M 39/344
Register summary
- Holder
- Niwest Limited
- Part of
- Alliance Nickel Limited (ASX:AXN) as at 2026-06-30
- Local government
- Shire of Leonora
- Application received
- 22 Nov 1994
- Commenced
- 30 Mar 2005
- Expiry
- 29 Mar 2047
- Term
- 21 Years (Renewed)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A131354 | 2022 | Sgmb Resources Pty Ltd | Zelica | 11% | Final Surrender Report for E 39/1897 Zelica Project for the period ending 22/04/2022. |
| A123204 | 2020 | Sgmb Resources Pty Ltd | Zelica | 10% | Zelica Project C 34/2014 Combined Annual Report for the period 1 January 2019 to 31 December 2019, E39/01897, |
| A123525 | 2020 | Gme Resources Ltd | Eucalyptus Bore | 5.3% | Annual Report Eucalyptus Bore, C89/2000, 1 March 2019 to 29 February 2020 |
| A118944 | 2019 | Matsa Resources Limited | Zelica | 10% | Zelica C34/2014 Combined Annual Report for the period 1 January 2018 to 1 January 2019, M39/01101, E39/01897 |
| A119868 | 2019 | Gme Resources Ltd | Eucalyptus Bore | 4.4% | Annual Report Eucalyptus Bore Project C89/2000 for the period 1 March 2018 to 28 February 2019 |
113 more reports
| A115821 | 2018 | Anova Metals Limited | Zelica | 10% | Zelica Project C34/2014 Combined Annual Report for the period 1 January 2017 to 31 December 2017, E39/01897, M |
| A116290 | 2018 | Anova Metals Limited | Eucalyptus | <1% | Final Surrender Report M39/0480 Eucalyptus Project for the period 27/11/2008 - 02/06/2017 |
| A116606 | 2018 | Gme Resources Ltd | Eucalyptus Bore | 4.4% | Eucalyptus Bore Annual Report, C89/2000, 01 March 2017 to 28 February 2018 |
| A112642 | 2017 | Gme Resources Ltd | Eucalyptus Bore | 4.4% | Annual Report Euclayptus Project C89/2000 For the Period 1 March 2016 to 28 February 2017, M39/00289, E39/0179 |
| A110747 | 2017 | Exterra Resources Limited | Eucalyptus | <1% | EXTERRA RESOURCES LIMITED Annual Report 27 November 2015 to 26th November 2016 M 39/00480 |
| A112287 | 2017 | Exterra Resources Limited | Zelica | 10% | C34/2014 Zelica Project Combined Annual Report for the period 1 January 2016 to 31 December 2016, E39/01897, M |
| A114092 | 2017 | Exterra Resources Limited | Zelica - Eucalyptus | <1% | Zelica - Eucalyptus Project M 39/00292 (C123/2007) Final Surrender Report for the period 1 September 1993 to 2 |
| A107713 | 2016 | Exterra Resources Ltd | Zelica - Eucalyptus | <1% | Eucalyptus Project P39/4636 Annual Report 9 December 2014 to 8th December 2015 |
| A107887 | 2016 | Exterra Resources Ltd | Zelica | <1% | Zelica Project C34/2014 Annual Report for the period 01/01/2015 to 31/12/2015, M39/1082, E39/1627, P39/4566, P |
| A108618 | 2016 | Gme Resources Ltd | Eucalyptus | 5.7% | Eucalyptus Annual Report C89/2000 for the period 1 March 2016 to 28 February 2016,M 39/00289, E39/01795, M39/0 |
| A104740 | 2015 | Exterra Resources Ltd | Eucalyptus | <1% | Annual Report for the period 27th November 2013 to 26th November 2014, Eucalyptus Project M39/480 |
| A104782 | 2015 | Exterra Resources Ltd | Zelica - Eucalyptus | <1% | ANNUAL REPORT FOR THE PERIOD 9th December 2013 to 8th December 2014 Eucalyptus P39/4636 |
| A106802 | 2015 | Murrin Murrin Operations Pty Ltd | Eucalyptus | <1% | Annual Report, Eucalyptus Project M39/818 for the period 11 August 2014 to 10 August 2015 |
| A107512 | 2015 | Exterra Resources Ltd | Zelica - Eucalyptus | <1% | Zelica/Eucalyptus Project M39/480 Annual Report for the period 27 November 2014 to 26th November 2015 |
| A105477 | 2015 | Exterra Resources Ltd | Zelica | <1% | Zelica Project C34/2014, M39/1082, E39/1627, P39/4566 Combined Annual Report for the period 1st January 2014 t |
| A105556 | 2015 | Gme Resources Ltd | Eucalyptus Bore | 5.7% | Eucalyptus Bore Project C89/2000 Annual Report for the period 01/03/2014 to 28/02/2015, M39/289, M39/313, M39/ |
| A106565 | 2015 | Exterra Resources Ltd | Eucalyptus | <1% | Eucalyptus Project M39/292 Annual Report for the period 30/06/2014 to 29/06/2015 |
| A100821 | 2014 | Exterra Resources Ltd | Eucalyptus | <1% | Eucalyptus Project, Annual Report for the period 09/12/2012 to 08/12/2013, P39/4636. |
| A100989 | 2014 | Exterra Resources Ltd | Eucalylptus | <1% | ANNUAL REPORT FOR THE PERIOD 27th November 2012 to 26th November 2013 Eucalyptus M39/480 |
| A101966 | 2014 | Gme Resources Ltd | Eucalyptus Bore | 7.4% | Eucalyptus Bore Project C89/2000 Annual Report 2014 for the period 1st March 2013 to 28th February 2014, M39/2 |
| A103534 | 2014 | Murrin Murrin Operations Pty Ltd | Eucalyptus | <1% | Annual Report, Eucalyptus Project, M39/818 For the period: 11 August 2013 to 10 August 2014 |
| A96274 | 2013 | Exterra Resources Pty Ltd | Eucalyptus | <1% | Annual Report for the period 27th November 2011 to 26th November 2012 Eucalyptus M39/480 |
| A96581 | 2013 | Exterra Resources Ltd | Eucalyptus | <1% | Annual Report for the period 9th December 2011 to 8th December 2012 Eucalyptus P39/4636 |
| A97518 | 2013 | Gme Resources Ltd | Eucalyptus Bore | 3.5% | Eucalyptus Bore Project, Annual Report for the period 1st March 2012 to 28th February 2013, M39/289, 313, 344, |
| A99468 | 2013 | Exterra Resources Ltd | Zelica | <1% | Zelica / Eucalyptus Project P39/4566 Annual Report 28th September 2012 to 27th September 2013 |
| A99571 | 2013 | Minara Resources Pty Ltd | Eucalyptus | <1% | Annual Report, Eucalyptus Project, M39/818 for the period 11 August 2012 to 10 August 2013 |
| A93685 | 2012 | Gme Resources Ltd | Eucalyptus Bore | 3.5% | Eucalyptus Bore Project Combined Reporting Group C89/2000 2012 Annual Report. Retorting Period: 1st March 201 |
| A94744 | 2012 | Exterra Resources Pty Ltd | Zelica - Eucalyptus | <1% | Annual Report for the period 30th June 2011 to 29th June 2012 Eucalyptus Project M39/292 C 123/2007 |
| A95643 | 2012 | Minara Resources Ltd | Eucalyptus | <1% | Annual Report, Eucalyptus Project, M39/818 for the period 11 August 2011 to 10 August 2012 |
| A95742 | 2012 | Exterra Resources Pty Ltd | Zelica | <1% | Annual Report Zelica Project P39/4566 for the period 28th September 2011 - 27th September 2012 |
| A92774 | 2011 | Exterra Resources Pty Ltd | Zelica - Mount Egerton | 13% | ANNUAL REPORT FOR THE PERIOD 15th Dec 2010 to 14th Dec 2011 MOUNT EGERTON E39/1578 |
| A90216 | 2011 | Gme Resources Ltd | Eucalyptus Bore | 3.5% | Eucalyptus Bore Project, Annual Report for the period 1st March 2010 to 28th February 2011, M39/289, 313, 344, |
| A91537 | 2011 | Minara Resources Ltd | Eucalyptus | <1% | Annual Technical Report for the Period 11 August 2010 to 10 August 2011, Eucalyptus Project, M39/818 |
| A86606 | 2010 | Gme Resources Ltd | Eucalyptus Bore | 5.8% | Eucalyptus Bore Project Combined Reporting Group C89/2000 2009-2010, Annual Report for 1st March 2009 to 28th |
| A87241 | 2010 | Regal Resources Ltd | Zelica | <1% | Combined Annual technical Report M 39/115, M 39/292 Zelica Gold Project, period 1st September 2008 to 31st Aug |
| A88083 | 2010 | Minara Resources Ltd | Eucalyptus | <1% | Annual Technical Report for M39/818 - Eucalyptus Report Period: 11 August 2009 to 10 August 2010 |
| A81887 | 2009 | Gme Resources Ltd | EUCALYPTUS BORE | 5.8% | EUCALYPTUS BORE PROJECT COMBINED REPORTING GROUP C89/2000 2009 ANNUAL REPORT, Reporting Period: 1st March 2008 |
| A84268 | 2009 | Minara Resources Ltd | Eucalyptus | <1% | Eucalyptus First Annual Technical Report M39/818, Reporting Period 11 August 2008 to 10 August 2009 |
| A78536 | 2008 | Niwest Ltd | Eucalyptus Bore | 5.8% | ANNUAL REPORT FOR THE PERIOD 01 MARCH 2007 TO 29 FEBRUARY 2008 EUCALYPTUS BORE PROJECT Combined Report C89/200 |
| A79388 | 2008 | Regal Resources Ltd | Eucalyptus | <1% | Annual Technical Report M39/292 Eucalyptus Period 1st September, 2007 to 31st August 2008 |
| A79420 | 2008 | Regal Resources Ltd | Zelica | <1% | Combined Annual Technical Report M39/115, P39/2819 Zelica Gold Project Period 1st Sept 2007 to 31st Aug 2008 C |
| A75237 | 2007 | Niwest Ltd | Eucalyptus Bore | 3.3% | Eacalyptus Bore Project M39/289, 313, 344, 430, 568, 570, 616, 665, 666, 674, 802, E39/703 and 480 Annual Tech |
| A75587 | 2007 | Regal Resources Ltd | Eucalyptus | <1% | Annual Report P39/2819 Eucalyptus Project |
| A76161 | 2007 | Regal Resources Ltd | Eucalyptus | <1% | Eucalyptus Project Annual Report E39/676, P39/3753, P39/3808 - P39/3812, P39/4343 Period 17/10/2006 - 16/10/20 |
| A75547 | 2007 | Regal Resources Ltd | Eucalyptus | <1% | Annual Technical Report M39/292 Eucalyptus Period 1st September 2006 to 31st August 2007 |
| A75585 | 2007 | Regal Resources Ltd | Eucalyptus | <1% | Annual Report P39/2819 Eucalyptus Project |
| A76335 | 2007 | Metex Resources Ltd | Linden | 5% | Linden Project, Surrender Report E39/1193, for the period 18/10/2006 - 31/08/2007. Mount Margaret Mineral Fi |
| A73476 | 2006 | Regal Resources Ltd | Eucalyptus | <1% | Annual Technical Report, M39/292 Eucalyptus, Period 1 September 2005 to 31 August 2006, (Edjudina). |
| A73577 | 2006 | Regal Resources Ltd | Eucalyptus | <1% | Eucalyptus Project E39/676,P39/3753,3808-3812, Annual Report for Period 17/08/2005 to 16/08/2006, Combined Rep |
| A72598 | 2006 | Niwest Ltd | Eucalyptus Bore | 3.3% | Eucalyptus Bore Project E39/480,703,M39/289,313,344,430,568, 570,616,665,666,674,802, Annual Technical & Progr |
| A69837 | 2005 | Regal Resources Ltd | Eucalyptus | <1% | Annual report for the period 09/11/03 - 08/11/04 Eucalyptus Project, P39/3938, Leonora |
| A71005 | 2005 | Regal Resources Ltd | Eucalyptus | <1% | Eucalyptus Project, Annual report, E39/676, P39/3753, P39/3808-P39/3813, Period 17/08/2004 - 16/08/2005, C127/ |
| A69202 | 2004 | Newcrest Operations Ltd | Dixon | <1% | Relinquishment report (August 2003 to August 2004) Dixon Option (C127/2001), E39/676, P39/3808, P39/3812 Newcr |
| A69454 | 2004 | Gme Resources Ltd | Eucalyptus | 6% | Annual technical report for the period 01/03/03 - 28/02/04 Eucalyptus Project, C89/2000, E39/256, E39/386, E39 |
| A70722 | 2004 | Gme Resources Ltd | Eucalyptus Bore | 18% | Eucalyptus Bore Project (part) E39/256, M39/313, M39/289, P39/2444-2446, Annual technical & Progress report fo |
| A69300 | 2004 | Regal Resources Ltd | Eucalyptus | <1% | Annual report for the period 01/09/2003-30/08/2004 Eucalyptus Project M39/292 |
| A66616 | 2003 | Niwest Ltd | Eucalyptus | 6% | Annual Technical & Progress Report for the 12 month period ended 28 February 2003 Eucalyptus Project C89/2000: |
| A67205 | 2003 | Newcrest Operations Ltd | Dixon | <1% | Dixon Project, Annual Report for the period 17/08/2002 to 16/08/2003,E39/676; P39/3753,3808- 3813 |
| A70053 | 2003 | Newcrest Operations Ltd | Eucalyptus Dam | <1% | Annual Report for the period 20/01/03 - 31/12/03, Eucalyptus Dam Project, P39/2819. |
| A66064 | 2003 | Newcrest Operations Ltd | Eucalyptus Dam | <1% | Annual Report for the period 20/1/2002 to 19/1/2003, Eucalyptus Dam Project, P39/2819. |
| A68003 | 2003 | Newcrest Mining Ltd | Eucalyptus Dam | <1% | Surrender Report for the period ending 19/01/2004 Yundamindra (Eucalyptus Dam) Project P39/2819 |
| A64615 | 2002 | Niwest Ltd | Eucalyptus | 6% | Eucalyptus Project: E39/256, E39/386 & E39/368 M39/313 & M39/289 P39/2692 & P39/2444-2446 Annual Technical & P |
| A64765 | 2002 | Anaconda Operations Pty Ltd | MURRIN MURRIN EAST PROJECT | <1% | MURRIN MURRIN EAST PROJECT, Fifth Annual Technical Report C354/1997 For The Period 1 March 2001 To 29 February |
| A65489 | 2002 | Newcrest Operations Ltd | Yundamindra | <1% | Annual Report Dixon Option E39/676, P39/3753, P39/3808- P39/3813. Reporting period 17/08/2001 To 16/08/2002 |
| A62506 | 2001 | Anaconda Operations Pty Ltd | Murrin Murrin East | <1% | TR 1083 Murrin Murrin East Project E39/443; E39/444; E39/564 E39/747; P39/3440; P39/3527; P39/3526; P39/3729; |
| A62627 | 2001 | Niwest Ltd | Eucalyptus | 6% | Eucalyptus Project: E39/256, E39/386 & E39/368 M39/313 & M39/289 P39/2692 & P39/2444-2446 Annual Technical & P |
| A59792 | 2000 | Jarrahmond Holdings Pty Ltd | Eucalyptus | <1% | Eucalytus Project Western Australia Annual Report for the period 21/01/1999 to 20/01/2000 Prospecting Licence |
| A60253 | 2000 | Mr Longman Mj | Eucalyptus | <1% | Euclyptus Project , Annual Report for the period 21/01/1997 to 20/01/1998 Prospecting Licence 39/2819 |
| A60252 | 2000 | Jarrahmond Holdings Pty Ltd | Eucalyptus | <1% | Eucalyptus Project Western Australia Annual Report for the Period 21/01/1998 to 21/01/1999 Prospecting Licence |
| A60290 | 2000 | Anaconda Nickel Ltd | Murrin Murrin East | <1% | Murrin Murrin East Project E39/443; E39/444; E39/545; E45/747; E45/564; P39/3440; P39/3527; P39/3729; M39/314; |
| A60872 | 2000 | Western Metals Ltd | Eucalyptus | 8.2% | Eucalyptus Project: E39/256,313, P39/2692,2444-2446 and E39/38, Annual Technical & Progress Report for the 12 |
| A61020 | 2000 | Western Metals Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Nickel Project M39/289 Annual Technical and Progress Report for the Period 21st June 1999 to 2 |
| A61334 | 2000 | Western Metals Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Nickel Project (Eucalyptus Northeast Option) M39/289. Annual Technical and Progress Report for |
| A58091 | 1999 | Western Metals Ltd | Eucalyptus | 8.2% | Eucalyptus Project ,M39/313, E39/256, 386, P39/2444-2446, 2692 Annual Report for the period 01/03/98 to 28/02 |
| A58423 | 1999 | Anaconda Nickel Ltd | Murrin Murrin East | <1% | Murrin Murrin East Project 01/03/98 - 29/02/99 E39/255, 443, 444, 545, 564, 3440, 3526, 3527, 3729, etc |
| A58693 | 1999 | Western Metals Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Nickel Project (Eucalyptus Northeast Option) M38/289 Annual Technical and Progress Report for |
| A54234 | 1998 | Aberfoyle Resources Ltd | Eucalyptus Bore | 8.2% | Eucalyptus Bore Nickel Project E39/256 M39/313 P39/2692 P39/2444 to P39/2446 E39/386 Annual Report for the 12 |
| A55685 | 1998 | Aberfoyle Resources Ltd | Eucalyptus NE | <1% | Eucalyptus NE Nickel Project, M39/289 Annual Technical & Progress Report 12 Month Period ended: 20/06/98 |
| A61335 | 1997 | Aberfoyle Resources Ltd | Eucalyptus | <1% | Eucalyptus Nickel Joint Venture, Western Australia. Mining Lease M39/289 Eucalyptus NE. Annual Exploration Rep |
| A50650 | 1997 | Aberfoyle Resources Ltd | Eucalyptus Bore | 8.2% | Eucalyptus Bore Nickel Project E39/256 M39/313 P39/2692 P39/2444 to P39/2446 and E39/386 annual technical repo |
| A51581 | 1997 | Mr Longman Mj | Eucalyptus | <1% | Eucalpytus Project Western Australia Annual report for the period 21/01/1996 to 20/01/1997 Prospecting Licence |
| A59013 | 1997 | Eucalyptus Gold Mines Pty Ltd | Eucalyptus | <1% | Eucalptus Gold Project Western Australia Annual Report for the period 30/08/98-29/08/99 Mining Lease 39/292 |
| A47124 | 1996 | Mr Longman Mj | Eucalyptus | <1% | Eucalyptus Gold Project Western Australia Annual report for the period 12/01/1995 to 20/01/1996 |
| A47464 | 1996 | Aberfoyle Resources Ltd | Eucalyptus Bore | 8.2% | Eucalyptus Bore Project, Annual report on Exploration for the period 01/03/1995 to 29/02/1996 for E39/256 M39/ |
| A48616 | 1996 | Aberfoyle Resources Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Nickel Project Annual Technical report on Exploration for the period 21/06/1995 to 20/06/1996 |
| A43297 | 1995 | Mr Longman Mj | Eucalyptus | <1% | Annual report Eucalyptus Pproject P39/2819 for the period 01/01/1994 to 01/12/1994. |
| A43519 | 1995 | Mining Project Investors Pty Ltd | Eucalyptus Bore | 8.2% | Annual Technical Report on Eucalyptus Bore Project Mount Morgans District Mount Margaret Mineral Field for the |
| A40054 | 1994 | Mr Longman Mj | Eucalyptus | <1% | Annual report for the period 01/93-01/94 Eucalyptus Project P39/2819 |
| A41985 | 1994 | Mr Longman Mj | Eucalyptus | <1% | Annual report for the period 01/08/93-01/08/94 Eucalyptus Project P39/2820 |
| A41410 | 1994 | Mining Project Investors Pty Ltd | Eucalyptus Bore | 27% | Annual report for the period ending 17/03/94 Eucalyptus Bore Project E39/256 P39/2444-2446 P39/2692 |
| A38145 | 1993 | Mim Exploration Pty Ltd | Eucalyptus South | 31% | Annual report for the period 12/91-12/92, Eucalyptus South Project , E39/256 P39/2444 P39/2445 P39/2446 |
| A39061 | 1993 | Nippon Mining Of Aust Pty Ltd | Eucalyptus | <1% | Annual Report Eucalyptus Gold Project Mt Margaret Goldfield (M39/56, M39/115, M39/181, M39/187, P39/2214) (for |
| A39632 | 1993 | Sir Samuel Mines Nl | Yundamindra | <1% | Annual Report for the Period 01/09/92 - 01/11/93 Yundamindra Project. |
| A38146 | 1992 | Wyatt & Clarke Consulting Geologists | Eucalyptus Bore | <1% | Eucalyptus Bore / Pyke Hill Nickel Prospects E39/340, P39/2692, 17/03/1992 Mount Margaret Mineral Fi |
| A35445 | 1992 | Mim Exploration Pty Ltd | Eucalyptus South | 31% | Annual Report for the Period 18/12/90 - 17/12/91 ,Eucalyptus South Project ,P39/2444-2446. |
| A39060 | 1991 | Nippon Mining Of Aust Pty Ltd | Eucalyptus | <1% | Annual Report Eucalyptus Gold Project Mt Margaret Goldfield (M39/56, M39/115, M39/181, M39/187, P39/2214) (for |
| A33213 | 1991 | Carpentaria Exp Co Pty Ltd | Eucalyptus South | <1% | Eucalyptus South Project, E39/256 Annual Report for the Period Ending 10/04/91. |
| A29938 | 1989 | Jarrahmond Holdings Pty Ltd | Eucalyptus | 24% | Quarterly Report on the Eucalyptus JVPr oject, 25/08/89 - 24/11/89 (R Report; GML39/982; M39/56,181-182,187) |
| A25363 | 1988 | Jarrahmond Holdings Pty Ltd | Eucalyptus | 13% | Eucalyptus Gold Project, Annual report, November 1988, M39/56, M39/114-115, M39/178182, M39/187, GML39/982, P3 |
| A8126 | 1979 | Western Mining Corporation Ltd | Eucalyptus Dam | 8.5% | Annual report, Eucalyptus Dam claim block, 14 December 1977 to 12 December 1978 |
| A7643 | 1978 | Australian Selection Pty Ltd | Eucalyptus | 1.6% | Eucalyptus Project, Non-statutory Report: Final Report for period ending 16/12/1975, MC39/11, 14, 19, 38-40, 4 |
| A1414 | 1971 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | 1.3% | Pyke Hill - Eucalyptus Project, Annual Report (s) for the period(s) ending 31/12/1970 & 31/12/1971, TR70/3701 |
| A1415 | 1971 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | 1.3% | Pyke Hill - Eucalyptus Project, Non-statutory Report:Index to Plans, Soil Geochemistry & Geology Grids ( for o |
| A2486 | 1971 | Newmont Pty Ltd | Eucalyptus North | 15% | Eucalyptus North (JV) Project, Non-statutory Report:Exploration Report, June1971, MC39/478-479, 498, 550, 578- |
| A2513 | 1971 | Le Nickel Aust Exp Pty Ltd | Watson Dam | 2.2% | Watson Dam Project, Annual Report for the period ending 31/12/1971, MC31/1171-1181, 1183-1185, 1187-1189, 1191 |
| A1412 | 1969 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | 1.3% | Pyke Hill - Eucalylptus Project, Annual Report [s] for the periods ending 31/12/1968 & 31/12/1969, TR3701 & 37 |
| A12748 | 1969 | Kia Ora Gold Corp Nl | Mount Keith | <1% | Geological report Mount Keith Nickel Prospect Leonora WA |
| A1409 | 1967 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | 2.9% | Pyke Hill - Eucalyptus Project, Non-statutory Report: Progress Report, with Grid Index & Index to Maps, 1966, |
| A1410 | 1967 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | 1.3% | Pyke Hill - Eucalyptus Project, Annual Report: Report of Investigations for the period 15th August 1967-12th O |
| A1411 | 1967 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | 1.3% | Pyke Hill - Eucalyptus Project, Non-statutory Report: Grid & Geology Sheets, December 1967, TR70/3748H |
| A1590 | 1965 | Mount Margaret Prospecting Syndicate | Yundamindera | <1% | Yundamindera Project, Non-statutory Report: Report on 78 Gold Products received 13th August 1964, TR70/2685, 2 |
| A70147 | 1753 | Regal Resources Ltd | Eucalyptus | <1% | Annual Report Eucalyptus Project M39/292, 115, P39/2819 Period 01/01/2004-31/12/2004 (C22/2005) |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 20 years · 29 Mar 2047
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 39/344 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 39/344? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.