- Holder
- Wingstar Investments Pty Ltd
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 28 June 1989
- Commenced
- 28 Mar 1990
- Expiry
- 27 Mar 2032
- Term
- 21 Years (Renewed)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A131600 | 2022 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | <1% | Bulong Project (C75/2016) Annual Report for the Period May 4th 2021 to May 3rd 2022.E 27/552,E 27/554,E 27/555 |
| A127639 | 2021 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | <1% | Bulong Project (C75/2016) Annual Report for the Period 4th May 2020 to 3rd May 2021 |
| A122836 | 2020 | Black Cat (Bulong) Pty Ltd | Bulong | 1.5% | Annual Report for the Bulong Gold Project C314/1992 for the period ending 31/12/2019 |
| A123494 | 2020 | Ardea Resources Limited | Bulong | 1.2% | Annual Report Bulong Project C224/1995, 1 January 2019 to 31 December 2019 |
| A123876 | 2020 | Hurricane Prospecting Pty Ltd | Bulong | 27% | Bulong Nickel E25/552 Annual Report for the period 23/4/2020 |
132 more reports
| A123984 | 2020 | Wingstar Investments Pty Ltd | Avalon | 22% | Avalon C156/2006 Annual Technical Report for the period ending 27/03/2020 |
| A124735 | 2020 | Hurricane Prospecting Pty Ltd | Bulong Nickel | 27% | E25/552 Annual Report Bulong Nickel project for the period 24 April 2019 to 23 April 2020 |
| A124136 | 2020 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | <1% | Bulong Project (C75/2016) Annual Report for the Period May 4th 2019 to May 3rd 2020 |
| A118881 | 2019 | Ardea Resources Limited | Little Bulong | <1% | Little Bulong Project C55/2012 Annual Report For the Period 29 September 2017 to 28 September 2018, M25/00151, |
| A119240 | 2019 | Black Cat (Bulong) Pty Ltd | Bulong | 1.7% | Annual Report for the Bulong Gold Poject C314/1992 for the period 01/01/2018 - 31/12/2018 |
| A119605 | 2019 | Ardea Resources Limited | Bulong | 1.4% | Bulong Project C224/1995 Annual Report for the period 1 January 2018 to 31 December 2018 |
| A120132 | 2019 | Wingstar Investments Pty Ltd | Avalon | 22% | C156/2006 Avalon Annual Technical Report for the period 28 March 2018 to 27 March 2019, M25/00075, M25/00076, |
| A120323 | 2019 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | <1% | Annual Report for Bulong Project C75/2016 for the period 4 May 2018 to 3 May 2019, E27/00551, E27/00552, E27/0 |
| A121114 | 2019 | Hurricane Prospecting Pty. Ltd. | Kanowna | 27% | Kanowna Project E25/552 Annual Report for the period 24 April 2018 to 23 April 2019 |
| A115684 | 2018 | Ardea Resources Limited | Little Bulong | <1% | C55/2012 Little Bulong Annual Report For the Period 29 September 2016 to 28 January 2017, M25/00151, M25/00187 |
| A116727 | 2018 | Southern Gold Limited | Bulong East | 2.1% | C224/1995 Bulong East Project Comined Report for the period 1 January 2017 to 31 December 2017, M25/00059, M25 |
| A116898 | 2018 | Wingstar Investments Pty Ltd | Avalon | 22% | Avalon Project C156/2006 Annual Technical Report for the period 28 March 2017 to 27 March 2018, M25/00075, M25 |
| A117074 | 2018 | Hurricane Prospecting Pty Ltd | Bulong | 27% | Bulong Project E25/552 Annual Report for the period 24/04/2017 - 23/04/2018 |
| A117189 | 2018 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | <1% | Annual Report for Bulong Project C75/2016 for the period 04/05/2017 - 03/05/2018, E27/00551, E27/00552, E27/00 |
| A112728 | 2017 | Southern Gold Limited | Bulong East | 1.4% | Bulong East Project C224/1995 Annual Report for the period 01/01/2016 - 31/12/2016, M 25/00059, M 25/00134, M |
| A113911 | 2017 | Wingstar Investments Pty Ltd | Avalon | 22% | Avalon Project C156/2006 Combined Annual Report For the Period 28 March 2016 to 27 March 2017, M25/00075, M25/ |
| A113952 | 2017 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | <1% | Bulong Project C75/2016 Annual Report for the period May 2016 to May 2017, E27/00551, E27/00552, E27/00554, E2 |
| A108680 | 2016 | Southern Gold Limited | Bulong East | 1.1% | Bulong East Project C224/1995, Annual Report for the period 1 January 2015 to 31 December 2015 |
| A109098 | 2016 | Wingstar Investments Pty Ltd | Avalon | 22% | Avalon Project C156/2006 Combined Annual Report M 25/00075, M 25/00076, M 25/00077, M 25/00078, M 27/00189 for |
| A105543 | 2015 | Southern Gold Ltd | Bulong East | <1% | Combined Annual Report for M25/59, M25/111, M25/134, M25/145, M25/161-162, M25/171, M25/206-210, M25/220, M25/ |
| A105853 | 2015 | Wingstar Investments Pty Ltd | Bulong | 22% | Bulong Project C156/2006 Combined Annual Report for the period 28/03/2014 to 27/03/2015, M25/75, 76, 77, 78, M |
| A101490 | 2014 | Southern Gold Ltd | Bulong East | <1% | Combined Annual Report for C Number: 224/1995 ‘Bulong East Project’ For the period 1st January 2013 to 31st De |
| A101496 | 2014 | Norilsk Nickel Australia Ltd | Avalon | 22% | Annual Report To the Department of Mines and Petroleum For the period 28 March 2013 to 27 March 2014 Avalon Pr |
| A103111 | 2014 | Aruma Resources Ltd | Bulong | 3% | Bulong E25/469 Surrender report for the period ending 3rd July 2014 |
| A104148 | 2014 | Heron Resources Ltd | Little Bulong | 2.3% | Little Bulong Project C55/2012, Annual Report for the period 29/09/2013 to 28/09/2014, M25/151,187 & 476. |
| A96527 | 2013 | Bulong Mining Pty Ltd | Bulong | 2.5% | Bulong Project (C314/1992) Annual Report for the period 01/01/2012 to 31/12/2012 |
| A97318 | 2013 | Norilsk Nickel Avalon Pty Limited | Avalon | 22% | Annual Report To the Department of Mines and Petroleum For the period 28 March 2012 to 27 March 2013 Avalon Pr |
| A99623 | 2013 | Aruma Resources Ltd | Woodline | 3% | E25/469 Woodline Glandore Project Annual Report for the period ended 26th July 2013 |
| A100909 | 2013 | Heron Resources Ltd | Little Bulong | 2.3% | Little Bulong Project, Annual Report for the period 29/09/2012 to 28/09/2013, M25/151 & 187; E25/476. [C55/201 |
| A93253 | 2012 | Southern Gold Ltd | Bulong East | 1% | Combined Annual Report for ‘Bulong East Project’ C224/1995 for the period 1st January 2011 to 31st December 20 |
| A97363 | 2012 | Southern Gold Ltd | Bulong East | 1% | Combined Annual Report for M25/59, M25/111, M25/134, M25/145, M25/161, M25/162, M25/171, M25/206-210, M25/220, |
| A93853 | 2012 | Heron Resources Ltd | South West Taurus | <1% | Annual report for the period 18 March 2011 to 17 March 2012, South West Taurus Dam Project, M25/151 |
| A95706 | 2012 | Heron Resources Ltd | Little Bulong | <1% | Annual report for the period 29 September 2011 to 28 September 2012, Little Bulong Project C55/2012, M25/151, |
| A93609 | 2012 | Norilsk Nickel ( Avalon) Pty Ltd | Avalon | 22% | Annual Report To the Department of Mines and Petroleum For the period 28 March 2011 to 27 March 2012 Avalon Pr |
| A89960 | 2011 | Heron Resources Ltd | Bulong | <1% | Combined annual report for the period 1 January 2010 to 31 December 2010, Bulong Project, C224/1995 |
| A90201 | 2011 | Norilsk Nickel ( Avalon) Pty Ltd | Avalon | 22% | Avalon Project, Annual Report for the period 28th March 2010 to 27th March 2011, M25/75-78, & M27/189. (C156/2 |
| A88987 | 2011 | Bulong Mining Pty Ltd | New Bulong | 2.5% | Annual Report for the period 1 January 2010 to 31st December 2010, New Bulong Project C314/1992 |
| A89901 | 2011 | Cazaly Resources Ltd | Bulong | 3% | Annual Report Bulong Project E25/395 For the Period 21 January 2010 to 20 January 2011 |
| A91720 | 2011 | Cazaly Resources Ltd | Bulong | 3% | Final Surrender Report Bulong Project E25/395 For the Period 21st January 2010 to 1st July 2011 |
| A91838 | 2011 | Heron Resources Ltd | Taurus Dam | <1% | Surrender report for the period 13 April 2006 to 13 July 2011, Taurus Dam Project, M25/127 |
| A86572 | 2010 | Heron Resources Ltd | Bulong | <1% | Annual report for the period 1 January 2009 to 31 December 2009, Bulong Project, C224/1995, E25/250, M25/59, M |
| A80567 | 2009 | Rubicon Resources Ltd | TAURUS | <1% | TAURUS PROJECT COMBINED REPORT C133/2007 M25/19, M25/32, M25/36, M25/58, M25/64, M25/81, M25/82, M25/149, P25/ |
| A82323 | 2009 | Norilsk Nickel Australia Ltd | AVALON | 22% | ANNUAL REPORT ON THE AVALON PROJECT FOR THE PERIOD 28 MARCH 2008 TO 27 MARCH 2009, MT MARGARET MINERAL FIELD, |
| A86188 | 2009 | Rubicon Resources Ltd | Taurus | <1% | Taurus Project, Combined Report, C133/2007, M25/19, 32, 36, 58, 64, 81, 82, 149, P25/1999, 2000, 2001, Annual |
| A77925 | 2008 | Yilgarn Gold Ltd | New Bulong | 2.8% | Annual report for the period 1 January 2007 to 31 December 2 007, New Bulong Project E25/90 & 218, M25/24, 83, |
| A78871 | 2008 | Norilsk Nickel Australia Ltd | Avalon | 22% | ANNUAL REPORT ON THE AVALON PROJECT FOR THE PERIOD 28 MARCH 2007 TO27 MARCH 2008 MT MARGARET MINERAL FIELD, WA |
| A79593 | 2008 | Rubicon Resources Ltd | Kurnalpi / Kanowna | <1% | M25/32 & M25/82 (BULONG) ANNUAL ENVIRONMENTAL REPORT |
| A77272 | 2008 | Rubicon Resources Ltd | Taurus | <1% | TAURUS PROJECT COMBINED REPORT C133/2007 ANNUAL REPORT 1 JANUARY 2006 TO 31 DECEMBER 2007 |
| A77762 | 2008 | Inco Resources (Australia) Pty Ltd | Bulong | <1% | BULONG PROJECT C224/1995, E25/250....M25/59...P27/1754 to P27/1761, Combined Annual Report C224/1995, |
| A81471 | 2008 | Vale Inco Australia Limited Partnership | Bulong | <1% | BULONG PROJECT C224/1995 FOR THE PERIOD 1 JANUARY 2008 – 31 DECEMBER 2008 |
| A74608 | 2007 | Inco Australia Ltd | Bulong Danae | 10% | Combined Annual Report C28/2007 for the period 1 January - 31 December 2006 Bulong Danae Project Tenements:M25 |
| A74679 | 2007 | Inco Australia Ltd | Bulong | <1% | Bulong Project C224/1995 Comb Annual Report for the Period 1 Jan 2006 - 31 Dec 2006 (Kurnalpi) |
| A74757 | 2007 | Heron Resources Ltd | Bulong-Manor | <1% | Bulong - Manor Project C137/1999 Annual Report for the Period 01 Jan 2006 - 31 Dec 2006 (Kurnalpi) |
| A75023 | 2007 | Heron Resources Ltd | Hampton Hil | <1% | Hampton Hill Project, Annual Report for the period 1st January 2006 to 31st December 2006, P25/1004,1005 & 100 |
| A75205 | 2007 | Yilgarn Gold Ltd | New Bulong | 2.8% | New Bulong Project E25/90 & 218, M25/24, 83, 91 & 129, P25/ 1125-1136, 1191 & 1788 and P25/1312, Combined Annu |
| A75476 | 2007 | Lionore Australia (Avalon) Pty Ltd | Avalon | 22% | Annual Report on the Avalon Project For the period 28 March 2006 TO 27 March 2007 Mount Margaret Field,Western |
| A71827 | 2006 | Heron Resources Ltd | Taurus Project | <1% | Taurus Project Combined Report C378/1997, East Coolgardie (Bulong) Mineral Field, Annual Report, 14 September |
| A72025 | 2006 | Yilgarn Gold Ltd | New Bulong | 2.9% | Annual Report for the period 01/01/05 to 31/12/05, New Bulong Project, E25/90,218, M25/24,83,91,129, P25/1125- |
| A72402 | 2006 | Heron Resources Ltd | Bulong/Manor/Danae | 4.3% | Bulong - Manor Project Combined Report C137/1999, Annual Report, 1 January 2004 to 31 December 2005 |
| A73311 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | <1% | Annual Report on the Avalon Nickel Project M25/78, For the Period 28 March 2005 to 27 March 2006, (Kurnalpi). |
| A73312 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | <1% | Annual Report on the Avalon Nickel Project M25/78, For the Period 28 March 2004 to 27 March 2005, (Kurnalpi). |
| A73315 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | <1% | Annual Report on the Avalon Nickel Project M25/76, For the Period 28 March 2004 to 27 March 2005, (Kurnalpi). |
| A73316 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | <1% | Annual Report on the Avalon Nickel Project M25/76, For the Period 28 March 2005 to 27 March 2006, (Kurnalpi). |
| A73317 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | 100% | Annual Report on the Avalon Nickel Project M25/77, For the Period 28 March 2004 to 27 March 2005, (Kurnalpi). |
| A73318 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | 100% | Annual Report on the Avalon Nickel Project M25/77, For the Period 28 March 2005 to 27 March 2006, (Kurnalpi). |
| A72377 | 2006 | Heron Resources Ltd | Bulong | <1% | Bulong Project Combined Report C224/1995, Annual Report, 1 January 2004 to 31 December 2005, (Kurnalpi). |
| A69928 | 2005 | Supersorb Minerals Nl | Taurus | <1% | Taurus Project ,Annual Report, 14th September 2003 to 13th September: 2004, P25/1004,P25/1005, P25/1006. |
| A70093 | 2005 | Yilgarn Gold Ltd | New Bulong | 2.9% | Annual report for the period 01/01/04 - 31/12/04 New Bulong Project, C314/1992, E25/90, E25/218, M25/24, M25/8 |
| A68050 | 2004 | Bulong Operations Pty Ltd | Bulong | 3.4% | Combined Annual Report C224/95 1st January 2003 to 31st dece mber 2003 E25/67, E27/72, E27/94 etc |
| A68051 | 2004 | Bulong Operations Pty Ltd | Kurnalpi gold / Taurus | <1% | Bulong/Talon Tenure Combined Annual Report, C378/1997 for the period 14th September 2002 to 13th September: 20 |
| A68527 | 2004 | Yilgarn Gold Ltd | Bulong | 2.9% | Annual report for the period 01/01/2003-31/12/2003 New Bulong Project (C314/1992), E25/90, E25/218, M25/24, M2 |
| A68049 | 2004 | Bulong Operations Pty Ltd | Bulong-Danae | 4.3% | Combined Annual Report C137/99 Bulong - Danae Joint Venture 1st January 2003 to 31st December 2003 |
| A66108 | 2003 | Yilgarn Gold Ltd | Bulong | 2.9% | Annual Report/Technical Review February 2003 New Bulong Project M25/24, 83, 91, 129, P25/1125-36, 1191, 1312, |
| A66309 | 2003 | Bulong Operations Pty Ltd | Bulong | 3.3% | Combined Annual Report C224/95 for the period 1 January 2002 to 31 December 2002 E25/67, E27/72,94, L27/55-56, |
| A66149 | 2003 | Bulong Operations Pty Ltd | Bulong | <1% | Bulong/Talon Tenure Combined Annual Report, C378/1997 for the period 14th September 2001 to 13th September: 20 |
| A66420 | 2003 | Bulong Operations Pty Ltd | Bulong- Danae | 4.3% | Combined Annual Report, C137/1999, Bulong-Danae Joint Venture, 1st January 2002 - 31st December 2002, : L25/7, |
| A63586 | 2002 | Anglogold Australia Ltd | New Bulong | 2.6% | New Bulong (JV) Project M25/83, E25/85, E25/218, P25/1125-1136, P25/1191 & P27/1312, Annual Report for the per |
| A64757 | 2002 | Bulong Operations Pty Ltd | Bulong | 3.7% | Combined Annual Report C224/95 1st January 2001 - 31st December 2001 Exploration Licences 25/67, 27/72, 27/94 |
| A65132 | 2002 | Anglogold Australia Ltd | New Bulong | 3.5% | Final Report for the Period 22 August 1997 to 13 June 2002 [ C314/92]. New Bulong (JV) Project, E25/85. |
| A64171 | 2002 | Bulong Operations Pty Ltd | Bulong | <1% | Annual Report 14th September 2000 to 13th September 2001 P25/1004, P25/1005, P25/1006 Bulong/Talon tenure, Bul |
| A64756 | 2002 | Bulong Operations Pty Ltd | Bulong - Danae | 4.3% | Combined Annual Report C137/99 Bulong - Danae Joint Venture 1st January 2001 - 31st December 2001. Mining Leas |
| A62577 | 2001 | Bulong Operations Pty Ltd | Bulong - Manor | 4.3% | Mining Leases 25/19, 25/32, 25/36, 25/58, 25/59, 25/64, 25/81, 25/82 Propsecting Licences 25/1175, 25/1176, 25 |
| A62233 | 2001 | Bulong Operations Pty Ltd | Bulong | <1% | Bulong WA Combined Report C224/95 For Year 2000. |
| A59936 | 2000 | Acacia Resources Ltd | New Bulong | 2% | New Bulong (JV) Project, E25/85, P25/1125-1136,1191 , GML27/1709, P27/1312, M25/83, E26/77, Annual Report for |
| A61983 | 2000 | Anglogold Australasia Ltd | New Bulong | 2.6% | New Bulong JV Project E25/85, P25/1125-1136, P25/1191, GML27/1709, P27/1312, M25/83 & E25/218 Verification Rep |
| A58802 | 1999 | Preston Resources Nl | Bulong | <1% | Bulong Project, Annual report to 31/12/98 for P25/1004 P25/1005 and P25/1006 Taurus Western Australia |
| A55022 | 1998 | Manor Resources Nl | Bulong | 2.6% | Bulong, Annual Report 09/06/1998 Manor Resources NL M25/19, M25/32, M25/36, M25/58, M25/59, M25/64, M25/81, |
| A56108 | 1998 | Resolute Ltd | Bulong | <1% | Combined annual mineral exploration report. Bulong Project. 01/01/97-31/12/97. E15/286. E25/67. E27/94,95. P25 |
| A57394 | 1998 | Acacia Resources Ltd | New Bulong | 2% | New Bulong (JV) Project, Annual Report for the period 01/01/98 - 31/12/98, E25/85, P25/1125-1136, 1191 GML27 |
| A53308 | 1998 | Talon Resources Nl | Taurus | <1% | Taurus Project, Annual Report P25/1004-1006 Year Ending: 13/09/1995 Kurnalpi, East Coolgardie Mine |
| A53309 | 1998 | Talon Resources Nl | Taurus | <1% | Taurus Project, Annual Report Year Ending: 13/09/1996 P25/1004-1006 Kurnalpi, East Coolgardie Mineral Field, |
| A54344 | 1998 | Acacia Resources Ltd | Bulong | 2% | New Bulong Joint Venture Project - Annual Report E25/85, MLA25/163-164, MLA27/332, P25/1125-1127, etc. 01/01/1 |
| A56082 | 1998 | Resolute Ltd | Bulong | 10% | Combined Annual Mineral-Exploration Report Bulong Project Tenements Exploration Licences E27/72 Prospecting Li |
| A50801 | 1997 | Resolute Ltd | Bulong | <1% | Bulong Joint Venture Project, (East Coolgardie Mineral Field Western Australia) Annual Report for ML25/75 ML25 |
| A51401 | 1997 | Goldfields Exploration Pty Ltd | Bulong | 2.7% | Annual report Project Bulong Tenements: Prospecting Licences P25/1058 P25/1061 to P25/1063 P25/1071 P25/1175 t |
| A52660 | 1997 | Talon Resources Nl | Taurus | <1% | Taurus Project, Annual Report Year Ending 13/09/1997 P25/1004-1006 Kurnalpi, East Coolgardie Mineral Field |
| A53417 | 1997 | Resolute Ltd | Bulong | 8.7% | Bulong Nickel Cobalt Project. Annual report 01/01/96-31/12/96. E25/67. E27/72. M25/75-78,127-128. M27/189-190. |
| A47427 | 1996 | Manor Resources Nl | Bulong / Manor / Danae | <1% | Bulong Gold Project Annual report for the period 1 January 1995 to 31 December 1995 Mining Leases M25/19 M25/3 |
| A48478 | 1996 | Resolute Samantha Ltd | Bulong | 9.1% | Bulong Nickel Cobalt Project Annual report Bulong (Nickel) Tenement Group M25/75 to M25/78 M25/127 M25/128 M27 |
| A43697 | 1995 | Cyprus Gold Australia Corporation | Bulong | 2.2% | Bulong (JV) Project , Annual Report for the period March 1,1994 to February 28,1995 E25/85,E25/90,P25/1125 to |
| A44059 | 1995 | Tindals Gold Mines Nl | Woodline Rush | <1% | Woodline Rush Gold Project Geological Report on M25/83 (East Coolgardie Mineral Field Western Australia) for p |
| A45341 | 1995 | Manor Resources Nl | Bulong / Manor / Danae | <1% | Bulong Gold Project Annual Report For the periodof 1st January to 31st March 1995 Mining Leases M25/19,32,36,5 |
| A40273 | 1994 | Talon Gold Nl | Taurus | <1% | Annual Report for the period 14/09/92-13/09/93 Taurus Project P25/1004-1006 |
| A40973 | 1994 | Cyprus Gold Australia Corporation | Bulong | 2.6% | Annual report for the period 01/03/93-28/02/94 Bulong JV Project E25/85 P25/1125-1136 P25/1192 |
| A41478 | 1994 | Manor Resources Nl | Bulong | 2.9% | Annual report for the period 01/01/93-31/12/93 Bulong Project |
| A43505 | 1994 | Talon Resources Nl | Taurus | <1% | Annual Report on the Taurus Group, P25/1004 to P25/1006 for period 14/09/1993 to 13/09/1994. |
| A37734 | 1993 | Ernmik Exploration | Bulong | 2.6% | Annual report for the period ending 31/12/1992 Bulong/North Queen Margaret Gold Project E25/85 P25/1125- 1136 |
| A36571 | 1992 | Manor Resources Nl | Bulong | 4.3% | Bulong Project Annual Report for the year ending June 1992 M25/19,32,36,58,59,64,81,82 P25/1175-1177,1179 |
| A32944 | 1991 | North Eastern Gold Mines Nl | Bulong | 6.3% | Bulong Project Annual report M25/19,32,58,59,64,81 & 82 (April 1991) |
| A34602 | 1991 | Mr Dalla-Costa Mr | Taurus | <1% | (Annual Report for the period 01/90-12/91 Taurus Project P25/1004-1006) Taurus, Bulong District |
| A30392 | 1990 | North Eastern Gold Mines Nl | Bulong | 6.3% | Bulong Project. Annual Report M25/19,32,58,59,64,81 and 82 04/1990 |
| A29399 | 1989 | Trafalgar Mining Nl | Bulong | 3.9% | Bulong Project, Annual Report - Associated plans (1988-1989) |
| A29268 | 1989 | Trafalgar Mining Nl | Bulong | 4.8% | Non-statutory Report: Alluvial Potential of The Bullong Prospect , March 1989, M25/19, 23, 36 ; P25/181 |
| A29269 | 1989 | Trafalgar Mining Nl | Bulong | 3.9% | Non-statutory Report : Hard Rock Potential of The Bulong Prospect, 07/03/1989, M25/19, 32, 36; P25/181 |
| A24768 | 1988 | Energy Oil & Gas Nl | Bulong | 25% | Bulong Project June 1987 to May 1988 Report No 878005 E25/11, E25/46, M25/34, M27/66 Geological Consultants In |
| A29275 | 1988 | Trafalgar Mining Nl | Bulong | 3.9% | Non-statutory Report : Progress Report Bulong Gold Project (1988) M25/19, 32, 36 & P25/181-182 |
| A26241 | 1988 | Bp Minerals Aust Pty Ltd | Virgin Dam | <1% | Virgin Dam Project - Patch Dam tenements P25/444, P25/612, M25/29 23/09/87 - 20/06/88 |
| A29265 | 1988 | Trafalgar Mining Nl | Bulong | 3.9% | Bulong Project, Annual Report , March 1988, M25/19, 32, 36 P25/181-182, 509, 525, 613 & 629 |
| A22010 | 1987 | Bp Minerals Aust Pty Ltd | Virgin Dam | <1% | Virgin Dam Project Patch Dam Tenements P25/444 P25/612 M25/29 Annual report for period ending 22nd September 1 |
| A23291 | 1987 | Leader Resources Nl | Bulong | <1% | Bulong Project, Initial reconnaissance and proposed further exploration, P25/159-161, P25/269 |
| A23672 | 1987 | Trafalgar Mining Nl | Bulong | 11% | Bulong Project ,Annual Report for the period Prospecting licence: P25/181, 182, 613. Mining Lease: M25/36Sept |
| A16210 | 1985 | Rytech Pty Ltd | Taurus | <1% | Taurus Project, Non-statutory Report: Report on Gold Prospects in the Eastern Goldfields of Western Australia, |
| A15676 | 1984 | Consolidated Resources Nl | Bulong | <1% | Bulong Project, Non-statutory Report: Final Report, Gold Exploration Activities , Taurus Mine & Environs at Bu |
| A7844 | 1978 | Aquitaine Aust Minerals Pty Ltd | Ophir | 12% | Ophir Project, Non-statutory Report: Exploration Report, March 1978, MC25/1042, 1113-1117. |
| A5073 | 1973 | Western Nickel Pty Ltd | Bulong | 4% | Bulong Project, Non-statutory Report: Geological Report for the period 1st January 1972 to 31st March 1973, |
| A1279 | 1970 | Western Nickel Pty Ltd | Bulong | 3.9% | Bulong Project, Annual Report for the period ending 31/12/1970, TR70/4677H; MC27/60, 232-233, 462-470, 775-777 |
| A1277 | 1968 | Western Nickel Pty Ltd | Bulong | 3.9% | Bulong Project, Annual Report for the period ending 31/12/1968, TR70/4677H; MC27/60, 232-233, 462-470, 775-777 |
| A47290 | 1753 | Cyprus Gold Australia Corporation | Bulong JV | 2.3% | Bulong Joint Venture Project Annual report March 1, 1995 to February 28, 1996 E25/85 E25/90 M25/163 M25/164 M2 |
| A5072 | 1753 | Western Nickel Pty Ltd | Bulong | 2.1% | Bulong Annual Report, Year Ending 31st March 1974 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A39278 | 1753 | Western Mining Corporation Ltd | Bulong | 9.4% | Annual Report for the period 18/10/90 to 27/03/93 WMC : Resolute Resources : Energy, Oil and Gas NL Bulong nic |
| A41487 | 1753 | Western Mining Corporation Ltd | Bulong | 9.4% | Annual report for the period 28/03/93-27/03/94 Bulong Laterite Project E25/67 E27/72 M25/75-78 P25/909 P25/10 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 5 years · 27 Mar 2032
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 25/77 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 25/77? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.