L 24/205
Register summary
- Holder
- Kundana Gold Pty Limited
- Part of
- Evolution Mining Limited (ASX:EVN) as at 2025-06-30
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 21 Sept 2012
- Commenced
- 9 Apr 2014
- Expiry
- 8 Apr 2035
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A150124 | 2025 | Bulletin Resources Ltd | Powder Sill | <1% | Final Surrender Report for Exploration Licence E16/534 (Powder Sill) for the period ending 20/09/2025. |
| A138378 | 2024 | Zuleika Gold Limited | Kurrawang South | <1% | Kurrawang South Project Final Surrender Report, P16/2837 for the period ending 13/05/2023. |
| A145359 | 2024 | Bulletin Resources Limited | Powder Sill | <1% | Powder Sill E16/534 Annual Report for the period ending 19/09/2024 |
| A136352 | 2023 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Annual Report for the period ending 30/6/2023 |
| A137541 | 2023 | Bulletin Resources Limited | Powder Sill | <1% | Annual Report for the Powder Sill Project E16/534 for the period ending 19/09/2023. |
244 more reports
| A130801 | 2022 | Zuleika Gold Limited | Kurrawang South | <1% | Kurrawang South Project Annual Report, P16/2837 for the period ending 13/05/2020. |
| A130761 | 2022 | Horizon Minerals Ltd | Broads Dam | 3.2% | Broads Dam Project C74/2020 Annual Mineral Exploration Report for the Period 2 April 2021 to 1 April 2022. P 1 |
| A130988 | 2022 | Zuleika Gold Limited | Kurrawang South | <1% | Kurrawang South Project Annual Report P16/2837 for the period ending 14/05/2022 |
| A131932 | 2022 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project Annual Report C36/2009 for the period ending 30/06/2022 |
| A127270 | 2021 | Horizon Minerals Ltd | Broads Dam | 3.2% | Broads Dam Project C74/2020 Annual Mineral Exploration Report for the Period 2 April 2020 to 1 April 2021 |
| A127273 | 2021 | Zuleika Gold Limited | Kurrawang South | <1% | Kurrawang South Project Annual Report, P16/2837 for the period 15 May 2020 to 14 May 2021 |
| A127829 | 2021 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project Annual Report C36/2009 for the period 1 July 2020 to 30 June 2021. |
| A122980 | 2020 | Torian Resources Ltd | Zuleika North | <1% | Zuleika North Project C 28/2016 Annual Report 2019 |
| A123026 | 2020 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Annual Report C1/2017 Mungari Project for the period 1 January 2019 to 31 December 2019 |
| A123477 | 2020 | Torian Resources Ltd | Zuleika Project M 16/229 | <1% | Zuleika Project M16/229 Annual Report 2018 |
| A123969 | 2020 | Horizon Minerals | Broads Dam | 3.3% | Annual Technical Report for P16/2820 for the period ending 01/07/2017 |
| A123993 | 2020 | Horizon Minerals Limited | Broads Dam | 3.2% | Annual Technical Report for Broads Dam P16/2821 for the period ending 01/07/2017 |
| A124090 | 2020 | Horizon Minerals Limited | Broads Dam | 3.3% | 2020 Annual Technical Report for P16/2820, Broads Dam for the period ending 01/07/2020 |
| A124092 | 2020 | Horizon Minerals Limited | Broads Dam | 3.2% | 2020 Annual Technical Report for P16/2821 Broads Dam for the period ending 01/07/2020 |
| A124749 | 2020 | Paddington Gold Pty Limited | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008 for the period 1 July 2019 to 30 June 2020 |
| A125177 | 2020 | Dampier Gold Limited | Zuleika | <1% | Zuleika Project M16/229 Annual Report for the period ending 11/08/2020 |
| A124772 | 2020 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project Annual Mineral Exploration Report C36/2009 for the period ending 30/06/2020 |
| A122989 | 2020 | Torian Resources Ltd | Zuleika | 2.9% | Zuleika Project P 24/4867 Annual Report for the period ending 14/10/2019 |
| A121726 | 2019 | Torian Resources Ltd | Zuleika | 1.7% | Zuleika Project P 16/2839 Annual Report for the period 4 November 2017 to 3 November 2018 |
| A120671 | 2019 | Paddington Gold Pty Limited | Paddington | <1% | Mineral Exploration Report Volume 1 of 2 Paddington Project for the period 1 July 2018 to 30 June 2019, C36/20 |
| A120901 | 2019 | Paddington Gold Pty Limited | Carbine | <1% | Carbine Project C188/2008 Mineral Eploration Report for the period 1 July 2018 to 30 June 2019 |
| A121664 | 2019 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2837 Annual Report for the period 14 May 2017 to 13 May 2018 |
| A121665 | 2019 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2841 Annual Report For the Period 14 May 2017 to 13 May 2018 |
| A121626 | 2019 | Torian Resources Ltd | Zuleika | 2.9% | Zuleika Project P 24/4867 Annual Report for the period 15 October 2017 to 14 October 2018 |
| A121725 | 2019 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 24/4831 Annual Report for the period 19 October 2017 to 18 October 2018 |
| A120672 | 2019 | Paddington Gold Pty Limited | Paddington | <1% | Mineral Exploration Report Volume 2 of 2 Paddington Project for the period 1 July 2018 to 30 June 2019, C36/20 |
| A119550 | 2019 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Annual Report - Group C1/2017 - Mungari Project For the Period 1 January 2018 to 31 December 2018 |
| A120924 | 2019 | Horizon Minerals Limited | Broads Dam | 3.2% | Broads Dam P16/02821 Annual Report for the period 02/07/2018 to 01/07/2019 |
| A120922 | 2019 | Horizon Minerals Limited | Broads Dam | 3.3% | P16/02820 Broads Dam Annual Report for the period 02/07/2018 to 01/07/2019 |
| A121524 | 2019 | Torian Resources Limited | Zuleika | <1% | Zuleika Project M16/229 Annual Report For the Period 12 August 2018 to 11 August 2019 |
| A121570 | 2019 | Torian Resources Limited | Zuleika | <1% | P16_2837 Zuleika Annual Report for the period 14 May 2018 to 13 May 2019 |
| A117392 | 2018 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 for the period 1 July 2017 to 30 June 201 |
| A117404 | 2018 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 2 of 2 for the period 1 July 2017 to 30 June 201 |
| A117509 | 2018 | Torian Resources Limited | Zuleika | 2.9% | P24/4867 Annual Report Zuleika Project, 15 October 2016 - 14 October 2017 |
| A116230 | 2018 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Annual Report Mungari Project C1/2017 For the Period 1 January 2017 to 31 December 2017 |
| A117516 | 2018 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Eploration Report, C188/2008, 01 July 2017 - 30 June 2018 |
| A117971 | 2018 | Black Mountain Gold Limited | Broads Dam | 3.3% | Broads Dam P16/2820 Annual Report for the period for the period 2 July 2017 to 1 July 2018 |
| A117972 | 2018 | Black Mountain Gold Limited | Broads Dam | 3.2% | Broads Dam P16/2821 Annual Report for the period 2 July 2017 to 1 July 2018 |
| A118064 | 2018 | Torian Resources Limited | Zuleika North | <1% | Zuleika North Project C28/2016 Annual Report for the period 01/12/2016 - 30/11/2017 |
| A118224 | 2018 | Torian Resources Limited | Zuleika North | <1% | Zuleika North Project C28/2016 Annual Report for the period 1 December 2017 to 30 November 2018 |
| A111989 | 2017 | Torian Resources Limited | Zuleika North | <1% | Zuleika North Project C28/2016 Annual Report for the period 01/12/2015 to 30/11/2016 |
| A114535 | 2017 | Paddington Gold Pty Limited | Paddington | <1% | Annual Mineral Exploration Report Paddington Project C36/2009 for the period 1 July 2016 to 30 June 2017 |
| A114340 | 2017 | Torian Resources Limited | Zuleika | <1% | P16/02837 Zuleika Project Annual Report For the Period 14 May 2016 to 13 May 2017 |
| A112440 | 2017 | Cerep Pty Ltd; Evolution Mining (Mungari) Pty Ltd; Hayes Min | Mungari | <1% | Annual Report for Mungari Project, C1/2017, for the period 1 October 2015 to 31 December 2016, P16/02244 ....E |
| A114436 | 2017 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Annual Mineral Exploration Report C188/2008 for the period 1 July 2016 to 30 June 2017 |
| A114803 | 2017 | Evolution Mining Limited | Johnson's Rest | 3.7% | Completion report for co-funded government - industry drilling program Johnson's Rest (BDDD0017) (R#12). |
| A114916 | 2017 | Strategic Projects Mining Pty. Ltd. | Stackhole Dam | <1% | Stackhole Dam Project C22/2012 Annual Report for the period 1 July 2016 to 30 June 2017, M16/00229, M16/00491 |
| A109539 | 2016 | Paddington Gold Pty Limited | Paddington | <1% | Annual Report For the Period 1 July 2015 to 30 June 2016 PADDINGTON PROJECT C36/2009 |
| A110544 | 2016 | Torian Resources Limited | Zuleika | 2.9% | Zuleika Project P24/4867 Annual Report For the Period 15 October 2015 to 14 October 2016 |
| A109701 | 2016 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project C188/2008 Mineral Exploration Report for the period 1 July 2015 to 30 June 2016 |
| A109500 | 2016 | Torian Resources Limited | Zuleika | <1% | Zuleika Project P16/2837 Annual Report For the Period 14 May 2015 to 13 May 2016 |
| A109675 | 2016 | Torian Resources Limited | Stackhole Dam Project | <1% | Stackhole Dam Project Annual Report, 1 July 2015 to 30 June 2016 |
| A110055 | 2016 | Evolution Mining (Mungari) Pty Ltd | Kintore | <1% | Annual Report for the period 1st July 2015 to 30th June 2016, Kintore, Kintore East, Carbine, Broads Dam, Star |
| A106587 | 2015 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1 July 2014 to 30 June 2015 |
| A106632 | 2015 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Annual Report for the period 1st July 2014 to 30th June 2015,C144/2014 Kintore, Kintore East, Carbine, Broads |
| A107223 | 2015 | Torian Resources Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2014 – 30 June 2015 M16/229, M16/491,P16/2479-81 |
| A107613 | 2015 | Phoenix Gold Limited | Broads Dam | <1% | Broad Dam Project C194/2010 Combined Mineral Exploration Report for the period 1st October 2014 to 30th Septem |
| A106287 | 2015 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report for the period 01 July 2014 to 30 June 2015, M24/16.... |
| A103131 | 2014 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 Reporting Period: 01 July 2013 to 30 June |
| A103166 | 2014 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1 July 2013 to 30 June 2014, M16/23, M1 |
| A103169 | 2014 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Annual Report for the period 1st July 2013 to 30th June 2014, Kintore, Kintore East, Carbine, Broads Dam, Star |
| A103681 | 2014 | Phoenix Gold Limited | Broads Dam | <1% | Broad Dam Project C194/2010 Annual Mineral Exploration Report for Period 1/10/13 to 30/09/14 |
| A103786 | 2014 | Strategic Projects Mining Pty Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2013 – 30 June 2014 M16/229,M16/491,P16/2479-81 |
| A98824 | 2013 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1 July 2012 to 30 June 2013, M16/23, M1 |
| A99302 | 2013 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report 01 July 2012 to 30 June 2013, M16/211.....P26/3613 |
| A99398 | 2013 | Strategic Projects Mining Pty Ltd | Balgarri | <1% | Balgarri Project Annual Report C21/2012 Period: 1 July 2012 – 30 June 2013 M24/431, M24/438, 9, M24/643 |
| A96968 | 2013 | Metaliko Resources Ltd | Anthill | <1% | Annual report for the period 15 January 2012 to 14 January 2013, Anthill Project, C216/2010, P16/2336, P16/233 |
| A97179 | 2013 | Strategic Projects Mining Pty Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2011 – 30 June 2012 M16/164, M16/229, M16/257, M16 |
| A97753 | 2013 | Kalgoorlie Mining Company (Bullant) | Bullant | <1% | Combined annual report for the Bullant Project, C24/2011 (M16/44–45, P16/2689 & P16/2694-2701), Coolgardie Min |
| A97967 | 2013 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Kintore Project, Annual Report for the period 06/03/2012 to 05/03/2013, P16/2358-2374, 2586, 2589-2591, 2642-2 |
| A98928 | 2013 | Phoenix Gold Limited | Kalgoorlie West 2 | <1% | Kalgoorlie West 2 Project (C180/2009) Annual Technical Report for Period 1/7/2012 to 30/6/2013, E16/359...... |
| A99397 | 2013 | Strategic Projects Mining Pty Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2012 – 30 June 2013 M16/164, M16/229, M16/257, M16 |
| A100441 | 2013 | Phoenix Gold Limited | Broads Dam | <1% | Mineral Exploration Report for Period 1/10/12 to 30/09/13 Broads Dam Project |
| A100454 | 2013 | Metaliko Resources Ltd | Zuleika | 3.2% | Surrender report for the Zuleika Project, C19/2011 (P16/2333-4), Coolgardie Mineral Field, for the period 9 Oc |
| A94764 | 2012 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project, Mineral Exploration Report, C188/2008, Reporting Period: 1 July 2011 to 30 June 2012 |
| A94982 | 2012 | Carrick Gold Ltd | Kalgoorlie West 2 | <1% | Annual report for the period 01 July 2011 to 30 June 2012, Kalgoorlie West 2 Project, C180/2009, E16/359, 360, |
| A95973 | 2012 | Metaliko Resources Ltd | Zuleika | 3.2% | Zuleika Project, Annual Report for the period 9th October 2011 to 8th October 2012, P16/2333 & 2334. [C19/2011 |
| A93602 | 2012 | Kalgoorlie Mining Company (Bullant) | Bullant | 2% | Combined annual report for the Bullant Project, C24/2011 (M16/44–45), Coolgardie Mineral Field, for the period |
| A94167 | 2012 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Annual Report for the period 6 March 2011 to 5 March 2012, Kintore, Kintore East and Carbine Projects, P16/235 |
| A94950 | 2012 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report, Volumes 1 to 7, Reporting Period: 01 July 2011 to 30 J |
| A95062 | 2012 | Strategic Projects Mining Pty Ltd | Mount Pleasant | <1% | Mount Pleasant Project Annual Report C36/2009 Period: 1 July 2011 – 30 June 2012 M24/431, M24/438-439, M24/64 |
| A95896 | 2012 | Strategic Projects Mining Pty Ltd | Stackhole Dam | <1% | Stackhole Dam Project, Annual Report for the period 1st July 2011 to 30th June 2012, M24/431, 438, 439 & 643. |
| A96112 | 2012 | Phoenix Gold Limited | Broads Dam | <1% | Broads Dam Project, Annual Report for the period 1st October 2011 to 30th September 2012, M16/19; P16/2244... |
| A90701 | 2011 | La Mancha Resources Australia Pty Ltd | Broads Dam | <1% | Broads Dam Project Annual Report to the Department of Mines and Petroleum for the period 14/04/2010 to 13/04/2 |
| A89844 | 2011 | Metaliko Resources Ltd | Anthill | <1% | Annual report for the period 15 January 2010 to 14 January 2011, Anthill Project, C216/2010, P16/2336, P16/233 |
| A91106 | 2011 | Argent (Bullant) Pty Ltd | Bullant | 2% | Annual report for the Bullant Project, C24/2011 (M16/44–45), Coolgardie Mineral Field, for the period 9 March |
| A91144 | 2011 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008, Reporting Period: 1 July 2010 to 30 June 2011 |
| A91831 | 2011 | Metaliko Resources Ltd | Zuleika | 3.2% | Combined annual report for the Zuleika Project, C19/2011 (P16/2333–4), Coolgardie Mineral Field, for the peri |
| A92058 | 2011 | Phoenix Gold Limited | Broads Dam | <1% | Annual Technical Report for Period 25/09/10 to 24/09/11 Broads Dam Project (C141/2009). |
| A92156 | 2011 | Phoenix Gold Limited | Broads Dam | 1.1% | Broads Dam Project, Annual Report for the period 01/10/2010 to 30/09/2011, M16/19; P16/2244 & 2245. (C194/2010 |
| A90899 | 2011 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report, Reporting Period: 01 July 2010 to 30 June 2011 |
| A91642 | 2011 | Carrick Gold Ltd | Kundana North - Kalgoorlie West 2 | <1% | Annual report for the Combined Reporting Area C180/2009 Kundana North (Kalgoorlie West 2) Project |
| A93281 | 2011 | Metaliko Resources Ltd | Anthill | <1% | Anthill Project, Annual Report for the period 15th January 2011 to 14th January 2012, P16/2336-2339. [C216/201 |
| A86551 | 2010 | Heron Resources Ltd | Anthill | <1% | Annual Report for the period 15 January 2009 to 14 January 2010, Anthill Project, C185/2009 |
| A88448 | 2010 | Cazaly Resources Ltd | Broads Dam | 1.7% | Broads Dam Annual Technical Report P16/2244, P16/2245 For the period 2nd October 2009 – 1st October 2010 |
| A88659 | 2010 | Australian Gold Investments Pty Ltd | Broad Dam | <1% | Annual Combined Report for the period ending 24 September 2010 |
| A86740 | 2010 | Barrick Gold Of Australia Ltd | North Zuleika | <1% | Project 8529, North Zuleika, M16/188, M16/239, M16/27, M16/411, M16/44, M16/45, P16/2508, Annual Report, Perio |
| A86987 | 2010 | La Mancha Resources Australia Pty Ltd | Red Dam - Broads Dam | <1% | Red Dam and Broads Dam Projects Annual Report for the Period 14th June 2009 to 13th June 2010 |
| A87601 | 2010 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1July 2009 to 30 June 2010 |
| A87700 | 2010 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report 01 July 2009 to 30 June 2010 |
| A84181 | 2009 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 , Reporting Period: 01 March 2008 to 30 J |
| A82319 | 2009 | Barrick Gold Of Australia Ltd | NORTH ZULEIKA | <1% | PROJECT 8529 NORTH ZULEIKA C303/1997 M16/188, M16/239, M16/27, M16/411, M16/44, M16/45, P16/2508, ANNUAL REPOR |
| A82595 | 2009 | La Mancha Resources Australia Pty Ltd | KINTORE, RED DAM AND BROADS DAM | <1% | KINTORE, RED DAM AND BROADS DAM PROJECTS ANNUAL REPORT FOR THE PERIOD 14th JUNE 2008 TO 13th JUNE 2009, C Numb |
| A84209 | 2009 | Paddington Gold Pty Ltd | Paddington | 1.4% | Mineral Exploration Report for M16/222, Reporting Period 12 August 2008 to 11 August 2009 |
| A84715 | 2009 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Mineral Exploration Report, Period 1 July 2008 to 30 June 2009, Tenements: M16/23, M16/48, M16/58, M16 |
| A85252 | 2009 | Abm Resources Nl; Australian Gold Investments Limited | BROADS DAM | <1% | BROADS DAM Annual Report for the period ending 24 September 2009 (P16/2375, P16/2376, P16/2377, P16/2378, P16 |
| A78277 | 2008 | Barrick Gold Of Australia Ltd | North Zuleika | <1% | ANNUAL REPORT Period 9 March 2007 - 8 March 2008 TECHNICAL REPORT No. 1267 C303/1997 PROJECT 8518, 8529, 8536, |
| A78766 | 2008 | Paddington Gold Pty Ltd | Mount Pleasant | <1% | MT PLEASANT PROJECT Mineral Exploration Report C106/2004 Reporting Period: 1 April 2007 - 31 March 2008 Paddin |
| A75401 | 2007 | Barrick Gold Of Australia Ltd | Mount Pleasant | <1% | Mount Pleasant Project, Annual Report for the period 1st April 2006 to 31st March 2007, M16/211, M24/16, M24/ |
| A74832 | 2007 | Barrick Gold Of Australia Ltd | North Zuleika | <1% | North Zuleika Project C303/1997 Annual Report, Period 9 March 2006 - 8 March 2007 Report No.1223 (Kalgoorlie) |
| A71733 | 2006 | South Kal Mines Pty Ltd | Sydney Mint | 1% | Sydney Mint M16/177 Project, Annual Report for the period March 6 2004 to March 5 2005, (Kalgoorlie). |
| A72335 | 2006 | Placer Dome Asia Pacific Ltd | North Zuleika | <1% | North Zuleika Project, Annual Report, 9 March 2005 to 8 March 2006, Combined Reporting No. C303/1997, (PDAP Re |
| A72494 | 2006 | Placer Dome Asia Pacific Ltd | Black Flag (Mount Pleasant) | <1% | Mt Pleasant Project, Annual Report, 01/04/2005 to 31/03/2006 , C106/2004, (PDAP Report No. WA06.015, Kalgoorli |
| A70420 | 2005 | Placer Dome Asia Pacific Ltd | North Zuleika | <1% | North Zuleika Project, Annual Report 9 March 2004 to 8 Marc h 2005 C303/1997 M16/23...M16/411, P16/1373...P24/ |
| A70831 | 2005 | Kinross Gold Australia Pty Ltd | Broads Dam | <1% | Broads Dam Project, Combined annual report, 09 June 2004 - 08 June 2005, DOME Reference: C87/1995 Group 1 M369 |
| A70914 | 2005 | Placer Dome Asia Pacific Ltd | Mt Pleasant | <1% | Mt Pleasant Project, Surrender report 19/03/90 - 01/06/2005, P16/1197-98, P16/1201-02, and P16/1463-64 (C106/2 |
| A70687 | 2005 | Placer Dome Asia Pacific Ltd | Mount Pleasant | <1% | (Mount Pleasant Project) Annual report, 01/04/04 - 31/03/05 C106/2004 (M16/211, M24/16, 60, 79-82, 102, 137, 1 |
| A68508 | 2004 | Placer Dome Asia Pacific Ltd | Carbine/Zuleika | <1% | Carbine/Zuleika Project Annual Report 09/03/2003 to 08/03/20 04 C303/1997 M16/27...M16/411, P16/1439...P24/335 |
| A68966 | 2004 | Kinross Gold Australia Pty Ltd | Broads Dam | <1% | Annual report for the period 09/06/2003-08/06/2004 Broads Dam Project (C87/1995), P16/1440-1453 |
| A69239 | 2004 | Placer Dome Asia Pacific Ltd | Carbine Balgarrie | 2.3% | Carbine Balgarrie JV Project, Annual Report 24/7/2003 to 23/7/2004, C116/2002, Tenements P16/1373 M16/23. Plac |
| A72434 | 2004 | Placer Dome Asia Pacific Ltd | Carnage | <1% | Carnage Project, End of Option Final Report, 27 April 2000 to 10 May 2004, Combined Reporting No. C400/1996, M |
| A68756 | 2004 | Placer Dome Asia Pacific Ltd | Mount Pleasant | <1% | Mt Pleasant Project ,Annual Report 01/04/2003 to 31/03/2004 C330/1997 E24/68, E24/103, M16/211...P24/3581 |
| A67339 | 2003 | Placer Dome Asia Pacific Ltd | Mount Pleasant | <1% | Mount Pleasant project, Annual Report for the period 01/04/2002 to 31/03/2003 C330/1997: E24/68,103 M16/211 M2 |
| A66927 | 2003 | Placer Dome Asia Pacific Ltd | Broads Dam | <1% | Annual Report for the period 31/07/2002 to 30/07/2003 Broads Dam Project C87/1995 Report No. WA03.037 |
| A67414 | 2003 | Placer Dome Asia Pacific Ltd | Carnage | <1% | Annual Report for the period 21/08/2002 to 20/08/2003 C400/1996: M16/154, M24/365 Report No. WA03.071 |
| A66072 | 2003 | Placer Dome Asia Pacific Ltd | Zuleika | <1% | Annual Report 30/12/2001-31/12/2002 C199/1998 Zuleika Project P16/1942-45 Report No: WA02.103 |
| A66658 | 2003 | Placer Dome Asia Pacific Ltd | Carbine | <1% | Carbine/ Zuleika Project, Annual Report 09/03/2002 - 08/03/2003 C303/1997: M16/27, 44-5, 48, 58, 86, 106, 143, |
| A67355 | 2003 | Placer Dome Asia Pacific Ltd | Carbine Balgarrie | 2.3% | Annual Report for the epriod 24/7/2002 to 23/7/2003 C116/2002: P16/1373 M16/23 Carbine Balgarrie JV Project R |
| A65102 | 2002 | Auriongold Exploration Pty Ltd | Carbine Zuleika | <1% | Annual Report Reporting Period 09/03/2000 - 08/03/2002 Combined Reporting NO C303/1997. Tenement/s M16/23, 27, |
| A65458 | 2002 | Auriongold Exploration Pty Ltd | Broads Dam | <1% | Broads Dam Project, Annual Report for the period 31/07/2001-30/07/2002 , P16/1440-1453. (C87/1995) |
| A65210 | 2002 | Auriongold Exploration Pty Ltd | Mount Pleasant | <1% | Mt Pleasant Project Annual Report 01/04/2000 - 30/04/2002 C330/1997 Tenement/s E24/57, 68, M24/16, 60, 79-82, |
| A65218 | 2002 | Auriongold Exploration Pty Ltd | Carbine Balgarrie | 2.3% | Annual Report Reporting Period 09/03/2000 - 23/07/2002 Tenements P16/1373, M16/23 Mineral Field Coolgardie |
| A65428 | 2002 | Auriongold Exploration Pty Ltd | Carnage | <1% | Carnage Project Annual Report 21/08/2001-20/08/2002 C400/1996 Tenement/s M16/154, M24/365 |
| A82878 | 2002 | Placer (Granny Smith) Pty Ltd | Kalgoorlie | <1% | Kalgoorlie High Resolution Gravity Surveys. |
| A63504 | 2001 | Plutonic Operations Ltd | Carnage | <1% | Verification Report Carnage Project Reporting Period: 22/8/2 000 to 21/8/2001 Tenement M16/154, M24/365 Vol 1 |
| A63585 | 2001 | Delta Gold Ltd | Broads Dam | <1% | C87/1995 Annual Report 31/07/2000 to 30/07/2001. |
| A61148 | 2000 | Delta Gold Ltd | West Black Flag | <1% | Broads Dam. M16/88, P16/1440-1453. Combined Annual Report 31 July 1999 to 30 July 2000. DOME Reference C87/199 |
| A61372 | 2000 | Centaur Mining & Exploration Ltd | Carbine Zuleika | <1% | Mining Leases M16/23,27,44,45,58,86,106,143,150,156,164,188, 212, Prospecting Licences P16/1353-1356,1373,1439 |
| A60329 | 2000 | Goldfields Exploration Pty Ltd | Zuleika | <1% | Annual Report Zuleika Project Tenements P16/1942,P16/1943, P16/1944,P16/1945 MLA16/412,MLA16/413 Reporting Per |
| A61373 | 2000 | Centaur Mining & Exploration Ltd | Mount Pleasant | <1% | Mount Pleasant Project, Annual Report for the period 1st April 1999 to 31st March, Combined Reporting Group: C |
| A59105 | 1999 | Centaur Mining & Exploration Ltd | Carbine Zuleika | <1% | C303/1997 - Carbine - Zuleika, Joint Annual Report For the Period 9/03/1998 to 8/03/1999 (M16/23, M16/27, M16/ |
| A57234 | 1999 | Mr Mitchard Pr | Hawkins Find | <1% | Hawkins Find Annual Report P16/1786-01787. 1997 - 1998. |
| A57388 | 1999 | Goldfields Exploration Pty Ltd | Zuleika | <1% | Zuleika 30/12/97 - 29/12/98 P16/1942-1945 |
| A58889 | 1999 | Kinross Gold Australia Pty Ltd | Broads Dam | <1% | Broads Dam Project, Annual report: July 1998 - June 1999, P16/1440 - P16/1453, (Kalgoorlie). |
| A59091 | 1999 | Centaur Mining & Exploration Ltd | Mount Pleasant | <1% | Mt Pleasant Project, (Joint) Annual Report for the period 01/04/1998 to 31/03/1999, C330/1997-Mt Pleasant. |
| A61943 | 1999 | Centaur Mining & Exploration Ltd | Mount Pleasant | <1% | Mount Pleasant Project, Non-statutory Report: Resources Report June 1999. |
| A54773 | 1998 | Digger Drilling Co Pty Ltd | Ora Banda | <1% | Ora Banda Project Mt. Burges Annual Report for Prospecting Licences 16/1832, 16/1833, 16/1834, 16/1835 for the |
| A55746 | 1998 | Centaur Mining & Exploration Ltd | Mount Pleasant | <1% | C330/1997 - Mt. Pleasant Joint Annual Report 01/04/97 - 31/03/98 Exploration Licence: E24/57, 68, Gold Lease: |
| A56928 | 1998 | Mines & Resources Australia Pty Ltd | Broads Dam | 2.1% | Broads Dam Annual Report For 22/10/97 - 21/10/98 PE 98/25 P16/1398-1400 |
| A55096 | 1998 | Kinross Gold Australia Pty Ltd | Camel Dam/ West Black Flag | <1% | Broad's Dam Project Annual Report: 07/97 - 07/98 M16/88, P16/1440-1453 |
| A55230 | 1998 | Centaur Mining & Exploration Ltd | Carbine Zuleika | <1% | C303/1997 - Carbine/Zuleika Joint Annual Report 09/03/97 - 08/03/98 Mining Licence: M16/23, 27, 44-45, 48, 58, |
| A56276 | 1998 | Homestake Gold Of Australia Ltd | Carnage | <1% | Project 567 Carnage M16/154 M24/365 Annual report for the period 22/08/97-21/08/98 Technical Report No:764 |
| A50835 | 1997 | Digger Drilling Co Pty Ltd | Ora Banda | <1% | Ora Banda Project, Annual Report for Prospecting Licences P16/ 1832, P16/1833, P16/1834, P16/1835 for the year |
| A52497 | 1997 | Plutonic Operations Ltd | Carnage | <1% | Carnage Project, Annual Report for period 22/08/1996 to 21/08/1997, M16/154 & M24/365. |
| A52796 | 1997 | Australasian Gold Mines Nl | Broads Dam | <1% | Broads Dam Project. Annual Report 07/1996 - 07/1997 M16/88, P16/1440-1453, M3695/2 |
| A53157 | 1997 | Mines & Resources Australia Pty Ltd | Broads Dam | 2.1% | Broads Dam Annual Report, 22/10/96 - 21/10/97 PE 97/21 P16/1398-1400 |
| A50800 | 1997 | Centaur Mining & Exploration Ltd | Balgarrie | 2.3% | Prospecting Licence P16/1373 and Mining Lease M16/23 C541/1994 'Balgarrie Marymia JV' Joint Annual report for |
| A50865 | 1997 | Sons Of Gwalia Ltd | White Elephant Dam | <1% | White Elephant Dam Project, Annual Report P16/1777-1780 for the period ending 9th March 1997. |
| A46608 | 1996 | Newcrest Mining Ltd | Balgarrie | 2.3% | Report No. WORA 97 OB No: 331 Balgarrie JV Annual Exploration Report M16823 M16/243 P16/1373 January 1 1995 - |
| A47174 | 1996 | Newcrest Mining Ltd | Zuleika | 1.3% | Ora Banda Gold Mine Zuleika Project Exploration report on leases M16/44 M16/45 M16/48 M16/86 M16/156 M16/212 P |
| A47465 | 1996 | Centaur Mining & Exploration Ltd | Black Flag (Mount Pleasant) | <1% | GML24/2486 GML24/2532 GML24/2764 GML24/3202 MLA16/211 MLA24/79 to MLA24/82 MLA16/102 MLA16/142 MLA16/155 MLA16 |
| A49177 | 1996 | Plutonic Operations Ltd | Carnage | <1% | Carnage Project M16/154 Annual Report Period 22/08/95-21/08/96 |
| A49388 | 1996 | Goldfields Exploration Pty Ltd | Duffer Dam | 1.4% | Duffer Dam Annual report 18 October 1995 to 17 October 1996 Tenements P16/1243 and P16/1244 (MLA16/222) Report |
| A49387 | 1996 | Pancontinental Gold Operations Pty Ltd | Zuleika | <1% | Zuleika Project Annual report 23 September 1995 to 22 September 1996 Tenements P16/1257 P16/1386 P16/1387 P16/ |
| A49541 | 1996 | Australasian Gold Mines Nl | Broads Dam | <1% | Broads Dam Project Annual report: July 1995 - July 1996 M16/88, P16/1440 - P16/1453. |
| A49672 | 1996 | Tulloch Resources Nl | Leaky Dam | <1% | Leaky Dam Project P16/1667 to P16/1669. Annual Report for the period 12 October 1995 to 11 October 1996 |
| A47849 | 1996 | Centaur Mining & Exploration Ltd | Black Flag Tattersalls Grants Patch | <1% | GML24/3171 M24/67 M24/100 M24/113 M24/148 M24/293 M24/412 M24/419 M24/430 P16/1462 to P16/1465 P16/1543 P16/15 |
| A49752 | 1996 | Mines & Resources Australia Pty Ltd | Broads Dam | 2.1% | Broads Dam Project P16/1398 to P16/1400 22/10/95 to 21/10/96 Mines and Resources Aust. Cutters Ridge Resources |
| A45971 | 1995 | Plutonic Operations Ltd | Carnage | <1% | Carnage Project, Annual Report M16/154 for period 22/08/1994 to 21/08/1995. |
| A48419 | 1995 | Tulloch Resources Nl | Leaky Dam | <1% | Leaky Dam Project, P16/1667 to P16/1669. Annual report for the period 12 October 1994 to 11 October 1995 |
| A44820 | 1995 | Mining Corporation Of Australia Ltd | Black Flag (Mount Pleasant) | <1% | Black Flag Regional gold report. Annual report For the period 1 January 1994 to 31 December 1994. |
| A44822 | 1995 | Mining Corporation Of Australia Ltd | Black Flag | <1% | Black flag regional gold project Annual report for the period 1 January 1994 to the 31 December 1994. |
| A43861 | 1995 | Newcrest Mining Ltd | Zuleika | 1.3% | Ora Banda Gold Mine Zuleika Project Exploration Report on Leases ML16/44 ML16/45 ML15/48 ML16/86 ML16/156 ML16 |
| A44654 | 1995 | Newcrest Mining Ltd | Balgarrie | 2.3% | Report No. WORA 82 OB NO. 331 Balgarrie Exploration report M16/23 P16/1373 August 13, 1994 to December 31, 199 |
| A45959 | 1995 | Mines & Resources Australia Pty Ltd | Broads Dam | 2.1% | Broads Dam project combined annual technical report on Prospecting Licences 16/1398-16/1400 for the period 22n |
| A46164 | 1995 | Australasian Gold Mines Nl | Broads Dam | <1% | Broads Dam Project Coolgardie Mineral Field Annual report for tenements M16/88, P16/1440 - P16/1453. |
| A42720 | 1994 | Pancontinental Mining Ltd | Zuleika | <1% | K94/026R Zuleika Project Annual report 23 September 1993 to 22 September 1994 (P16/1257 P16/1386 to P16/1388 P |
| A42851 | 1994 | North Star Resources Nl | Leaky Dam | <1% | Leaky Dam Project, P16/1667 to 16/1669. Annual Report for August 1993 to August 1994 |
| A42920 | 1994 | Newcrest Mining Ltd | Balgarrie | 3.6% | Balgarrie Exploration Report P16/1373 for the period August 13, 1991 to August 12, 1994 |
| A43028 | 1994 | Pancontinental Gold Operations Pty Ltd | Duffer Dam | <1% | K94/031R Duffer Dam Project Annual report 18 October 1993 to 17 October 1994 |
| A43042 | 1994 | Afmeco Pty Ltd | Broads Dam | 2.1% | Broads Dam Project Combined Annual Report Prospecting Licences P16/1398 to P16/1400 for the period 22 October |
| A41047 | 1994 | Mining Corporation Of Australia Ltd | Central Area | <1% | Black Flag Gold Project Annual Report for the Period 01 July 1992 to 31 December 1993 Central Area |
| A41048 | 1994 | Mining Corporation Of Australia Ltd | Black Flag | <1% | Annual Report for the period 1 July 1992 to 31 December 1993 Black Flag Gold Project Western Area |
| A40921 | 1994 | Mmc Management Pty Ltd | Broads Dam | <1% | Broads Dam Gold Project Mining Lease 16/88 Prospecting Licences 16/1440 to 16/1453 inclusive Report on work ca |
| A42077 | 1994 | Newcrest Mining Ltd | Zuleika | 1.4% | Zuleika Project Exploration Report on Leases M16/44-45, M16/48, M16/86, P16/1374 for the period January 1992 |
| A42921 | 1994 | Newcrest Mining Ltd | Balgarrie | <1% | Balgarrie Exploration Report M16/23 for the period July 24, 1991 to July 23,1994 |
| A38577 | 1993 | Mmc Management Pty Ltd | Broads Dam | <1% | Annual Report for the period 01/92-05/93 Broads Dam Project M16/88, P16/1440-1453 |
| A39832 | 1993 | Pancontinental Mining Ltd | Zuleika | <1% | Annual Report for the period 23/09/92-22/09/93 Zuleika Project P16/1257,1386-1388 |
| A37615 | 1993 | Pancontinental Mining Ltd | Duffer Dam | <1% | Annual Report for the Period 18/10/90 - 07/10/92 Duffer Dam Project |
| A39814 | 1993 | Afmeco Pty Ltd | Broads Dam | 2.1% | Annual Report for the period 22/10/92 to 21/10/93 Broads Dam Project P16/1398 to P16/1400 |
| A40363 | 1993 | Marymia Exploration Nl | Balgarrie | 1.6% | Report on reverse circulation drilling January 1993, Balgarrie Gold Project M16/123. Marymia Exploration NL. |
| A40364 | 1993 | Marymia Exploration Nl | Balgarrie | 1.6% | Report on reverse circulation drilling February 1993 to March 1993, Balgarrie Gold Project M16/123. Marymia E |
| A40461 | 1993 | Pancontinental Mining Ltd | Duffer Dam | <1% | Annual report for the period 18/10/92-07/10/93 Duffer Dam Project P16/1232-1234 P16/1243-1244 P16/1376 P16/137 |
| A37070 | 1992 | Marymia Exploration Nl | Balgarrie | 1.6% | Annual Report for the Period 01/09/91 - 01/09/92 Balgarrie Project M16/123 |
| A37209 | 1992 | Pancontinental Mining Ltd | Zuleika | <1% | Annual Report for the period 23/09/91-22/09/92 Zuleika Project P16/1257,1386-1388 |
| A37373 | 1992 | Newcrest Mining Ltd | Zuleika | 1.4% | Annual Report for the Period 01/01/90 - 01/12/91 Zuleika Project M16/44-45, M16/86, P16/1374 |
| A35710 | 1992 | Black Flag Consolidated Nl | Black Flag | <1% | Annual Report for the Period 01/01/91 - 31/12/91 Black Flag i Joint Venture M24/302,303,366,390,392 |
| A34912 | 1992 | Mmc Management Pty Ltd | Broads Dam | <1% | Broads Dam project M16/77, M16/88, M16/92 and M16/93 Report on work carried out during 1991 |
| A37222 | 1992 | Afmeco Pty Ltd | Broads Dam | 2.1% | Annual report for the period 22/10/91 to 21/10/92 Broads Dam Project P16/1398 to P16/1400 Afmeco Pty Ltd, Reso |
| A32828 | 1991 | Plutonic Operations Ltd | West Black Flag | <1% | West Black Flag Project, Annual Report ffor the period 14 March 1990 to 13 March 1991, M16/77,79, 88 ,92 & 93 |
| A32815 | 1991 | Windsor Resources Nl | Black Flag | <1% | Annual Report for the Period 01/01/90 - 31/12/90 Black Flag Project Area E24/20,M24/302,303,366 |
| A34707 | 1991 | Windsor Resources Nl | Stackhole Dam project | <1% | Stackhole Dam project, M24/74 and M24/75, Surrender report. |
| A31522 | 1990 | Bhp Minerals Pty Ltd | Zuleika | 2% | Zuleika Leases M16/44 and M16/45. Annual Report for the period 02/89-01/90. |
| A31524 | 1990 | Bhp Minerals Pty Ltd | Zuleika | 1.8% | Report on Diamond Drill Holes ZD006-ZD009 Wattle Bird, Zuleika Old Pit and Zuleika South (R Report for 1990; M |
| A31823 | 1990 | Bhp Minerals Pty Ltd | Zuleika | 2% | Zuleika Leases M16/44-45 Annual Report for the Period 02/89 - 01/90 |
| A32409 | 1990 | Windsor Resources Nl | Stack Hole Dam | <1% | Stackhole Dam Project, M24/74 & M24/75 Annual Report 1990 |
| A26598 | 1989 | Pioneer Minerals Aust Ltd | West Black Flag | <1% | West Black Flag report on geological mapping, trenching, rotary air blast and reverse circulation drilling. Ju |
| A23436 | 1988 | Bhp Minerals Pty Ltd | Zuleika | 1.8% | Zuleika JV Annual Report for the period 1 January 1987 to 31 December 1987. M16/48. February 1988. BHP Mineral |
| A25395 | 1988 | Electrum Nl | Anthill | <1% | Report on the Anthill 12/1988 GML16/1223 |
| A23140 | 1988 | Adelaide Petroleum Nl | Blue Funnel East | <1% | Blue Funnel East, Annual report for period ending 25 February 1988, P16/562-563 |
| A23435 | 1988 | Bhp Minerals Pty Ltd | Zuleika | 2% | Zuleika Annual Report for the period 1 January 1987 to 31 December 1987. M16/44 and M16/45. February 1988. BHP |
| A24113 | 1988 | Bhp Minerals Pty Ltd | Zuleika | 2% | Zuleika Report For the period 01/01/88 - 31/05/88 M16/44 and M16/45 |
| A24114 | 1988 | Bhp Minerals Pty Ltd | Zuleika | 1.8% | Zuleika Joint Venture Report for the period 01/01/88 - 31/05/88 M16/48 |
| A25080 | 1988 | Noranda Australia Ltd | West Black Flag | <1% | Project 566 : West Black Flag , Report on rotary airblast and aircore drilling September - November 1987 and F |
| A27240 | 1988 | Electrum Nl | Anthill pit Extension | 2.5% | Report No: 335 Report on the Anthill Pit Extension (M16/59) (1988) |
| A28138 | 1988 | Electrum Nl | Anthill | 1.6% | Report on the Anthill, Pit Extension 12/1988 (M16/23,59, GML16/1233, MLA16/123) |
| A22072 | 1987 | Associated Resources Management | Anthill | <1% | Test R.A.B. Drilling of the Southern Portion of the Anthill Prospecting Licence (P16/413, 1987) |
| A22225 | 1987 | Windsor Resources Nl | Stack Hole Dam | <1% | Annual report 1987. M24/74 and M24/75, Stackhole Dam, Black Flag area, Kalgoorlie District, WA. |
| A19396 | 1986 | Windsor Resources Nl | Stack Hole | <1% | 1986 Annual Report on Mining Leases M24/74 and M24/75 Stockhole Dam, Black Flag Area, Kalgoorlie District WA. |
| A34217 | 1985 | Windsor Resources Nl | Stack Hole Dam | <1% | Report on Stackhole Dam Joint Venture Black Flag Area WA |
| A16554 | 1985 | Samantha Exploration Nl | Anthill | <1% | Anthill Prospect Annual report on P16/220 P16/413 1985 |
| A15339 | 1984 | Samantha Exploration Nl | Anthill | <1% | Anthill Gold Deposit Ora Banda, Western Australia 2nd Progress Report & Mineral Reserve November 1984 Technica |
| A12212 | 1983 | Bhp Minerals Pty Ltd | Hawkins Find | 2.5% | Hawkins Find (JV) Project, Non-statutory Report:A Report on Chip Sampling of Quartz-Feldspar Porphyry around H |
| A12213 | 1983 | Bhp Minerals Pty Ltd | Hawkins Find | 2.5% | Hawkins Find Project, Non-statutory Report: Report on Percussion Hammer Drilling ZR47 to ZR62, at Hawkins Find |
| A11567 | 1982 | Bhp Minerals Pty Ltd | Zuleika | 2.5% | Zuleika Project, Non-statutory Report: Ground Magnetic Survey, October 1981, GML16/1082.....1339; MC16/1437. |
| A11568 | 1982 | Bhp Minerals Pty Ltd | Zuleika | 2.5% | Zuleika (JV) Project, Non-statutory Report: Report on Activities for the period to March 1982, GML16/1082..... |
| A11569 | 1982 | Bhp Minerals Pty Ltd | Zuleika | 2.5% | Zuleika (JV) Project, Non-statutory Report: Zuleika Soil Geochemistry at Hawkins Find, July 1982, GML16/1082.. |
| A11570 | 1982 | Bhp Minerals Pty Ltd | Zuleika | 2.5% | Zuleika (JV) Project, Non-statutory Report: Report on Diamond Drill Holes ZDH3 and ZDH4, August 1982, GML16/10 |
| A11806 | 1982 | Swiss Aluminium Mining Aust Pty Ltd | Hawkin's Find | 2.5% | Hawkin's Find (JV) Project, Non-statutory Report: Report on Reverse Circulation Holes :ZR29-ZR46, June 1982, M |
| A5660 | 1975 | Swiss Aluminium Mining Aust Pty Ltd | Hawkin's Find | 3.6% | GML16/1082 & 16/1091-1095, Hawkin's Find Prospect, Annual report 1974 |
| A3022 | 1972 | Carpentaria Exp Co Pty Ltd | Carbine | <1% | Carbine Project, Non-statutory Report: Final Report, March 1972, MC16/45-56, & 280-282. |
| A3020 | 1972 | Carpentaria Exp Co Pty Ltd | White Flag | 2.1% | White Flag Project, Non-statutory Report: Final Report, March 1972, MC16/61-64. |
| A3021 | 1972 | Carpentaria Exp Co Pty Ltd | Zuleika | 2.2% | Zuleika Project, Non-statutory Report: Final Report, March 1972, MC16/57-60. |
| A49729 | 1753 | Marymia Exploration Nl | Balgarrie | 1.6% | Annual Report for Mining Lease M16/123 Balgarrie Gold Project Period: 22nd August 1995 to 21st August 1996 |
| A50610 | 1753 | Centaur Mining & Exploration Ltd | Black Flag | <1% | 'Black Flag Central' 'C186/1995' Joint Annual report for the period 01 January 1996 to 31 December 1996 |
| A50869 | 1753 | Centaur Mining & Exploration Ltd | Black Flag West | <1% | GML24/3171 M24/67 M24/100 M24/113 M24/148 M24/293 M24/412 M24/419 M24/430 P16/1462 to P16/1465 P16/1543 P16/15 |
| A82879 | 1753 | Placer Dome Asia Pacific Ltd | Blister Dam | <1% | Ground Geophysics Survey |
| A82880 | 1753 | Placer Dome Asia Pacific Ltd | Mount Pleasant | <1% | Ground Geophysics Survey |
| A53115 | 1753 | Mr Mitchard Pr | Hawkins Find | <1% | Hawks Find Annual Report 28/1196 to 27/11/97, P16/1786 and P16/1787. |
| A88153 | 1753 | Paddington Gold Pty Ltd | Carbine | 3.6% | Carbine M16/243 Mineral Exploration Report Tenements: M16/243 Reporting Period: 11 September 2009 to 10 Septem |
| A28039 | 1753 | Bhp Minerals Pty Ltd | Zuleika | 1.9% | Report on exploration at Zuleika Mining leases M16/44, M16/45, M16/48 06/1988 - 01/1989 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A50373 | 1753 | Centaur Mining & Exploration Ltd | Ora Banda South | <1% | Prospecting Licences P16/1353 to P16/1356 P16/1374 P16/1439 P16/1512 P16/1570 to P16/1573 and Mining Leases M1 |
| A106819 | Placer Dome Asia Pacific Ltd | Paddington - Mount Pleasant | 2% | Joe Lord Core Library Drill Hole Reports BUGD158, BUGD162, BUGD166, BUGD167 From Bullant Underground M16/45 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 9 years · 8 Apr 2035
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 24/205 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 24/205? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-28. Compiled by NextMaps. Verify against primary sources before reliance.