NextMaps›WA Tenements›M 39/744

M 39/744

LiveMining LeaseShire of LeonoraMt. Morgans District
Area
656.128ha
Expires
May 2029
in 3 years
WAMEX reports
106
WA median is 53
Report drilling
62
of 106 reports
Leonora Explore on the live map

Register summary

Holder
Franco-Nevada Australia Pty Ltd
Local government
Shire of Leonora
Application received
15 Nov 1999
Commenced
22 May 2008
Expiry
21 May 2029
Term
21 Years

Exploration history on this ground

106 historical WAMEX exploration reports intersect M 39/744: 19 report geochemistry or sampling, 73 include a digital data package.
When this ground was worked · 104 of 106 reports dated
61960s
41970s
1980s
251990s
382000s
262010s
52020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A145946 2024 Northern Star Resources Ltd Mount Celia 29% Final Surrender Report on E39/1804, Mount Celia Project, for the Period 26 November 2014 to 6 November 2024
A122389 2020 Saracen Gold Mines Pty Limited Yundamindera 3.3% Yundamindera Project (C96/2016) Annual Report for the Period 1 November 2018 to 31 October 2019
A123534 2020 Murrin Murrin Operations Pty Ltd Murrin Murrin East Nickel Laterite Proje <1% Murrin Murrin East Nickel Laterite Project - C354/1997 - 1 March 2019 to 29 February 2020
A123525 2020 Gme Resources Ltd Eucalyptus Bore 9.6% Annual Report Eucalyptus Bore, C89/2000, 1 March 2019 to 29 February 2020
A125696 2020 Saracen Gold Mines Pty Limited Yundamindera 4.1% Yundamindera Project (C96/2016) Annual Report for the Period 1 November 2019 to 31 October 2020
101 more reports
A119852 2019 Murrin Murrin Operations Pty Ltd Murrin Murrin East <1% Combined Annual Report for the Murrin Murrin East Nickel Laterite Project C354/1997 for the period 1 March 201
A119868 2019 Gme Resources Ltd Eucalyptus Bore 7.9% Annual Report Eucalyptus Bore Project C89/2000 for the period 1 March 2018 to 28 February 2019
A119280 2019 Hawthorn Resources Limited; Westgold Resources Limited Yundamindera 3.3% C96/2016 Yundamondera Project Annual Report for the period 1 November 2017 to 31 October 2018
A115738 2018 Hawthorn Resources Limited Yundamindera 3.3% C96/2016 Combined Group Report 2017 - Yundamindera Project For the Period 1 November 2016 to 31 October 2017,
A116606 2018 Gme Resources Ltd Eucalyptus Bore 8% Eucalyptus Bore Annual Report, C89/2000, 01 March 2017 to 28 February 2018
A116665 2018 Murrin Murrin Operations Pty Ltd Murrin Murrin East <1% Combined Annual Report for the Murrin Murrin East Project - C354/1997 for the period 01/03/2017 - 28/02/2018,
A112642 2017 Gme Resources Ltd Eucalyptus Bore 8% Annual Report Euclayptus Project C89/2000 For the Period 1 March 2016 to 28 February 2017, M39/00289, E39/0179
A112766 2017 Murrin Murrin Operations Pty Ltd Murrin Murrin East <1% Combined Annual Report for the Murrin Murrin East Project – C354/1997 for the period 01/03/2016 to 28/02/2017
A112186 2017 Hawthorn Resources Limited; Metals X Limited Yundamindera 3.3% Yundamindera Project C96/2016 Annual Report For the Period 1 November 2015 to 31 October 2016, E39/01292, E39/
A108237 2016 Hawthorn Resources Limited Yundamindera 29% Exploration Licence E39/1804 Yundamindera Annual Report for the period 26 November 2014 - 25 November 2015
A108618 2016 Gme Resources Ltd Eucalyptus 10% Eucalyptus Annual Report C89/2000 for the period 1 March 2016 to 28 February 2016,M 39/00289, E39/01795, M39/0
A108673 2016 Murrin Murrin Operations Pty Ltd Murrin Murrin East <1% Combined Annual Report for the Period 1 March 2015 to 29 February 2016, Murrin Murrin East Project - C354/1997
A105552 2015 Murrin Murrin Operations Pty Ltd Murrin Murrin East <1% Combined Annual Report for the Period 1 March 2014 to 28 February 2015, Murrin Murrin East Project - C354/1997
A105556 2015 Gme Resources Ltd Eucalyptus Bore 10% Eucalyptus Bore Project C89/2000 Annual Report for the period 01/03/2014 to 28/02/2015, M39/289, M39/313, M39/
A101529 2014 St Barbara Ltd Camel Back 34% Camel Back Final Surrender Report E39/1699 for the period 15 February 2013 to 19 December 2013
A101914 2014 Murrin Murrin Operations Pty Ltd Murrin Murrin East <1% Combined Annual Report For The Period: 1 March 2013 to 28 February 2014 Murrin Murrin East Project C354/1997 C
A101966 2014 Gme Resources Ltd Eucalyptus Bore 13% Eucalyptus Bore Project C89/2000 Annual Report 2014 for the period 1st March 2013 to 28th February 2014, M39/2
A97518 2013 Gme Resources Ltd Eucalyptus Bore 6.4% Eucalyptus Bore Project, Annual Report for the period 1st March 2012 to 28th February 2013, M39/289, 313, 344,
A97658 2013 Gme Resources Ltd Eucalyptus Bore 34% Surrender Report for E39/1552 Eucalyptus Bore for the period 9 September 2010 to 8th September 2012
A97702 2013 Murrin Murrin Operations Pty Ltd Murrin Murrin East <1% Combined Annual Report, Murrin Murrin East Project - C354/1997 for the period 1 March 2012 to 28 February 2013
A93685 2012 Gme Resources Ltd Eucalyptus Bore 6.4% Eucalyptus Bore Project Combined Reporting Group C89/2000 2012 Annual Report. Retorting Period: 1st March 201
A93872 2012 Murrin Murrin Operations Pty Ltd Murrin Murrin East <1% Combined Annual Report for the Period 1 March 2011 to 29 February 2012, Murrin Murrin East Project, C354/1997
A90216 2011 Gme Resources Ltd Eucalyptus Bore 6.4% Eucalyptus Bore Project, Annual Report for the period 1st March 2010 to 28th February 2011, M39/289, 313, 344,
A90328 2011 Murrin Murrin Operations Pty Ltd Murrin Murrin East <1% Murrin Murrin East Project, Annual Report for the period 1st March 2010 to 28th February 2011, M39/314, 322, 5
A86606 2010 Gme Resources Ltd Eucalyptus Bore 10% Eucalyptus Bore Project Combined Reporting Group C89/2000 2009-2010, Annual Report for 1st March 2009 to 28th
A86583 2010 Minara Resources Ltd Murrin Murrin East <1% Murrin Murrin East Project, Thirteenth Combined Annual Report C354/1997, Concerning Tenements: M 39/314 M 39/3
A81887 2009 Gme Resources Ltd EUCALYPTUS BORE 10% EUCALYPTUS BORE PROJECT COMBINED REPORTING GROUP C89/2000 2009 ANNUAL REPORT, Reporting Period: 1st March 2008
A81898 2009 Minara Resources Ltd MURRIN MURRIN EAST <1% MURRIN MURRIN EAST PROJECT, TWELFTH COMBINED ANNUAL TECHNICAL REPORT, C354/1997, FOR THE PERIOD 1 MARCH 2008 T
A78141 2008 Minara Resources Ltd Murrin Murrin East 3.7% TR1415 MURRIN MURRIN EAST PROJECT, ELEVENTH COMBINED ANNUAL TECHNICAL REPORT C354/1997
A78536 2008 Niwest Ltd Eucalyptus Bore 10% ANNUAL REPORT FOR THE PERIOD 01 MARCH 2007 TO 29 FEBRUARY 2008 EUCALYPTUS BORE PROJECT Combined Report C89/200
A77535 2008 Niwest Ltd Camelback 96% Acacia Camelback Tenements P39/3459 and P39/3460 Annual Technical and Progress Report FOR THE PERIOD 21st DECE
A79077 2008 Gme Resources Ltd EUCALYPTUS BORE 35% EUCALYPTUS BORE PROJECT E39/703 SURRENDER REPORT
A74902 2007 Minara Resources Ltd Murrin Murrin East 3.7% Murrin Murrin East Project Tenth, Combined Annual Technical Report C354/1997, for the Period 1 March 2006 TO 2
A75237 2007 Niwest Ltd Eucalyptus Bore 5.8% Eacalyptus Bore Project M39/289, 313, 344, 430, 568, 570, 616, 665, 666, 674, 802, E39/703 and 480 Annual Tech
A74179 2007 Niwest Ltd Camelback 96% Camelback Project P39/3459 and P39/3460, Annual Technical & Progress Report for the Period 21st December 2005
A74692 2007 Niwest Ltd Eucalyptus Bore <1% Eucalyptus Bore Project E39/480 Surrender Report 2006
A75352 2007 Niwest Ltd Eucalyptus Bore 35% Eucalyptus Bore Project, Annual Report for the year ending 28th February 2007, E39/703.
A72160 2006 Niwest Ltd Camelback 96% Camelback Project, Annual Technical & Progress Report for the Period 28 February 2005 to 27 February 2006, P39
A72256 2006 Minara Resources Ltd Eucalyptus / Murrin Murrin East 3.7% Eucalyptus /Murrin Murrin East Project, Ninth Combined Annual Technical Report C354/1997, For the Period 1 Mar
A72598 2006 Niwest Ltd Eucalyptus Bore 5.8% Eucalyptus Bore Project E39/480,703,M39/289,313,344,430,568, 570,616,665,666,674,802, Annual Technical & Progr
A71147 2005 Minara Resources Ltd Camelback 7.5% TR1386 Camelback Project, Twelth Annual Technical Report (E39/374), for the period 20 August 2004 to 19 August
A70238 2005 Niwest Ltd Camelback 96% Camelback Project, Annual technical and progress report for the period 28th February 2004 to 27th February 200
A68404 2004 Niwest Ltd Camelback 92% Annual report for the period 28/02/2003-27/02/2004 Camelback Project (C37/1999), P39/3458 -3462
A69454 2004 Gme Resources Ltd Eucalyptus 11% Annual technical report for the period 01/03/03 - 28/02/04 Eucalyptus Project, C89/2000, E39/256, E39/386, E39
A68498 2004 Niwest Ltd Camelback 92% Camelback project, Annual technical and progress report for the period 28th February 2003 to 27th February 200
A66616 2003 Niwest Ltd Eucalyptus 11% Annual Technical & Progress Report for the 12 month period ended 28 February 2003 Eucalyptus Project C89/2000:
A67427 2003 Anaconda Operations Pty Ltd Camelback 7.5% Tenth Annual Report for the period 20 August 2002 to 19 August 2003 Camelback Project E39/374 TR1312
A65963 2003 Niwest Ltd Camelback 92% Camelback Project, Annual Report for the period 28th February 2002 to 27th February 2003, P39/3458-3462. [C
A64615 2002 Niwest Ltd Eucalyptus 11% Eucalyptus Project: E39/256, E39/386 & E39/368 M39/313 & M39/289 P39/2692 & P39/2444-2446 Annual Technical & P
A64613 2002 Niwest Ltd Camelback 92% Camelback Project 2002 Annual Report . Reporting Period: 28/02/2001 to 27/02/2002. Tenements: P39/3458 to P39/
A64638 2002 Anaconda Nickel Ltd Camelback 7.5% Technical Report 1251 E39/374, M39/720, M39/800, M39/801 Camelback Project Eight Annual Technical Report For p
A64765 2002 Anaconda Operations Pty Ltd MURRIN MURRIN EAST PROJECT <1% MURRIN MURRIN EAST PROJECT, Fifth Annual Technical Report C354/1997 For The Period 1 March 2001 To 29 February
A65603 2002 Anaconda Nickel Ltd Camelback 7.5% Technical Report 1280 E39/374, M39/720, M39/800, M39/801. Camelback Project. Ninth Annual Technical Report For
A65728 2002 Niwest Ltd Eucalyptus South <1% Eucalyptus South Project E39/480 Annual Report For The Period 20th September 2001 To 19th September 2002.
A62506 2001 Anaconda Operations Pty Ltd Murrin Murrin East <1% TR 1083 Murrin Murrin East Project E39/443; E39/444; E39/564 E39/747; P39/3440; P39/3527; P39/3526; P39/3729;
A62627 2001 Niwest Ltd Eucalyptus 11% Eucalyptus Project: E39/256, E39/386 & E39/368 M39/313 & M39/289 P39/2692 & P39/2444-2446 Annual Technical & P
A63891 2001 Niwest Ltd Eucalyptus South <1% Eucalyptus South Project E39/480 Annual Report for the period 20th September 2000 to 19th September 2001.
A62180 2001 Niwest Ltd Camelback 92% 2001 Annual Report reporting period 28/02/2000 to 27/02/2001 Camelback Project tenements P39/3458 to P39/3462,
A61740 2000 Niwest Ltd Eucalyptus South <1% Eucalyptus South, E39/480, Annual report for the Period 20/09/1999 to 19/09/2000.
A59543 2000 Western Metals Ltd Eucalyptus South <1% Eucalyptus South project, E39/480, Partial Surrender Report for the Period 20/09/1995 to 19/09/1999.
A60161 2000 Western Metals Ltd Camelback 92% Camelback Project 2000 Annual Report Reporting period 28/02/1999 to 27/02/2000 Joint Reporting C73/1999
A60872 2000 Western Metals Ltd Eucalyptus 15% Eucalyptus Project: E39/256,313, P39/2692,2444-2446 and E39/38, Annual Technical & Progress Report for the 12
A60995 2000 Western Metals Ltd Eucalyptus Bore <1% Eucalyptus Bore Project (Eucalyptus Northeast Option) ,E39/368, Annual Report for the period 5th May 1999 to
A61380 2000 Anaconda Nickel Ltd Camelback 7.5% Technical Report 905 E39/374 Camelback Project Seventh Annual Technical Report for the period 20th August 1999
A58091 1999 Western Metals Ltd Eucalyptus 15% Eucalyptus Project ,M39/313, E39/256, 386, P39/2444-2446, 2692 Annual Report for the period 01/03/98 to 28/02
A58423 1999 Anaconda Nickel Ltd Murrin Murrin East <1% Murrin Murrin East Project 01/03/98 - 29/02/99 E39/255, 443, 444, 545, 564, 3440, 3526, 3527, 3729, etc
A58692 1999 Western Metals Ltd Eucalyptus Bore <1% Eucalyptus Bore Project (Eucalyptus Northeast Option) E39/368 Annual Report for the period 05/05/98-04/05/99.
A58694 1999 Western Metals Ltd Eucalyptus South <1% Eucalupytus South Project, Partial Surrender Report for the period 20/09/1995 to 04/03/1999, E39/480.
A57748 1999 Western Metals Ltd Camelback 92% Camelback Project - 1998 Annual Report 28/02/98 - 27/02/99 P39/3458-3462
A59148 1999 Anaconda Nickel Ltd Camelback 7.5% Camelback Project, E39/374, Sixth Annual Technical Report for the Period 20th August 1998 to 19th August 1999
A59466 1999 Western Metals Ltd Eucalyptus South <1% Eucalyptus South Project, E39/480, Annual Report for the Period 20th September 1998 to 19th September 1999.
A56201 1998 Homestake Gold Of Australia Ltd Camelback Bore 7.5% Camelback Bore - Project 460 Annual Report 20/08/97 - 19/08/98 Technical Report No:759, E39/374
A56504 1998 Aberfoyle Resources Ltd Eucalyptus <1% Eucalyptus Project, E39/480, Annual technical and progress report for the 12 month period ended 19/09/98.
A53902 1998 Acacia Resources Ltd Camelback 9.8% Camelback Project P39/3458-3462,E39/491,E39/502, E39/503 E39/596 Annual report for the period 01/01/97-31/12/
A54234 1998 Aberfoyle Resources Ltd Eucalyptus Bore 15% Eucalyptus Bore Nickel Project E39/256 M39/313 P39/2692 P39/2444 to P39/2446 E39/386 Annual Report for the 12
A54641 1998 Yundamindra Nickel Pty Ltd Eucalyptus <1% Eucalyptus Project. Annual combined technical report. 01/03/97 to 28/02/98. E39/255, E39/443, E39/564, M39/314
A55107 1998 Aberfoyle Resources Ltd Eucalyptus North East <1% Eucalyptus North East Project, E39/368, Annual Report for the year ending 04/05/1998.
A50650 1997 Aberfoyle Resources Ltd Eucalyptus Bore 15% Eucalyptus Bore Nickel Project E39/256 M39/313 P39/2692 P39/2444 to P39/2446 and E39/386 annual technical repo
A51512 1997 Aberfoyle Resources Ltd Eucalyptus North East <1% Eucalyptus North East Project , E39/368 , Annual report for the period May 5th1996 to May 4th 1997
A52508 1997 Plutonic Operations Ltd Camelback Bore 7.5% Project 460 - Camelback Bore, E39/374 Annual Report. 20/08/1996 - 19/08/1997 Technical Report No: 647,
A53120 1997 Plutonic Operations Ltd Camelback Bore 7.5% Camelback Bore Project, Partial Surrender Report, December 1997, E39/374
A50237 1997 Acacia Resources Ltd Camelback 13% Camelback Project P39/3458 to P39/3462 E39/491 E39/502 E39/503 1996 Annual report for the period 1 January 199
A52701 1997 Aberfoyle Resources Ltd Eucalyptus <1% Eucalyptus Nickel Project, WA. E39/480 Eucalyptus South. Annual report for the period 20/09/96-19/09/97.
A47464 1996 Aberfoyle Resources Ltd Eucalyptus Bore 15% Eucalyptus Bore Project, Annual report on Exploration for the period 01/03/1995 to 29/02/1996 for E39/256 M39/
A49393 1996 Aberfoyle Resources Ltd Eucalyptus South <1% E39/480 , Eucalyptus South Project, Annual report for the period 20/09/95 to 19/09/96.
A45800 1995 Dominion Mining Ltd Camelback Bore 7.5% Annual Report 'Camel Back Bore' E39/374 From 20 August 1994 to 19 August 1995
A43519 1995 Mining Project Investors Pty Ltd Eucalyptus Bore 15% Annual Technical Report on Eucalyptus Bore Project Mount Morgans District Mount Margaret Mineral Field for the
A42793 1994 Dominion Mining Ltd Camelback Bore 7.5% Annual report 'Camelback' E39/374 from 20 August 1993 to August 1994
A39632 1993 Sir Samuel Mines Nl Yundamindra 6.8% Annual Report for the Period 01/09/92 - 01/11/93 Yundamindra Project.
A7643 1978 Australian Selection Pty Ltd Eucalyptus 3.7% Eucalyptus Project, Non-statutory Report: Final Report for period ending 16/12/1975, MC39/11, 14, 19, 38-40, 4
A1414 1971 Australian Selection Pty Ltd Pyke Hill - Eucalyptus 2.3% Pyke Hill - Eucalyptus Project, Annual Report (s) for the period(s) ending 31/12/1970 & 31/12/1971, TR70/3701
A1415 1971 Australian Selection Pty Ltd Pyke Hill - Eucalyptus 2.3% Pyke Hill - Eucalyptus Project, Non-statutory Report:Index to Plans, Soil Geochemistry & Geology Grids ( for o
A2513 1971 Le Nickel Aust Exp Pty Ltd Watson Dam 4.2% Watson Dam Project, Annual Report for the period ending 31/12/1971, MC31/1171-1181, 1183-1185, 1187-1189, 1191
A1412 1969 Australian Selection Pty Ltd Pyke Hill - Eucalyptus 2.3% Pyke Hill - Eucalylptus Project, Annual Report [s] for the periods ending 31/12/1968 & 31/12/1969, TR3701 & 37
A12748 1969 Kia Ora Gold Corp Nl Mount Keith 1% Geological report Mount Keith Nickel Prospect Leonora WA
A1409 1967 Australian Selection Pty Ltd Pyke Hill - Eucalyptus 5.3% Pyke Hill - Eucalyptus Project, Non-statutory Report: Progress Report, with Grid Index & Index to Maps, 1966,
A1410 1967 Australian Selection Pty Ltd Pyke Hill - Eucalyptus 2.3% Pyke Hill - Eucalyptus Project, Annual Report: Report of Investigations for the period 15th August 1967-12th O
A1411 1967 Australian Selection Pty Ltd Pyke Hill - Eucalyptus 2.3% Pyke Hill - Eucalyptus Project, Non-statutory Report: Grid & Geology Sheets, December 1967, TR70/3748H
A1590 1965 Mount Margaret Prospecting Syndicate Yundamindera 1.1% Yundamindera Project, Non-statutory Report: Report on 78 Gold Products received 13th August 1964, TR70/2685, 2
A50859 1753 Anaconda Nickel Nl Eucalyptus <1% Eucalyptus Project , Annual Report for the period 19 February 1996 to 18 February 1997, P39/3526.
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
3 years · 21 May 2029
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over M 39/744 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold M 39/744? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.