E 28/3067
Register summary
- Holder
- Ac Minerals Pty Ltd
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 12 Oct 2020
- Commenced
- 3 Nov 2021
- Expiry
- 2 Nov 2026
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A144042 | 2024 | Kingston Nominees Pty Ltd | Lake Roe North | <1% | Annual Technical Report for the Lake Roe North Project E28/3214 during the Period 12 September 2023 to 11 Sept |
| A130013 | 2022 | Breaker Resources Nl | Lake Roe | <1% | Partial Surrender Report for E28/2556 Barling Project for the period ending 21/02/2022 |
| A130040 | 2022 | Nexus Minerals Australia Pty Ltd | Pinnacles | <1% | E28/2526 Partial Surrender Report Pinnacles Project for the period ending 21/12/2021. |
| A132906 | 2022 | Solstice Minerals Ltd | Mt Turner | <1% | Partial Surrender Report for E28/2583 Mt Turner for the period ending 20/09/2022. |
| A124559 | 2020 | Breaker Resources Nl | Lake Roe | <1% | Lake Roe Project Co-Funded Drilling Final Report (DAG2019/01562920), R19 |
196 more reports
| A124585 | 2020 | St Barbara Limited | Pinjin South | <1% | E28/2264 - Partial Surrender Report for the Period 2 April 2013 to 24 June 2020, Pinjin South project. |
| A124593 | 2020 | St Barbara Limited | Pinjin Central | <1% | E28/2447 - Partial Surrender Report for the Period 4 September 2014 to 24 June 2020, Pinjin Central Project |
| A124697 | 2020 | St Barbara Limited | Pinjin South | <1% | Pinjin South Project Combined Reporting Group C124/2015 - Annual Report for the Period 1 July 2019 to 30 June |
| A124701 | 2020 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2019 to 30 Jun |
| A124723 | 2020 | Breaker Resources Nl | Lake Roe | <1% | Lake Roe Project (C46/2016) Annual Report for the period 20 May 2019 to 19 May 2020. E 28/02515,E 28/02551,E 2 |
| A124790 | 2020 | Ac Minerals Pty Ltd | Yindi | <1% | Annual Technical Report Yindi Project E28/02444 for the period ending 17/08/2020 |
| A124921 | 2020 | Nexus Minerals Limited | Pinnacles | <1% | Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 for the period ending 30/06/2020 |
| A125101 | 2020 | St Barbara Limited | South Pinjin | <1% | E28/2264 - Partial Surrender Report for the Period 2 April 2013 to 14 August 2020, South Pinjin project. |
| A125120 | 2020 | St Barbara Limited | Yindi | <1% | E28/2446 - Partial Surrender Report Yindi for the Period 25 August 2014 to 24 August 2020 |
| A125374 | 2020 | Serendipity Resources Pty Ltd | Yilgani | <1% | Annual Technical Report Yilgani Project E28/2583 for the period 21 September 2019 to 20 September 2020 |
| A122911 | 2020 | Element 25 Limited | Pinnacles | <1% | Annual Report - C210/2017 Pinnacles for the period ending 04/01/2020, E 28/02577, E 28/02701 |
| A124591 | 2020 | St Barbara Limited | Pinjin South | <1% | E28/2446 - Partial Surrender Report for the Period 25 August 2014 to 24 June 2020 Pinjin South project. |
| A124820 | 2020 | Ac Minerals Pty Ltd | Yindi | <1% | Partial Surrender Report - Yindi Project For the Period 18 August 2014 to 17 August 2020 |
| A125122 | 2020 | St Barbara Limited | South Pinjin | <1% | E28/2447 - Partial Surrender Report South Pinjin for the Period 4 September 2014 to 3 September 2020 |
| A119504 | 2019 | Element 25 Limited | Pinnacles | <1% | Annual Report C210/2017 Pinnacles for the period 5 January 2018 to 4 January 2019, E28/02577, E28/02701 |
| A120543 | 2019 | Breaker Resources Nl | Lake Roe | <1% | Lake Roe Project (C46/2016) Annual Report for the period 20 May 2018 to 19 May 2019 E 28/02515,E 28/02551,E 28 |
| A120696 | 2019 | Nexus Minerals Limited | Pinnacles | <1% | Combined Annual Report for Pinnacles Project, C45/2016 for the period 1 July 2018 to 30 June 2019, E 28/02526, |
| A120891 | 2019 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2018 to 30 Jun |
| A120894 | 2019 | St Barbara Limited | Pinjin South | <1% | Pinjin South Project Combined Reporting Group C124/2015 Annual Report for the Period 1 July 2018 to 30 June 20 |
| A122108 | 2019 | Sumitomo Metal Mining Oceania Pty Ltd | Yindi | 98% | Yindi Project (E28/02533) Annual Report for the Period October 15 2018 to October 14 2019 |
| A121634 | 2019 | Ac Minerals Pty Ltd | Yindi | <1% | Annual Technical Report - Yindi Project E28/02444 for the period 18 August 2018 to 17 August 2019 |
| A121867 | 2019 | Serendipity Resources Pty Ltd | Yilgani | <1% | Annual Technical Report Yilgani Project E28/2583 for the period 21 September 2018 to 20 September 2019 |
| A116288 | 2018 | Montezuma Mining Company Ltd | PIinnacles | <1% | Annual Report C210/2017 Pinnacles For the Period 5 January 2017 to 4 January 2018, E28/02577, E28/02701 |
| A117242 | 2018 | Breaker Resources Nl | Lake Roe | <1% | Lake Roe Project (C46/2016) 2018 Annual Report for the period 20 May 2017 to 19 May 2018, E28/02515, E28/02551 |
| A117529 | 2018 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2017 to 30 Jun |
| A117533 | 2018 | St Barbara Limited | Pinjin South | <1% | Pinjin South Project Combined Reporting Group C124/2015 - Annual Report for the Period 1 July 2017 to 30 June |
| A117596 | 2018 | Nexus Minerals Limited | Pinnacles | <1% | Combined Annual Report for Pinnacles Project, C45/2016, 01 July 2017 - 30 June 2018 |
| A118261 | 2018 | Riversgold (Australia) Pty Ltd | Yilgani | <1% | Annual Report for E2802583 Yilgani Project For the Period 21 September 2017 to 20 September 2018 |
| A118274 | 2018 | Sumitomo Metal Mining Oceania Pty Ltd | Yindi | 98% | Yindi Project (E28/02533) Annual Report for the Period October 15 2017 to October 14 2018 |
| A118566 | 2018 | Ac Minerals Pty Ltd | Yindi | <1% | Annual Technical Report Yindi Project E28/02444 For the Period 18 August 2017 to 17 August 2018 |
| A114571 | 2017 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2016 to 30 Jun |
| A114577 | 2017 | St Barbara Limited | Pinjin South | <1% | Pinjin South Project Combined Reporting Group C124/2015 - Annual Report for the Period 1 July 2016 to 30 June |
| A114595 | 2017 | Breaker Resources Nl | Lake Roe | <1% | Lake Roe Project C46/2016 Annual Report For the Period 20 May 2016 to 19 May 2017, E28/02515, E28/02551, E28/0 |
| A114725 | 2017 | Nexus Gold Pty Ltd | Pinnacles | <1% | Combined Annual Report for Pinnacles Project, C45/2016 For the Period 1 July 2016 to 30 June 2017, E28/02526, |
| A115147 | 2017 | Sumitomo Metal Mining Oceania Pty Ltd | Yindi | 98% | Yindi Project (E28/02533) Annual Report for the Period October 15 2016 to October 14 2017 |
| A115201 | 2017 | Riversgold Ltd | Kurnalpi | <1% | Annual Technical Report for: E28/2583-I Kurnalpi Project for the period 21 September 2016 to 20 September 2017 |
| A115289 | 2017 | Ac Minerals Pty Ltd | Yindi | <1% | Annual Technical Report - Yindi Project E28/2444 for the period 18 August 2016 to 17 August 2017 |
| A109378 | 2016 | Breaker Resources Nl | Lake Roe | <1% | Lake Roe Project C46/2016 Annual Report for the period 20/05/2015 to 19/05/2016, E28/02515, E28/02551, E28/025 |
| A109692 | 2016 | St Barbara Limited | Pinjin South | <1% | Pinjin South Project Combined Reporting Group C124/2015 - Annual Report for the Period 1 July 2015 to 30 June |
| A109693 | 2016 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2015 to 30 Jun |
| A109789 | 2016 | Nexus Minerals Limited | Pinnacles | <1% | Combined Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 For the Period 1 July 2015 to |
| A110484 | 2016 | Ac Minerals Pty Ltd | Yindi | <1% | Annual Technical Report - Yindi Project E28/02444 for the period 18/08/2015 to 17/08/2016 |
| A110494 | 2016 | Sumitomo Metal Mining Oceania Pty Ltd | Yindi | 98% | Yindi Project (E28/02533) Annual Report for the Period October 15 2015 to October 14 2016 |
| A106387 | 2015 | St Barbara Limited | Away from it all Dam | <1% | Annual Report for the Period 1 July 2014 to 30 June 2015 |
| A106702 | 2015 | St Barbara Limited | Away From It All Dam E28/2447 | <1% | Annual Report for the Period 4 September 2014 to 3 September 2015 |
| A106703 | 2015 | St Barbara Limited | Away From It All Dam E28/2446 | <1% | Annual Report for the Period 25 August 2014 to 24 August 2015 |
| A107366 | 2015 | Ac Minerals Pty Ltd | Yindi | <1% | First Annual Technical Report Yindi Project - E28/2444 |
| A103130 | 2014 | St Barbara Ltd | Away From It All Dam | <1% | Annual Report for the Period 1 July 2013 to 30 June 2014, Away From It All Dam Project C73/2013 E28/2218, E28/ |
| A103198 | 2014 | Cazaly Resources Ltd | Carosue Dam | <1% | E31/886, E28/2273 Combined Annual Report C50/2011 for the period 01/07/2013 to 30/06/2014 |
| A97218 | 2013 | Renaissance Minerals Ltd | Rebecca | 20% | Rebecca Project, Annual Report for the period 26/10/2011 to 25/10/2012, E28/1756-1757, 1850, 1852, 1992, 2037- |
| A97555 | 2013 | Magma Metals Ltd | Roe | <1% | Roe Project, Annual Report for the period 1st January 2012 to 31st December 2012, E28/1416 & 1659. [C408/1996 |
| A98910 | 2013 | Kalnorth Gold Mines Ltd | Yindi | <1% | Surrender report for the period ending 28 June 2013, E28/2196 Yindi |
| A99065 | 2013 | St Barbara Mines Ltd | Away from It All Dam | <1% | Annual Mineral Exploration Report – Combined Reporting Group C73/2013 (AWAY FROM IT ALL DAM) for the period 30 |
| A100500 | 2013 | Renaissance Minerals Ltd | E28/2227 | 100% | E28/2227 Surrender Report for the period 19/10/2012 to 29/07/2013 |
| A98111 | 2013 | Renaissance Minerals Ltd | Mulgabbie | <1% | E28/1756 “Menangina South” Surrender Report |
| A97810 | 2013 | Aruma Resources Ltd | Pinnacles Kurnalpi South | 23% | E28/1849 Pinnacles Kurnalpi South Project Final report for the period 9 February 2012 to 10 April 2013 |
| A100147 | 2013 | Cazaly Resources Ltd | Carosue Dam | <1% | E31/886, E28/2049 Combined Annual Report C50/2011 for the period ended 30 June 2013 |
| A92878 | 2012 | Renaissance Minerals Ltd | Rebecca | 20% | Rebecca Project, Annual Report for the period 26/10/2010 to 25/10/2011, E31/920; E28/1756-1757, 1850,1852, 199 |
| A95050 | 2012 | Cove Resources Limited | Carosue Dam | <1% | Carosue Dam Project Combined Annual Exploration Report For The Year to 30th June 2012, C50/2011, E31/886, P31/ |
| A96120 | 2012 | Renaissance Minerals Ltd | Yindi | 1.1% | C 268/2011 - Combined Annual Report on Exploration for the Period 13th July 2011 to 12th July 2012. |
| A93598 | 2012 | Aruma Resources Ltd | Pinnacles South Kurnalpi | 23% | Pinnacles South Kurnalpi E28/1849 Annual report for the year ended 8 February 2012 |
| A93995 | 2012 | Legacy Iron Ore Ltd | South Laverton - Yindi | 100% | Final Surrender Mineral Exploration Report - Yindi Project E28/1648, 30th March 2007 – 29th March 2012 |
| A92642 | 2012 | Magma Metals Ltd | Roe | <1% | Roe Project, Annual Report for the period 1st January 2011 to 31st December 2011, E28/1659 & 1416. (C408/1996) |
| A90000 | 2011 | Aruma Resources Ltd | Pinnacles South | 23% | Annual report for the year ended 8 February 2011. Pinnacles South, E28/1849 |
| A90237 | 2011 | Renaissance Minerals Ltd | Mulgabbie | 50% | Mulgabbie Project, Annual Report for the period 9th February 2010 to 8th February 2011, E28/1852. |
| A92014 | 2011 | Renaissance Minerals Ltd | Mulgabbie | <1% | E28/1757 Annual Report, 30 July 2010 to 29 July 2011 |
| A90373 | 2011 | Legacy Iron Ore Ltd | Yindi | 100% | Yindi Project, Annual Report for the period 30th March 2010 to 29th March 2011, E28/1648. |
| A88152 | 2011 | Magma Metals Ltd | Roe | <1% | Annual Report for the period 1st January 2010 to 31st December 2010, Roe Project E28/1659, E28/1416 |
| A91960 | 2011 | Cove Resources Limited | Carosue Dam | <1% | Carosue Dam Project C50/2011 Combined First Annual Report period ending 30 June 2011 for E31/886, E31/889, E31 |
| A91142 | 2011 | Legacy Iron Ore Ltd | Yindi | 32% | Final Mineral Exploration Report Yindi Project E28/1536 For the Period 9th June 2006 to 8th June 2011 |
| A90767 | 2011 | Renaissance Minerals Ltd | Mulgabbie | <1% | E28/1756 “Menangina South” Annual Report for the period 06 March 2010 to 05 March 2011 |
| A85573 | 2010 | Magma Metals Ltd | Roe | <1% | Roe Project Annual Report for period 1st January 2009 - 31st December2009, Group Reporting No C408/1996 E28/16 |
| A86176 | 2010 | Hemisphere Resources Ltd | Laverton East | 23% | Laverton East C62/2009, P38/3782 - P38/3786, Annual report for the year ended 28 January 2010 |
| A86822 | 2010 | Gryphon Minerals Ltd | Mulgabbie | 50% | Mulgabbie E28/1852 Annual Report for the period 9 February 2009 to 8 February 2010 |
| A86880 | 2010 | Legacy Iron Ore Ltd | Yindi | 100% | Annual Mineral Exploration Report Yindi Project E28/1648 For the Period 30th March 2009 to 29th March 2010 |
| A86881 | 2010 | Legacy Iron Ore Ltd | Yindi | 100% | Partial Surrender Mineral Exploration Report Yindi Project E28/1648 For the Period 30th March 2007 to 29th Mar |
| A87887 | 2010 | Gryphon Minerals Ltd | Mulgabbie | <1% | Mulgabbie, E28/1757 Annual Report for the period 30 July 2009 to 29 July 2010 |
| A86821 | 2010 | Gryphon Minerals Ltd | Menangina South | <1% | E28/1756 “Menangina South” Annual Report for the period 06 March 2009 to 05 March 2010 |
| A87501 | 2010 | Legacy Iron Ore Ltd | Yindi | 32% | Annual Mineral Exploration Report Yindi Project E28/1536 For the Period 9th June 2009 to 8th June 2010 |
| A81411 | 2009 | Carbon Energy Ltd; Magma Metals Ltd | TIBERIUS | 12% | TIBERIUS PROJECT E28/836 ANNUAL TECHNICAL REPORT for the period 01/01/2008 to 31/12/2008, Group Reporting No. |
| A82165 | 2009 | Newmont Asia Pacific | Pinjin | 100% | FINAL REPORT ON EXPLORATION for the period 03/04/2008 to 01/04/2009 E28/1789 Pinjin Project WA |
| A82375 | 2009 | Legacy Iron Ore Ltd | Yindi | 100% | Yindi – E28/1648 Project 2008 Annual Report, 30th March 2008 – 29th March 2009 |
| A82860 | 2009 | Carbon Energy Ltd | Tiberius | 12% | Tiberius Project, E28/836, Surrender Report for the period 29/05/2000 to 28/05/2009, Group Reporting Number C2 |
| A82892 | 2009 | Legacy Iron Ore Ltd | BARRICK-YINDI | 32% | ANNUAL TECHNICAL REPORT BARRICK-YINDI PROJECT E28/1536 BETWEEN 9TH JUNE 2008 AND 8TH JUNE 2009 JULY 2009 |
| A84263 | 2009 | Magma Metals Ltd | Roe | <1% | Roe Project, E28/1416, Partial Surrender Report for the period 29/09/2004 to 6/07/2009, Group Reporting Number |
| A84364 | 2009 | Legacy Iron Ore Ltd | Yangan Hill | 34% | Yangan Hill – E28/1417, 1493 Project 2007 - 2009 Annual Report, C18/2006. Report Period: 18th July 2008 to 17 |
| A84707 | 2009 | Gryphon Minerals Ltd | Mulgabbie | <1% | Mulgabbie E28/1757 Annual Report for the period 30 July 2008 to 29 July 2009 |
| A80607 | 2009 | Jackson Minerals Ltd | Yindi | 29% | Yindi Project E28/1599 Surrender Report, Report Period: 19 February 2007 – 21 November 2008 |
| A80800 | 2009 | Jackson Minerals Ltd | Argument Dam | 71% | Argument Dam Project E28/1493 Partial Surrender Report, Period: 18 July 2005 – 21 November 2008 |
| A82164 | 2009 | Newmont Asia Pacific | Pinjin | 99% | Final Report On Exploration For The Period 03/04/2008 To 01/04/2009 for E28/1778 |
| A82443 | 2009 | Gryphon Minerals Ltd | Mulgabbie | <1% | E28/1756 “Menangina South” Annual Report for the period 06 March 2008 to 05 March 2009 |
| A77220 | 2008 | Magma Metals Ltd | Roe | <1% | Annual report for the period 1st January 2007 to 31st Decemb December 2007,Roe Project, E28/803, E28/1153, E28 |
| A77247 | 2008 | Saracen Gold Mines Pty Ltd | Yindi | 15% | Yindi Project Annual Report 01 OCTOBER 2006 TO 30 SEPTEMBER 2007, C118/1999, E28/892, E28/1062 to E28/1065, E2 |
| A77959 | 2008 | Metex Resources Ltd | Tiberius | 9.9% | Tiberius Project, E28/836, E28/1658 and P28/1063, Annual technical report for the period 01/01/2007 to 31/12/2 |
| A78372 | 2008 | Jackson Minerals Ltd | Yindi | 100% | Yindi - E28/1648 Project 2007 Annual Report 30 March 2007 - 29 March 2008 |
| A78680 | 2008 | Jackson Minerals Ltd | Yindi | 32% | Yindi - E28/1536 Project 2007 - 2008 Annual Report Report Period: 9 June 2007 - 8 June 2008 |
| A78973 | 2008 | Duskgale Pty Ltd | Red Dam | 26% | ANNUAL REPORT RED DAM PROJECT EXPLORATION LICENCE 28/1676 For the period: 26/04/07 – 25/04/08 North East Coolg |
| A79568 | 2008 | Jackson Minerals Ltd | Argument Dam | 32% | Argument Dam Project C18/2006 2007 - 2008 Annual Report, Report Period: 18 July 2007 – 17 July 2008 |
| A80784 | 2008 | Magma Metals Ltd | ROE | <1% | ROE PROJECT, ANNUAL REPORT For Period 1st January 2008 – 31st December 2008, Group Reporting No C 408/1996 E28 |
| A78037 | 2008 | Jackson Minerals Ltd | Cowarna | 29% | Yindi Project E28/1599 Annual Report Report Period: 19 February 2007 - 18 February 2008 |
| A78698 | 2008 | Dioro Exploration Nl | Yindi Project | 34% | YINDI PROJECT C109/2004 COMBINED SURRENDER REPORT AUGUST 13, 2004 TO AUGUST 12, 2008 P28/0997, E28/1498, E28/1 |
| A78964 | 2008 | Metex Resources Ltd | TIBERIUS | <1% | Tiberius Project, E28/1658, P28/1063. Surrender Report for the Period 20/04/2007 to 16/05/2008. Part Group Rep |
| A79892 | 2008 | Jackson Minerals Ltd | Argument Dam | 71% | Argument Dam Project E28/1493 Partial Surrender, Report Period: 18 July 2005 – 17 July 2008 |
| A80602 | 2008 | Jackson Minerals Ltd | Yindi | 32% | Yindi – E28/1536 Project Partial surrender Report, 9 June 2006 – 21 November 2008 |
| A74239 | 2007 | Saracen Gold Mines Pty Ltd | Yindi/Carosue Dam | 15% | Yindi Project, Annual Report, 01 October 2005 to 30 Sep 2006 (C118/1999, E28/892, E28/1062, E28/1063, E28/1064 |
| A74364 | 2007 | Metex Resources Ltd | Roe | 2.9% | Roe Project Area E28/620...E28/1598 Annual Technical Report for the Period 01/01/2006 to 31/12/2006 Combined R |
| A75080 | 2007 | Saracen Gold Mines Pty Ltd | Yindi | 25% | Yindi Project, Partial Surrender Report for the period 16th December 2002 to 15th December 2006, E28/1065. [C1 |
| A75082 | 2007 | Saracen Gold Mines Pty Ltd | Yindi | 21% | Yindi Project, Partial Surrender Report for period 23rd December 2003 to 22nd December 2006, E28/1071. (C118/1 |
| A75084 | 2007 | Saracen Gold Mines Pty Ltd | Yindi | 75% | Partial Surrender Report E28/1062, 16 December 2002 to 15 December 2006 (C118/1999) (Yindi Project). |
| A75603 | 2007 | Jackson Gold Ltd | Yindi | 32% | Yindi Project (E28/1536) Annual Report Reporting Period 9 June 2006 - 8 June 2007 |
| A76576 | 2007 | Metex Resources Ltd | Roe | <1% | Roe Project Area, Partial Surrender Report for the period 29 /09/2004 to 28/09/2007 (Group Reporting Number C4 |
| A76577 | 2007 | South Kal Mines Pty Ltd | Yindi | 27% | Yindi Project, Partial Surrender Report for the period 13th August 2004 to 12th August 2007, E28/1379. (C109/ |
| A75518 | 2007 | Yilgarn Mining (Wa) Pty Ltd | Pinjin Project | 23% | Pinjin Project E28/1491 Annual Technical Report for the period ended 3 May 2007 |
| A75994 | 2007 | Jackson Gold Ltd | Argument Dam | 32% | Argument Dam Project C18/2006 2006 - 2007 Annual Report E28/1417, E28/1318, E28/1493 18 July 2006 - 17 July 20 |
| A73030 | 2006 | Yilgarn Mining (Wa) Pty Ltd | Pinjin | 23% | Pinjin Project E28/1491, Annual Technical Report for the Period Ended 3 May 2006, (Kurnalpi). |
| A73265 | 2006 | Barrick Gold Of Australia Ltd | Argument Dam JV | 32% | Argument Dam JV Project E28/1493, Annual Report, Period 18 July 2005 to 17 July 2006, (Barrick Report No. 1193 |
| A73369 | 2006 | Metex Resources Ltd | Roe | 17% | Roe Joint Venture, Surrender Report E28/833, E28/1338, E28/672 (Partial) & E28/1105 (Partial), Combined Report |
| A73454 | 2006 | South Kal Mines Pty Ltd | Yindi Project | 34% | Yindi Project E28/1379, E28/1498, P28/997, Combined Annual Report for the Period 13 August 2005 to 12 August 2 |
| A71911 | 2006 | Metex Resources Ltd | Roe | 6.2% | Roe Project Area, Annual Technical Report for the Period 01/01/2005 to 31/12/2005, Combined Reporting No. C408 |
| A70608 | 2005 | Troy Resources Nl | Mulgabbie | 45% | Annual report for the period 29/10/03 - 28/10/04 Mulgabbie JV Project, C117/1999, E28/478, Kurnalpi |
| A70622 | 2005 | Newcrest Mining Ltd | Roe | 6.2% | Annual Report Roe Project for the Period 1/1/2004 to 31/12/2004 Group Reporting No.: C408/1996 Report No: K420 |
| A71371 | 2005 | South Kal Mines Pty Ltd | Yindi Project | 34% | Yindi Project, Combined annual report for the period August 13 2004 to August 12 2005, Reporting group C109/20 |
| A69287 | 2004 | Metex Resources Ltd | Roe | 12% | Partial Surrender report for the period 29/05/00-28/05/04 Roe Project E28/836 |
| A68651 | 2004 | Metex Resources Ltd | Roe | 7.2% | 2003 Annual Report for Period 01/01/2003 to 31/12/2003 Roe Project (C408/1996), E28/620, E28/672, E28/720, E28 |
| A68704 | 2004 | Gutnick Resources Nl | Karonie North | 60% | Exploration Licences: E28/979, E28/1046 to E28/1049, C71/2002 - Karonie North, Joint Annual Report for the per |
| A69274 | 2004 | Sons Of Gwalia Ltd | Carosue Dam | 97% | Carosue Dam Project, Surrender report for the period 23 December 2003 - 21 July 2004, E28/1072 |
| A69470 | 2004 | Sons Of Gwalia Ltd | Yindi | 19% | Annual Report for the period 01/10/03 - 30/09/04 Yindi Project, C118/1999, E28/812, E28/813, E28/892, E28/1062 |
| A65818 | 2003 | Sons Of Gwalia Ltd | Mulgabbie | 21% | Mulgabbie JV Annual Report For The Period 1 October 2001 - 30 September 2002. Tenements: E28/474, E28/476, E28 |
| A66142 | 2003 | Placer Dome Asia Pacific Ltd | Roe Metex | 7.2% | Annual Report 01/01/2002 - 31/12/2002 Roe Metex JV Project C408/1996: E28/620, 672, 720, 803-04, 810, 833, 836 |
| A66697 | 2003 | Sons Of Gwalia Ltd | Yindi | 23% | Yindi Project, Annual Report for the period 01 October 2001 - 30 September 2002, C118/1999: E28/812-3, 852, 89 |
| A66990 | 2003 | Sons Of Gwalia Ltd | Gilgarna Rock and Rough Gap | 38% | Yindi Group, Surrender Report for C118/1999 Tenements surrendered between 28 March 2003 and 27 May 2003 C118/1 |
| A67469 | 2003 | Sons Of Gwalia Ltd | Mulgabbie | 21% | Annual Report for the period 1 October 2002 - 30 September 2003 Mulgabbie JV E28/474,476,478 Report No. 0579-2 |
| A67480 | 2003 | Sons Of Gwalia Ltd | Yindi | 28% | Annual Report for the period 1 October 2002 to 30 September 2003 Yindi Project C118/1999: E28/812-813,852,892- |
| A67742 | 2003 | Sons Of Gwalia Ltd | Yindi | 72% | Expiry Report for the period 15/10/1998- 14/10/2003 Yindi Project C118/1999, E28/812-813 Report No: 0585 2003 |
| A67322 | 2003 | Sons Of Gwalia Ltd | Yindi | 13% | Partial Surrender Report and Surrender Report for C118/1999 Tenemetns surrendered between 24 July 2003 & 26 Au |
| A64192 | 2002 | Delta Gold Ltd | Roe Joint Venture | 8.2% | Roe Joint Venture Project C408/1996 Annual Report 01/01/2001 to 31/12/2001 tenements E28/620, 672, 720, 803, 8 |
| A65762 | 2002 | Auriongold Exploration Pty Ltd | Roe | 84% | Roe JV Project Partial Surrender Report 12/06/1998 - 05/11/2002. E28/833. Report No. WA02.089. |
| A65926 | 2002 | Auriongold Exploration Pty Ltd | Roe | 84% | Partial Surrender Report 12/06/1998-05/11/2002 E28/833 Roe JV Project Report Number: WA02.089 |
| A62607 | 2001 | Pacmin Mining Corporation Ltd | North East Coolgardie | 41% | 2000/01 Annual Report E28/893 Report For Period 17/02/00 to 16/02/01 North East Coolgardie Mineral Field Weste |
| A62794 | 2001 | Pacmin Mining Corporation Ltd | Yindi | 38% | 2001 Final Report E28/623 Report For Period 16/05/97 to 21/03/01. Group Reporting No. C118/1999. |
| A62882 | 2001 | Metex Resources Ltd | Roe | 8.2% | Combined Biannual Technical Report W503 Roe Project E28/620, E28/672, E28/720, E28/803-804, E28/810, E28/833, |
| A62966 | 2001 | Pacmin Mining Corporation Ltd | Pinjin | 69% | 2000/01 Annual Report E28/894 Report For Period 19/05/00 to 18/05/01 Map Sheets: Kurnalpi (SH51-10) 1:250,000 |
| A63754 | 2001 | Sons Of Gwalia Ltd | Yindi | 35% | 2000/01 Annual Report Yindi Project Area E28/567, E28/623, E28/812, E28/813 Report for period 01/10/00 to 30/0 |
| A63873 | 2001 | Sons Of Gwalia Ltd | Mulgabbie | 45% | 2000/01 Annual Report E28/478 Mulgabbie JV Report for period 29/10/00 to 28/10/01 North East Coolgardie Minera |
| A63875 | 2001 | Sons Of Gwalia Ltd | Yindi | 97% | 2001 Partial Relinquishment Report Yindi Project area E28/812 Report for period 15/10/98 to 14/10/01 North Eas |
| A63876 | 2001 | Sons Of Gwalia Ltd | Yindi | 46% | 2001 Partial Relinquishment Report Yindi Project Area E28/813 Report for period 15/10/98 to 14/10/01 North Eas |
| A59564 | 2000 | Pacmin Mining Corporation Ltd | Yindi | 46% | 1998/1999 Annual Report, Yindi, E28/813, Report for 15 Oct 1998 to 14 Oct 1999, North East Coolgardie Mineral |
| A59565 | 2000 | Pacmin Mining Corporation Ltd | Yindi | 97% | 1998/1999 Annual Report, Yindi, E28/812, Report for 15 Oct 1998 to 14 Oct 1999, North East Coolgardie Mineral |
| A59724 | 2000 | Newcrest Mining Ltd | Mulgabbie | 24% | Interim Report, Mulgabbie Joint Venture, E28/476 and 478, for the period 01/01/1998 to 23/09/1998. |
| A60190 | 2000 | Troy Resources Nl | Mulgabbie | 22% | Annual Reprot Exploration Licences E28/474,E28/476,E28/478, E28/574 Mulgabbie Project Western Australia 02/01/ |
| A60847 | 2000 | Pacmin Mining Corporation Ltd | Yindi | 38% | 1999/2000 Annual Report, E28/623, Report for Period 16/05/1999 to 15/05/2000, North East Coolgardie Mineral Fi |
| A59563 | 2000 | Pacmin Mining Corporation Ltd | Mulgabbie | 32% | 1998/1999 Annual Report, Mulgabbie, E28/567,623, Report for Period 01/08/1998 to 31/07/1999, North East Coolga |
| A60135 | 2000 | Troy Resources Nl | Borderline Bore | 32% | Borderline Bore Mulgabbie District Western Australia Partial Surrender Report Exploration Licence E28/574 1995 |
| A60539 | 2000 | Planet Management & Research Pty Ltd | Lake Yindarlgooda | 6.2% | Report on Lake Yindarlgooda Base Metals Prospect W.A. May 1971 MCA's872-881, 884-900, 913-921. |
| A60883 | 2000 | Troy Resources Nl | Borderline Bore | 32% | Borderline Bore Mulgabbie District Western Australia Final Surrender Report Exploration Licence E28/574 1995 t |
| A61804 | 2000 | Pacmin Mining Corporation Ltd | Yindi | 35% | 1999/2000 Annual Report Yindi Project Area E28/567, E28/623, E28/812, E28/813 report for the period 01/10/99 t |
| A61917 | 2000 | Pacmin Mining Corporation Ltd | Yindi | 38% | 2000 Partial Relinquishment Report Yindi Project Area E28/623 report for period 16/05/97 to 04/09/00, North Ea |
| A56952 | 1998 | Troy Resources Nl | Mulgabbie | 21% | Mulgabbie Project - North East Coolgardie Mineral Field W.A. Partial Surrender Report Exploration Licence:28/4 |
| A53498 | 1998 | Newcrest Mining Ltd | Mulgabbie | 17% | Combined Annual Report Mulgabbie Joint Venture E28/474,476,478,492 and 574 for the period 01/01/97-31/12/97 Re |
| A56002 | 1998 | Heron Resources Ltd | Mulgabbie | 32% | Mulgabbie Project Area Exploration Licences 28/567, 612, 613 and 623. Combined Annual Report 1 August 1997 to |
| A52799 | 1997 | Yardarino Mining Nl | Yindi | 25% | Yindi Project, Annual Report for period ending 27th October 1997, E28/448,P28/878-879. |
| A50351 | 1997 | Newcrest Mining Ltd | Mulgabbie | 17% | Combined Annual Exploration Report Mulgabbie Joint Venture for E28/474, E28/476, E28/478, E28/574 for the peri |
| A51889 | 1997 | Heron Resources Ltd | Mulgabbie | 32% | Mulgabbie Project Exploration Licences 28/567, 28/612, 28/613, Annual Report August 1 1996 to July 31 12 1997. |
| A53325 | 1997 | Newcrest Mining Ltd | Mulgabbie | 17% | Combined Partial Relinquishment Report Mulgabbie Joint Venture for E28/474,476, 478 & 492 (September 1997). |
| A53914 | 1997 | Cove Mining Nl | Roe | 17% | Final Report Roe Project E28/579, 614, 624, 625, 664, P28/891-894, 915-922 and P31/1528-1529, December 1997. |
| A47696 | 1996 | Normandy Exploration Ltd | Mount Briggs | 41% | Mount Briggs Project, Annual & Final Report for the period 25th November 1994 to 22nd January 1996. |
| A47961 | 1996 | Troy Resources Nl | Borderline Bore gold exploration | 32% | Borderline Bore Mulgabbie District Western Australia Exploration Licence E28/574 Annual Report 14/03/1995 to 1 |
| A49428 | 1996 | Yardarino Mining Nl | Yindi | 25% | Yindi Project E28/448 P28/878-879 Annual Report for Period Ending 27 October 1996 |
| A44909 | 1995 | Poseidon Gold Ltd | Mount Briggs | 41% | Mount Briggs Project, Annual Report E28/491 for the period 25th November 1993 to 24th November 1994. |
| A45605 | 1995 | Troy Resources Nl | Elsie Dam | 100% | Elsie Dam Project, Annual Report Prospecting Licences P28/878-881 for the period 5th August 1994 to 4th August |
| A45832 | 1995 | Troy Resources Nl | Mulgabbie gold exploration | 8.3% | Yindi Rocks E28/492 Mulgabbie District of Western Australia Annual Report 10 October 1994 to 9 October 1995 |
| A46428 | 1995 | Maverick Exploration Pty Ltd | Mulgabbie | 16% | Mulgabbie Project North East Coolgardie Mineral Field Western Australia Annual Report October 1994 to 9 Octob |
| A46430 | 1995 | Yardarino Mining Nl | Yindi / Yardarino | 23% | Yindi / Yardarino Project, Annual Report Exploration Licence E28/448 for the period 28th October 1994 to 27th |
| A46788 | 1995 | Cra Exploration Pty Ltd | Kurnalpi East | 4.9% | Partial Surrender for the period 1995 Kurnalpi East Project E28/372 E28/374 E28/433 E28/453 E31/93 E31/94 |
| A43031 | 1994 | Cra Exploration Pty Ltd | Sardine Dam | 4.3% | Final report to 30th August 1994 on E28/431 Sardine Dam, Kurnalpi SH51-10, Western Australia |
| A41598 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | First partial relinquishment report to April 1994 on E28/372, 374, 431, 433, E31/93, 94 Kurnalpi East Project |
| A42910 | 1994 | Troy Resources Nl | Mulgabbie | 16% | Mulgabbie Project North East Coolgardie Mineral Field Western Australia Annual Report 10 October 1993 to 9 Oct |
| A43058 | 1994 | Troy Resources Nl | Yindi Yardarino | 23% | Yindi Yardarino Project, Annual Report for the period 28th October 1993 to 27th October 1994, E28/448. |
| A43302 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | 4.9% | Annual Report to 7 December 1994 on E31/93-94, E28/372, 374, 433, 442, 453, Kurnalpi East Project. |
| A38589 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | 4.8% | Kurnalpi East Project, Annual Report for the period 08/12/1991 to 07/12/1992, E28/372 ,374, 431, 433, 442 & 45 |
| A39675 | 1993 | Yardarino Mining Nl | Yindi | 23% | Yindi Project, Annual Report for period ending March 1993, E28/448. |
| A39676 | 1993 | Yardarino Mining Nl | Yindi | 23% | Yind Project, Non-statutory Report: Progress Report -December 1993, E28/448. |
| A41041 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | 4.8% | Annual report for the period 08/12/92-07/12/93 Kurnalpi East Project E28/372 E28/374 E28/431 E28/433 E28/442 E |
| A36333 | 1991 | Cra Exploration Pty Ltd | Kurnalpi East | 4.2% | Annual Report for the period 08/12/90-07/12/91 Kurnalpi East Project, E31/92-94 E28/370-374,398,419,431-433,4 |
| A13907 | 1984 | Bp Australia Ltd | Pinnacles Dam | 4.1% | Pinnacles Dam Project, Annual Report for the period ending 03/05/1984, E28/82, MC28/2700 & 2916; GML28/608-617 |
| A4697 | 1974 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: Cowarna I. P. Survey : Lines 158N-164N, 156N-192N ( No 3 Sill)., |
| A3918 | 1973 | Australian Anglo American Ltd | Gilgarna Rock | 85% | Gilgarna Rock Project, Non-statutory Report:Brief Exploration Report for the period ending 31/12/1969, MC28/17 |
| A4492 | 1972 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: Summary Report, December 1972. |
| A4696 | 1971 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: ( No 1 Sill), Percussion Logs & Drill Hole Sections, 1970/1971. |
| A4698 | 1971 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: I. P. Lines 60N-92N & 128N-174N, to January 1971. |
| A4693 | 1970 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: No 3 Sill, Drill Holes & Logs, November 1970, |
| A4695 | 1970 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: Drill Holes & Logs, ( No 2 Sill) for the year ending 31/12/1970. |
| A75997 | 1753 | South Kal Mines Pty Ltd | Yindi Project | 34% | Yindi Project C109/2004 Combined Exploration Report for the period August 13, 2006 to August 12, 2007 P28/997, |
| A80544 | 1753 | Saracen Gold Mines Pty Ltd | YINDI | 15% | YINDI PROJECT ANNUAL REPORT 01 OCTOBER 2007 TO 30 SEPTEMBER 2008, CR GROUP: C118/1999, TENEMENTS: E28/892, E28 |
| A49716 | 1753 | Cra Exploration Pty Ltd | Sardine Dam | 4.3% | Sardine Dam E28/431. Additional Information to the 1994 Surrender Report. |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 35 days · 2 Nov 2026
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 28/3067 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 28/3067? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.