E 52/4345
Register summary
- Holder
- Stanifer Pty Ltd
- Local government
- Shire of Meekatharra
- Application received
- 3 Apr 2024
- Commenced
- 10 June 2026
- Expiry
- 9 June 2031
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A147618 | 2025 | Venus Metals Corporation Limited | Curara Well | <1% | Final Surrender Report for Tenement E52/3069 Curara Well for the period ending 28/11/2024. |
| A149785 | 2025 | Aic Mines Limited | Thaddona Hill | <1% | Final Surrender Report forThaddona Hill Project E52/3317, E52/3318 and E52/3319 (C53/2017) for the period endi |
| A139300 | 2024 | Aic Mines Limited | Curara Well | 22% | C14/2019 Curara Well Annual Technical Reporthe period ending 31/12/2023. E 52/3069,E 52/3743,E 52/3768 |
| A144521 | 2024 | Aic Mines Limited | Curara Well | 100% | Curara Well E52/3743 Final Surrender Report for the period 11 September 2020 to 3 April 2024 |
| A138794 | 2024 | Sandfire Resources Limited | Ned’s Creek | <1% | E 52/1858, E 52/2356 and E 52/2405 ‘Ned’s Creek” Surrender Report for the period ending 16/01/2024 |
157 more reports
| A144835 | 2024 | Aic Mines Limited | Curara Well | <1% | E52/3768 Final Surrender Report Curara Well Project for the period ending 01/08/2024. |
| A134604 | 2023 | Aic Mines Limited | Curara Well | 21% | Annual Technical Report C14/2019 Curara Well for the period ending 31/12/2022. E 52/3069,E 52/3488,E 52/3489,E |
| A137181 | 2023 | Aic Mines Limited | Curara Well | <1% | Curara Well E52/3488-3489 Final Surrender Report for the period ending 14/05/2023 |
| A132572 | 2022 | Aic Mines Limited | Thaddona Hill | 5.1% | Annual Technical Report C53/2017 Thaddona Hill Project for the period ending 25/07/2022 |
| A130019 | 2022 | Aic Mines Limited | Three Rivers | 100% | Final Surrender Report - E52/3320 Three Rivers Project for the period ending 19/12/2021. |
| A130291 | 2022 | Aic Mines Limited | Curara Well | 20% | C14/2019 Annual Technical Report Curara Well Project for the period ending 31/12/2021. |
| A130765 | 2022 | Aic Mines Limited | Curara Well JV | <1% | E52/3069 - Partial Surrender Report Curara Well JV for the period ending 09/02/2022. |
| A130908 | 2022 | Aic Mines Limited | Marymia | 8.9% | E52/3346 - Final Surrender Report Marymia project for the period ending 19/05/2022. |
| A132229 | 2022 | Aic Mines Limited | Thaddona | <1% | E52/3318 - Partial Surrender Report period 30 June 2015 to 29 June 2022 |
| A126651 | 2021 | Aic Mines Limited | Beyondie | 16% | Curara Well Annual Report C14/2019 for the period ending 31 December 2020 |
| A128652 | 2021 | Aic Mines Limited | Thaddona Hill | 5.1% | Thaddona Hill C53/2017 Annual Technical Report for the period ending 25/07/2021 |
| A128763 | 2021 | Aic Mines Limited | Marymia | 100% | E52/3743 – Annual Technical Report Marymia project for the period 10 September 2020 to 9 September 2021. |
| A122285 | 2020 | Paranoid Enterprises Pty Ltd | Doolgunna | 83% | Surrender Report on Doolgunna Project E52/3576, 21 November 2018 to 29 August 2019 |
| A123075 | 2020 | Aic Mines Limited | Curara Welll | 16% | Curara Well C14/2019 Annual Technical Report for the period 1 January 2019 to 31 December 2019 |
| A124404 | 2020 | Sandfire Resources Limited | Neds Creek | <1% | C144/2005 Ned’s Creek Project Combined Annual Technical Report for the period ending 11/05/2020 |
| A125207 | 2020 | Aic Mines Limited | Thaddona Hill | 5.1% | Thaddona Hill C53/2017 Annual Report for the period ending 9 August 2020 |
| A123106 | 2020 | Vango Mining Limited | Marymia | <1% | Annual Report for the Marymia Gold Project C93/2018 for the period 1 January 2019 to 31 December 2019 |
| A119455 | 2019 | Aic Resources Limited | Curara Well | 16% | Annual Report CR14/2019 Curara Well Project for the period 1 January 2018 to 31 December 2018, E52/03069, E52/ |
| A119558 | 2019 | Vango Mining Limited | Marymia | <1% | Annual Report for the Marymia Gold Project C93/2018 for the period 1 January 2018 to 31 December 2018 |
| A120649 | 2019 | Sandfire Resources Nl | Ned's Creek | <1% | C144/2005 Ned’s Creek Project Combined Annual Technical Report For the period 12 May 2018 to 11 May 2019 |
| A120703 | 2019 | Aic Resources Limited | Thadoona | 5.1% | Annual Report for C53/2017 Thadoona project for the period 27 July 2018 to 26 July 2019 |
| A121615 | 2019 | Vango Mining Limited | Ned's Creek | 1.7% | Ned's Creek C212/2010 Annual report for the period 12 September 2018 to 11 September 2019, E 52/02440, E 52/02 |
| A122156 | 2019 | Ora Gold Limited | Curara Well | <1% | Surrender Report on E52/2402 (Curara Well Project) for the period 11 June 2010 to 15 November 2019 |
| A116602 | 2018 | Dampier (Plutonic) Pty Ltd | Plutonic Dome | <1% | Plutonic Dome Project - Combined Annual Report - C226/2011, 01 January 2017 to 31 December 2017 |
| A116613 | 2018 | Venus Metals Corporation Limited | Curara Well West | <1% | Curara Well West Annual Report on E52/3069 for the period 10 February 2017 to 09 February 2018 |
| A117323 | 2018 | Sandfire Resources Nl | Ned's Creek | <1% | C144/2005 Ned’s Creek Project Combined Annual Technical Report For the Period 12 May 2017 to 11 May 2018, E52/ |
| A117485 | 2018 | Aic Resources Limited | Thadoona | 5.1% | Annual Report on Explorations Activies for C53/2017, Thadoona, 27 July 2017 - 26 August 2018 |
| A118596 | 2018 | Lodestar Minerals Limited | Ned's Creek | 1.7% | Annual Report for the Ned's Creek Project, C212/2010, 12 September 2017 - 11 September 2018 |
| A116451 | 2018 | Venus Metals Corporation Limited | Curara Well West | 100% | Annual Report E52/3320 Curara Well West Project for the period 20/12/2016 - 19/12/2017 |
| A117246 | 2018 | Thundelarra Exploration Ltd | Curara Well | <1% | Annual Technical Report on E52/2402 Curara Well Project for the period 11 June 2017 to 10 June 2018, Peak Hil |
| A112759 | 2017 | Dampier (Plutonic) Pty Ltd | Plutonic Dome | <1% | Combined Annual Report - C226/2011 Plutonic Dome Gold Project for the period 01/01/2016 to 31/12/2016 |
| A114356 | 2017 | Sandfire Resources Nl | Ned's Creek | <1% | C144/2005 Ned’s Creek Project Combined Annual Technical Report For the Period 12 May 2016 to 11 May 2017, E52/ |
| A115417 | 2017 | Lodestar Minerals Ltd | Neds Creek | 1.8% | Neds Creek C212/2010 Annual Report for the period 12 September 2016 to 11 September 2017, E52/02440, E52/02456 |
| A113901 | 2017 | Venus Metals Corporation Limited | Curara Well | <1% | Annual Report E52_3069 Curara Well Project for the period 9 February 2016 to 10 February 2017 |
| A114237 | 2017 | Thundelarra Limited | Curara Well | <1% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11 June 2016 to 10 June 2017, Peak Hi |
| A114841 | 2017 | Venus Metals Corporation Limited | Curara Well | <1% | EIS Co-funded Final Drilling Completion Report For the Period 7 June 2016 to 30 September 2017, E52/03069 (R#1 |
| A115009 | 2017 | Aic Resources Limited | Marymia | 5.1% | Annual Report for Thadoona Group of Tenements C53/2017, E52/03317, E52/03318, E52/03319, E52/03346 for the per |
| A108249 | 2016 | Top Iron Pty Ltd | Doolgunna | 83% | Annual Report on Doolgunna Project E52/3006 For the Period 25/11/2014 to 24/11/2015 |
| A108310 | 2016 | Sandfire Resources Nl | Ned’s Creek | <1% | Ned’s Creek Project E52/2405 Partial Surrender Report 06/04/2010 to 11/02/2016 |
| A108642 | 2016 | Vango Mining Limited | Plutonic Dome | <1% | Annual Exploration Report for C226/2011, The Plutonic Dome Project from 01/01/2015 to 31/12/2015 |
| A108910 | 2016 | Thundelarra Limited | Curara Well | <1% | PARTIAL SURRENDER REPORT For the Period 11 June 2009 to 10 June 2016 CURARA WELL Partial Surrender Report on E |
| A109553 | 2016 | Thundelarra Limited | Curara Well | <1% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11June 2015 to 10 June 2016, Peak Hil |
| A110507 | 2016 | Lodestar Minerals Limited | Ned's Creek | 1.8% | Ned's Creek Project C212 Annual Report for the period 12 September 2015 to 11 September 2016, E52/02440, E52/0 |
| A110777 | 2016 | Top Minerals Ltd | Doolgunna | 83% | Annual Report on Doolgunna Project 52/3006 25 November 2015 to 24 November 2016 |
| A109385 | 2016 | Sandfire Resources Nl | Ned's Creek | <1% | C144/2005 Ned’s Creek Project Combined Annual Technical Report for the period 12/05/2015 to 11/05/2016, E52/01 |
| A104392 | 2015 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Neds Creek | 1% | Peak Hill - Doolgunna - Neds Creek Project C212/2010 Annual Report for the period 12th September 2013 to 11th |
| A105239 | 2015 | Vango Mining Limited | Plutonic Dome | <1% | Annual Exploration Report for C226/2011, The Plutonic Dome Project from 01/01/2014 to 31/12/2014, E52/2071.... |
| A106213 | 2015 | Sandfire Resources Nl | Ned’s Creek | <1% | Ned’s Creek C144/2005, E52/1673, E52/1674. E52/1858, E52/2356, E52/2357, E52/2405 Combined Annual Report for t |
| A107487 | 2015 | Lodestar Minerals Limited | Peak Hill - Doolgunna - Neds Creek | 1.2% | Peak Hill - Doolgunna - Neds Creek Project C212/2010 Annual Report for the period 12/09/2014 to 11/09/2015, E5 |
| A106182 | 2015 | Thundelarra Limited | Curara Well | <1% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11June 2014 to 10 June 2015, Peak Hil |
| A101168 | 2014 | Lodestar Minerals Ltd | Peak - Doolgunna - Marymia | 67% | Peak / Doolgunna / Marymia Project (C213/2010) Final Surrender Report E52/2505 for the period 12th September 2 |
| A102561 | 2014 | Dampier (Plutonic) Pty Ltd | Plutonic | 93% | Plutonic Project, Final Surrender Report for M52/657 from 21/01/1998 to 26/02/2013 |
| A102562 | 2014 | Dampier (Plutonic) Pty Ltd | Plutonic | 94% | Plutonic Project, Final Surrender Report for the period 21/01/1998 - 26/01/2013, M52/658. |
| A102568 | 2014 | Dampier (Plutonic) Pty Ltd | Plutonic | 3.4% | Plutonic Project, Final Surrender Report for the period 12/02/1993 – 26/02/2013, M52/351. |
| A102573 | 2014 | Dampier (Plutonic) Pty Ltd | Plutonic | 13% | Plutonic Project, Final Surrender Report for the period 13/01/1992 to 27/06/2013, M52/277. |
| A102869 | 2014 | Thundelarra Exploration Ltd | Curara Well | <1% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11 June 2013 to 10 June 2014, Peak Hi |
| A103001 | 2014 | Sipa Exploration Nl | Thaduna | <1% | THADUNA PROJECT E52/1673, E52/1674, E52/1858, E52/2356, E52/2357 & E52/2405 ANNUAL REPORT COVERING THE PERIOD |
| A101167 | 2014 | Lodestar Minerals Ltd | Maymia | 5.7% | Partial Surrender Report for Marymia Project E52/2493 for the period 17th September 2012 to 25th October 2013 |
| A96999 | 2013 | Thundelarra Exploration Ltd | Doolgunna | <1% | Doolgunna (JV) Project, Annual Report for the period 6th November 2011 to 5th November 2012, E52/2402 ; M52/59 |
| A97128 | 2013 | Dampier Gold Ltd | Plutonic Dome | 2.4% | Combined Annual Report for the period 1 January 2012 to 31 December 2012 Plutonic Dome Project C226/2012, E52/ |
| A97675 | 2013 | Dampier Gold Ltd | Plutonic Dome | 5.9% | Combined Surrender Report Plutonic Dome Project C226/2011 for the period ending 26/02/2013 |
| A98659 | 2013 | Sipa Exploration Nl | Thaduna | <1% | Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356, E52/2357 & E52/2405 Annual Report covering the report |
| A98809 | 2013 | Thundelarra Exploration Ltd | Curara Well | <1% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11June 2012 to 10 June 2013, Peak Hil |
| A99878 | 2013 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Marymia | 4.1% | Peak Hill - Doolgunna - Marymia (C213/2010) E52/2492, E52/2493, E52/2505, E52/2734 Annual Report for the perio |
| A101570 | 2013 | Ord River Resources Ltd | Plutonic Dome | <1% | C226/2011 ANNUAL EXPLORATION REPORT Reporting Period 01/01/2013 to 31/12/2013 |
| A92542 | 2012 | Thunderlarra Exploration Ltd | Doolgunna | <1% | Doolgunna Project, Annual Report for the period 6th November 2010 to 5th November 2011, M52/597; E52/2402. ( |
| A93152 | 2012 | Dampier Gold Ltd | Plutonic Dome | 2.4% | Combined Annual Report for the period 1 January 2011 to 31 December 2011 Plutonic Dome Project C226/2011 |
| A94113 | 2012 | Sipa Exploration Nl | Thaduna | <1% | Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356, E52/2357 & E52/2405 annual report covering the period |
| A95992 | 2012 | Astro Resources Nl | North Doolgunna | 6.7% | North Doolgunna Project, Annual Report for the period 4th October 2011 to 3rd October 2012, E52/2480-2482. [C2 |
| A96076 | 2012 | Lodestar Minerals Ltd | Marymia | 2.2% | Marymia Project, C213/2010, Annual Report for period 12th September 2011 to 1th September 2012. |
| A89066 | 2011 | Thunderlarra Exploration Ltd | Doolgunna | <1% | Annual Technical Report, Doolgunna Project, Combined Annual Report C102/2010, M52/597 & E52/2402, For the peri |
| A89778 | 2011 | Barrick (Plutonic) Ltd | Plutonic - Marymia | 2% | Marymia Project, Plutonic Project, Plutonic Extended Project, Freshwater Project, Annual Report, Period 1 Janu |
| A90160 | 2011 | Sipa Exploration Nl | Thaduna | <1% | Thaduna Project, Co-Funded Drilling Report for the period ending 30/06/2011, E52/1673,1674, 1858, 2356, 2357,& |
| A90997 | 2011 | Sipa Exploration Nl | Thaduna | <1% | Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356 (provisional inclusion), E52/2357 (provisional inclusio |
| A91649 | 2011 | Astro Resources Nl | North Doolgunna | 12% | Annual Mineral Exploration Report Project: North Doolgunna E52/2482 reporting period: 4/10/2010 to 3/10/2011 |
| A92371 | 2011 | Lodestar Minerals Ltd | Marymia | 2.2% | MARYMIA PROJECT TENEMENTS E52/2492, E52/2493, E52/2505, E69/2662, 52/2544, 52/2558 ANNUAL TECHNICAL REPORT YEA |
| A86710 | 2010 | Barrick (Plutonic) Ltd | Plutonic / Marymia | 2% | 6490 MARYMIA PROJECT 6520 PLUTONIC PROJECT 6523 PLUTONIC EXTENDED Project 6530 FRESHWATER PROJECT ANNUAL REPO |
| A87651 | 2010 | Sipa Exploration Nl | Thaduna | <1% | Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356 (provisional inclusion), E52/2357 (provisional inclusio |
| A81452 | 2009 | Peak Resources Ltd | DOOLGUNNA | 4.4% | Doolgunna Project Surrender Report on Exploration 29th October 2004 to 24th October 2008 E52/1650, E52/1661 & |
| A82894 | 2009 | Sipa Exploration Nl | THADUNA | <1% | THADUNA PROJECT E52/1673, E52/1674 & E52/1858 (C144/2005) ANNUAL REPORT COVERING THE PERIOD MAY 12 2008 TO MAY |
| A81899 | 2009 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | 1.8% | PROJECT 6490 MARYMIA PROJECT, PROJECT 6520 PLUTONIC PROJECT, PROJECT 6523 PLUTONIC EXTENDED PROJECT, PROJECT 6 |
| A78498 | 2008 | Peak Resources Ltd | Doolgunna | 4.4% | Doolgunna - Annual Report on Exploration Report Period:1st March 2007 to 28th February 2008 E52/1650, E52/1661 |
| A79008 | 2008 | Sipa Exploration Nl | Thaduna | <1% | THADUNA PROJECT E52/1673, E52/1674 & E52/1858 PARTIAL SURRENDER REPORT C144/2005 (Peak Hill) |
| A77831 | 2008 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | 1.9% | Annual Report Period 1 January 2007 - 31 December 2007 Technical Report No. 1257 Plutonic/ Marymia Project |
| A78193 | 2008 | Sipa Exploration Nl | Thaduna | <1% | THADUNA PROJECT E52/1673, E52/1674 & E52/1858 ANNUAL REPORT COVERING THE PERIOD MAY 12 2007 TO MAY 11 2008 |
| A78511 | 2008 | Peak Resources Ltd | Doolgunna | <1% | Doolgunna Project, Partial Surrender Report for the period 29th October 2004 to 28th October 2007, E52/1650. |
| A74147 | 2007 | Peak Resources Ltd | Doolgunna | <1% | Doolgunna Project E52/1650 Annual Report for the Period 29th Oct 2005 - 28th Oct 2006 (Peak Hill) |
| A74697 | 2007 | Barrick Gold Of Australia Ltd | Marymia/ Plutonic | 1.9% | Marymia/ Plutonic Project C94/1999 Annual Report Period 1 January 2006 - 31 December 2006 (Peak Hill) |
| A75173 | 2007 | Sipa Exploration Nl | Thaduna | <1% | Thaduna Project, E52/1673, E52/1674 & E52/1858, Annual Report, Covering the Period May 12 2006 to May 11 2007. |
| A75252 | 2007 | Peak Resources Ltd | Doolgunna | 4.4% | Annual Report - C6/2007, 1st Anniversary - 28th February 2007, Doolgunna, E52/1650, E52/1661, E52/1838. |
| A72015 | 2006 | Barrick Gold Of Australia Ltd | Marymia, Plutonic, Plutonic Extended & F | 1.5% | Marymia, Plutonic, Plutonic Extended & Freshwater Projects, Annual Report, Period 1 January 2005 to 31 Decembe |
| A72784 | 2006 | Sipa Exploration Nl | Thaduna | <1% | Thaduna Project E52/1673,1674,1858, Annual Report Covering the Period 12 May 2005 to 11 May 2006(but including |
| A72154 | 2006 | Mr Hocking Jc | Doolgunna | <1% | Doolgunna Project, Annual Report for the Period 29 October 2004 to 28 October 2005, E52/1650, (Peak Hill). |
| A70185 | 2005 | Barrick Gold Of Australia Ltd | Plutonic/ Marymia | 1.5% | Annual Report Period 1 January 2004 to 31 December 2004 Technical Report No. 1152 Projects 6490 - Marymia, 652 |
| A68298 | 2004 | Barrick Gold Of Australia Ltd | Marymia / Plutonic / Plutonic Extended / | 1.5% | Annual Report for the period 01/01/2003-31/12/2003 Marymia Project,Plutonic Project,Plutonic Extended Project, |
| A68584 | 2004 | Peak Hill Gold Mines Nl | Doolgunna | 18% | Partial Surrender Report for the Period 18 November 2002 to 23 October 2003 E52/1384 |
| A66308 | 2003 | Barrick Gold Of Australia Ltd | Plutonic | 1.5% | Annual Report period 1 January 2002 - 31 December 2002 Project 6490 Marymia Project 6520 Plutonic Project 6523 |
| A66382 | 2003 | Image Resources Nl | Curara | 18% | Curara Project, E52/1384, Annual Report period 18/11/01-18/11/02. |
| A64075 | 2002 | Image Resources Nl | Doolgunna | 18% | Annual Report for period 18.11.00 to 19.11.01 Doolgunna Project, Curara Prospect E52/1384. |
| A64818 | 2002 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | 1.5% | Plutonic/Marymia M52/148-150, M52/170-171, M52/183, M52/185 M52/217-220, M52/222-223, M52/226-235, M52/246-247 |
| A65476 | 2002 | Rio Tinto Exploration Pty Ltd | Doolgunna | <1% | Annual And Final Report For The Period Ending 7 December 2001 E52/1420 Doolgunna, Peak Hill SG50-08 Western Au |
| A64505 | 2002 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | 1.5% | Annual Report Period 1 January 2001 - 31 December 2001. Vertification Report Technical Report No. 1024. Projec |
| A61657 | 2001 | Magnetic Resources Nl | Doolgunna | 18% | Annual Report for period 18.11.99 to 19.11.00 Doolgunna Project, Curara Prospect E52/1384. |
| A62112 | 2001 | Homestake Gold Of Australia Ltd | Plutonic - Marymia | 3.1% | Development Drilling Annual Report period 1/01/00-31/12/00 Project 520 Plutonic, Project 523 Plutonic Extended |
| A62434 | 2001 | Rio Tinto Exploration Pty Ltd | Doolgunna | <1% | First Annual Report for the Period ending 12th December 2000 E52/1420, Doolgunna Peak Hill SG50-08, Western Au |
| A62465 | 2001 | Homestake Gold Of Australia Ltd | Marymia | 1.5% | Project 6490 Marymia Project 6520 Plutonic Project 6523 Plutonic Extended Project 6530 Freshwater M52/148-150, |
| A63820 | 2001 | Rio Tinto Exploration Pty Ltd | Northern Star | <1% | Fourth Annual Report on the North Star JV exploration licence E52/1226 (Sakaldis) for the period ending 27/07/ |
| A60012 | 2000 | Homestake Gold Of Australia Ltd | Plutonic/ Marymia | 1.3% | Project 6490,Marymia, Project 6520, Plutonic, Project 6523, Plutonic Extended, Project 6530, Freshwater, M52/1 |
| A61060 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | 2.4% | Project 6596, Peak Hill Mine JV Project, E52/13,35,56,116,28 287,324,345-347,452,465,474,541,581-582,P52/514-5 |
| A60103 | 2000 | Acacia Resources Ltd | Freshwater | 3.4% | Freshwater Project,Partial Surrender Report for the period 13/01/1992 to 10/01/2000, M52/277-280. [C226/2011] |
| A60176 | 2000 | Homestake Gold Of Australia Ltd | Plutonic - Freshwater - Marymia | <1% | Project 520, Plutonic, Project 523, Plutonic Extended, Project 530, Freshwater, Project 490, Marymia, M52/148- |
| A60985 | 2000 | Rio Tinto Exploration Pty Ltd | North Star | <1% | Partial Relinquishment Report on the North Star JV Exploration Licence E52/1226(Sakaldis) for the Period endin |
| A61219 | 2000 | Rio Tinto Exploration Pty Ltd | Sakaldis | <1% | Third Annual Report on the North Star JV Exploration Licence E52/1226 (Sakaldis) for the Period Ending 27/07/2 |
| A57727 | 1999 | Homestake Gold Of Australia Ltd | Marymia | 2.8% | Marymia Exploration - Project 6490 - Technical Report No.812 01/01/98 - 31/12/98 M52/183, 185, 217-220, 226-23 |
| A59117 | 1999 | Haoma Mining Nl | Marymia | 4.9% | Tenement E52/1153 Marymia Region Annual Report for the period June 1998 to June 1999 |
| A57474 | 1999 | Homestake Gold Of Australia Ltd | Plutonic | <1% | PRojecr 520 - Plutonic. Project 523 - Plutonic Extended. Project 530 - Freshwater. Annual Report 01/01/98-31/1 |
| A57678 | 1999 | Homestake Gold Of Australia Ltd | Plutonic | <1% | Development Drilling Annual Report For the Period 1/01/1998 to 31/12/98, M52/148-150,170,171,222-223,263-264,2 |
| A59104 | 1999 | Rio Tinto Exploration Pty Ltd | Doolgunna | <1% | Second Annual Report on Exploration for Diamonds on North Star JV Exploration Licence E51/1225 (Sakalidis) for |
| A59118 | 1999 | Haoma Mining Nl | Marymia | 4.9% | Tenement E52/1153-Marymia Region Partial Relinquishment Report-June 1999 |
| A53884 | 1998 | Plutonic Operations Ltd | Plutonic - Freshwater | <1% | Project 520 - Plutonic, Project 523 - Plutonic Extended, Project 530 - Freshwater. 01/01/1997 - 31/12/1997 M52 |
| A55338 | 1998 | Resolute Ltd | Randall Well | 2.5% | Randall Well Joint Venture M52/253-255, 289-293, 308-309, 351-353, 395, 546-547, 572 01/01/97 - 31/03/97 |
| A55346 | 1998 | Resolute Ltd | Marymia Hill JV | <1% | Marymia Hill Joint Venture, Annual Report 01/01/97 - 31/12/97 M52/185, 233-235, 269-276, 340-342, 365-366, 478 |
| A54915 | 1998 | Resolute Ltd | Orient Well | 21% | Orient Well JV E52/824 E52/826 M52/572 M52/657 M52/658 MLA52/697 Annual report on Exploration for the period |
| A55339 | 1998 | Resolute Ltd | Randall Well | 18% | Randall Well Joint Venture, Surrender Report Exploration Licence: E52/920 07/1998 |
| A55849 | 1998 | Resolute Ltd | Marymia | 3.3% | Marymia Gold Project - 06/1998 Three Year Proposed Exploration Program E52/634-635, 747, 823-826, 1052 |
| A55893 | 1998 | Haoma Mining Nl | Marymia/Yandal | 4.9% | Marymia/Yandal, Exploration Licence: 52/1153, 04/06/97 - 03/06/98 |
| A56320 | 1998 | North Star Resources Nl | Doolgunna | <1% | North Star Resources N.L., Doolgunna project, Exploration Licence E52/1226, Sakalidis, Peak Hill Mineral Field |
| A50964 | 1997 | Plutonic Operations Ltd | Plutonic | <1% | Plutonic Operations M52/148 to M52/150 M52/170 M52//171 M52/222 M52/223 M52/305 M52/306 M52/368 to M52/370 P52 |
| A50281 | 1997 | Plutonic Operations Ltd | Plutonic - Freshwater | <1% | Project 520 Plutonic Project 523 Plutonic Extended Project 530 Freshwater M52/148 to M52/150 M 52/170 M52/171 |
| A50980 | 1997 | Plutonic Operations Ltd | Mystery Well | <1% | Mystery Well Project, Surrender Report E52/1067, April 1997. |
| A51465 | 1997 | Resolute Ltd | Randall Well | 6.6% | Randall Well Joint Venture E52/920 M52/253 to M52/255 M52/289 to M52/293 M52/308 M52/309 M52/351 to M52/353 M5 |
| A47312 | 1996 | Plutonic Operations Ltd | Plutonic - Freshwater | <1% | Project 520 Plutonic Project and Project 523 Plutonic Extended Project and Project 530 Freshwater M52/148 to M |
| A47535 | 1996 | Resolute Samantha Ltd | Orient Well | 20% | Orient Well Joint Venture E52/614 E52/824 E52/825 E52/826 Annual report December 1995 |
| A43761 | 1995 | Plutonic Operations Ltd | Plutonic - Freshwater | <1% | Annual report Project 520: Plutonic M52/148 to M52/150 and Project 523 Plutonic Extended M52/170 and M52/171 M |
| A44223 | 1995 | Resolute Resources Ltd | Orient Well | 20% | Orient Well Joint Venture E52/614 E52/823 E52/824 E52/825 E52/826 Report on Exploration to December 1994 |
| A44226 | 1995 | Resolute Resources Ltd | Randall Well | 2.9% | Randall Well Project M52/253 to M52/255 M52/308 M52/309 M52/395 M52/289 to M52/293 M52/351 to M52/353 E52/320 |
| A45086 | 1995 | Resolute Resources Ltd | Randall Well - Barra | 20% | Randall Well Project, Reverse Circulation Drilling and Resource Estimation. Barra Prospect M52/292. May 1995 |
| A45100 | 1995 | Marymia Exploration Nl | Orient Well | 34% | Orient Well Prospect Exploration Licence 52/614 Annual Report on Exploration For the year ended 26th March 199 |
| A41185 | 1994 | Resolute Resources Ltd | Randall Well | 2.9% | (Annual Report for the period 01/93-01/94) Report on Exploration to January 1994 Randall Well Project E52/320 |
| A38354 | 1993 | Stockdale Prospecting Ltd | Peak Hill | 4.4% | Annual report for the period 16/03/92-16/03/93 Peak Hill Project E52/352 |
| A38549 | 1993 | Resolute Resources Ltd | Marymia | 4.4% | Marymia Project, E52/352. Partial Surrender Report for the period 16/03/1989 to 12/03/1993, E52/352. |
| A38043 | 1993 | Resolute Resources Ltd | Randall Well | 2.9% | R Report for the period ending 12/92 Randall Well Project E52/288 E52/320 M52/253-255 M52/289-293 M52/308-309 |
| A38054 | 1993 | Resolute Resources Ltd | Marymia | 1.2% | Annual report for the period 01/92-12/92 Marymia Project |
| A38270 | 1993 | Marymia Exploration Nl | Orient Well | 34% | Annual Report for the period 27/03/93-26/03/93 Orient Well Project E52/614 |
| A38271 | 1993 | Marymia Exploration Nl | Neds Creek | 18% | Annual Report for the period 18/03/92-17/03/93, Neds Creek Project, E52/616. |
| A35334 | 1992 | Resolute Resources Ltd | Marymia | 4.4% | PARTIAL SURRENDER REPORT |
| A37926 | 1992 | Plutonic Operations Ltd | Plutonic Extended - Freshwater | <1% | Annual Report for the period 01/01/92-31/12/92 Plutonic Extended Project 523 M52/170-171,222-223,263-264 Fresh |
| A32635 | 1991 | Resolute Resources Ltd | Thadoona Hill | 4.4% | Progress Report - Thadoona Hill E52/352 Period May 1990 - December 1990 |
| A30779 | 1990 | Resolute Resources Ltd | Thadoona Hill | 4.4% | Thadoona Hill Exploration Licence E52/352 Technical Report No:10 May 1990. Resoulte Resources Ltd |
| A32633 | 1990 | Resolute Resources Ltd | Marymia | 1.8% | Marymia Area WA Interpretation of Aeromagnetic (1990) Data (R Report for 1990; E52/158,320,322,342,352; M52/18 |
| A28050 | 1989 | Resolute Resources Ltd | Marymia | 1.7% | Marymia Gold Project : Regional review February 1989 E52/288, E52/317, E52/320, E52/322, E52/342 and E52/352 R |
| A7406 | 1977 | Amax Exploration Aust Inc | Beering Unna Tank | 20% | Beering Unna Tank Project, Non-statutory Report: Final Report , December 1977, TR70/6405H. |
| A53746 | 1753 | Plutonic Operations Ltd | Plutonic - Freshwater | <1% | Project 520-Plutonic, Project 523-Plutonic Extended, Project 530-Freshwater, Annual Report 01/01/97 - 31/12/97 |
| A38046 | 1753 | Resolute Resources Ltd | Randall Well | 3.3% | R Report for the period ending 07/92 Randall Well Project E52/288 E52/320 M52/253-255 M52/289-293 |
| A40525 | 1753 | Plutonic Operations Ltd | Plutonic - Barramundi - Freshwater - Gol | <1% | Annual Report for the Period 01/01/93 - 31/12/93 Plutonic/Barramundi/Freshwater/Goldfish/Perch/Redfin/Trout Pr |
| A47550 | 1753 | Marymia Exploration Nl | Orient/ Marymia | 34% | Annual report for Exploration Licence E52/614 Orient Well for the period 27th March 1995 to 26th March 1996 |
| A51329 | 1753 | Resolute Ltd | Orient Well | 20% | Orient Well Joint Venture E52/1018 E52/614 E52/823 to E52/826 Annual report 1st January 1996 to 31st December |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 5 years · 9 June 2031
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 52/4345 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 52/4345? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.