological Report for the year ending 17th June |
| A5073 | 1973 | Western Nickel Pty Ltd | Bulong | <1% | Bulong Project, Non-statutory Report: Geological Report for the period 1st January 1972 to 31st March 1973, |
| A1279 | 1970 | Western Nickel Pty Ltd | Bulong | <1% | Bulong Project, Annual Report for the period ending 31/12/1970, TR70/4677H; MC27/60, 232-233, 462-470, 775-777 |
| A71 | 1970 | Broken Hill Pty Co Ltd | Majestic | 1.3% | Majestic Project, Non-statutory Report: Geochemical & Geophysical Surveys, May 1970, MC25/68-75. |
| A8666 | 1969 | Broken Hill Pty Co Ltd | Majestic | 1.3% | Majestic Project, Non-statutory Report: Progress Report, May 1969, MC25/68-75. |
| A1277 | 1968 | Western Nickel Pty Ltd | Bulong | <1% | Bulong Project, Annual Report for the period ending 31/12/1968, TR70/4677H; MC27/60, 232-233, 462-470, 775-777 |
| A48011 | 1753 | Troy Resources Nl | Morelands Find | 3.7% | Annual report M25/152 Moreland's Find Bulong District, Western Australia 15 March 1995 to 14 March 1996 File N |
| A5072 | 1753 | Western Nickel Pty Ltd | Bulong | <1% | Bulong Annual Report, Year Ending 31st March 1974 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A44152 | 1753 | Aurora Gold Ltd | Lake Yindarlgooda | <1% | Annual Techical Report, Lake Yindalgooda Project, Mining Lease M25/93for the period 1 January 1994 to 31 Dece |
| A44153 | 1753 | Aurora Gold Ltd | Lake Yindarlgooda | 1% | Annual Technical Report Lake Yindarlgooda Mining Leases M25/107 M25/118 M25/126 and M25/146 Prospecting Licenc |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 11 years · 13 Apr 2037
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 25/53 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 25/53? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.