E 52/4333
Register summary
- Holder
- Stanifer Pty Ltd
- Local government
- Shire of Meekatharra
- Application received
- 16 Jan 2024
- Commenced
- 10 June 2026
- Expiry
- 9 June 2031
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A146194 | 2025 | Sultan Resources Ltd | Thaduna | <1% | Annual Technical Report for Thaduna E52/3481 for the period 1 August 2023 to 31 July 2024 |
| A143960 | 2024 | Sandfire Resources Limited | Neds Creek | <1% | E52/3479 Ned’s Creek Surrender Report 3 July 2017 to 10 July 2024 |
| A138794 | 2024 | Sandfire Resources Limited | Ned’s Creek | 37% | E 52/1858, E 52/2356 and E 52/2405 ‘Ned’s Creek” Surrender Report for the period ending 16/01/2024 |
| A143184 | 2024 | Sandfire Resources Limited | Ned’s Creek | 11% | E 52/1673, E 52/2357, E 52/3187, E 52/3188 ‘Ned’s Creek” Surrender Report 2024 |
| A136986 | 2023 | Sandfire Resources Limited | Neds Creek | 4.6% | E 52/1674 Neds Creek Project Surrender Report for the period ending 30/08/2023. |
140 more reports
| A137075 | 2023 | Sultan Resources Ltd | Thaduna | <1% | Annual Technical Report for the Thaduna Project E52/3481 for the period ending 31/07/2023. |
| A132572 | 2022 | Aic Mines Limited | Thaddona Hill | <1% | Annual Technical Report C53/2017 Thaddona Hill Project for the period ending 25/07/2022 |
| A133155 | 2022 | Sultan Resources Ltd | Thaduna | <1% | Annual Technical Report - Thaduna Project C131/2018 for the period ending 31/07/2022 |
| A130908 | 2022 | Aic Mines Limited | Marymia | <1% | E52/3346 - Final Surrender Report Marymia project for the period ending 19/05/2022. |
| A132387 | 2022 | Sandfire Resources Ltd | Neds Creek | <1% | E52/3479 Neds Creek Project Partial Surrender Report 3 July 2017 to 5 August 2022 |
| A133103 | 2022 | Sandfire Resources Limited | Neds Creek | <1% | E52/3479 Neds Creek Project Partial Surrender Report for the period 3/7/2017 to 11/10/2022 |
| A128652 | 2021 | Aic Mines Limited | Thaddona Hill | <1% | Thaddona Hill C53/2017 Annual Technical Report for the period ending 25/07/2021 |
| A128980 | 2021 | Sultan Resources Ltd | Thaduna | <1% | Annual Exploration Report: Thaduna Project C131/2018 for the period 1 August 2020 to 31 July 2021, E 52/03481, |
| A124404 | 2020 | Sandfire Resources Limited | Neds Creek | 18% | C144/2005 Ned’s Creek Project Combined Annual Technical Report for the period ending 11/05/2020 |
| A125207 | 2020 | Aic Mines Limited | Thaddona Hill | <1% | Thaddona Hill C53/2017 Annual Report for the period ending 9 August 2020 |
| A125597 | 2020 | Sultan Resources Ltd | Thaduna | <1% | Annual Exploration Report Thaduna Project C131/2018 for nthe period ending 31/7/2020 |
| A120649 | 2019 | Sandfire Resources Nl | Ned's Creek | 18% | C144/2005 Ned’s Creek Project Combined Annual Technical Report For the period 12 May 2018 to 11 May 2019 |
| A120703 | 2019 | Aic Resources Limited | Thadoona | <1% | Annual Report for C53/2017 Thadoona project for the period 27 July 2018 to 26 July 2019 |
| A121615 | 2019 | Vango Mining Limited | Ned's Creek | <1% | Ned's Creek C212/2010 Annual report for the period 12 September 2018 to 11 September 2019, E 52/02440, E 52/02 |
| A121820 | 2019 | Sultan Resources Ltd | Thaduna | <1% | Combined Annual Technical Report for E52/3481, E52/3461 Thaduna project for the period 1 August 2018 to 31 Jul |
| A117323 | 2018 | Sandfire Resources Nl | Ned's Creek | 18% | C144/2005 Ned’s Creek Project Combined Annual Technical Report For the Period 12 May 2017 to 11 May 2018, E52/ |
| A117485 | 2018 | Aic Resources Limited | Thadoona | <1% | Annual Report on Explorations Activies for C53/2017, Thadoona, 27 July 2017 - 26 August 2018 |
| A118596 | 2018 | Lodestar Minerals Limited | Ned's Creek | <1% | Annual Report for the Ned's Creek Project, C212/2010, 12 September 2017 - 11 September 2018 |
| A118635 | 2018 | Lodestar Minerals Limited | Ned's Creek - Contessa | <1% | E52/02456 (Contessa) EIS Co-Funded Drilling Report for the period 1 January 2018 to 31 December 2018 (R#16) |
| A110839 | 2017 | Lodestar Minerals Limited | Neds Creek | <1% | Partial Surrender Report for E52/2456 17 September 2010 to 18 October 2016 |
| A114356 | 2017 | Sandfire Resources Nl | Ned's Creek | 18% | C144/2005 Ned’s Creek Project Combined Annual Technical Report For the Period 12 May 2016 to 11 May 2017, E52/ |
| A115417 | 2017 | Lodestar Minerals Ltd | Neds Creek | <1% | Neds Creek C212/2010 Annual Report for the period 12 September 2016 to 11 September 2017, E52/02440, E52/02456 |
| A115529 | 2017 | Lodestar Minerals Limited | Neds Creek - Contessa | <1% | EIS Co-funded drilling - Final Report 2017 (R 14) NEDS CREEK - CONTESSA E52/02456 for the period 12 September |
| A114248 | 2017 | Gswa | P729 and P779 | 8.5% | Petrophysical Measurements P729 and P779 |
| A115009 | 2017 | Aic Resources Limited | Marymia | <1% | Annual Report for Thadoona Group of Tenements C53/2017, E52/03317, E52/03318, E52/03319, E52/03346 for the per |
| A108309 | 2016 | Sandfire Resources Nl | Ned’s Creek | 59% | Ned’s Creek Project E52/2356 Partial Surrender Report for the period 15/02/2010 to 11/02/2016 |
| A108310 | 2016 | Sandfire Resources Nl | Ned’s Creek | 46% | Ned’s Creek Project E52/2405 Partial Surrender Report 06/04/2010 to 11/02/2016 |
| A108647 | 2016 | Vango Mining Limited | Plutonic Dome | 6.8% | E52/527 Final Surrender Report for the period 03/07/1992 to 31/12/2015 |
| A110507 | 2016 | Lodestar Minerals Limited | Ned's Creek | <1% | Ned's Creek Project C212 Annual Report for the period 12 September 2015 to 11 September 2016, E52/02440, E52/0 |
| A109385 | 2016 | Sandfire Resources Nl | Ned's Creek | 18% | C144/2005 Ned’s Creek Project Combined Annual Technical Report for the period 12/05/2015 to 11/05/2016, E52/01 |
| A104392 | 2015 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Neds Creek | <1% | Peak Hill - Doolgunna - Neds Creek Project C212/2010 Annual Report for the period 12th September 2013 to 11th |
| A105239 | 2015 | Vango Mining Limited | Plutonic Dome | 1.8% | Annual Exploration Report for C226/2011, The Plutonic Dome Project from 01/01/2014 to 31/12/2014, E52/2071.... |
| A106213 | 2015 | Sandfire Resources Nl | Ned’s Creek | 18% | Ned’s Creek C144/2005, E52/1673, E52/1674. E52/1858, E52/2356, E52/2357, E52/2405 Combined Annual Report for t |
| A107487 | 2015 | Lodestar Minerals Limited | Peak Hill - Doolgunna - Neds Creek | <1% | Peak Hill - Doolgunna - Neds Creek Project C212/2010 Annual Report for the period 12/09/2014 to 11/09/2015, E5 |
| A103001 | 2014 | Sipa Exploration Nl | Thaduna | 18% | THADUNA PROJECT E52/1673, E52/1674, E52/1858, E52/2356, E52/2357 & E52/2405 ANNUAL REPORT COVERING THE PERIOD |
| A101167 | 2014 | Lodestar Minerals Ltd | Maymia | <1% | Partial Surrender Report for Marymia Project E52/2493 for the period 17th September 2012 to 25th October 2013 |
| A97128 | 2013 | Dampier Gold Ltd | Plutonic Dome | 1.5% | Combined Annual Report for the period 1 January 2012 to 31 December 2012 Plutonic Dome Project C226/2012, E52/ |
| A98659 | 2013 | Sipa Exploration Nl | Thaduna | 18% | Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356, E52/2357 & E52/2405 Annual Report covering the report |
| A99878 | 2013 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Marymia | <1% | Peak Hill - Doolgunna - Marymia (C213/2010) E52/2492, E52/2493, E52/2505, E52/2734 Annual Report for the perio |
| A101570 | 2013 | Ord River Resources Ltd | Plutonic Dome | 1.8% | C226/2011 ANNUAL EXPLORATION REPORT Reporting Period 01/01/2013 to 31/12/2013 |
| A100336 | 2013 | Lodestar Minerals Ltd | Neds Creek | <1% | Neds Creek Project, Annual Report for the period 12th September 2012 to 11th September 2013, E52/2440, 2444, 2 |
| A93152 | 2012 | Dampier Gold Ltd | Plutonic Dome | 1.5% | Combined Annual Report for the period 1 January 2011 to 31 December 2011 Plutonic Dome Project C226/2011 |
| A94113 | 2012 | Sipa Exploration Nl | Thaduna | 18% | Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356, E52/2357 & E52/2405 annual report covering the period |
| A95982 | 2012 | Lodestar Minerals Ltd | Ned's Creek | <1% | Ned's Creek Project, Annual Report for the period 12th September 2011 to 11th September 2012, E52/2440, 2444, |
| A96076 | 2012 | Lodestar Minerals Ltd | Marymia | <1% | Marymia Project, C213/2010, Annual Report for period 12th September 2011 to 1th September 2012. |
| A89778 | 2011 | Barrick (Plutonic) Ltd | Plutonic - Marymia | 1.3% | Marymia Project, Plutonic Project, Plutonic Extended Project, Freshwater Project, Annual Report, Period 1 Janu |
| A90160 | 2011 | Sipa Exploration Nl | Thaduna | 18% | Thaduna Project, Co-Funded Drilling Report for the period ending 30/06/2011, E52/1673,1674, 1858, 2356, 2357,& |
| A90997 | 2011 | Sipa Exploration Nl | Thaduna | 18% | Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356 (provisional inclusion), E52/2357 (provisional inclusio |
| A92371 | 2011 | Lodestar Minerals Ltd | Marymia | <1% | MARYMIA PROJECT TENEMENTS E52/2492, E52/2493, E52/2505, E69/2662, 52/2544, 52/2558 ANNUAL TECHNICAL REPORT YEA |
| A92493 | 2011 | Lodestar Minerals Ltd | Neds Creek | <1% | Neds Creek Project E52/2440, E52/2444, E52/2456, E52/2468 Annual Technical Report Year 1 period 12th September |
| A86710 | 2010 | Barrick (Plutonic) Ltd | Plutonic / Marymia | 1.3% | 6490 MARYMIA PROJECT 6520 PLUTONIC PROJECT 6523 PLUTONIC EXTENDED Project 6530 FRESHWATER PROJECT ANNUAL REPO |
| A87651 | 2010 | Sipa Exploration Nl | Thaduna | 18% | Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356 (provisional inclusion), E52/2357 (provisional inclusio |
| A82894 | 2009 | Sipa Exploration Nl | THADUNA | 14% | THADUNA PROJECT E52/1673, E52/1674 & E52/1858 (C144/2005) ANNUAL REPORT COVERING THE PERIOD MAY 12 2008 TO MAY |
| A84710 | 2009 | Magellan Metals Pty Ltd | McDonald Well | <1% | FINAL SURRENDER REPORT - E52/2052: MCDONALD WELL |
| A81899 | 2009 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | 1.1% | PROJECT 6490 MARYMIA PROJECT, PROJECT 6520 PLUTONIC PROJECT, PROJECT 6523 PLUTONIC EXTENDED PROJECT, PROJECT 6 |
| A79008 | 2008 | Sipa Exploration Nl | Thaduna | 14% | THADUNA PROJECT E52/1673, E52/1674 & E52/1858 PARTIAL SURRENDER REPORT C144/2005 (Peak Hill) |
| A77831 | 2008 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | 1.2% | Annual Report Period 1 January 2007 - 31 December 2007 Technical Report No. 1257 Plutonic/ Marymia Project |
| A78193 | 2008 | Sipa Exploration Nl | Thaduna | 14% | THADUNA PROJECT E52/1673, E52/1674 & E52/1858 ANNUAL REPORT COVERING THE PERIOD MAY 12 2007 TO MAY 11 2008 |
| A74085 | 2007 | Barrick Gold Of Australia Ltd | Gregory Project | <1% | Gregory Project, E52/1680-1684, E52/1706, E69/1879, (C121/2004), Annual Report for the Period 16 August 2005 t |
| A74697 | 2007 | Barrick Gold Of Australia Ltd | Marymia/ Plutonic | 1.2% | Marymia/ Plutonic Project C94/1999 Annual Report Period 1 January 2006 - 31 December 2006 (Peak Hill) |
| A75173 | 2007 | Sipa Exploration Nl | Thaduna | 14% | Thaduna Project, E52/1673, E52/1674 & E52/1858, Annual Report, Covering the Period May 12 2006 to May 11 2007. |
| A72015 | 2006 | Barrick Gold Of Australia Ltd | Marymia, Plutonic, Plutonic Extended & F | 1% | Marymia, Plutonic, Plutonic Extended & Freshwater Projects, Annual Report, Period 1 January 2005 to 31 Decembe |
| A72784 | 2006 | Sipa Exploration Nl | Thaduna | 14% | Thaduna Project E52/1673,1674,1858, Annual Report Covering the Period 12 May 2005 to 11 May 2006(but including |
| A70185 | 2005 | Barrick Gold Of Australia Ltd | Plutonic/ Marymia | 1% | Annual Report Period 1 January 2004 to 31 December 2004 Technical Report No. 1152 Projects 6490 - Marymia, 652 |
| A70948 | 2005 | Sipa Exploration Nl | Thaduna | 14% | Thaduna Project, E52/1673 & E52/1674, Annual report (covering the period May 12 2004 to May 11 2005). (Peak Hi |
| A71168 | 2005 | Placer Dome Asia Pacific Ltd | Gregory | <1% | Gregory Project, Annual Technical Report for the period 16/08/2004 to 15/08/2005, on tenements E52/1680-1684 E |
| A68298 | 2004 | Barrick Gold Of Australia Ltd | Marymia / Plutonic / Plutonic Extended / | 1% | Annual Report for the period 01/01/2003-31/12/2003 Marymia Project,Plutonic Project,Plutonic Extended Project, |
| A66308 | 2003 | Barrick Gold Of Australia Ltd | Plutonic | 1% | Annual Report period 1 January 2002 - 31 December 2002 Project 6490 Marymia Project 6520 Plutonic Project 6523 |
| A64818 | 2002 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | 1% | Plutonic/Marymia M52/148-150, M52/170-171, M52/183, M52/185 M52/217-220, M52/222-223, M52/226-235, M52/246-247 |
| A65476 | 2002 | Rio Tinto Exploration Pty Ltd | Doolgunna | 14% | Annual And Final Report For The Period Ending 7 December 2001 E52/1420 Doolgunna, Peak Hill SG50-08 Western Au |
| A64505 | 2002 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | 1% | Annual Report Period 1 January 2001 - 31 December 2001. Vertification Report Technical Report No. 1024. Projec |
| A62434 | 2001 | Rio Tinto Exploration Pty Ltd | Doolgunna | 14% | First Annual Report for the Period ending 12th December 2000 E52/1420, Doolgunna Peak Hill SG50-08, Western Au |
| A62465 | 2001 | Homestake Gold Of Australia Ltd | Marymia | 1% | Project 6490 Marymia Project 6520 Plutonic Project 6523 Plutonic Extended Project 6530 Freshwater M52/148-150, |
| A63545 | 2001 | Homestake Gold Of Australia Ltd | Marymia | 6.8% | Marymia Project, Partial Surrender Report for the period ending 3rd July 2001, E52/527. [C226/2011] |
| A60012 | 2000 | Homestake Gold Of Australia Ltd | Plutonic/ Marymia | 1% | Project 6490,Marymia, Project 6520, Plutonic, Project 6523, Plutonic Extended, Project 6530, Freshwater, M52/1 |
| A60572 | 2000 | Homestake Gold Of Australia Ltd | Marymia | <1% | Project 6490, Marymia, Surrender report for M52/355,475, E52/634,747, Partial Surrender Report for M52/356,635 |
| A57727 | 1999 | Homestake Gold Of Australia Ltd | Marymia | 5.5% | Marymia Exploration - Project 6490 - Technical Report No.812 01/01/98 - 31/12/98 M52/183, 185, 217-220, 226-23 |
| A59117 | 1999 | Haoma Mining Nl | Marymia | 32% | Tenement E52/1153 Marymia Region Annual Report for the period June 1998 to June 1999 |
| A59118 | 1999 | Haoma Mining Nl | Marymia | 32% | Tenement E52/1153-Marymia Region Partial Relinquishment Report-June 1999 |
| A59535 | 1999 | Homestake Gold Of Australia Ltd | Marymia | 61% | Marymia Project, Final Surrender Report for the period 16/03/1994 to 02/08/1999, E52/826.[Johnson's Cairn] |
| A54162 | 1998 | Resolute Ltd | Orient Well | 100% | Orient Well Joint Venture, Exploration Licence E52/1018 Surrender Report,January 1998. |
| A55502 | 1998 | Resolute Ltd | Thaduna | 1.3% | Thaduna Project, Partial Surrender Report for the period 20/05/1993 to 20/05/1998, E52/634. |
| A55635 | 1998 | Mr Milne P | Neds Creek | 39% | Ned's Creek Project E52/1127 Annual Report 27/03/1997 to 26/03/1998 |
| A55995 | 1998 | Resolute Ltd | Marymia | 61% | Orient Well Joint Venture Exploration Licence E52/826 Partial Surrender Report. |
| A54199 | 1998 | Resolute Ltd | Thaduna | <1% | Thaduna Project. E52/634-635,747. M52/355-356,475-477,488-489. Annual report for the period 01/01/97-31/12/97. |
| A54915 | 1998 | Resolute Ltd | Orient Well | 45% | Orient Well JV E52/824 E52/826 M52/572 M52/657 M52/658 MLA52/697 Annual report on Exploration for the period |
| A55849 | 1998 | Resolute Ltd | Marymia | 5.6% | Marymia Gold Project - 06/1998 Three Year Proposed Exploration Program E52/634-635, 747, 823-826, 1052 |
| A55893 | 1998 | Haoma Mining Nl | Marymia/Yandal | 32% | Marymia/Yandal, Exploration Licence: 52/1153, 04/06/97 - 03/06/98 |
| A50980 | 1997 | Plutonic Operations Ltd | Mystery Well | 13% | Mystery Well Project, Surrender Report E52/1067, April 1997. |
| A51536 | 1997 | Marymia Exploration Nl | Yowerreena Hill | 6.8% | Yowerreena Hill Joint Venture Exploration Licence E52/527 (Sector B) Annual report for the year ending July 19 |
| A51598 | 1997 | Resolute Ltd | Marymia | 6.8% | [ Marymia base metals - gold - diamond exploration, Annual report for period 1/8/1994 - 1/12/1996, E52/527 ] |
| A52247 | 1997 | Resolute Ltd | Orient Well | 61% | Orient Well (JV) Project, Partial Surrender Report , September 1997, E52/826. |
| A47535 | 1996 | Resolute Samantha Ltd | Orient Well | 43% | Orient Well Joint Venture E52/614 E52/824 E52/825 E52/826 Annual report December 1995 |
| A45520 | 1995 | Cra Exploration Pty Ltd | Ruby Bore gold exploration | 6.8% | E52/527 Ruby Bore 24 Annual Report to 2nd July 1995 Peak Hill SG 50-08,Western Australia. |
| A44223 | 1995 | Resolute Resources Ltd | Orient Well | 42% | Orient Well Joint Venture E52/614 E52/823 E52/824 E52/825 E52/826 Report on Exploration to December 1994 |
| A44229 | 1995 | Resolute Resources Ltd | Yowereena | 6.8% | Exploration Licence E52/527 'Sector A' Yowereena Hill Report on Exploration to July 1994 |
| A45100 | 1995 | Marymia Exploration Nl | Orient Well | 33% | Orient Well Prospect Exploration Licence 52/614 Annual Report on Exploration For the year ended 26th March 199 |
| A46986 | 1995 | Resolute Samantha Ltd | Orient Well | 61% | Orient Well Project, Partial Surrender Report February 1995, E52/826. |
| A40211 | 1994 | Cra Exploration Pty Ltd | Ruby Bore | 6.8% | Annual report for the period 03/07/92-02/07/93 Ruby Bore Project E52/527 |
| A41650 | 1994 | Cra Exploration Pty Ltd | Ruby Bore | 6.8% | Annual Report for the period 03/07/93-02/07/94 Ruby Bore Project E52/527 |
| A41787 | 1994 | Marymia Exploration Nl | Yowerreena Hill | 6.8% | Yowerreena Hill Project, Non-statutory Report : R Report for the period ending 12/93 , E52/527 |
| A41789 | 1994 | Marymia Exploration Nl | Yowerreena Hill | 6.8% | Annual Report for the period 01/94-04/94 Yowerreena Hill Project E52/527 |
| A38124 | 1993 | Cra Exploration Pty Ltd | Ruby Bore | 1.3% | Annual report for the period 09/91-09/92 Ruby Bore Project E51/321 E52/220 E52/222 E52/224 E52/226 E52/527 E52 |
| A38354 | 1993 | Stockdale Prospecting Ltd | Peak Hill | 1.3% | Annual report for the period 16/03/92-16/03/93 Peak Hill Project E52/352 |
| A38549 | 1993 | Resolute Resources Ltd | Marymia | 1.3% | Marymia Project, E52/352. Partial Surrender Report for the period 16/03/1989 to 12/03/1993, E52/352. |
| A38054 | 1993 | Resolute Resources Ltd | Marymia | 1.9% | Annual report for the period 01/92-12/92 Marymia Project |
| A38270 | 1993 | Marymia Exploration Nl | Orient Well | 33% | Annual Report for the period 27/03/93-26/03/93 Orient Well Project E52/614 |
| A39238 | 1993 | Resolute Resources Ltd | Area A - Yowereena Hill | 6.8% | Area A - Yowereena Hill, Annual report to July 1993, E52/527 |
| A39402 | 1993 | Marymia Exploration Nl | Yowerreena Hill | 6.8% | Annual Report for the period 07/92-07/93 Yowerreena Hill Project E52/527 |
| A41775 | 1993 | Stockdale Prospecting Ltd | Peak Hill | <1% | Annual Report for the period 01/01/92-11/10/93 Peak Hill Project E52/322,342,633-635 |
| A35334 | 1992 | Resolute Resources Ltd | Marymia | 1.3% | PARTIAL SURRENDER REPORT |
| A32635 | 1991 | Resolute Resources Ltd | Thadoona Hill | 1.3% | Progress Report - Thadoona Hill E52/352 Period May 1990 - December 1990 |
| A30779 | 1990 | Resolute Resources Ltd | Thadoona Hill | 1.3% | Thadoona Hill Exploration Licence E52/352 Technical Report No:10 May 1990. Resoulte Resources Ltd |
| A32633 | 1990 | Resolute Resources Ltd | Marymia | <1% | Marymia Area WA Interpretation of Aeromagnetic (1990) Data (R Report for 1990; E52/158,320,322,342,352; M52/18 |
| A28050 | 1989 | Resolute Resources Ltd | Marymia | <1% | Marymia Gold Project : Regional review February 1989 E52/288, E52/317, E52/320, E52/322, E52/342 and E52/352 R |
| A9871 | 1981 | Chevron Exploration Corp | Ned's Creek | 53% | Ned's Creek Project, Non-statutory Report: Final Report, September 1981, TR70/7492H. |
| A7406 | 1977 | Amax Exploration Aust Inc | Beering Unna Tank | <1% | Beering Unna Tank Project, Non-statutory Report: Final Report , December 1977, TR70/6405H. |
| A2875 | 1972 | Western Mining Corporation Ltd | Thaduna | 12% | Thaduna Project, Non-statutory Report for the year ending 30th June 1972, MC52/200-204, 212-217, 451-452 & 813 |
| A1747 | 1971 | Western Mining Corporation Ltd | Thaduna | 3.9% | Thaduna Project, Non-statutory Report: Pecussion Drill Assay & Log Sheets, June 1971, TR70/5439 & 5440H. |
| A1745 | 1971 | Western Mining Corporation Ltd | Thaduna - McDonald Well | 24% | Thaduna - McDonald Well Project, Non-statutory Report:Vacuum Drilling at McDonald Well, MTV513 to MTV611 inc, |
| A1732 | 1971 | Western Mining Corporation Ltd | Thaduna | 24% | Thaduna Project, Non-statutory Report: File 1:- Reconnaissance Soil Sampling, June 1971, TR70/5440H. |
| A1746 | 1971 | Western Mining Corporation Ltd | Thaduna - Good Pool | 3.9% | Thaduna - Good Pool Project, Non-statutory Report: Soil Sampling at Good Pool, June 1971, TR70/5439 & 5440H. |
| A1748 | 1971 | Western Mining Corporation Ltd | Thaduna | 3.9% | Thaduna Project, Non-statutory Report: Geochemical Data Plans, June 1971, TR70/5439 & 5440H. |
| A1749 | 1971 | Western Mining Corporation Ltd | Thaduna - Red Bore | 3.9% | Thaduna - Red Bore Project, Non-statutory Report: Vacuum Drillilng Traverses,for period ending 01/03/1971, TR7 |
| A1750 | 1971 | Western Mining Corporation Ltd | Thaduna | 3.9% | Thaduna Project, Non-statutory Report: Final Report for the period 01/02/1969 to 31/01/1970, TR70/5439 & 5440H |
| A4546 | 1971 | British Metals Corporation | Thaduna | 1.3% | Thaduna Project, Non-statutory Report: Annual Report for the year ending 30/04/1971, TR70/3922H. |
| A9473 | 1971 | Western Mining Corporation Ltd | Thaduna | 4.2% | Thaduna Project, Non-statutory Report: Terminal Report for the period 21/02/1969 to 30/03/1971, TR70/5439 & 54 |
| A757 | 1970 | New Consolidated Gold Fields Aust Ltd | Thaduna | 1.3% | Thaduna Project, Non-statutory Report: Geological Report on TR70/3922H held by British Metal Corporation, Apri |
| A2606 | 1970 | British Metals Corporation | Thaduna | 1.3% | Thaduna Project, Annual Report : Diamond Drilling Programme Report plus Ore Reserve Estimate to September 1968 |
| A9504 | 1970 | Western Mining Corporation Ltd | Thaduna | 4.2% | Thaduna Project, Non-statutory Report:Report on Rock & Ironstone Assays, September 1970, Tr70/5439-5440H; MC5 |
| A756 | 1966 | New Consolidated Gold Fields Aust Ltd | Thaduna | 5.1% | Thaduna Project, Non-statutory Report:Report on Diamond Drilling Programme 1966, TR70/2884H. |
| A755 | 1965 | New Consolidated Gold Fields Aust Ltd | Thaduna | 5.1% | Thaduna Project, Non-statutory Report: Report on Activities 1965, Induced Polarisation Survey, November 1965, |
| A751 | 1964 | New Consolidated Gold Fields Aust Ltd | Thaduna | 1.3% | Thaduna Project, Non-statutory Report: Final Report on 1963 Investigations,February 1964, TR70/3922H. |
| A752 | 1964 | New Consolidated Gold Fields Aust Ltd | Thaduna | 5.1% | Thaduna Project, Non-statutory Report: Progress Report on Geochemical Investigations , 1964, TR70/2448H. |
| A753 | 1964 | New Consolidated Gold Fields Aust Ltd | Thaduna | 5.1% | Thaduna Project, Annual Report for the period ending 31/10/1964, TR70/2448H. |
| A750 | 1963 | New Consolidated Gold Fields Aust Ltd | Thaduna | 1.3% | Thaduna Project, Non-statutory Report: Interim Summary Report on Activities, 1963, TR70/3922H. |
| A749 | 1962 | New Consolidated Gold Fields Aust Ltd | Thaduna | 1.3% | Thaduna Project, Non-statutory Report: 1961 Report on the Thaduna Copper Deposits, TR70/3922H. |
| A47550 | 1753 | Marymia Exploration Nl | Orient/ Marymia | 33% | Annual report for Exploration Licence E52/614 Orient Well for the period 27th March 1995 to 26th March 1996 |
| A51329 | 1753 | Resolute Ltd | Orient Well | 42% | Orient Well Joint Venture E52/1018 E52/614 E52/823 to E52/826 Annual report 1st January 1996 to 31st December |
| A51627 | 1753 | Resolute Ltd | Thaduna | <1% | Thaduna Project E52/635 M52/356 E52/634 Annual report 1st September 1995 to 31st December 1996 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 5 years · 9 June 2031
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 52/4333 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 52/4333? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.