E 59/1275-I
Register summary
- Holder
- Silver Lake (Deflector) Pty Ltd
- Part of
- Vault Minerals Limited (ASX:VAU) as at 2026-06-30
- Local government
- Shire of Yalgoo
- Application received
- 12 July 2006
- Commenced
- 7 Apr 2009
- Expiry
- 6 Apr 2027
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A138204 | 2024 | Surefire Resources Nl | Blue Moon | <1% | Final Surrender Report E59/2846 Blue Moon for the period ending 23/11/2023. |
| A134523 | 2023 | Recharge Metals Limited | Brandy Hill South | <1% | Partial Surrender Report E59/2181 Brandy Hill South for the period ending 31/01/2023. |
| A135714 | 2023 | Prospect Ores Pty Ltd | Brandy Hill | <1% | Brandy Hill E59/02695 Project First and Final Report for the period 13 May 2022 to 12 May 2023 |
| A135779 | 2023 | Red Dust Prospecting Pty Ltd | Buddadoo Southeast | <1% | Buddadoo Southeast Tenement Final Surrender Report, E59/2554 for the period 26 July 2021 to 8 May 2023 |
| A132143 | 2022 | Red Dust Prospecting Pty Ltd | Buddadoo Southeast | <1% | Buddadoo Southeast Tenement Annual Mineral Exploration Report E59/2554 for the period ending 25/07/2022 |
109 more reports
| A128488 | 2021 | Silverlake Resources Ltd | Deflector Group 1 | <1% | Partial Surrender Report for E59/1240 Deflector Project Group 1 for the period 10 July 2007 to 5 July 2021 |
| A122958 | 2020 | Silver Lake Resources Limited | Deflector Group 1 | 6.2% | Annual Technical Report for the Period 1st January 2019 to 31st December 2019 - Deflector Project Group 1 Comb |
| A123514 | 2020 | Revolution Mining Pty Ltd | BRANDY HILL SOUTH | <1% | ANNUAL REPORT for C149/2019 "BRANDY HILL SOUTH", 1 FEBRUARY 2019 TO 31 JANUARY 2020 |
| A124394 | 2020 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Buddadoo C4/2020, E 59/01350, E 59/02349 Annual Report for the period ending 9 July 2020 |
| A119196 | 2019 | Doray Minerals Limited | Deflector Group 1 | 6.2% | Annual Technical Report for the Period 1st January 2018 to 31st December 2018 - Deflector Project Group 1 Comb |
| A119364 | 2019 | Pure Rich Resources Pty Ltd; Revolution Mining Pty Ltd | South Brandy Hill | <1% | South Brandy Hill E59/02181 Annual Report for the period 1 February 2018 to 31 January 2019 |
| A120677 | 2019 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual report E59/1350 Buddadoo Project for the period 10 July 2018 to 9 July 2019 |
| A116004 | 2018 | Doray Minerals Limited | Deflector | 6.2% | Deflector Project Area C169/2017 Annual Report for the period 1 January 2017 to 31 December 2017, E59/01240, E |
| A117180 | 2018 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | E59/1350 Buddadoo Project Annual Report for the period 01/08/2017 - 09/07/2018 |
| A115614 | 2018 | Pure Rich Resources Pty Ltd | South Brandy Hill | <1% | South Brandy Hill Project E59/02181 Annual Report for the period 01/02/2017 - 31/01/2018 |
| A111929 | 2017 | Deflector Mining Limited | Gullewa | <1% | Gullewa Project Combined Report C15/1997 Annual Technical Report For the Period 1 January 2016 to 31 December |
| A113929 | 2017 | Deflector Mining Limited | Gullewa | 26% | Annual Technical Report for E59/1275 Gullewa Project For the Period 7 April 2016 to 6 April 2017 |
| A114377 | 2017 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Buddadoo Project E59/01350 Annual Report for the period 6 July 2016 to 31 July 2017 |
| A108133 | 2016 | Doray Minerals Ltd | Gullewa | <1% | Gullewa Project Combined Annual Report - C15/1997, 1st January 2015 to 31st December 2015, E59/1240, E59/1241, |
| A108217 | 2016 | Black Peak Holdings Pty Ltd | Kadji Kadji | <1% | Kadji Kadji Combined Surrender Report for the period 22 April 2010 to 01 December 2015, C32/2012, E70/3758, E7 |
| A109296 | 2016 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual Report For the Period 10 July 2015 to 9 July 2016 BUDDADOO PROJECT E59/01350 |
| A109325 | 2016 | Fortescue Metals Group Ltd | Pipeline Tank | 26% | E59/1275 (Pipeline Tank) Annual Report for the period 07/04/2015 to 06/04/2016 |
| A104719 | 2015 | Mutiny Gold Ltd | Gullewa | <1% | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2014, E59/1134.....P59/1737 |
| A105968 | 2015 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Buddadoo Project E59/1350 Annual Report for the period 10 July 2014 to 9 July 2015 |
| A105941 | 2015 | Fortescue Metals Group Ltd | Pipeline Tank | 26% | E59/1275 Pipeline Tank Annual Report for the period 7 April 2014 to 6 April 2015 |
| A106461 | 2015 | Black Peak Holdings Pty Ltd | Kadji Kadji | <1% | Kadji Kadji C32/2012 Combined Partial Surrender Report for the period 22 April 2010 to 29 June 2015, E59/1575, |
| A107012 | 2015 | Black Peak Holdings Pty Ltd | Kadji Kadji | <1% | Kadji Kadji Iron Project C32/2012, E59/1575, E59/1679, E70/3615, E70/3758, E70/3879 and E70/4026 for the perio |
| A102177 | 2014 | Fortescue Metals Group Ltd | Pipeline Tank | 26% | Annual Mineral Exploration Report: E59/1275 Pipeline Tank for the period 07 April 2013 to 06 April 2014 |
| A102607 | 2014 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Partial Surrender Report for Exploration Licence E59/1350 Buddadoo Project, for the period 10/07/2008 to 014/0 |
| A102735 | 2014 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | BUDDADOO PROJECT ANNUAL REPORT For EXPLORATION LEASE E59/1350 Gullewa Region, WA 10th July 2013 – 9th July 201 |
| A103548 | 2014 | Black Peak Holdings Pty Ltd | Kadji Kadji | <1% | Kadji Kadji Iron ProjectC32/2012 Combined Annual Report for the period 01 July 2013 to 30 June 2014, E59/1575 |
| A99925 | 2013 | Brandy Hill Iron Pty Ltd | Brandy Hill | <1% | Partial Surrender Report for Tenement E59/1240 (Gullewa) for the period ended 9 July 2013 |
| A96545 | 2013 | Mutiny Gold Ltd | Gullewa | <1% | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2012, E59/1134.......P59/1737 |
| A98262 | 2013 | Fortescue Metals Group Ltd | Pipeline Tank- Blue Cap | 26% | Pipeline Tank- Blue Cap Project, Annual Report for the period 7th April 2012 to 6th April 2013, E59/1275. |
| A98568 | 2013 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual Report Exploration Licence E59/1350 Buddadoo Project, for the period 10/07/2012 to 09/07/2013 |
| A99627 | 2013 | Black Peak Holdings Pty Ltd | Edowa Hill | <1% | Edowa Hill Combined Annual Report for the period 01 July 2012 to 30 June 2013, C32/2012, E59/1575, E59/1679, E |
| A101029 | 2013 | Mutiny Gold Ltd | Gullewa | <1% | Gullewa Project, Annual Report for the period 01/01/2013 to 31/12/2013, E59/1134, 1240-1242 & 1274; M59/49, 68 |
| A92777 | 2012 | Mutiny Gold Ltd | Gullewa | <1% | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2011 |
| A94968 | 2012 | Black Peak Holdings Pty Ltd | Edowa Hill | <1% | Edowa Hill E59/1575, E591679, E70/3615 Combined Annual Report for the period 01 July 2011 to 30 June 2012 |
| A94275 | 2012 | Fortescue Metals Group Ltd | Blue Cap | 26% | Annual report for the period 07 April 2011 to 06 April 2012, E59/1275, Blue Cap |
| A95119 | 2012 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual Report Exploration Licence E59/1350 Buddadoo Project, for the period 10/07/2011 to 09/07/2012. |
| A89392 | 2011 | Mutiny Gold Ltd | Gullewa | <1% | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2010 |
| A90443 | 2011 | Fortescue Metals Group Ltd | Blue Cap | 26% | Blue Cap Project, Annual Report for the period 7th April 2009 to 6th April 2010, E59/1275. |
| A90764 | 2011 | Black Peak Holdings Pty Ltd | Edowa Hill | <1% | E59/1575 “Edowa Hill” Annual Report for the period 22 April 2010 to 21 April 2011 |
| A91428 | 2011 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual Report E59/1350 Buddadoo Project For the period 10th July 2010 – 9th July 2011 |
| A86935 | 2010 | Fortescue Metals Group Ltd | Blue Cap | 26% | Annual report for the period 07 April 2009 to 06 April 2010, E59/1275 |
| A84241 | 2009 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual Report E59/1350 Buddadoo Project, For the period 10/07/08 –09/07/2009 |
| A80767 | 2009 | Independence Gold Nl | BRANDY HILL SOUTH | <1% | Murchison Region BRANDY HILL SOUTH PROJECT E59/1156 Yalgoo Gold Field, WA Surrender Report 27 October 2007 to |
| A85441 | 2009 | Atw Gold Corp Pty Ltd | Gullewa | <1% | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2009, M59/132, M59/133, M59/224, |
| A77564 | 2008 | Independence Group Nl | Brandy Hill South | <1% | Murchison Region BRANDY HILL SOUTH PROJECT E59/1156 Yalgoo Gold Field, WA. ANNUAL TECHNICAL REPORT Reporting P |
| A80757 | 2008 | Atw Gold Corp Pty Ltd | GULLEWA | <1% | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2008 |
| A77005 | 2007 | Batavia Mining Limited | Gullewa | <1% | Gullewa Project C15/1997. Annual Technical Report for the year ending 31 December 2007. |
| A74115 | 2007 | Batavia Mining Ltd | Gullewa | <1% | Gullewa Project (C15/1997), E59/877, E59/960....,M59/49, M59/68....,M59/1640...,P59/1671 to P59/1674, Annual R |
| A71846 | 2006 | Batavia Mining Ltd | Gullewa | <1% | Gullewa Gold Project, E59/877, E59/960..., M59/49.., P59/1671 to P59/1674, Annual Technical Report for the per |
| A70325 | 2005 | Batavia Mining Ltd | Gullewa | <1% | Gullewa Gold Project,(C15/1997),E59/877, E59/988...,M59/49, ....,M59/132...,P59/1640, P59/1641 and P59/1659 to |
| A69132 | 2004 | Batavia Mining Ltd | Gullewa | <1% | Gullewa Gold Project, Annual technical report for the period 1 January 2003 to 31 December 2003, C15/1997, M59 |
| A66195 | 2003 | King Solomon Mines Ltd | Gullewa | <1% | Annual Report for the period 1 January 2002 - 31 December 2002 Gullewa Gold Project C15/1997: M59/49, 68, 132, |
| A64235 | 2002 | King Solomon Mines Pty Ltd | Gullewa | <1% | Annual Report on exploration activities for exploration licence 59/877 the period up to 14/12/2001. |
| A64726 | 2002 | King Solomon Mines Ltd | Murchison / Gullewa | <1% | Murchison Copper Gold Project (previously known as Gullewa Project) (M59/49, 68, 132, 294, 335, 336, 356, 391, |
| A61606 | 2001 | King Solomon Mines Pty Ltd | Gullewa | <1% | Gullewa Project M59/49,68,132,294,335,336,356,391,392,442, 507, E59/295,575,877. Annual Report for the Period |
| A60809 | 2000 | Gullewa Ltd | Gullewa 2 | <1% | Gullewa 2 Project, Non-statutory Report (CD format), July 2000,E59/360, 419, 438, 457, 459, 483 etc ( Multiple |
| A57796 | 1999 | Julia Mines Nl | Gullewa | <1% | Exploration Licence E 59/575, Gullewa JointVenture Annual Report for Year ending 19th January1999. |
| A58397 | 1999 | Gullewa Gold Nl | Widgullia | <1% | Partial Surrender Report E59/575 for the period 20/01/1995 to 20/05/1999 (Widgullia Project). |
| A73371 | 1999 | Gullewa Gold Nl | White Cliffs | <1% | White Cliffs Kaolin Deposit E59/575,877,M59/531, Preliminary Geological Investigation, (Period 02/99, Yalgoo) |
| A59830 | 1999 | Gullewa Gold Nl | Gullewa | <1% | Annual Report for the Gullewa Project, E59/360,575, P59/1300 -1302, 1060, M59/49,68,356,371,442,507 for the Pe |
| A55860 | 1998 | Gullewa Gold Nl | Buddadoo | 29% | Surrender Report for Exploration Licence E59/483 (Buddadoo Project) for the period 26th November 1992 to 30th |
| A53958 | 1998 | Gullewa Gold Nl | Pillia Well | 8.6% | Pillia Well Project, Surrender Report for the period 11th April 1996 to 23rd December 1997, E59/661. |
| A54306 | 1998 | Gullewa Gold Nl | Widgullia | <1% | Partial Surrender Report for Exploration Licence E59/575 (Widgullia Project) for the period 20/01/1995 to 19/0 |
| A55101 | 1998 | Gullewa Gold Nl | Gullewa | 3.7% | Annual Report for the Gullewa Project for the period 01/01/1997 to 31/12/1997 E59/355,360,568,621,295,483,585, |
| A57348 | 1998 | Acacia Resources Ltd | Gullewa | 5.7% | Annual Report for the Gullewa Project for the period 01/01/1998 to 31/12/1998 for E59/360,E59/483,E59/575, GML |
| A52779 | 1997 | Gullewa Gold Nl | Buddadoo | 29% | Buddadoo Project, Partial Surrender Report for the period 26th November 1992 to 7th July 1997, E59/483. |
| A52011 | 1997 | Gullewa Gold Nl | Mona Lisa | 40% | Mona Lisa Project, Surrender Report for the period 22nd July 1992 to 19th June 1997, E59/457; & Parts of P59/ |
| A50269 | 1997 | Gullewa Gold Nl | Gullewa | 4.3% | Gullewa Project, Annual Report for the period 01/01/1996 to 31/12/1996 Report No. 1996/32. |
| A48122 | 1996 | Gullewa Gold Nl | Gullewa 1 | 6.2% | Annual report 1994 to 1995 Gullewa 1 Project period 01/11/94 to 31/10/95 |
| A48562 | 1996 | National Resources Exp Ltd | Gullewa 2 | 4.6% | Annual Report 1994 to 1995 Gullewa 2 Project Period 01/01/1995 to 31/12/1995 Yalgoo 1:250,000 Sheet SH50-2 NRE |
| A50681 | 1996 | Gullewa Gold Nl | Pillia Well/ Pillia East | 29% | Pillia Well/ Pillia East Project, Partial Surrender Report E59/483 for the period 26th November 1992 to 25 Nov |
| A43346 | 1995 | National Resources Exp Ltd | Gullewa 1 | 6.5% | Annual Report for Gullewa 1 Project to 31 October 1994 E59/189,294,295,331,457,M59/132,258,294,296,333,334,348 |
| A43992 | 1995 | National Resources Exp Ltd | Gullewa 2 | 3.1% | Annual Report for Gullewa 2 Project to 31 December 1994 Tenements:E59/355,360,361,378,419,438,480,454,459,483 |
| A40661 | 1994 | Sons Of Gwalia Ltd | Gullewa 2 | 3.2% | Annual Report for the period 01/01/93-31/12/93 Gullewa 2 Project E59/360,361,378,419,438,454,459,480,483 P59/1 |
| A40834 | 1994 | Reynolds Australia Metals Ltd | Brandy Hill | <1% | Annual Report on Exploration Activities in 1993 [for the Period 01/01/93 - 31/12/93] Brandy hill Project M59/2 |
| A41448 | 1994 | Normandy Poseidon Ltd | Shaw Well | <1% | Shaw Well Joint Venture M59/286 E59/236 E59/349 P59/1295 Report for the period 3 September 1993 to 30 June 199 |
| A41708 | 1994 | National Resources Exp Ltd | Gullewa 2 | 15% | Gullewa 2 Project, Partial Surrender Report for the period 13/01/1991 to 12/01/1994, E59/361. |
| A37800 | 1993 | Sons Of Gwalia Nl | Gullewa 1 | 6.8% | Gullewa 1 (JV) Project, Annual Report for the period 01/11/1991 to 31/10/1992, M59/132 M59/145 M59/146 M59/243 |
| A38806 | 1993 | Sons Of Gwalia Ltd | Gullewa 2 | 3.2% | Gullewa 2 Project, Annual Report for the year ending 31/12/1992, E59/360-361, 378, 419, 438, 454, 459, 480 & |
| A40350 | 1993 | Sons Of Gwalia Ltd | Gullewa | 6.5% | Annual Report for the Period 01/11/92 - 31/10/93 Gullewa Project |
| A38006 | 1993 | Reynolds Australia Metals Ltd | Brandy Hill | <1% | Annual report for the period 01/01/92-31/12/92 Brandy Hill Project E59/236 E59/349 M59/133 M59/224-226 |
| A35290 | 1992 | Reynolds Australia Metals Ltd | Brandy Hill | <1% | Report on Air-Core and RAB Drilling, Brandy Hill project M59/133,224-226; E59/236,349. [Report for the per |
| A38218 | 1992 | Reynolds Australia Metals Ltd | Brandy Hill | <1% | Partial Surrender Report for the period 1992, Brandy Hill Project, E59/236. |
| A36837 | 1992 | Sons Of Gwalia Nl | Gullewa 2 | 1.8% | Gullewa 2 Project, Annual Report for the period 01/01/199 to 31/12/1991, E59/360-361,378 & 419; P59/1060 |
| A34885 | 1991 | Sons Of Gwalia Nl | Gullewa 1 | 2.3% | Gullewa 1 Project, Annual Report for the period to 2nd September 1991, M59/132,145,146,197; E59/294,295,189,3 |
| A35289 | 1991 | Reynolds Australia Metals Ltd | Brandy Hill | <1% | Review and Geological Re-interpretation of Previous Exploration in the Brandy Hill Tenements [Report for the |
| A36865 | 1991 | Ivernia West Plc | Buddadoo | 16% | Non-statutory Report: Geological Report on the Buddadoo Project, E59/303, July 1991. |
| A36879 | 1991 | Ivernia West Plc | Buddadoo | 16% | Summary report. Buddadoo Vanadium-Titanium Project, WA. |
| A33460 | 1991 | Sons Of Gwalia Nl | Gullewa | 2.4% | Gullewa Project, Annual Report for the period 01/03/1990 to 01/03/1991, E59/294 & 331. |
| A35291 | 1991 | Reynolds Australia Metals Ltd | Brandy Hill | <1% | Interim Report on Air-Core Drilling and Lag Sampling (Ocotober 1991) Brandy Hill Prospect [R Report for the pe |
| A31419 | 1990 | Ivernia West Plc | Buddadoo | 16% | Non-statutory Report: Davis Tube Testing on drillcore of Diamond DrillHole DDH1. Buddadoo Vanadium - Titanium |
| A31420 | 1990 | Ivernia West Plc | Buddadoo | 16% | Non-statutory Report: Buddadoo Vanadium-Titanium. Initial RAB drilling reserves. October-November 1989. E59/30 |
| A34047 | 1990 | Ivernia West Plc | Buddadoo | 16% | Non-statutory Report ; Magnetite/ Ilmenite, Laboratory Separation Testing, Buddadoo Vanadlum - Titanium Projec |
| A31421 | 1990 | Ivernia West Plc | Buddadoo | 16% | Buddadoo Project, Non-statutory Report: Diamond Drilling Survey, October - November 1989, E59/303. |
| A31096 | 1990 | Julia Mines Nl | Brandy Hill | <1% | Non-statutory Report : Progress Report, Brandy Hill Project ,E59/119 & 59/236; M59/133, for the period 01/90- |
| A28361 | 1989 | Hunter Resources Ltd | Buddadoo Range- White Well | 14% | Buddadoo Range - White Well Project, Annual [Surrender] Report for the period ending 30/11/1988, E59/95 & 124. |
| A31422 | 1989 | Ivernia West Plc | Buddadoo | 16% | Non-statutory Report :First assessment of Buddadoo Titanium-Vanadium Project, September 1989. |
| A22201 | 1987 | Hunter Resources Ltd | Buddadoo Range | 14% | 1987 Annual report, Buddadoo Range, E59/95 and White Well, E59/124 |
| A18554 | 1986 | Hunter Resources Ltd | Buddadoo Range | 14% | 1985 Annual Report on Buddadoo Range Prospect EL 59/95 |
| A19126 | 1986 | Goldfields Exploration Pty Ltd | Gullewa | 3.9% | Gullewa Project, E59/35, Progress [non-statutory] report, June 1986 |
| A15362 | 1985 | Goldfields Exploration Pty Ltd | Gullewa | 3.9% | Gullewa Project, Non-statutory Report: Progress Report, February 1985, E59/35. |
| A17203 | 1977 | North Flinders Mines Ltd | Yilgarn -Yalgoo | <1% | Yilgarn -Yalgoo Project, Non-statutory Report: Reconnaissance Report on Copper-Zinc Massive Sulphide Target A |
| A6514 | 1976 | Samin Ltd | Brandy Hill | 9% | Brandy Hill Project, Annual Report for the period 18th June 1975 to 29th June 1976, MC59/5321-5329............ |
| A16765 | 1976 | North Flinders Mines Ltd | Mount Gibson-Yalgoo | <1% | Mount Gibson-Yalgoo Project, Non-statutory Report; Notes on Photogeological Base Maps of Central-Western porti |
| A5964 | 1975 | Samin Ltd | Brandy Hill | 9% | Brandy Hill Project, Annual Report for the period 19th June 1974 to 17th June 1975, MC59/5732,5798, 5344-5347, |
| A5470 | 1975 | Mines Exploration Pty Ltd | Murdaburia Hill | 31% | Final report on exploration [non-statutory], Murdaburia Hill, January 1975, MC59/699 ... 59/4348 |
| A6027 | 1975 | Samin Ltd | Brandy Hill | 9% | Brandy Hill Project, Annual Report: Plans to accompany Annual Report, Brandy Hill to June 1975. (See A5964 for |
| A6029 | 1974 | Samin Ltd | Brandy Hill | 2.9% | Brandy Hill Project, Annual Report for the period ending 18th June 1974, MC59/5732, 5798, 5344-5347, 5340-5343 |
| A88037 | 1753 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual Report Exploration Licence E59/1350 Buddadoo Project, for the period 10/07/2009 to 09/07/2010. |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 6 months · 6 Apr 2027
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 59/1275-I into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 59/1275-I? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-28. Compiled by NextMaps. Verify against primary sources before reliance.