M 16/542
Register summary
- Holder
- Evolution Mining (Phoenix) Pty Ltd
- Part of
- Evolution Mining Limited (ASX:EVN) as at 2025-06-30
- Local government
- Shire of Coolgardie
- Application received
- 15 Jan 2016
- Commenced
- 24 Jan 2017
- Expiry
- 23 Jan 2038
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A150124 | 2025 | Bulletin Resources Ltd | Powder Sill | 21% | Final Surrender Report for Exploration Licence E16/534 (Powder Sill) for the period ending 20/09/2025. |
| A145073 | 2024 | Zuleika Gold Limited | Castle East | <1% | Zuleika Project Annual Report 2024, Castle East P16/3274 for the period ending 16/9/2024 |
| A138876 | 2024 | Zuleika Gold Limited | Kundana / Little T | <1% | Zuleika Project Annual Report 2023, Kundana, C161/2022 |
| A145359 | 2024 | Bulletin Resources Limited | Powder Sill | 21% | Powder Sill E16/534 Annual Report for the period ending 19/09/2024 |
| A145603 | 2024 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Final Surrender Report 2024, Kundana, P16/2967 |
245 more reports with detail
| A145581 | 2024 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Final Surrender Report 2024, Kundana, P16/2966 (20 March 2017 to 31 October 2024) |
| A145684 | 2024 | Zuleika Gold Limited | Castle East | <1% | Zuleika Project Final Surrender Report 2024, Castle East P16/3274 |
| A134029 | 2023 | Zuleika Gold Limited | Kundana - Zuleika | <1% | Zuleika Project Annual Report Kundana, C161/2022, for the period ending |
| A136954 | 2023 | Zuleika Gold Limited | Zuleika | <1% | Zuleika Project Annual Report Castle East P16/3274 for the period ending 16/09/2023 |
| A137541 | 2023 | Bulletin Resources Limited | Powder Sill | 21% | Annual Report for the Powder Sill Project E16/534 for the period ending 19/09/2023. |
| A137691 | 2023 | Zuleika Gold Limited | Zuleika South | <1% | Zuleika South Project Final Surrender Report 2023, P16/2902 |
| A130941 | 2022 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Annual Report 2020, Kundana, P16/2966 for the period ending 19/03/2020. |
| A130932 | 2022 | Torian Resources Limited | Kundana | <1% | Zuleika Project Annual Report 2018, Kundana, P16/2966 for the period ending 19/03/2018. |
| A130942 | 2022 | Torian Resources Limited | Kundana | <1% | Zuleika Project Annual Report 2018, Kundana, P16/2967 for the period ending 19/06/2018. |
| A129661 | 2022 | Zuleika Gold Limited | Zuleika South | <1% | Zuleika South Project Annual Report P16/2902 for the period ending 30/11/2021 |
| A130521 | 2022 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Annual Report Kundana, P16/2966 period ending 20/03/2022 |
| A130523 | 2022 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Annual Report, Kundana, P16/2967, for the period ending 20/03/2022 |
| A130761 | 2022 | Horizon Minerals Ltd | Broads Dam | <1% | Broads Dam Project C74/2020 Annual Mineral Exploration Report for the Period 2 April 2021 to 1 April 2022. P 1 |
| A130946 | 2022 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Annual Report 2020, Kundana, P16/2967 for the period ending 19/03/2020 |
| A133220 | 2022 | Zuleika Gold Limited | Zuleika South | <1% | Zuleika South Project Annual Report 2022, P16/2902 |
| A125920 | 2021 | Dampier Gold Limited | Zuleika South | <1% | Zuleika South Project Annual Report 2020, P16/2902 for the period ending 30/11/2020 |
| A126897 | 2021 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Annual Report P16/2966 for the period ending 20/03/2021 |
| A126898 | 2021 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Annual Report Kundana P16/2967 for the period ending 20/3/2021 |
| A127270 | 2021 | Horizon Minerals Ltd | Broads Dam | <1% | Broads Dam Project C74/2020 Annual Mineral Exploration Report for the Period 2 April 2020 to 1 April 2021 |
| A122786 | 2020 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2887 Annual Report for the period 1 December 2018 to 30 November 2019 |
| A122788 | 2020 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2902 Annual Report for the period 1 December 2018 to 30 November 2019 |
| A122799 | 2020 | Northern Star (Kanowna) Pty Limited | Kundana | <1% | Kundana Annual Report C102/2004 for the period 1 January 2019 to 31 December 2019 |
| A123026 | 2020 | Evolution Mining (Mungari) Pty Ltd | Mungari | 7.9% | Annual Report C1/2017 Mungari Project for the period 1 January 2019 to 31 December 2019 |
| A123513 | 2020 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | <1% | Final Surrender Report P16/2669 and P16/2670, Kunanalling, 6 October 2011 to 5 October 2019 |
| A123630 | 2020 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2966 Annual Report for the period ending 19/3/2019 |
| A123631 | 2020 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2967 Annual Report for the period ending 19/3/2019 |
| A123969 | 2020 | Horizon Minerals | Broads Dam | <1% | Annual Technical Report for P16/2820 for the period ending 01/07/2017 |
| A124090 | 2020 | Horizon Minerals Limited | Broads Dam | <1% | 2020 Annual Technical Report for P16/2820, Broads Dam for the period ending 01/07/2020 |
| A124749 | 2020 | Paddington Gold Pty Limited | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008 for the period 1 July 2019 to 30 June 2020 |
| A125459 | 2020 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project E24/190 Annual Report for the period ending 14/04/2020 |
| A121136 | 2019 | Torian Resources Limited | Kundana North | <1% | Kundana North Project E24/190 Annual Report for the period 15 April 2018 to 14 August 2019 |
| A120901 | 2019 | Paddington Gold Pty Limited | Carbine | <1% | Carbine Project C188/2008 Mineral Eploration Report for the period 1 July 2018 to 30 June 2019 |
| A121569 | 2019 | Evolution Mining (Mungari) Pty Ltd | Broads Dam | 12% | Final Surrender Report Broads Dam E16/360, E16/364, and E16/371 for the period 24 August 2009 to 23 August 201 |
| A121610 | 2019 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2887 Annual Report For the Period 1 December 2017 to 30 November 2018 |
| A121663 | 2019 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2623 Final Report For the Period 15 March 2017 to 16 February 2018 |
| A121674 | 2019 | Evolution Mining (Mungari) Pty Ltd | Broads Dam | <1% | Broads Dam Final Surrender Report P16/2892-2895 for the period 24 August 2015 to 23 August 2019 |
| A121721 | 2019 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2902 Annual Report for the period 1 December 2017 to 30 November 2018 |
| A119241 | 2019 | Northern Star (Kanowna) Pty Limited | Kundana | <1% | Kundana C102/2004 Annual Technical Report for the period 1 January 2018 to 31 December 2018 |
| A119550 | 2019 | Evolution Mining (Mungari) Pty Ltd | Mungari | 6.8% | Annual Report - Group C1/2017 - Mungari Project For the Period 1 January 2018 to 31 December 2018 |
| A119823 | 2019 | Evolution Mining (Mungari) Pty Ltd | Broads Dam | 6% | Surrender Report E16/359 Broads Dam Project for the period 3 December 2008 to 2 December 2018 |
| A120922 | 2019 | Horizon Minerals Limited | Broads Dam | <1% | P16/02820 Broads Dam Annual Report for the period 02/07/2018 to 01/07/2019 |
| A121660 | 2019 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project E 24/190 Annual Report for the period 15 April 2017 to 14 April 2018 |
| A115978 | 2018 | Evolution Mining (Phoenix) Pty Limited | Mungari | <1% | Mungari Project C1/2017 Final Surrender Report for P16/2560, 2561, 2562 & 2563 for the period 30 December 2009 |
| A117425 | 2018 | Torian Resources Limited | Kundana North | <1% | Kundana North Project E24/190 Annual Report For the Period 15 April 2017 to 14 April 2018 |
| A117255 | 2018 | Evolution Mining (Mungari) Pty Ltd | Broads Dam | <1% | Final Surrender Report P16/2609 Broads Dam Project for the period 10 June 2010 to 9 June 2018 |
| A116058 | 2018 | Northern Star (Kanowna) Pty Limited | Kundana | <1% | Kundana C102/2004 Annual Technical Report for the period 1 January 2017 to 31 December 2017 |
| A116230 | 2018 | Evolution Mining (Mungari) Pty Ltd | Mungari | 6.6% | Annual Report Mungari Project C1/2017 For the Period 1 January 2017 to 31 December 2017 |
| A117516 | 2018 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Eploration Report, C188/2008, 01 July 2017 - 30 June 2018 |
| A117971 | 2018 | Black Mountain Gold Limited | Broads Dam | <1% | Broads Dam P16/2820 Annual Report for the period for the period 2 July 2017 to 1 July 2018 |
| A118496 | 2018 | Torian Resources Limited | Zuleika | <1% | Zuleika Project P16/2887 Annual Report for the period 01/12/2016 to 30/11/2017 |
| A114230 | 2017 | Torian Resources Limited | Kundana North | <1% | KUNDANA NORTH PROJECT E24/190 Annual Report for the period 15 April 2016 to 14 April 2017 |
| A110816 | 2017 | Torian Resources Limited | Zuleika | <1% | Zuleika Project P16/2887 Annual Report 2016 1 December 2015 to 30 November 2016 |
| A111909 | 2017 | Torian Resources Limited | Zuleika | <1% | Zuleika Project P16/2902 Annual Report 1 December 2015 to 30 November 2016 |
| A112160 | 2017 | Northern Star (Kanowna) Pty Limited | Kundana | <1% | Kundana Project C102/2004 Annual Technical Report for the period 1 January 2016 to 31 December 2016, E24/00152 |
| A112440 | 2017 | Cerep Pty Ltd; Evolution Mining (Mungari) Pty Ltd; Hayes Min | Mungari | 6.5% | Annual Report for Mungari Project, C1/2017, for the period 1 October 2015 to 31 December 2016, P16/02244 ....E |
| A113875 | 2017 | Torian Resources Limited | Balgarrie | <1% | Balgarrie Project C52/2011 Annual Report For the Period 15 March 2016 to 14 March 2017, P16/02621, P16/02622, |
| A114436 | 2017 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Annual Mineral Exploration Report C188/2008 for the period 1 July 2016 to 30 June 2017 |
| A107992 | 2016 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project Annual Mineral Exploration Report C153/2006 For the period 1st January 2015 to 31st Decemb |
| A108144 | 2016 | Northern Star (Kanowna) Pty Limited | Kundana | <1% | Kundana Annual Technical Report for the Period 1 January 2015 to 31 December 2015 C102/2004 |
| A108698 | 2016 | Cascade Resources Ltd | Balgarrie | <1% | Balgarrie Project C52/2011, P16/02621, P16/02622, P16/02623 Annual Report for the period 15/03/2015 to 14/03/2 |
| A109100 | 2016 | Torian Resources Limited | Kundana North | <1% | Kundana North Project E24/190 Annual Report for the period 15/04/2015 to 14/04/2016 |
| A109701 | 2016 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project C188/2008 Mineral Exploration Report for the period 1 July 2015 to 30 June 2016 |
| A104845 | 2015 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project, Annual Report for the period 01/01/2014 to 31/12/2014, C153/2006. |
| A104917 | 2015 | Northern Star Resources Ltd | Kundana | <1% | Kundana Project C102/2004 Annual Report for the period 1 January 2014 – 31 December 2014, E24/152....P26/3574 |
| A106587 | 2015 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1 July 2014 to 30 June 2015 |
| A106632 | 2015 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Annual Report for the period 1st July 2014 to 30th June 2015,C144/2014 Kintore, Kintore East, Carbine, Broads |
| A107613 | 2015 | Phoenix Gold Limited | Broads Dam | 26% | Broad Dam Project C194/2010 Combined Mineral Exploration Report for the period 1st October 2014 to 30th Septem |
| A103131 | 2014 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 Reporting Period: 01 July 2013 to 30 June |
| A103166 | 2014 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1 July 2013 to 30 June 2014, M16/23, M1 |
| A103169 | 2014 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Annual Report for the period 1st July 2013 to 30th June 2014, Kintore, Kintore East, Carbine, Broads Dam, Star |
| A101201 | 2014 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project, Annual Report, Reporting Group: C153/2006, For the period 1st Januray 2013 to 31st Decem |
| A101284 | 2014 | Barrick (Australia Pacific) Ltd | Kundana | <1% | Project 8100 Kundana Project 8101 Kundana Project 8103 East Kundana Project 8104 West Kundana Annual Report P |
| A103681 | 2014 | Phoenix Gold Limited | Broads Dam | 28% | Broad Dam Project C194/2010 Annual Mineral Exploration Report for Period 1/10/13 to 30/09/14 |
| A98824 | 2013 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1 July 2012 to 30 June 2013, M16/23, M1 |
| A99302 | 2013 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report 01 July 2012 to 30 June 2013, M16/211.....P26/3613 |
| A96888 | 2013 | Barrick (Australia Pacific) Ltd | Kundana | <1% | PROJECT 8100 KUNDANA PROJECT 8101 KUNDANA PROJECT 8103 EAST KUNDANA PROJECT 8104 WEST KUNDANA Annual Report P |
| A96993 | 2013 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project, Annual Report for the period 1st January 2012 to 31st December 2012, M15/696; M16/15..... |
| A98371 | 2013 | Western Resources Pty Ltd | Balgarrie | <1% | Annual Report for the period 15 March 2012 to 14 March 2013, Balgarrie Project, Combined Reporting Group C52/2 |
| A98928 | 2013 | Phoenix Gold Limited | Kalgoorlie West 2 | 21% | Kalgoorlie West 2 Project (C180/2009) Annual Technical Report for Period 1/7/2012 to 30/6/2013, E16/359...... |
| A100149 | 2013 | La Mancha Resources Australia Pty Ltd | Mungari West Kurrawang | <1% | Mungari West Kurrawang C41/2007 Annual Report to the Department of Mines and Petroleum for the period 15/03/12 |
| A100441 | 2013 | Phoenix Gold Limited | Broads Dam | 28% | Mineral Exploration Report for Period 1/10/12 to 30/09/13 Broads Dam Project |
| A100454 | 2013 | Metaliko Resources Ltd | Zuleika | <1% | Surrender report for the Zuleika Project, C19/2011 (P16/2333-4), Coolgardie Mineral Field, for the period 9 Oc |
| A94095 | 2012 | La Mancha Resources Australia Pty Ltd | Mungari West - Kurrawang | <1% | Mungari West-Kurrawang Project Annual Report to the Department of Mines and Petroleum for the period 15/03/11 |
| A94764 | 2012 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project, Mineral Exploration Report, C188/2008, Reporting Period: 1 July 2011 to 30 June 2012 |
| A94982 | 2012 | Carrick Gold Ltd | Kalgoorlie West 2 | 21% | Annual report for the period 01 July 2011 to 30 June 2012, Kalgoorlie West 2 Project, C180/2009, E16/359, 360, |
| A95973 | 2012 | Metaliko Resources Ltd | Zuleika | <1% | Zuleika Project, Annual Report for the period 9th October 2011 to 8th October 2012, P16/2333 & 2334. [C19/2011 |
| A92835 | 2012 | Phoenix Gold Limited | Kunanulling | <1% | Kunanulling Project, Annual Report for the period 1st January 2011 to 31st December 2011, M15/696; M16/15..... |
| A93643 | 2012 | Siburan Resources Limited | Balgarrie | <1% | Annual report Balgarrie Project Exploration Licence P16/2621, P16/2622 & P16/2623 C52/2011 Period 15 March 201 |
| A94950 | 2012 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report, Volumes 1 to 7, Reporting Period: 01 July 2011 to 30 J |
| A96112 | 2012 | Phoenix Gold Limited | Broads Dam | 62% | Broads Dam Project, Annual Report for the period 1st October 2011 to 30th September 2012, M16/19; P16/2244... |
| A93042 | 2012 | Barrick Gold Of Australia Ltd | Kundana | <1% | ANNUAL REPORT Period 1 January 2011 – 31 December 2011 C102/2004 |
| A90210 | 2011 | Siburan Resources Limited | Balgarrie | <1% | Balgarrie Project, Annual Report for the period 15th March 2010 to 14th March 2011, P16/2621, P16/ 2622 & P16/ |
| A90859 | 2011 | La Mancha Resources Australia Pty Ltd | West Kal | <1% | West Kal JV C8/2009, Annual Report to the Department of Mines and Petroleum for the period 29/04/10 to 28/04/1 |
| A91144 | 2011 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008, Reporting Period: 1 July 2010 to 30 June 2011 |
| A91831 | 2011 | Metaliko Resources Ltd | Zuleika | <1% | Combined annual report for the Zuleika Project, C19/2011 (P16/2333–4), Coolgardie Mineral Field, for the peri |
| A91989 | 2011 | Guj A L | North Kundana | 9% | Annual report for the period 23 July 2010 to 22 July 2011 North Kundana Project, E16/342 and P24/4175 |
| A92058 | 2011 | Phoenix Gold Limited | Broads Dam | 75% | Annual Technical Report for Period 25/09/10 to 24/09/11 Broads Dam Project (C141/2009). |
| A92156 | 2011 | Phoenix Gold Limited | Broads Dam | <1% | Broads Dam Project, Annual Report for the period 01/10/2010 to 30/09/2011, M16/19; P16/2244 & 2245. (C194/2010 |
| A90899 | 2011 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report, Reporting Period: 01 July 2010 to 30 June 2011 |
| A90940 | 2011 | Carrick Gold Ltd | Kundana North | <1% | Kundana North PROJECT ANNUAL MINERAL EXPLORATION REPORT P16/2562 2010 FOR THE PERIOD 30TH December 2009 - 29TH |
| A91642 | 2011 | Carrick Gold Ltd | Kundana North - Kalgoorlie West 2 | 21% | Annual report for the Combined Reporting Area C180/2009 Kundana North (Kalgoorlie West 2) Project |
| A85972 | 2010 | Barrick Gold Of Australia Ltd | Kundana | <1% | PROJECT 8100 KUNDANA PROJECT 8101 KUNDANA PROJECT 8103 EAST KUNDANA PROJECT 8104 WEST KUNDANA E15/256, E15/634 |
| A88442 | 2010 | Guj A L | North Kundana | 9% | Annual report for the period 23 July 2009 to 22 July 2010 North Kundana Project, E16/342 and P24/4175 |
| A88659 | 2010 | Australian Gold Investments Pty Ltd | Broad Dam | 75% | Annual Combined Report for the period ending 24 September 2010 |
| A86579 | 2010 | Carrick Gold Ltd | Leaky Dam | 99% | Leaky Dam Project C119/2007 - Annual Report for period 1 January 2009 to 31 December 2009, P16/2313; P16/2314 |
| A87601 | 2010 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1July 2009 to 30 June 2010 |
| A87700 | 2010 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report 01 July 2009 to 30 June 2010 |
| A88613 | 2010 | Golden Deeps Ltd | Blue Funnel | <1% | Annual Report for the Period 16th October 2009 to 15th October 2010, Blue Funnel Project, M16/19. |
| A81030 | 2009 | Western Resources Pty Ltd | Leaky Dam | 99% | Annual Mineral Exploration Report Leaky Dam Project C119/2007, Period Ending 31 December 2008 |
| A81372 | 2009 | Barrick Gold Of Australia Ltd | KUNDANA | <1% | ANNUAL REPORT Period 1 January 2008 – 31 December 2008 C102/2004, PROJECT 8100 KUNDANA, PROJECT 8101 KUNDANA, |
| A81462 | 2009 | Cazaly Resources Ltd | KUNANALLING | <1% | Combined Annual Report KUNANALLING PROJECT, For the Period 1 January 2008 to 31 December 2008. Exploration |
| A82020 | 2009 | Western Resources Pty Ltd | Willow Dam | 100% | Annual Report for the period 5 March 2008 to 4 March 2009, Willow Dam Project, P16/2540 |
| A82022 | 2009 | Western Resources Pty Ltd | Halfway Dam | 100% | Annual Report for the period 5 March 2008 to 4 March 2009, Halfway Dam Project, P16/2542 |
| A84181 | 2009 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 , Reporting Period: 01 March 2008 to 30 J |
| A84644 | 2009 | Guj A L | North Kundana | 9% | Annual report for the period 23 July 2008 to 22 July 2009 North Kundana Project, E16/342 and P24/4175 |
| A81508 | 2009 | Cazaly Resources Ltd | KUNANALLING | 6.2% | Final Surrender Report KUNANALLING PROJECT E16/0302, For the Period 5 February 2004 to 8 October 2008, C153/20 |
| A82594 | 2009 | La Mancha Resources Australia Pty Ltd | WEST KALGOORLIE | <1% | ANNUAL REPORT FOR WEST KALGOORLIE PROJECT FOR THE PERIOD 29th APRIL 2008 TO 28th APRIL 2009. Tenement: M15/140 |
| A84209 | 2009 | Paddington Gold Pty Ltd | Paddington | <1% | Mineral Exploration Report for M16/222, Reporting Period 12 August 2008 to 11 August 2009 |
| A85252 | 2009 | Abm Resources Nl; Australian Gold Investments Limited | BROADS DAM | 75% | BROADS DAM Annual Report for the period ending 24 September 2009 (P16/2375, P16/2376, P16/2377, P16/2378, P16 |
| A77532 | 2008 | Cazaly Resources Ltd | Kunanalling | 2.6% | Combined Annual Report KUNANALLING PROJECT C153/2006 For the Period 1 January 2007 to 31 December 2007 |
| A77536 | 2008 | Barrick Gold Of Australia Ltd | Kundana | <1% | ANNUAL REPORT Period 1 January 2007 - 31 December 2007 KUNDANA PROJECT C102/2004 TECHNICAL REPORT No. 1253 |
| A78766 | 2008 | Paddington Gold Pty Ltd | Mount Pleasant | <1% | MT PLEASANT PROJECT Mineral Exploration Report C106/2004 Reporting Period: 1 April 2007 - 31 March 2008 Paddin |
| A77888 | 2008 | Western Resources Pty Ltd | Leaky Dam | 99% | Annual Mineral Exploration Report Leaky Dam Project C119/2007 Period Ending 31 December 2007 |
| A80469 | 2008 | Golden Deeps Ltd | BLUE FUNNEL | <1% | Annual Report for the Period 16th October 2007 to 15th October 2008, Blue Funnel Project, M16/19. |
| A75401 | 2007 | Barrick Gold Of Australia Ltd | Mount Pleasant | <1% | Mount Pleasant Project, Annual Report for the period 1st April 2006 to 31st March 2007, M16/211, M24/16, M24/ |
| A74388 | 2007 | Monarch Gold Mining Company Ltd | Carbine | <1% | Carbine Project M16/86, 143, 150, 164, 212, 244, P16/1439, 1512, 1570-73, 1816, 1915-16, 2178-82, 2006 Annual |
| A74443 | 2007 | Cazaly Resources Ltd | Kunanalling | 3.3% | Combined Annual Report, Kunanalling Project, For the Period 1 January 2006 to 31 December 2006. (C87/2004) |
| A75295 | 2007 | Cazaly Resources Ltd | Kunanalling | <1% | Surrender Report Kunanalling Project P16/2241, P16/2242, P16/2243 For The Period 30 March 2005 to 12 December |
| A74407 | 2007 | Barrick Gold Of Australia Ltd | Kundana | <1% | Kundana Project C102/2004 Annual Report 1 January 2006 to 31 December 2006 Technical Report No.1214 (Kalgoorli |
| A76753 | 2007 | Golden Deeps Ltd | Blue Funnel | <1% | BLUE FUNNEL PROJECT M16/19 ANNUAL REPORT PERIOD FROM 16 OCTOBER 2006 TO 15 OCTOBER 2007 |
| A71733 | 2006 | South Kal Mines Pty Ltd | Sydney Mint | 59% | Sydney Mint M16/177 Project, Annual Report for the period March 6 2004 to March 5 2005, (Kalgoorlie). |
| A71809 | 2006 | Cerep Pty Ltd | Blue Funnel | <1% | Blue Funnel Project, M16/19, Annual Technical Report, For the period 16/10/2004 to 15/10/2005, (Cerep Report N |
| A72089 | 2006 | Placer Dome Asia Pacific Ltd | Kundana | <1% | Kundana Project, Annual Report 1 January 2005 to 31 December 2005 C102/2004, (PDAP Report No. WA06.012, Kalgoo |
| A72502 | 2006 | Cazaly Resources Ltd | Kunanalling | 3.2% | Combined Annual Report C87/2004, Kunanalling Project, For the Period 1 January 2005 to 31 December 2005, (Kalg |
| A72494 | 2006 | Placer Dome Asia Pacific Ltd | Black Flag (Mount Pleasant) | <1% | Mt Pleasant Project, Annual Report, 01/04/2005 to 31/03/2006 , C106/2004, (PDAP Report No. WA06.015, Kalgoorli |
| A73032 | 2006 | Cazaly Resources Ltd | Kunanalling | 7.7% | Combined Annual Report, Kunanalling Project P16/2193-2196, P16/2203-2208,2241-2243,2292, For the Period 30 Mar |
| A73846 | 2006 | Golden Deeps Ltd | Blue Funnel | <1% | Blue Funnel Project M16/19 Annual Report for the Period 16 Oct 2005 to 15 Oct 2006 (Kalgoorlie) |
| A72737 | 2006 | Mr Guj Al | North Kundana | 6.3% | Annual Exploration Report, E24/85, North Kundana Project, Broad Arrow and Coolgardie Mineral Fields, WA, GSWA |
| A73237 | 2006 | Cazaly Resources Ltd | Kunanalling | <1% | Combined Annual Report for the Period 7 July 2005 to 6 July 2006, Kunanalling Project P16/2197-2198,2224-2231, |
| A70352 | 2005 | Placer Dome Asia Pacific Ltd | Kundana | <1% | Kundana Project, Annual report 1 January 2004 to 31 December 2004, C102/2004, E15/256, 634, E16/113, E26/43, M |
| A70525 | 2005 | Cerep Pty Ltd | Blue Funnel | <1% | Annual report for the period 16/10/03 - 15/10/04 Blue Funnel Project, M16/19, Coolgardie, Report BF0104 |
| A70831 | 2005 | Kinross Gold Australia Pty Ltd | Broads Dam | 75% | Broads Dam Project, Combined annual report, 09 June 2004 - 08 June 2005, DOME Reference: C87/1995 Group 1 M369 |
| A70914 | 2005 | Placer Dome Asia Pacific Ltd | Mt Pleasant | <1% | Mt Pleasant Project, Surrender report 19/03/90 - 01/06/2005, P16/1197-98, P16/1201-02, and P16/1463-64 (C106/2 |
| A70920 | 2005 | Mr Guj Al | North Kundana | 6.3% | Annual exploration report E24/85, North Kundana Project, Broad Arrow and Coolgardie Mineral Fields, Western Au |
| A68185 | 2004 | Cerep Pty Ltd | Blue Funnel | <1% | Blue Funnel Project M16/19, Annual Report for the period 16/10/2002-15/10/2003. |
| A68216 | 2004 | Placer Dome Asia Pacific Ltd | Kundana GEM | <1% | Kundana Gem Project ,Annual Report P16/1531-1532,P16/1754-1755, E16/113, M15/993, M16/181-182, M16/213-214, M1 |
| A68226 | 2004 | Placer Dome Asia Pacific Ltd | Carbine Zuleika | <1% | Surrender Report for the period 23/01/2001-23/01/2004 Carbine Zuleika Project P16/2062-2064 |
| A68233 | 2004 | Placer Dome Asia Pacific Ltd | Kundana West | <1% | Annual Report for the period 01/01/2003-31/12/2003 Kundana West Project (C200/1998), P16/1781, P16/1846, P16/1 |
| A68966 | 2004 | Kinross Gold Australia Pty Ltd | Broads Dam | 75% | Annual report for the period 09/06/2003-08/06/2004 Broads Dam Project (C87/1995), P16/1440-1453 |
| A69153 | 2004 | Placer Dome Asia Pacific Ltd | Kundana | <1% | Kundana Operations, Annual Report 01/07/2003-30/06/2004, C433/1994, Tenements: P16/1678-80, P16/1781, P16/1846 |
| A69250 | 2004 | Mr Guj Al | North Kundana | 6.3% | Annual exploration report, E24/85,' North Kundana Project', Broad Arrow and Coolgardie Mineral Fields, WA, GSW |
| A66069 | 2003 | Placer Dome Asia Pacific Ltd | Kundana West | <1% | Annual Technical Report 01/01/2002 - 31/12/2002 Kundana West C200/1998 Tenements P15/3917, P16/1781, P16/1846, |
| A66927 | 2003 | Placer Dome Asia Pacific Ltd | Broads Dam | 75% | Annual Report for the period 31/07/2002 to 30/07/2003 Broads Dam Project C87/1995 Report No. WA03.037 |
| A67910 | 2003 | Placer Dome Asia Pacific Ltd | Kunanalling | 26% | Kunanalling Project Surrender Report 03/08/2002- 07/11/2003 P16/1788-1790 |
| A66164 | 2003 | Placer Dome Asia Pacific Ltd | Kunanalling | 3% | Annual Report 01/01/2002 - 31/12/2002 Kunanalling Project C36/1999: M16/15, 17, 33, 36, 47, 52, 99, 139-40, 17 |
| A66329 | 2003 | Placer Dome Asia Pacific Ltd | Kundana (GEM) | <1% | Kundana (GEM) Project, Annual Report, 01/01/2002-31/12/2002,C22/1999: P16/1531-32, 1754-55, E16/113, M15/993, |
| A66368 | 2003 | Placer Dome Asia Pacific Ltd | Kintore East | <1% | Annual Report 23/01/2002-22/01/2003 Kintore East (White Flag) Project C9/2000: P16/1822-23, 1825-26 |
| A66658 | 2003 | Placer Dome Asia Pacific Ltd | Carbine | <1% | Carbine/ Zuleika Project, Annual Report 09/03/2002 - 08/03/2003 C303/1997: M16/27, 44-5, 48, 58, 86, 106, 143, |
| A66835 | 2003 | Golden Deeps Ltd | Blue Funnel | <1% | Annual Technical Report for the period 16 October 2001 to 15 October 2002 Blue Funnel Project M16/19 |
| A64276 | 2002 | Mines & Resources Australia Pty Ltd | Croesus | <1% | Croesus Joint Venture Annual Report for the period 8 December 2000 to 7 December 2001 tenement: M16/199-200, M |
| A64285 | 2002 | Goldfields Exploration Pty Ltd | Kundana West | <1% | Annual Report Kundana West Project reporting period 01/01/2001 - 31/12/2001 EL(s)/tenements E16/163, E16/164, |
| A64425 | 2002 | Goldfields Exploration Pty Ltd | Kunanalling | 3% | Annual Report. Kunanalling Project. Tenements M16/139-40, M16/15, M16/17, M16/178, M16/217, M16/236, M16/306, |
| A65458 | 2002 | Auriongold Exploration Pty Ltd | Broads Dam | 75% | Broads Dam Project, Annual Report for the period 31/07/2001-30/07/2002 , P16/1440-1453. (C87/1995) |
| A64443 | 2002 | Goldfields Exploration Pty Ltd | Kundana | <1% | Kundana Project Annual Report 2001. Reporting Period: 01/01/2001 - 31/12/2001. Tenements E16/113, M16/181-82, |
| A64451 | 2002 | Goldfields Exploration Pty Ltd | Kintore East | <1% | Annual Report, Kintore East Project, P16/1822 - P16/151823, P16/1825- P16/1826. Reporting Period 23/01/2001 -2 |
| A65041 | 2002 | Mr Guj Al | North Kundana | 6.3% | Annual Exploration Report E24/85 'North Kundana Project' Broad Arrow And Coolgardie Mineral Fields Western Aus |
| A65210 | 2002 | Auriongold Exploration Pty Ltd | Mount Pleasant | <1% | Mt Pleasant Project Annual Report 01/04/2000 - 30/04/2002 C330/1997 Tenement/s E24/57, 68, M24/16, 60, 79-82, |
| A82878 | 2002 | Placer (Granny Smith) Pty Ltd | Kalgoorlie | <1% | Kalgoorlie High Resolution Gravity Surveys. |
| A61935 | 2001 | Kundana Gold Pty Ltd | Kundana West | <1% | Kundana West Annual Report 2000 reporting period 01/01/2000 - 31/12/2000, vol 1 of 1. WA D of M & E reference |
| A62148 | 2001 | Goldfields Exploration Pty Ltd | Kintore East (White Flag) | <1% | Combined Annual Report C9/2000 Kintore East (White Flag) Project reporting period 23/01/2000 to 22/01/2001 ten |
| A62264 | 2001 | Goldfields Exploration Pty Ltd | Kundana | <1% | Kundana Project Annual Report 2000 reporting period 01/01/2000 - 31/12/2000 tenements E15/247, E16/113, M16/18 |
| A61827 | 2001 | Mines & Resources Australia Pty Ltd | Croesus | <1% | Croesus Joint Venture Annual Report for the period 8 December 1999 to 7 December 2000. PE 00/34. Tenements M |
| A62613 | 2001 | Golden Deeps Nl | Blue Funnel | <1% | Blue Funnel Project Western Australia Mining Licence M16/19 Annual Technical Report For the period 16 October |
| A62765 | 2001 | Mr Guj Al | North Kundana | 6.3% | Annual Exploration Report E24/85 'North Kundana Project' Broad Arrow And Coolgardie Mineral Fields Western Aus |
| A63585 | 2001 | Delta Gold Ltd | Broads Dam | 75% | C87/1995 Annual Report 31/07/2000 to 30/07/2001. |
| A64186 | 2001 | Golden Deeps Nl | Blue Funnel | <1% | Annual Technical Report for the period 16 October 2000 to 15 October 2001 Blue Funnel Project, Western Austral |
| A59890 | 2000 | Amx Resources Nl | Kunanalling | 3.1% | Annual Report on Kunanalling Gold Project Progress Report on Exploration carried out on Tenements GML16/1253,M |
| A60227 | 2000 | Gilt-Edged Mining Nl | Kundana | <1% | Kundana Project Western Australia Technical Report E15/247, E16/113,M16/181,M16/182,M16/213-214,M16/218,P16/15 |
| A60333 | 2000 | Goldfields Exploration Pty Ltd | Kundana West | <1% | Annual Report Kundana West Project Tenement P15/3917, P16/1849,P16/1781,P16/1858,P16/1859,E16/163,E16/164 Kund |
| A61148 | 2000 | Delta Gold Ltd | West Black Flag | 69% | Broads Dam. M16/88, P16/1440-1453. Combined Annual Report 31 July 1999 to 30 July 2000. DOME Reference C87/199 |
| A60037 | 2000 | Mines & Resources Australia Pty Ltd | Croesus Joint Venture | <1% | Combined Annual Technical Report for the Period 08/12/1998 to 07/12/1999 PE00/10 Tenements P16/1385,1484-1487, |
| A60398 | 2000 | Thiess Bros Pty Ltd | Ubini base | 3.8% | Progress Report Ubini Mineral Claims Nos 75-80,947, Coolgardie Goldfield Western Australia as at 31/07/1968 |
| A67175 | 2000 | Goldfields Exploration Pty Ltd | Mungari NW | 14% | Final Report documenting all work carried out on P16/1963 since its grant date@3 March 1998 Mungari NW JV Proj |
| A57311 | 1999 | Heron Resources Ltd | Mungari NW | 13% | Mungari NW Annual Report 1998 01/01/98 - 31/12/98 E16/121, 146, P16/1684-1686, 1696-1697, 1811-1813 |
| A57386 | 1999 | Goldfields Exploration Pty Ltd | Kundana | <1% | Kundana West Project Annual Report 1988 01/01/98 - 31/12/98 P16/1846, 1849, 1781, 1859, 1858, 3917, E16/163 |
| A58868 | 1999 | Goldfields Exploration Pty Ltd | Mungari Northwest | 17% | Partial Surrender Report Mungari Northwest E16/121( period covering 24/06/1996 to 23/06/1999) |
| A56998 | 1999 | Gilt-Edged Mining Nl | East Kundana | <1% | East Kundana Project W.A. 02/12/97-03/12/98 Technical Report:E15/247, 113, M16/181-182, P16/1523-1530, P16/15 |
| A57321 | 1999 | Mines & Resources Australia Pty Ltd | Croesus | <1% | Croesus Joint Venture - PE99/1 08/12/97 - 07/12/98 P16/1385, 1484-1487, 1569, 1607-1614, M16/199, 200 |
| A58889 | 1999 | Kinross Gold Australia Pty Ltd | Broads Dam | 75% | Broads Dam Project, Annual report: July 1998 - June 1999, P16/1440 - P16/1453, (Kalgoorlie). |
| A59435 | 1999 | Golden Deeps Nl | Blue Funnel | <1% | Blue Funnel Project, Mining Licence M16/19, Annual Technical Report for the Period 16 October 1998 to 15 Octob |
| A53481 | 1998 | Gilt-Edged Mining Nl | East Kundana | <1% | East Kundana Project, Annual Report for theperiod 02/12/1996 to 03/12/1997, E15/247; E16/113; M16/181-182; P1 |
| A53901 | 1998 | Croesus Mining Nl | Croesus JV | <1% | Combined Annual Technical Report for the period 08/12/96- 07/12/97 Tenements P16/1385,1484-1487, 1569, 1607-16 |
| A57059 | 1998 | Golden Deeps Nl | Blue Funnel | <1% | Blue Funnel Project W.A. Mining Licence: M16/19 16/10/97 - 15/10/98 |
| A53310 | 1998 | Heron Resources Ltd | Mungari NW | 17% | Annual Report for the period 24 June 1996 to 23 June 1997. Mungari NW Project E16/121. |
| A55096 | 1998 | Kinross Gold Australia Pty Ltd | Camel Dam/ West Black Flag | 69% | Broad's Dam Project Annual Report: 07/97 - 07/98 M16/88, P16/1440-1453 |
| A50240 | 1997 | Mines & Resources Australia Pty Ltd | Croesus | <1% | Croesus Joint Venture Project Combined Annual Technical report for Prospecting Licences P16/1385 P16/1484 to P |
| A50437 | 1997 | Coolgardie Gold Nl | Kintore | 26% | Annual Report Kintore Project P16/1788 to P16/1790 for the period 10/01/1996 to 09/01/1997 |
| A51405 | 1997 | Ando Resources Pty Ltd | Zuleika | <1% | Zuleika Project, Western Australia Prospecting Licence P16/1799 Annual Technical Report for the period: 14 Feb |
| A52277 | 1997 | Goldfields Exploration Pty Ltd | Kurrawang | <1% | P16/1846 - Annual report 1997 Australian Gold Report Number K97/034R (Kurrawang Project) |
| A52650 | 1997 | Mines & Resources Australia Pty Ltd | Little Hill Dam | 3.1% | Little Dam Project ,Partial Surrender Report E16/78 for the period 14/09/91-17/04/97 ,E16/78. |
| A52796 | 1997 | Australasian Gold Mines Nl | Broads Dam | 69% | Broads Dam Project. Annual Report 07/1996 - 07/1997 M16/88, P16/1440-1453, M3695/2 |
| A53057 | 1997 | Golden Deeps Ltd | Blue Funnel | <1% | Twin Hills Project Mining Licence 16/19 Annual Technical Report for the period 16/10/96-15/10/97 |
| A50126 | 1997 | Mines & Resources Australia Pty Ltd | Little Hill Dam | <1% | Little Hill Dam Project,,Surrender Report P16/1436, 1472 for the period 11th February 1992 to 6th April 1996. |
| A53159 | 1997 | Amx Resources Nl | Kununalling | 5.3% | Kunanalling Gold Project M16/15, 17, 36, 99, 139, 140, 178, 236, etc. 01/11/96 - 31/10/97 |
| A47181 | 1996 | Coolgardie Gold Nl | Kintore | 26% | Annual Report, Kintore Project, P16/1788 to P16/1790 for the period 10/01/1995 to 09/01/1996. |
| A47465 | 1996 | Centaur Mining & Exploration Ltd | Black Flag (Mount Pleasant) | <1% | GML24/2486 GML24/2532 GML24/2764 GML24/3202 MLA16/211 MLA24/79 to MLA24/82 MLA16/102 MLA16/142 MLA16/155 MLA16 |
| A49388 | 1996 | Goldfields Exploration Pty Ltd | Duffer Dam | <1% | Duffer Dam Annual report 18 October 1995 to 17 October 1996 Tenements P16/1243 and P16/1244 (MLA16/222) Report |
| A49541 | 1996 | Australasian Gold Mines Nl | Broads Dam | 69% | Broads Dam Project Annual report: July 1995 - July 1996 M16/88, P16/1440 - P16/1453. |
| A49672 | 1996 | Tulloch Resources Nl | Leaky Dam | 99% | Leaky Dam Project P16/1667 to P16/1669. Annual Report for the period 12 October 1995 to 11 October 1996 |
| A47849 | 1996 | Centaur Mining & Exploration Ltd | Black Flag Tattersalls Grants Patch | <1% | GML24/3171 M24/67 M24/100 M24/113 M24/148 M24/293 M24/412 M24/419 M24/430 P16/1462 to P16/1465 P16/1543 P16/15 |
| A46904 | 1996 | Mines & Resources Australia Pty Ltd | Croesus Joint Venture | <1% | Croesus Joint Venture Project Combined Annual report for Prospecting Licences P16/1385 P16/1484 to P16/1487 P1 |
| A49507 | 1996 | Mines & Resources Australia Pty Ltd | Little Hill Dam | 3.1% | Little Hill Dam Project Combined Annual Technical Report E16/78 and P16/1466 for the period 14 September 1995 |
| A49822 | 1996 | Tribune Resources Nl | Kundana East | <1% | Exploration Licences E15/247 E15/16/113 Prospecting Licences P16/1339 P16/1375 P16/1523 to P16/1530 P16/1560 t |
| A45450 | 1995 | Mines & Resources Australia Pty Ltd | Little Hill Dam | 3.1% | LITTLE HILL DAM PROJECT. PARTIAL SURRENDER REPORT E16/78 FOR THE PERIOD 14 SEPTEMBER 1991 TO 13 FEBRUARY 1995 |
| A46229 | 1995 | Tribune Resources Nl | Kundana East | <1% | Exploration Licence E15/247 Prospecting Licences P16/1339 P16/1375 P16/1523 to P16/1530 P16/1560 to P16/1568 a |
| A46951 | 1995 | Eltin Minerals Pty Ltd | Blue Funnel | <1% | Period report for the two year period November 1993 to October 1995 Project Area: Blue Funnel M16/19 |
| A48419 | 1995 | Tulloch Resources Nl | Leaky Dam | 99% | Leaky Dam Project, P16/1667 to P16/1669. Annual report for the period 12 October 1994 to 11 October 1995 |
| A44820 | 1995 | Mining Corporation Of Australia Ltd | Black Flag (Mount Pleasant) | <1% | Black Flag Regional gold report. Annual report For the period 1 January 1994 to 31 December 1994. |
| A44822 | 1995 | Mining Corporation Of Australia Ltd | Black Flag | <1% | Black flag regional gold project Annual report for the period 1 January 1994 to the 31 December 1994. |
| A43430 | 1995 | Mines & Resources Australia Pty Ltd | Croesus | <1% | Croesus Joint Venture Project Combined Annual Technical Report for Prospecting Licences P16/1608 to P16/1614 P |
| A45223 | 1995 | Coolgardie Gold Nl | Kintore | <1% | Surrender Report for the period 17/07/94-16/07/95 Kintore Project P16/1371 P16/1372 |
| A45707 | 1995 | Mines & Resources Australia Pty Ltd | Little Hill Dam | 2.9% | Little Hill Dam project Combined annual technical report E16/78, P16/1436, P16/1466 & P16/1472 for the period |
| A46164 | 1995 | Australasian Gold Mines Nl | Broads Dam | 69% | Broads Dam Project Coolgardie Mineral Field Annual report for tenements M16/88, P16/1440 - P16/1453. |
| A40277 | 1994 | Afmeco Pty Ltd | Croesus - Macaroni - Crest Shear | <1% | Annual Report for the period 08/12/92-07/12/93 Croesus JV(Macaroni & Crest Shear Area) Project P16/1152-1154,1 |
| A41976 | 1994 | Coolgardie Gold Nl | Kintore | <1% | Annual report for the period 17/07/93-16/07/94, Kintore Project, P16/1371 P16/1372 |
| A42851 | 1994 | North Star Resources Nl | Leaky Dam | 99% | Leaky Dam Project, P16/1667 to 16/1669. Annual Report for August 1993 to August 1994 |
| A43027 | 1994 | Pancontinental Gold Operations Pty Ltd | Duffer Dam | 26% | Duffer Dam, Final [surrender] report, period 18/10/1990-17/10/1994, P16/1232 - 16/1234 |
| A43028 | 1994 | Pancontinental Gold Operations Pty Ltd | Duffer Dam | 12% | K94/031R Duffer Dam Project Annual report 18 October 1993 to 17 October 1994 |
| A43188 | 1994 | Tribune Resources Nl | East Kundana | <1% | East Kundana Project,Annual Report, Prospecting Licences 16/1339,16/1375,16/1523-30,16/1560-68 and 24/2981-2; |
| A41048 | 1994 | Mining Corporation Of Australia Ltd | Black Flag | <1% | Annual Report for the period 1 July 1992 to 31 December 1993 Black Flag Gold Project Western Area |
| A40921 | 1994 | Mmc Management Pty Ltd | Broads Dam | 69% | Broads Dam Gold Project Mining Lease 16/88 Prospecting Licences 16/1440 to 16/1453 inclusive Report on work ca |
| A42711 | 1994 | Afmeco Pty Ltd | Little Hill Dam | 2.9% | Little Hill Dam Project Combined Annual Technical Report E16/78 P15/2984 P16/1436 P16/1466 and P16/1472 for th |
| A38577 | 1993 | Mmc Management Pty Ltd | Broads Dam | 69% | Annual Report for the period 01/92-05/93 Broads Dam Project M16/88, P16/1440-1453 |
| A39125 | 1993 | Coolgardie Gold Nl | Kintore | <1% | Annual report for the period 17/07/92-16/07/93 Kintore Project P16/1371 P16/1372 |
| A39747 | 1993 | Afmeco Pty Ltd | Croesus | <1% | Surrender report for the period 20/01/93-16/08/93 Croesus JV Project M16/190 M16/192 |
| A40058 | 1993 | Tern Minerals Nl | Kundana | <1% | Report on Activities Kundana Project P16/1339 P16/1375 P16/1523-1530 P16/1560-1568 P24/2981-2982 Year Ended De |
| A37615 | 1993 | Pancontinental Mining Ltd | Duffer Dam | 12% | Annual Report for the Period 18/10/90 - 07/10/92 Duffer Dam Project |
| A38668 | 1993 | Altus Corporation Pty Ltd | Kundana | <1% | Annual report for the period 01/88-12/92 Kundana Project M16/65 M16/70-71 M16/116-117 P16/1339 |
| A40461 | 1993 | Pancontinental Mining Ltd | Duffer Dam | 12% | Annual report for the period 18/10/92-07/10/93 Duffer Dam Project P16/1232-1234 P16/1243-1244 P16/1376 P16/137 |
| A34912 | 1992 | Mmc Management Pty Ltd | Broads Dam | 70% | Broads Dam project M16/77, M16/88, M16/92 and M16/93 Report on work carried out during 1991 |
| A36848 | 1992 | Coolgardie Gold Nl | Kintore | <1% | Annual Report for the period 17/07/91-16/07/92 Kintore Project P16/1371 P16/1372 |
| A37157 | 1992 | Afmeco Pty Ltd | Little Hill Dam | 2.9% | Annual Report for the period 14/09/91-13/09/92 Little Hill Dam Project E16/78 P15/2984 P16/1436,1466,1472 |
| A39153 | 1992 | Afmeco Pty Ltd | Little Hill Dam | 2.9% | Combined Annual Technical Report. Little Hill Dam Project, E16/78, P15/2984, P16/1436, P16/1466, and P16/1472. |
| A32828 | 1991 | Plutonic Operations Ltd | West Black Flag | 66% | West Black Flag Project, Annual Report ffor the period 14 March 1990 to 13 March 1991, M16/77,79, 88 ,92 & 93 |
| A29452 | 1990 | Golden Deeps Ltd | Blue Funnel | <1% | Blue Funnel. M16/19 Annual Report 1988/89 |
All 265 report numbers over this ground
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 11 years · 23 Jan 2038
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 16/542 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.