M 16/421
Register summary
- Holders
- Rand Exploration Nl, Gilt-Edged Mining Pty Limited, Tribune Resources Ltd
- Part of
- Tribune Resources Limited (ASX:TBR) as at 2025-06-30, Evolution Mining Limited (ASX:EVN) as at 2025-06-30
- Local government
- Shire of Coolgardie
- Application received
- 28 Oct 1999
- Commenced
- 21 July 2009
- Expiry
- 20 July 2030
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A142849 | 2024 | Zuleika Gold Limited | Star Well | 9.4% | Star Well Annual Report E16/574 for the period ending 04/04/2024 |
| A145415 | 2024 | Zuleika Gold Limited | Star Well | 9.4% | Star Well Final Surrender Report E16/574 for the period ending 31/10/2024 |
| A135323 | 2023 | Zuleika Gold Limited | Star Well | 9.4% | Star Well Annual Report E16/574 for the period ending 4/4/2023 |
| A134763 | 2023 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | <1% | Final Surrender report - P15/5920-5921 Kunanalling for the period ending 02/02/2023. |
| A122799 | 2020 | Northern Star (Kanowna) Pty Limited | Kundana | 4.9% | Kundana Annual Report C102/2004 for the period 1 January 2019 to 31 December 2019 |
154 more reports
| A123026 | 2020 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Annual Report C1/2017 Mungari Project for the period 1 January 2019 to 31 December 2019 |
| A123163 | 2020 | Evolution Mining (Mungari) Pty Ltd | Kintore-Kunanalling | <1% | Annual Report - C3/2017 - Kintore/Kunanalling - 1 January 2019 to 31 December 2019 |
| A124511 | 2020 | Evolution Mining (Mungari) Pty Ltd | Little Hill Dam | 9.4% | Final Surrender Report - E16/340 Little Hill Dam project for the period 29 April 2008 to 28 April 2020 |
| A119241 | 2019 | Northern Star (Kanowna) Pty Limited | Kundana | 5% | Kundana C102/2004 Annual Technical Report for the period 1 January 2018 to 31 December 2018 |
| A119550 | 2019 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Annual Report - Group C1/2017 - Mungari Project For the Period 1 January 2018 to 31 December 2018 |
| A119552 | 2019 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanalling | <1% | Group Annual Technical Report - Kintore Kunanalling - C3/2017 For the Period 1 January 2018 to 31 December 201 |
| A116303 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanulling | <1% | Annual Report Kintore - Kunanulling C3/2017 For the Period 1 January 2017 to 31 December 2017 |
| A116058 | 2018 | Northern Star (Kanowna) Pty Limited | Kundana | 5% | Kundana C102/2004 Annual Technical Report for the period 1 January 2017 to 31 December 2017 |
| A116230 | 2018 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Annual Report Mungari Project C1/2017 For the Period 1 January 2017 to 31 December 2017 |
| A112192 | 2017 | Northern Star (Kanowna) Pty Limited | West Kundana | <1% | West Kundana EM Anomaly Drilling - Final Report (Co-Funded Drilling Report) C102/2004, M 16/00213, M 16/00073 |
| A112160 | 2017 | Northern Star (Kanowna) Pty Limited | Kundana | 5.3% | Kundana Project C102/2004 Annual Technical Report for the period 1 January 2016 to 31 December 2016, E24/00152 |
| A112431 | 2017 | Evolution Mining (Mungari) Pty Ltd; Hayes Mining Pty Ltd | Kintore - Kunanalling | <1% | Annual Report on the Kintore - Kunanalling Project, C3/2017, for the period 1 January 2016 to 31 December 2016 |
| A112440 | 2017 | Cerep Pty Ltd; Evolution Mining (Mungari) Pty Ltd; Hayes Min | Mungari | <1% | Annual Report for Mungari Project, C1/2017, for the period 1 October 2015 to 31 December 2016, P16/02244 ....E |
| A107992 | 2016 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project Annual Mineral Exploration Report C153/2006 For the period 1st January 2015 to 31st Decemb |
| A108144 | 2016 | Northern Star (Kanowna) Pty Limited | Kundana | 5.1% | Kundana Annual Technical Report for the Period 1 January 2015 to 31 December 2015 C102/2004 |
| A108735 | 2016 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Mungari Project C145/2013 Annual Report to the Department of Mines and Petroleum for the period 01/01/2015 to |
| A110144 | 2016 | Evolution Mining (Mungari) Pty Ltd | Cutters Ridge | <1% | Cutters Ridge C6/2009 Annual Report for the year ending 27/07/2016, M15/00692, P15/04863, P15/04864, P15/04865 |
| A110055 | 2016 | Evolution Mining (Mungari) Pty Ltd | Kintore | 1.3% | Annual Report for the period 1st July 2015 to 30th June 2016, Kintore, Kintore East, Carbine, Broads Dam, Star |
| A104845 | 2015 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project, Annual Report for the period 01/01/2014 to 31/12/2014, C153/2006. |
| A104917 | 2015 | Northern Star Resources Ltd | Kundana | 5.1% | Kundana Project C102/2004 Annual Report for the period 1 January 2014 – 31 December 2014, E24/152....P26/3574 |
| A105026 | 2015 | La Mancha Resources Australia Pty Ltd | Mungari | <1% | MUNGARI PROJECT ANNUAL REPORT to the Department of Mines and Petroleum for the period 01/01/2014 to 31/12/2014 |
| A106632 | 2015 | La Mancha Resources Australia Pty Ltd | Kintore | 1.2% | Annual Report for the period 1st July 2014 to 30th June 2015,C144/2014 Kintore, Kintore East, Carbine, Broads |
| A106792 | 2015 | Evolution Mining Pty Ltd | Cutters Ridge | <1% | Cutters Ridge Project C6/2009 Annual Report to the Department of Mines and Petroleum for the period 28/07/2014 |
| A103169 | 2014 | La Mancha Resources Australia Pty Ltd | Kintore | 1.2% | Annual Report for the period 1st July 2013 to 30th June 2014, Kintore, Kintore East, Carbine, Broads Dam, Star |
| A101201 | 2014 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project, Annual Report, Reporting Group: C153/2006, For the period 1st Januray 2013 to 31st Decem |
| A101174 | 2014 | La Mancha Resources Australia Pty Ltd | Mungari | <1% | Mungari Project C145/2013 Annual Report for the period 01/01/2013 to 31/12/2013, E15/960......P15/5265-5267 |
| A101284 | 2014 | Barrick (Australia Pacific) Ltd | Kundana | 4.4% | Project 8100 Kundana Project 8101 Kundana Project 8103 East Kundana Project 8104 West Kundana Annual Report P |
| A103181 | 2014 | La Mancha Resources Australia Pty Ltd | Cutters | <1% | CUTTERS RIDGE PROJECT ANNUAL REPORT to the Department of Mines and Petroleum FOR THE PERIOD 28/07/2013 TO 27/0 |
| A96888 | 2013 | Barrick (Australia Pacific) Ltd | Kundana | 4.4% | PROJECT 8100 KUNDANA PROJECT 8101 KUNDANA PROJECT 8103 EAST KUNDANA PROJECT 8104 WEST KUNDANA Annual Report P |
| A96993 | 2013 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project, Annual Report for the period 1st January 2012 to 31st December 2012, M15/696; M16/15..... |
| A98985 | 2013 | La Mancha Resources Australia Pty Ltd | Cutters Ridge | <1% | Cutters Ridge Project Annual Report to the Department of Mines and Petroleum for the period 28/07/2012 TO 27/ |
| A100149 | 2013 | La Mancha Resources Australia Pty Ltd | Mungari West Kurrawang | <1% | Mungari West Kurrawang C41/2007 Annual Report to the Department of Mines and Petroleum for the period 15/03/12 |
| A94095 | 2012 | La Mancha Resources Australia Pty Ltd | Mungari West - Kurrawang | <1% | Mungari West-Kurrawang Project Annual Report to the Department of Mines and Petroleum for the period 15/03/11 |
| A92727 | 2012 | La Mancha Resources Australia Pty Ltd | Lake Greta | 6.6% | Lake Greta Project, Annual Report for the period 14/11/2010 to 13/11/2011, E15/634. |
| A92835 | 2012 | Phoenix Gold Limited | Kunanulling | <1% | Kunanulling Project, Annual Report for the period 1st January 2011 to 31st December 2011, M15/696; M16/15..... |
| A95532 | 2012 | La Mancha Resources Australia Pty Ltd | Cutter's Ridge | <1% | Cutter's Ridge Project M15/692 & P15/4863-6 Annual Report to the DMP for the period 28/07/2011 to 27/07/2012 ( |
| A93042 | 2012 | Barrick Gold Of Australia Ltd | Kundana | 4.4% | ANNUAL REPORT Period 1 January 2011 – 31 December 2011 C102/2004 |
| A90700 | 2011 | La Mancha Resources Australia Pty Ltd | Mungari West Kurrawang | <1% | Mungari West Kurrawang Project, Annual Report to the Department of Mines and Petroleum for the period 15/03/10 |
| A90859 | 2011 | La Mancha Resources Australia Pty Ltd | West Kal | 2.2% | West Kal JV C8/2009, Annual Report to the Department of Mines and Petroleum for the period 29/04/10 to 28/04/1 |
| A91504 | 2011 | La Mancha Resources Australia Pty Ltd | Cutters Ridge | <1% | Cutters Ridge Project Annual Report to the Department of Mines and Petroleumfor the period 28/07/2010 to 27/07 |
| A89371 | 2011 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Annual Technical Report For the period 1st January 2010 to 31st December 2010 |
| A85972 | 2010 | Barrick Gold Of Australia Ltd | Kundana | 4% | PROJECT 8100 KUNDANA PROJECT 8101 KUNDANA PROJECT 8103 EAST KUNDANA PROJECT 8104 WEST KUNDANA E15/256, E15/634 |
| A86751 | 2010 | La Mancha Resources Australia Pty Ltd | Mungari West / Kurrawang | <1% | Mungari West and Kurrawang Projects Annual Report for the Period 15 March 2009 to 14 March 2010, E15/961 & 964 |
| A87884 | 2010 | La Mancha Resources Australia Pty Ltd | CUTTERS RIDGE | <1% | CUTTERS RIDGE ANNUAL REPORT FOR THE PERIOD 28 July 2008 TO 27 July 2009, M15/692 & P15/4863-6 |
| A81372 | 2009 | Barrick Gold Of Australia Ltd | KUNDANA | 3.7% | ANNUAL REPORT Period 1 January 2008 – 31 December 2008 C102/2004, PROJECT 8100 KUNDANA, PROJECT 8101 KUNDANA, |
| A82352 | 2009 | La Mancha Resources Australia Pty Ltd | MUNGARI WEST AND KURRAWANG | <1% | MUNGARI WEST AND KURRAWANG PROJECTS, ANNUAL REPORT FOR THE PERIOD 15 MARCH 2008 TO 14 MARCH 2009, Tenement(s): |
| A81508 | 2009 | Cazaly Resources Ltd | KUNANALLING | 2.5% | Final Surrender Report KUNANALLING PROJECT E16/0302, For the Period 5 February 2004 to 8 October 2008, C153/20 |
| A82594 | 2009 | La Mancha Resources Australia Pty Ltd | WEST KALGOORLIE | 2.2% | ANNUAL REPORT FOR WEST KALGOORLIE PROJECT FOR THE PERIOD 29th APRIL 2008 TO 28th APRIL 2009. Tenement: M15/140 |
| A84626 | 2009 | La Mancha Resources Australia Pty Ltd | Cutters Ridge | <1% | Cutters Ridge Annual Report for the period 28 July 2008 to 27 July 2009, M15/692, P15/4863-6, and PLA 15/5266 |
| A77532 | 2008 | Cazaly Resources Ltd | Kunanalling | 1% | Combined Annual Report KUNANALLING PROJECT C153/2006 For the Period 1 January 2007 to 31 December 2007 |
| A77536 | 2008 | Barrick Gold Of Australia Ltd | Kundana | 3.7% | ANNUAL REPORT Period 1 January 2007 - 31 December 2007 KUNDANA PROJECT C102/2004 TECHNICAL REPORT No. 1253 |
| A78506 | 2008 | La Mancha Resources Australia Pty Ltd | Mungari West | 1% | Mungari West Project M15/829, M15/830, L15/227, 1228 & 1236 Annual Report for the period 28 February 2007 to 2 |
| A74443 | 2007 | Cazaly Resources Ltd | Kunanalling | <1% | Combined Annual Report, Kunanalling Project, For the Period 1 January 2006 to 31 December 2006. (C87/2004) |
| A74871 | 2007 | La Mancha Resources Australia Pty Ltd | Mungari West | 1% | Mungari West Project , Annual Report for the period 28th February 2006 to 27th February 2007, M15/829-830; L15 |
| A74407 | 2007 | Barrick Gold Of Australia Ltd | Kundana | 5.3% | Kundana Project C102/2004 Annual Report 1 January 2006 to 31 December 2006 Technical Report No.1214 (Kalgoorli |
| A72089 | 2006 | Placer Dome Asia Pacific Ltd | Kundana | 5.3% | Kundana Project, Annual Report 1 January 2005 to 31 December 2005 C102/2004, (PDAP Report No. WA06.012, Kalgoo |
| A72349 | 2006 | Mines & Resources Australia Pty Ltd | Mungari West (White Foil) | 1% | Mungari West Joint Venture Project, Annual Report for the Period 28 February 2005 to 27 February 2006, M15/829 |
| A72502 | 2006 | Cazaly Resources Ltd | Kunanalling | 1.3% | Combined Annual Report C87/2004, Kunanalling Project, For the Period 1 January 2005 to 31 December 2005, (Kalg |
| A73040 | 2006 | Stericorp Ltd | Cutters Ridge | <1% | Cutters Ridge Annual Report for the Period 1 January 2005 to 31 December 2005, M15/692,P15/3109-3111,3303, Com |
| A70331 | 2005 | Mines & Resources Australia Pty Ltd | Mungari West | <1% | Annual report for the period 28/02/04 - 27/02/05 Mungari West joint venture project, C70/1994, E15/197, E15/33 |
| A70352 | 2005 | Placer Dome Asia Pacific Ltd | Kundana | 5.3% | Kundana Project, Annual report 1 January 2004 to 31 December 2004, C102/2004, E15/256, 634, E16/113, E26/43, M |
| A71009 | 2005 | Placer Dome Asia Pacific Ltd | Kundana | <1% | Sub-Audio magnetic survey, Kundana, Placer Dome Asia Pacific Western Australia, Post-activity report (M15/993, |
| A68129 | 2004 | Mines & Resources Australia Pty Ltd | Cutter's Ridge | <1% | Cutter's Ridge Project, Annual Report P15/3109-3111, P15/3303, M15/692 for the period 01/01/2003-31/12/2003. ( |
| A68216 | 2004 | Placer Dome Asia Pacific Ltd | Kundana GEM | 13% | Kundana Gem Project ,Annual Report P16/1531-1532,P16/1754-1755, E16/113, M15/993, M16/181-182, M16/213-214, M1 |
| A68476 | 2004 | Mines & Resources Australia Pty Ltd | Mungari West | <1% | Annual report for the period 28/02/2003-27/02/2004 Mungari West Joint Venture Project (C70/1994), E15/197, E15 |
| A69657 | 2004 | Placer Dome Asia Pacific Ltd | Lake Kopai | 6.6% | Annual report for the period 14/11/03 - 13/11/04 Lake Kopai Project, E15/634, Kalgoorlie, Project 8105, Report |
| A66069 | 2003 | Placer Dome Asia Pacific Ltd | Kundana West | 1.2% | Annual Technical Report 01/01/2002 - 31/12/2002 Kundana West C200/1998 Tenements P15/3917, P16/1781, P16/1846, |
| A66908 | 2003 | Placer Dome Asia Pacific Ltd | Kundana West | 3.7% | Surrender Report for P16/1858-1859 for the period 21/01/1997 to 09/05/2003 and P15/3917 for the period 19/11/1 |
| A67450 | 2003 | Placer Dome Asia Pacific Ltd | Northlander | <1% | Surrender Report for P15/3262-3263 (12/01/1993-09/07/2003) P15/3726 (15/01/1996-09/07/2003), P15/3824 (19/12/1 |
| A67887 | 2003 | Placer Dome Asia Pacific Ltd | Lake Kopai | 6.6% | Annual Report for the period 14/11/2002- 13/11/2003 Lake Kopai Project E15/634 |
| A65997 | 2003 | Placer Dome Asia Pacific Ltd | Lake Kopai | 6.6% | Annual Report 14/11/2001 - 13/11/2002 Lake Kopai Project E15/634 Report Number: WA02.109 |
| A66146 | 2003 | Mines & Resources Australia Pty Ltd | Cutters Ridge | <1% | Cutter's Ridge, Annual Report for the period 1 January 2002 to 31 December 2002, P15/3109-3111, P15/3303, M15/ |
| A66329 | 2003 | Placer Dome Asia Pacific Ltd | Kundana (GEM) | 13% | Kundana (GEM) Project, Annual Report, 01/01/2002-31/12/2002,C22/1999: P16/1531-32, 1754-55, E16/113, M15/993, |
| A66511 | 2003 | Mines & Resources Australia Pty Ltd | Mungari West - White Foil | <1% | Annual Report for the period 28th February 2002 to 27th February 2003 Mungari West Joint Venture Project C70/1 |
| A67340 | 2003 | Placer Dome Asia Pacific Ltd | Northlander | <1% | Annual Report for the period 01/08/2002 to 31/07/2003 Northlander Project C410/1994: M15/696 P15/2916,3029,326 |
| A64285 | 2002 | Goldfields Exploration Pty Ltd | Kundana West | <1% | Annual Report Kundana West Project reporting period 01/01/2001 - 31/12/2001 EL(s)/tenements E16/163, E16/164, |
| A64443 | 2002 | Goldfields Exploration Pty Ltd | Kundana | 13% | Kundana Project Annual Report 2001. Reporting Period: 01/01/2001 - 31/12/2001. Tenements E16/113, M16/181-82, |
| A64542 | 2002 | Mines & Resources Australia Pty Ltd | Cutter's Ridge | <1% | Cutter's Ridge Annual Report For The Period 1 January 2001 to 31 December 2001 PE02/04. Tenements: P15/3109-31 |
| A64736 | 2002 | Mines & Resources Australia Pty Ltd | Mungari West | <1% | MUNGARI WEST JOINT VENTURE PROJECT ANNUAL REPORT FOR THE PERIOD 28th FEBRUARY 2001 TO 27th FEBRUARY 2002 Tenem |
| A65433 | 2002 | Auriongold Exploration Pty Ltd | Northlander | <1% | Northlander Project Annual Reprt 01/08/2001-31/07/2002 C410/1994 Tenements P15/2916, 3029, 3262-3263, 3363, 33 |
| A82878 | 2002 | Placer (Granny Smith) Pty Ltd | Kalgoorlie | 1% | Kalgoorlie High Resolution Gravity Surveys. |
| A61924 | 2001 | Mines & Resources Australia Pty Ltd | Cutters Ridge | <1% | Cutters Ridge Joint Venture Project Annual Report 1 January 2000 to 31 December 2000, tenements P15/3109 - 311 |
| A61935 | 2001 | Kundana Gold Pty Ltd | Kundana West | <1% | Kundana West Annual Report 2000 reporting period 01/01/2000 - 31/12/2000, vol 1 of 1. WA D of M & E reference |
| A62264 | 2001 | Goldfields Exploration Pty Ltd | Kundana | 13% | Kundana Project Annual Report 2000 reporting period 01/01/2000 - 31/12/2000 tenements E15/247, E16/113, M16/18 |
| A63329 | 2001 | Hampton Hill Mining Nl | Northlander | <1% | Northlander Project. Reporting Period: 1/08/2000-31/07/2001 Tenements M15/696, P15/2916, P15/3263, P15/3363, P |
| A62327 | 2001 | Mines & Resources Australia Pty Ltd | Mungari West Joint Venture | <1% | Annual Report for the period 28th February 2000 to 27th February 2001 Mungari West Joint Venture Project tenem |
| A59799 | 2000 | Hampton Hill Mining Nl | Speargrass | <1% | Annual Report, Speargrass Project, P15/3262 & 3263 for the period 11/01/1997 to 11/01/1998. |
| A60227 | 2000 | Gilt-Edged Mining Nl | Kundana | 13% | Kundana Project Western Australia Technical Report E15/247, E16/113,M16/181,M16/182,M16/213-214,M16/218,P16/15 |
| A60333 | 2000 | Goldfields Exploration Pty Ltd | Kundana West | <1% | Annual Report Kundana West Project Tenement P15/3917, P16/1849,P16/1781,P16/1858,P16/1859,E16/163,E16/164 Kund |
| A59781 | 2000 | Mines & Resources Australia Pty Ltd | Cutters Ridge | <1% | Cutters Ridge Joint Venture Project Annual Report for the period 01 January 1998 to 31 December 1999 PE00/02 P |
| A59798 | 2000 | Hampton Hill Mining Nl | Speargrass | <1% | Annual Report, Speargrass Project. P15/3262 & 3263 for the period 11/01/1998 to 11/01/1999. |
| A60309 | 2000 | Mines & Resources Australia Pty Ltd | Mungari West (White Foil) gold explorati | 1.2% | Mungari West Project Annual Report for the period 28/02/1999 to 27/02/2000 PE00/15 Tenements E15/197,E15/339,M |
| A61117 | 2000 | Goldfields Exploration Pty Ltd | Northlander | <1% | Annual Report Northlander Project M15/696,P15/2916,P15/3029, P15/3262-3263,P15/3363,P15/3368,P15/3370-3373,P15 |
| A57386 | 1999 | Goldfields Exploration Pty Ltd | Kundana | 1.2% | Kundana West Project Annual Report 1988 01/01/98 - 31/12/98 P16/1846, 1849, 1781, 1859, 1858, 3917, E16/163 |
| A56998 | 1999 | Gilt-Edged Mining Nl | East Kundana | 14% | East Kundana Project W.A. 02/12/97-03/12/98 Technical Report:E15/247, 113, M16/181-182, P16/1523-1530, P16/15 |
| A57576 | 1999 | Gilt-Edged Mining Nl | West Kundana | <1% | West Kundana Project W.A Technical Report M16/213,214,218 P16/1531,1532 Period Reported 1/1/1998 to 31/12/1998 |
| A57698 | 1999 | Mines & Resources Australia Pty Ltd | Cutters Ridge | <1% | Cutters Ridge Joint Venture Project PE 99/6 Annual Report 01/01/98 - 31/12/98 P15/3109-3111, 3303, M15/692 |
| A58042 | 1999 | Mines & Resources Australia Pty Ltd | Mungari West | 1.2% | Mungari West Joint Venture Project Annual Report For the Per iod For the Period 28/02/1998 to 27/02/1999, E15/ |
| A53350 | 1998 | Goldfields Exploration Pty Ltd | Kundana | 7.9% | Kundana - Annual Report P15/3917 11/1996 - 11/1997 |
| A53481 | 1998 | Gilt-Edged Mining Nl | East Kundana | 14% | East Kundana Project, Annual Report for theperiod 02/12/1996 to 03/12/1997, E15/247; E16/113; M16/181-182; P1 |
| A54434 | 1998 | Mines & Resources Australia Pty Ltd | Mungari West | <1% | Mungari West Joint Venture Project E15/197 E15/339 and MLA 15/829 to MLA15/830 Annual report for the Twelve mo |
| A54023 | 1998 | Mines & Resources Australia Pty Ltd | Cutters Ridge | <1% | Cutters Ridge Joint Venture Project (PE 98/6) Annual Report, 01/01/1997 - 31/12/1997 P15/3109-3111, 3303, M15 |
| A50093 | 1997 | Gold Mines Of Coolgardie Pty Ltd | Speargrass | <1% | Annual report on the Speargrass Project for the year 11/01/1996 to 10/01/1997 Prospecting Licences P15/3262 an |
| A50356 | 1997 | Mines & Resources Australia Pty Ltd | Cutters Ridge | <1% | Cutters Ridge Project Combined Annual Technical Report on Prospecting Licences P15/3109 to P15/3111, P15/3303 |
| A50954 | 1997 | Mines & Resources Australia Pty Ltd | Mungari West | <1% | Mungari West Joint Ventue Project E15/197 E15/339 MLA15/829 MLA15/830 MLA15/927 Annual report for the 12 month |
| A52650 | 1997 | Mines & Resources Australia Pty Ltd | Little Hill Dam | 1.3% | Little Dam Project ,Partial Surrender Report E16/78 for the period 14/09/91-17/04/97 ,E16/78. |
| A53472 | 1997 | Horizon Mining Nl | West Kundana | <1% | West Kundana Project, Period Ending: 31/12/91 Coogardie Mineral Field (Kunanalling District) Kalgoorlie M16/2 |
| A47099 | 1996 | Mines & Resources Australia Pty Ltd | Cutters Ridge | <1% | Cutters Ridge Project Combined Annual Technical Report on Prospecting Licence P15/3109 to P15/3111, P15/3303 a |
| A47281 | 1996 | Coolgardie Gold Nl | Speargrass 1 & 2 | <1% | Speargrass 1 & 2 Project, Annual Report for the period 11/01/1995 to 10/01/1996, P15/3262-3263. |
| A47689 | 1996 | Mines & Resources Australia Pty Ltd | Mungari West Joint Venture | <1% | Mungari West Joint Venture Project E15/197 E15/339 Annual report for the 12 Month period to 27 February 1996 |
| A48814 | 1996 | Pershing Pty Ltd | Kundana | <1% | Kundana Project, Partial Surrender Report for period 14/09/1991 to 11/09/1996, E15/247. |
| A49823 | 1996 | Tribune Resources Nl | Kundana West | <1% | West Kundana joint project Prospecting Licences 16/1531 and 1532 Mining Leases 16/213, 16/214 and 16/218 West |
| A49507 | 1996 | Mines & Resources Australia Pty Ltd | Little Hill Dam | 1.3% | Little Hill Dam Project Combined Annual Technical Report E16/78 and P16/1466 for the period 14 September 1995 |
| A49822 | 1996 | Tribune Resources Nl | Kundana East | 14% | Exploration Licences E15/247 E15/16/113 Prospecting Licences P16/1339 P16/1375 P16/1523 to P16/1530 P16/1560 t |
| A43746 | 1995 | Mines & Resources Australia Pty Ltd | Cutters Ridge | <1% | Cutters Ridge Joint Venture Project Combined Annual report on Prospecting Licences P15/3109 to P15/3111 P15/33 |
| A44278 | 1995 | Mines & Resources Australia Pty Ltd | Mungari West | <1% | Mungari West Joint Venture Project E15/197 And E15/339 Annual Report for the 12 month period to 27 February 19 |
| A45450 | 1995 | Mines & Resources Australia Pty Ltd | Little Hill Dam | 1.3% | LITTLE HILL DAM PROJECT. PARTIAL SURRENDER REPORT E16/78 FOR THE PERIOD 14 SEPTEMBER 1991 TO 13 FEBRUARY 1995 |
| A46229 | 1995 | Tribune Resources Nl | Kundana East | <1% | Exploration Licence E15/247 Prospecting Licences P16/1339 P16/1375 P16/1523 to P16/1530 P16/1560 to P16/1568 a |
| A43418 | 1995 | Coolgardie Gold Nl | Speargrass | <1% | Annual report on P15/3262 to P15/3263 Speargrass 1 and 2 For the period 11.02.1994 to 10.1.1995 |
| A45707 | 1995 | Mines & Resources Australia Pty Ltd | Little Hill Dam | 1.3% | Little Hill Dam project Combined annual technical report E16/78, P16/1436, P16/1466 & P16/1472 for the period |
| A46554 | 1995 | Tribune Resources Nl | West Kundana | <1% | West Kundana Joint Project Prospecting Licences 16/1531 and 1532 Mining Leases 16/213, 16/214 and 16/218 West |
| A40684 | 1994 | Afmeco Pty Ltd | Mungari West | <1% | Annual report for the period 28/02/93-27/02/94 Mungari West Project E15/197 |
| A40982 | 1994 | Coolgardie Gold Nl | Speargrass | <1% | Annual Report for the Period 11/01/93 - 10/01/94 Speargrass Project P15/3262-3263 |
| A41531 | 1994 | Tribune Resources Nl | West Kundana | <1% | Annual report for the period 20/06/93-21/06/94 West Kundana JV Project P16/1218 P16/1219 P16/1220 P16/1221 P16 |
| A42084 | 1994 | Pershing Pty Ltd | Kundana South | <1% | Partial Surrender Report E15/247 Kundana South for the period ending 30/08/1994. |
| A42085 | 1994 | Pershing Pty Ltd | Kundana | <1% | Kundana South Project E15/247 Annual Report for the period 14/09/93-13/09/94 |
| A42711 | 1994 | Afmeco Pty Ltd | Little Hill Dam | 1.9% | Little Hill Dam Project Combined Annual Technical Report E16/78 P15/2984 P16/1436 P16/1466 and P16/1472 for th |
| A37842 | 1993 | Afmeco Pty Ltd | Mungari West | <1% | Mungari West (JV() Project, Annual Report for the period 28/02/1993 to 27/02/1993, E15/197. |
| A37879 | 1993 | Afmeco Pty Ltd | Mungari West | <1% | Mungari West Joint Venture Project. E15/197. Partial surrender report to 8/12/92 and 27/2/93. |
| A38667 | 1993 | Tribune Resources Nl | Kundana | <1% | Annual report for the period 01/88-12/92 Kundana Project M16/161 P16/604-611 P16/1218-1221 P16/1231 P16/1531- |
| A39375 | 1993 | Pershing Pty Ltd | Kundana | <1% | Annual Report for the period 14/09/92-13/09/93 Kundana Project E15/247 |
| A37984 | 1993 | Resource Service Group Pty Ltd | Cutters Ridge | <1% | Annual Report for the period 01/01/92-31/12/92 Cutters Ridge JV Project P15/3109-3111,2754 M15/628 |
| A35344 | 1992 | Afmeco Pty Ltd | Mungari West | <1% | Mungari West Joint Venture Project E15/197 Annual Report for the 12 month period to 27 February 1992 |
| A94572 | 1992 | Afmeco Pty Ltd | Mungari | <1% | PROPOSED MUNGARI INDUSTRIAL SITE - STERILIZATION PROGRAMME |
| A35034 | 1992 | Afmeco Pty Ltd | Cutters Ridge | <1% | Annual Report for the Period 01/01/91- 31/12/91 Cutters Ridge Project |
| A37157 | 1992 | Afmeco Pty Ltd | Little Hill Dam | 1.9% | Annual Report for the period 14/09/91-13/09/92 Little Hill Dam Project E16/78 P15/2984 P16/1436,1466,1472 |
| A39153 | 1992 | Afmeco Pty Ltd | Little Hill Dam | 1.9% | Combined Annual Technical Report. Little Hill Dam Project, E16/78, P15/2984, P16/1436, P16/1466, and P16/1472. |
| A33312 | 1991 | Afmeco Pty Ltd | Mungari West | <1% | Mungari West Annual report on Exploration Licence 15/197 (1991) |
| A21504 | 1987 | Cesium International Pty Ltd | Lady Grace | <1% | Lady Grace Project, Non-statutory Report: Exploration Review, May 1987. |
| A19851 | 1986 | Paragon Gold Pty Ltd | Dunn's 8 Mile | 1.6% | Annual report on exploration carried out on Dunn's 8 Mile, For the year ending November 1986, P16/178 ... 16/1 |
| A2860 | 1972 | Western Mining Corporation Ltd | Black Cat | <1% | Black Cat Project, Annual Report for the year ending 30th June 1972, MC15/1631-1635, 1640-1646 & 1995-2021. |
| A105 | 1970 | Western Mining Corporation Ltd | Ora Banda- Kunanalling | <1% | Ora Banda- Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Reports Data File, |
| A106 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Kalgoorlie Regional & Geological Plans (8), circa July |
| A107 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report ,Data File |
| A112 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report:Annual Report, Folder 11, Sample Data Sheets for Kunanal |
| A108 | 1970 | Western Mining Corporation Ltd | Ora Banda/Kunanalling | <1% | Annual Tenements and Temporary Reserve Report Data File, Ora Banda - Kunanalling Area. |
| A109 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report,Folder 8,In |
| A110 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | <1% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenement & Temporary Reserve Report, Folder 9, Vac |
| A111 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | <1% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenements & Temporary Reserve Report Folder 10,Sam |
| A1612 | 1753 | New Consolidated Gold Fields Aust Ltd | Three Mile Hill | <1% | Three Mile Hill Project, Non-statutory Report: |
| A82877 | 1753 | Placer Dome Asia Pacific Ltd | Kundana | 5.3% | Ground Geophysics Survey |
| A82882 | 1753 | Placer Dome Asia Pacific Ltd | Kundana Detailed | 5.3% | Ground Geophysics Survey |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A89376 | 1753 | Barrick Gold Of Australia Ltd | Kundana | 3.9% | Kundana Project, ANNUAL REPORT, Period 1 January 2010 – 31 December 2010, C102/2004, E15/256, E15/634, E16/113 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 4 years · 20 July 2030
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 16/421 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 16/421? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.