E 38/2945
Register summary
- Holder
- Matsa Gold Pty Ltd
- Part of
- Matsa Resources Limited (ASX:MAT) as at 2025-06-30
- Local government
- Shire of Laverton
- Application received
- 30 Apr 2014
- Commenced
- 14 Dec 2015
- Expiry
- 13 Dec 2027
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A129997 | 2022 | Matsa Gold Pty Ltd | Hacks Well | 47% | E38/2945 Hacks Well Report on Areas Relinquished 9th December 2021 |
| A126029 | 2021 | Gsm Mining Company Pty Ltd | E38/2888 | <1% | Compulsory Partial Surrender (40%) of Exploration Licence E38/2888 For the Period 23 January 2015 to 22 Januar |
| A122548 | 2020 | Stone Resources Australia | Brightstar | <1% | E38/1958 Surrender Report Brightstar project for the period 27 January 2014 to 15 December 2019 |
| A122815 | 2020 | Anglogold Ashanti Australia Limited | Sunrise Dam | <1% | Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio |
| A122827 | 2020 | Matsa Resources Limited | Red October | 14% | Red October Group Annual Report C173/2017 for the period ending 31/12/2019 |
187 more reports
| A123791 | 2020 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020 |
| A123995 | 2020 | Gsm Mining Company Pty Ltd | Prendergast Shear | <1% | Prendergast Shear Project C160/2017 Annual Technical Report for the period ending 31/03/2020 |
| A124126 | 2020 | Anglogold Ashanti Australia Limited | Pink Lady | <1% | CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine |
| A124821 | 2020 | Gsm Mining Company Pty Ltd | Laverton | <1% | Surrender Report Prospecting Licenses P38/4206, P38/4209, P38/4210 for the period ending 9 July 2020 |
| A125157 | 2020 | Anglogold Ashanti Australia Limited | Western Ramps | <1% | EIS Round 20 - Western Ramps (Final Report) |
| A120369 | 2019 | Gsm Mining Company Pty Ltd | Prendergast Shear | <1% | Prendergast Shear Project C160/2017 Annual Technical Report for the period 1 April 2018 to 31 March 2019 |
| A118830 | 2019 | Matsa Gold Pty Ltd | Hack Well | 47% | Annual Mineral Exploration Report E38/2945 Hack Well for the period 14 December 2017 to 13 December 2018 |
| A119211 | 2019 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3 |
| A119510 | 2019 | Matsa Resources Limited | Red October | 13% | Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019 |
| A120095 | 2019 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201 |
| A120368 | 2019 | Anglogold Ashanti Australia Limited | Southern Shear - Sunrise Dam | <1% | EIS Southern Shear Zones – SDGM project (R#17) |
| A116879 | 2018 | Gsm Mining Company Pty Ltd | Prendergast Shear | <1% | Prendergast Shear Project C160/2017 Annual Report for the period 1 April 2017 to 31 March 2018, E38/03095, E38 |
| A118056 | 2018 | Stone Resources Australia Limited | Brightstar | <1% | Brightstar C101/2005 Combined Annual Report for the Period for the period 1 August 2017 to 31 July 2018 |
| A115637 | 2018 | Australian Potash Limited | Hack Well | 47% | ANNUAL REPORT HACK WELL PROJECT E38/02945 FOR THE PERIOD 14/12/2016 - 13/12/2017 |
| A115940 | 2018 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3 |
| A116266 | 2018 | Matsa Gold Pty Ltd | Lake Carey | <1% | Lake Carey Project C5/2003 Annual Report for the period 01/01/2017 - 31/12/2017 |
| A116780 | 2018 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018 |
| A112079 | 2017 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | 1.6% | Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016 |
| A112519 | 2017 | Legendre B | WILGA DAM | <1% | Wilga Dam E39/01796 Annual Report for the period 23 February 2016 to 22 February 2017 |
| A114051 | 2017 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2 |
| A112076 | 2017 | Australian Potash Limited | Hack Well | 47% | Hack Well Project E38/2945 Annual Report for the period 14/12/2015 to 13/12/2016 |
| A115368 | 2017 | Stone Resources Australia Limited | Brightstar | <1% | Annual Exploration Report Brightstar Project C101/2005 for the period 1 August 2016 to 31 July 2017 |
| A108112 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | 1.8% | Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/ |
| A108576 | 2016 | Legendre B | Wilga Dam | <1% | Annual Report For the period 23 February 2015 to 22 February 2016 Wilga Dam Project E39/1796 |
| A108971 | 2016 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | C86/2002 CENTRAL LAVERTON PROJECT COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/04/2015 TO 31/03/2016 |
| A110478 | 2016 | Stone Resources Australia Limited | Brightstar | <1% | Brightstar Project C101/2005 Annual Report for the period 1 August 2015 to 31 July 2016 |
| A104898 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | 2.2% | Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3 |
| A105693 | 2015 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Combined Annual Technical Report for the period 01 April 2014 to 31 March 2015, C86/2002, E38 |
| A107181 | 2015 | Stone Resources Australia Ltd | Brightstar | <1% | Annual Exploration Report for C101/2005 Brightstar Project for 01/08/2014 to 31/07/2015 |
| A104705 | 2015 | Gsm Mining Company Pty Ltd | Barnicoat | 100% | Barnicoat Project Surrender Report M38/484 (C388/1993) for the period 19 May 2009 to 17 December 2014 |
| A104805 | 2015 | Gsm Mining Company Pty Ltd | Barnicoat | <1% | BARNICOAT PROJECT COMBINED ANNUAL TECHNICAL REPORT (C388/1993) FOR THE PERIOD 01 JANUARY 2014 – 31 DECEMBER 20 |
| A101216 | 2014 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 2.3% | Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201 |
| A105171 | 2014 | Stone Resources Australia Ltd | Brightstar | <1% | C101/2005 ANNUAL EXPLORATION REPORT Reporting Period 01/08/2013 – 31/07/2014 [Brightstar Project] |
| A100732 | 2014 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 31% | Sunrise Dam Group Partial Surrender Report for M38/427, M39/358 and M39/359 for the period 21/03/1996 to 06/12 |
| A100990 | 2014 | Gsm Mining Company Pty Ltd | Barnicoat | 42% | Barnicoat Project, Annual Report for the period 01/01/2013 to 31/12/2013, M38/361-362, 483-484; E38/2029 & 203 |
| A102477 | 2014 | Focus Minerals Ltd | Mount Weld | <1% | Mt Weld E38/1652 Annual Report for the period 01/09/2013 to 31/03/2014 |
| A102837 | 2014 | Gsm Mining Company Pty Ltd | Barnicoat | 46% | Barnicoat Project, Final Surrender Report for the period 08/10/2008 to 29/04/2014, E38/2029 & 2035. [C388/1993 |
| A103515 | 2014 | Stone Resources Australia Ltd | Brightstar | <1% | C101/2005 Annual Exploration Report, Reporting Period 01/08/2013 - 31/07/2014. [Brightstar Project] |
| A96934 | 2013 | Stone Resources Australia | E38/1958 | <1% | E38/1958 Annual Exploration Report for the period 28/01/2012 - 27/01/2013 |
| A99227 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | <1% | Sunrise Dam Group Surrender Report for E38/2220 for the period 16/07/2010 to 24/07/2013 |
| A99658 | 2013 | Stone Resources Australia | Brightstar | <1% | Annual Exploration Report for C101/2005 Brightstar Project for 01/08/2012 to 31/07/2013, E38/1958......P 38/39 |
| A100055 | 2013 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 1.4% | Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545 |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 1.2% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A96870 | 2013 | Barrick (Granny Smith) Pty Ltd | Barnicoat | 41% | PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483, M38/484 E38/2029, E38/2035 P39/4806 ANNUAL REPORT Pe |
| A97044 | 2013 | Barrick (Granny Smith) Pty Ltd | Barnicoat | <1% | Barnicoat Project, Final Surrender Report for the 16th January 2009 to 14th January 2013, P39/4806. [C388/199 |
| A93444 | 2012 | Stone Resources Australia | Gamma | <1% | Annual Exploration Report for Gamma Project E38/1958, period 28/01/2011 – 27/01/2012 |
| A92690 | 2012 | Crescent Gold Ltd | Sunrise | 8.5% | Interim Combined Annual Report on Exploration for the period 01/09/2010 to 31/08/2011; Sunrise Project; C320/2 |
| A92879 | 2012 | Barrick (Granny Smith) Pty Ltd | Barnicoat | 41% | Barnicoat Project, Annual Report for the period 1st January 2011 to 31st December 2011, M38/361-362, 483-484; |
| A92885 | 2012 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 1.1% | Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995). |
| A95100 | 2012 | Torridon Exploration | Sunrise Dam | <1% | Sunrise Dam Project Combined Annual Exploration Report For The Year To 30th June 2012 C42/2011 For Tenements: |
| A95571 | 2012 | Anglogold Ashanti Australia | Sunrise Dam | <1% | Final Surrender Report for the period 01/01/2012 to 17/10/2012, E38/2348, E38/2349, E38/2477, E38/2478,2487, 2 |
| A96196 | 2012 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 1.4% | Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797 |
| A89916 | 2011 | A1 Minerals Ltd | Gamma | <1% | Annual Exploration Report E38/1958, Period 28/01/2010 – 27/01/2011 |
| A90051 | 2011 | Crescent Gold Ltd | Wilga Dam | 7% | Combined Annual Report on Exploration for the period 01/01/2010 to 31/12/2010; Wilga Dam Project; C118/2009 |
| A89346 | 2011 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 1.7% | Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010 |
| A89375 | 2011 | Barrick (Granny Smith) Pty Ltd | Barnicoat | 41% | Project 8362 BARNICOAT PROJECT P39/4806 E38/2029, E38/2035 8/361, M38/362, M38/483, M38/484 Annual Report Peri |
| A90565 | 2011 | Crescent Gold Ltd | Childe Harold | <1% | Combined Annual Report on Exploration for the period 01/04/2010 to 31/03/2011; Childe Harold Project; C157/200 |
| A91983 | 2011 | Cove Resources Limited | Sunrise Dam | <1% | Sunrise Dam Project C42/2011 Combined First Annual Report period ending 30 June 2011 for E38/2155, E38/2272 & |
| A86622 | 2010 | Barrick (Australia Pacific) Ltd | Wilga Dam | 7% | Wilga Dam Project P39/4797, M39/664, M39/742, M39/743, M39/862, M39/904, M39/951, Annual Report Period 1 Janua |
| A85813 | 2010 | Barrick (Australia Pacific) Ltd | Barnicoat | 41% | Project 8362 Barnicoat Project P39/4806 E38/2029, E38/2035 M38/361, M38/362, M38/483, M38/484 Annual Report pe |
| A86215 | 2010 | Regis Resources Ltd | Burtville | <1% | Combined annual report on exploration for the period 01/01/2009 to 31/12/2009; Burtville Project C40/2001: E38 |
| A87437 | 2010 | Crescent Gold Ltd | Childe Harold | <1% | Combined Annual Report C133/2006 Ffor Leases E38/1652, 1ST April 2009 to 31st March 2010 |
| A88308 | 2010 | Cullen Exploration Pty Ltd | Laverton | <1% | Laverton Project North East Goldfields, W.A. Final Surrender Report For the Period 29th December 2008 to 6th A |
| A88423 | 2010 | Cazaly Resources Ltd | Sunrise Dam | <1% | Annual Report Sunrise Dam Project E38/2155 For the Period 14 August 2009 to 13 August 2010 |
| A82441 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | <1% | CHILDE HAROLD PROJECT Annual Report E38/1652 For the period 01/04/2008 to 31/03/2009, Group Reporting No. C157 |
| A81076 | 2009 | Anglogold Ashanti Australia Ltd | SUNRISE DAM GROUP | 6.8% | SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A82274 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | <1% | Childe Harold Project, Partial Surrender Report, E38/1652, blocks Kalgoorlie 749 p, u, y, z, and Kalgoorlie 75 |
| A78902 | 2008 | Jindalee Resources Ltd | Jubilee Well | 16% | Jubilee Well Project E38/1730 SURRENDER REPORT Report. Period 11/08/2006 - 12/06/2008 E38_1730_2008S |
| A77574 | 2008 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 6.9% | SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07 |
| A78009 | 2008 | Barrick Gold Of Australia Ltd | Barnicoat | <1% | Project 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483 Annual Report Period 1 January 2007 - 31 December 200 |
| A78425 | 2008 | Metex Resources Ltd | Childe Harold | <1% | CHILDE HAROLD PARTIAL SURRENDER REPORT E38/1652 blocks KALGOORLIE 0750 g,m,r,w; KALGOORLIE 0822 b,g,h,j,m,n, o |
| A81090 | 2008 | Barrick (Granny Smith) Pty Ltd | Barnicoat | <1% | PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483 ANNUAL REPORT Period 1 January 2008 – 31 December 200 |
| A74516 | 2007 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 6.9% | Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31 |
| A74557 | 2007 | Barrick Gold Of Australia Ltd | Barnicoat | <1% | Barnicoat Project M38/361,362,483 C388/1993 Annual Report for the Period 1st Jan 2006 to 31st Dec 2006 Report |
| A75232 | 2007 | Metex Resources Ltd | Childe Harold | <1% | Childe Harold Project, Annual Technical Report for the period 01/04/2006 - 31/03/2007, Group Reporting No C157 |
| A76288 | 2007 | Metex Resources Ltd | Childe Harold | 1.7% | Childe Harold Project, Surrender Report E38/1658, P38/3293 -3295, Group Reporting No. C157/2005, Mount Marga |
| A76156 | 2007 | Jindalee Resources Ltd | Burtville | 16% | Burtville Annual Report 2007 11/08/2006 to 11/08/2007 E38/1730 |
| A72814 | 2006 | Barrick (Granny Smith) Pty Ltd | Wilga Dam | 32% | Wilga Dam Project E39/786, Annual Exploration Report for the Period 1 July 2005 to 30 June 2006, C314/1995, ( |
| A72825 | 2006 | Metex Resources Ltd | Childe Harold | <1% | W128 Childe Harold E38/1123,1529,1652,1658,P38/3211-3213, Annual Technical Report for the Period 01/04/2005 to |
| A72164 | 2006 | Placer (Granny Smith) Pty Ltd | Barnicoat | 38% | Barnicoat Project, E38/494,M38/361,362,483, P39/3239,3291-3293, Mount Margaret Mineral Field, Annual Explorati |
| A72416 | 2006 | Placer (Granny Smith) Pty Ltd | Mikado | 5.7% | Mikado Project, Annual Exploration Report for the Period 1 January 2005 to 31 December 2005, C463/1996, (PGS R |
| A72951 | 2006 | Crescent Gold Ltd | Jubilee Well | <1% | Surrender Report, Jubilee Well JV E38/462, Period 21 January 2005 to 20 January 2006, Surrendered 27 January 2 |
| A70514 | 2005 | Placer Dome Asia Pacific Ltd | Mikado | 5.7% | Mikado Project, Annual Report for the period 01/01/2004 - 31/12/2004 , E38/422, 680, 772, 930, 1126, E38/1205, |
| A70338 | 2005 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 6.9% | Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M |
| A70566 | 2005 | Anglogold Ashanti Australia Ltd | Laverton | <1% | Annual report for the period 01/01/04 - 31/12/04 Laverton Project, C164/2002, E38/199, 399, 420, 462, 523, E38 |
| A70688 | 2005 | Placer Dome Asia Pacific Ltd | Barnicoat | 38% | Barnicoat Project, M38/361, M38/362, M38/483, E38/494, P39/3239, P39/3291, P39/3292, P39/3293, Mount Margaret |
| A70691 | 2005 | Placer Dome Asia Pacific Ltd | Sunrise - Sunset | <1% | Sunrise - Sunset Project, Annual Report for the period 1st January 2004 to 31st December 2004, P39/3076, P39/3 |
| A71360 | 2005 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 16% | Wilga Dam Project, E39/347 & E39/786, Mount Margaret Mineral Field Western Australia, Annual Exploration Repor |
| A68271 | 2004 | Placer (Granny Smith) Pty Ltd | Barnicoat | 38% | Barnicoat Project, Annual Exploration Report M38/361-362, M38/ 483; E38/494; P39/3239, P39/ 3291-3293 for the |
| A68435 | 2004 | Placer Dome Asia Pacific Ltd | Sunrise/Sunset | <1% | Sunrise/Sunset Project, P39/3076, P39/3090, P39/3091, P39/3238, P39/3294, P39/3240. Mount Margaret Mineral Fii |
| A68436 | 2004 | Placer Dome Asia Pacific Ltd | Mikado | 5.7% | Annual report for the period 01/01/2003-31/12/2003 Mikado Project E38/0422, E38/0680, E38/0772, E38/0930, E38/ |
| A69923 | 2004 | Placer Dome Asia Pacific Ltd | Wilga Dam | 16% | Wilga Dam Project, Annual exploration report for the period 1st July 2003 to 30th June 2004 X32, C314/1995, E3 |
| A68170 | 2004 | Anglogold Australasia Ltd | Sunrise Dam | 7.4% | Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21 |
| A68313 | 2004 | Anglogold Australia Ltd | Laverton | 1.2% | Annual Report for the period 01/01/2003-31/12/2003 Laverton Project (C164/2002), E38/1010, E38/1015, E38/1066, |
| A69921 | 2004 | Placer Dome Asia Pacific Ltd | Mikado | 13% | Mikado Project, E38/1205, Partial surrender report for the period 20th July, 2001 to 19th July 2004, C463/1996 |
| A71952 | 2004 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 6.9% | Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t |
| A65899 | 2003 | Placer (Granny Smith) Pty Ltd | Barnicoat | 38% | Combined Annual Mineral Exploration Report for the period 1 January 2002 to 31 December 2002 Barnicoat Project |
| A66170 | 2003 | Placer (Granny Smith) Pty Ltd | Sunrise-Sunset | <1% | Annual Report on Exploration period ending 30th September 2002 Sunrise-Sunset Project C185/1995: M39/217, P39/ |
| A66171 | 2003 | Placer (Granny Smith) Pty Ltd | Mt Lebanon | 5.7% | Annual Report on Exploration period ending 31st December 2002 Mt Lebanon Project C463/1996: M38/9, E38/422, E3 |
| A66180 | 2003 | Anglogold Australia Ltd | Jubilee Well | <1% | Annual Report for the period 21 January 2002 to 20 January 2003 ,Jubilee Well JV Project,[C164/2002], E38/462, |
| A66552 | 2003 | Anglogold Australia Ltd | Relief Well and Sunrise Bore | 6.9% | Relief Well JV & Sunrise Bore JV, E39/329, M38/427, 429, 358-59, 260, Annual Report for the period 1 February |
| A66976 | 2003 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 32% | Wilga Dam Project, E39/786, Mount Margaret Mineral Field,Western Australia, Partial Surrender Report for the |
| A66542 | 2003 | Anglogold Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366, |
| A67211 | 2003 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 16% | Wilga Dam Project, E39/347,786, Mount Margaret Mineral Field, Western Australia Annual Exploration Report for |
| A67737 | 2003 | Anglogold Australia Ltd | Jubilee Well | <1% | Jubilee Well JV, E38/462, E38/523, Partial Surrender Report for the period 21/01/1996- 12/11/2003. |
| A64307 | 2002 | Anglogold Australia Ltd | Jubilee Well | <1% | Annual Report for the period 21 January 2001 to 20 January 2002 Jubilee Well JV E38/462, E38/523 & E338/524. |
| A64321 | 2002 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | <1% | Annual Report on exploration Sunrise-Sunset Project M39/217, P39/3076, 3090-3091, 3119, 3238, 3240, 3294 for t |
| A64488 | 2002 | Anglogold Australia Ltd | Sunrise Dam | <1% | Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144 |
| A65544 | 2002 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 16% | Project E39/347, E39/786 Annual Report On Exploration For The Period 1st July 2001 To 30th June 2002 Group Rep |
| A64064 | 2002 | Placer (Granny Smith) Pty Ltd | Mt Lebanon P | 5.7% | Mt Lebanon Project M38/0009, E38/0422, E38/0680, E38/0772 E38/0930, E38/1126, E38/1205, E38/1206, P38/2239 and |
| A64258 | 2002 | Placer (Granny Smith) Pty Ltd | Barnicoat | 38% | Annual Report on exploration for the period 1 January 2001 to 31 December 2001 Barnicoat Project P39/3239, 329 |
| A62105 | 2001 | Placer (Granny Smith) Pty Ltd | Barnicoat | 38% | Annual Report on exploration Barnicoat Project P39/3239, 3291, 3292, 3293; E38/494; M38/361, 362, 483 1 Januar |
| A63421 | 2001 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 16% | Wilga Dam Project Mount Margaret Mineral Field Western Australia Annual Report On Exploration For The Period 1 |
| A64334 | 2001 | Anglogold Australia Ltd | Sunrise Well/Sunrise Bore/Relief Well | 6.9% | Annual Report for the period 1 February 2001 to 31 January 2002 Relief Well JV & Sunrise Bore JV E39/329, M38/ |
| A62104 | 2001 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | <1% | Annual Report on exploration Sunrise/Sunset Project M39/217, P39/3075, 3090-3091, 3119, 3238, 3240, 3294 for t |
| A62813 | 2001 | Anglogold Australasia Ltd | Sunrise Well-Sunrise Bore | 6.9% | Relief Well Sunrise Bore Project E39/329, M38/427, M38/429 M39/358, M39/359 & M38/260 Annual Report for the pe |
| A63177 | 2001 | Pan Palladium Ltd | Sunset Strip | 4.7% | Annual Report on Exploration, Sunset Strip project, P38/2828 2829,2830, Ref C2/2001, Mt Margaret Mineral Field |
| A59851 | 2000 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | <1% | Annual Report On Exploration Sunrise-Sunset Project M39/217, P39/3076,3090-3091,3119 For The Period 01/01/1999 |
| A60543 | 2000 | Placer (Granny Smith) Pty Ltd | Barnicoat | 38% | Annual Report on Exploration, Barnicoat Project, P39/3239,32 3291-3293,E38/494,M38/361,362,483, Mt Margaret Go |
| A61260 | 2000 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 16% | Wilga Dam E39/347 Annual Report on Exploration for the Period 1 July 1999 to 30 June 2000. C314/1995 Grid Ref: |
| A60182 | 2000 | Acacia Resources Ltd | Jubilee Well | <1% | Jubilee Well J.V; E38/462, E38/523 and E38/524; Annual report for the period 21/01/1999 to 20/01/2000 |
| A60247 | 2000 | Anglogold Australasia Ltd | Relief Well | 6.9% | Relief Well JV & Sunrise Bore JV E39/329, M38/427-429, M39/358-360, M38/260 Annual report for the Period 1/2/1 |
| A60321 | 2000 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999 |
| A61954 | 2000 | Anglogold Australasia Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat |
| A62054 | 2000 | Anglogold Australasia Ltd | Jubilee Well | <1% | Jubilee Well Project E38/462, E38/523 and E38/524 Verification Report, Annual Report for the period 21 January |
| A57772 | 1999 | Placer (Granny Smith) Pty Ltd | Barnicoat | 38% | Barnicoat Project-P39/3239, 3291-3293, E38/494, M38/361-362, M38/483 for the period 01/01/98 - 31/12/98 |
| A57593 | 1999 | Acacia Resources Ltd | Jubilee Well | <1% | Acacia Resources Ltd Aurora Gold W.A Ltd Jubilee Well J.V E38/462,523.524 Annual Report For the Period 21/01/1 |
| A58027 | 1999 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | <1% | Sunrise - Sunset Project, Annual Report for the period 1st Janaury 1998 to 31st December 1998, M39/217; P39/ |
| A58149 | 1999 | Acacia Resources Ltd | Relief Well | 6.9% | Relief Well JV And Sunrise Bore JV E39/329 M38/427,428,429, 260 M39/358,359,360 Annual Report For the Period 0 |
| A59071 | 1999 | Exodus Minerals Ltd | Wilga Dam | 16% | Annual report Wilga Dam Exploration Licence 39/347 Prospecting Licences 39/2985 &39/2986 for the period 01/07/ |
| A59519 | 1999 | Abador Gold Nl | Sunset Strip | 14% | 2nd Annual Report on P38/2828, Sunset Strip, Mt Morgan Mineral Field WA, Laverton 1:250,000 for the Period 28 |
| A56033 | 1998 | Exodus Minerals Ltd | Wilga Dam | 16% | Annual Report - Wilga Dam Exploration Licence:39/347, Prospecting Licence:39/2985-2986 01/07/97 - 30/06/98 |
| A56457 | 1998 | Abador Gold Nl | Sunset Strip | 14% | Sunset Strip Project First Annual Report on Prospecting Licence 38/2828, Mt Morgan Mineral Field, W.A, Laverto |
| A57146 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9 |
| A53829 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997 |
| A54452 | 1998 | Placer (Granny Smith) Pty Ltd | Sunset | <1% | Sunrise/Sunset Project, Mt Margaret Goldfield, W.A. 01/01/97 - 31/12/97 M39/217, P39/3076, 3090-3091, 3119, 32 |
| A54524 | 1998 | Placer (Granny Smith) Pty Ltd | Barnicoat | 16% | Barnicoat Project, [8th] Annual Report 01/01/97 - 31/12/97, P38/2380, P39/3239, 3292-3293, P38/2380, E38/437, |
| A56251 | 1998 | Placer (Granny Smith) Pty Ltd | Barnicoat/Keringal | 16% | Hack Well/ Ophir Bore (E38/437) Surrender Report October 1998. |
| A56253 | 1998 | Placer (Granny Smith) Pty Ltd | Davis Well | 7.7% | Davis Well (E38/482) Surrender Report October 1998. |
| A52374 | 1997 | Wmc Resources Ltd | Wilga Dam | 16% | Annual Report 01/07/96-30/06/97 Wilga Dam E39/347 P39/2985 P39/2986 P39/3396 (Edjudina SH51-6 1:250 000) |
| A53166 | 1997 | Acacia Resources Ltd | Brumby Well | <1% | Jubilee Well J.V. E38/462, 523, 524 Laverton, North-Eastern Goldfields, Yilgarn W.A. Annual Report, 21/01/97 |
| A53600 | 1997 | Acacia Resources Ltd | Relief Well | 6.9% | Relief Well JV and Sunrise Bore JV E39/329 M38/427-429 M39/358 M39/359 M39/360 M38/260 1997 Annual Report for |
| A50186 | 1997 | Acacia Resources Ltd | Brumby Well | <1% | Jubilee Well Joint Venture E38/462 E38/523 and E38/524 Annual report for the period 21/01/96 to 20/01/97 Repor |
| A50393 | 1997 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report |
| A51069 | 1997 | Placer (Granny Smith) Pty Ltd | Hack Well Grid- Barnicoat | 35% | Hack Well Grid- Barnicoat Project, Final Surrender Report for period ending 15th December 1996, P38/2396. |
| A50570 | 1997 | Acacia Resources Ltd | Relief Well | 6.9% | Relief Well Joint Venture and Sunrise Bore E39/329 M38/427 M38/428 M38/429 M39/358 M39/359 M39/360 and M38/260 |
| A50913 | 1997 | Placer (Granny Smith) Pty Ltd | Sunset | <1% | Annual report on Exploration Sunrise/ Sunset Project M39/217 P39/3076 P39/3090 to P39/3091 P39/3119 P39/3238 P |
| A51588 | 1997 | Placer (Granny Smith) Pty Ltd | Barnicoat | 16% | Barnicoat Project P38/2380 P38/3239 P38/3291 P38/3292 P38/3293 E38/437 E38/482 E38/494 E38/502 M38/313 M38/361 |
| A51717 | 1997 | Placer (Granny Smith) Pty Ltd | Ophir Bore/ Barnicoat | 15% | Ophir Bore/ Barnicoat Project,Surrender Report P38/2426, July 1997. |
| A51718 | 1997 | Placer (Granny Smith) Pty Ltd | Ophir Bore / Barnicoat | 1.2% | Ophir Bore / Barnicoat Project, Surrender Report P38/2427, July 1997. |
| A46975 | 1996 | Acacia Resources Ltd | Relief Well | 6.9% | Relief Well E39/329 1995 annual report for the period January 1995 to December 1995 Report NO. 08.7642 |
| A47027 | 1996 | Placer Exploration Ltd | Barnicoat | 15% | Barnicoat Project P38/2380 P38/2396 P39/3239 P39/3291 P39/3292 P39/3293 E38/395 E38/437 E38/482 E38/494 E38/50 |
| A47061 | 1996 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb |
| A47216 | 1996 | Aurora Gold Ltd | Brumby Well | <1% | H468 Brumby Well Project Western Australia Annual Technical Report for the period 21 January 1995 to 20 Januar |
| A47500 | 1996 | Placer Prospecting Pty Ltd | Sunrise/Sunset | <1% | Second Annual report on Exploration Sunrise/Sunset Project M39/217 P39/3076 P39/3090 P39/3091 P39/3238 P39/324 |
| A48993 | 1996 | Wmc Resources Ltd | Wilga Dam | 16% | Annual report for the period 1 July 1995 to 30 June 1996 Wilga Dam Project Exploration Licence E39/347 Prospec |
| A44007 | 1995 | Acacia Resources Ltd | Relief Well | 6.9% | Relief Well Joint Venture E39/329, P39/2520 1994 Annual Report for the period January 1994 to 31 December 1994 |
| A44189 | 1995 | Aurora Gold Ltd | Brumby Well | <1% | Annual Techincal Report Brumby Well Project Western Australia Exploraton Licences 38/462,38/523 and 38/524 For |
| A44303 | 1995 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3 |
| A45379 | 1995 | Acacia Resources Ltd | Sunrise Bore | 6.9% | Sunrise Bore M38/260 And A Portion Of E39/329 ANNUAL REPORT for the period 31/1/94 to 31/1/95 |
| A43702 | 1995 | Placer Exploration Ltd | Barnicoat | 10% | Barnicoat Project E38/298, 395, 437, 482, 502, 537, 494, P38/2380, 2393-2399 INCL. 2404, 2405, 2408, 2423-2429 |
| A45239 | 1995 | Western Mining Corporation Ltd | Wilga Dam | 16% | Annual report for the period 1 July 1994 to 30 June 1995 The Wilga Dam Project Exploration Licence E39/347 Pro |
| A45544 | 1995 | Placer Exploration Ltd | Barnicoat | 16% | Partial Surrender Report for the period 07/09/92-18/08/95 ,Barnicoat Project ,E38/437. |
| A40299 | 1994 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263 |
| A41746 | 1994 | Placer Exploration Ltd | Barnicoat | 66% | Annual Report for the period 11/02/93-10/02/94 Barnicoat Project E38/494 |
| A42285 | 1994 | Western Mining Corporation Ltd | Wilga Dam | 16% | Annual Report for the period 28/10/92-30/06/94 The Wilga Dam Project E39/347 P39/2985-2986 (Edjudina, SH51-6, |
| A40377 | 1994 | Dominion Mining Ltd | Sunrise Well | 6.9% | Annual report for the period 01/93-01/94 Sunrise Well Prospect E39/329 |
| A40522 | 1994 | Placer Exploration Ltd | Mount Weld | 6.4% | Annual Report for the Period 01/01/93 - 31/12/93 Mt Weld/Keringal/Ophir Bore Project |
| A41227 | 1994 | Aurora Gold Ltd | Brumby Well | <1% | Annual Technical Report Period: 21/01/93 to 21/01/94 Brumby Well Project E38/462, 38/523, 38/524 |
| A42103 | 1994 | Placer Exploration Ltd | Sunset | 4.2% | Annual Report for the period 06/93-06/94 Sunset Project P39/3090-91,3238-40,3076,& 3119 |
| A38516 | 1993 | Dominion Mining Ltd | Sunrise Well | 6.9% | Annual Report for the period 08/92-01/93 Sunrise Well(Edjudina) Project E39/329 |
| A38820 | 1993 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263 |
| A40012 | 1993 | Billiton Australia Pty Ltd | Sunrise Central | <1% | Partial surrender report, Sunrise Central, E39/229. |
| A36820 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Sunrise Dam Project, Partial Surrender Report July 1992, . E39/174, 206, 229; Surrender Report E39/230. |
| A35603 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2 |
| A33010 | 1991 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230 |
| A34983 | 1991 | Mr Mckeaig Ls | Sunrise Well | 6.9% | Sunrise Well Prospect Summary Report to 10/12/91 (R Report for 1991; E39/329; M38/260) |
| A28729 | 1989 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report ending 30 June 1989, Sunrise Dam Project, E39/174, E39/206, E39/227, E39/229, E39/230, P39/215 |
| A14703 | 1985 | Golconda Minerals Nl | Hack Well | 8.6% | Hack Well Project, Final Surrender Report for the period ending 10/05/1985, E38/24. |
| A12968 | 1983 | Golconda Minerals Nl | Davis Well - Hack Well | 6.4% | Davis Well - Hack Well Project, Non-statutory Report: Geological Report, November 1983, E38/4, E38/24; P38/72- |
| A3742 | 1973 | Pacminex Pty Ltd | Wilga | <1% | Wilga Project, Annual Report for the period ending 31/10/1972, MC39/64-70, 73-79, 82-88, 91-97, 100-104, 109-1 |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A2691 | 1972 | Australian Selection Pty Ltd | Wilga | 7.2% | Wilga Project, Annual Report for the period ending 31/12/1971, TR70/3747; MC39/62-115, 136-143, 191-219, 911-9 |
| A1366 | 1970 | Australian Selection Pty Ltd | Wilga | 12% | Wilga Area, Annual Report for the year ending 31/12/1969, TR70/3747H; MC39/62-115, 136-143, 191-209, 911-939 & |
| A1365 | 1968 | Australian Selection Pty Ltd | Wilga | <1% | Wilga Project, Non-statutory Report: Annual Report [s] 1966-1968, for the period ending 31/12/1968, TR70/3747, |
| A85886 | 1753 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 4.4% | Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 15 months · 13 Dec 2027
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 38/2945 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 38/2945? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-26. Compiled by NextMaps. Verify against primary sources before reliance.