NextMaps›WA Tenements›E 59/1904

E 59/1904

LiveExploration LicenceShire of YalgooYalgoo M.F. District
Area
12,710ha
Expires
Feb 2028
in 17 months
WAMEX reports
133
WA median is 53
Report drilling
66
of 133 reports
Yalgoo Explore on the live map

Register summary

Holder
Spartan Resources Limited
Local government
Shire of Yalgoo, Shire of Mount Magnet
Application received
2 Aug 2012
Commenced
21 Feb 2014
Expiry
20 Feb 2028
Term
5 Years (Extended)

Exploration history on this ground

133 historical WAMEX exploration reports intersect E 59/1904: 61 report geochemistry or sampling, 44 include a digital data package.
When this ground was worked · 130 of 133 reports dated
11960s
151970s
241980s
441990s
182000s
212010s
72020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A148178 2025 Spartan Resources Limited Joe Bore <1% E59/2289 Joe Bore Project Partial Surrender Report for the period ending 21/02/2025. C30/2015
A143974 2024 Kallenia Mines Pty Ltd Dalgaranga <1% Partial Surrender Report for E 59/2292 Dalgaranga Project for the period 14 June 2018 to 13 June 2024
A126066 2021 Dalgaranga Exploration Pty Ltd Dalgaranga <1% Dalgaranga Project Surrender Report for E59/2053 for the period ending 31 October 2014 to 30 October 2020
A127744 2021 Kallenia Mines Pty Ltd Dalgaranga <1% Final EIS report for co-funded drilling at the Dalgaranga Project, E59/2292, for the Period 2020-21 (R21)
A123683 2020 Gascoyne Resources Limited Dalgaranga 30% Dalgaranga Project Surrender Report for E59/1904 and E59/1906, C30/2015, 21 February 2014 to 20 February 2020
128 more reports
A123717 2020 Gascoyne Resources Ltd Dalgaranga 16% Dalgraranga Project C30/2015 Annual Report for the period ending 20/2/2020
A124485 2020 Kallenia Mines Pty Ltd Dalgaranga <1% Annual Technical Report for the Dalgaranga Project, E59/2292, for the Period 14 June 2019 to 13 June 2020
A120185 2019 Gascoyne Resources Ltd Dalgaranga 19% C30/2015 Dalgaranga Project Annual Technical Report for the period 21 May 2018 to 20 May 2019, E21/00195, E59/
A120567 2019 Kallenia Mines Pty Ltd Dalgaranga <1% Annual Technical Report for the Dalgaranga Project, E59/2292, for the Period 14 June 2018 to 13 June 2019
A116801 2018 Gascoyne Resources Ltd Dalgaranga 19% Dalgaranga Project C30/2015 Annual Report for the period 21/02/2017 - 22/02/2018, M59/00749, E21/00195, E59/01
A111937 2017 Dormer M Dalgaranga <1% DALGARANGA PROJECT E59/2053 Annual Technical Report For the 12 months ending 30 October 2016
A113874 2017 Gascoyne Resources Ltd Dalgaranga 23% Dalgaranga Project C30/2015 Annual Report for the period 23 May 2016 to 22 May 2017, M59/00749, E59/01904, E59
A114395 2017 Gascoyne Resources Limited Dalgaranga <1% Drillcore Submission by Gascoyne Resources Limited. M59/00749 [CRG #: 30/2015]
A115534 2017 Dormer M Dalgaranga <1% Dalgaranga E59/2053 Annual Technical Report 2017 for the period 31/10/2016-30/10/2017
A108146 2016 Martin Dormer Dalgaranga <1% Dalgaranga Project E59/2053 Annual Technical Report For the Period 31 October 2014 to 30 October 2015
A109165 2016 Gascoyne Resources Limited Dalgaranga 28% C30/2015 DALGARANGA PROJECT Annual Report for the period 23 May 2015 to 22 May 2016, M 59/00749, E 59/01904, E
A110190 2016 Horrocks Enterprises Pty Ltd Joe Bore <1% Joe Bore E59/2089 Annual Technical Report for the period 1 September 2015 to 31 August 2016
A104986 2015 Gascoyne Resources Ltd Dalgaranga <1% Annual Report 21/02/2014 to 20/02/2015 Dalgaranga Project, E59/1906
A104985 2015 Gascoyne Resources Ltd Dalgaranga 60% Annual Report 21/02/2014 to 20/02/2015 Dalgaranga Project, E59/1904
A105250 2015 Gascoyne Resources Ltd Dalgaranga 10% Annual Report For the period 17th March 2014 to 16th March 2015 Dalgaranga Project, E59/1709
A102046 2014 Gascoyne Resources Ltd Dalgaranga 10% Annual Report For the period 17th March 2013 to 16th March 2014 Dalgaranga Project, E59/1709
A103755 2014 Gascoyne Resources Ltd Dalgaranga <1% Annual Report Dalgaranga Project M59/749 for the period 23/09/2013 to 22/09/2014
A97455 2013 Gascoyne Resources Ltd Dalgaranga 10% Dalgaranga Project, Annual Report for the period 17th March 2012 to 16th March 2013, E59/1709.
A94203 2012 Richmond W R Dalgaranga <1% Annual Report on Exploration Completed on Exploration Licence 59/1644 Dalgaranga for the period 13 May 2011 –
A101382 2012 Richmond W R Dalgaranga <1% Dalgaranga Project, Annual Report for the period 13/05/2012 to 12/05/2013, E59/1630 & 1644. [C155/2012]
A94060 2012 Mcdowell, Ja Dalgaranga 10% E59/1709 Annual mineral exploration report for the Dalgaranga gold project 17th March 2011 to 16th March 2012
A96164 2012 Mr Richmond Wr Dalgaranga <1% Dalgaranga Project, Annual Report for the period 1st October 2011 to 30th September 2012, E59/1630 & E59/1644.
A92159 2011 Richmond W R Dalgaranga <1% DALGARANGA PROJECT ANNUAL REPORT ON EXPLORATION COMPLETED ON EXPLORATION LICENCE 59/1630 For the period 19 Oct
A82927 2009 Lihir Gold Limited DALGARANGA 2% COMBINED ANNUAL REPORT FOR THE DALGARANGA GOLD MINES JV DALGARANGA, WA, FOR THE PERIOD 1 JUNE 2008 TO 31MAY 20
A78768 2008 Equigold Nl Dalgaranga 2% TECHNICAL REPORT NO. TR260 COMBINED ANNUAL REPORT FOR THE DALGARANGA GOLD MINES JV DALGARANGA, WA For The Peri
A75755 2007 Equigold Nl Dalgaranga 2% Combined Annual Report For the Dalgaranga Gold Mines Joint Venture For the Period 1 June 2006 TO 31 May 2007 (
A71978 2006 Teleferscot Nominees Pty Ltd Dalgaranga <1% Dalgaranga Project, Annual Report 2006, Tenements E59/1074, Period covered 4 March 2005 to 3 March 2006, (Murg
A72998 2006 Equigold Nl Dalgaranga 2% Combined Annual Report for the Dalgaranga Gold Mines JV, For the Period 1 June 2005 to 31 May 2006, Combined R
A70693 2005 Mr Seivwright Dk Meekatharra 93% Mineral exploration report (Surrender report for the period 23/02/04 to 22/02/05, E59/933, Meekatharra).
A71442 2005 Equigold Nl Dalgaranga Gold Mines JV 13% Combined annual report for the Dalgaranga Gold Mines JV, Dalgaranga Western Australia, For the period 1 June 2
A68805 2004 Equigold Nl Dalgaranga 13% Combined Annual report for the Dalgaranga Gold Mines JV, Dalgaranga, WA for the period 01/06/2003-31/05/2004
A68851 2004 Mr Seivwright Dk Camp Bore/Dalgaranga 93% Annual Report. Exploration Licence E59/933 for the period 23/02/2003-22/02/2004.
A67144 2003 Tantalum Australia Pty Ltd Dalgaranga <1% Annual Report for the period 01/07/2002 to 30/06/2003 Dalgaranga Tantalum Project C81/2000: E59/967,969,970, M
A66832 2003 Mr Seivwright Dk Camp Bore Dalgaranga 93% Annual Report for the period 23/02/02 to 22/02/03 E59/933
A65170 2002 Tantalum Australia Pty Ltd Dalgaranga <1% Dalgaranga Project, E59/967, E59/969, E59/970, M20/131 and M59/106 Annual Report 2002 For The Period 01/07/200
A62262 2001 Wrf Securities Ltd Dalgaranga West 5.3% Annual Report, Dalgaranga West Project, for the period 1 Jan 2000 to 31 Dec 2000, E59/508, E59/530. [C149/19
A62862 2001 Equigold Nl Dalgaranga 7% Annual Report for the Dalgaranga Project,,for the Period 30 May 2000 to 29 May 2001 Mines Dept Ref No C306/199
A63184 2001 Tantalum Australia Pty Ltd Dalgaranga 30% Dalgaranga Tantalum Project, M59/106, M20/131, E59/904,933 967, (C81/2000), Annual Report for the Period 01/07
A59727 2000 Mr Richmond Wr Dalgaranga Southwest 7.1% Dalgaranga Southwest Project, Annual Report for the period 01/01/1999 to 31/12/1999, E59/508.
A60317 2000 Equigold Nl Dalgaranga 34% Final Surrender Report for the Dalgaranga Gold Mines JV for the Period 05/05/1991 to 26/11/1999 Partial Surren
A61034 2000 Equigold Nl Dalgaranga 7.2% Annual Report for the Dalgaranga Gold Mines JV, Dalgaranga, Western Australia for the period 30/05/1999 to 29/
A58667 1999 Equigold Nl Dalgaranga 18% Dalgaranga Gold Mines JV, Dalgaranga W.A. 30/05/1998 - 29/05/1999 E59/407, 439, 791, M59/265
A58954 1999 Western Reefs Ltd Dalgaranga Southwest 5.3% Dalgaranga Southwest Project, Annual Report 1998, E59/508,E59/530, Period covered 1 January 1997 to 31 Decem
A57890 1999 Equigold Nl Dalgaranga 1.5% Annual Report for Exploration Licence E59/811 Dalgaranga , Western Australia for the period 6th November 199
A53551 1998 Equigold Nl Dalgaranga West 2.6% Annual Report , Dalgaranga West JV Project, for the period 01/01/97 - 31/12/97, E59/508, 521, 529, 530, 612,
A55530 1998 Equigold Nl Dalgaranga 15% Dalgaranga (JV) Project, Annual Report for the period 30/05/1997 to 29/05/1998, E59/344, 407 & 439; M59/265, 2
A55637 1998 Equigold Nl Dalgaranga 2.8% Surrender Report for Exploration Licence E59/344 Dalgaranga Gold Mines JV for the period 24th June 1990 to 23r
A50247 1997 Equigold Nl Dalgaranga West 2.5% Annual Report , Dalgaranga West (JV) Project, E59/508, E59/521, E59/529, E59/530, E59/574, E59/612, P59/1306,
A50977 1997 Equigold Nl Dalgaranga 45% Technical Report No. 014 Paritial Surrender Report for Exploration Licence E59/407 Dalgaranga Gold Mines Joint
A52530 1997 Equigold Nl Dalgaranga 53% Dalgaranga (JV) Project, Annual Report for the period 4th August 1996 to 3rd August 1997, E59/506.
A52876 1997 Mr Ruane M Dalgaranga <1% Dalgaranga Project, Annual Report for period 18th October 1996 to 17th October 1997, M59/393, P59/1072-1073, P
A51766 1997 Equigold Nl Dalgaranga 15% Dalgaranga (JV) Project, Annual report for the Dalgaranga Gold Mines JV Dalgaranga, Western Australia for the
A50725 1997 Marymia Exploration Nl Dalgaranga/Gum Bore 55% Dalgaranga/Gum Bore Project, Annual Report (Gum Bore) Exploration Licence E59/528 for the period 30th December
A50726 1997 Marymia Exploration Nl Dalgaranga/Gum Bore 55% Dalgaranga/Gum Bore Project, Partial Surrender Report (Gum Bore) Exploration Licence E59/528, December 1996.
A46587 1996 Marymia Exploration Nl Dalgaranga 55% Dalgaranga Project, Annual Report January 1996, E59/528.
A48870 1996 Finders Gold Nl Dalgaranga 2.6% Dalgaranga Project, Annual Report for period 26th April 1994 to 25th April 1996, E59/546.
A49245 1996 Equigold Nl Dalgaranga 53% Annual Report for Exploration Licence E59/506 Kevaurum JV Dalgaranga, Western Australia for the Period 4th Aug
A48387 1996 Equigold Nl Dalgaranga 15% Annual report for the Dalgaranga Gold Mines Joint Venture Dalgarange, Western Australia for the period 30 May
A47020 1996 Equigold Nl Stewarts Bore 14% Annual Report , P59/1350 ,Stewarts Bore J.V. Project, for the period 27 September 1994 to 26 September 1995
A47021 1996 Equigold Nl Dalgaranga South 86% Annual Report , P59/1352, Dalgaranga South (J.V.) Project, for the period 27 September 1994 to 26 September 1
A45705 1995 Western Reefs Ltd Dalgaranga West 7% Dalgaranga West Project, Annual Report for the period 06/08/1994 to 05/08/1995, E59/508; P59/1306.
A45863 1995 Egerton Gold Nl Dalgaranga 53% Dalgaranga Project, (Annual ) Progress Report E59/506 for the period 4th August 1994 to 3rd August 1995.
A46363 1995 Kirkdale Holdings Pty Ltd Prospect Bore/ Dalgaranga <1% Prospect Bore/ Dalgaranga Project, Annual Report Prospecting Licences P59/1045, 1072, 1073, 1075, 1076, 1077,
A41669 1994 Newcrest Mining Ltd Hunter 16% Annual report for the period 06/93-05/94 Hunter Project E59/344 E59/407 E59/439 M59/292-293 P59/1004
A42869 1994 Egerton Gold Nl Dalgaranga 53% Dalgaranga Project, Annual Report for the period 04/08/1993 to 03/08/1994, E59/506.
A41269 1994 Western Reefs Ltd Prospect Bore <1% Prospect Bore Project, Annual Report for the period 24th March 1993 to 23rd March 1994, P59/1045, 1072-1073, 1
A42087 1994 Western Reefs Ltd Dalgaranga West 7% Dalgaranga West Project, Annual Report 1994, Tenements E59/508 and P59/1306. Period Covered 6th August 1993 to
A43545 1994 Marymia Exploration Nl Dalgaranga 55% Dalgaranga Project, Annual Report (Part A) Exploration Licence E59/528 for year ending December 1994.
A39188 1993 Hunter Resources Ltd Noongal 45% Annual Report for the period 05/06/92-04/06/93 Noongal Project E59/407
A39729 1993 Hunter Resources Ltd Duffy Bore 2.8% Duffy Bore Project, Annual Report for the period 27th June 1992 to 26th June 1993, E59/344.
A39781 1993 Hunter Resources Ltd Duffy Bore 2.8% Duffy Bore Project, , Partial Surrender Report for the period 27 June 1992 to 26 June 1993, E59/344.
A36808 1992 Hunter Resources Ltd Duffy Bore 2.8% Duffy Bore Project, Annual Report for the period ending 26th June 1992, E59/344.
A37465 1992 Acm Gold Ltd East Dalgaranga Hill 16% East Dalgaranga Hill Project, Annual Report for the period 8th December 1990 to 7th December 1992, E59/250.
A37466 1992 Acm Gold Ltd Dalgaranga Hill East 16% East Dalgaranga Hill E59/250. Partial surrender report for the period 8/12/88 to 7/12/92.
A37467 1992 Acm Gold Ltd Quartz Ridge North 44% Quartz Ridge North EL59/290. Surrender report for areas surrendered between 20/8/89 and 19/8/92. Cue 1:250 000
A37468 1992 Acm Gold Ltd Quartz Ridge North 44% Quartz Ridge North Project, Annual Report for the period 20th August 1990 to 19th August 1992, E59/290.
A34143 1991 Cra Exploration Pty Ltd Pollard Well 3.8% Pollard Well Project, Partial Surrender Report for the period ended 9th October 1990, E59/150.
A34460 1991 Outokumpu Exp Aust Pty Ltd Dalgaranga 5.1% Dalgaranga Project, Annual Report for year ending 29/11/1990, M59/115-116, 173, 184-185, 187-188, 198; E59/11
A34479 1991 Hunter Resources Ltd Duffy Bore 2.8% Duffy Bore Project, Annual Report for period to 27th June 1991, E59/344.
A34503 1991 Cra Exploration Pty Ltd Gum Well - Pollard Well - Dalgaranga 5.2% Gum Well - Pollard Well - Dalgaranga Project, Annual Report for the period ended 31st December 1990, M59/97,
A30441 1990 Cra Exploration Pty Ltd Pollard Well 3.8% Pollard Well Project, Partial Surrender Report for period ended 9th October 1989, E59/150.
A31078 1990 Acm Gold Ltd East Dalgaranga Hill 16% East Dalgaranga Hill Project, Non-statutory Report: Progress Report, July 1990, E59/250.
A30664 1990 Cra Exploration Pty Ltd Outcamp Well 4.2% Outcamp Well Project, Partial Surrender Report for the period ended 18th April 1990, E59/113.
A31228 1990 Cra Exploration Pty Ltd Dalgaranga 19% Dalgaranga Project, Annual Report for the period ended 29th November 1989, M59/115 & 116 (Dalgaranga), P59/445
A32236 1990 Acm Gold Ltd Quartz Ridge North 44% Quartz Ridge North Project, Annual Report for the period 20th August 1988 to 31st May 1990, E59/290.
A28882 1989 Cra Exploration Pty Ltd Outcamp Well - Dalgaranga 4.2% Partial relinquishment (partial surrender) report for period ended 18 April 1989 on Outcamp Well, E59/113
A28991 1989 Cra Exploration Pty Ltd Dalgaranga 11% Partial and final relinquishment report for period ended 4 March 1988 on Dalgaranga, E59/22
A30391 1989 Cra Exploration Pty Ltd Dalgaranga 19% Dalgaranga Project, Annual Report for period ended 29th November 1988, M59/115,116,(Dalgaranga) P59/445-448,
A23758 1988 Johnsons Well Mining Nl Wadgingarra - Noongal 2.9% Mount Kersey Wadgingarra and Noongal Tenements, [ Non-statutory report ], E59/92...134, P59/295...792, M59/72.
A29230 1988 Cra Exploration Pty Ltd Gum Well 50% Partial relinquishment for period ended 7 December 1988, Gum Well, E59/84
A20070 1987 Mt Kersey Mining Nl Wadgingarra 19% Wadgingarra, Annual report, P59/295 ... 59/343 and E59/92, 30 March 1987.
A21696 1987 Cra Exploration Pty Ltd Paddy Well 56% Paddy Well Project, Final Surrender Report, October 1987, E59/132.
A22076 1987 Cra Exploration Pty Ltd Pollard Well 3.8% Pollard Well Project, Annual Report for the year ending 31/12/1986, E9/150.
A22653 1987 Mt Kersey Mining Nl Wadgingarra - Bridge Well 66% Bridge Well - Wadgingarra, Annual report for period ending 22 October 1987, P59/340-343
A22886 1987 Cra Exploration Pty Ltd Gum Well - Dalgaranga 50% Annual report for 1986 on E59/84, Gum Well
A23286 1987 Cra Exploration Pty Ltd Outcamp Well - Dalgaranga 4.2% Outcamp Well, Annual report for 1986, E59/113
A23070 1987 Cra Exploration Pty Ltd Dalgaranga 11% Dalgaranga, Annual report for 1985 and 1986, E59/22
A18906 1986 Cra Exploration Pty Ltd Gum Well 50% Annual report for 1985 on E59/84, Gum Well
A19393 1986 Mt Kersey Mining Nl Wadgingarra - Bridge Well 66% Wadgingarra - Bridge Well, Geological [annual] report, 23/10/1985 to 22/10/1986, P59/334-336 and P59/340-343
A19413 1986 Cra Exploration Pty Ltd Kevaurum <1% Final [surrender] report on P59/18, Kevaurum, September 1986
A23067 1986 Cra Exploration Pty Ltd Dalgaranga 11% Dalgaranga - Ground Em, Follow-up of input anomalies, E59/22
A23069 1986 Cra Exploration Pty Ltd Dalgaranga 11% Dalgaranga Project - Lasoda Prospect, Report on petrology and mineralogy of diamond drill holes, 5 November 19
A15701 1985 Cra Exploration Pty Ltd Dalgaranga 11% Dalgaranga Project, Annual Report for the period ending 31/12/1984, E59/22
A16158 1985 Broken Hill Pty Co Ltd Little Alston Well 39% Little Alston Well Project, Final Surrender Report for the period 27th August 1984 to 31st May 1985, E59/76.
A16987 1985 Wadgingarra Gold Pty Ltd Wadgingarra 4.2% Wadgingarra Project, Non-statutory Report: A Report on Investigations, August 1985, E59/92, 121; P59295, 299,
A23068 1985 Cra Exploration Pty Ltd Dalgaranga 11% Dalgaranga, Input survey, October 1985, E59/22
A14061 1984 Cra Exploration Pty Ltd Dalgaranga 11% Dalgaranga Project. Annual Report for the period ending 31/12/1983, E59/22.
A12267 1983 Esso Exploration Aust Inc Rosary Well 6.4% Rosary Well Project, Non-statutory Report: Final Report for the period ending 24/03/1983, MC59/7943-7954.
A9761 1980 Carpentaria Exp Co Pty Ltd Dalgaranga 11% Dalgaranga Project, Non-statutory Report: Final Report, April 1980, MC59/5252................MC59/6025.
A11161 1978 Carpentaria Exp Co Pty Ltd Dalgaranga 11% Dalgaranga (JV) Project, Annual Report, October 1978, MC 59/5252, 5262-5266, 5293-5295, 5297, 5432-5433, 5449-
A17203 1977 North Flinders Mines Ltd Yilgarn -Yalgoo <1% Yilgarn -Yalgoo Project, Non-statutory Report: Reconnaissance Report on Copper-Zinc Massive Sulphide Target A
A6914 1976 Amax Exploration (Aust.) Inc Dalgaranga 34% Dalgaranga Project, Non-statutory Report: Final Report for the year ending 31/12/1976, MC59/5200, 5220, 5238-5
A7784 1976 Samantha Mines Nl Dalgaranga 33% Dalgaranga Project, Non-statutory Report: Progress Report to January 1976, MC59/5200, 5220, 5238-5240, 5243 &
A6915 1976 Amax Exploration (Aust.) Inc Dalgaranga 34% Dalgaranga (JV) Project, Final Report for the period ending 31/12/1976, MC59/5200, 5220, 5238-5240, 5243, 6520
A6486 1975 Carpentaria Exp Co Pty Ltd Dalgaranga 12% Dalgaranga Project, Non-statutory Report: Progress Report, December 1975,Mc59/5252, 5262-5266, 5592-5594, 5449
A11160 1975 Carpentaria Exp Co Pty Ltd Dalgaranga 8.8% Dalgaranga Project, Non-statutory Report:Transient Electromagnetic Survey, October 1975, MC59/5252-5266, 5293-
A4625 1974 Broken Hill Pty Co Ltd Dalgaranga 12% Dalgaranga Project, Final Surrender Report, Exploration Summary for the period ending 31/12/1973, TR70/4489H.
A5332 1974 Western Mining Corporation Ltd Gum Well 97% Gum Well - Murchison, MC59/5015 ... 59/5121, Annual report and accompanying data for year 1973 - 1974
A5469 1974 Consolidated Gold Fields Aust Ltd Joe Well 66% Mineral exploration report [non-statutory], Joe Well, MC59/5200, 5220, 5238-5240, 5243
A3555 1973 Broken Hill Pty Co Ltd Dalgaranga 12% Dalgaranga Project, Annual Report for the year ending 31/12/1972, TR70/4489; MC59/4793-4799, 4879-4885 & 4907.
A2534 1972 Broken Hill Pty Co Ltd Dalgaranga 12% Dalgaranga Project, Non-statutory Report: Drilling Exploration Report (4 vols), April 1972, TR70/4489H.
A3029 1971 Broken Hill Pty Co Ltd Dalgaranga 12% Dalgaranga Project, Non-statutory Report: A Report on the Induced Polarization & Resistivity Survey, February
A175 1970 Broken Hill Pty Co Ltd Dalgaranger 12% Dalgaranger Project, Non-statutory Report: Report for the Quarter ending 31st December 1969, TR70/4489H.
A176 1970 Broken Hill Pty Co Ltd Dalgaranger 12% Dalgaranger Project, Non-statutory Report: Report for the year ending 31/12/1969, TR70/4489H.
A174 1969 Broken Hill Pty Co Ltd Dalgaranger 12% Dalgaranger Project, Non-statutory Report:Geological Plans & Geochemical Profiles , 1968-1969, TR70/4489H.
A26821 1753 Cra Exploration Pty Ltd Gum Well 50% Gum Well, Annual Report, E59/84, ended 7 December.
A36851 1753 Hunter Resources Ltd Noongal 45% E59/407- Noongal,Annual Exploration Report to 4th June 1994, Hunter Resources Limited
A45059 1753 Newcrest Mining Ltd Dalgaranga 15% Dalgaranga Area Annual report 06/1994-05/1995
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
17 months · 20 Feb 2028
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 59/1904 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 59/1904? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-28. Compiled by NextMaps. Verify against primary sources before reliance.