E 80/6210
Register summary
- Holder
- Amery Holdings Pty Ltd
- Local government
- Shire of Halls Creek
- Application received
- 17 Feb 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A154237 | 2026 | Igo Limited | E80/5603: Red Rock | 100% | Final Surrender E80/5603 Red Rock Project for the period ending 20/02/2026. (C123/2022) |
| A147951 | 2025 | Mining Equities Pty Ltd | Duffer Range | <1% | Annual Report for the Duffer Range Project from 08/01/2024 to 07/01/2025 |
| A138277 | 2024 | Mining Equities Pty Ltd | Duffer Range | <1% | Annual Report for the Duffer Range Project E80/5340 from 08/01/2023 to 07/01/2024 |
| A134299 | 2023 | Peak Minerals Limited | Ilmars | <1% | Annual Report for Ilmars E80/5340 for the period ending 7/1/2023 |
| A129955 | 2022 | Peak Minerals Limited | Ilmars | <1% | Summary of Exploration Activities – Ilmars E80/5340 for the period ending 07/01/2022 |
232 more reports
| A123897 | 2020 | Halls Creek Mining Pty Ltd | Grants Creek | <1% | Annual Report Grants Creek Project C10/2019 For the Period 24 March 2019 to 23 March 2020 |
| A124800 | 2020 | Legacy Iron Ore Ltd | Sophie Downs | <1% | Annual Mineral Exploration Report for the Sophie Downs Project E 80/5067 for the period ending 17/07/2020 |
| A125508 | 2020 | Gianni, Pr | Duffer Range | <1% | Annual Report for the Duffer Range Project E80/05340 from 08/01/2020 to 07/01/2021 |
| A119163 | 2019 | Thundelarra Limited | Sophie Downs | <1% | ANNUAL REPORT SOPHIE DOWNS PROJECT E80/3673 FOR THE PERIOD 5 FEBRUARY 2018 TO 4 FEBRUARY 2019 EAST KIMBERLEY |
| A119944 | 2019 | Thundelarra Limited | Sophie Downs | <1% | Final Surrender Report Sophie Downs Project E80/3673 for the period 5 February 2008 to 13 March 2019 |
| A121088 | 2019 | Legacy Iron Ore Ltd | Sophie Downs | <1% | Annual Mineral Exploration Report for the Sophie Downs Project E80/05067 for the period 18 July 2018 to 17 Jul |
| A115892 | 2018 | Thundelarra Limited | Sophie Downs | <1% | ANNUAL REPORT SOPHIE DOWNS PROJECT E80/3673 FOR THE PERIOD 5 FEBRUARY 2017 TO 4 FEBRUARY 2018 EAST KIMBERLEY M |
| A118676 | 2018 | Gbe Exploration Pty Ltd | Armanda River | <1% | Armanda River E80/5013 Final Surrender Report for the period 23 November 2017 to 22 November 2018 |
| A111982 | 2017 | Thundelarra Limited | Sophie Downs | <1% | Annual Report Sophie Downs Project E80/3673 for the period 05/02/2016 to 04/02/2016 |
| A108251 | 2016 | Thundelarra Limited | Sophie Downs | <1% | ANNUAL REPORT SOPHIE DOWNS PROJECT E80/3673 (5 February 2015 to 4 February 2016) |
| A105287 | 2015 | Thundelarra Limited | Sophie Downs | <1% | Annual Report, Sophie Downs Project; E80/3673, For the Period 5 February 2014 to 4 February 2015, East Kimberl |
| A101657 | 2014 | Thundelarra Limited | Sophie Downs | <1% | Annual Report, Sophie Downs Project; E80/3673, for the period 5 February 2013 to 4 February 2014, East Kimberl |
| A97328 | 2013 | Thundelarra Limited | Sophie Downs | <1% | Sophie Downs Project, Annual Report for the period 5th February 2012 to 4th February 2013, E80/3673. |
| A98391 | 2013 | Regency Mines Australasia Pty Ltd | Little Mt Isa | 25% | Little Mt Isa project, E80/4046, Annual Report for the period 1st May 2012 to 30th April 2013 |
| A94078 | 2012 | Red Rock Australasia Pty Ltd | Little Mount Isa | 25% | Little Mt Isa Annual Report E80/4046 For the period 1st May 2011 to 3oth April 2012 |
| A93520 | 2012 | Thundelarra Exploration | Sophie Downs | <1% | Annual Report, Sophie Downs Project; E80/3673, for the period 5 February 2011 to 4 February 2012, East Kimberl |
| A90458 | 2011 | Thunderlarra Exploration Ltd | Sophie Downs | <1% | Annual Report, Sophie Downs Project; E80/3673, for the period 5 February 2010 to 4 February 2011, East Kimberl |
| A90770 | 2011 | Regency Mines Australasia Pty Ltd | Little Mount Isa | 25% | Summary of Activities for E80/4046 Little Mount Isa for the period 01/05/2010 to 30/04/2011 |
| A87059 | 2010 | Red Rock Australasia Pty Ltd | Little Mount Isa | 25% | Annual Report for E80/4046 Little Mount Isa Project for the period 1st May 2009 to 30th April 2010 |
| A86263 | 2010 | Panoramic Resources Ltd | Sophie Downs | <1% | Annual Report, Sophie Downs Project; E80/3673, for the period 5 February 2009 to 4 February 2010, East Kimberl |
| A82770 | 2009 | Metminco Ltd | Sophie Downs | 4.3% | Annual Report 24th April 2008 to 23rd April 2009, Sophie Downs E80/3742 |
| A81689 | 2009 | Thundelarra Exploration Ltd | SOPHIE DOWNS | <1% | ANNUAL REPORT SOPHIE DOWNS PROJECT E80/3673, FOR THE PERIOD 5 FEBRUARY 2008 TO 4 FEBRUARY 2009, EAST KIMBERLEY |
| A78641 | 2008 | Thundelarra Exploration Ltd | Sophie Downs | <1% | Annual Report, Sophie Downs Project; E80/3673 for the period 5 February 2007 to 4 February 2008, East Kimberle |
| A79603 | 2008 | Heron Resources Ltd | Gordon Downs | <1% | ANNUAL REPORT 7 September 2007 to 6 September 2008 |
| A76264 | 2007 | Heron Resources Ltd | Gordon Downs | <1% | Gordon Downs Project E80/3531 Kimberley Mineral Field Annual Report 7th September 2006 to 6th September 2007 |
| A73193 | 2006 | Mr Baxter C | Twin Hills | 25% | Twin Hills Project E80/3164, Annual Report for the Period 17 March 2005 to 16 March 2006, (Gordon Downs). |
| A70413 | 2005 | Great Australian Resources Ltd | Sophie Downs | 4.6% | Sophie Downs Project, 2004 Combined Annual Report for the year ending 8th July 2004. E80/2799, P80/1474 (C8 |
| A70501 | 2005 | Mr Baxter C | Twin Hills | 25% | Twin Hills Project, Annual report for E80/3164, for the period 17 March 2004 to 16 March 2005, E80/3164, East |
| A68468 | 2004 | Udu Resources Ltd | Little Mt Isa | 15% | Little Mt Isa Project, Annual Report for E80/2420, for the period 4 January 2003 to 3 January 2004 |
| A66380 | 2003 | Anglo American Exploration (Australia) Pty Ltd | Sophie Downs | 4.6% | Halls Creek Mobile Zone Joint Venture E80/2799, 'Sophie Downs', Progress Report for the Period 25th September |
| A66771 | 2003 | Anglo American Exploration (Australia) Pty Ltd | Little Mount Isa | 15% | Little Mount Isa Project, Annual Report for the period 4th January 2002 to 14th October 2002., E80/2420. |
| A64304 | 2002 | Anglo American Exploration (Australia) Pty Ltd | Little Mount Isa (Halls Creek Mobile Zo | 15% | E80/2420 'Little Mt Isa' (Halls Creek Mobile Zone Project) Annual Report for the period 4th January 2001 to 3r |
| A62246 | 2001 | Udu Resources Ltd | Little Mount Isa | 15% | Little Mt Isa Project Annual Report for E80/2420 for the Period 4 January 2000 to 3 January 2001. |
| A58914 | 1999 | Precious Metals Australia Gold Pty Ltd | Grants Creek | 1.4% | Surrender Report for exploration licence E80/1786 from 29th April 1994 to 7th December 1998. |
| A55014 | 1998 | Pma Gold Pty Ltd | Grants Creek | <1% | Annual Report to 31 December 1997 on Grants Creek Project C283/1996 covering E80/1646, E80/1786, M80/233, M80/ |
| A53996 | 1998 | Lachlan Resources Nl | Little Mount Isa | 5.8% | Project 585 Little Mt Isa Group, Tenements E80/800, 1523, M80/228, 229 Annual Report, Period ending December |
| A55900 | 1998 | Pma Gold Pty Ltd | Grants Creek | 1.4% | Grants Creek Project, Partial Surrender Report, September 1998, E80/1786. |
| A50992 | 1997 | Lachlan Resources Nl | Little Mount Isa | 5.8% | Little Mount Isa Project, Annual Report E80/800, E80/1523, M80/228, M 80/229 for period ending December 1996. |
| A52706 | 1997 | Lachlan Resources Nl | Little Mount Isa | 5.9% | Little Mt Isa Project, Partial Surrender Report for period ending 4th May 1997, E80/1523. |
| A46855 | 1996 | Precious Metals Aust Ltd | Maude Headly- Grants Creek | 1.4% | Maude Headly - Grants Creek Project, Annual Report for the period 29th April 1994 to 28th April 1995, E80/1786 |
| A47121 | 1996 | Lachlan Resources Nl | Little Mount Isa Group | 5.8% | Little Mount Isa Group Project, Annual Report Period Ending December 1995, E80/800, E80/1523, M80/228, M80/229 |
| A49847 | 1996 | Pma Gold Pty Ltd | Grants Creek | <1% | Grants Creek Project, Annual Report for the period 1st January 1996 to 31st December 1996, E80/1646, E80/1786, |
| A50872 | 1996 | Lachlan Resources Nl | Little Mount Isa | 5.9% | Little Mount Isa Project, Partial Relinquishment Report E80/1523 for period 4th May 1996. |
| A48313 | 1996 | Precious Metals Aust Ltd | Palm Springs | <1% | Palm Springs Project Aeromagnetic/Radiometric Interpretation (E80/1569 E80/1634 E80/1635 E80/1716 E80/1786 M80 |
| A48516 | 1996 | Precious Metals Aust Ltd | Grants Creek - Palm Springs | 1.4% | Grants Creek Palm Springs Project, Annual report on E80/1786 covering the period 29 April 1995 to 28 April 1 |
| A48669 | 1996 | Pma Gold Pty Ltd | Grants Creek | <1% | Annual Report to 31 December 1994 on Grants Creek Prospect Covering the Tenements M80/233, M80/366, M80/405, E |
| A44901 | 1995 | Anglo Australian Resources Nl | Little Mount Isa | 5.8% | Little Mount Isa Project, Annual Report Exploration Licences E80/800, E80/1523(in part), Mining Leases M80/228 |
| A40595 | 1994 | Billiton Australia Pty Ltd | Little Mount Isa | 5.8% | Little Mt Isa, Annual Report for the period 01/01/1993 to 31/12/1993, E80/800, E80/1523 (in part), M80/ 228 -2 |
| A41704 | 1994 | Billiton Australia Pty Ltd | Sophie Downs | 5.9% | Sophie Downs Project, Annual Report for the period 05/05/1993 to 04/05/1994, E80/1523. |
| A35362 | 1992 | Billiton Australia Pty Ltd | Little Mount Isa | 9.1% | Little Mount Isa Project, Annual Report for the period ending 31st December 1991, E80/800, M80/228 & 229. |
| A37805 | 1992 | Billiton Australia Pty Ltd | Little Mount Isa | 9.1% | Little Mount Isa Group, Annual report for period 1/1/92 to 21/12/92, E80/800, M80/228-229 |
| A34342 | 1991 | Billiton Australia Pty Ltd | Little Mount Isa | 11% | Little Mt Isa Project, Partial Surrender Report, February 1991, E80/800. |
| A32840 | 1991 | Billiton Australia Pty Ltd | Little Mount Isa | 11% | Little Mt Isa Project, (2nd) Partial Surrender Report for period ending 21st February 1991, E80/800. |
| A33835 | 1991 | Billiton Australia Pty Ltd | Litlle Mt Isa | 9.1% | Litlle Mt Isa Project, Annual Report to 31st December 1990, E80/800, M80/228, & M80/229. |
| A30801 | 1990 | Billiton Australia Pty Ltd | Little Mount Isa | 11% | Little Mt Isa Project, Partial Surrender Report, February 1990, E80/800. |
| A31248 | 1990 | Billiton Australia Pty Ltd | Little Mt Isa | 9.1% | Little Mt Isa Project, Annual Report to April 1990, E80/800; M80/228 & 229. |
| A26860 | 1989 | Bhp Minerals Pty Ltd | Little Mount Isa | 11% | Little Mount Isa, Annual Report, exploration licence 80/800, for the year ending 21st February 1989. |
| A23502 | 1988 | Freeport Of Australia Inc | Mount Coghlan | 3.3% | Mount Coghlan, Annual report for period 26 May 1987 to 25 May 1988, E80/365 |
| A23350 | 1988 | Asarco Australia Ltd | Koongie Park | 11% | Koongie Park Project, Annual Report for the year ending 31/12/1987, E80/800 & E80/364; P80/173 & , 175-178. |
| A20862 | 1987 | Freeport Of Australia Inc | Mount Coghlan | 3.3% | E80/365, Mount Coghlan, Annual report 26/5/86 to 25/5/87 |
| A18777 | 1986 | Pnc Exp Aust Pty Ltd | Sophie Downs | 5.7% | Final (surrender) report on E80/419, Sophie Downs Area, to 19/05/1986 |
| A508 | 1986 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Bow River I.P. Profiles, 1968, ( Folder 1), TR70/ 2687H. |
| A15944 | 1985 | Freeport Of Australia Inc | Mount Coghlan | 3.3% | Mt Coghlan Project, Annual Report for the period 26th May 1984 to 25th May 1985, E80/365. |
| A18328 | 1985 | Freeport Of Australia Inc | Mount Coghlan | 3.3% | Mount Coghlan, Annual report, 26 May 1985 to 25 May 1986, E80/365 |
| A12164 | 1983 | Stockdale Prospecting Ltd | Saunders Creek | 21% | Saunders Creek Project, Final Surrender Report for the period ending 31/12/1982, MC80/6614-6634H |
| A9497 | 1981 | Mobil Energy Min Aust Inc | Saunders Creek | 21% | Saunders Creek Project, Annual Report for the period 1978 to January 1981, MC80/6614-6634. |
| A8988 | 1980 | Uranerz Australia Pty Ltd | Saunders Creek | 27% | Saunders Creek Project, 1979 Annual Report, March 1980, MC80/6540-6548. |
| A7914 | 1978 | Samantha Mines Nl | Palm Creek | 12% | Palm Creek Project, Non-statutory Report: Final Report for the 1st and Final Year, August 1978, TR70/6595H. |
| A8165 | 1978 | Carpentaria Exp Co Pty Ltd | Sophie Downs - Bullaman | <1% | Sophie Downs - Bullaman Project, Non-statutory Report: Exploration Report, December 1978, TR70/6643H & TR70/66 |
| A7965 | 1978 | Shell Minerals Exp Aust Pty Ltd | Twin Hills | <1% | Twin Hills Project, Annual & Final Report, Diamond Drillling (DDH1) for the year ending 31/12/1977, MC80/4824 |
| A6894 | 1977 | Pickands Mather & Co Int | Kimberley | <1% | Non-statutory Report : Pickands Mather reconnaissance Drainage Survey of the Kimberleys, February 1977, TR70/2 |
| A7287 | 1977 | Samantha Mines Nl | Palm Creek | 12% | Palm Creek Project, Non-statutory Report: Quarterly Report for the period ending 31/10/1977,TR70/6595H. |
| A6901 | 1977 | Pickands Mather & Co Int | East Kimberley - Ilmars | <1% | East Kimberley - Ilmars Project, Non-statutory Report: Core Analyses, Air Drill Analyses, 1968-1970, TR70/2687 |
| A6902 | 1977 | Pickands Mather & Co Int | East Kimberley - Angelo- Angelo North | <1% | East Kimberley - Angelo- Angelo North Project, Non-statutory Report: Geochemistry Plans & Drill Sections 1968- |
| A7964 | 1977 | Shell Minerals Exp Aust Pty Ltd | Twin Hills | <1% | Twin Hills Project, Annual Report for the period ending 31/12/1976, MC80/4824-4827, 4885, 4962-4963 & 5068-507 |
| A6195 | 1976 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Key Maps & Sub Number Indexes: Kimberley TRs 70/2686 & 2687H. |
| A712 | 1971 | Pickands Mather & Co Int | Kimberley - Cummins Range | <1% | Kimberley - Cummins Range Project, Non-statutory Report: Reconnaissance Work in the Cummins Range, March 1971, |
| A760 | 1971 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Re-Evaluation of Bow River 1970, February 1971, TR70/2686 |
| A2441 | 1971 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Annual (Summary) Report 1 November 1971, (1971 Field Season April to October ), TR70/2686-2 |
| A4907 | 1971 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Weekly Drill Hole Reports & Drill Records, DDH B.R. 111-1 |
| A6983 | 1971 | Pickands Mather & Co Int | East Kimberley - Panton Sill | <1% | East Kimberley - Panton Sill Project, Non-statutory Report: Analytical Report Assay Sheets for Rock & Soil Sam |
| A708 | 1971 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Exploration at the Ilmars Prospect 1970, February 1971, TR70 |
| A711 | 1971 | Pickands Mather & Co Int | Ord Crossing - Tickalara Bore | <1% | Ord Crossing - Tickalara Bore Project, Non-statutory Report: Geological Report, Ord Crossing Area, Tickalara A |
| A713 | 1971 | Pickands Mather & Co Int | Kimberley - Koongie Park | <1% | Kimberley - Koongie Park Project, Non-statutory Report: Report on Koongie Park Radioactive Showing , March 197 |
| A761 | 1971 | Pickands Mather & Co Int | Kimberley - Hall's Creek | <1% | Kimberley - Hall's Creek Project: Non-statutory Report; Geological Reconnaissance South of Hall's Creek, March |
| A2224 | 1971 | Pickands Mather & Co Int | Bow River | <1% | Bow River Project, Non-statutory Report: Drilling Programme 1971, August 1971,TR70/2686 & 2687H. |
| A2226 | 1971 | Pickands Mather & Co Int | Kimberley - McIntosh " A " | <1% | Kimberley- McIntosh " A " Project, Non-statutory Report: Report on McIntosh " A " Prospect, July 1971, TR70/26 |
| A2227 | 1971 | Pickands Mather & Co Int | Cummins Range | <1% | Cummins Range Project, Non-statutory Report: Report on Cummins Range Prospect, September 1971, TR70/2686-2687, |
| A2228 | 1971 | Pickands Mather & Co Int | Kimberley - Cummmins Range | <1% | Kimberley - Cummmins Range Project, Non-statutory Report:Cummins Range Costeans, November 1971, TR70/2686-2687 |
| A2229 | 1971 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Laboratory Report on the Beneficiation of Titano Magnetite-Bearing Ga |
| A2230 | 1971 | Pickands Mather & Co Int | Emull | <1% | Emull Project, Non-statutory Report:Report on Preliminary Investigation & Percussion Drilling Programme, Octob |
| A6209 | 1971 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Drill Records & Analysis Sheets for the period to February 1971, TR70 |
| A4764 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Ilmars Prospect, Electromagnetics Inline Configuration A, for the yea |
| A4759 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Bow River I.P. Profiles, July 1970, TR70/2687H. |
| A4765 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Koongie Park Lead I. P. Profiles, 1'-200', May 1970, TR70/2687H. |
| A4773 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Little Mount Isa Drill Records,DDH 401 & 402 , July- August 1970, TR7 |
| A4908 | 1970 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Weekly Drill Hole Reports & Analysis Report Sheets for the p |
| A6903 | 1970 | Pickands Mather & Co Int | Kimberley- Mount Angelo | <1% | Kimberley- Mount Angelo Project, Non-statutory Report; Miscellaneous Plans & Sections, 1966 & 1970, TR70/2687H |
| A6904 | 1970 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Plans & Sections , 1970, TR70/2687H. |
| A517 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Annual Report for the year ending 31/12/1969, TR70/2686, 2687,4658, 5284, 5285, 5286 & 528 |
| A519 | 1970 | Pickands Mather & Co Int | Kimberley -llmars | <1% | Kimberley -llmars Project, Non-statutory Report: Ilmars Report 1969, including Sophie Downs Copper Showing - A |
| A4762 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Wild Dog Creek I.P.Profiles, May 1970 , TR70/2686 & 2687H. |
| A4763 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Golf course I P Profiles, May 1970, TR70/2686 & 2687H. |
| A6208 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Miscellaneous Analysis Report Sheets ( Bullman Copper, Moola Bulla & |
| A6211 | 1970 | Pickands Mather & Co Int | Kimberley - | <1% | Kimberley Project, Non-statutory Report: Golf Course Prospect, D. D. H. 1 (Venture 3 Drillilng), Logs & Assay |
| A6213 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Miscellaneous Analysis Sheets for the period 1965 to August 1970.[Lam |
| A523 | 1969 | Pickands Mather & Co Int | West Kimberley | <1% | West Kimberley Project, Non-statutory Report: Exploration, 1969 Field Season, TR70/2686 & 2687H. |
| A4775 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo Core Analyses 1967-1969; Drill Logs 1967-1969 & Drill Logs |
| A496 | 1969 | Pickands Mather & Co Int | McIntosh Hills - Panton Sill | <1% | McIntosh Hills - Panton Sill Project, Annual Report for the year ending 31/12/1968, TR70/2687H. |
| A512 | 1969 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report, February 1968, TR70/ 2687H. |
| A522 | 1969 | Pickands Mather & Co Int | Kimberley- Bow River | <1% | Kimberley- Bow River Project, Non-statutory Report: Report on 1969 Field Season, [Eastern Basics Exploration], |
| A513 | 1969 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars 1968 I. P. Profiles ( 100' & 200' Dipole), May - June |
| A515 | 1969 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report 1968, Folder No 2, Pocket C & D, February 1969 |
| A516 | 1969 | Pickands Mather & Co Int | Kimberley Area | <1% | Kimberley Area Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1969, TR70/2686 |
| A520 | 1969 | Pickands Mather & Co Int | East Kimberley Project | <1% | East Kimberley Project, Non-statutory Report: Miscellaneous Exploration , 1969 Field Season, TR70/2686 & 2687H |
| A521 | 1969 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Radioactive Exploration, East Kimberley 1969 Field Season, TR70/ |
| A524 | 1969 | Pickands Mather & Co Int | Kimberley - Sophie Downs | <1% | Kimberley - Sophie Downs Project, Non-statutory Report: Sophie Downs, I.P. Profiles, 1969, TR70/2686 & 2687H. |
| A525 | 1969 | Pickands Mather & Co Int | Kimberleys- Bullman | <1% | Kimberleys- Bullman Project, Non-statutory Report: Kimberleys Bullman I.P.Profiles, 1969, TR70/2686 & 2687H. |
| A526 | 1969 | Pickands Mather & Co Int | Kimberley - Angelo Valley | <1% | Kimberley - Angelo Valley Project, Non-statutory Report: Angelo Valley I.P.Profiles, 1969, TR70/2686 & 2687H. |
| A527 | 1969 | Pickands Mather & Co Int | Kimberley - Napier | <1% | Kimberley - Napier Project, Non-statutory Report: Napier I. P. Profiles 1969, TR70/2686 & 2687H. |
| A528 | 1969 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Kimberley -Bow River I.P.Profiles 1969, TR70/2686 & 2687H |
| A529 | 1969 | Pickands Mather & Co Int | Kimberley - Golf Course | <1% | Kimberleys- Golf Course, Non-statutory Report: IP Profiles, 1969, TR70/2686 & 2687H. |
| A6212 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report SheetsOctober 1968 to May 1969 , TR70/2686 & 2687H. |
| A6214 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Miscellaneous Analysis Sheets with Sample Shipment Records, to Octobe |
| A6216 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report Sheets, ( Soil Rock Analysis, 1966-1969, Kimberley Re |
| A505 | 1968 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report: Mt.Angelo I.P Profiles 1968, TR70/2686 & 2687H. |
| A506 | 1968 | Pickands Mather & Co Int | Kimberley- Sophie Downs | <1% | Kimberley-Sophie Downs Project, Non-statutory Report: Sophie Downs I. P. Profiles, 1968, TR70/2686 & 2687H. |
| A6916 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Regional Stream Sediment Survey Maps, Cambridge Gulf, 1964-1968, TR70 |
| A509 | 1968 | Pickands Mather & Co Int | Kimberley- Bow River | <1% | Kimberley- Bow River Project, Non-statutory Report: Bow River I.P.Profiles (Folder 2), 1968, TR70/2687H. |
| A510 | 1968 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: East Kimberley Areas I.P. Profiles, 1968, TR70/ 2687H. |
| A4766 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Black - Bow River I.P. Lines 1966 - 1968, TR70/2687H. |
| A4909 | 1968 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Weekly Drill Records & Analyis Report Sheets, to September 1 |
| A487 | 1968 | Pickands Mather & Co Int | Kimberley - Ilmar's Showing | <1% | Kimberley - Ilmar's Showing Project, Non-statutory Report: Ilmar's Showing I.P. 200 Foot Dipole 1967 & 300 Fo |
| A489 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars - Little Mount Isa | <1% | Kimberley- Ilmars - Little Mount Isa Project, Final Surrender Report, February 1968, TR70/2686 & 2687H. |
| A490 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars- Little Mount Isa | <1% | Kimberley- Ilmars- Little Mount Isa Project, Non-statutory Report: Report on Ilmars & Little Mount Isa Lead-Zi |
| A491 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars - Little Mount Isa | <1% | Kimberley- Ilmars - Little Mount Isa Project, Non-statutory Report: Report on Ilmars & Little Mt Isa "Zinc- Le |
| A492 | 1968 | Pickands Mather & Co Int | Kimberley-Ilmars | <1% | Kimberley-Ilmars Project, Non-statutory Report: Report on Ilmars Showing I.P., 300 Foot Dipole 1966 & 200 Foot |
| A493 | 1968 | Pickands Mather & Co Int | Kimberley Reserves | <1% | Kimberley Reserves Project, Annual Report for the period ending 31/12/1968,TR70/2686 & 2687H. |
| A494 | 1968 | Pickands Mather & Co Int | West Kimberley | <1% | West Kimberley Project, Non-statutory Report: Report on Field work in the West Kimberley for the year ending 3 |
| A495 | 1968 | Pickands Mather & Co Int | Kimberley - Bow River - Salt Lick Creek | <1% | Kimberley - Bow River-Salt Lick Creek- Black Mountain Project, Annual Report for the year ending 31/12/1968, T |
| A497 | 1968 | Pickands Mather & Co Int | Moola Bulla - Little Panton | <1% | Moola Bulla - Little Panton Project, Annual Report for the period ending 31/12/1968, TR70/2686 & 2687H. |
| A498 | 1968 | Pickands Mather & Co Int | Kimberley - Springvale | <1% | Kimberley - Springvale Project, Annual Report for the year ending 31/12/1968, TR70/2686 & 2687H. |
| A500 | 1968 | Pickands Mather & Co Int | Kimberley - Louisa Downs | <1% | Kimberley - Louisa Downs Project, Non-statutory Report: Report on the Louisa Downs Serpentinite, & Nearby Mine |
| A502 | 1968 | Pickands Mather & Co Int | Kimberley - Fletcher Creek-Armanda Sill | <1% | Kimberley - Fletcher Creek-Armanda Sill Project, Non-statutory Report: Follow-up Work in the Fletcher Creek & |
| A504 | 1968 | Pickands Mather & Co Int | Kimberley - Mount Angelo North | <1% | Kimberley - Mt Angelo North Project, Non-statutory Report: Mt Angelo North I.P.Profiles, 1968, TR70/2686 & 268 |
| A507 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars Range | <1% | Kimberley- Ilmars Range Project, Non-statutory Report: Ilmars Range I.P Profiles 1968, TR70/2686 & 2687H. |
| A946 | 1968 | Pickands Mather & Co Int | Kimberley - Lansdowne | <1% | Kimberley - Lansdowne Project, Non-statutory Report: Plans for Lansdowne Area, TR70/2686 & 2687H. |
| A6199 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets, Regional Stream Geochemistry , Series : 42000, February |
| A6200 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets-Regional Stream Geochemistry, Series 43 0000, February 1 |
| A6215 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report Sheets, Soil Rock Analysis to November 1966-1969, TR7 |
| A471 | 1967 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mount Angelo Project, Non-statutory Report: Mt Angelo I.P. 100 & 300 Foot Dipole to June 1967, TR7 |
| A476 | 1967 | Pickands Mather & Co Int | Kimberley - Sophie Downs | <1% | Kimberley - Sophie Downs Project, Non-statutory Report: Report on Sophie Downs Regional Copper Anomaly, Novemb |
| A4905 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimnberley - Bow River Project, Non-statutory Report: Analysis Report Sheets & Daily Drilling Records, B R 10 |
| A474 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Angelo North Project, Non-statutory Report: Brief Exploration Report, November 1967, TR70/2687H. |
| A478 | 1967 | Pickands Mather & Co Int | Kimberley - Grants Creek | <1% | Kimberley - Grants Creek Project, Non-statutory Report:Final Report for the period ending 31/12/1967, TR70/268 |
| A4758 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Angelo-Peko, I.P.Lines, June 1966 & August 1967, TR70/2687H. |
| A4774 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo Weekly Drill Hole Reports:- D.H. 202-209,1966 & 1967, TR70/ |
| A4906 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report:Final Logs, DDH B.R.106-110, to August 1967, TR70/2687H. |
| A6205 | 1967 | Pickands Mather & Co Int | Kimberley -Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report: Series 61, Analysis Report Sheet, for the period to Janua |
| A457 | 1967 | Pickands Mather & Co Int | Kimberley - Gentle Annie | <1% | Kimberley - Gentle Annie Project, Non-statutory Report: Progress Report, March 1967, TR70/2686 & 2687H. |
| A455 | 1967 | Pickands Mather & Co Int | Kimberley- Bow River- Mt Angelo | <1% | Kimberley- Bow River - Mt Angelo Project, Annual Report for the period ending 31/12/1966 (Field Season), TR70/ |
| A459 | 1967 | Pickands Mather & Co Int | Kimberley -Grants Creek | <1% | Kimberley - Grants Creek Project, Non-statutory Report: Progress Report for September / October 1966, March 19 |
| A483 | 1967 | Pickands Mather & Co Int | Kimberley - Margaret River | <1% | Kimberley - Margaret River Project, Non-statutory Report: Margaret River I.P. Survey, 200' Dipole, September 1 |
| A465 | 1967 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report:Mt Angelo Geophysical Report, December 1966, TR70/2686 & 2 |
| A468 | 1967 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: I.P.:& E.M. Results , Ilmars Project, March 1967, TR70/2686 |
| A469 | 1967 | Pickands Mather & Co Int | Kimberley- Ilmars | <1% | Kimberley- Ilmars Project, Non-statutory Report:Progess Report, Ilmars Zinc- Lead - Copper Showing, March 1967 |
| A472 | 1967 | Pickands Mather & Co Int | East Kimberley -West Kimberley | <1% | East Kimberley -West KimberleyProject, Annual Report for the period ending 318/12/1967, TR70/2686 & 2687H. |
| A473 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: 1967 Report on Bow River Air Drill Programme, October 196 |
| A475 | 1967 | Pickands Mather & Co Int | Kimberley - Gentle Annie Creek | <1% | Kimberley - Gentle Annie Creek Project, Non-statutory Report: Final Report 1966, Gentle Annie Creek Area, Apri |
| A477 | 1967 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mount Angelo Project, Non-statutory Report: Diamond Drilling Results at Mt Angelo, December 1967, |
| A484 | 1967 | Pickands Mather & Co Int | Kimberley - Peko Angelo | <1% | Kimberley - Peko Angelo Project, Non-statutory Report: Peko Angelo I.P. 100' Dipole, September 1967, TR70/2686 |
| A479 | 1967 | Pickands Mather & Co Int | Kimberley - Yampi Sound | <1% | Kimberley - Yampi Sound Project, Non-statutory Report: Preliminary Report, Coppermine Inlet Area, October 1967 |
| A480 | 1967 | Pickands Mather & Co Int | Kimberley - Panton River | <1% | Kimberley - Panton River Project, Non-statutory Report: Final Report, Panton River Copper- Zinc-Lead Anomaly, |
| A481 | 1967 | Pickands Mather & Co Int | West Kimberley | <1% | West Kimberley Project, Non-statutory Report: Report on Field Work for the year ending 31/12/1967, TR70/2686 & |
| A482 | 1967 | Pickands Mather & Co Int | Kimberley - Angelo North | <1% | Kimberley - Angelo North Project, Non-statutory Report: Maps, Sections & Diagrams, circa August 1967, TR70/268 |
| A486 | 1967 | Pickands Mather & Co Int | Kimberley - Discovery Yard | <1% | Kimberley - Discovery Yard Project, Non-statutory Report: Discovery Yard I.P. 100 Foot Dipole, August 1967. Tr |
| A488 | 1967 | Pickands Mather & Co Int | Kimberley - Emull | <1% | Kimberley - Emull Project, Non-statutory Report: Emull I.P. Survey, 200 Foot Dipole, September 1967,TR70/2686 |
| A501 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Bow River I.P. 200 Foot Dipole, 1965 & 1967, TR70/2686 & |
| A6197 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry , 40 Series, to December |
| A6198 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry, Series 41 0000, Reruns a |
| A6206 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Exploration Report, Analysis Results on Copper, Nickel, Sulphur & Pho |
| A6210 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report Sheets to October 1967, TR70/2686 & 2687H. |
| A4680 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Report on Saunders Creek Anticline Copper Anomaly, December 1966, TR7 |
| A4674 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: An Extract from Progress Report, September 1966, TR70/2687H. |
| A4675 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Supplementary Report on the Margaret River Gossan, April 1966, TR70/2 |
| A4682 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Report on the Salt Lick Creek Nickel Anomaly & Lissadell - Mt Pitt Go |
| A4756 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo I.P. 300' Di Pole Lines, June 1966, TR70/2687H. |
| A4676 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report:Progress Report on Mount Angelo Copper Showing ( Mt Ramsay 3), April 1 |
| A4684 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report; Final Report, Bow River Copper -Nickel Prospect, November 1966, TR70 |
| A4686 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Brief Geological Report , Bow River I P Lines , July 1966, TR70/2687 |
| A444 | 1966 | Pickands Mather & Co Int | Kimberley - Ding Dong Downs | <1% | Ding Dong Downs Project, Non-statutory Report: Summary Report on Ding Dong Downs Copper, Lead & Zinc Anomaly, |
| A460 | 1966 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report: Geological Report, Mount Angelo Copper Showing, May 1966, |
| A462 | 1966 | Pickands Mather & Co Int | Kimberley - Panton River | <1% | Kimberley - Panton River Project, Non-statutory Report: Preliminary Report of Panton River Copper Anomaly , De |
| A463 | 1966 | Pickands Mather & Co Int | Kimberley- Carr Boyd Range | <1% | Kimberley- Carr Boyd Range Project, Non-statutory Report: Final Report, November 1966, TR70/2686 &2687H. |
| A464 | 1966 | Pickands Mather & Co Int | Kimberley- Bow River | <1% | Kimberley- Bow River Project, Non-statutory Report:Final Report on the Bow River Region, December 1966, TR70/2 |
| A466 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley - Discovery Yard Project, Non-statutory Report: Discovery Yard Copper Anomaly, December 1966, TR70/2 |
| A6203 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets - regional Stream Geochemistry , Series 53 0000, to Janu |
| A1492 | 1965 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Metal Concentrations in Stream Sediment Locations, 1965, TR70/26 |
| A6906 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Regional Geology & Geochemical Anomalies Maps, (circa 1965), TR70/268 |
| A4757 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo. 200' IP Lines, November 1965, TR70/2687H. |
| A6917 | 1965 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Regional Stream Sediment Geochemistry Maps, Lissadell & Derby, |
| A6919 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Stream Sediment Survey Maps, Dixon Range, 1964, TR70/2687H. |
| A6920 | 1965 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Stream Sediment Survey Maps, Mt Ramsay, 1964, TR70/2687H. |
| A6921 | 1965 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Stream Sediment Survey Geochemistry Maps, Gordon Downs & Mt Bann |
| A439 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Annual Report for the year ending 31/12/1964, TR70/2686 & 2687H. |
| A440 | 1965 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley -Bow River Project, Non-statutory Report: Preliminary Report, November 1965. TR70/2686 & 2687H. |
| A441 | 1965 | Pickands Mather & Co Int | Kimberley- Taylor River | <1% | Kimberley - Taylor River Project, Non-statutory Report; Brief Summary Exploration Report on the Taylor River C |
| A442 | 1965 | Pickands Mather & Co Int | Mount Elliza No 1 | <1% | Kimberley - Mount Elliza No 1 Project, Non-statutory Report: Mt Eliza No 1 Tin - Arsenic Anomaly Summary Repor |
| A443 | 1965 | Pickands Mather & Co Int | Kimberley - Carr Boyd Range | <1% | Kimberley - Carr Boyd Range Project, Non-statutory Report: Preliminary Report, Carr Boyd Range Lead Anomaly, N |
| A445 | 1965 | Pickands Mather & Co Int | Kimberley - Five Mile Gossan | <1% | Kimberley - Five Mile Gossan Project,Non-statutory Report: Summary Report, August 1965, TR70/2686 & 2687H. |
| A446 | 1965 | Pickands Mather & Co Int | Kimberley - Me No Savvy | <1% | Kimberley - Me No Savvy Project, Non-statutory Report:Brief Summary Report on Me No Savvy Copper Showing, Aug |
| A447 | 1965 | Pickands Mather & Co Int | Kimberley - Lamboo No 1 | <1% | Kimberley - Lamboo No 1 Project, Non-statutory Report: Summary Report on Lamboo no 1 Copper Showing, December |
| A448 | 1965 | Pickands Mather & Co Int | Kimberley - New Lamboo | <1% | Kimberley - New Lamboo Project, Non-statutory Report: New Lamboo Copper Nickel Anomaly, December 1965, TR70/26 |
| A449 | 1965 | Pickands Mather & Co Int | Kimberley - McClintock Range | <1% | Kimberley - McClintock Range Project, Non-statutory Report: McClintock Range Tin Anomaly Follow-up, August 196 |
| A450 | 1965 | Pickands Mather & Co Int | Kimberley -McClintock- Cummins Ranges | <1% | Kimberley -McClintock- Cummins Ranges Project, Non-statutory Report: McClintock & Cummins Ranges Tin Anomaly F |
| A454 | 1965 | Pickands Mather & Co Int | Kimberley - Margaret River Gossan | <1% | Kimberley - Margaret River Gossan Project, Non-statutory Report: Brief Summary Report, August 1965, TR70/2686 |
| A1488 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Plates: Stream Sediment Sample Locations, 1965, TR70/2686 & 2687H. |
| A6202 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry , Series 51 0000, to Octo |
| A6204 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets- Regional Stream Geochemistry, Series 54 0000, to 16/08/ |
| A6905 | 1964 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report:Miscellanous Geoleogical & Geochemistry Plans 1964, , TR70/2687H. |
| A438 | 1964 | Pickands Mather & Co Int | Kimberley - Halls Creek | <1% | Kimberley - Halls Creek Project, Annual Report for the period 1st july 1963 to 30th June 1964, TR70/2686 & 268 |
| A6201 | 1964 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets- Regional Stream Geochemistry , Series 44 0000, Re-runs |
| A39962 | 1962 | Peko Mines Nl | Halls Creek | <1% | Halls Creek Project, Non-statutory Report: Report on Geophysical Surveys in the Halls Creek District , WA, Nov |
| A85598 | 1753 | Heron Resources Ltd | Gordon Downs | <1% | Surrender report for the period 7 September 2006 to 18 December 2009, Gordon Downs Project, E80/3531 |
| A947 | 1753 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report:Plans: Mt Elma- Mt Krauss - Mt Cummins - Mt Amherst Areas: [250,000 Mo |
| A485 | 1753 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mount Angelo Project, Non-statutory Report: Mt Angelo I.P. 100 Foot Dipole, June 1967, TR70/2686 & |
| A503 | 1753 | Pickands Mather & Co Int | Kimberley- Angelo Valley | <1% | Kimberley- Angelo Valley Project, Non-statutory Report: Angelo Valley I.P. Profiles, September 1968, TR70/2686 |
| A499 | 1753 | Pickands Mather & Co Int | Kimberley - Mabel Downs- Violet Valley | <1% | Kimberley - Mabel Downs- Violet Valley Project, Annual Report for the year ending 31/12/1968, TR70/2686 & 2687 |
| A514 | 1753 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report 1968, Folder No 1, Pocket A & B, February 1969 |
| A518 | 1753 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report 1969, including Sophie Downs Copper Showing - |
| A710 | 1753 | Pickands Mather & Co Int | Kimberley - Halls Creek | <1% | Kimberley - Halls Creek Project, Non-statutory Report:Geological Report , Halls Creek Area, Moola Bulla Copper |
| A945 | 1753 | Pickands Mather & Co Int | Kimberley - Lansdowne | <1% | Kimberley - Lansdowne Project, Non-statutory Report: Plans for the Lansdowne Area. (Undated), Tr70/2686 & 2687 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 80/6210 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 80/6210 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 80/6210? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.