NextMaps›WA Tenements›E 59/3134

E 59/3134

PendingExploration LicenceYalgoo M.F. District
Area
3,410ha
Applied
Sept 2026
27 days ago
WAMEX reports
76
WA median is 53
Report drilling
41
of 76 reports
Yalgoo M.F. Explore on the live map

Register summary

Holder
Recharge Metals Limited
Application received
1 Sept 2026

Exploration history on this ground

76 historical WAMEX exploration reports intersect E 59/3134: 40 report geochemistry or sampling, 39 include a digital data package.
When this ground was worked
101970s
71980s
161990s
102000s
272010s
62020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A148355 2025 Recharge Metals Limited South Brandy Hill 75% Final Surrender Report South Brandy Hill E59/2636 for the period 5 January 2022 to 17 February 2025
A140743 2024 Silver Lake Resources Limited Blueberry Grove (Brandy Hill) 8.6% DAG2023/00891240 – Defining the stratigraphy of Blueberry Grove (Brandy Hill) - R27
A128463 2021 Silver Lake Resources Pty Ltd Deflector Group 1 8.6% Partial Surrender Report for E59/1241 Deflector Project Group 1 for the period ending 04/08/2021
A128488 2021 Silverlake Resources Ltd Deflector Group 1 <1% Partial Surrender Report for E59/1240 Deflector Project Group 1 for the period 10 July 2007 to 5 July 2021
A122601 2020 Silver Lake Resources Limited Deflector Group 1 12% Partial Surrender Report for E59/1274 Deflector Group 1 Project for the period 20 November 2007 to 19 November
71 more reports
A122958 2020 Silver Lake Resources Limited Deflector Group 1 5.1% Annual Technical Report for the Period 1st January 2019 to 31st December 2019 - Deflector Project Group 1 Comb
A119196 2019 Doray Minerals Limited Deflector Group 1 5.1% Annual Technical Report for the Period 1st January 2018 to 31st December 2018 - Deflector Project Group 1 Comb
A120692 2019 Silver Lake Resources Limited Deflector 7.9% DAG2018/01278658 Deflector North (R#17)
A116004 2018 Doray Minerals Limited Deflector 5.1% Deflector Project Area C169/2017 Annual Report for the period 1 January 2017 to 31 December 2017, E59/01240, E
A114482 2017 Doray Minerals Limited Gullewa 8.6% DAG2016/00827515 (Round 13) - EIS Gearless Well Drill Program - Deflector Project
A111929 2017 Deflector Mining Limited Gullewa 3.9% Gullewa Project Combined Report C15/1997 Annual Technical Report For the Period 1 January 2016 to 31 December
A112502 2017 Alto Metals Limited Peranbye <1% Peranbye Project Final Surrender Report E59/1855 For the Period 14 October 2013 to 16 February 2017
A113929 2017 Deflector Mining Limited Gullewa 7.1% Annual Technical Report for E59/1275 Gullewa Project For the Period 7 April 2016 to 6 April 2017
A108133 2016 Doray Minerals Ltd Gullewa 3.9% Gullewa Project Combined Annual Report - C15/1997, 1st January 2015 to 31st December 2015, E59/1240, E59/1241,
A109325 2016 Fortescue Metals Group Ltd Pipeline Tank 7.1% E59/1275 (Pipeline Tank) Annual Report for the period 07/04/2015 to 06/04/2016
A110308 2016 Alto Metals Limited Peranbye <1% PERANBYE PROJECT E59/1855 ANNUAL REPORT 14 OCTOBER 2015 – 13 OCTOBER 2016
A104719 2015 Mutiny Gold Ltd Gullewa 3.9% Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2014, E59/1134.....P59/1737
A107357 2015 Enterprise Uranium Ltd Peranbye <1% Peranbye Project E59/1855 Annual Report 2015
A105941 2015 Fortescue Metals Group Ltd Pipeline Tank 7.1% E59/1275 Pipeline Tank Annual Report for the period 7 April 2014 to 6 April 2015
A107356 2015 Enterprise Uranium Ltd Peranbye <1% Peranbye Project E59/1855 Partial Surrender Report 2015
A102177 2014 Fortescue Metals Group Ltd Pipeline Tank 7.1% Annual Mineral Exploration Report: E59/1275 Pipeline Tank for the period 07 April 2013 to 06 April 2014
A104344 2014 Enterprise Uranium Ltd Peranbye <1% Peranbye Project E59/1855 Annual Report for the period 14 October 2013 to 13 October 2014
A99925 2013 Brandy Hill Iron Pty Ltd Brandy Hill <1% Partial Surrender Report for Tenement E59/1240 (Gullewa) for the period ended 9 July 2013
A96545 2013 Mutiny Gold Ltd Gullewa 3.6% Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2012, E59/1134.......P59/1737
A98262 2013 Fortescue Metals Group Ltd Pipeline Tank- Blue Cap 7.1% Pipeline Tank- Blue Cap Project, Annual Report for the period 7th April 2012 to 6th April 2013, E59/1275.
A99926 2013 Gullewa Gold Project Pty Ltd Gullewa 8.6% Partial Surrender Report for Tenement E59/1241 (Gullewa) for the period ended 4 August 2013
A101029 2013 Mutiny Gold Ltd Gullewa 3.6% Gullewa Project, Annual Report for the period 01/01/2013 to 31/12/2013, E59/1134, 1240-1242 & 1274; M59/49, 68
A92777 2012 Mutiny Gold Ltd Gullewa 3.6% Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2011
A94275 2012 Fortescue Metals Group Ltd Blue Cap 7.1% Annual report for the period 07 April 2011 to 06 April 2012, E59/1275, Blue Cap
A96243 2012 Brandy Hill Iron Pty Ltd Brandy Hill 12% Brandy Hill Project, Partial Surrender Report for the period ending 11/12/2012, E59/1274
A89392 2011 Mutiny Gold Ltd Gullewa 3.6% Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2010
A90443 2011 Fortescue Metals Group Ltd Blue Cap 7.1% Blue Cap Project, Annual Report for the period 7th April 2009 to 6th April 2010, E59/1275.
A86935 2010 Fortescue Metals Group Ltd Blue Cap 7.1% Annual report for the period 07 April 2009 to 06 April 2010, E59/1275
A80767 2009 Independence Gold Nl BRANDY HILL SOUTH <1% Murchison Region BRANDY HILL SOUTH PROJECT E59/1156 Yalgoo Gold Field, WA Surrender Report 27 October 2007 to
A85441 2009 Atw Gold Corp Pty Ltd Gullewa 3.6% Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2009, M59/132, M59/133, M59/224,
A77564 2008 Independence Group Nl Brandy Hill South <1% Murchison Region BRANDY HILL SOUTH PROJECT E59/1156 Yalgoo Gold Field, WA. ANNUAL TECHNICAL REPORT Reporting P
A80757 2008 Atw Gold Corp Pty Ltd GULLEWA 3.6% Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2008
A77005 2007 Batavia Mining Limited Gullewa 3.6% Gullewa Project C15/1997. Annual Technical Report for the year ending 31 December 2007.
A74115 2007 Batavia Mining Ltd Gullewa 1.4% Gullewa Project (C15/1997), E59/877, E59/960....,M59/49, M59/68....,M59/1640...,P59/1671 to P59/1674, Annual R
A71845 2006 Batavia Mining Ltd Brandy Hill Project 9% Brandy Hill Project, M59/133, M59/224, E59/982, Annual Technical Report for the period 1 January 2005 to 31 De
A71221 2005 Batavia Mining Ltd Brandy Hill 9% Brandy Hill Project M59/133,224 & E59/982, Annual technical Report for the period 1 January 2004 to 31 Decembe
A61606 2001 King Solomon Mines Pty Ltd Gullewa 1.5% Gullewa Project M59/49,68,132,294,335,336,356,391,392,442, 507, E59/295,575,877. Annual Report for the Period
A60809 2000 Gullewa Ltd Gullewa 2 <1% Gullewa 2 Project, Non-statutory Report (CD format), July 2000,E59/360, 419, 438, 457, 459, 483 etc ( Multiple
A73371 1999 Gullewa Gold Nl White Cliffs 1.9% White Cliffs Kaolin Deposit E59/575,877,M59/531, Preliminary Geological Investigation, (Period 02/99, Yalgoo)
A59830 1999 Gullewa Gold Nl Gullewa 2.3% Annual Report for the Gullewa Project, E59/360,575, P59/1300 -1302, 1060, M59/49,68,356,371,442,507 for the Pe
A57796 1999 Julia Mines Nl Gullewa 3.3% Exploration Licence E 59/575, Gullewa JointVenture Annual Report for Year ending 19th January1999.
A58397 1999 Gullewa Gold Nl Widgullia 3.3% Partial Surrender Report E59/575 for the period 20/01/1995 to 20/05/1999 (Widgullia Project).
A57348 1998 Acacia Resources Ltd Gullewa 1.9% Annual Report for the Gullewa Project for the period 01/01/1998 to 31/12/1998 for E59/360,E59/483,E59/575, GML
A54306 1998 Gullewa Gold Nl Widgullia 3.3% Partial Surrender Report for Exploration Licence E59/575 (Widgullia Project) for the period 20/01/1995 to 19/0
A55101 1998 Gullewa Gold Nl Gullewa 1.2% Annual Report for the Gullewa Project for the period 01/01/1997 to 31/12/1997 E59/355,360,568,621,295,483,585,
A50269 1997 Gullewa Gold Nl Gullewa <1% Gullewa Project, Annual Report for the period 01/01/1996 to 31/12/1996 Report No. 1996/32.
A48122 1996 Gullewa Gold Nl Gullewa 1 <1% Annual report 1994 to 1995 Gullewa 1 Project period 01/11/94 to 31/10/95
A43346 1995 National Resources Exp Ltd Gullewa 1 <1% Annual Report for Gullewa 1 Project to 31 October 1994 E59/189,294,295,331,457,M59/132,258,294,296,333,334,348
A37800 1993 Sons Of Gwalia Nl Gullewa 1 <1% Gullewa 1 (JV) Project, Annual Report for the period 01/11/1991 to 31/10/1992, M59/132 M59/145 M59/146 M59/243
A40350 1993 Sons Of Gwalia Ltd Gullewa <1% Annual Report for the Period 01/11/92 - 31/10/93 Gullewa Project
A33460 1991 Sons Of Gwalia Nl Gullewa <1% Gullewa Project, Annual Report for the period 01/03/1990 to 01/03/1991, E59/294 & 331.
A34885 1991 Sons Of Gwalia Nl Gullewa 1 <1% Gullewa 1 Project, Annual Report for the period to 2nd September 1991, M59/132,145,146,197; E59/294,295,189,3
A30589 1990 Auralia Resources Nl Brandy Hill 8.1% Brandy Hill Project, Partial Surrender Report for the period October 1988 to October 1989, E59/119.
A31096 1990 Julia Mines Nl Brandy Hill 3.3% Non-statutory Report : Progress Report, Brandy Hill Project ,E59/119 & 59/236; M59/133, for the period 01/90-
A29560 1989 Auralia Resources Nl Brandy Hill 8.1% Brandy Hill Project, E59/119 7 M59/133, Annual Report for the period 07/88-11/89
A25880 1988 Auralia Resources Nl Brandy Hill 8.1% Brandy Hill Project , Non-statutory Report: Exploration Report for the period 12/1987 - 06/1988, E59/119.
A19457 1987 Auralia Resources Nl M4417/6: Brandy Hill Au/PGE/base metal e 8.1% Project 494.6 on the Brandy Hill Prospect EL59/119 Pipeline Bore Area, Yalgoo Mineral Field 1987.
A22657 1987 Auralia Resources Nl Brandy Hill 8.1% Brandy Hill Project, E59/119,Annual Report for the year ended 21 November 1987 .
A19126 1986 Goldfields Exploration Pty Ltd Gullewa 1% Gullewa Project, E59/35, Progress [non-statutory] report, June 1986
A15362 1985 Goldfields Exploration Pty Ltd Gullewa 1% Gullewa Project, Non-statutory Report: Progress Report, February 1985, E59/35.
A10676 1982 Esso Exploration Aust Inc Biddy Biddy Well 2.6% Biddy Biddy Well Project, Non-statutory Report: Annual Report for the period 01/01/1981 to 31/12/1981, MC59/74
A8355 1979 E & B Explorations Ltd Mellenbye 34% Mellenbye Report, Annual Report ( plus Drill Logs & Assay Values) for the year ending 31/12/1978, TR70/6835H.
A7971 1978 Samin Ltd Brandy Hill <1% Brandy Hill Project, Annual Report for the period 29th June 1977 to 27th June 1978, MC59/5321-5322, 5324-5329,
A17203 1977 North Flinders Mines Ltd Yilgarn -Yalgoo <1% Yilgarn -Yalgoo Project, Non-statutory Report: Reconnaissance Report on Copper-Zinc Massive Sulphide Target A
A7271 1977 Samin Ltd Brandy Hill <1% Brandy Hill Project, Annual Report for the period 30th June 1976 to 28th June 1997, MC59/5321-5329, 5351-5367,
A6514 1976 Samin Ltd Brandy Hill <1% Brandy Hill Project, Annual Report for the period 18th June 1975 to 29th June 1976, MC59/5321-5329............
A16368 1976 North Flinders Mines Ltd Yilgarn <1% Yilgarn Project, Non-statutory Report: Summary of Activities for Quarterly period ending 30th June 1976 [Mt G
A16765 1976 North Flinders Mines Ltd Mount Gibson-Yalgoo <1% Mount Gibson-Yalgoo Project, Non-statutory Report; Notes on Photogeological Base Maps of Central-Western porti
A5964 1975 Samin Ltd Brandy Hill <1% Brandy Hill Project, Annual Report for the period 19th June 1974 to 17th June 1975, MC59/5732,5798, 5344-5347,
A6027 1975 Samin Ltd Brandy Hill <1% Brandy Hill Project, Annual Report: Plans to accompany Annual Report, Brandy Hill to June 1975. (See A5964 for
A6029 1974 Samin Ltd Brandy Hill <1% Brandy Hill Project, Annual Report for the period ending 18th June 1974, MC59/5732, 5798, 5344-5347, 5340-5343
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 59/3134 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 59/3134 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 59/3134? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.