NextMaps›WA Tenements›E 37/1253

E 37/1253

LiveExploration LicenceShire of LeonoraMt. Malcolm District
Area
2,170ha
Expired
Sept 2026
23 days ago
WAMEX reports
140
WA median is 53
Report drilling
86
of 140 reports
Leonora Explore on the live map

Register summary

Holder
Darlot Mining Company Pty Ltd
Part of
Vault Minerals Limited (ASX:VAU) as at 2026-06-30
Local government
Shire of Leonora
Application received
19 Feb 2016
Commenced
6 Sept 2016
Expiry
5 Sept 2026
Term
5 Years (Extended)

Exploration history on this ground

140 historical WAMEX exploration reports intersect E 37/1253: 59 report geochemistry or sampling, 93 include a digital data package.
When this ground was worked · 138 of 140 reports dated
21970s
41980s
311990s
422000s
472010s
122020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A134652 2023 Round Oak Minerals Pty Ltd Teutonic Bore <1% E 37/1278 Partial Surrender Report, Teutonic Bore Project for the period 15 February 2017 to 14 February 2023
A137848 2023 Native Mineral Resources Pty Ltd Music Well <1% C183-2021 Annual Report E37/1362 and E37/1363 Music Well Project for the period ending 16/09/2023
A132850 2022 Native Mineral Resources Pty Ltd Music Well <1% C183-2021 Music Well, E37/1362 and E37/1363 Combined Annual Report for period ending 16/10/2022
A128464 2021 Native Mineral Resources Pty Ltd Music Well <1% Music Well Project Combined Annual Report for E3701362 and E3701363 for the period ending 16/09/2021
A128693 2021 Native Mineral Resources Pty Ltd Music Well <1% CO-FUNDED DRILLING REPORT MUSIC WELL (R23)
135 more reports
A126256 2021 Round Oak Minerals Pty Ltd Teutonic Bore P <1% Partial Surrender Report, Teutonic Bore Project, E37/1161, for the period ending 6 November 2020
A126427 2021 Native Mineral Resources Pty Ltd Music Well <1% Annual Report Music Well E37/1363 for the period 17 September 2019 to 16 September 2020
A123220 2020 Round Oak Jaguar Pty Ltd; Round Oak Jaguar Project Pty Ltd Teutonic Bore Project <1% Combined Annual Report 2019 Teutonic Bore Project C/157/2002 for the period 1 January 2019 to 31 December 2019
A123360 2020 Round Oak Jaguar Pty Ltd TEUTONIC BORE <1% Annual Report E37/1278, Teutonic Bore, 15 February 2019 to 14 February 2020
A124133 2020 Sr Mining Pty Ltd Celtic Project <1% Celtic Project (C28/2012) Annual Report for the Period 1 April 2019 to 31 March 2020
A125277 2020 Darlot Mining Company Pty Ltd King of the West 85% King of the West E37/1253 Annual Report for the period ending 5/9/2020
A125341 2020 Round Oak Minerals Pty Ltd Teutonic Bore <1% Annual Report for E37/1306 Teutonic Bore Project for the period 13 September 2019 to 12 September 2020
A119556 2019 Round Oak Jaguar Project Pty Ltd; Round Oak Jaguar Pty Ltd Teutonic Bore <1% C157/2002 Combined Annual Report for Teutonic Bore Project for the period 1 January 2018 to 31 December 2018
A119723 2019 Round Oak Jaguar Pty Ltd Teutonic Bore <1% Annual Report on E37/1278 Teutonic Bore Project for the period 15 February 2018 to 14 February 2019
A120118 2019 Bligh Resources Limited Bundarra <1% Annual Report Bundarra Project C28/2012 for the period 1 April 2018 to 31 March 2019, M37/00350, M37/00488, M3
A121652 2019 Round Oak Jaguar Pty Ltd Teutonic Bore <1% Annual Report for E37/1306 Teutonic Bore Project 13 September 2018 to 12 September 2019
A121914 2019 Roman Kings Pty Ltd King of the West 85% Annual Report for E37/1253 King of the West for the period 6 September 2018 to 5 September 2019
A116474 2018 Independence Jaguar Pty Ltd Teutonic Bore <1% ANNUAL REPORT ON E37/1278 TEUTONIC BORE PROJECT FOR THE PERIOD 15 FEBRUARY 2017 TO 14 FEBRUARY 2018
A118154 2018 Roman Kings Pty Ltd King of the West 85% Annual Report for E37/1253 King of the West for the period 6 September 2018 to 5 September 2018
A115994 2018 Independence Group Nl Teutonic Bore <1% Combined Annual Report C157/2002 Teutonic Bore Project for the period from 1st January 2017 to 31st December 2
A117050 2018 Bligh Resources Limited Bundarra <1% Annual Report C28/2012 Bundarra Project for the period 1 April 2017 to 31 March 2018, M37/00350, M37/00488, M3
A118195 2018 Round Oak Jaguar Pty Ltd Teutonic Bore <1% Annual Report on E37/1306, Teutonic Bore Project, 13 September 2017 to 12 September 2018
A112037 2017 Independence Group Nl Teutonic Bore <1% Combined Annual Report on C157/2002 Teutonic Bore Project for the period 1 January 2016 to 31 December 2016
A114129 2017 S R Mining Pty Ltd; Bligh Resources Limited Celtic <1% Celtic Project, Annual Report Covering 01/04/2016 to 31/03/2017, Combined Reporting Number C28/2012 for P37/83
A115120 2017 Roman Kings Pty Ltd King of the West 85% Annual Report for E37/1253 King of the West Project 6 September 2016 to 5 September 2017
A108840 2016 Sr Mining Pty Ltd; Bligh Resources Limited Celtic <1% Celtic Project Annual Report Covering 01/04/2015 – 31/03/2016 Combined Reporting Number C28/2012 For M37/350,
A107737 2016 Independence Group Nl Teutonic Bore <1% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2015 to 31 December 2015
A109842 2016 Sr Mining Pty Ltd Bundarra <1% Bundarra Project C28/2012 Annual Report for the period 01/04/2015 to 31/03/2016, M37/00350, M37/00488, M37/005
A105028 2015 Independence Group Nl Teutonic Bore 4.5% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2014 to 31 December 2014,
A105903 2015 Sr Mining Pty Ltd Celtic <1% Annual Report for Celtic Project (M37/350,M37/488, M37/513, M37/514 and M37/638) for the period 1 April 2014 -
A104433 2015 Sr Mining Pty Ltd; Bligh Resources Limited Bundarra <1% BUNDARRA PROJECT ANNUAL REPORT COVERING 14/11/2013 – 13/11/2014 Prospecting Licence 37/8382
A104434 2015 Sr Mining Pty Ltd; Bligh Resources Limited Bundarra - Celtic <1% BUNDARRA PROJECT ANNUAL REPORT COVERING 14/11/2013 – 13/11/2014 Prospecting Licence 37/8383
A105027 2015 Independence Group Nl Teutonic Bore <1% [Annual Report] E37/1189 TEUTONIC BORE PROJECT, FOR THE PERIOD 1 JANUARY 2014 TO 31 DECEMBER 2014.
A102069 2014 Independence Group Nl Teutonic Bore 59% Final Surrender Report on E37/914, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the
A100605 2014 Independence Group Nl Teutonic Bore <1% Final Surrender Report on E37/911, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the
A101281 2014 Independence Group Nl Teutonic Bore 3.8% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2013 to 31 December 2013,
A102258 2014 St Barbara Ltd Leonora <1% Annual Mineral Exploration Report - DMP Combined Reporting Group C162/2006 (Leonora) Reporting Period 1 April
A102388 2014 Resource Mining Corporation Ltd Saint Patricks <1% Saint Patricks Project, Final Surrender Report for the period 26/04/2011 to 17/04/2014, E37/1064, 1078, 1091-1
A102399 2014 Bligh Resources Limited; Sr Mining Pty Ltd Celtic <1% Celtic Project, Annual Report for the period 01/04/2013 to 31/03/2014, M37/54, 350, 488, 513-514 & 638. [C28/2
A102687 2014 Independence Group Nl Teutonic Bore <1% Final Surrender Report on E37/912, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the
A97108 2013 Terrain Minerals Ltd Black Cat <1% Black Cat Project Annual Report for the period 01/02/2012 to 31/01/2013, M37/326, M37/382, M37/480, P37/7200 t
A97747 2013 Independence Group Nl Teutonic Bore 3.8% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2012 to 31 December 2012,
A98017 2013 St Barbara Ltd Leonora <1% Leonora Project, Annual Report for the period 1st April 2012 to 31st March 2013, E37/670.......E37/964; M36/41
A98355 2013 Bligh Resources Limited Celtic <1% M37/54, M37/350,M37/488, M37/513, M37/514 and M37/638 Annual Report for Celtic Project covering the period 01/
A98608 2013 Independence Group Nl Teutonic Bore 3.8% Teutonic Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E37/258........E37
A99231 2013 Resource Mining Corporation Ltd Saint Patricks <1% 2013 Annual Report for the St Patricks Project (C14/2011) for the period 26th July 2012 - 26th July 2013, E37/
A100535 2013 Independence Group Nl Teutonic Bore <1% Final Surrender Report on E37/899, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the
A99698 2013 Resource Mining Corporation Ltd Saint Patricks <1% Final Drilling Report for the St Patricks Project, C14/2011, E37/1064, E37/1078, E37/1091, E37/1092, E37/1110,
A93519 2012 Jabiru Metals Ltd Teutonic Bore 3.8% Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2011 to 31st December 2011
A94121 2012 Sr Mining Pty Ltd Celtic <1% Celtic Project annual report for the period 01/04/2011 - 31/03/2012 M37/350, M37/488, M37/513, M37/514, M37/54
A94985 2012 Resource Mining Corporation Ltd Saint Patricks <1% Annual Report for the St Patricks Project, C14/2011 (E37/1064, E37/1078, E37/1091, E37/1092) for the period 27
A93160 2012 Terrain Minerals Ltd Celtic <1% Celtic Project Annual report for the period 01/01/2011 to 31/12/2011, M37/489, P37/7199, and P37/7212 - P37/72
A93822 2012 St Barbara Ltd Leonora <1% Leonora C162/2006 Annual Report for the Period 1 April 2011 to 31 March 2012
A89204 2011 Terrain Minerals Ltd Celtic <1% CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2010 TO 31/12/2010 M37/350, M37/488, M37/489, M37/513, M37/5
A89792 2011 Jabiru Metals Ltd Teutonic Bore <1% Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2010 to 31st December 2010
A90352 2011 St Barbara Ltd Leonora 2.6% Leonora Project, Annual Report for the period 1st April 2010 to 31st March 2011, Tenements as per Combined Rep
A85881 2010 Terrain Minerals Ltd Celtic <1% CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2009 TO 31/12/2009 M37/350, M37/488, M37/489, M37/513, M37/5
A86577 2010 Jabiru Metals Ltd Teutonic Bore <1% Teutonic Bore Project Combined Annual Report C157/2002, For the period 1st January 2009 to 31st December 2009,
A87123 2010 St Barbara Ltd Leonora 2.6% Annual Report for the Period 1 April 2009 to 31 March 2010, Leonora, C162/2006, E37/235, E37/496, E37/573, E37
A81103 2009 Terrain Minerals Ltd CELTIC <1% CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2008 TO 31/12/2008 M37/350, M37/488, M37/489, M37/513, M37/5
A81243 2009 Jabiru Metals Ltd TEUTONIC BORE <1% TEUTONIC BORE PROJECT COMBINED ANNUAL REPORT C157/2002 For the period 1st January 2008 to 31st December 2008
A85333 2009 Brumby Resources Ltd Brilliant Well 2.6% FINAL REPORT FOR E37/887 For the Period 21 July 2008 to 22 September 2009, E37/932 For the Period 18 June 2008
A82914 2009 Brumby Resources Ltd BRILLIANT WELL JV 1.8% Annual Report E37/820, 831, 799, 887, 932 and 933, For the Period 1 April 2008 to 31 March 2009 BRILLIANT WELL
A78149 2008 Jabiru Metals Ltd Teutonic Bore <1% COMBINED ANNUAL REPORT, E37/512, E37/258, E37/319, M37/44, M37/515, M37/1132, M37/1153, P37/4326, P37/6794-P37
A78842 2008 St Barbara Ltd Leonora 2.2% LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2007 - 31 MARCH 2008 GROUP: C162/2006 E37/235, E37/236, E
A77450 2008 Terrain Minerals Ltd Wilson Creek-Garden Well-McEast <1% CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2007 TO 31/12/2007 M37/350, M37/488, M37/489, M37/513, M37/5
A74353 2007 Terrain Minerals Ltd Wilson Creek-Garden Well-McEast <1% Celtic Project E37/251,M37/350,488-489,513-514,638,P37/6029, Annual Report for the Period 01/01/2006 to 31/12/
A75800 2007 Jabiru Metals Ltd Charlie Chicks <1% Final Surrender Report E37/556 for reporting period 6th July 2000 to 5th July 2007 (Charlie Chicks Project).
A74695 2007 Jabiru Metals Ltd Teutonic Bore <1% Combined Annual Report Teutonic Bore Project C157/2002 From 18 January 2006 to 17 January 2007
A75283 2007 St Barbara Ltd Leonora 2.7% Leonora Project, Annual Report for the Period 1 April 2006 - 31 March 2007, C162/2006.(Report No.0051-2007-02)
A72195 2006 Jabiru Metals Ltd Heather Bore <1% Annual Report, E37/553 (Mt Clifford) & E37/556(Charlie Chicks), Heather Bore Project C72/2001, From 1 January
A72388 2006 Jabiru Metals Ltd Teutonic Bore <1% Combined Annual Report E37/258, 512, M37/44,515, 1132, 1153, P37/4326, Teutonic Bore Project, Combined Reporti
A72988 2006 St Barbara Mines Ltd McEast - Robinsons 3.9% McEast / Robinsons Project, Annual Report for the Period 1 July 2005 to 30 June 2006, Combined Reporting No. C
A70505 2005 Jabiru Metals Ltd Teutonic Bore <1% Combined annual report, E37/258, 501, 512, 691, M37/44, P37/4326, and 6235, Teutonic Bore Project, C157/2002,
A70999 2005 Jabiru Metals Ltd Teutonic Bore <1% Annual report E37/556 (Charlie Chicks) Teutonic Bore Project C72/2001, From 1 January 2003 to 31 December 2004
A68125 2004 Sons Of Gwalia Ltd Cambrian 92% Cambrian Project, Surrender Report for E37/702, Tenement surrendered on 24 December 2003
A68460 2004 Pilbara Mines Ltd Teutonic Bore <1% Annual report for the period 01/01/2003-31/12/2003 Newmont Teutonic Bore Joint Venture Project E37/556
A68874 2004 Pilbara Mines Ltd Teutonic Bore <1% Exploration Licences E37/258, M37/44, E37/501, E37/691, E37/512, P37/6235, Teutonic Bore Project Combined Annu
A68100 2004 Sons Of Gwalia Ltd Cambrian 1.8% Cambrian Project, Surrender Report for E37/294.(Tenement surrendered on 11 December 2003)
A68976 2004 Sons Of Gwalia Ltd McEast-Robinsons 4.8% McEast/Robinsons project, annual report for the period 5 June 2003 - 30 June 2004
A65854 2003 Sons Of Gwalia Ltd Mount Newman <1% 2001/02 Annual Report for period 01/07/01 to 30/06/02 Group Reporting No C121/1999 Mount Newman/Royal Arthur B
A65855 2003 Sons Of Gwalia Ltd Cambrian 12% Annual Report for period 05/06/01 to 04/06/02, C327/1995, Cambrian JV Project , E37/236, E37/281, E37/294, M3
A66964 2003 Pilbara Mines Ltd Teutonic Bore <1% Combined Annual Report for the period ending 17 January 2003 C157/2002 (formerly C417/1994): E37/258, M37/44,
A67076 2003 Sons Of Gwalia Ltd MOUNT NEWMAN <1% MOUNT NEWMAN, Annual report for the period 1 July 2002 to 30 June 2003 C121/1999: M37/459-460,478 E37/235,284,
A66101 2003 Newmont Australia Ltd Heather Bore <1% Annual Report for the period 01/01/2002 to 31/12/2002 Heather Bore Project,C72/2001 E37/319, 553, 556.
A66782 2003 Sons Of Gwalia Ltd Cambrian 92% Cambrian Project, Annual Report for the period 1 May 2002 to 30 April 2003ect E37/0702 Report No. 0574-2003-01
A66925 2003 Sons Of Gwalia Ltd Cambrian 12% CAMBRIAN PROJECT ANNUAL REPORT FOR THE PERIOD 5 JUNE 2002 – 4 JUNE 2003 C327/1995, M37/479, E37/236,281,294,
A66942 2003 Sons Of Gwalia Ltd McEast/ Robinsons <1% McEast/Robinsons Project C5/1996, Annual Report for the period 1 July 2001 to 30 June 2002,M37/350,326,382,480
A67321 2003 Sons Of Gwalia Ltd Wilson Creek-Garden Well-McEast <1% Annual Report for the period 1 July 2002 to 30 June 2003 McEast/Robinsons Project C5/1996: M37/350,326,382,480
A67410 2003 Sons Of Gwalia Ltd Cambrian 7.9% Cambrian Project, Annual Report for the period 9 September 2002 to 8 September 2003, E37/492.
A67765 2003 Pacmin Mining Corporation Ltd Cambrian 12% Annual Report for the period 05/06/1999- 04/06/2000 Cambrian Project C327/1995, E37/236, E37/281, E37/294, E37
A68119 2003 Tarmoola Australia Pty Ltd Cambrian 7.9% Cambrian Project, Surrender Report E37/492 - Tenement surrendered on 15th December 2003.
A63877 2002 Sons Of Gwalia Ltd Royal Arthur Bore <1% 2000/01 Annual Report Royal Arthur Bore Project Area E37/235, E37/284, E37/345, M37/459, M37/460, M37/478, P37
A64066 2002 Sons Of Gwalia Ltd McEast <1% 2000/01 Annual Report McEast Project area combined report for period 01/07/00 to 30/06/01 E37/251, E37/411, E3
A64410 2002 Newmont Yandal Operations Ltd Heather Bore <1% Annual Report form the period 1/01/2001 To 31/12/2001. Project Heather Bore E37/319 E37/553 E37/556.
A61673 2001 Pilbara Mines Ltd Teutonic Bore <1% Digital Data at November 2000 on P37/4326, E37/258,501,512, M37/44,636,705, Teutonic Bore.
A63376 2001 Pacmin Mining Corporation Ltd Cambrian 12% 2000/2001 Annual Report Cambrian Project Area - E37/236, E37 /281, E37/294, E37/492, M37/479, P37/4402, P37/44
A60944 2000 Sons Of Gwalia Ltd Madman Well 2.4% Madman Well Project Annual Report for the Period 3 January 1999 - 2 January 2000 SOG Report No. 0361-04 E37/4
A62610 2000 Pacmin Mining Corporation Ltd McEast <1% 1999/2000 Annual Report McEast Project Area E37/251,E37/411 E37/456, M37/382, M37/480, M37/488, P37/3870-P37/3
A62612 2000 Pacmin Mining Corporation Ltd Royal Arthur Bore <1% 1999/2000 Annual Report Royal Arthur Bore Project Area E37/235, E37/284, E37/345, M37/459, M37/460, M37/478 P3
A62780 2000 Sons Of Gwalia Ltd Madman Well 2.4% Madman Well Project, Partial Surrender Report for the period 3rd January 1996 to 31st July 2000, E37/402-403.
A57477 1999 Pacific Mining Corporation Ltd Cambrian 11% Annual Report for Cambrian Project for the period ending 04/06/98. E37/236,281,294,409. M37/479. P37/4402,4434
A58159 1999 Sons Of Gwalia Ltd Madman Well 2.4% Madman Well Project , Partial Surrender Report for the period 03/01/1996 to 02/01/1999 E37/402 & E37/403.
A58460 1999 Pacmin Mining Corporation Ltd Royal Arthur Bore <1% Royal Arthur Bore Project - Mt Margaret Mineral Field W.A. 01/02/98 - 31/01/99 E37/284, M37/478, P37/4681-4682
A59088 1999 Pacmin Mining Corporation Ltd Robinsons/ McEast <1% Robinsons/McEast Project Area E37/251, 411, 456, M37/382 01/07/98-30/06/99 Mount Margaret Mineral Field
A57072 1999 Goldfields Exploration Pty Ltd Teutonic Bore <1% Teutonic Bore JV 18/01/97 - 17/01/98 E37/258, 282, 353, 373-375, 501, P37/4326, M37/44, MLA37/515, 636, 705
A59344 1999 Pacmin Mining Corporation Ltd Cambrian 11% Cambrian Project, Annual Report for the period 05/06/1998 to 04/06/1999, E37/236,E37/281,E37/294,E37/409,M37/
A54022 1998 Tarmoola Australia Pty Ltd Royal Arthur Bore <1% Compulsory Partial Surrender Report for Tenement E37/284 (part of the Royal Arthur Bore Project Group).
A54365 1998 Sons Of Gwalia Ltd Madman Well 2.4% Madman Well Project, Annual Report 03/01/97 - 02/01/98 E37/402, 403
A55251 1998 Tarmoola Australia Pty Ltd Royal Arthur Bore <1% Royal Arthur Bore Project, Annual Technical Report 01/02/97 - 31/01/98 E37/284, M37/478, P37/4681-4682, 4883-4
A56685 1998 Pacific Mining Corporation Ltd McEast <1% Annual report for 1997 and 1998 on the exploration of the McEast Project Area. 01/07/96-30/06/97 & 01/07/97-30
A50918 1997 Sons Of Gwalia Ltd Madman Well 2.4% Leonora Region Madman Well Project Annual report for the period 03 January 1996 to 02 January 1997 (Tenements
A50936 1997 Goldfields Exploration Pty Ltd Teutonic Bore <1% Annual Report Teutonic Bore JV E37/247 E37/258 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Technical
A51326 1997 Mt Edon Gold Mines Aust Ltd Royal Arthur <1% Annual report on the Exploration of the Royal Arthur Bore Prospect Area E37/284 M37/478 P37/4681 P37/4682 P37/
A51653 1997 Goldfields Exploration Pty Ltd Wendy's Bore <1% Partial Surrender Report, Wendy's Bore JV E37/282 , Technical Report for the period 29/01/1993 to 28/01/1997.
A52599 1997 Goldfields Exploration Pty Ltd Teutonic Bore <1% Teutonic Bore Project, Final Surrender Report for the period 9th November 1994 to 1st September 1997, E37/353,
A49707 1996 Mt Edon Gold Mines Aust Ltd Leonora 12% Leonora Project ( Cambrian JV Tenements) Annual Report for the period ending June 30th 1996, E37/236, 281, 294
A47244 1996 Goldfields Exploration Pty Ltd Teutonic Bore <1% Annual report Teutonic Bore JV E37/247 E37/258 E37/282 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Te
A48470 1996 Mt Edon Gold Mines Aust Ltd Royal Arthur <1% Royal Arthur E37/284 M37/478 P37/4681 P37/4682 P37/4883 P37/4884 P37/4885 P37/4886 P37/4887 P37/4888 P37/4889
A49900 1996 Mt Edon Gold Mines Aust Ltd Robinson 1.6% Annual report on the Exploration of the McKeaig and Robinson Project areas E37/251 M37/382 M37/480 M37/488 P37
A48976 1995 Mt Edon Gold Mines Aust Ltd Cambrian 12% Cambrian (JV) Project, E37/236 E37/281 E37/294 M37/479 P37/4402 P37/4434 and P37/4988, for the period ending J
A44162 1995 Pancontinental Gold Operations Pty Ltd Teutonic Bore <1% Teutonic Bore Project, Annual Report for the period ending 17th January 1995, E37/247 E37/258 & E37/282; M37/
A46244 1995 Mt Edon Gold Mines Aust Ltd McKeaig 1.2% Annual report on the Exploration of the McKeaig Prospect area E37/251 M37/488 M37/513 M37/514 for the period
A46411 1995 Mt Edon Gold Mines Aust Ltd Royal Arthur Bore <1% Annual Report on the exploration of the Royal Arthur Bore Project, for the period ending May 4, 1995 E37/284.
A40806 1994 Mim Exploration Pty Ltd Wendy's Bore <1% Annual Report Year ending January 1994 Exploration Licence E37/282 Wendy's Bore
A42289 1994 Mt Edon Gold Mines Nl Bundarra 62% Bundarra Project, E37/236 , Annual Report for the period ending June 4, 1994.
A41575 1994 Mt Edon Gold Mines Nl Bundarra 1.8% Annual report for the period 03/93-03/94, Bundarra Project, E37/294.
A41817 1994 Mt Edon Gold Mines Nl Royal Arthur Bore <1% Annual Report for the period 05/05/93-04/05/94, Royal Arthur Bore Project, E37/284.
A42447 1994 Mt Edon Gold Mines Nl Leonora 62% Leonora Project, Partial Surrender Report, October 1994, E37/236.
A44050 1994 Mt Edon Gold Mines Aust Ltd McKeaig 2.1% Annual Report on the Exploration of the Mckeaig Project area E37/251, P37/3812 Mount Margaret Mineral Field We
A39137 1993 Cambrian Resources Nl Teutonic Well 62% Annual report for the period 05/06/92-04/06/93 Teutonic Well Project E37/236
A37410 1992 Mr Creasy Mg Bundarra- Leonora 62% Bundarra- Leonora project, 1992 annual report Exploration Licence 37/236 from 5.6.1991 - 4.6.1992
A18523 1986 Mr Anderson Bf Teutonic Well <1% Annual report GML37/2331 Mt Margaret Mineral Field Western Australia Summary of Geological work February 1985
A18522 1985 Mr Anderson Bf Teutonic Well <1% Annual report M37/2331 Mt Margaret Mineral Field Western Australia Summary of Geological work February 1984 to
A34334 1984 Anderson B F Teutonic Well <1% Geological Inspection Teutonic gold Mine M37/2331,P37/304-305; Report No:399.1 (R Report for 1984)
A10299 1981 Seltrust Mining Corp Pty Ltd Teutonic Bore 1.9% Teutonic Bore Project, Non-statutory Report: Report for the period 1st January 1979 to 31st December 1980, MC3
A21875 1978 Australian Selection Pty Ltd Teutonic Bore <1% Teutonic Bore (JV) Project, Non-statutory Report: Progress Report for the period ending 31/12/1978, MC37/4648-
A7295 1977 Australian Selection Pty Ltd Teutonic Bore <1% Teutonic Bore (JV) Project, Non-statutory Report: Progress Report to 30th September 1977, (Vol 1), MC37/4648-4
A82836 1753 St Barbara Ltd Leonora 3.2% LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2008 – 31 MARCH 2009 GROUP: C162/2006 TENEMENTS: E37/235,
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
Past expiry date · 5 Sept 2026
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 37/1253 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 37/1253? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.