M 39/803
Register summary
- Holder
- Niwest Limited
- Part of
- Alliance Nickel Limited (ASX:AXN) as at 2026-06-30
- Local government
- Shire of Leonora
- Application received
- 15 Aug 2000
- Commenced
- 22 May 2008
- Expiry
- 21 May 2029
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A139475 | 2024 | Carl Sibraa | Murphys Well | 12% | Murphys Well Annual Report E39/2094 for the period ending 20/02/2024. |
| A145946 | 2024 | Northern Star Resources Ltd | Mount Celia | 1.2% | Final Surrender Report on E39/1804, Mount Celia Project, for the Period 26 November 2014 to 6 November 2024 |
| A134190 | 2023 | Carl Sibraa | Murphys Well | 12% | Mineral Exploration Report E39/2094 Murphys Well for the period ending 20/02/2023. |
| A129942 | 2022 | Sibraa, C | Murphys Well | 12% | Mineral Exploration Report E39/2094 Annual Report for the period ending 19/02/2022 |
| A122389 | 2020 | Saracen Gold Mines Pty Limited | Yundamindera | <1% | Yundamindera Project (C96/2016) Annual Report for the Period 1 November 2018 to 31 October 2019 |
130 more reports
| A123949 | 2020 | Sibraa, C | E39/2094 | 12% | Mineralisation report and supporting statement E39/2094, 2019-2020 |
| A123525 | 2020 | Gme Resources Ltd | Eucalyptus Bore | 8.4% | Annual Report Eucalyptus Bore, C89/2000, 1 March 2019 to 29 February 2020 |
| A124549 | 2020 | Gme Resources Ltd | Eucalyptus Bore | 1.2% | Surrender Report E39/1859 Eucalyptus Bore project for the period 1 September 2015 to 30 June 2020 |
| A125696 | 2020 | Saracen Gold Mines Pty Limited | Yundamindera | <1% | Yundamindera Project (C96/2016) Annual Report for the Period 1 November 2019 to 31 October 2020 |
| A119868 | 2019 | Gme Resources Ltd | Eucalyptus Bore | 6.9% | Annual Report Eucalyptus Bore Project C89/2000 for the period 1 March 2018 to 28 February 2019 |
| A118800 | 2019 | Ling M; Issler N; Sibraa K | Yundamindra | 15% | Final Report for the Yundamindra Project E39/01700 for the period 2 August 2013 to 1 August 2018 |
| A119280 | 2019 | Hawthorn Resources Limited; Westgold Resources Limited | Yundamindera | <1% | C96/2016 Yundamondera Project Annual Report for the period 1 November 2017 to 31 October 2018 |
| A115738 | 2018 | Hawthorn Resources Limited | Yundamindera | <1% | C96/2016 Combined Group Report 2017 - Yundamindera Project For the Period 1 November 2016 to 31 October 2017, |
| A116606 | 2018 | Gme Resources Ltd | Eucalyptus Bore | 7% | Eucalyptus Bore Annual Report, C89/2000, 01 March 2017 to 28 February 2018 |
| A112642 | 2017 | Gme Resources Ltd | Eucalyptus Bore | 7% | Annual Report Euclayptus Project C89/2000 For the Period 1 March 2016 to 28 February 2017, M39/00289, E39/0179 |
| A112186 | 2017 | Hawthorn Resources Limited; Metals X Limited | Yundamindera | <1% | Yundamindera Project C96/2016 Annual Report For the Period 1 November 2015 to 31 October 2016, E39/01292, E39/ |
| A114845 | 2017 | Ling M | Yundamindra | 15% | Annual Report for the period 02 August 2016 to 01 August 2017, Yundamindra Project, E39/1700 |
| A108237 | 2016 | Hawthorn Resources Limited | Yundamindera | 1.2% | Exploration Licence E39/1804 Yundamindera Annual Report for the period 26 November 2014 - 25 November 2015 |
| A108618 | 2016 | Gme Resources Ltd | Eucalyptus | 9.1% | Eucalyptus Annual Report C89/2000 for the period 1 March 2016 to 28 February 2016,M 39/00289, E39/01795, M39/0 |
| A109514 | 2016 | Ling M | Yundamindra | 15% | Annual Report for the period 02 August 2015 to 01 August 2016, Yundamindra Project, E 39/1700 |
| A110179 | 2016 | Gme Resources Ltd | Eucalyptus Bore | 1.2% | Annual Report E39/1859 Eucalyptus Bore for the period 2 September 2008 to 1 September 2016 |
| A106623 | 2015 | Ling M | Yundamindra | 15% | Annual Report for the period 02 August 2014 to 01 August 2015, Yundamindra Project, E39/1700 |
| A105556 | 2015 | Gme Resources Ltd | Eucalyptus Bore | 9.1% | Eucalyptus Bore Project C89/2000 Annual Report for the period 01/03/2014 to 28/02/2015, M39/289, M39/313, M39/ |
| A101529 | 2014 | St Barbara Ltd | Camel Back | 1.4% | Camel Back Final Surrender Report E39/1699 for the period 15 February 2013 to 19 December 2013 |
| A101966 | 2014 | Gme Resources Ltd | Eucalyptus Bore | 12% | Eucalyptus Bore Project C89/2000 Annual Report 2014 for the period 1st March 2013 to 28th February 2014, M39/2 |
| A102936 | 2014 | Issler N; Ling M; Sibraa K | Yundamindra | 15% | Annual report for the period 02 August 2013 to 01 August 2014, Yundamindra Project, E 39/1700 |
| A97518 | 2013 | Gme Resources Ltd | Eucalyptus Bore | 5.6% | Eucalyptus Bore Project, Annual Report for the period 1st March 2012 to 28th February 2013, M39/289, 313, 344, |
| A97658 | 2013 | Gme Resources Ltd | Eucalyptus Bore | 1.4% | Surrender Report for E39/1552 Eucalyptus Bore for the period 9 September 2010 to 8th September 2012 |
| A99774 | 2013 | Gme Resources Ltd | Eucalyptus Bore | <1% | 2013 Surrender Report for Eucalyptus Bore M39/804, M39/570, M39/616, M39/665 for the period 30th March 2005 – |
| A93685 | 2012 | Gme Resources Ltd | Eucalyptus Bore | 5.6% | Eucalyptus Bore Project Combined Reporting Group C89/2000 2012 Annual Report. Retorting Period: 1st March 201 |
| A93045 | 2012 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007, Annual Report, 1st January 2011 – 31 December 2011 |
| A89379 | 2011 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007 2010, 1st January 2010 – 31 December 2010 |
| A90216 | 2011 | Gme Resources Ltd | Eucalyptus Bore | 5.6% | Eucalyptus Bore Project, Annual Report for the period 1st March 2010 to 28th February 2011, M39/289, 313, 344, |
| A90591 | 2011 | Hawthorn Resources Limited | Yundamindera – Bore Well | <1% | Yundamindera – Bore Well E39/1047 Final Surrender Report for the period 14 March 2006 to 12 March 2011 |
| A91240 | 2011 | Rubicon Resources Ltd | Celia | <1% | Final; report for the period 7 September 2006 to 6 September 2011, E39/831 |
| A86606 | 2010 | Gme Resources Ltd | Eucalyptus Bore | 9.2% | Eucalyptus Bore Project Combined Reporting Group C89/2000 2009-2010, Annual Report for 1st March 2009 to 28th |
| A85596 | 2010 | Heron Resources Ltd | Murphy Well | <1% | Partial surrender report for the period 7 September 2006 to 6 September 2009, Murphy Well Project, E39/831 |
| A87167 | 2010 | Hawthorn Resources Limited | Yundamindera - Bore Well | <1% | Yundamindera – Bore Well E39/1047 Annual Report for the period 14 March 2009 to 13 March 2010 |
| A87168 | 2010 | Hawthorn Resources Limited | Yundamindera - Bore Well | <1% | Yundamindera – Bore Well E39/1047 Partial Surrender Report for the period 14 March 2006 to 13 March 2010 |
| A88495 | 2010 | Rubicon Resources Ltd | Murphy Well | <1% | Partial surrender report for the period 7 September 2006 to 6 September 2010, Murphy Well Project, E39/831 |
| A81887 | 2009 | Gme Resources Ltd | EUCALYPTUS BORE | 9.2% | EUCALYPTUS BORE PROJECT COMBINED REPORTING GROUP C89/2000 2009 ANNUAL REPORT, Reporting Period: 1st March 2008 |
| A83039 | 2009 | Heron Resources Ltd | Mount Percy | <1% | MOUNT PERCY PROJECT C77/2008 E39/831, E39/883, E39/1265 MOUNT MARGARET MINERAL FIELD Edjudina (SH51-06) 1:250, |
| A78141 | 2008 | Minara Resources Ltd | Murrin Murrin East | <1% | TR1415 MURRIN MURRIN EAST PROJECT, ELEVENTH COMBINED ANNUAL TECHNICAL REPORT C354/1997 |
| A78536 | 2008 | Niwest Ltd | Eucalyptus Bore | <1% | ANNUAL REPORT FOR THE PERIOD 01 MARCH 2007 TO 29 FEBRUARY 2008 EUCALYPTUS BORE PROJECT Combined Report C89/200 |
| A78782 | 2008 | Hawthorn Resources Limited | Yundamindera | <1% | Yundamindera E39/1047 ANNUAL REPORT FOR THE PERIOD 14 March 2007 TO 13 March 2008 |
| A79022 | 2008 | Heron Resources Ltd | Carr Boyd | <1% | MOUNT PERCY PROJECT C77/2008 E39/831, E39/883 MOUNT MARGARET MINERAL FIELD ANNUAL REPORT 2 May 2007 to 1 May 2 |
| A77510 | 2008 | Great Gold Mines Nl | Yundamindera | <1% | Exploration Licence E39/812 Yundamindera Annual Report for the period 17 October 2006 TO 18 October 2007 |
| A79077 | 2008 | Gme Resources Ltd | EUCALYPTUS BORE | <1% | EUCALYPTUS BORE PROJECT E39/703 SURRENDER REPORT |
| A74902 | 2007 | Minara Resources Ltd | Murrin Murrin East | <1% | Murrin Murrin East Project Tenth, Combined Annual Technical Report C354/1997, for the Period 1 March 2006 TO 2 |
| A75237 | 2007 | Niwest Ltd | Eucalyptus Bore | 5.2% | Eacalyptus Bore Project M39/289, 313, 344, 430, 568, 570, 616, 665, 666, 674, 802, E39/703 and 480 Annual Tech |
| A76054 | 2007 | Heron Resources Ltd | Murphy Well | <1% | Murphy Well Project E39/831 Annual Report 7th September 2006 to 6th September 2007 |
| A74692 | 2007 | Niwest Ltd | Eucalyptus Bore | 12% | Eucalyptus Bore Project E39/480 Surrender Report 2006 |
| A75352 | 2007 | Niwest Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Project, Annual Report for the year ending 28th February 2007, E39/703. |
| A72256 | 2006 | Minara Resources Ltd | Eucalyptus / Murrin Murrin East | <1% | Eucalyptus /Murrin Murrin East Project, Ninth Combined Annual Technical Report C354/1997, For the Period 1 Mar |
| A72598 | 2006 | Niwest Ltd | Eucalyptus Bore | 5.2% | Eucalyptus Bore Project E39/480,703,M39/289,313,344,430,568, 570,616,665,666,674,802, Annual Technical & Progr |
| A71147 | 2005 | Minara Resources Ltd | Camelback | <1% | TR1386 Camelback Project, Twelth Annual Technical Report (E39/374), for the period 20 August 2004 to 19 August |
| A68404 | 2004 | Niwest Ltd | Camelback | 5.2% | Annual report for the period 28/02/2003-27/02/2004 Camelback Project (C37/1999), P39/3458 -3462 |
| A68603 | 2004 | Gutnick Resources Nl | Yundamindera | <1% | Joint Surrender Report for the Period 23 May 2002 to 1 Augus t 2003 C76/2000 - Yundamindera, E39/776, E39/780, |
| A69454 | 2004 | Gme Resources Ltd | Eucalyptus | <1% | Annual technical report for the period 01/03/03 - 28/02/04 Eucalyptus Project, C89/2000, E39/256, E39/386, E39 |
| A68498 | 2004 | Niwest Ltd | Camelback | 5.2% | Camelback project, Annual technical and progress report for the period 28th February 2003 to 27th February 200 |
| A69079 | 2004 | Gutnick Resources Nl | Yundermindera | <1% | Joint Annual Report for the Period 1 June 2003 to 31 May 200 4 C76/2000 - Yundamindera E39/708...P39/3860 |
| A66616 | 2003 | Niwest Ltd | Eucalyptus | <1% | Annual Technical & Progress Report for the 12 month period ended 28 February 2003 Eucalyptus Project C89/2000: |
| A67427 | 2003 | Anaconda Operations Pty Ltd | Camelback | <1% | Tenth Annual Report for the period 20 August 2002 to 19 August 2003 Camelback Project E39/374 TR1312 |
| A65963 | 2003 | Niwest Ltd | Camelback | 5.2% | Camelback Project, Annual Report for the period 28th February 2002 to 27th February 2003, P39/3458-3462. [C |
| A67291 | 2003 | Gutnick Resources Nl | Yundamindera | <1% | Joint annual Report for the period 1 June 2002 - 31 May 2003 Yundamindera Project C76/2000: E39/708,719,721,72 |
| A64615 | 2002 | Niwest Ltd | Eucalyptus | <1% | Eucalyptus Project: E39/256, E39/386 & E39/368 M39/313 & M39/289 P39/2692 & P39/2444-2446 Annual Technical & P |
| A64613 | 2002 | Niwest Ltd | Camelback | 5.2% | Camelback Project 2002 Annual Report . Reporting Period: 28/02/2001 to 27/02/2002. Tenements: P39/3458 to P39/ |
| A64638 | 2002 | Anaconda Nickel Ltd | Camelback | <1% | Technical Report 1251 E39/374, M39/720, M39/800, M39/801 Camelback Project Eight Annual Technical Report For p |
| A64890 | 2002 | Gutnick Resources Nl | Yundamindera | <1% | C76/2000 - Yundamindera Joint Annual Report for the period 1 June 2001 to 31 May 2002 |
| A65603 | 2002 | Anaconda Nickel Ltd | Camelback | <1% | Technical Report 1280 E39/374, M39/720, M39/800, M39/801. Camelback Project. Ninth Annual Technical Report For |
| A65728 | 2002 | Niwest Ltd | Eucalyptus South | 12% | Eucalyptus South Project E39/480 Annual Report For The Period 20th September 2001 To 19th September 2002. |
| A62627 | 2001 | Niwest Ltd | Eucalyptus | <1% | Eucalyptus Project: E39/256, E39/386 & E39/368 M39/313 & M39/289 P39/2692 & P39/2444-2446 Annual Technical & P |
| A63891 | 2001 | Niwest Ltd | Eucalyptus South | 12% | Eucalyptus South Project E39/480 Annual Report for the period 20th September 2000 to 19th September 2001. |
| A62180 | 2001 | Niwest Ltd | Camelback | 5.2% | 2001 Annual Report reporting period 28/02/2000 to 27/02/2001 Camelback Project tenements P39/3458 to P39/3462, |
| A63889 | 2001 | Gutnick Resources Nl | Yundamindera | <1% | Joint Annual Report for the period 1 June 2000 to 31 May 2001 C76/2000 - Yundamindera exploration licences: E3 |
| A61740 | 2000 | Niwest Ltd | Eucalyptus South | 12% | Eucalyptus South, E39/480, Annual report for the Period 20/09/1999 to 19/09/2000. |
| A59543 | 2000 | Western Metals Ltd | Eucalyptus South | 12% | Eucalyptus South project, E39/480, Partial Surrender Report for the Period 20/09/1995 to 19/09/1999. |
| A60161 | 2000 | Western Metals Ltd | Camelback | 5.2% | Camelback Project 2000 Annual Report Reporting period 28/02/1999 to 27/02/2000 Joint Reporting C73/1999 |
| A60872 | 2000 | Western Metals Ltd | Eucalyptus | <1% | Eucalyptus Project: E39/256,313, P39/2692,2444-2446 and E39/38, Annual Technical & Progress Report for the 12 |
| A61380 | 2000 | Anaconda Nickel Ltd | Camelback | <1% | Technical Report 905 E39/374 Camelback Project Seventh Annual Technical Report for the period 20th August 1999 |
| A58091 | 1999 | Western Metals Ltd | Eucalyptus | <1% | Eucalyptus Project ,M39/313, E39/256, 386, P39/2444-2446, 2692 Annual Report for the period 01/03/98 to 28/02 |
| A58694 | 1999 | Western Metals Ltd | Eucalyptus South | 12% | Eucalupytus South Project, Partial Surrender Report for the period 20/09/1995 to 04/03/1999, E39/480. |
| A57748 | 1999 | Western Metals Ltd | Camelback | 5.2% | Camelback Project - 1998 Annual Report 28/02/98 - 27/02/99 P39/3458-3462 |
| A58272 | 1999 | Acacia Resources Ltd | Bore Well | <1% | Acacia Resources Ltd, Bore Well E39/491 Surrender Report (01/03/99) |
| A59148 | 1999 | Anaconda Nickel Ltd | Camelback | <1% | Camelback Project, E39/374, Sixth Annual Technical Report for the Period 20th August 1998 to 19th August 1999 |
| A59466 | 1999 | Western Metals Ltd | Eucalyptus South | 12% | Eucalyptus South Project, E39/480, Annual Report for the Period 20th September 1998 to 19th September 1999. |
| A56201 | 1998 | Homestake Gold Of Australia Ltd | Camelback Bore | <1% | Camelback Bore - Project 460 Annual Report 20/08/97 - 19/08/98 Technical Report No:759, E39/374 |
| A56504 | 1998 | Aberfoyle Resources Ltd | Eucalyptus | 12% | Eucalyptus Project, E39/480, Annual technical and progress report for the 12 month period ended 19/09/98. |
| A53902 | 1998 | Acacia Resources Ltd | Camelback | <1% | Camelback Project P39/3458-3462,E39/491,E39/502, E39/503 E39/596 Annual report for the period 01/01/97-31/12/ |
| A54234 | 1998 | Aberfoyle Resources Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Nickel Project E39/256 M39/313 P39/2692 P39/2444 to P39/2446 E39/386 Annual Report for the 12 |
| A50650 | 1997 | Aberfoyle Resources Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Nickel Project E39/256 M39/313 P39/2692 P39/2444 to P39/2446 and E39/386 annual technical repo |
| A52508 | 1997 | Plutonic Operations Ltd | Camelback Bore | <1% | Project 460 - Camelback Bore, E39/374 Annual Report. 20/08/1996 - 19/08/1997 Technical Report No: 647, |
| A53120 | 1997 | Plutonic Operations Ltd | Camelback Bore | <1% | Camelback Bore Project, Partial Surrender Report, December 1997, E39/374 |
| A50237 | 1997 | Acacia Resources Ltd | Camelback | <1% | Camelback Project P39/3458 to P39/3462 E39/491 E39/502 E39/503 1996 Annual report for the period 1 January 199 |
| A52701 | 1997 | Aberfoyle Resources Ltd | Eucalyptus | 12% | Eucalyptus Nickel Project, WA. E39/480 Eucalyptus South. Annual report for the period 20/09/96-19/09/97. |
| A47464 | 1996 | Aberfoyle Resources Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Project, Annual report on Exploration for the period 01/03/1995 to 29/02/1996 for E39/256 M39/ |
| A48226 | 1996 | Audax Resources Nl | Eucalyptus | 7.2% | Eucalyptus Project, Partial Reliquishment Report, June 1996, E39/304. |
| A49393 | 1996 | Aberfoyle Resources Ltd | Eucalyptus South | 12% | E39/480 , Eucalyptus South Project, Annual report for the period 20/09/95 to 19/09/96. |
| A48227 | 1996 | Audax Resources Nl | Eucalyptus | 7.2% | Eucalyptus (JV) Project, Annual report E39/304 period 13/01/95 to 12/01/96. |
| A45800 | 1995 | Dominion Mining Ltd | Camelback Bore | <1% | Annual Report 'Camel Back Bore' E39/374 From 20 August 1994 to 19 August 1995 |
| A43519 | 1995 | Mining Project Investors Pty Ltd | Eucalyptus Bore | <1% | Annual Technical Report on Eucalyptus Bore Project Mount Morgans District Mount Margaret Mineral Field for the |
| A44012 | 1995 | Audax Resources Nl | Eucalyptus | 7.2% | Eucalyptus Joint Venture Mount Margaret Mineral Field Western Australia, Annual Report E39/304 Period 13/01/19 |
| A42793 | 1994 | Dominion Mining Ltd | Camelback Bore | <1% | Annual report 'Camelback' E39/374 from 20 August 1993 to August 1994 |
| A37832 | 1993 | Delta Gold Ltd | Murphy Well | 7.2% | Annual report for the period 01/92-12/92 Murphy Well Project E36/304 |
| A40002 | 1993 | Enterprise Gold Mines Nl | Eucalyptus | 7.2% | Annual report for the period 01/93-01/94 Eucalyptus Project E39/304 |
| A39632 | 1993 | Sir Samuel Mines Nl | Yundamindra | <1% | Annual Report for the Period 01/09/92 - 01/11/93 Yundamindra Project. |
| A36446 | 1992 | Delta Gold Ltd | Murphy Well | 7.2% | Annual Report for the period 01/91 to 12/91, Murphy Well Project, E39/304. |
| A7643 | 1978 | Australian Selection Pty Ltd | Eucalyptus | 3.5% | Eucalyptus Project, Non-statutory Report: Final Report for period ending 16/12/1975, MC39/11, 14, 19, 38-40, 4 |
| A95270 | 1974 | Carpentaria Exp Co Pty Ltd | Mount Margaret | <1% | Technical Report Mineral Claims 39/4263 to 39/4276 incl."Bald Hills Bore" - Mount Margaret Goldfield, Western |
| A4755 | 1974 | Carpentaria Exp Co Pty Ltd | Bald Hills Bore | <1% | Bald Hills Bore Project, Non-statutory Report: Final Report for the period 04/02/1974 to 07/02/1974, MC39/4263 |
| A3932 | 1973 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Final Report for the period 1st July 1972 to 30th June 1973, TR70/37 |
| A4652 | 1973 | Carpentaria Exp Co Pty Ltd | Bald Hills Bore | <1% | Bald Hils Bore Project, Non-statutory Report: First Progress Report , October 1973, MC39/4267-4276. |
| A2782 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1971, TR70/3730 & 5279H. |
| A2829 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1972, TR70/3730H. |
| A3618 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Miscellaneous Maps (1-20), for the period ending 31/12/1972, TR70/3 |
| A941 | 1971 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1970, TR70/3730H & 5279H. |
| A1414 | 1971 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | 1.9% | Pyke Hill - Eucalyptus Project, Annual Report (s) for the period(s) ending 31/12/1970 & 31/12/1971, TR70/3701 |
| A1415 | 1971 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | 1.9% | Pyke Hill - Eucalyptus Project, Non-statutory Report:Index to Plans, Soil Geochemistry & Geology Grids ( for o |
| A271 | 1970 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1969, TR70/3730H. |
| A1412 | 1969 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | 2% | Pyke Hill - Eucalylptus Project, Annual Report [s] for the periods ending 31/12/1968 & 31/12/1969, TR3701 & 37 |
| A1121 | 1969 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report:;Volume 1: Report on the Induced Polarization & Resistivity Survey on |
| A1122 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Appendix 2:Annual Report, June 30th 1969, TR70/3730H; Report on the |
| A1123 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Annual Report for the period ending 30th June 1969, TR70/3730H. A Re |
| A12748 | 1969 | Kia Ora Gold Corp Nl | Mount Keith | <1% | Geological report Mount Keith Nickel Prospect Leonora WA |
| A270 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Report on the Induced Polarisation & Resistivity Survey on the Deep |
| A269 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1968, TR70/3730H. |
| A1409 | 1967 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | 4.4% | Pyke Hill - Eucalyptus Project, Non-statutory Report: Progress Report, with Grid Index & Index to Maps, 1966, |
| A1410 | 1967 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | 2% | Pyke Hill - Eucalyptus Project, Annual Report: Report of Investigations for the period 15th August 1967-12th O |
| A1411 | 1967 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | 2% | Pyke Hill - Eucalyptus Project, Non-statutory Report: Grid & Geology Sheets, December 1967, TR70/3748H |
| A268 | 1967 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1967, TR70/3730H. |
| A1590 | 1965 | Mount Margaret Prospecting Syndicate | Yundamindera | 1% | Yundamindera Project, Non-statutory Report: Report on 78 Gold Products received 13th August 1964, TR70/2685, 2 |
| A82519 | 1753 | Hawthorn Resources Limited | YUNDAMINDERA | <1% | Exploration Licence E39/1047 YUNDAMINDERA ANNUAL REPORT FOR THE PERIOD 15 MARCH 2008 TO 14 MARCH 2009 |
| A82541 | 1753 | Hawthorn Resources Limited | YUNDAMINDERA | <1% | Exploration Licence E39/1047 YUNDAMINDERA PARTIAL SURRENDER REPORT FOR THE PERIOD 15 MARCH 2006 TO 16 MARCH 20 |
| A81492 | 1753 | Hawthorn Resources Limited | YUNDAMINDERA | <1% | Exploration Licence E39/812 YUNDAMINDERA FINAL SURRENDER REPORT, FOR THE PERIOD 18 OCTOBER 2005 TO 19 NOVEMBER |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 3 years · 21 May 2029
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 39/803 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 39/803? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.