NextMapsWA TenementsE 77/2943

E 77/2943

LiveExploration LicenceShire of YilgarnYilgarn M.F. District
Area
2,790ha
Expires
Sept 2028
in 2 years
WAMEX reports
104
WA median is 53
Report drilling
42
of 104 reports
Yilgarn Explore on the live map

Register summary

Holder
Midas Minerals (Newington) Pty Ltd
Local government
Shire of Yilgarn
Application received
3 May 2022
Commenced
21 Sept 2023
Expiry
20 Sept 2028
Term
5 Years

Exploration history on this ground

104 historical WAMEX exploration reports intersect E 77/2943: 52 report geochemistry or sampling, 49 include a digital data package.
When this ground was worked · 103 of 104 reports dated
211990s
272000s
382010s
172020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A150319 2025 Golden Horse Minerals Limited Ennuin Dome <1% Ann Report Final E77/2939 Ennuin Dome for the period ending 06/09/2025.
A145339 2024 Golden Horse Minerals Limited Ennuin Dome <1% Annual Report E77/2939 Ennuin Dome Project for the period ending 06/09/2024
A145388 2024 Midas Minerals (Newington) Pty Ltd Newington 29% Partial Surrender Report for Newington E77/2943 For the Period 21 Sept 2023 to 13 Sept 2024
A133171 2022 Bullseye Mining Limited Newfield <1% Final Surrender Report Newfield Project P77/4487 for the period ending 08/11/2022.
A133173 2022 Bullseye Mining Limited Newfield <1% Final Surrender report Newfield Project P77/4488 for the period ending 08/11/2022.
99 more reports
A133174 2022 Bullseye Mining Limited Newfield <1% Final surrender report Newfield Project P77/4489 for the period ending 08/11/2022.
A129609 2022 Discovex Resources Limited Newfield 12% Partial Surrender Report for E77/2309 Newfield Project for the period 19/01/2022.
A131720 2022 Bullseye Mining Limited Newfield <1% Newfield P77/4487 Annual Report for the period ending 13/06/2022
A131723 2022 Bullseye Mining Limited Newfield <1% P77/4488 Newfield Project Annual Report for the period ending 13/06/2022
A131726 2022 Bullseye Mining Limited Newfield <1% P77/4489 Newfield Project Annual Report for the period ending 13/06/2022
A127860 2021 Bullseye Mining Limited Newfield <1% Newfield P77/4488 Annual Report for the period ending 13/06/2021
A127861 2021 Bullseye Mining Limited Newfield <1% P77/4489 Newfield Project Annual Report for the period 14 June 2020 to 13 June 2021
A127859 2021 Bullseye Mining Limited Newfield <1% P77/4487 Newfield Project Annual Report for the period 14 June 2020 to 13 June 2021
A124667 2020 Bullseye Mining Limited Newfield <1% P77/4488 Newfield project for the period 14 June 2019 to 13 June 2020
A124668 2020 Bullseye Mining Limited Newfield <1% P77/4489 Newfield Project for the period 14 June 2019 to 13 June 2020
A123649 2020 Gateway Projects Wa Pty Ltd Ennuin 12% Ennuin E77/2309 Annual Report for the period ending 19/1/2020
A124666 2020 Bullseye Mining Limited Newfield <1% Newfield P77/4487 Annual Report for the period ending 13/06/2020
A120833 2019 Bullseye Mining Limited Newfield <1% Newfield P77/4488 Annual Report for the period 14/06/2018 to 13/06/2019
A120834 2019 Bullseye Mining Limited Newfield <1% Newfield P77/4489 Annual Report for the period 14 June 2018 to 13 June 2019
A119907 2019 Omni Projects Pty Ltd Carterton 12% Carterton Project E77/02309 Southern Cross Annual Report For the Period 20 January 2018 to 20 January 2019
A120832 2019 Bullseye Mining Limited Newfield <1% Newfield Project P77/4487 Annual Report for the period 14/06/2018 to 13/06/2019
A115573 2018 Omni Projects Pty Ltd Southern Cross 12% Southern Cross Annual Report, E77/2309 for the period 20/01/2017-10/01/2018
A116435 2018 Bullseye Mining Limited Newfield <1% C131/2013 Newfield Project Final Surrender for the period 13/08/2016 - 23/11/2017, P77/04205, P77/04206, P77/0
A112674 2017 Omni Projects Pty Ltd Carterton 12% Carterton Project E77/2309 Annual Report for the period 20 January 2016 to 19 January 2017
A109415 2016 Polaris Metals Pty Ltd Exploration Licence 77/1374 5.1% Outright Surrender
A110382 2016 Bullseye Mining Limited Newfield <1% Newfield Project Combined Annual Report C131/2013 for the period 1 September 2015 to 31 August 2016, P77/04205
A105161 2015 Polaris Metals Pty Ltd Bullfinch North 4.9% Bullfinch North JV Project C20/2005 Annual Report for the period 01/01/2014 - 31/12/2014, E77/1374-I, E77/1892
A106423 2015 Black Oak Minerals Limited Bullfinch North 12% C256/2011 Bullfinch North Project Final Surrender Report for Exploration Licences E77/2093, E77/2094 and E77/2
A107387 2015 Bullseye Mining Limited Newfield <1% Annual Combined Report Newfield Project Combined Reporting Group Number: C131/2013 P77/4205, P77/4206 & P77/42
A104304 2014 Newfield Resources Ltd Kawana <1% Kawana Project, Final Surrender Report for the period 09/02/2010 to 24/10/2014, E77/1674.
A105427 2014 Bullseye Mining Limited Newfield <1% Annual Combined Report Newfield Combined Reporting Group Number: C131/2013, P77/4205, P77/4206 & P77/4207 Repo
A101958 2014 Polaris Metals Pty Ltd; Southern Cross Goldfields Ltd Bullfinch North 4.5% Bullfinch North Joint Venture 1 Combined Annual Report for the Period 1 January 2013 – 31 December 2013 for E7
A102520 2014 Newfield Resources Ltd Kawana <1% Annual Mineral Exploration Report for the Kawana Project E77/1394, E77/ 1674, and E77/1825 (C175/2008)
A102745 2014 Southern Cross Goldfields Ltd Bullfinch North 4.9% Combined annual report for the Bullfinch North Project, C256/2011 (E77/1630, E77/2093, E77/2094, E77/2095, E77
A97254 2013 Polaris Metals Pty Ltd Bullfinch North (JV 1) 4.3% Bullfinch North (JV 1) Project, Annual Report for the period 1st January2012 to 31st December 2012, E77/1371,
A97403 2013 Western Areas Limited Bullfinch 4.6% Bullfinch Project Annual Technical Report Nickel 2012 C20/2005 2012A [for the period 1st January 2012 to 31st
A98505 2013 Western Areas Limited Kawana <1% Kawana Project Annual Technical Report 2013 (C175/2008) E77/1355, 1365, 1394, 1438, 1674,1686 & 3618 for the p
A105487 2013 Western Areas Limited Trough Well 5.1% Trough Well E77/1374 Geological Summary for the period 01/01/2012 - 31/12/2012
A97008 2013 Polaris Metals Pty Ltd Bullfinch North 5.1% Bullfinch North (Joint Venture 1) Project, Partial Surrender Report for the period 27/11/2007 to 23/11/2012, E
A97314 2013 Bullseye Mining Limited Newfield <1% Final Surrender Report Newfield Combined Reporting Group Number: C184/2009 Tenements: P77/3328, P77/3329 & P77
A98400 2013 Western Areas Limited Kawana <1% Kawana Project, Final Surrender Report for the period 1st April 2012 to 26th March 2013, E77/1093. [C175/2008
A98793 2013 Tew H Hamersley Lake 19% Hamersley Lake Project Final Report E77/2046 for the period 01/11/2012 – 31/10/2013
A93350 2012 Polaris Metals Pty Ltd Bullfinch North 4.2% Bullfinch North Project, Annual Report for the period 01/01/2011 to 31/12/2011, E77/1283, 1371, 1374, 1391; M7
A93802 2012 Western Areas Nl Kawana <1% Kawana Project C175/2008 Annual Technical Report for the period 1st April 2011 to 31st March 2012, E77/1093, 1
A93488 2012 Polaris Metals Pty Ltd Lake Deborah <1% Lake Deborah Project E77/1767-I and E77/1768-I Combined Annual Report for the period 1 January 2011 – 31 Decem
A94301 2012 Bullseye Mining Limited Newfield <1% Annual Combined Report Newfield Combined Reporting Group Number: C184/2009 Tenements: P77/3328, P77/3329 & P77
A96310 2012 Polaris Metals Pty Ltd Lake Deborah <1% Lake Deborah Project E77/1767-I Surrender Report for the Period 5 October 2010 to 17 December 2012
A89720 2011 Polaris Metals Pty Ltd Bullfinch 4.2% COMBINED YEARLY REPORT FOR THE PERIOD 1 JANUARY 2010 TO 31 DECEMBER 2010 FOR E77/1283-I, E77/1371-I, E77/1374-
A90514 2011 Southern Cross Goldfields Ltd Newfield <1% Newfield Project, Annual Report for the period 01/03/2010 to 28/02/2011, P77/3328-3330. (C184/2009)
A92140 2011 Polaris Metals Pty Ltd; Southern Cross Goldfields Ltd BNJV1 <1% BNJV1 Project Surrender Report for the Period 15 November 2006 – 31 October 2011 for E77/1283-I
A90300 2011 Western Areas Nl Kawana <1% Kawana Project, Annual Report for the period 1st April 2010 to 31st March 2011, E77/1093, 1355, 1365, 1394, 14
A86547 2010 Polaris Metals Nl Bullfinch North 4.2% Bullfinch North Joint Venture 1 Project Combined Annual Report for the Period 1 January 2009 – 31 December 200
A87141 2010 Southern Cross Goldfields Ltd Newfield <1% Newfield Project C184/2009 Combined Annual Report for the Period 1/3/2009 to 28/2/2010, P77/3328, P77/3329, P7
A87164 2010 Western Areas Nl Kawana <1% Combined Annual Report for Kawana Project (C175/2008), For the Period 1st April 2009 to 31st March 2010, E77/
A88198 2010 Golden Iron Resources Ltd Newfield <1% Annual Report Newfield Project M77/422, 846, E77/1100, 1278 Period 4/08/09-3/08/10 GSWA Combined Reporting Gro
A82687 2009 Cliffs Asia Pacific Iron Ore Pty Ltd Kawana <1% Annual report for the period 01 April 2008 to 31 March 2009, Kawana Project, E77/1093, E77/1355, E77/1365, E77
A82045 2009 Newfield Central Pty Ltd Currajong Tank <1% Partial Surrender Report for the period 01 February 2005 to 31 January 2009, Currajong Tank Project, E77/1100
A82186 2009 Polaris Metals Nl BULLFINCH NORTH 4.4% BULLFINCH NORTH JOINT VENTURE PROJECT, COMBINED ANNUAL REPORT FOR THE PERIOD 1 JANUARY 2008 – 31 DECEMBER 2008
A84675 2009 Golden Iron Resources Ltd Newfield <1% Annual Report Newfield Project M77/422, 846, E77/1100, 1278 Period 4/08/08-3/08/09, GSWA Combined Reporting Gr
A78977 2008 Newfield Central Pty Ltd Newfield <1% E77/1100, Partial Surrender Report 01/02/2005 - 19/5/2008
A79618 2008 Newfield Central Pty Ltd Newfield <1% Annual Report Newfield Project M77/422, 846, E77/1100, 1278 Period 4/08/07-3/08/08 GSWA Combined Reporting Gro
A77324 2008 Polaris Metals Nl Bullfinch North <1% BULLFINCH NORTH PROJECT ANNUAL REPORT FOR THE PERIOD 15 NOVEMBER 2006 - 14 NOVEMBER 2007 FOR E77/1283
A78553 2008 Southern Cross Goldfields Ltd Kawana <1% 2008 ANNUAL REPORT KAWANA PROJECT EXPLORATION LICENCE 77/1093 For the Period 27 March 2007 - 26 March 2008
A80974 2008 Polaris Metals Nl BULLFINCH NORTH <1% BULLFINCH NORTH PROJECT E77/1283 ANNUAL REPORT FOR THE PERIOD 15 NOVEMBER 2007 – 14 NOVEMBER 2008
A74506 2007 Polaris Metals Nl Mayfield <1% Mayfield Project, Combined Annual Report (C59/2001) for the Period 1 January 2006 to 31 December 2006 for E77/
A75177 2007 Polaris Metals Nl Kawana <1% Kawana Farm-in Project, Annual Report for the Period 27 March 2006 - 26 March 2007 for E77/1093. (Report No: 2
A76848 2007 Newfield Central Pty Ltd Bullfinch - Newfield <1% Bullfinch - Newfield Project GSWA Combined Reporting Group C118/2002 Annual Report Reporting period: 4 Aug 200
A73396 2006 Newfield Central Pty Ltd Bullfinch - Newfield <1% Bullfinch - Newfield Project E77/1100,M77/422,846, Annual Report, Period 4 August 2005 to 3 August 2006, Combi
A71876 2006 Polaris Metals Nl Bullfinch North <1% Mayfield Project, Combined Annual Report for the period 1 January 2005 to 31 December 2005 for E77/922,E77/924
A72621 2006 Fleet Street Holdings Pty Ltd Kawana <1% Kawana Project E77/1093, Annual Report Reporting Period: 27 March 2005 to 26 March 2006
A69878 2005 Western Areas Nl Bullfinch North 11% Partial surrender report for 2004 Bullfinch North Project, C159/2001, E77/932, E77/933, Walyahmoning, Yilgarn
A70186 2005 Polaris Metals Nl Mayfield 5.8% Annual Report for the period 01/01/04 - 31/12/04, Mayfield Project, C159/2001, E77/922, E77/924, E77/932, E77/
A70494 2005 Fleet Street Holdings Pty Ltd Kawana <1% Kawana Project - E77/1093 Annual Report Reporting period: 27 March 2004 to 26 March 2005
A71208 2005 Newfield Central Pty Ltd Bullfinch - Newfield <1% Bullfinch - Newfield Project, GSWA Combined Reporting Group C118/2002, Annual Report, Reporting Period: 4 Augu
A68633 2004 Fleet Street Holdings Pty Ltd Kawana <1% Kawana Project E77/1093 Annual Report Reporting Period: 27 M arch 2003 to 26 March 2004
A68757 2004 Portman Iron Ore Ltd Mayfield <1% Combined annual Report, Mayfield Project, Exploration licences E77/922 and E77/924 for the period 01 January 2
A69331 2004 Western Areas Nl Bullfinch North 2.3% Annual report 2001 and 2002, Bullfinch North Project E77/922, E77/932, and E77/933, C159/2001 (22/5/01 - 31/12
A69507 2004 Western Areas Nl Bullfinch North 7.5% Bullfinch North Project, Partial Surrender Report for the period ending 18th October 2003, E77/932 & 933. [C1
A68839 2004 Western Areas Nl Bullfinch North 7.5% Annual report for the period 01/01/2003-31/12/2003 Bullfinch North Project (C159/2001), E77/922-I, E77/932, E7
A69037 2004 Western Areas Nl Bullfinch North <1% Annual report for the period 22nd May 2001 to 31st December 2001, Bullfinch North Project E77/922
A63691 2001 Western Areas Nl Bullfinch North 7.5% Exploration licences E77/922, E77/932 & E77/933 Bullfinch North Project Eastern Golfields Province, WA. Combi
A60014 2000 Mr Tew Ha Kawana 11% Annual report E77/749 24/01/1999 to 23/01/2000
A57308 1999 Sons Of Gwalia Ltd Ennuin 2.5% Ennuin Project EL 77/512 and 537 Surrender Report for the Period 29 November 1993-22 October 1998
A57569 1999 Mr Tew Ha Kawana 11% Annual Report E77/749 24/01/1998 to 23/01/1999
A54011 1998 Mr Tew Ha Kawana 11% Annual Report E77/749 24/01/1997 to 23/01/1998
A54933 1998 Sons Of Gwalia Ltd Ennuin 4.1% Ennuin Project, E70/77/488, Final Surrender Report for the period 6th October 1992-17th December 1997.
A54934 1998 Sons Of Gwalia Ltd Ennuin 1.6% Ennuin Project, E77/512-513, Partial Surrender Report for the Period 11 February 1994 to 10 February 1998
A55084 1998 Sons Of Gwalia Ltd Ennuin 1.6% Ennuin Project, Annual Report Period 01/01/97 - 31/12/97 EL77/485, 488, 512, 513, 537, 733
A55709 1998 Sons Of Gwalia Ltd Ennuin <1% Ennuin Project E77/485,537 Partial Surrender Report for the period 22nd December 1992 to 9th April 1998.
A52830 1997 Goanna Resources Inc Newfield <1% Newfield Prospect (P77/3207 - P77/3210). Annual Report 07/10/1996 to 08/10/1997
A50364 1997 Sons Of Gwalia Ltd Ennuin 1.6% Ennuin Project,Annual report for the period 1 January 1996 to 31 December 1996 EL77/485 EL77/488 EL77/512 EL77
A51780 1997 Sons Of Gwalia Ltd Ennuin 4.1% Ennuin Project, Partial Surrender Report for the period 06/10/1992 to 05/10/1996, E77/488.
A47236 1996 Burmine Ltd Newfield <1% Newfield Project, Annual Report for Period 29/11/1994 to 28/11/1995, E77/537.
A48201 1996 Burmine Ltd Ennuin 3% Ennuin Project, Annual Report for the period 11/02/1995 to 10/02/1996, E77/512.
A48526 1996 Burmine Ltd Ennuin 1.7% Ennuin Project E77/485 (Highclere Hills) and E77/488 (Kawana) annual report for period 01/01/94 to 31/12/95
A49326 1996 Stockdale Prospecting Ltd Koolyanobbing <1% Annual and Final Report E77/640 - E77/646 and E77/656-658 Koolyanobbing Project, Western Australia
A44722 1995 Burmine Ltd Bullfinch - North 1.7% Bullfinch - North Project, E77/485 (Highclere Hills) & E77/488 (Kawana) Annual Report for Period 01/01/94 to
A45543 1995 Burmine Ltd Gnabberdocking Rock 3% Gnabberdocking Rock Project. E77/512. Partial Surrender Report for period 11/2/94 to 10/4/95.
A45308 1995 Burmine Ltd Newfield <1% Newfield Project, Annual Report for the period 29/11/1993 to 28/11/1994, E77/537.
A45489 1995 Burmine Ltd Gnabberdocking Rock 3% Gnabberdocking Rock Project, Annual Report Exploration Licence E77/ 512 for period 11/02/1994 to 10/02/1995.
A34955 1991 Broken Hill Metals Nl Newfield <1% Newfield Project, 1990-1991 Annual Report, September 1991, P77/2191-2194, P77/2191-2194.
A31804 1990 Broken Hill Metals Nl Newfield <1% Newfield Project, 1989-1990 Annual Report , September 1990, P77/2191-2194.
A32666 1990 Cra Exploration Pty Ltd Newfield - Mayfield <1% Newfield - Mayfield Project, Non-statutory Report: Progress Report for the period August 1990 to November 1990
A895 1753 Western Mining Corporation Ltd Yilgarn <1% Yilgarn
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
2 years · 20 Sept 2028
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 77/2943 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 77/2943? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.