E 58/567
Register summary
- Holder
- Marigold Minerals Pty Ltd
- Local government
- Shire of Mount Magnet
- Application received
- 10 Dec 2020
- Commenced
- 19 Feb 2021
- Expiry
- 18 Feb 2031
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A150203 | 2025 | Platina Resources Limited | Challa | <1% | Final Surrender Report for E58/552 & E58/553 Challa Project for the period ending 14/07/2025. C242/2021 |
| A151797 | 2025 | Santa Fe Minerals Ltd | Challa North Group 1 | 17% | Partial Surrender Report for E 58/502 Challa North Group 1 for the period ending 01/09/2025. |
| A151815 | 2025 | Santa Fe Minerals Ltd | Challa North Group 2 | <1% | Partial Surrender Report for E 58/503 Challa North Group 2 Project for the period ending 01/09/2025 |
| A138656 | 2024 | Empire Resources Limited | Paynesville | <1% | E58/611 Surrender Report Paynesville for the period ending 15/11/2023. |
| A143122 | 2024 | Aruma Resources Limited | Carter Well | <1% | Final Surrender Report for EXPLORATION LICENCE E58/590 Carter Well for the period ending 26/04/2024. |
142 more reports
| A144560 | 2024 | Platina Resources Limited | Challa | <1% | Combined Annual Report C242/2021 Challa Project for the period ending 14/07/2024. E 58/552,E 58/553 |
| A136714 | 2023 | Platina Resources Limited | Challa | <1% | Challa Project C242/2021 Annual Report for the period ending 14 July 2023 |
| A132104 | 2022 | Platina Resources Limited | Challa | <1% | Challa Project C242/2021 Annual Report for the period 15 July 2021 to 14 July 2022. E 58/552,E 58/553 |
| A128405 | 2021 | Platina Resources Limited | Challa Gold | <1% | Challa Gold Project - E58/553 Annual Report for the period 15 July 2020 to 14 July 2021 |
| A124440 | 2020 | Santa Fe Minerals Ltd | Challa North Group 1 | 34% | Final Surrender Report for E58/504, E58/472 Challa North Group 1 Project for the period ending 08/05/2020 |
| A124567 | 2020 | Santa Fe Minerals Ltd | Challa North Group 1 | 17% | Partial Surrender Report for E 58/502 for the period 1 October 2019 to 8 May 2020 |
| A124600 | 2020 | Santa Fe Minerals Ltd | Challa North | <1% | Partial Surrender Report for E58/501 E 58/503 Challa North Group 2 for the period ending 08/05/2020 |
| A125624 | 2020 | Santa Fe Minerals Ltd | Challa North Group 1 | 17% | Annual Report For E58/502 Challa North Group 1 Project for the period ending 30/09/2020 |
| A125679 | 2020 | Santa Fe Minerals Ltd | Challa North Group 2 | <1% | Annual Report for C45/2018, E58/501 and E58/503 Challa North Group 2 project for the period 1/10/2019 to the |
| A121927 | 2019 | Santa Fe Minerals Ltd | Challa North Group 1 | 25% | Challa North (Group 1) Project Combined Annual Report C44/2018 for the period 1 October 2018 to 30 September 2 |
| A122061 | 2019 | Santa Fe Minerals Ltd | Challa North Group 2 | <1% | Challa North (Group 2) Project Combined Annual Report C45/2018 for the period 1 October 2018 to 30 September 2 |
| A118608 | 2018 | Santa Fe Minerals Ltd | Challa North Group 1 | 25% | Challa North Project Annual Report on Exploration for the period 1 October 2017 to 30 September 2018, WA Explo |
| A118610 | 2018 | Santa Fe Minerals Ltd | Challa North Group 2 | <1% | Challa North Project Annual Report on Exploration for the period 1 October 2017 to 30 September 2018, WA Expl |
| A114802 | 2017 | Perring R J; Legendre B; Corporate & Resource Consultants Pt | Challa North | <1% | First Annual Report - E58/501 Challa North Project for the period 30/08/2016 - 29/08/2017 |
| A114934 | 2017 | Pegmatite Holdings Pty Ltd | Challa North | <1% | First Annual Report - E58/503 Challa North Project for the period 1 September 2016 to 31 August 2017 |
| A114795 | 2017 | Perring R J; Legendre B R; Corporate & Resource Consultants | Challa North | 62% | Second Annual Report - E58/472 Challa North for the period 8 September 2016 to 7 September 2017 |
| A114823 | 2017 | Corporate & Resource Consultants Pty Ltd; Legendre B; Perrin | Challa North | 3.2% | First Annual Report - E58/504 Challa North for the period 30 August 2016 to 29 August 2017 |
| A114873 | 2017 | Pegmatite Holdings Pty Ltd | Challa | 17% | First Annual Report - E58/502 Challa Project for the period 01/09/2016 - 31/08/2017 |
| A109863 | 2016 | Perring R J | Challa Regional | 62% | Annual Report - E58/472 Challa Regional Project for the period 8 September 2015 to 7 September 2016 |
| A105013 | 2015 | Gold & Mineral Resources Pty Ltd | Windimurra Complex | <1% | Annual Technical Report For the Period 20.11.13 to 19.11.14, E58/431 Windimurra Complex Project. |
| A100693 | 2014 | West Peak Iron Ltd | Pioneer Well | 100% | Final Surrender report for the period 7th September 2011 to 9th October 2013, Pioneer Well Project, E58/395 |
| A103378 | 2014 | Maximus Resources Ltd | Narndee - Windimurra Complex | 8.6% | Windimurra Complex Project 2014 Annual Report For the Period 1 July 2012 to 30 June 2013 C29/2003 E58, E58/356 |
| A96849 | 2013 | Te Johnston And Associates Pty Ltd | Nulyercamyer Well | 100% | Annual technical report on E58/396 For the period 16/12/2011 to 15/12/2012 Nulyercamyer Well, WA |
| A99140 | 2013 | Maximus Resources Ltd | Narndee - Windimurra Complex | 8.6% | 2013 Annual Report For the Period 1 July 2012 to 30 June 2013 C29/2003, E58/356 Windimurra Complex Project |
| A94882 | 2012 | Maximus Resources Ltd | Windimurra Complex | 8.6% | PARTIAL SURRENDER REPORT For the Period 25 February 2010 to 30 January 2012 C29/2003, E58/356 WINDIMURRA COMPL |
| A94883 | 2012 | Maximus Resources Ltd | NARNDEE – Windimurra Complex | 5.9% | 2012 ANNUAL REPORT For the Period 1 July 2011 to 30 June 2012 C29/2003, E58/294, E58/356 WINDIMURRA COMPLEX PR |
| A93346 | 2012 | Maximus Resources Ltd | Narndee [ Windimurra Complex] | 5.1% | FINAL SURRENDER REPORT, For the Period 22 March 2002 to 31 January 2012, C29/2003, E58/237, E58/273, E58/274, |
| A93726 | 2012 | Hemisphere Resources Ltd | E57/387 | <1% | E57/387, Final Surrender Report for the year ended 4th April 2012 |
| A94220 | 2012 | Maximus Resources Ltd | Windimurra | 7.3% | FINAL SURRENDER REPORT For the Period 11 March 2002 to 7 March 2012 C29/2003 E58/240 WINDIMURRA COMPLEX PROJEC |
| A96087 | 2012 | West Peak Iron Ltd | Pioneer Well | 100% | Annual report for the period 7th September 2011 to 6th September 2012, Pioneer Well Project, E58/395, |
| A91073 | 2011 | Maximus Resources Ltd | Windimurra | 1.9% | Partial Surrender Report for the period 22 March 2002 to 7 April 2011, E58/237 Windimurra Project |
| A91231 | 2011 | Maximus Resources Ltd | Wondinong Hill | 43% | Final Surrender Report for the period 28.10.2005 to 27.10.2010, E58/270 – Wondinong Hill |
| A91444 | 2011 | Maximus Resources Ltd | Boundary Well - Narndee | 33% | Final Report For the Period: 28th June 2006 to 27th June 2011, E58/281 – Boundary Well, Narndee Project |
| A87991 | 2010 | Maximus Resources Ltd | Narndee | 100% | Final Report For the Period 17/09/2008 to 29/06/2010, E58/244 – Paynesville E1, Narndee Project |
| A85466 | 2010 | Maximus Resources Ltd | Kundingguari Hill | 66% | 2009 Annual Report For the Period 1.12.2008 to 30.11.2009, E58/300 – Kundingguari Hill |
| A86458 | 2010 | Maximus Resources Ltd | Kundingguari Hill / Narndee | 66% | Partial Surrender Report for the period 1.12.2006 to 30.11.2009, E58/300 – Kundingguari Hill, Narndee Project |
| A87779 | 2010 | Plasia Pty Ltd | Rocky Dam Well | <1% | Surrender Report for Rocky Dam Well Project E58/306, Report Period 3 July 2007 to 18 June 2010 |
| A87989 | 2010 | Maximus Resources Ltd | Milgoo Bore West | 100% | 2009 Annual Report For the Period 13.11.2008 to 12.11.2009 P58/1379 – Milgoo Bore West, Narndee Project |
| A88335 | 2010 | Maximus Resources Ltd | Narndee - Kundingguari Hill | 66% | 2010 Final Report For the Period 1/12/2009 to 29/06/2010, E58/300 – Kundingguari Hill, Narndee Project |
| A84550 | 2009 | Maximus Resources Ltd | Narndee (Boundary Well) | 33% | Partial Surrender Report, for the period: 28 June 2006 to 27tJune 2009, E58/281 – Boundary Well, Narndee Proje |
| A84865 | 2009 | Plasia Pty Ltd | Rocky well | <1% | ANNUAL TECHNICAL REPORT on Exploration Licence E58/306 For the Year Ending 31 August 2009 |
| A77078 | 2008 | Maximus Resources Ltd | Narndee | 66% | 2007 Annual Report for the period 1.12.2006 to 30.11.2007 E58/300 Kundingguari Hill, Narnee Project |
| A79524 | 2008 | Plasia Pty Ltd | Rocky Well | <1% | ANNUAL TECHNICAL REPORT on EXPLORATION LICENCE E58/306 ON THE MT MAGNET SHEET SG 50-03 in the 1:250,000 Series |
| A75610 | 2007 | Maximus Resources Ltd | Narndee | 33% | 2007 Annual Report For the Period:28th June 2006 to 27th June 2007 E58/281 - Boundary Well Narndee Project |
| A75856 | 2007 | Maximus Resources Ltd | Narndee (Windimurra) | 5.2% | 2007 Annual Report For the Period 1.07.2006 to 30.6.2007 C29/2003 E58/232, E58/235, E58/236, E58/237, E58/240 |
| A76834 | 2007 | Maximus Resources Ltd | Narndee | 43% | 2007 ANNUAL REPORT For the Period 28.10.2006 to 27.10.2007 E58/270 - Wondinong Hill, NARNDEE PROJECT Report Nu |
| A73503 | 2006 | Maximus Resources Ltd | Narndee (Windimurra) | 5.2% | Narndee E58/232,235-237,240,274, Annual Report, 1 July 2005 to 30 June 2006, Combined Reporting No. C29/2003, |
| A73939 | 2006 | Maximus Resources Ltd | Narndee | 43% | 2006 Annual Report for the Period 28/10/2005 to 27/10/2006, E58/270 - Wondinong Hill, Narndee Project, (Maximu |
| A73359 | 2006 | Maximus Resources Ltd | Windimurra (Narndee) | 5.2% | Partial Surrender Report 2006, Combined Reporting No. C29/2003, Windimurra Complex E58/232,235-237,240,274, (M |
| A70060 | 2005 | Mr Youngs Pw | Kundingguari Hill | 77% | Annual report, Period 31/10/03 - 30/10/04, Kundingguari Hill Project, E58/158, Paynesville. |
| A70649 | 2005 | Apex Minerals Nl | Windimurra | 2.4% | Windimurra Project, Annual ( & Interim ) Report, E59/908,1078,1081-1085, with new amalgamated tenements E58/23 |
| A70679 | 2005 | Apex Minerals Nl | Windimurra | 7.3% | E58/240 Partial relinquishment report, Windimurra Project (11/03/02 - 09/03/05, Cue, Peak Hill mineral field). |
| A68969 | 2004 | Apex Minerals Nl | Windimurra | 4.1% | Combined Annual report for the period 01/07/2003-30/06/2004 Windimurra Project (C29/2003), E58/232, E58/235, E |
| A67149 | 2003 | Apex Minerals Nl | Narndee/Windimurra | 4.1% | Combined Annual Report for the period 1/7/2002 to 30/6/2003 Windimurra Project C29/2003: E58/232,235,236,237,2 |
| A67799 | 2003 | Mr Youngs Pw | Kundingguari Hill | 77% | Annual Report, Period 31/10/2002- 30/10/2003, Project: Kundingguarri Hill, Exploration Licence E58/158. |
| A64344 | 2002 | Mr Youngs Pw | Milgoo South | 100% | Annual Report For P58/1108. Gswa Reference First Report. Period: 21.12.00 - 20.12.01. Project: Milgoo South. T |
| A64343 | 2002 | Mr Youngs Pw | Milgoo South | 100% | Annual Report For P58/1107. GSWA Reference First Report. Period: 21.12.00 - 20.12.01. Project: Milgoo South. T |
| A65808 | 2002 | Ekomin Pty Ltd | Kundingguari Hill | 77% | Annual Report For E58/158. Period: 31.10.01 - 30.10.02. Project: Kundingguari Hill. |
| A61592 | 2001 | Ekomin Pty Ltd | Kundingguari Hill | 77% | Annual Report for E58/158, Kundingguari Hill Project for the Period 31/10/99 to 30/10/00. |
| A63856 | 2001 | Ekomin Pty Ltd | Kundingguari Hill | 77% | Annual Report for E58/158 period 31.10.00 - 30.10.01 Kundingguari Hill Project. GSWA reference M10309, sheet |
| A59828 | 2000 | Mr Youngs Pw | Kundingguari Hill | 77% | Annual Report for E58/158 Period 31/10/1998 to 30/10/1999 Kundinggurai Hill Project E58/158 |
| A60070 | 2000 | Australian Gold Resources Ltd | Windimurra | 18% | Exploration Licences: E58/203,204,206, C139/1998 - Windimurra 1, Joint Annual Report for the Period 29/01/1999 |
| A59121 | 1999 | Ekomin Pty Ltd | Kundingguari Hill | 77% | Kundingguari Hill E58/158 28/08/99 |
| A57098 | 1999 | Ekomin Pty Ltd | Kundingguari Hill | 77% | Kundingguari Hill E58/158 31/10/97 - 30/10/98 |
| A58965 | 1999 | Australian Gold Resources Ltd | Windimurra 1 | 15% | E58/164,203-204,206, Windimurra 1 Project, Annual Report for the period 29 January 1998 to 28 January 1999.[C1 |
| A59119 | 1999 | Australian Gold Resources Ltd | Windimurra | 7.3% | E58/164 Windimurra Surrender Report for the period 29th January 1996 to 25th June 1999. |
| A55389 | 1998 | Windimurra Resources Pty Ltd | Windimurra - Narndee | 7.3% | Windimurra - Narndee Project,Non-statutory Report: Geological Report, June 1998, E58/164, 203, 204, 206, E59/7 |
| A50538 | 1997 | Australian Gold Resources Ltd | Kantie Murdana | 7.3% | Kantie Murdana Project, Annual Report Exploration Licence E58/164 fo the period 29/01/1996 to 28/01/1997. |
| A51699 | 1997 | Aarex Resources Nl | Windimurra | <1% | Annual report 27/04/96 to 26/04/97 Exploration Licence E58/140, Windimurra Project. |
| A53180 | 1997 | Ekomin Pty Ltd | Kundingguari Hill | 77% | Annual Report for E58/158 M10309 Period 31/10/1996 to 30/10/1997 Kundingguari Hill SG50-15 2542 & SG50-16 2642 |
| A47795 | 1996 | Gold State Nl | Challa North | <1% | Second Annual Report E58/140 Western Australia (Challa North) Year ended 26 April 1996 |
| A48275 | 1996 | Gold State Nl | Challa East | <1% | Challa East Project, Surrender Report for the period 29th June 1995 to 12th January 1996, E58/146. |
| A49714 | 1996 | Ekomin Pty Ltd | Kundingguari Hill | 77% | Annual Report for E58/158 31/10/95 to 30/10/1996 Kundingguari Hill SG50-15 2542 & SG50-16 2642 |
| A45055 | 1995 | Gold State Nl | Challa North | <1% | First Annual Report E58-140 Western Australia (Challa North) Year ended 26 April 1995 |
| A45143 | 1995 | Gold State Nl | Challa East | <1% | Challa East Project, First Annual Report E58/146 for period 29th June 1994 to 28th June 1995. |
| A42106 | 1994 | Dodsley Pty Ltd | Pioneer Well | 98% | Pioneer Well Project, Annual Report for the period 19/07/1993 to 19/07/1994, E58/134. |
| A42847 | 1994 | Dodsley Pty Ltd | Naluthanna Hill | 25% | Naluthanna Hill Project,Annual Report for the period 19/07/1993 to 25/07/1994, E58/132. |
| A44796 | 1994 | Peregrine Resources Nl | Paynesville | 36% | Partial Surrender Report for the period 30/12/93-16/12/94 Paynesville Project E58/138 |
| A44797 | 1994 | Peregrine Resources Nl | Paynesville | 36% | Paynesville Project, Annual Report E58/138 covering period 30/12/1993 to 29/12/1994. |
| A37328 | 1992 | Anglo Australian Resources Nl | Mount Carron | 40% | Mt Carron Project, Final Surrender Report, March 1992, E58/114. |
| A33850 | 1991 | Geopeko | Wondinong - Windimurra | 6.5% | Wondinong - Windimurra Project, Partial Surrender Report for the period April 1990 to April 1991, E58/41. |
| A33863 | 1991 | Pancontinental Mining Ltd | Wondinong - Windimurra | 6.5% | Wondinong - Windimurra Project, Annual Report for the period April 1990 to April 1991, E58/41 |
| A33611 | 1991 | Geopeko | Killarney - Wilndimurra | 55% | Killarney - Wilndimurra Project, Non-statutory Report: Exploration Work for the period September 1990 to Decem |
| A30277 | 1990 | Pancontinental Mining Ltd | Wondinong | 6.5% | Wondinong Project, Partial Surrender Report for the period April 1987 to April 1990, E58/41 |
| A31896 | 1990 | Pancontinental Mining Ltd | Killarney | 55% | Killarney Project,Partial Surrender Report for the period November 1986 to November 1990,E58/40 |
| A29609 | 1990 | Pancontinental Mining Ltd | Killarney | 55% | Killarney Project, Partial Surrender Report for the period November 1986 to November 1989, E58/40. |
| A28015 | 1989 | Pancontinental Mining Ltd | Windimurra | 3.2% | Third Annual Report, Windimurra, E58/31,41,56,75 and 78, June 1988 to June 1989. |
| A30086 | 1989 | Precious Metals Aust Ltd | Windimurra Hills - Wagoo Hills | 2.6% | Windimurra Hills - Wagoo Hills Project, Non-statutory Report: Exploration Report for the period 01/04/1989 to |
| A29219 | 1989 | Pancontinental Mining Ltd | Killarney | 55% | Third annual report, E58/40, Killarney, November 1988 to November 1989 |
| A25601 | 1988 | Pancontinental Mining Ltd | Killarney | 55% | Second annual report, E58/40 - Killarney, Nov 1987 to Nov 1988 |
| A23221 | 1988 | Precious Metals Aust Ltd | Windimurra | 2.6% | Non-statutory Report : An Appraisal of the Windimurra Project [110], February 1988, E58/28, 47-49 & 53; M58/53 |
| A23356 | 1988 | Century Metals And Mining Nl | Mount Carron | <1% | Mount Carron Prospect, Final report for period 2 May 1987 to 1 May 1988, E58/18 |
| A23847 | 1988 | Pancontinental Mining Ltd | Windimurra | 1.2% | Windimurra Project, Annual report June 1987 to June 1988, E58/30-32, E58/37, E58/41, E58/56, E59/147 |
| A19421 | 1987 | Yinnex Nl | Paynesville - Windsor | 83% | Windsor Property, [Non-statutory] geological report prepared for prospectus purposes, E58/22, P58/344-349 |
| A19539 | 1987 | Yinnex Nl | Milgoo | <1% | Milgoo Option Area, GML58/2048, Drill appraisal, [Non-statutory report], November 1986 |
| A22340 | 1987 | Auralia Resources Nl | Killarney | 55% | Annual report for Killarney E58/40, for period 27 November 1986 to 26 November 1987 |
| A21081 | 1987 | Pancontinental Mining Ltd | Windimurra | 1.2% | First annual report, Windimurra Project, E58/30-32, 37, 41, E59/147, June 1986 - June 1987 |
| A21194 | 1987 | Century Metals And Mining Nl | Mount Carron | <1% | Mt Carron Project, Annual Report for the period 2nd May 1987 to 1st May 1987, E58/18. |
| A22662 | 1987 | Bhp Minerals Pty Ltd | Wondinong - Windimurra | 7.3% | Wondinong area, Windimurra Project, Annual report for the period 1 July 1986 to 30 June 1987, E58/5 |
| A22299 | 1987 | Austplat Minerals Nl | Windimurra (Windsor) | 83% | Windimurra (Windsor) Prospect, Annual report for period ending 23 September 1987, Covering tenements E58/22, P |
| A23220 | 1987 | Precious Metals Aust Ltd | Windimurra | 2.6% | Windimurra Project, Non-statutory Report: Geological Report for the Precious Metals Australia Ltd, Prospectus |
| A18904 | 1986 | Yinnex Nl | Paynesville | 95% | Paynesville, Non-statutory report, P58/344 - 58/349 |
| A23219 | 1986 | Precious Metals Aust Ltd | Windimurra | 2.6% | Non-statutory Report: An Appraisal of Pacific Quest Tenement Areas, Windimurra, Murchison Mineral Field, Weste |
| A17377 | 1985 | Yinnietharra Exp Pty Ltd | Paynesville | 83% | Paynesville Project, Annual Report for the period 07/12/1984 to 06/12/1985, E58/22. |
| A13973 | 1984 | Yinnietharra Exp Pty Ltd | Paynesville | 99% | Paynesville Project, Non-statutory Report: A Literature Appraisal of the Geology of the Paynesville District, |
| A13821 | 1984 | Cra Exploration Pty Ltd | Mount Carron | <1% | Mount Carron Project, Annual Report for the period ending 09/12/1983, MC58/2448-2451, MC58/2573-2599, ELA58/18 |
| A13936 | 1984 | Cra Exploration Pty Ltd | Mount Carron | <1% | Mount Carron Project, Annual Report for the (six month) period ending 11th May 1984, MC58/2448-2451, 2573-2599 |
| A14768 | 1984 | Cra Exploration Pty Ltd | Mount Carron | <1% | Mount Carron Project, Final Report for the period ending 20/12/1984, E58/18. |
| A12386 | 1983 | Anaconda Aust Inc | Windimurra | 10% | Windimurra Project, Final Surrender Report for the year ending 10th April 1983, E58/7-12, 14; E59/12-15. |
| A12584 | 1983 | V & D Ridolfo Pty Ltd | Nulyercamyer Hill | 50% | Nulyercamyer Hill Project, Final Surrender Report, February 1983, P58/16 (MC58/2290). |
| A13164 | 1983 | Alcoa Of Australia Ltd | Windimurra Complex | 1.8% | Windimurra Complex Project, (1st) Annual Report for the period 18/12/1982 to 17/12/1983, E58/2, 4, 5 & 6. |
| A11341 | 1982 | Alcoa Of Australia Ltd | Windimurra Complex | 1.8% | Windimurra Complex Project, (1st) Annual Report for the period ending 18/12/1982, TR70/8083-8084, 8558, & 8756 |
| A11348 | 1982 | Anaconda Aust Inc | Windimurra | 11% | Windimurra Project, Annual Report for theyear ending 10th April 1982, TR70/8240-8250H. |
| A7797 | 1978 | Newmont Pty Ltd | Windsor | 36% | Windsor Project, Annual Report for the year ending 31/12/1977, MC58/2046 - 2096. |
| A17203 | 1977 | North Flinders Mines Ltd | Yilgarn -Yalgoo | <1% | Yilgarn -Yalgoo Project, Non-statutory Report: Reconnaissance Report on Copper-Zinc Massive Sulphide Target A |
| A6480 | 1976 | Chevron Exploration Corp | Goldfields W.A. | 20% | Goldfields W.A. Project, Non-statutory Report: Uranium in Calcrete Exploration Programme, W.A., September 1976 |
| A5012 | 1974 | Western Mining Corporation Ltd | Wondinong - Windsor | 4.2% | Wondinong - Windsor Project,.Non-statutory Report: Progress Report , June 1974, MC58/1483-1541, 1616-1628, & 1 |
| A968 | 1972 | Western Mining Corporation Ltd | Menzies - Comet Vale - Ora Banda | <1% | Menzies - Comet Vale - Ora Banda Project, Non-statutory Report: |
| A141 | 1970 | Aust Geophysical Pty Ltd | Youanmi Area | 4% | Youanmi Area Project, Non-statutory Report: Progress Report for the year ending 31/12/1969, TR70/3930,3931 & 5 |
| A140 | 1969 | Aust Geophysical Pty Ltd | Youanmi Area | 4% | Youanmi Area Project, Non-statutory Report: Progress Report for the period 01/08/1968 to 28/02/1969, TR70/3930 |
| A139 | 1967 | Aust Geophysical Pty Ltd | Youanmi Area | 4% | Youanmi Area Project, Non-statutory Report: Geological Appraisal, May 1967,TR70/3930 & 3931H. |
| A1884 | 1962 | Mangore Australia Pty Ltd | Coates - Gabanintha | <1% | Coates - Gabanintha Project, Non-statutory Report:Quarterly Report(s) covering the period 02/07/1961 to 28/03/ |
| A1885 | 1962 | Mangore Australia Pty Ltd | Coates - Gabanintha | <1% | Coates - Gabanintha Project, Non-statutory Report:An Economic Evaluation of Vanadifeous Magnetite Deposits of |
| A1886 | 1962 | Mangore Australia Pty Ltd | Coates -Gabanintha | <1% | Gabanintha Project, Non-statutory Report: Quarterly Progress Report for the period 01/04/1962 to 30/06/1962, T |
| A1883 | 1960 | Mangore Australia Pty Ltd | Coates - Gabanintha | <1% | Coates - Gabanintha Project, Non-statutory Report:Geological Outline, [Gabanintha, Andover], circa 1960, TR70/ |
| A7980 | 1753 | Amax Iron Ore Corporation | Paynesville | 19% | Paynesville Project, Non-statutory Report: Final Report , July 1978, MC58/2028-2040, 2043-2045, 2106-2109. |
| A79521 | 1753 | Maximus Resources Ltd | Narndee | 5.2% | 2008 ANNUAL REPORT For the Period 1.07.2007 to 30.6.2008 For the Period 1.07.2007 to 30.6.2008 E58/232, E58/23 |
| A88271 | 1753 | Maximus Resources Ltd | NARNDEE | 100% | FINAL REPORT 2010 For the Period 13.11.2009 to 29.06.2010 P58/1380 – Pioneer Well West NARNDEE PROJECT Report |
| A88273 | 1753 | Maximus Resources Ltd | NARNDEE | 83% | FINAL REPORT 2010 For the Period 13.11.2009 to 29.06.2010 P58/1382 – Nulyercamyer Hill NARNDEE PROJECT Report |
| A80748 | 1753 | Maximus Resources Ltd | NARNDEE | 100% | 2008 ANNUAL REPORT For the Period 13.11.2007 to 12.11.2008, P58/1380 – Pioneer Well West NARNDEE PROJECT |
| A80750 | 1753 | Maximus Resources Ltd | Nulyercamyer Hill | 83% | 2008 ANNUAL REPORT For the Period 13.11.2007 to 12.11.2008 P58/1382 – Nulyercamyer Hill, NARNDEE PROJECT |
| A79099 | 1753 | Quantum Resources Ltd | Windimurra | 99% | EXPLORATION LICENCE 58/251 ANNUAL REPORT FOR THE PERIOD 5 JUNE 2007 to 6 JUNE 2008 |
| A79186 | 1753 | Maximus Resources Ltd | NARNDEE | 33% | 2008 ANNUAL REPORT For the Period: 28th June 2007 to 27th June 2008 E58/281 - Boundary Well NARNDEE PROJECT |
| A80747 | 1753 | Maximus Resources Ltd | Milgoo Bore West | 100% | 2008 ANNUAL REPORT For the Period 13.11.2007 to 12.11.2008 P58/1379 – Milgoo Bore West NARNDEE PROJECT |
| A81605 | 1753 | Maximus Resources Ltd | Kundingguari Hill Narndee | 66% | 2008 ANNUAL REPORT For the Period 1.12.2007 to 30.11.2008 E58/300 – Kundingguari Hill NARNDEE PROJECT |
| A81806 | 1753 | Quantum Resources Ltd | Windimurra | 99% | EXPLORATION LICENCE 58/251 FINAL REPORT FOR THE PERIOD 7 JUNE 2006 to 18 FEBRUARY 2009 |
| A84548 | 1753 | Maximus Resources Ltd | Narndee | 7.8% | 2009 ANNUAL REPORT For the Period 1.07.2008 to 30.6.2009 C29/2003 NARNDEE PROJECT |
| A84889 | 1753 | Maximus Resources Ltd | Paynesville E1 / Narndee | 100% | ANNUAL REPORT, For the Period 17.09.2008 to 16.09.2009, E58/244 – Paynesville E1, Narndee Project |
| A85754 | 1753 | Maximus Resources Ltd | Wondinong Hill | 43% | PARTIAL SURRENDER REPORT For the Period 28.10.2005 to 27.10.2009 E58/270 – Wondinong Hill |
| A88203 | 1753 | Maximus Resources Ltd | NARNDEE – Windimurra Complex | 7.7% | 2010 ANNUAL REPORT For the Period 1 July 2009 to 30 June 2010 C29/2003 E58/232, E58/235, E58/236, E58/237, E58 |
| A88270 | 1753 | Maximus Resources Ltd | NARNDEE | 100% | FINAL REPORT 2010 For the Period 13.11.2009 to 29.06.2010 P58/1379 – Milgoo Bore West NARNDEE PROJECT Report N |
| A91678 | 1753 | Maximus Resources Ltd | Windimurra | 6.5% | 2011 Annual Report For the Period 1 July 2010 to 30 June 2011 C29/2003 Windimurra Complex Project. |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 4 years · 18 Feb 2031
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 58/567 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 58/567? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.