NextMaps›WA Tenements›E 38/2945

E 38/2945

LiveExploration LicenceShire of LavertonMt. Margaret District
Area
5,580ha
Expires
Dec 2027
in 15 months
WAMEX reports
192
WA median is 53
Report drilling
129
of 192 reports
Laverton Explore on the live map

Register summary

Holder
Matsa Gold Pty Ltd
Part of
Matsa Resources Limited (ASX:MAT) as at 2025-06-30
Local government
Shire of Laverton
Application received
30 Apr 2014
Commenced
14 Dec 2015
Expiry
13 Dec 2027
Term
5 Years (Extended)

Exploration history on this ground

192 historical WAMEX exploration reports intersect E 38/2945: 82 report geochemistry or sampling, 139 include a digital data package.
When this ground was worked · 190 of 192 reports dated
11960s
41970s
31980s
521990s
612000s
592010s
102020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A129997 2022 Matsa Gold Pty Ltd Hacks Well 47% E38/2945 Hacks Well Report on Areas Relinquished 9th December 2021
A126029 2021 Gsm Mining Company Pty Ltd E38/2888 <1% Compulsory Partial Surrender (40%) of Exploration Licence E38/2888 For the Period 23 January 2015 to 22 Januar
A122548 2020 Stone Resources Australia Brightstar <1% E38/1958 Surrender Report Brightstar project for the period 27 January 2014 to 15 December 2019
A122815 2020 Anglogold Ashanti Australia Limited Sunrise Dam <1% Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio
A122827 2020 Matsa Resources Limited Red October 14% Red October Group Annual Report C173/2017 for the period ending 31/12/2019
187 more reports
A123791 2020 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020
A123995 2020 Gsm Mining Company Pty Ltd Prendergast Shear <1% Prendergast Shear Project C160/2017 Annual Technical Report for the period ending 31/03/2020
A124126 2020 Anglogold Ashanti Australia Limited Pink Lady <1% CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine
A124821 2020 Gsm Mining Company Pty Ltd Laverton <1% Surrender Report Prospecting Licenses P38/4206, P38/4209, P38/4210 for the period ending 9 July 2020
A125157 2020 Anglogold Ashanti Australia Limited Western Ramps <1% EIS Round 20 - Western Ramps (Final Report)
A120369 2019 Gsm Mining Company Pty Ltd Prendergast Shear <1% Prendergast Shear Project C160/2017 Annual Technical Report for the period 1 April 2018 to 31 March 2019
A118830 2019 Matsa Gold Pty Ltd Hack Well 47% Annual Mineral Exploration Report E38/2945 Hack Well for the period 14 December 2017 to 13 December 2018
A119211 2019 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3
A119510 2019 Matsa Resources Limited Red October 13% Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019
A120095 2019 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201
A120368 2019 Anglogold Ashanti Australia Limited Southern Shear - Sunrise Dam <1% EIS Southern Shear Zones – SDGM project (R#17)
A116879 2018 Gsm Mining Company Pty Ltd Prendergast Shear <1% Prendergast Shear Project C160/2017 Annual Report for the period 1 April 2017 to 31 March 2018, E38/03095, E38
A118056 2018 Stone Resources Australia Limited Brightstar <1% Brightstar C101/2005 Combined Annual Report for the Period for the period 1 August 2017 to 31 July 2018
A115637 2018 Australian Potash Limited Hack Well 47% ANNUAL REPORT HACK WELL PROJECT E38/02945 FOR THE PERIOD 14/12/2016 - 13/12/2017
A115940 2018 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3
A116266 2018 Matsa Gold Pty Ltd Lake Carey <1% Lake Carey Project C5/2003 Annual Report for the period 01/01/2017 - 31/12/2017
A116780 2018 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018
A112079 2017 Anglogold Ashanti Australia Limited Sunrise Dam Group 1.6% Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016
A112519 2017 Legendre B WILGA DAM <1% Wilga Dam E39/01796 Annual Report for the period 23 February 2016 to 22 February 2017
A114051 2017 Gsm Mining Company Pty Ltd Central Laverton <1% CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2
A112076 2017 Australian Potash Limited Hack Well 47% Hack Well Project E38/2945 Annual Report for the period 14/12/2015 to 13/12/2016
A115368 2017 Stone Resources Australia Limited Brightstar <1% Annual Exploration Report Brightstar Project C101/2005 for the period 1 August 2016 to 31 July 2017
A108112 2016 Anglogold Ashanti Australia Limited Sunrise Dam Group 1.8% Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/
A108576 2016 Legendre B Wilga Dam <1% Annual Report For the period 23 February 2015 to 22 February 2016 Wilga Dam Project E39/1796
A108971 2016 Gsm Mining Company Pty Ltd Central Laverton <1% C86/2002 CENTRAL LAVERTON PROJECT COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/04/2015 TO 31/03/2016
A110478 2016 Stone Resources Australia Limited Brightstar <1% Brightstar Project C101/2005 Annual Report for the period 1 August 2015 to 31 July 2016
A104898 2015 Anglogold Ashanti Australia Ltd Sunrise Dam Group 2.2% Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3
A105693 2015 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton Combined Annual Technical Report for the period 01 April 2014 to 31 March 2015, C86/2002, E38
A107181 2015 Stone Resources Australia Ltd Brightstar <1% Annual Exploration Report for C101/2005 Brightstar Project for 01/08/2014 to 31/07/2015
A104705 2015 Gsm Mining Company Pty Ltd Barnicoat 100% Barnicoat Project Surrender Report M38/484 (C388/1993) for the period 19 May 2009 to 17 December 2014
A104805 2015 Gsm Mining Company Pty Ltd Barnicoat <1% BARNICOAT PROJECT COMBINED ANNUAL TECHNICAL REPORT (C388/1993) FOR THE PERIOD 01 JANUARY 2014 – 31 DECEMBER 20
A101216 2014 Anglogold Ashanti Australia Ltd Sunrise Dam 2.3% Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201
A105171 2014 Stone Resources Australia Ltd Brightstar <1% C101/2005 ANNUAL EXPLORATION REPORT Reporting Period 01/08/2013 – 31/07/2014 [Brightstar Project]
A100732 2014 Anglogold Ashanti Australia Ltd Sunrise Dam 31% Sunrise Dam Group Partial Surrender Report for M38/427, M39/358 and M39/359 for the period 21/03/1996 to 06/12
A100990 2014 Gsm Mining Company Pty Ltd Barnicoat 42% Barnicoat Project, Annual Report for the period 01/01/2013 to 31/12/2013, M38/361-362, 483-484; E38/2029 & 203
A102477 2014 Focus Minerals Ltd Mount Weld <1% Mt Weld E38/1652 Annual Report for the period 01/09/2013 to 31/03/2014
A102837 2014 Gsm Mining Company Pty Ltd Barnicoat 46% Barnicoat Project, Final Surrender Report for the period 08/10/2008 to 29/04/2014, E38/2029 & 2035. [C388/1993
A103515 2014 Stone Resources Australia Ltd Brightstar <1% C101/2005 Annual Exploration Report, Reporting Period 01/08/2013 - 31/07/2014. [Brightstar Project]
A96934 2013 Stone Resources Australia E38/1958 <1% E38/1958 Annual Exploration Report for the period 28/01/2012 - 27/01/2013
A99227 2013 Anglogold Ashanti Australia Ltd Sunrise Dam Group <1% Sunrise Dam Group Surrender Report for E38/2220 for the period 16/07/2010 to 24/07/2013
A99658 2013 Stone Resources Australia Brightstar <1% Annual Exploration Report for C101/2005 Brightstar Project for 01/08/2012 to 31/07/2013, E38/1958......P 38/39
A100055 2013 Focus Minerals (Laverton) Pty Ltd Sunrise 1.4% Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545
A96848 2013 Anglogold Ashanti Australia Ltd Sunrise Dam 1.2% Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995)
A96870 2013 Barrick (Granny Smith) Pty Ltd Barnicoat 41% PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483, M38/484 E38/2029, E38/2035 P39/4806 ANNUAL REPORT Pe
A97044 2013 Barrick (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project, Final Surrender Report for the 16th January 2009 to 14th January 2013, P39/4806. [C388/199
A93444 2012 Stone Resources Australia Gamma <1% Annual Exploration Report for Gamma Project E38/1958, period 28/01/2011 – 27/01/2012
A92690 2012 Crescent Gold Ltd Sunrise 8.5% Interim Combined Annual Report on Exploration for the period 01/09/2010 to 31/08/2011; Sunrise Project; C320/2
A92879 2012 Barrick (Granny Smith) Pty Ltd Barnicoat 41% Barnicoat Project, Annual Report for the period 1st January 2011 to 31st December 2011, M38/361-362, 483-484;
A92885 2012 Anglogold Ashanti Australia Ltd Sunrise Dam 1.1% Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995).
A95100 2012 Torridon Exploration Sunrise Dam <1% Sunrise Dam Project Combined Annual Exploration Report For The Year To 30th June 2012 C42/2011 For Tenements:
A95571 2012 Anglogold Ashanti Australia Sunrise Dam <1% Final Surrender Report for the period 01/01/2012 to 17/10/2012, E38/2348, E38/2349, E38/2477, E38/2478,2487, 2
A96196 2012 Focus Minerals (Laverton) Pty Ltd Sunrise 1.4% Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797
A89916 2011 A1 Minerals Ltd Gamma <1% Annual Exploration Report E38/1958, Period 28/01/2010 – 27/01/2011
A90051 2011 Crescent Gold Ltd Wilga Dam 7% Combined Annual Report on Exploration for the period 01/01/2010 to 31/12/2010; Wilga Dam Project; C118/2009
A89346 2011 Anglogold Ashanti Australia Ltd Sunrise Dam 1.7% Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010
A89375 2011 Barrick (Granny Smith) Pty Ltd Barnicoat 41% Project 8362 BARNICOAT PROJECT P39/4806 E38/2029, E38/2035 8/361, M38/362, M38/483, M38/484 Annual Report Peri
A90565 2011 Crescent Gold Ltd Childe Harold <1% Combined Annual Report on Exploration for the period 01/04/2010 to 31/03/2011; Childe Harold Project; C157/200
A91983 2011 Cove Resources Limited Sunrise Dam <1% Sunrise Dam Project C42/2011 Combined First Annual Report period ending 30 June 2011 for E38/2155, E38/2272 &
A86622 2010 Barrick (Australia Pacific) Ltd Wilga Dam 7% Wilga Dam Project P39/4797, M39/664, M39/742, M39/743, M39/862, M39/904, M39/951, Annual Report Period 1 Janua
A85813 2010 Barrick (Australia Pacific) Ltd Barnicoat 41% Project 8362 Barnicoat Project P39/4806 E38/2029, E38/2035 M38/361, M38/362, M38/483, M38/484 Annual Report pe
A86215 2010 Regis Resources Ltd Burtville <1% Combined annual report on exploration for the period 01/01/2009 to 31/12/2009; Burtville Project C40/2001: E38
A87437 2010 Crescent Gold Ltd Childe Harold <1% Combined Annual Report C133/2006 Ffor Leases E38/1652, 1ST April 2009 to 31st March 2010
A88308 2010 Cullen Exploration Pty Ltd Laverton <1% Laverton Project North East Goldfields, W.A. Final Surrender Report For the Period 29th December 2008 to 6th A
A88423 2010 Cazaly Resources Ltd Sunrise Dam <1% Annual Report Sunrise Dam Project E38/2155 For the Period 14 August 2009 to 13 August 2010
A82441 2009 Carbon Energy Ltd CHILDE HAROLD <1% CHILDE HAROLD PROJECT Annual Report E38/1652 For the period 01/04/2008 to 31/03/2009, Group Reporting No. C157
A81076 2009 Anglogold Ashanti Australia Ltd SUNRISE DAM GROUP 6.8% SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3
A82274 2009 Carbon Energy Ltd CHILDE HAROLD <1% Childe Harold Project, Partial Surrender Report, E38/1652, blocks Kalgoorlie 749 p, u, y, z, and Kalgoorlie 75
A78902 2008 Jindalee Resources Ltd Jubilee Well 16% Jubilee Well Project E38/1730 SURRENDER REPORT Report. Period 11/08/2006 - 12/06/2008 E38_1730_2008S
A77574 2008 Anglogold Ashanti Australia Ltd Sunrise Dam 6.9% SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07
A78009 2008 Barrick Gold Of Australia Ltd Barnicoat <1% Project 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483 Annual Report Period 1 January 2007 - 31 December 200
A78425 2008 Metex Resources Ltd Childe Harold <1% CHILDE HAROLD PARTIAL SURRENDER REPORT E38/1652 blocks KALGOORLIE 0750 g,m,r,w; KALGOORLIE 0822 b,g,h,j,m,n, o
A81090 2008 Barrick (Granny Smith) Pty Ltd Barnicoat <1% PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483 ANNUAL REPORT Period 1 January 2008 – 31 December 200
A74516 2007 Anglogold Ashanti Australia Ltd Sunrise Dam 6.9% Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31
A74557 2007 Barrick Gold Of Australia Ltd Barnicoat <1% Barnicoat Project M38/361,362,483 C388/1993 Annual Report for the Period 1st Jan 2006 to 31st Dec 2006 Report
A75232 2007 Metex Resources Ltd Childe Harold <1% Childe Harold Project, Annual Technical Report for the period 01/04/2006 - 31/03/2007, Group Reporting No C157
A76288 2007 Metex Resources Ltd Childe Harold 1.7% Childe Harold Project, Surrender Report E38/1658, P38/3293 -3295, Group Reporting No. C157/2005, Mount Marga
A76156 2007 Jindalee Resources Ltd Burtville 16% Burtville Annual Report 2007 11/08/2006 to 11/08/2007 E38/1730
A72814 2006 Barrick (Granny Smith) Pty Ltd Wilga Dam 32% Wilga Dam Project E39/786, Annual Exploration Report for the Period 1 July 2005 to 30 June 2006, C314/1995, (
A72825 2006 Metex Resources Ltd Childe Harold <1% W128 Childe Harold E38/1123,1529,1652,1658,P38/3211-3213, Annual Technical Report for the Period 01/04/2005 to
A72164 2006 Placer (Granny Smith) Pty Ltd Barnicoat 38% Barnicoat Project, E38/494,M38/361,362,483, P39/3239,3291-3293, Mount Margaret Mineral Field, Annual Explorati
A72416 2006 Placer (Granny Smith) Pty Ltd Mikado 5.7% Mikado Project, Annual Exploration Report for the Period 1 January 2005 to 31 December 2005, C463/1996, (PGS R
A72951 2006 Crescent Gold Ltd Jubilee Well <1% Surrender Report, Jubilee Well JV E38/462, Period 21 January 2005 to 20 January 2006, Surrendered 27 January 2
A70514 2005 Placer Dome Asia Pacific Ltd Mikado 5.7% Mikado Project, Annual Report for the period 01/01/2004 - 31/12/2004 , E38/422, 680, 772, 930, 1126, E38/1205,
A70338 2005 Anglogold Ashanti Australia Ltd Sunrise Dam 6.9% Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M
A70566 2005 Anglogold Ashanti Australia Ltd Laverton <1% Annual report for the period 01/01/04 - 31/12/04 Laverton Project, C164/2002, E38/199, 399, 420, 462, 523, E38
A70688 2005 Placer Dome Asia Pacific Ltd Barnicoat 38% Barnicoat Project, M38/361, M38/362, M38/483, E38/494, P39/3239, P39/3291, P39/3292, P39/3293, Mount Margaret
A70691 2005 Placer Dome Asia Pacific Ltd Sunrise - Sunset <1% Sunrise - Sunset Project, Annual Report for the period 1st January 2004 to 31st December 2004, P39/3076, P39/3
A71360 2005 Placer (Granny Smith) Pty Ltd Wilga Dam 16% Wilga Dam Project, E39/347 & E39/786, Mount Margaret Mineral Field Western Australia, Annual Exploration Repor
A68271 2004 Placer (Granny Smith) Pty Ltd Barnicoat 38% Barnicoat Project, Annual Exploration Report M38/361-362, M38/ 483; E38/494; P39/3239, P39/ 3291-3293 for the
A68435 2004 Placer Dome Asia Pacific Ltd Sunrise/Sunset <1% Sunrise/Sunset Project, P39/3076, P39/3090, P39/3091, P39/3238, P39/3294, P39/3240. Mount Margaret Mineral Fii
A68436 2004 Placer Dome Asia Pacific Ltd Mikado 5.7% Annual report for the period 01/01/2003-31/12/2003 Mikado Project E38/0422, E38/0680, E38/0772, E38/0930, E38/
A69923 2004 Placer Dome Asia Pacific Ltd Wilga Dam 16% Wilga Dam Project, Annual exploration report for the period 1st July 2003 to 30th June 2004 X32, C314/1995, E3
A68170 2004 Anglogold Australasia Ltd Sunrise Dam 7.4% Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21
A68313 2004 Anglogold Australia Ltd Laverton 1.2% Annual Report for the period 01/01/2003-31/12/2003 Laverton Project (C164/2002), E38/1010, E38/1015, E38/1066,
A69921 2004 Placer Dome Asia Pacific Ltd Mikado 13% Mikado Project, E38/1205, Partial surrender report for the period 20th July, 2001 to 19th July 2004, C463/1996
A71952 2004 Anglogold Ashanti Australia Ltd Sunrise Dam 6.9% Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t
A65899 2003 Placer (Granny Smith) Pty Ltd Barnicoat 38% Combined Annual Mineral Exploration Report for the period 1 January 2002 to 31 December 2002 Barnicoat Project
A66170 2003 Placer (Granny Smith) Pty Ltd Sunrise-Sunset <1% Annual Report on Exploration period ending 30th September 2002 Sunrise-Sunset Project C185/1995: M39/217, P39/
A66171 2003 Placer (Granny Smith) Pty Ltd Mt Lebanon 5.7% Annual Report on Exploration period ending 31st December 2002 Mt Lebanon Project C463/1996: M38/9, E38/422, E3
A66180 2003 Anglogold Australia Ltd Jubilee Well <1% Annual Report for the period 21 January 2002 to 20 January 2003 ,Jubilee Well JV Project,[C164/2002], E38/462,
A66552 2003 Anglogold Australia Ltd Relief Well and Sunrise Bore 6.9% Relief Well JV & Sunrise Bore JV, E39/329, M38/427, 429, 358-59, 260, Annual Report for the period 1 February
A66976 2003 Placer (Granny Smith) Pty Ltd Wilga Dam 32% Wilga Dam Project, E39/786, Mount Margaret Mineral Field,Western Australia, Partial Surrender Report for the
A66542 2003 Anglogold Australia Ltd Sunrise Dam <1% Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366,
A67211 2003 Placer (Granny Smith) Pty Ltd Wilga Dam 16% Wilga Dam Project, E39/347,786, Mount Margaret Mineral Field, Western Australia Annual Exploration Report for
A67737 2003 Anglogold Australia Ltd Jubilee Well <1% Jubilee Well JV, E38/462, E38/523, Partial Surrender Report for the period 21/01/1996- 12/11/2003.
A64307 2002 Anglogold Australia Ltd Jubilee Well <1% Annual Report for the period 21 January 2001 to 20 January 2002 Jubilee Well JV E38/462, E38/523 & E338/524.
A64321 2002 Placer (Granny Smith) Pty Ltd Sunrise - Sunset <1% Annual Report on exploration Sunrise-Sunset Project M39/217, P39/3076, 3090-3091, 3119, 3238, 3240, 3294 for t
A64488 2002 Anglogold Australia Ltd Sunrise Dam <1% Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144
A65544 2002 Placer (Granny Smith) Pty Ltd Wilga Dam 16% Project E39/347, E39/786 Annual Report On Exploration For The Period 1st July 2001 To 30th June 2002 Group Rep
A64064 2002 Placer (Granny Smith) Pty Ltd Mt Lebanon P 5.7% Mt Lebanon Project M38/0009, E38/0422, E38/0680, E38/0772 E38/0930, E38/1126, E38/1205, E38/1206, P38/2239 and
A64258 2002 Placer (Granny Smith) Pty Ltd Barnicoat 38% Annual Report on exploration for the period 1 January 2001 to 31 December 2001 Barnicoat Project P39/3239, 329
A62105 2001 Placer (Granny Smith) Pty Ltd Barnicoat 38% Annual Report on exploration Barnicoat Project P39/3239, 3291, 3292, 3293; E38/494; M38/361, 362, 483 1 Januar
A63421 2001 Placer (Granny Smith) Pty Ltd Wilga Dam 16% Wilga Dam Project Mount Margaret Mineral Field Western Australia Annual Report On Exploration For The Period 1
A64334 2001 Anglogold Australia Ltd Sunrise Well/Sunrise Bore/Relief Well 6.9% Annual Report for the period 1 February 2001 to 31 January 2002 Relief Well JV & Sunrise Bore JV E39/329, M38/
A62104 2001 Placer (Granny Smith) Pty Ltd Sunrise - Sunset <1% Annual Report on exploration Sunrise/Sunset Project M39/217, P39/3075, 3090-3091, 3119, 3238, 3240, 3294 for t
A62813 2001 Anglogold Australasia Ltd Sunrise Well-Sunrise Bore 6.9% Relief Well Sunrise Bore Project E39/329, M38/427, M38/429 M39/358, M39/359 & M38/260 Annual Report for the pe
A63177 2001 Pan Palladium Ltd Sunset Strip 4.7% Annual Report on Exploration, Sunset Strip project, P38/2828 2829,2830, Ref C2/2001, Mt Margaret Mineral Field
A59851 2000 Placer (Granny Smith) Pty Ltd Sunrise - Sunset <1% Annual Report On Exploration Sunrise-Sunset Project M39/217, P39/3076,3090-3091,3119 For The Period 01/01/1999
A60543 2000 Placer (Granny Smith) Pty Ltd Barnicoat 38% Annual Report on Exploration, Barnicoat Project, P39/3239,32 3291-3293,E38/494,M38/361,362,483, Mt Margaret Go
A61260 2000 Placer (Granny Smith) Pty Ltd Wilga Dam 16% Wilga Dam E39/347 Annual Report on Exploration for the Period 1 July 1999 to 30 June 2000. C314/1995 Grid Ref:
A60182 2000 Acacia Resources Ltd Jubilee Well <1% Jubilee Well J.V; E38/462, E38/523 and E38/524; Annual report for the period 21/01/1999 to 20/01/2000
A60247 2000 Anglogold Australasia Ltd Relief Well 6.9% Relief Well JV & Sunrise Bore JV E39/329, M38/427-429, M39/358-360, M38/260 Annual report for the Period 1/2/1
A60321 2000 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999
A61954 2000 Anglogold Australasia Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat
A62054 2000 Anglogold Australasia Ltd Jubilee Well <1% Jubilee Well Project E38/462, E38/523 and E38/524 Verification Report, Annual Report for the period 21 January
A57772 1999 Placer (Granny Smith) Pty Ltd Barnicoat 38% Barnicoat Project-P39/3239, 3291-3293, E38/494, M38/361-362, M38/483 for the period 01/01/98 - 31/12/98
A57593 1999 Acacia Resources Ltd Jubilee Well <1% Acacia Resources Ltd Aurora Gold W.A Ltd Jubilee Well J.V E38/462,523.524 Annual Report For the Period 21/01/1
A58027 1999 Placer (Granny Smith) Pty Ltd Sunrise - Sunset <1% Sunrise - Sunset Project, Annual Report for the period 1st Janaury 1998 to 31st December 1998, M39/217; P39/
A58149 1999 Acacia Resources Ltd Relief Well 6.9% Relief Well JV And Sunrise Bore JV E39/329 M38/427,428,429, 260 M39/358,359,360 Annual Report For the Period 0
A59071 1999 Exodus Minerals Ltd Wilga Dam 16% Annual report Wilga Dam Exploration Licence 39/347 Prospecting Licences 39/2985 &39/2986 for the period 01/07/
A59519 1999 Abador Gold Nl Sunset Strip 14% 2nd Annual Report on P38/2828, Sunset Strip, Mt Morgan Mineral Field WA, Laverton 1:250,000 for the Period 28
A56033 1998 Exodus Minerals Ltd Wilga Dam 16% Annual Report - Wilga Dam Exploration Licence:39/347, Prospecting Licence:39/2985-2986 01/07/97 - 30/06/98
A56457 1998 Abador Gold Nl Sunset Strip 14% Sunset Strip Project First Annual Report on Prospecting Licence 38/2828, Mt Morgan Mineral Field, W.A, Laverto
A57146 1998 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9
A53829 1998 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997
A54452 1998 Placer (Granny Smith) Pty Ltd Sunset <1% Sunrise/Sunset Project, Mt Margaret Goldfield, W.A. 01/01/97 - 31/12/97 M39/217, P39/3076, 3090-3091, 3119, 32
A54524 1998 Placer (Granny Smith) Pty Ltd Barnicoat 16% Barnicoat Project, [8th] Annual Report 01/01/97 - 31/12/97, P38/2380, P39/3239, 3292-3293, P38/2380, E38/437,
A56251 1998 Placer (Granny Smith) Pty Ltd Barnicoat/Keringal 16% Hack Well/ Ophir Bore (E38/437) Surrender Report October 1998.
A56253 1998 Placer (Granny Smith) Pty Ltd Davis Well 7.7% Davis Well (E38/482) Surrender Report October 1998.
A52374 1997 Wmc Resources Ltd Wilga Dam 16% Annual Report 01/07/96-30/06/97 Wilga Dam E39/347 P39/2985 P39/2986 P39/3396 (Edjudina SH51-6 1:250 000)
A53166 1997 Acacia Resources Ltd Brumby Well <1% Jubilee Well J.V. E38/462, 523, 524 Laverton, North-Eastern Goldfields, Yilgarn W.A. Annual Report, 21/01/97
A53600 1997 Acacia Resources Ltd Relief Well 6.9% Relief Well JV and Sunrise Bore JV E39/329 M38/427-429 M39/358 M39/359 M39/360 M38/260 1997 Annual Report for
A50186 1997 Acacia Resources Ltd Brumby Well <1% Jubilee Well Joint Venture E38/462 E38/523 and E38/524 Annual report for the period 21/01/96 to 20/01/97 Repor
A50393 1997 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report
A51069 1997 Placer (Granny Smith) Pty Ltd Hack Well Grid- Barnicoat 35% Hack Well Grid- Barnicoat Project, Final Surrender Report for period ending 15th December 1996, P38/2396.
A50570 1997 Acacia Resources Ltd Relief Well 6.9% Relief Well Joint Venture and Sunrise Bore E39/329 M38/427 M38/428 M38/429 M39/358 M39/359 M39/360 and M38/260
A50913 1997 Placer (Granny Smith) Pty Ltd Sunset <1% Annual report on Exploration Sunrise/ Sunset Project M39/217 P39/3076 P39/3090 to P39/3091 P39/3119 P39/3238 P
A51588 1997 Placer (Granny Smith) Pty Ltd Barnicoat 16% Barnicoat Project P38/2380 P38/3239 P38/3291 P38/3292 P38/3293 E38/437 E38/482 E38/494 E38/502 M38/313 M38/361
A51717 1997 Placer (Granny Smith) Pty Ltd Ophir Bore/ Barnicoat 15% Ophir Bore/ Barnicoat Project,Surrender Report P38/2426, July 1997.
A51718 1997 Placer (Granny Smith) Pty Ltd Ophir Bore / Barnicoat 1.2% Ophir Bore / Barnicoat Project, Surrender Report P38/2427, July 1997.
A46975 1996 Acacia Resources Ltd Relief Well 6.9% Relief Well E39/329 1995 annual report for the period January 1995 to December 1995 Report NO. 08.7642
A47027 1996 Placer Exploration Ltd Barnicoat 15% Barnicoat Project P38/2380 P38/2396 P39/3239 P39/3291 P39/3292 P39/3293 E38/395 E38/437 E38/482 E38/494 E38/50
A47061 1996 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb
A47216 1996 Aurora Gold Ltd Brumby Well <1% H468 Brumby Well Project Western Australia Annual Technical Report for the period 21 January 1995 to 20 Januar
A47500 1996 Placer Prospecting Pty Ltd Sunrise/Sunset <1% Second Annual report on Exploration Sunrise/Sunset Project M39/217 P39/3076 P39/3090 P39/3091 P39/3238 P39/324
A48993 1996 Wmc Resources Ltd Wilga Dam 16% Annual report for the period 1 July 1995 to 30 June 1996 Wilga Dam Project Exploration Licence E39/347 Prospec
A44007 1995 Acacia Resources Ltd Relief Well 6.9% Relief Well Joint Venture E39/329, P39/2520 1994 Annual Report for the period January 1994 to 31 December 1994
A44189 1995 Aurora Gold Ltd Brumby Well <1% Annual Techincal Report Brumby Well Project Western Australia Exploraton Licences 38/462,38/523 and 38/524 For
A44303 1995 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3
A45379 1995 Acacia Resources Ltd Sunrise Bore 6.9% Sunrise Bore M38/260 And A Portion Of E39/329 ANNUAL REPORT for the period 31/1/94 to 31/1/95
A43702 1995 Placer Exploration Ltd Barnicoat 10% Barnicoat Project E38/298, 395, 437, 482, 502, 537, 494, P38/2380, 2393-2399 INCL. 2404, 2405, 2408, 2423-2429
A45239 1995 Western Mining Corporation Ltd Wilga Dam 16% Annual report for the period 1 July 1994 to 30 June 1995 The Wilga Dam Project Exploration Licence E39/347 Pro
A45544 1995 Placer Exploration Ltd Barnicoat 16% Partial Surrender Report for the period 07/09/92-18/08/95 ,Barnicoat Project ,E38/437.
A40299 1994 Billiton Australia Pty Ltd Sunrise Dam <1% Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263
A41746 1994 Placer Exploration Ltd Barnicoat 66% Annual Report for the period 11/02/93-10/02/94 Barnicoat Project E38/494
A42285 1994 Western Mining Corporation Ltd Wilga Dam 16% Annual Report for the period 28/10/92-30/06/94 The Wilga Dam Project E39/347 P39/2985-2986 (Edjudina, SH51-6,
A40377 1994 Dominion Mining Ltd Sunrise Well 6.9% Annual report for the period 01/93-01/94 Sunrise Well Prospect E39/329
A40522 1994 Placer Exploration Ltd Mount Weld 6.4% Annual Report for the Period 01/01/93 - 31/12/93 Mt Weld/Keringal/Ophir Bore Project
A41227 1994 Aurora Gold Ltd Brumby Well <1% Annual Technical Report Period: 21/01/93 to 21/01/94 Brumby Well Project E38/462, 38/523, 38/524
A42103 1994 Placer Exploration Ltd Sunset 4.2% Annual Report for the period 06/93-06/94 Sunset Project P39/3090-91,3238-40,3076,& 3119
A38516 1993 Dominion Mining Ltd Sunrise Well 6.9% Annual Report for the period 08/92-01/93 Sunrise Well(Edjudina) Project E39/329
A38820 1993 Billiton Australia Pty Ltd Sunrise Dam <1% Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263
A40012 1993 Billiton Australia Pty Ltd Sunrise Central <1% Partial surrender report, Sunrise Central, E39/229.
A36820 1992 Billiton Australia Pty Ltd Sunrise Dam <1% Sunrise Dam Project, Partial Surrender Report July 1992, . E39/174, 206, 229; Surrender Report E39/230.
A35603 1992 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2
A33010 1991 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230
A34983 1991 Mr Mckeaig Ls Sunrise Well 6.9% Sunrise Well Prospect Summary Report to 10/12/91 (R Report for 1991; E39/329; M38/260)
A28729 1989 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report ending 30 June 1989, Sunrise Dam Project, E39/174, E39/206, E39/227, E39/229, E39/230, P39/215
A14703 1985 Golconda Minerals Nl Hack Well 8.6% Hack Well Project, Final Surrender Report for the period ending 10/05/1985, E38/24.
A12968 1983 Golconda Minerals Nl Davis Well - Hack Well 6.4% Davis Well - Hack Well Project, Non-statutory Report: Geological Report, November 1983, E38/4, E38/24; P38/72-
A3742 1973 Pacminex Pty Ltd Wilga <1% Wilga Project, Annual Report for the period ending 31/10/1972, MC39/64-70, 73-79, 82-88, 91-97, 100-104, 109-1
A6945 1973 Kennecott Exp Aust Pty Ltd Erlistoun <1% Aeromag- Raw Data
A2691 1972 Australian Selection Pty Ltd Wilga 7.2% Wilga Project, Annual Report for the period ending 31/12/1971, TR70/3747; MC39/62-115, 136-143, 191-219, 911-9
A1366 1970 Australian Selection Pty Ltd Wilga 12% Wilga Area, Annual Report for the year ending 31/12/1969, TR70/3747H; MC39/62-115, 136-143, 191-209, 911-939 &
A1365 1968 Australian Selection Pty Ltd Wilga <1% Wilga Project, Non-statutory Report: Annual Report [s] 1966-1968, for the period ending 31/12/1968, TR70/3747,
A85886 1753 Anglogold Ashanti Australia Ltd Sunrise Dam 4.4% Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
15 months · 13 Dec 2027
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 38/2945 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 38/2945? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-26. Compiled by NextMaps. Verify against primary sources before reliance.