M 37/399
Register summary
- Holder
- Genesis Minerals (Leonora) Pty Ltd
- Part of
- Genesis Minerals Limited (ASX:GMD) as at 2026-06-30
- Local government
- Shire of Leonora
- Application received
- 28 Apr 1993
- Commenced
- 21 Oct 1993
- Expiry
- 20 Oct 2035
- Term
- 21 Years (Renewed)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A134471 | 2023 | Fmg Resources Pty Ltd | Tarmoola | 1.8% | C39/2020 (Tarmoola) Annual Mineral Exploration Report for the period ending 06/02/2023. E 37/1380,E 37/1381,E |
| A135098 | 2023 | Fortescue Metals Group Ltd | Tarmoola | 1.8% | Tarmoola C39/2020 Combined Final Surrender Reportperiod ending 27/03/2023. E 37/1379,E 37/1380,E 37/1381 |
| A130122 | 2022 | Fortescue Metals Group Ltd | Tarmoola | 1.8% | Tarmoola Annual C39/2020 for the period ending 06/02/2022. |
| A126676 | 2021 | Fmg Resources Pty Ltd | Tarmoola | 1.8% | Tarmoola Project Annual Mineral Exploration Report [C39/2020] for the period ending 06/02/2021 |
| A123220 | 2020 | Round Oak Jaguar Pty Ltd; Round Oak Jaguar Project Pty Ltd | Teutonic Bore Project | <1% | Combined Annual Report 2019 Teutonic Bore Project C/157/2002 for the period 1 January 2019 to 31 December 2019 |
94 more reports
| A125488 | 2020 | Overseas Mining Services Pty Ltd | Mount Davis | 2.3% | Mount Davis P37/8635 Annual Mineral Exploration Report for the period 15th August 2019 - 14th August 2020 |
| A125691 | 2020 | St Barbara Limited | Gwalia | 1.4% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2019 to 30 September |
| A119556 | 2019 | Round Oak Jaguar Project Pty Ltd; Round Oak Jaguar Pty Ltd | Teutonic Bore | <1% | C157/2002 Combined Annual Report for Teutonic Bore Project for the period 1 January 2018 to 31 December 2018 |
| A122153 | 2019 | St Barbara Limited | Gwalia | 1.3% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2018 to 30 September |
| A120854 | 2019 | Sammy Resources Pty Ltd | Teutonic Bore | 2% | Final Surrender Report E37/01037 Teutonic Bore Project for the period 23 July 2010 to 19 July 2019 |
| A115994 | 2018 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report C157/2002 Teutonic Bore Project for the period from 1st January 2017 to 31st December 2 |
| A117767 | 2018 | Kopore Metals Limited | TEUTONIC | 2% | ANNUAL EXPLORATION REPORT TEUTONIC PROJECT E37/1037, 23 JULY 2017 - 22 JULY 2018 |
| A118601 | 2018 | St Barbara Limited | Gwalia | 1.3% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2017 to 30 September |
| A112037 | 2017 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002 Teutonic Bore Project for the period 1 January 2016 to 31 December 2016 |
| A114524 | 2017 | Metallum Limited | Teutonic | 2% | Annual Mineral Exploration Report Teutonic Project E37/01037 for the period 23 July 2016 to 22 July 2017 |
| A115512 | 2017 | St Barbara Limited | Gwalia | 1.3% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2016 to 30 September |
| A110551 | 2016 | St Barbara Limited | Gwalia | 1.3% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2015 to 30 September |
| A107737 | 2016 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2015 to 31 December 2015 |
| A108571 | 2016 | Metallum Ltd | Teutonic | 2% | Metallum Ltd, Final Drilling Report, Mustang Prospect, Teutonic Project, E37/1037 (Round 10) |
| A109886 | 2016 | Metallum Limited | Teutonic | 2% | Annual Exploration Report - Teutonic Project E37/01037 For the Period 23 July 2015 to 22 July 2016 |
| A105028 | 2015 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2014 to 31 December 2014, |
| A105579 | 2015 | St Barbara Ltd | Leonora | 1.2% | Annual Mineral Exploration Report - DMP Combined Reporting Group C162/2006 (Leonora) Reporting Period 1 April |
| A105069 | 2015 | Caeneus Minerals Ltd | Mount Davis | 3.3% | Mount Davis Project (C177/2010) P37/7803, 7804, 7820, 7821, 7824, 7825, 7826, 7827 Combined Annual Technical R |
| A106676 | 2015 | Metallum Ltd | Teutonic | 2% | Annual Exploration Report Teutonic Project E37/1037 for the period 23rd July 2014 to 22nd July 2015 |
| A107603 | 2015 | St Barbara Limited | Gwalia | 1.2% | Gwalia Project C55/2004 Combined Annual Report for the Period 1 October 2014 to 30 September 2015 |
| A104225 | 2014 | St Barbara Ltd | Gwalia | <1% | Annual Mineral Exploration Report - DMP Combined Reporting Group C55/2004 (Gwalia) Reporting Period 1 October |
| A103291 | 2014 | Metallum Ltd | Teutonic | 2% | Annual Exploration Report Teutonic Project E37/1037 for the period 23nd July 2013 to 22st July 2014 |
| A101281 | 2014 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2013 to 31 December 2013, |
| A102258 | 2014 | St Barbara Ltd | Leonora | <1% | Annual Mineral Exploration Report - DMP Combined Reporting Group C162/2006 (Leonora) Reporting Period 1 April |
| A96320 | 2013 | Bligh Resources Limited | Mount Davis | 3.3% | Mount Davis Project, Annual Report for the period 20/10/2011 to 19/10/2012, P37/7803-7804, 7820-7821 & 7824-78 |
| A97747 | 2013 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2012 to 31 December 2012, |
| A98017 | 2013 | St Barbara Ltd | Leonora | <1% | Leonora Project, Annual Report for the period 1st April 2012 to 31st March 2013, E37/670.......E37/964; M36/41 |
| A98608 | 2013 | Independence Group Nl | Teutonic Bore | <1% | Teutonic Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E37/258........E37 |
| A99133 | 2013 | Mining Group Ltd | Teutonic | 2% | Annual Exploration Report Teutonic Project E37/1037 for the period 23nd July 2013 to 22st July 2013 |
| A100342 | 2013 | St Barbara Ltd | Gwalia | <1% | Annual Mineral Exploration Report - DMP Combined Reporting Group: C55/2004 Gwalia Project Reporting Period: 1 |
| A100606 | 2013 | Bligh Resources Limited | Mount Davis | 3.3% | Mount Davis Project Final Annual Report for Tenements P37/7803, P37/7804, P37/7820, P37/7821, P37/7824-P37/782 |
| A93519 | 2012 | Jabiru Metals Ltd | Teutonic Bore | <1% | Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2011 to 31st December 2011 |
| A94674 | 2012 | Mining Group Ltd | Teutonic | 2% | Annual Exploration Report Teutonic Project E37/1037 for the period 23nd July 2011 to 22st July 2012 |
| A92370 | 2012 | Bligh Resources Limited | Mount Davis | 3.3% | Mount Davis Project Annual Report for Tenements P37/7803, P37/7804, P37/7820, P37/7821, P37/7824-P37/7827 For |
| A93822 | 2012 | St Barbara Ltd | Leonora | <1% | Leonora C162/2006 Annual Report for the Period 1 April 2011 to 31 March 2012 |
| A96105 | 2012 | St Barbara Ltd | Gwalia | <1% | Gwalia Project, Annual Report for the period 1st October 2011 to 30th September 2012, E37/896, 918-919; M37/17 |
| A91039 | 2011 | Mining Group Ltd | Teutonic | 2% | Annual Exploration Report, Teutonic Project E37/1037 for the period 23nd July 2010 to 22st July 2011 |
| A89039 | 2011 | St Barbara Ltd | Gwalia | <1% | Gwalia Project C55/2004 Annual Report for the Period 1 October 2009 to 30 September 2010 |
| A90352 | 2011 | St Barbara Ltd | Leonora | <1% | Leonora Project, Annual Report for the period 1st April 2010 to 31st March 2011, Tenements as per Combined Rep |
| A92197 | 2011 | St Barbara Mines Ltd | Gwalia | <1% | Gwalia Project Annual Report for the Period 1 October 2010 to 30 September 2011 (C55/2004) |
| A87123 | 2010 | St Barbara Ltd | Leonora | <1% | Annual Report for the Period 1 April 2009 to 31 March 2010, Leonora, C162/2006, E37/235, E37/496, E37/573, E37 |
| A86096 | 2010 | Jupiter Mines Ltd | Grattan Well | 3.6% | Final Report for Grattan Well P37/5609-5612, Period 01/03/09 to 28/02/10 |
| A82015 | 2009 | Jupiter Mines Ltd | GRATTAN WELL | 2.7% | GRATTAN WELL PROJECT, Annual Report for Grattan Well P37/5735, P37/6466, P37/6467, P37/6894, P37/5609 to P37/5 |
| A82969 | 2009 | Jupiter Mines Ltd | Grattan Well | 2.4% | Final Report for Grattan Well P37/6567, P37/6568 & P37/6570 Period 05/08/08 to 06/08/09 |
| A85015 | 2009 | St Barbara Ltd | Argus | 1.2% | Partial Surrender Report for the period 2 September 2005 to 1 September 2009 |
| A82967 | 2009 | Jupiter Mines Ltd | Grattan Well | 5.2% | Final Report for Grattan Well P37/6466 & P37/6467 C31/2006 Period 13/09/08 to 14/09/09 |
| A85286 | 2009 | St Barbara Ltd | Gwalia | <1% | Gwalia Project C55/2004, Annual Report for the Period 1 October 2008 to 30 September 2009, E37/789, E37/918-91 |
| A77903 | 2008 | Jupiter Mines Ltd | Grattan Well | 2.3% | ANNUAL MINERAL EXPLORATION REPORT Combined Reporting No. C31/2006 2006 to 2007 GRATTAN WELL PROJECT LEONORA WA |
| A78232 | 2008 | Jupiter Mines Ltd | Grattan Well | 2.7% | ANNUAL MINERAL EXPLORATION REPORT GRATTAN WELL PROJECT LEONORA WA Combined Reporting No. C31/2006 2007 to 2008 |
| A78842 | 2008 | St Barbara Ltd | Leonora | <1% | LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2007 - 31 MARCH 2008 GROUP: C162/2006 E37/235, E37/236, E |
| A76878 | 2008 | St Barbara Ltd | Gwalia | <1% | Gwalia project, Annual report for the period 1 October 2006 - 30 September 2007 (C55/2004) |
| A73969 | 2007 | St Barbara Ltd | Gwalia | <1% | Gwalia Project, Annual Report for the Period 1 October 2005 to 30 september 2006, Combined Reporting No. C55/2 |
| A75283 | 2007 | St Barbara Ltd | Leonora | 1% | Leonora Project, Annual Report for the Period 1 April 2006 - 31 March 2007, C162/2006.(Report No.0051-2007-02) |
| A71746 | 2006 | St Barbara Mines Ltd | Harbour Lights / Gwalia | <1% | Gwalia Project, Annual Report for the period 1 October 2004 - 30 September 2005, Combined Reporting No. C055/2 |
| A72400 | 2006 | St Barbara Mines Ltd | Tarmoola | 2.1% | Tarmoola Regional Project, Annual Report for the Period 1 April 2005 to 31 March 2006, C100/2003, (St Barbara |
| A70723 | 2005 | St Barbara Mines Ltd | Tarmoola Regional | 2.1% | Tarmoola Regional Project, Annual Report for the period 1st April 2004 to 31st March 2005,( C100/2003), E37/23 |
| A67937 | 2004 | Sons Of Gwalia Ltd | Tarmoola | <1% | Surrender Report for the period ending 24/12/2003 Tarmoola Regional Project C100/2003, M37/308, M37/408, M37/4 |
| A68643 | 2004 | Sons Of Gwalia Ltd | Tarmoola | 2% | Annual Report for the period 01/04/2003-31/03/2004 Tarmoola Regional Project (C100/2003) E37/235, E37/345, E3 |
| A66500 | 2003 | Sons Of Gwalia Ltd | Argus | 7.5% | Annual Report for the period 1 April 2002 - 31 March 2003 Argus Project C113/1999: E37/415, 557-58, M37/338, 3 |
| A66719 | 2003 | Sons Of Gwalia Ltd | Mount Davis | 5.2% | Surrender Report 12 November 1999 to 4 January 2003 Mount Davis Project C265/1992: M37/545 |
| A66932 | 2003 | Sons Of Gwalia Ltd | Mount Davis | 1.7% | Annual Report for the period 20 June 2002 to 19 June 2003 Mount Davis Project |
| A67299 | 2003 | Sons Of Gwalia Ltd | Argus | 2.1% | Argus Project, Final Surrender Report for the period ending 7th April 2003, P37/5320 -5323. [C113/1999] |
| A64936 | 2002 | Sons Of Gwalia Ltd | Argus | 6.6% | 2001/02 Annual Report For Period 01/04/01 to 31/03/02 Group Reporting No. C113/1999 E37/415, E37/416, E37/557, |
| A64644 | 2002 | Sons Of Gwalia Ltd | Mount Davis | 3.1% | Mt Davis Surrender Report For The Period 20 July 1991 - 18 January 2002. Tenement: P37/4007 |
| A65105 | 2002 | Sons Of Gwalia Ltd | Mount Davis | 1.7% | Mount Davis Annual Report For The Period 20/6/01 To 19/6/02 Tenements: M37/545, M37/604 Group: C265/1992 |
| A63380 | 2001 | Pacmin Mining Corporation Ltd | Argus | 6.4% | 2000/01 Annual Report Argus Project Area E37/344, E37/415, E37/416, E37/557, E37/558, M37/338, M37/398, M37/39 |
| A60958 | 2000 | Pacmin Mining Corporation Ltd | Mount Davis | 27% | 1998/1999 Annual Report, Mount Davis Project Area, E37/415,M37/398-400, Combined Report for Period 01/12/1998 |
| A61071 | 2000 | Sons Of Gwalia Ltd | Mount Davis | 2% | Mt Davis Project, , Annual Report for the Period 20/06/1999 to 19/06/2000, M37/545,604, P37/4007,4317 |
| A61103 | 2000 | Pacmin Mining Corporation Ltd | Desperado | <1% | 1999/2000 Annual Report Desperado Project Area P37/5218, P37/5219, P37/5237-5255, P37/5317, P37/5319-5323, P37 |
| A59087 | 1999 | Pacmin Mining Corporation Ltd | Desperado | <1% | Desperado Project Area P37/5218, 5219, 5237-5255, 5317, 5319-5322 14/06/98 - 13/06/99. Mount Margaret Mineral |
| A57783 | 1999 | Mt Edon Gold Mines Aust Ltd | Mount Davis | 27% | Mt Davis Project - Mt Margaret Mineral Field W.A. 30/11/96 - 29/11/98 E37/415, M37/398-400 |
| A59444 | 1999 | Sons Of Gwalia Ltd | Mount Davis | 1.7% | Mount Davis, Annual Report for the Period 20-6-1998 to 19-6-1999, P37/4007, 4010-4011, P37/4241-4244, 4317 |
| A55872 | 1998 | Pacific Mining Corporation Ltd | Desperado | <1% | Desperado Prospect, Annual Technical Report 14/06/97 - 13/06/98, Mt Margaret Mineral Field W.A. P37/5218-5219, |
| A56233 | 1998 | Sons Of Gwalia Ltd | Mount Davis | 1.7% | Mt Davis Annual Report for the Period 20/6/97 - 19/6/98. |
| A51389 | 1997 | Normandy Exploration Ltd | Mount Davis | 3.7% | Mount Davis Project, Combined Annual/ Surrender Report P37/5277,5278, 5279, 5280 & P 37/5281 for the period 1s |
| A53053 | 1997 | Sons Of Gwalia Ltd | Mount Davis | 1.7% | Mount Davis Project, Annual Report for the period 20th June 1996 to 19th June 1997, P37/4007, 4010-4011, 4241- |
| A50638 | 1996 | Sons Of Gwalia Ltd | Mount Davis | 3.1% | Mount Davis Project, Partial Surrender Report Prospecting Licences P37/4007,4010, & 4011 for the period 20/06/ |
| A45789 | 1995 | Sons Of Gwalia Nl | Mount Davis | 2.1% | Mount Davis Project, Annual Report Prospecting Licences P37/4007-4015, P37/4241-4244, P37/4317 & 4318 for the |
| A43692 | 1995 | Mt Edon Gold Mines Nl | Tarmoola | 2.9% | Summary of exploration Tarmoola exploration areas Argus, Mount Davis, Mount Newman & Kurrajong Prospects, Moun |
| A41971 | 1994 | Sons Of Gwalia Ltd | Mount Davis | 2.1% | Mount Davis Project, Annual Report for the period 20th June 1993 to 19th June 1994, P37/4007-4015, P37/4241-42 |
| A39803 | 1993 | Sons Of Gwalia Ltd | Mount Davis | 2.1% | Mt Davis Project, Annual Report for the period 20th June 1992 to 19th June 1993, P37/4007-4015, 4241-4244, 431 |
| A39899 | 1993 | Mt Edon Gold Mines Nl | Tarmoola | 3.2% | Annual report for the period 11/92-11/93 Tarmoola Project |
| A36845 | 1992 | Sons Of Gwalia Ltd | Mount Davis | 2.1% | Mt Davis Project, Annual Report for the period ending 19th June 1992, P37/4007-4015, P37/4241-4244. |
| A7734 | 1978 | Western Mining Corporation Ltd | Tarmoola | <1% | Tarmoola Project, Annual Report for the period 30th June 1976 to 13th December 1977, MC37/62-63, 68-71, 675-68 |
| A6808 | 1976 | Western Mining Corporation Ltd | Tarmoola | <1% | Tarmoola Project, Annual Report for the period 1st July 1973 to 29th June 1976, MC37/63-71, 675-681& 695. |
| A4657 | 1974 | Asarco Australia Ltd | Mount Davis East | <1% | Mt Davis East Project, Non-statutory Report: Brief Exploration Report for the period ending 12/10/1973, MC37/4 |
| A2893 | 1972 | Western Mining Corporation Ltd | Mount Davis- Tarmoola | <1% | Mount Davis-Tarmoola Project, Non-statutory Report for the year ending 30th June 1972, MC37/62-74. |
| A1874 | 1971 | Western Mining Corporation Ltd | Tarmoola | 1.6% | Tarmoola Project, Annual Report for the period for the year ending 30th June 1971, MC37/528-532,536-539, 541-5 |
| A1907 | 1971 | Western Mining Corporation Ltd | Mount Davis | <1% | Mount Davis Project, Annual Report for the year ending 30th June 1971, MC37/62-74. |
| A81260 | 1753 | St Barbara Ltd | GWALIA | <1% | GWALIA PROJECT, ANNUAL REPORT FOR THE PERIOD 1 OCTOBER 2007 – 30 SEPTEMBER 2008, C55/2004 E37/269, E37/789, E3 |
| A52885 | 1753 | Mt Edon Gold Mines Aust Ltd | Desperado | <1% | Desperado Prospect Annual Technical Report 14/06/96-13/06/97 P37/5218-5219, P37/5237-5255 P37/5317 P37/5319-53 |
| A74638 | 1753 | Jupiter Mines Ltd | Grattan Well | 2.3% | Annual Mineral Exploration Report, P37/5735,P37/6466 to P37/6470, P37/6894,P37/5609 to P37/5612, Gratton Well |
| A82836 | 1753 | St Barbara Ltd | Leonora | <1% | LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2008 – 31 MARCH 2009 GROUP: C162/2006 TENEMENTS: E37/235, |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 9 years · 20 Oct 2035
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 37/399 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 37/399? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.