Register summary
- Holder
- Pelm Resources Pty Ltd
- Local government
- Shire of Coolgardie
- Application received
- 18 June 2018
- Commenced
- 23 Nov 2021
- Expiry
- 22 Nov 2029
- Term
- 4 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A150075 | 2025 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | <1% | Final Surrender Report - P16/3018 Kunanalling for the period ending 20/07/2025. |
| A128805 | 2021 | Evolution Mining (Mungari) Pty Ltd | Little Crest Dam | <1% | Final Surrender Report - P16/3019 and P16/3020 Little Crest Dam Project for the period 25 July 2017 to 24 July |
| A123163 | 2020 | Evolution Mining (Mungari) Pty Ltd | Kintore-Kunanalling | <1% | Annual Report - C3/2017 - Kintore/Kunanalling - 1 January 2019 to 31 December 2019 |
| A125403 | 2020 | Devant Pty Ltd; Sos Enterprises Pty Ltd | Kintore | 1.4% | Kintore Project, Mining leases M16/351, M16/289 & P16/3184 Annual Mineral Exploration Report Combined Reportin |
| A122105 | 2019 | Devant Pty Ltd & D.M Duggan & D.M Duggan & Sos Enterprises P | Kintore | 1.4% | Kintore Project, Mining leases – M16/351, M16/289 & P16/2835 2018 Annual Mineral Exploration Report Combined R |
104 more reports
| A119552 | 2019 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanalling | <1% | Group Annual Technical Report - Kintore Kunanalling - C3/2017 For the Period 1 January 2018 to 31 December 201 |
| A119926 | 2019 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | 2.5% | Surrender Report P16/2862 Kunanalling Project for the period 4 February 2015 to 3 February 2019 |
| A116303 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanulling | <1% | Annual Report Kintore - Kunanulling C3/2017 For the Period 1 January 2017 to 31 December 2017 |
| A117294 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kratos | 23% | Final Surrender Report Kratos Project C3/2017 for the period 17 June 2010 to 16 June 2018, P16/02554, P16/0255 |
| A117674 | 2018 | Devant Pty Ltd | Kintore | 1.4% | Kintore Project, Mining leases – M16/351, M16/289 & P16/2835 2018 Annual Mineral Exploration Report combined r |
| A117765 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | <1% | Final Surrender Report P16/2660, Kunanalling, 26 July 2010 - 25 July 2018 |
| A112431 | 2017 | Evolution Mining (Mungari) Pty Ltd; Hayes Mining Pty Ltd | Kintore - Kunanalling | <1% | Annual Report on the Kintore - Kunanalling Project, C3/2017, for the period 1 January 2016 to 31 December 2016 |
| A115213 | 2017 | Devant Pty Ltd | Kintore | 1.6% | Annual Mineral Exploration Report, Kintore Project C100/2012 (M16/00289, M16/00351) for the period 18/08/2016 |
| A107992 | 2016 | Phoenix Gold Limited | Kunanalling | 1.2% | Kunanalling Project Annual Mineral Exploration Report C153/2006 For the period 1st January 2015 to 31st Decemb |
| A109675 | 2016 | Torian Resources Limited | Stackhole Dam Project | <1% | Stackhole Dam Project Annual Report, 1 July 2015 to 30 June 2016 |
| A110055 | 2016 | Evolution Mining (Mungari) Pty Ltd | Kintore | <1% | Annual Report for the period 1st July 2015 to 30th June 2016, Kintore, Kintore East, Carbine, Broads Dam, Star |
| A110126 | 2016 | Devant Pty Ltd | Kintore | 1.6% | Annual Mineral Exploration Report, Kintore Project C100/2012 for the period 18/08/2015 to 17/08/2016, M16/351 |
| A104845 | 2015 | Phoenix Gold Limited | Kunanalling | 1.2% | Kunanalling Project, Annual Report for the period 01/01/2014 to 31/12/2014, C153/2006. |
| A106632 | 2015 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Annual Report for the period 1st July 2014 to 30th June 2015,C144/2014 Kintore, Kintore East, Carbine, Broads |
| A107223 | 2015 | Torian Resources Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2014 – 30 June 2015 M16/229, M16/491,P16/2479-81 |
| A107335 | 2015 | Devant Pty Ltd | Kintore | 1.6% | Combined Annual Mineral Exploration Report, Kintore Project, for the period 18/08/2014 to 17/08/2015 |
| A103169 | 2014 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Annual Report for the period 1st July 2013 to 30th June 2014, Kintore, Kintore East, Carbine, Broads Dam, Star |
| A101201 | 2014 | Phoenix Gold Limited | Kunanalling | 1.3% | Kunanalling Project, Annual Report, Reporting Group: C153/2006, For the period 1st Januray 2013 to 31st Decem |
| A103173 | 2014 | Chitty C G | Kintore Partnership | 1.6% | Combined Annual Mineral Exploration report for the period 18 August, 2013 to 17 August, 2014, Kintore Partners |
| A103786 | 2014 | Strategic Projects Mining Pty Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2013 – 30 June 2014 M16/229,M16/491,P16/2479-81 |
| A97612 | 2013 | Phoenix Gold Limited | Kintore | <1% | Kintore Project, Annual Report for the period 01/02/2012 to 31/01/2013, M16/16, 215, 444; P16/2573, 2574 & 262 |
| A96993 | 2013 | Phoenix Gold Limited | Kunanalling | 1.4% | Kunanalling Project, Annual Report for the period 1st January 2012 to 31st December 2012, M15/696; M16/15..... |
| A97179 | 2013 | Strategic Projects Mining Pty Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2011 – 30 June 2012 M16/164, M16/229, M16/257, M16 |
| A97967 | 2013 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Kintore Project, Annual Report for the period 06/03/2012 to 05/03/2013, P16/2358-2374, 2586, 2589-2591, 2642-2 |
| A99111 | 2013 | Tarnwood Pty Ltd | Kintore | 1.4% | Kintore Project, Annual Report for the period 18/08/2012 to 17/08/2013, M16/298, & 351; P26/2626 |
| A99397 | 2013 | Strategic Projects Mining Pty Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2012 – 30 June 2013 M16/164, M16/229, M16/257, M16 |
| A99757 | 2013 | Chitty C G | Kintore | 1.6% | Combined Annual Mineral Exploration report for the period 18 August, 2012 to 17 August, 2013, Kintore Partners |
| A92835 | 2012 | Phoenix Gold Limited | Kunanulling | 1.5% | Kunanulling Project, Annual Report for the period 1st January 2011 to 31st December 2011, M15/696; M16/15..... |
| A94167 | 2012 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Annual Report for the period 6 March 2011 to 5 March 2012, Kintore, Kintore East and Carbine Projects, P16/235 |
| A96289 | 2012 | Mr Chitty C G | Kintore Partnership | 1.6% | Kintore Partnership Project, Annual Report for the period 18th August 2011 to 17th August 2012, M16/289 & M16/ |
| A93582 | 2012 | Allen B | Kintore | <1% | Combined Annual Report KINTORE PROJECT C71/2009 For the Period 1st February 2011 – 31st January 2012, M16/16, |
| A89370 | 2011 | Phoenix Gold Limited | Castle Hill | 7.5% | Annual Technical Report for Period 1/1/10 to 31/12/10, Castle Hill, Combined Reporting Number C99/1994 Mining |
| A90374 | 2011 | Allen B | Kintore | <1% | Combined Annual Report, C71/2009, Kintore Project, M6/16, 215, 444; P16/2522-2524, 2573-2574 & P16/2624, Repo |
| A91144 | 2011 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008, Reporting Period: 1 July 2010 to 30 June 2011 |
| A91333 | 2011 | Seatommy Pty Ltd | Kintore | <1% | Annual Report Kintore Project P16/2660 For the period: 26/07/10 – 25/07/11 |
| A90752 | 2011 | La Mancha Resources Australia Pty Ltd | Kintore East - Carbine | <1% | Annual Report for the period 6 March 2010 to 5 March 2011, Kintore, Kintore East and Carbine Projects C187/200 |
| A87109 | 2010 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Kintore Annual Report for the period 06/03/2009 to 05/03/2010, P16/2358 and 2369-2374, C187/2009 |
| A86723 | 2010 | Allen B | Kintore | <1% | Combined AnnualL Report C71/2009 KINTORE PROJECT M16/16, M16/215, M16/444, P16/2522, P16/2523, P16/2524, P16/2 |
| A86988 | 2010 | La Mancha Resources Australia Pty Ltd | Kintore East | <1% | Kintore East Project Annual Report for the period 14th June 2009 to 13th June 2010 |
| A87601 | 2010 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1July 2009 to 30 June 2010 |
| A81511 | 2009 | Cazaly Resources Ltd | CASTLE HILL | <1% | Combined Annual Report CASTLE HILL PROJECT For the Period 1 January 2008 to 31 December 2008 |
| A82596 | 2009 | La Mancha Resources Australia Pty Ltd | KINTORE EAST | <1% | KINTORE EAST PROJECT ANNUAL REPORT FOR THE PERIOD 14th JUNE 2008 TO 13th JUNE 2009, C Number 38/2009 |
| A84715 | 2009 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Mineral Exploration Report, Period 1 July 2008 to 30 June 2009, Tenements: M16/23, M16/48, M16/58, M16 |
| A77599 | 2008 | Cazaly Resources Ltd | CASTLE HILL | <1% | Combined Annual Report CASTLE HILL PROJECT C99/1994 For the Period 1 January 2007 to 31 December 2007 |
| A77188 | 2008 | Monarch Gold Mining Company Ltd | Davyhurst | <1% | DAVYHURST PROJECT Reporting Group C189/2007 Report Type: Annual Technical Report Report Period: 2 November 200 |
| A74388 | 2007 | Monarch Gold Mining Company Ltd | Carbine | 3.3% | Carbine Project M16/86, 143, 150, 164, 212, 244, P16/1439, 1512, 1570-73, 1816, 1915-16, 2178-82, 2006 Annual |
| A75229 | 2007 | Jaguar Minerals Ltd | Kintore | <1% | Annual Report Kintore Project, C342/1997, Tenements in reporting group: P16/1544, P16/1545, P16/1546, P16/1866 |
| A75021 | 2007 | Cazaly Resources Ltd | Castle Hill | <1% | Combined Annual Report, Castle Hill Project, For the Period 1 January 2006 to 31 December 2006. (C99/1994 - M1 |
| A75605 | 2007 | Cazaly Resources Ltd | Castle Hill | <1% | Annual Environmental Report, Castle Hill Project For the period 1 January 2006 to 31 December 2006 Tenements: |
| A71993 | 2006 | Siberia Mining Corporation Ltd | Carbine | 3.7% | Carbine Project, Annual Technical Report 01/01/2005 to 31/12/2005, Combined Reporting No. C109/2005, Kalgoorli |
| A72133 | 2006 | Jaguar Minerals Ltd | Kintore | <1% | Annual Report, Kintore Project C342/1997, M16/16,215,444, P16/1544-1546,1866, Period 10 November 2004 to 9 Nov |
| A73350 | 2006 | Cazaly Resources Ltd | Castle Hill | <1% | Combined Annual Report, Castle Hill Project P16/2253-2259, P16/2265-2266, For the Period 7 July 2005 to 6 July |
| A70059 | 2005 | Mr Pavlinovich K | Kintore | <1% | Annual report for the period 01/01/04 - 31/12/04 Kintore Project, C342/1997, M16/16, M16/215, P16/1866, GML16/ |
| A70065 | 2005 | Siberia Mining Corporation Ltd | Red Dam | 22% | Annual technical report for the period 11/01/04 - 10/01/05 Red Dam Project, M16/143, Kalgoorlie |
| A70167 | 2005 | Jaguar Minerals Ltd | Kintore | <1% | Annual report for the period 10/11/03 - 09/11/04 Kintore Project, C342/1997, M16/16, M16/215, M16/444, P16/154 |
| A70386 | 2005 | Siberia Mining Corporation Ltd | Carbine | <1% | Carbine Project, P16/1572, Annual technical report 09/03/04 - 08/03/05 Kalgoorlie |
| A70387 | 2005 | Siberia Mining Corporation Ltd | Carbine | <1% | Carbine Project, P16/1571, Annual technical report 9/03/04 -08/03/05 Kalgoorlie |
| A68508 | 2004 | Placer Dome Asia Pacific Ltd | Carbine/Zuleika | 1.8% | Carbine/Zuleika Project Annual Report 09/03/2003 to 08/03/20 04 C303/1997 M16/27...M16/411, P16/1439...P24/335 |
| A69018 | 2004 | Placer Dome Asia Pacific Ltd | Carbine Zuleika | <1% | Carbine Zuleika Project, Surrender report 06/06/2000-05/06/2004, P16/2008-09 |
| A66238 | 2003 | Mr Pavlinovich K | Kintore | <1% | Annual Report 1 January 2002 to 31 December 2002 Kintore Project M16/16, 215, GML16/1163, P16/1866 |
| A66658 | 2003 | Placer Dome Asia Pacific Ltd | Carbine | 1.8% | Carbine/ Zuleika Project, Annual Report 09/03/2002 - 08/03/2003 C303/1997: M16/27, 44-5, 48, 58, 86, 106, 143, |
| A65102 | 2002 | Auriongold Exploration Pty Ltd | Carbine Zuleika | 1.8% | Annual Report Reporting Period 09/03/2000 - 08/03/2002 Combined Reporting NO C303/1997. Tenement/s M16/23, 27, |
| A62040 | 2001 | Mr Pavlinovich K | Kintore | <1% | Kintore Project M16/16, M16/215, GML16/1163, P16/1866 Annual Report for the period 1 January 2000 to 31 Decemb |
| A62276 | 2001 | Cardinal Minerals Ltd | Kintore | <1% | A review of the Kintore Project Coolgardie WA GML16/1163, M16/16 & 16/215, P16/1866. |
| A60310 | 2000 | Mines & Resources Australia Pty Ltd | Kintore East | <1% | Kintore East Joint Venture Project Annual Report for the Period 10/03/1999 to 09/03/2000 PE00/12 Tenements P16 |
| A61372 | 2000 | Centaur Mining & Exploration Ltd | Carbine Zuleika | 2% | Mining Leases M16/23,27,44,45,58,86,106,143,150,156,164,188, 212, Prospecting Licences P16/1353-1356,1373,1439 |
| A59889 | 2000 | Mr Pavlinovich K | Kintore | <1% | Kintore Project M16/16,M16/215,GML16/1163,P16/1866 Annual Report for the Period 01/01/1999 to 31/12/1999 |
| A59105 | 1999 | Centaur Mining & Exploration Ltd | Carbine Zuleika | 2.1% | C303/1997 - Carbine - Zuleika, Joint Annual Report For the Period 9/03/1998 to 8/03/1999 (M16/23, M16/27, M16/ |
| A57798 | 1999 | Herald Resources Ltd | Kintore | <1% | Annual Technical Report P16/1544-1546, 1866, M16/16, 215, GML16/1163, 01/01/98 - 31/12/98 |
| A58177 | 1999 | Mines & Resources Australia Pty Ltd | Kintore East | <1% | Kintore East joint venture project. Annual technical report on P16/1416-1420. 10/03/98-09/03/99. |
| A54425 | 1998 | Herald Resources Ltd | Kintore | <1% | Kintore, C342/1997 Annual Report 01/01/97 - 31/12/97 P16/1470, 1544-1546, 1626, 1866, M16/215, 16, GML16/1163 |
| A54598 | 1998 | Mines & Resources Australia Pty Ltd | Kintore East Joint Venture | <1% | Kintore East Joint Venture Project Prospecting Licence: 16/1416-1420 10/03/97 - 09/03/98 |
| A54395 | 1998 | Herald Resources Ltd | Kintore | 1.6% | Kintore Project, Annual Report P16/1470, 1626 for the period 01/01/97 - 31/12/97 |
| A55230 | 1998 | Centaur Mining & Exploration Ltd | Carbine Zuleika | 2.1% | C303/1997 - Carbine/Zuleika Joint Annual Report 09/03/97 - 08/03/98 Mining Licence: M16/23, 27, 44-45, 48, 58, |
| A50807 | 1997 | Mines & Resources Australia Pty Ltd | Kintore East | <1% | Kintore East Project Annual Technical Report on Prospecting Licences P16/1416 to P16/1420 for the period 10th |
| A47860 | 1996 | Mines & Resources Australia Pty Ltd | Kintore East | <1% | Kintore East Project Annual Technical Report on Prospecting Licences P16/1416 to P16/1420 for the period 10th |
| A48542 | 1996 | Newcrest Mining Ltd | Breakaway Dam | 4.4% | Newcrest Report No. WORA 104 OB No. 352 Ora Banda Gold Mine Breakaway Dam Project M16/58 M16/106 M16/143 M16/1 |
| A49964 | 1996 | Amx Resources Nl | Kunanalling | <1% | Annual report for Kunanalling Project Period 1 November 1995 to 31 October 1996 Mining Leases M16/139 M16/140 |
| A48337 | 1996 | Devant Pty Ltd | Kintore | 1.5% | Kintore Western Australia Prospecting Licences P16/1470 P16/1594 Chitty Mining Annual report May 1995 to May 1 |
| A44290 | 1995 | Mines & Resources Australia Pty Ltd | Kintore East | <1% | Annual Technical Report on Prospecting Licences P16/1416 to P16/1420 for the period 10 March 1994 to 9 March 1 |
| A44946 | 1995 | Newcrest Mining Ltd | Breakaway Dam | 4.4% | Newcrest Mining Report No. WORA 85 OB No. 334 Ora Banda Gold Mine Breakaway Dam Project Exploration Report on |
| A41044 | 1994 | Resource Service Group Pty Ltd | Kintore East | <1% | Combined Annual Technical Report for the 12 months to 9/03/1994 Kintore East Project P16/1416 to 1420 |
| A41999 | 1994 | Newcrest Mining Ltd | Breakaway Dam | 4.4% | Breakaway Dam Project Exploration Report on Leases M6/58, M16/106,M16/143,M16/150,M16/164, P16/1439, P6/1570-1 |
| A38140 | 1993 | Afmeco Pty Ltd | Kintore East | <1% | Annual report for the period 10/03/92-09/03/93 Kintore East JV Project P16/1416-1420 |
| A39998 | 1993 | Newcrest Mining Ltd | Breakaway Dam | 4.4% | Breakaway Dam Project Exploration Report on Leases M16/58, M16/106, M16/143, M16/150, M16/164, P16/1439, P16/1 |
| A35699 | 1992 | Afmeco Pty Ltd | Kintore East | <1% | Final Report on tenements for the period 01/08/91 - 10/03/92 Kintore East Joint Venture Project M16/172 and M1 |
| A37470 | 1992 | Newcrest Mining Ltd | Breakaway Dam | 4.4% | Annual report for the period 05/91 to 05/92 Breakaway Dam Project M16/58, M16/106, M16/143, M16/150, M16/164, |
| A32917 | 1991 | Poseidon Ltd | Little Crest Dam | 22% | Little Crest Dam Project Annual Report 1990 P16/657, P16/658, P16/1042, P16/1043 and M16/143 Poseidon Explorat |
| A31267 | 1990 | Poseidon Ltd | Little Crest Dam | 22% | Annual report 1989 Little Crest Dam project P16/538 to P16/539, P16/488 to P16/490, P16/492, P16/493, P16/1402 |
| A6607 | 1976 | Western Mining Corporation Ltd | Ora Banda- Kunanalling- Broad Arrow | 1% | Ora Banda- Kunanalling- Broad Arrow Project, Annual Report for the period 01/05/1973 to 29/06/1976, TR70/5012 |
| A1814 | 1971 | Western Mining Corporation Ltd | Kunanalling | <1% | Kunanalling Project, Annual Report for theyear ending 30th June 1971, MC16/118-119, 124-185, & 190-205. |
| A105 | 1970 | Western Mining Corporation Ltd | Ora Banda- Kunanalling | <1% | Ora Banda- Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Reports Data File, |
| A106 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Kalgoorlie Regional & Geological Plans (8), circa July |
| A107 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report ,Data File |
| A112 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report:Annual Report, Folder 11, Sample Data Sheets for Kunanal |
| A108 | 1970 | Western Mining Corporation Ltd | Ora Banda/Kunanalling | <1% | Annual Tenements and Temporary Reserve Report Data File, Ora Banda - Kunanalling Area. |
| A109 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report,Folder 8,In |
| A110 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | <1% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenement & Temporary Reserve Report, Folder 9, Vac |
| A111 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | <1% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenements & Temporary Reserve Report Folder 10,Sam |
| A68432 | 1753 | Herald Resources Ltd | Kintore | <1% | Annual report for the period 01/01/2003-31/12/2003 Kintore Project P16/1544, P16/1545, P16/1546, P16/1866, M1 |
| A27226 | 1753 | Aberfoyle Resources Ltd | Kintore | <1% | Kintore J.V. Progress report to 28/02/89 E16/08-09, M16/55-57, M16/68, M16/76 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A44876 | 1753 | Mr Chitty Cg | Kintore | <1% | Chitty Mining, An Examination of the Kintore Area (P16/1594, 1626,1470) June 1995 |
| A50373 | 1753 | Centaur Mining & Exploration Ltd | Ora Banda South | 2.2% | Prospecting Licences P16/1353 to P16/1356 P16/1374 P16/1439 P16/1512 P16/1570 to P16/1573 and Mining Leases M1 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 3 years · 22 Nov 2029
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over P 16/3142 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold P 16/3142? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.