P 25/2730
Register summary
- Holder
- Costanzo, Patrick Natale
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 6 Jan 2022
- Commenced
- 18 Nov 2022
- Expiry
- 17 Nov 2026
- Term
- 4 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149142 | 2025 | Black Cat (Kal East) Pty Ltd | Slate Dam | <1% | Final Surrender for the Slate Dam Project E25/553 for the period ending 28/04/2025 |
| A138424 | 2024 | Kalgoorlie Gold Mining Limited | Bulong Taurus | <1% | Final Surrender - P25/02304,P25/02308 & P25/02297 Bulong Taurus forthe period ending 30/11/2023. |
| A135225 | 2023 | Black Cat (Kal East) Pty Ltd | Slate Dam | <1% | Partial Surrender Report for the Slate Dam Project E25/553 for the period ending 02/04/2023 |
| A123494 | 2020 | Ardea Resources Limited | Bulong | <1% | Annual Report Bulong Project C224/1995, 1 January 2019 to 31 December 2019 |
| A124158 | 2020 | Aruma Resources Limited | SLATE DAM | <1% | Annual Report for C112/2017 Slate Dam Project for the period ending 02/04/2020 |
97 more reports
| A118881 | 2019 | Ardea Resources Limited | Little Bulong | <1% | Little Bulong Project C55/2012 Annual Report For the Period 29 September 2017 to 28 September 2018, M25/00151, |
| A119605 | 2019 | Ardea Resources Limited | Bulong | <1% | Bulong Project C224/1995 Annual Report for the period 1 January 2018 to 31 December 2018 |
| A120476 | 2019 | Aruma Resources Limited | Slate Dam | <1% | Annual Report for C112/2017 "Slate Dam" for the period 3 April 2018 to 2 April 2019, E25/00553, E25/00556, E25 |
| A115684 | 2018 | Ardea Resources Limited | Little Bulong | <1% | C55/2012 Little Bulong Annual Report For the Period 29 September 2016 to 28 January 2017, M25/00151, M25/00187 |
| A117326 | 2018 | Aruma Resources Limited | Slate Dam | <1% | Annual Report for C112/2017 Slate Dam Project for the period 3 April 2017 to 2 April 2018, E25/00553, E25/0055 |
| A108182 | 2016 | Silver Lake Resources Pty Ltd | Queen Lapage | <1% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2014 to 31 October 2015, E25/ |
| A104633 | 2015 | Silverlake Resources Ltd | Queen Lapage | <1% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2013 to 31 October 2014, E25/ |
| A104934 | 2015 | Rubicon Resources Ltd | Bulong - Yindarlgooda | 1.8% | Bulong - Yindarlgooda Project, Final Surrender Report for the period 29/12/2009 to 28/12/2014, E25/392. [C210/ |
| A106060 | 2015 | Rubicon Resources Ltd | Bulong | <1% | Bulong, Yindarlgooda E25/422 Final Report for the period 24 May 2015 – 23 May 2015 |
| A106214 | 2015 | Silver Lake Resources Ltd | Queen Lapage | <1% | Partial Surrender Report on E25/273 (Queen Lapage Project) for the period 23 March 2006 to 20 March 2015 |
| A107604 | 2015 | Rubicon Resources Ltd | Yindarlgooda | <1% | Yindarlgooda Project C210/2007 Combined Annual Report for the period 1 November 2014 – 31 October 2015, E25/35 |
| A101170 | 2014 | Silver Lake Resources Limited | Queen Lapage | <1% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2012 to 31 October 2013 |
| A104148 | 2014 | Heron Resources Ltd | Little Bulong | <1% | Little Bulong Project C55/2012, Annual Report for the period 29/09/2013 to 28/09/2014, M25/151,187 & 476. |
| A104174 | 2014 | Rubicon Resources Ltd | Yindarlgooda | <1% | Yindarlgooda C210/2007 Combined Annual Report E25/355, 392, 422, E27/425, 430, 443, 449 P27/1949 for the perio |
| A100409 | 2013 | Rubicon Resources Ltd | Yindarlgooda | <1% | Yindarlgooda Project, Annual Report for the period 01/11/2012 to 31/10/2013, E25/355, 392, 422 & 456; E27/425, |
| A100909 | 2013 | Heron Resources Ltd | Little Bulong | <1% | Little Bulong Project, Annual Report for the period 29/09/2012 to 28/09/2013, M25/151 & 187; E25/476. [C55/201 |
| A96582 | 2013 | Integra Mining Ltd | Queen Lapage | <1% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2011 to 31 October 2012, E25/ |
| A92700 | 2012 | Integra Mining Ltd | Queen Lapage | <1% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2010 to 31 October 2011, E25/ |
| A93853 | 2012 | Heron Resources Ltd | South West Taurus | <1% | Annual report for the period 18 March 2011 to 17 March 2012, South West Taurus Dam Project, M25/151 |
| A95706 | 2012 | Heron Resources Ltd | Little Bulong | <1% | Annual report for the period 29 September 2011 to 28 September 2012, Little Bulong Project C55/2012, M25/151, |
| A96114 | 2012 | Rubicon Resources Ltd | Yindarlgooda | <1% | Yindarlgooda Project, Annual Report for the period 1st November 2011 to 31st October 2012, E25/355, 392, 422, |
| A89960 | 2011 | Heron Resources Ltd | Bulong | <1% | Combined annual report for the period 1 January 2010 to 31 December 2010, Bulong Project, C224/1995 |
| A90718 | 2011 | Rubicon Resources Ltd | White Gate Dam | <1% | Annual Report for the period 24th May 2010- 23rd May 2011, White Gate Dam Project, E25/422 |
| A89527 | 2011 | Rubicon Resources Ltd | Lake Yindarlgooda | 1.8% | Annual Report for the period 29th December 2009 to 28th December 2010, Lake Yindarlgooda Project, E25/392 |
| A88967 | 2011 | St Barbara Ltd | Yindarlgooda - Rocky Dam | <1% | Yindarlgooda (Rocky Dam) Project, Annual Report for the Period 1 November 2009 to 31 October 2010,C210/2007 Te |
| A92275 | 2011 | Rubicon Resources Ltd | Yindarlgooda | <1% | Yindarlgooda C210/2007 Combined Annual Report 1 November 2010 – 31 October 2011 |
| A86572 | 2010 | Heron Resources Ltd | Bulong | <1% | Annual report for the period 1 January 2009 to 31 December 2009, Bulong Project, C224/1995, E25/250, M25/59, M |
| A80567 | 2009 | Rubicon Resources Ltd | TAURUS | <1% | TAURUS PROJECT COMBINED REPORT C133/2007 M25/19, M25/32, M25/36, M25/58, M25/64, M25/81, M25/82, M25/149, P25/ |
| A82933 | 2009 | International Exploration Ltd | EAST BULONG | <1% | Final Surrender Report East Bulong Project E25/0296 For reporting period 24th August 2005 to 9th April 2009 |
| A84968 | 2009 | St Barbara Ltd | Yindarlgooda (Rocky Dam) | <1% | Annual Report for the Period 1 November 2008 to 31 October 2009 C210/2007, Tenement Numbers E25/273, E25/316, |
| A86188 | 2009 | Rubicon Resources Ltd | Taurus | <1% | Taurus Project, Combined Report, C133/2007, M25/19, 32, 36, 58, 64, 81, 82, 149, P25/1999, 2000, 2001, Annual |
| A76906 | 2008 | Rubicon Resources Ltd | Yindarlgooda | <1% | YINDARLGOODA PROJECTCOMBINED REPORT C210/2007 ANNUAL REPORT 1st November 2006 to 31st October 2007 |
| A79593 | 2008 | Rubicon Resources Ltd | Kurnalpi / Kanowna | <1% | M25/32 & M25/82 (BULONG) ANNUAL ENVIRONMENTAL REPORT |
| A80224 | 2008 | Australasian Resources Pty Ltd | EAST BULONG | <1% | ANNUAL EXPLORATION REPORT EAST BULONG PROJECT E25/296, For reporting period 24th August 2007 to 23rd August 20 |
| A80490 | 2008 | Rubicon Resources Ltd | YINDARLGOODA | <1% | YINDARLGOODA PROJECT COMBINED REPORT, C210/2007, E25/273, E25/316, E25/326, E25/335, E27/291, E27/337, E28/15 |
| A77272 | 2008 | Rubicon Resources Ltd | Taurus | <1% | TAURUS PROJECT COMBINED REPORT C133/2007 ANNUAL REPORT 1 JANUARY 2006 TO 31 DECEMBER 2007 |
| A77762 | 2008 | Inco Resources (Australia) Pty Ltd | Bulong | <1% | BULONG PROJECT C224/1995, E25/250....M25/59...P27/1754 to P27/1761, Combined Annual Report C224/1995, |
| A80208 | 2008 | Australasian Resources Pty Ltd | East Bulong | <1% | ANNUAL EXPLORATION REPORT For reporting period 24th August 2007 to 23rd August 2008 |
| A81471 | 2008 | Vale Inco Australia Limited Partnership | Bulong | <1% | BULONG PROJECT C224/1995 FOR THE PERIOD 1 JANUARY 2008 – 31 DECEMBER 2008 |
| A74757 | 2007 | Heron Resources Ltd | Bulong-Manor | <1% | Bulong - Manor Project C137/1999 Annual Report for the Period 01 Jan 2006 - 31 Dec 2006 (Kurnalpi) |
| A75023 | 2007 | Heron Resources Ltd | Hampton Hil | <1% | Hampton Hill Project, Annual Report for the period 1st January 2006 to 31st December 2006, P25/1004,1005 & 100 |
| A76393 | 2007 | Australasian Resources Pty Ltd | East Bulong | <1% | Annual Exploration Report East Bulong Project E25/296 For Reporting Period 24th August 2006 to 23rd August 200 |
| A71827 | 2006 | Heron Resources Ltd | Taurus Project | <1% | Taurus Project Combined Report C378/1997, East Coolgardie (Bulong) Mineral Field, Annual Report, 14 September |
| A72402 | 2006 | Heron Resources Ltd | Bulong/Manor/Danae | <1% | Bulong - Manor Project Combined Report C137/1999, Annual Report, 1 January 2004 to 31 December 2005 |
| A73541 | 2006 | Australasian Resources Ltd | East Bulong | <1% | Annual Exploration Report, East Bulong Project E25/296, For Period 24 August 2005 to 23 August 2006, (Kurnalpi |
| A69928 | 2005 | Supersorb Minerals Nl | Taurus | <1% | Taurus Project ,Annual Report, 14th September 2003 to 13th September: 2004, P25/1004,P25/1005, P25/1006. |
| A68050 | 2004 | Bulong Operations Pty Ltd | Bulong | <1% | Combined Annual Report C224/95 1st January 2003 to 31st dece mber 2003 E25/67, E27/72, E27/94 etc |
| A68051 | 2004 | Bulong Operations Pty Ltd | Kurnalpi gold / Taurus | <1% | Bulong/Talon Tenure Combined Annual Report, C378/1997 for the period 14th September 2002 to 13th September: 20 |
| A68049 | 2004 | Bulong Operations Pty Ltd | Bulong-Danae | <1% | Combined Annual Report C137/99 Bulong - Danae Joint Venture 1st January 2003 to 31st December 2003 |
| A65953 | 2003 | Placer Dome Asia Pacific Ltd | Lake Yindarlgooda | <1% | Annual Report 14/11/2001-13/11/2002 Lake Yindarlgooda Project C9/2002 Tenements E25/226, 228 Report No WA02.08 |
| A66309 | 2003 | Bulong Operations Pty Ltd | Bulong | <1% | Combined Annual Report C224/95 for the period 1 January 2002 to 31 December 2002 E25/67, E27/72,94, L27/55-56, |
| A66149 | 2003 | Bulong Operations Pty Ltd | Bulong | <1% | Bulong/Talon Tenure Combined Annual Report, C378/1997 for the period 14th September 2001 to 13th September: 20 |
| A66420 | 2003 | Bulong Operations Pty Ltd | Bulong- Danae | <1% | Combined Annual Report, C137/1999, Bulong-Danae Joint Venture, 1st January 2002 - 31st December 2002, : L25/7, |
| A64757 | 2002 | Bulong Operations Pty Ltd | Bulong | <1% | Combined Annual Report C224/95 1st January 2001 - 31st December 2001 Exploration Licences 25/67, 27/72, 27/94 |
| A64171 | 2002 | Bulong Operations Pty Ltd | Bulong | <1% | Annual Report 14th September 2000 to 13th September 2001 P25/1004, P25/1005, P25/1006 Bulong/Talon tenure, Bul |
| A64756 | 2002 | Bulong Operations Pty Ltd | Bulong - Danae | <1% | Combined Annual Report C137/99 Bulong - Danae Joint Venture 1st January 2001 - 31st December 2001. Mining Leas |
| A62577 | 2001 | Bulong Operations Pty Ltd | Bulong - Manor | <1% | Mining Leases 25/19, 25/32, 25/36, 25/58, 25/59, 25/64, 25/81, 25/82 Propsecting Licences 25/1175, 25/1176, 25 |
| A60114 | 2000 | Croesus Mining Nl | Queen LaPage | <1% | Queen LaPage Project, Final Report on E25/78 for the period 14 October 1998 to 13 October 1999 |
| A58802 | 1999 | Preston Resources Nl | Bulong | <1% | Bulong Project, Annual report to 31/12/98 for P25/1004 P25/1005 and P25/1006 Taurus Western Australia |
| A57919 | 1999 | Croesus Mining Nl | Queen Lapage | <1% | Queen Lapage Project ,Annual Technical Report on Exploration Activity for the period 28/02/1998 to27/02/1999 |
| A55022 | 1998 | Manor Resources Nl | Bulong | <1% | Bulong, Annual Report 09/06/1998 Manor Resources NL M25/19, M25/32, M25/36, M25/58, M25/59, M25/64, M25/81, |
| A53308 | 1998 | Talon Resources Nl | Taurus | <1% | Taurus Project, Annual Report P25/1004-1006 Year Ending: 13/09/1995 Kurnalpi, East Coolgardie Mine |
| A53309 | 1998 | Talon Resources Nl | Taurus | <1% | Taurus Project, Annual Report Year Ending: 13/09/1996 P25/1004-1006 Kurnalpi, East Coolgardie Mineral Field, |
| A54187 | 1998 | Julia Mines Nl | Lake Yindarlgooda | <1% | Lake Yindarlgooda Alluvial Gold Project Annual Report for year ended 14 October 1997 E25/78 |
| A51401 | 1997 | Goldfields Exploration Pty Ltd | Bulong | <1% | Annual report Project Bulong Tenements: Prospecting Licences P25/1058 P25/1061 to P25/1063 P25/1071 P25/1175 t |
| A52660 | 1997 | Talon Resources Nl | Taurus | <1% | Taurus Project, Annual Report Year Ending 13/09/1997 P25/1004-1006 Kurnalpi, East Coolgardie Mineral Field |
| A47427 | 1996 | Manor Resources Nl | Bulong / Manor / Danae | <1% | Bulong Gold Project Annual report for the period 1 January 1995 to 31 December 1995 Mining Leases M25/19 M25/3 |
| A47039 | 1996 | North Ltd | Lake Yindarlgooda - Gundockerta | <1% | Lake Yindarlgooda - Gundockerta Project,Partial Surrender Report for the period ending 13/10/95 E25/78 |
| A47040 | 1996 | North Ltd | Lake Yindarlgooda - Gundockerta | <1% | Annual Report for E25/78 Gundockerta, Lake Yindarlgooda, WA Fourth Year ending 13 October 1995. |
| A49022 | 1996 | North Ltd | Lake Yindarlgooda - Gundockerta | <1% | Annual mineral exploration report for E25/78 Gundockerta, Yindarlgooda, WA, for the period ending 13 October 1 |
| A44678 | 1995 | Western Mining Corporation Ltd | Glandore | 4% | Annual report for the period 1 January 1994 to 31 December 1994 Glandore Project Mining Leases M25/73 M25/74 M |
| A45341 | 1995 | Manor Resources Nl | Bulong / Manor / Danae | <1% | Bulong Gold Project Annual Report For the periodof 1st January to 31st March 1995 Mining Leases M25/19,32,36,5 |
| A47480 | 1995 | Western Mining Corporation Ltd | Glandore | 4% | Annual Report for the period 1 January 1995 to 31 December 1995 , Glandore Project, M25/73 M25/74 M25/86 M25/ |
| A41175 | 1994 | Western Mining Corporation Ltd | Glandore | 5.9% | Annual Report for the period 01/01/93-31/12/93 Glandore Project M25/73,74,86,88,90,95,97,98 |
| A40273 | 1994 | Talon Gold Nl | Taurus | <1% | Annual Report for the period 14/09/92-13/09/93 Taurus Project P25/1004-1006 |
| A40652 | 1994 | Geopeko | Lake Yindarlgooda -Gundockerta | <1% | Annual Report for E25/78, Gundockerta, Lake Yindarlgooda, WA. Second Year ending 13 October 1993. |
| A41478 | 1994 | Manor Resources Nl | Bulong | <1% | Annual report for the period 01/01/93-31/12/93 Bulong Project |
| A43248 | 1994 | North Mining Ltd | Lake Yindarlgooda- Gundockerta | <1% | Annulal Report for E25/78 Gundockerta, Lake Yindarlgooda WA, Third Year ending 13 October 1994. |
| A43505 | 1994 | Talon Resources Nl | Taurus | <1% | Annual Report on the Taurus Group, P25/1004 to P25/1006 for period 14/09/1993 to 13/09/1994. |
| A37705 | 1993 | Western Mining Corporation Ltd | Glandore | 5.9% | Three Year Report for the Period 01/01/90 - 31/12/92 The Glandore Project Mining Leases 25/73-74,86,88,90,95,9 |
| A37809 | 1993 | Geopeko | Lake Yindarlgooda -Gundockerta | <1% | Report for E25/78 Gundockerta, Lake Yindarlgooda, WA. First year ending 13 October 1992. |
| A36571 | 1992 | Manor Resources Nl | Bulong | <1% | Bulong Project Annual Report for the year ending June 1992 M25/19,32,36,58,59,64,81,82 P25/1175-1177,1179 |
| A32944 | 1991 | North Eastern Gold Mines Nl | Bulong | <1% | Bulong Project Annual report M25/19,32,58,59,64,81 & 82 (April 1991) |
| A34602 | 1991 | Mr Dalla-Costa Mr | Taurus | <1% | (Annual Report for the period 01/90-12/91 Taurus Project P25/1004-1006) Taurus, Bulong District |
| A30392 | 1990 | North Eastern Gold Mines Nl | Bulong | <1% | Bulong Project. Annual Report M25/19,32,58,59,64,81 and 82 04/1990 |
| A29399 | 1989 | Trafalgar Mining Nl | Bulong | <1% | Bulong Project, Annual Report - Associated plans (1988-1989) |
| A29268 | 1989 | Trafalgar Mining Nl | Bulong | <1% | Non-statutory Report: Alluvial Potential of The Bullong Prospect , March 1989, M25/19, 23, 36 ; P25/181 |
| A29269 | 1989 | Trafalgar Mining Nl | Bulong | <1% | Non-statutory Report : Hard Rock Potential of The Bulong Prospect, 07/03/1989, M25/19, 32, 36; P25/181 |
| A29275 | 1988 | Trafalgar Mining Nl | Bulong | <1% | Non-statutory Report : Progress Report Bulong Gold Project (1988) M25/19, 32, 36 & P25/181-182 |
| A29265 | 1988 | Trafalgar Mining Nl | Bulong | <1% | Bulong Project, Annual Report , March 1988, M25/19, 32, 36 P25/181-182, 509, 525, 613 & 629 |
| A23291 | 1987 | Leader Resources Nl | Bulong | <1% | Bulong Project, Initial reconnaissance and proposed further exploration, P25/159-161, P25/269 |
| A23672 | 1987 | Trafalgar Mining Nl | Bulong | <1% | Bulong Project ,Annual Report for the period Prospecting licence: P25/181, 182, 613. Mining Lease: M25/36Sept |
| A16210 | 1985 | Rytech Pty Ltd | Taurus | <1% | Taurus Project, Non-statutory Report: Report on Gold Prospects in the Eastern Goldfields of Western Australia, |
| A15676 | 1984 | Consolidated Resources Nl | Bulong | <1% | Bulong Project, Non-statutory Report: Final Report, Gold Exploration Activities , Taurus Mine & Environs at Bu |
| A7844 | 1978 | Aquitaine Aust Minerals Pty Ltd | Ophir | <1% | Ophir Project, Non-statutory Report: Exploration Report, March 1978, MC25/1042, 1113-1117. |
| A82549 | 1753 | St Barbara Ltd | ROCKY DAM | <1% | ROCKY DAM PROJECT PARTIAL SURRENDER REPORT FOR THE PERIOD 23 MARCH 2006 – 20 MARCH 2009 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 2 months · 17 Nov 2026
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over P 25/2730 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold P 25/2730? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-28. Compiled by NextMaps. Verify against primary sources before reliance.