E 37/1437

LiveExploration LicenceShire of LeonoraMt. Malcolm District
Area
18,600ha
Expired
Sept 2026
22 days ago
WAMEX reports
213
WA median is 53
Report drilling
102
of 213 reports
Leonora Explore on the live map

Register summary

Holder
Nano Metals Pty Ltd
Local government
Shire of Leonora
Application received
12 Jan 2021
Commenced
7 Sept 2021
Expiry
6 Sept 2026
Term
5 Years

Exploration history on this ground

213 historical WAMEX exploration reports intersect E 37/1437: 97 report geochemistry or sampling, 100 include a digital data package.
When this ground was worked · 209 of 213 reports dated
41960s
761970s
21980s
231990s
372000s
542010s
132020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A149664 2025 Greenstone Resources (Wa) Pty Ltd King of the Hills <1% Final Surrender Report P37/9409 and P37/9410 King of the Hills Project for the period ending 9/4/2025
A138045 2024 Dynamic Metals Limited Leinster (E 37/1370) <1% Annual Report for Exploration Licence E 37/1370 Leinster for the period ending 14/11/2023.
A138184 2024 Dynamic Metals Limited Leinster <1% Final Surrender Report for E 37/1370 Leinster for the period ending 15/12/2023.
A133557 2023 Jindalee Resources Limited Lockyer Well <1% Annual Report for E 37/1370 Lockyer Well for the period ending 14/11/2022
A133859 2023 Xplore Resources Pty Ltd Knight <1% Annual Technical Report for Exploration Activity Knight Project E37/1336, Period Ending 14 November 2022.
208 more reports
A136884 2023 Fireant Resources Pty Ltd; Gascoyne Mining Limited Mount Ross <1% Annual Report for the Mount Ross Project P37/9466 for the period 09 June 2022 to 08 June 2023
A129143 2021 Auroch Minerals Ltd Leinster <1% Leinster Nickel Project P37/1370 Annual Technical Report for the period ending 13/11/2021
A129151 2021 Xplore Resources Pty Ltd Knight <1% Annual Technical Report For Exploration Activity Knight Project E37/1336, Period Ending 14 November 2021
A125789 2021 Xplore Resources Pty Ltd Knight <1% Annual Technical Report for Exploration Activity Knight Project E37/1336, Period Ending 14 November 2020
A126367 2021 Auroch Minerals Ltd; Jindalee Resources Ltd Leinster <1% Annual Report for E37/1370 Leinster Project for the period ending 14/11/2020
A124588 2020 Saracen Metals Pty Limited Bannockburn 3.4% Bannockburn Project (C113/2005) Annual Report for the Period 1 July 2019 to 30 June 2020
A124958 2020 Great Boulder Resources Ltd. Tarmoola 65% Final Surrender Report on Tarmoola NW Joint Venture C151/2016 for the period 8 March 2016 to 30 September 2020
A122629 2020 Xplore Resources Pty Ltd Knight <1% Knight project (tenure E37/1336) Annual Technical Report For Exploration Activity for the period 15 November 2
A120768 2019 Saracen Metals Pty Limited; Pvw Resources Nl Bannockburn 8.3% Bannockburn Project (C113/2005) Annual Report for the Period 1 July 2018 to 30 June 2019, E37/00907, M37/00135
A119925 2019 Talisman Nickel Pty Ltd Sinclair <1% Sinclair Nickel Project Combined Annual Report C1/2006 for the period 17 February 2018 to 16 February 2019
A120642 2019 Talisman Nickel Pty Ltd Bannockburn <1% Final Surrender Report for Tenement E37/903 Bannockburn project for the period 22 September 2008 to 3 April 2
A122214 2019 Great Boulder Resources Ltd. Tarmoola NW 65% Combined Annual Report on E37/1241, E37/1242, P37/8667, P37/8668, P37/8669, P37/8670, P37/8671, P37/8672, P37/
A115674 2018 Great Boulder Resources Ltd Tarmoola 66% C151/2016 Tarmoola Project Combined Annual Report for the period 1 October 2016 to 30 September 2017
A116758 2018 Talisman Nickel Pty Ltd Sinclair <1% Sinclair Nickel Project Combined Annual Exploration Report C1/2006 for the period 17 February 2017 to 16 Febru
A117443 2018 Saracen Metals Pty Limited Bannockburn 8.3% Bannockburn Project (C113/2005) Annual Report for the Period 1 July 2017 to 30 June 2018, E37/00907, M37/00135
A118637 2018 Great Boulder Resources Ltd. Tarmoola NW 65% Combined Annual Report on E37/1241, E37/1242, P37/8667, P37/8668, P37/8669, P37/8670, P37/8671, P37/8672, P37/
A113848 2017 Talisman Nickel Pty Ltd Sinclair <1% Sinclair Nickel Project C1/2006 Annual Report for the period 17 February 2016 to 16 February 2017, E36/00650..
A114600 2017 Saracen Metals Pty Limited Bannockburn 8.3% Bannockburn Project (C113/2005) Annual Report for the Period 1 July 2016 to 30 June 2017, E37/00907, M37/00135
A110712 2017 Talisman Nickel Pty Ltd Sturt Meadows 100% P37/7228 Sturt Meadows Project Final Surrender Report, 9 September 2008 to 9 September 2016
A114216 2017 Great Boulder Resources Ltd Tarmoola 79% C151/2016 Combined Annual Report on E37/1241 & E37/1242, Tarmoola Joint Venture, for the period 8 March 2016 t
A109645 2016 Saracen Metals Pty Limited Bannockburn 8% Bannockburn Project (C113/2005) Annual Report for the Period 1 July 2015 to 30 June 2016
A108580 2016 Talisman Nickel Pty Ltd Sinclair 3.4% Combined Annual Exploration Report Sinclair Nickel Project C1/2006 for the period 17 February 2015 to 16 Febru
A105469 2015 Saracen Metals Pty Limited Bannockburn 33% Bannockburn Project E37/907 Partial Surrender Report for the period 18/11/2008 to 17/11/2014
A105505 2015 Talisman Mining Ltd Sinclair 5.1% Sinclair Nickel Project Combined Annual Exploration Report C1/2006 For the Period 17 February 2014 to 16 Febru
A106556 2015 Talisman Mining Ltd Sturt Meadows 40% E37/538 Sturt Meadows Final Surrender Report for the period 10/08/2000 - 05/05/2015
A106898 2015 Saracen Metals Pty Limited Bannockburn 8% Bannockburn Project (C113/2005) Annual Report for the Period 1 July 2014 to 30 June 2015, E37/907, M37/135, M3
A107148 2015 Talisman Nickel Pty Ltd Sturt Meadows 96% E37/1012 STURT MEADOWS PROSPECT SINCLAIR NICKEL PROJECT Final Surrender Report 28th May 2009 – 14th July 2015
A100775 2014 St Barbara Ltd Leonora 53% Final Surrender Report Tenement: E37/945 Combined Reporting Group: C162/2006 (Leonora) Reporting Period 1 Octo
A102363 2014 Xstrata Nickel Australasia Operations Pty Ltd Bannockburn 4.7% Bannockburn Project, Annual Report for the period 17/02/2013 to 16/02/2014, E36/581 & 650; E37/538, 852-853, 9
A103502 2014 Saracen Metals Pty Limited Bannockburn - North Well - Mount Fouracr 8% ANNUAL REPORT ON THE BANNOCKBURN PROJECT COMBINED REPORT C113/2005 FOR THE PERIOD 1 JULY 2013 TO 30 JUNE 2014
A100875 2014 St Barbara Ltd Leonora 44% Leonora Project, Final Surrender Report for the period 05/09/2012 to 30/01/2014, E37/1127. [C162/2006]
A102057 2014 Xstrata Nickel Australasia Pty Ltd Mount Fouracre <1% Mount Fouracre Project (C46/2007) Combined Annual Report for P37/7230-7231 For the period 3/2/2013 to 2/2/2014
A102258 2014 St Barbara Ltd Leonora 7.7% Annual Mineral Exploration Report - DMP Combined Reporting Group C162/2006 (Leonora) Reporting Period 1 April
A97333 2013 T E Johnston & Assciates Pty Ltd Bannockburn 19% Bannockburn Project, Annual Report for the period 02/02/2012 to 01/02/2013, E37/943 & 1006. [C153/2010]
A97368 2013 Xstrata Nickel Australasia Operations Pty Ltd Mount Fouracre <1% MOUNT FOURACRE PROJECT Combined Annual Report for P37/7230-7231 For the period 3/2/2012 to 2/2/2013 Ref: C46/2
A98017 2013 St Barbara Ltd Leonora 6% Leonora Project, Annual Report for the period 1st April 2012 to 31st March 2013, E37/670.......E37/964; M36/41
A98611 2013 Norilsk Nickel Wildara Pty Ltd Bannockburn 7.9% Annual Report on the Bannockburn Project Combined Report C113/2005 for the period 1 July 2012 to 30 June 2013
A96820 2013 Areva Resources Australia Sturt Meadows 17% Final Surrender Report For the period 14 April 2010 to 20 November 2012 Sturt Meadows Project E37/1020
A96821 2013 Areva Resources Australia Lake Raeside 2 12% Final Surrender Report For the period 21 July 2011 to 20 November 2012 Lake Raeside 2 Project E37/1089
A98097 2013 Xstrata Nickel Australasia Operations Pty Ltd Bannockburn 4.7% Bannockburn Project, Annual Report for the period 17th February 2012 to 16th February 2013, E36/581 & 650; E37
A99614 2013 St Barbara Ltd Raeside West 44% Annual Mineral Exploration Report - DMP E37/1127 (Raeside West) Reporting Period: 5 September 2012 – 4 Septemb
A100798 2013 Xstrata Nickel Australasia Operations Pty Ltd Bannockburn <1% Bannockburn Project, Final Surrender Report for the period 28/10/2008 to18/12/2013, P36/1714-1719; E36/581; M3
A93862 2012 Xstrata Nickel Australasia Operations Pty Ltd Bannockburn 4.7% Bannockburn Project C1/2006 Annual Report for the Period 17th February 2011 to 16th February 2012
A94262 2012 Norilsk Nickel Wildara Pty Ltd Bannockburn 7.9% Annual Report on the bannockburn Project Combined Report C113/2005 for the period 1 July 2011 to 30 June 2012,
A95638 2012 Areva Resources Australia North Yilgarn 13% Annual Report For the period 1 August 2011 to 31 July 2012 North Yilgarn Project E37/1019, 1020, 1089 (C34/201
A96187 2012 Norilsk Nickel Wildara Pty Ltd Bannockburn <1% Bannockburn Project, Final Surrender Report for the period 18th November 2008 to 17th November 2012, P37/7353.
A96518 2012 Areva Resources Australia North Yilgarn 13% Annual Report For the period 1 August 2011 to 31 July 2012 North Yilgarn Project E37/1019, 1020, 1089
A93011 2012 Te Johnston And Associates Pty Ltd Bannockburn 19% Annual Technical Report Group C153/2010, E37/943 and E37/1006 for the period 2/2/2011 to 1/2/2012, Bannockbu
A93500 2012 Afmeco Mining & Exploration Pty Ltd North Yilgarn 17% Annual Report For the period 14 April 2011 to 14 April 2012, North Yilgarn Project E37/1020
A93822 2012 St Barbara Ltd Leonora 5.1% Leonora C162/2006 Annual Report for the Period 1 April 2011 to 31 March 2012
A93861 2012 Xstrata Nickel Australasia Operations Pty Ltd Mount Fouracre <1% Mount Fouracre Project Combined Annual Report for P37/7230-7231 For the period 3/2/2011 to 2/2/2012, C46/2007
A90094 2011 Xstrata Nickel Australasia Operations Pty Ltd Mount Fouracre <1% MOUNT FOURACRE PROJECT, Combined Annual Report for P37/7230-7231, For the period 3/2/2010 to 2/2/2011 Ref: C4
A90340 2011 Xstrata Nickel Australasia Operations Pty Ltd Bannockburn 4.7% Bannockburn Project, Annual Report for the period 17th February 2010 to 16th February 2011, Tenements as per C
A90352 2011 St Barbara Ltd Leonora 4.3% Leonora Project, Annual Report for the period 1st April 2010 to 31st March 2011, Tenements as per Combined Rep
A91067 2011 Norilsk Nickel Wildara Nl Bannockburn 7.9% Annual Report on the Bannockburn Project Combined Report C113/2005 for the period 1 July 2010 to 30 June 2011
A89754 2010 Te Johnston And Associates Pty Ltd Bannockburn 19% Annual Technical Report Group C153/2010 E37/943 and E37/1006 for the period 2/2/2010 to 1/2/2011 Bannockburn P
A86486 2010 Te Johnston And Associates Pty Ltd Bannockburn 81% Annual technical report on E37/943 Bannockburn, Leonora, WA. For the period 23 Feb 2009 to 22 Feb 2010
A87123 2010 St Barbara Ltd Leonora 4.3% Annual Report for the Period 1 April 2009 to 31 March 2010, Leonora, C162/2006, E37/235, E37/496, E37/573, E37
A87928 2010 Norilsk Nickel Bannockburn 7.9% Annual Report on the Bannockburn Project Combined Report C113/2005 for the period 1 July 2009 to 30 June 2010,
A86687 2010 Xstrata Nickel Australasia Opertions Pty Ltd Mount Fouracre <1% Mount Fouracre Project - Combined Annual Report for P37/7230-7231, For the period 3/2/2009 to 2/2/2010, C46/20
A86949 2010 Xstrata Nickel Australasia Opertions Pty Ltd Bannockburn 3.7% Bannockburn Project C1/2006 Annual Report for the Period 17th February 2009 to 16th February 2010, M37/383, M3
A87975 2010 Heron Resources Ltd Cutmore 44% Surrender report for the period 12 September 2008 to 20 August 2010, Cutmore Project, E37/876
A84135 2009 Xstrata Nickel Australasia Opertions Pty Ltd Bannockburn 3.6% Annual Exploration Report on The Bannockburn Project Tenements For the Period 17th February 2008 to 16th Febru
A81490 2009 Xstrata Nickel Australasia Opertions Pty Ltd STURT MEADOWS 90% SURRENDER TECHNICAL REPORT FOR E 37/798 STURT MEADOWS FOR THE PERIOD 14th November 2005 TO 6th November 2008
A84516 2009 Norilsk Nickel Wildara Nl BANNOCKBURN 6.8% ANNUAL REPORT ON THE BANNOCKBURN PROJECT COMBINED REPORT C113/2005, FOR THE PERIOD 1 JULY 2008 TO 30 JUNE 2009
A85028 2009 Heron Resources Ltd Cutmore 44% Annual report for the period 12 September 2008 to 11 September 2009, Cutmore Project, E37/876
A77874 2008 Jubilee Mines Nl Mount Fouracre <1% Annual Exploration Report on Mount Fouracre Project P37/6559-6560 For the period 3/2/2007 to 2/2/2008 C46/2007
A79372 2008 Norilsk Nickel Wildara Nl Bannockburn 7% Annual Report on the Bannockburn Project Combined Report C113/2005 for the period 1 July 2007 to 30 June 2008
A79836 2008 Mr Johnson Ng Sturt Meadows 26% E37/783, Annual report 2007 for Sturt Meadows Project, Report Period: 18 April 2006 – 17 April 2007
A79837 2008 Eagle Eye Metals Ltd Sturt Meadows 26% E37/783, Annual report 2008 for Sturt Meadows Project, Report Period: 18 April 2007 – 17 April 2008
A78217 2008 Jubilee Mines Nl Bannockburn 9.7% Annual Exploration Report on The Bannockburn Project Tenements For the Period 17th February 2007 to 16th Febru
A74642 2007 Sir Samuel Mines Nl Mount Fouracre <1% ANNUAL EXPLORATION REPORT ON MOUNT FOURACRE PROJECT P37/6559-6660 For the period 3/2/2006 to 2/2/2007
A75106 2007 Jubilee Mines Nl Sturt Meadows 41% Annual Exploration Report on E37/538, 616, 798 and P37/5949 -5953 and 6736,Sturt Meadows for the period 1st Ma
A75834 2007 Lionore Australia Pty Ltd Bannockburn 6.8% Annual Report on the Bannockburn Project Combined Report C113/2005 for the Period 1 July 2006 to 30 June 2007
A76143 2007 Norilsk Nickel Australia Ltd BANNOCKBURN 53% Surrender Report on the E37/752 Tenement For the period to 23 July 2007
A74968 2007 Jubilee Mines Nl Bannockburn 5.2% Annual Exploration Report on The Bannockburn Project over E36/183, E37/224, 253, etc. For the Period 17th Feb
A72574 2006 Jubilee Mines Nl Sturt Meadows 41% Annual Exploration Report on E37/538,616,P37/5949-5953 Sturt Meadows, For the Period 1 March 2005 to 28 Februa
A72376 2006 Jubilee Mines Nl Bannockburn 5.2% Annual Exploration Report on the Bannockburn Project over E36/183, E37/224, E37/253, etc., For the Period 1 Ja
A73469 2006 Lionore Australia Ltd Bannockburn 6.8% Annual Technical Report, Combined Reporting No. C113/2005 for Bannockburn Project, For the Period 1 July 2005
A70218 2005 Breakaway Resources Ltd Bannockburn 5.6% Annual technical report, Bannockburn project, E36/183, E37/224, 253, 287, E37/295, 431, 432, 457, 502, M37/135
A70405 2005 Sir Samuel Mines Nl Sturt Meadows 41% Annual exploration report on E37/538, E37/616, P37/5949, P37/5950-5953,Sturt Meadows Project for the period 1
A68280 2004 Jubilee Mines Nl Bannockburn 5.5% Bannockburn Project, Annual Technical Report E36/183, E37/224, E37/253, E37/287, E37/295, E37/431, E37/432, E
A68467 2004 Jubilee Mines Nl Sturt Meadows 50% Partial Surrender Report on E37/616, Sturt Meadows for the period 1 March 2001 to 29 February 2004.
A68466 2004 Jubilee Mines Nl Sturt Meadows 41% Annual exploration report on E37/538, E37/616 and P37/5949-5953, Sturt Meadows Project for period 1 March 2003
A65858 2003 Anaconda Nickel Ltd Sturt Meadows 22% Annual Technical Report for period 3 October 2001 to 2 October 2002. Sturt Meadows Project Old Station Well E3
A66547 2003 Sons Of Gwalia Ltd Tarmoola West 53% Tarmoola West Project, Surrender Report for the period 9 February 2001 - 28 February 2003. Group C113/2002, Te
A66287 2003 Jubilee Mines Nl Bannockburn 5.5% Annual Exploration Report for the period 1st January 2002 to 31st December 2002 The Bannockburn Nickel/Base Me
A66714 2003 Jubilee Mines Nl Sturt Meadows 41% Annual Exploration Report on E37/538, 616 and P37/5949-53 Sturt Meadows for the period 1st March 2002 to 28th
A67526 2003 Jubilee Mines Nl Sturt Meadows 40% Partial Surrender Report, E37/538, Sturt Meadows for the period 10 August 2000 to 9 August 2003 Technical Repo
A64203 2002 Breakaway Resources Ltd Bannockburn 5.6% Annual Technical Report Bannockburn Project E36/183, E37/224 E37/253, E37/287, E37/295, E37/431, E37/432, E37/
A65486 2002 Sons Of Gwalia Ltd Tarmoola West 53% Tarmoola West Project Area E37/636, P37/6058-P37/6086 2001/02 Annual Report For Period 09/02/01 To 08/02/02 Mo
A64662 2002 Anaconda Nickel Ltd Sturt Meadows 22% Sturt Meadows Project Technical Report 1252 Old Station Well E37/645 Annual Technical Report For Period 3 Dece
A64906 2002 Agnew Gold Mining Company Pty Ltd Victory – Doyle’s Well <1% Victory – Doyle’s Well Project, Annual Report For The Period 1.5.2001 to 30.4.2002 E37/406; P37/5830 P37/5831,
A64933 2002 Jubilee Mines Nl Sturt Meadows 41% Annual Exploration Report On E37/538, 616 and P37/5949-5953 Sturt Meadows For The Period 21st July 2000 to 28t
A61959 2001 Arrow Resources Management Pty Ltd Bannockburn 4.3% Annual Technical Report Bannockburn Project E36/183, E36/334 E37/201, E37/202, E37/224, E37/253, E37/287, E37/
A62756 2001 Wmc Resources Ltd Doyle's Well <1% Doyle's Well Project, Exploration License E37/406 Partial Relinquishment Report For The Period 10.4.1996 to 9.
A62392 2001 Arrow Resources Management Pty Ltd Bannockburn 5.3% Surrender And Partial Relingquishment Report Bannockburn Project E37/401, E37/430, E37/431, E37/432 & E37/497
A62898 2001 Wmc Resources Ltd Victory - Doyle's Well <1% Victory - Doyle's Well Combined Annual Report For The Period 1.5.2000 to 30.4.2001 Exploration License E37/406
A60535 2000 Mines Administration Pty Ltd Schmitz Pools 23% Report on Work to date at Schmitz Pools 1972. (MC37/387 to MC37/389, MC37/391, MC37/393, MC37/395, MC37/39 9,
A57875 1999 Consolidated Gold Mines Ltd Bannockburn 5.2% Bannockburn Project 01/01/98 - 31/12/98 E36/183, E37/201, 224, 253
A59461 1999 Heron Resources Ltd Doyle Well- Victory <1% Doyle Well - Victory Project, E37/406, Annual Report for the period 1st April 1998 to 1st April 1999.
A55733 1998 North Ltd Balkan Well 56% Balkan Well E37/331, P37/5388-5405, P37/5420-5422, P37/5428-5432, P37/5436, P37/5505-5506 Annual Report 1997 -
A54613 1998 Consolidated Gold Mines Ltd Bannockburn 5.1% Bannockburn Project, Regional Exploration Annual Report 1997, E36/183, E37/201, 224, 253
A54620 1998 Consolidated Gold Mines Ltd Banncockburn - Lake Raeside 17% Banncockburn- Lake Raeside Project, , Annual Report: 1997 E37/432.
A50623 1997 Australian Gold Fields Nl Mount Fouracre 30% Annual report Mt Fouracre E37/295 and P37/4039 for the period 1 January 1996 to 31 December 1996
A50796 1997 Stockdale Prospecting Ltd Wilbah <1% Wilbah Project,1996 First and Final Report E37358, March 1997.
A52609 1997 Heron Resources Ltd Doyle Well <1% Doyle Well Project. E37/406. Annual report 10/04/96-09/04/97.
A57038 1997 Australian Gold Fields Nl Miranda 2.4% Miranda Project, Cottees Project, Bannockburn Project, Mt Ida Project. E26/133, 183, 252, 258 01/11/96
A51582 1997 Placer Exploration Ltd Balkan Well 56% Balkan Well Project E37/331,P37/5388-5405,5420-5422,5428- 5436 First Annual Combined Report for the Period 10/
A57037 1997 Consolidated Gold Mines Ltd Miranda 2.4% Miranda Project-M36/34, 61-64, 69-75, 77, 89 etc. Bannockburn Project-M37/135, 339, E37/201, 224, 253,287 etc.
A48475 1996 Australian Gold Fields Nl Mount Fouracre 30% Annual report Mt Fouracre E37/295 and P37/4039 for the period 1 January 1995 to 31 December 1995 Mt Margaret M
A48675 1996 Mr Mason H Balkan Well 77% Balkan Well E37/331 1995 - 1996 Annual Report
A49975 1996 Mr Mason H Balkan Well 77% Balkan Well E37/331 Annual Report 1995 - 1996
A44934 1995 Plutonic Operations Ltd Lockyer Well 37% Lockyer Well Project, Annual Report E37/201for period 10/06/1994 to 09/06/1995.
A45302 1995 Mr Mason H Balkan Well 58% Balkan Well E37/331 and P37/4894 - 4917 1994 - 1995 Annual Report
A40025 1994 Sons Of Gwalia Ltd Sturt Meadows 67% Sturt Meadows Project, Annual Report for the period 19th January 1992 to 18th January 1993, E37/248.
A40869 1994 Dominion Mining Ltd Mount Fouracre 30% Annual Report for the Period 09/03/93 - 08/03/94 Mt Fouracre Project E37/295
A41083 1994 Sons Of Gwalia Ltd Sturt Meadows 67% Sturt Meadows Project, Annual Report for the period 19th January 1993 to 18th January 1994, E37/248.
A42599 1994 Plutonic Operations Ltd Lockyer Well 37% Lockyer Well Project, Partial Surrender Report(& Final Surrender Report ) November 1994, E37/201.
A41839 1994 Plutonic Operations Ltd Chilcoot - Lockyer Well 37% Chilcoot - Lockyer Well (JV) Project, Annual Report for the period 10/06/1993 to 09/06/1994, E37/201.
A36560 1992 Dakota Gold Mines Pty Ltd Lockyer Well 37% Lockyer Well Project, Annual Report for the period June 10th 1991 to June 9th 1992, E37/201.
A34118 1991 Dakota Gold Mines Pty Ltd Lockyer Well 37% Lockyer Well Project, Annual Report for the period 10th June 1990 to 9th June 1991, E37/201.
A78 1985 Western Mining Corporation Ltd Kurrajong - Mount Clifford 3.2% Temporary reserve (non-statutory) report file, Kurrajong, 3755H, 5325H, 5326H, Data folder
A1786 1985 Western Mining Corporation Ltd Mount Clifford - Kurrajong 3.2% Mount Clifford MC and TR Group, 3755H (area 2), Ground magnetometer profiles (non-statutory report), June 1971
A7731 1978 Western Mining Corporation Ltd Fly Bore 30% Fly Bore Project, Non-statutory Report: Terminal Report for the period 30th June 1976 to 16th March 1977, MC37
A6815 1976 Western Mining Corporation Ltd Fly Bore -Wildara 30% Fly Bore -Wildara Project, Annual Report for the period 1st July 1973 to 29th June 1976, MC37/477-485.
A4255 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: [Temporary Reserve & Mineral Claim Complex, Marshall Pool A
A4256 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: [Temporary Reserve & Mineral Claim Complex], Mount Clifford
A4257 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: [Temporary Reserve & Mineral Claim Complex], Mount Clifford
A4258 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, [Temporary Reserve & Mineral Claim Complex], Mount Clifford North, Vacuum Drillin
A4259 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project,Non-statutory Report:[Temporary Reserve & Minera Claim Complex], Wildara Percussio
A4260 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: Temporary Reserve & Mineral Claim Complex, Auger and Percus
A4261 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project,Non-statutory Report: [Temporary Reserve & Mneral Claim Complex], Diamond Drilling
A4262 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: [Temporary Reserve and Mineral Claim Complex], Computer Pri
A4263 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report:Soil Geochemistry, October 1973, TR70/3755 & 5325-5326.
A4264 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: [Temporary Reserve & Mineral Claim Complex, Marshall Well N
A4265 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara, Non-statutory Report: [Temporary Reserve and Mineral Claim Complex, Tarmoola, Mount Newma
A4266 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: [Temporary Reserve & Mineral Claims Complex ,780 Prospect &
A4267 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara project,Non-statutory Report: [Temporary Reserve and Mineral Claim Complex], Ground Magnet
A4268 1973 Western Mining Corporation Ltd Kurrajong - Wildara 3.1% Exploration activities in TRs 3755H and 4264H (non-statutory report), July 1967 to June 1973, (Wildara, Marsha
A14476 1973 Western Mining Corporation Ltd Kurrajong 3.2% Kurrajong Project, Non-statutory Report: Geological & Geochemistry Plans for the period covering December 1969
A14483 1973 Western Mining Corporation Ltd Mount Clifford 3.1% Mount Clifford Project, Non-statutory Report: Brief Exploration Report for the period 01/07/1967 to 30/06/1973
A14487 1973 Western Mining Corporation Ltd Mount Clifford 3.2% Mount Clifford Project, Non-statutory Report: Kurrjong-Wildara Soil Geochemistry Computer Printout, April 1972
A15494 1973 Western Mining Corporation Ltd Mount Clifford - Bannockburn Well 3.2% Mount Clifford - Bannockburn Well Project, Non-statutory Report: 1973 Field Reduction Sheets, Transient EM, 10
A2248 1972 Western Mining Corporation Ltd Kurrajong 3.2% Kurrajong Project, Non-statutory: Computer Printout , Kurrajong Ironstones, Assay Report, Parts 1 & 2, TR70/3
A2340 1972 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong Ironstones, 1970 map index, topography & sheet layout for assay report (non-statutory)
A2341 1972 Western Mining Corporation Ltd Kurrajong 3.2% Kurrajong Project, Non-statutory Report: Computer Print-out of Assay Results, January 28th 1972, TR70/3755.
A2342 1972 Western Mining Corporation Ltd Tarmoola - Wildara-Kurrajong 3.2% Tarmoola - Wildara-Kurrajong Project, Non-statutory Report: Tarmoola Ironstones Computer printout, Assay Resul
A2833 1972 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara, 3755H, Aeromagnetic and geological plans (non-statutory report), July 1972
A2834 1972 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara, 3755H, Aeromagnetic survey plans (non-statutory report), July 1972
A2835 1972 Western Mining Corporation Ltd Kurrajong 3.2% Kurrajong Project, Non-statutory Report: Diamond Drilling, 1969 , TR70/3755H.
A2836 1972 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report:Drill Hole Logs & Assay Results, 1970, TR70/3755, 5325 & 532
A2841 1972 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: , Percussion Drilling, 1969-1970, TR70/3755H.
A2842 1972 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: Percussion Drilling, Log & Assay Sheets, 1969 - 1971, TR70/
A2895 1972 Western Mining Corporation Ltd Mount Newman 7.4% Mount Newman Project, Non-statutory Report for the year ending 30th June 1972, MC37/401-444, 475-483, 2278, 22
A3098 1972 Western Mining Corporation Ltd Kurrajong- Wildara 3.2% Kurrajong - Wildara Project, Annual Report, October 1973, [Soil Geochemistry- Computer Printout 14/04/1972], T
A3140 1972 Petrocarb Exploration Nl Sturts Meadows - 3 Mile Hill 100% Sturts Meadows - 3 MIle Hill Project, Non-statutory Report: Final Report on Percussion Drilling , March 1972,
A3211 1972 Carpentaria Exp Co Pty Ltd Schmitz Pools 20% Schmitz Pools Project, Non-statutory Report: Progress Report, July 1972, MC37/337-339, 391, 395, 399, 453-460,
A3329 1972 Carpentaria Exp Co Pty Ltd Schmitz Pools 21% Schmitz Pools Project, Non-statutory Report: Final Report, December 1972, MC37/337-339, 391, 395, 399, 453-460
A12285 1972 Mines Administration Pty Ltd Schmitz Pools 23% Schmitz Pools Project, Non-statutory Report: Report on Work to Date at Schmitz Pools, February 1972, MC37/387-
A14480 1972 Western Mining Corporation Ltd Kurrajong- Wildara- Mount Clifford 3.2% Kurrajong- Wildara - Mt Clifford Project, Non-statutory Report: Vacuum Drilling Data, to August 1972, TR70/375
A14482 1972 Western Mining Corporation Ltd Mount Clifford- Kurrajong- Wildara 3.2% Mount Clifford- Kurrajong- Wildara Project, Non-statutory Report: Diamond Drilling Data. 1969/1970, TR70/3755,
A14485 1972 Western Mining Corporation Ltd Mount Clifford 3.2% Mount Clifford Project, Non-statutory Report:Tarmola Ironstones Printout, Kurrjong Soils Master File 1, March
A60537 1971 Mines Administration Pty Ltd Doyle Well 76% Summary of Work completed on Doyle Well central section Block 'B' with special reference to Mineral Claims und
A1761 1971 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report; Diamond D.H. Assay & Log Sheets, file 1, June 1971, Tr70/53
A1765 1971 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: Percussion Drillling at the "880" Prospect, Hole No MCP 226
A1766 1971 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: Percussion Drilling at Mount Newman Prospect,
A1767 1971 Western Mining Corporation Ltd Kurrajong - Wildara - Marshall Pool 3.2% Kurrajong - Wildara, 5325H, 5326H, 3755H, Percussion drilling (non-statutory report) - Marshall Pool, June 197
A1769 1971 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: Percussion Drillling, Chrysoprase Prospect, Hole Nos: MCD22
A1770 1971 Western Mining Corporation Ltd Kurrajong- Wildara 3.2% Kurrajong- Wildara Project, Non-statutory Report:Percussion Drilling , "832" Prospect, June 1971, TR70/5325-53
A1771 1971 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: Vacuum Drill Hole Data, File 1, Holes 1-99, June1971, TR70/
A1772 1971 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: Vacuum Drill Hole Data, File 2, ( Holes 100-199), June 1971
A1773 1971 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Vacuum Drill Hole Data, File 3, Holes 200-299, June 1971, TR70/5325-5326 & 3755H.
A1774 1971 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: Vacuum Drill Hole Data, File 4, ( Holes 300-399) June 1971,
A1775 1971 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara, TR70/5325H, 5326H, 3755H, Vacuum drill hole data (non-statutory report), June 1971
A1776 1971 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: Special Vacuum Down Hole Data Sheets, Hole Nos: B1-15,
A1777 1971 Western Mining Corporation Ltd Kurrjong - Wildara -Fly Bore 3.2% Kurrjong- Wildara - Fly Bore Project, Non-statutory Report: Ironstone Sampling at Fly Bore , Geochemical Data
A1782 1971 Western Mining Corporation Ltd Kurrajong - Marshalls Pool 3.2% Annual (non-statutory) tenements report, Marshalls Pool Mineral Claims & TR Group, Ground magnetometer profile
A1792 1971 Western Mining Corporation Ltd Mount Clifford - Kurrajong 3.2% Mount Clifford MC and TR Group, 3755H (area 2), Ground magnetometer profiles (non-statutory report), June 1971
A1909 1971 Western Mining Corporation Ltd Mount Newman 8.2% Mount Newman Project, Annual Report for the year ending 30th June 1971, MC37/401-439, 441-443, 475-483, 2278,
A1942 1971 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara, 3755H & surrounding MC, Soil sampling data sheets (non-statutory report), August 1971
A1992 1971 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara, 3755H, Diamond drill hole data sheets (non-statutory report), October 1971
A2538 1971 Mines Administration Pty Ltd Doyle Well 76% Doyle Well Project,Non-statutory Report: Summary of Work Completed on Doyle Well Central Section Block "B" ,w
A2583 1971 Mines Administration Pty Ltd North Well 41% North Well Project, Non-statutory Report: Brief Exploration Review Report for the period ending 30/09/1971,(
A2843 1971 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: Drill Hole List [MCV503-MCV558] & Data Sheets, to June 197
A3139 1971 Petrocarb Exploration Nl 3 Mile Hill - Sturts Meadows 100% 3 Mile Hill - Sturts Meadows Project, Non-statutory Report:Preliminary Report of Percussion Drilling, August 1
A15384 1971 Western Mining Corporation Ltd Wildara- Kurrajong 3.2% Wildara -Kurrajong Project, Non-statutory Report:[Wildara Mineral Claim and TR Group], Ground Magnetometer Pro
A74 1970 Western Mining Corporation Ltd Kurrajong - Mount Clifford 3.2% Mount Clifford, Non-statutory report, Geological maps, 1970, TR70/3755, 5325 & 5326H.
A75 1970 Western Mining Corporation Ltd Kurrajong - Mount Clifford 3.2% Temporary reserve report file (annual report), Kurrajong, 3755H, 5325H, 5326H, Data file - ground magnetometer
A76 1970 Western Mining Corporation Ltd Kurrajong - Mount Clifford 3.2% Temporary reserve (non-statutory) report file, Kurrajong, 3755H, 5325H, 5326H, Data folder
A77 1970 Western Mining Corporation Ltd Kurrajong - Mount Clifford 3.2% Temporary reserve (non-statutory) report file, Kurrajong, 3755H, 5326H, 5327H, Data folder - index to plans
A80 1970 Western Mining Corporation Ltd Mount Clifford-Bannockburn Well 3.2% Mount Clifford-Bannockburn Well Project, Non-statutory Report: Data Folder:- Sample Data Sheets & Logs for the
A81 1970 Western Mining Corporation Ltd Mount Clifford-Bannockburn Well 3.2% Mt Clifford-Bannockburn Well Project, Non-statutory Report: Data Folder:-Sample Data Sheets & Ironstone Sampli
A82 1970 Western Mining Corporation Ltd Kurrajong 3.2% Kurrajong Project, Non-statutory Report: Data Folder to December 1968,TR70/3755H, 5325 & 5326H,
A3141 1970 Petrocarb Exploration Nl Sturts Meadows - 3 Mile Hill 100% Sturts Meadows - 3 Mile Hill Project, Non-statutory Report: Report on the Induced Polarisation & Resistivity
A14477 1970 Western Mining Corporation Ltd Kurrajong 3.2% Kurrajong Project, Non-statutory Report : Ground Magnetic Profiles , November 1970, TR70/3755, 5325 & 5326.(
A14478 1970 Western Mining Corporation Ltd Kurrajong - Mount Clifford 3.2% Kurrajong - Mt Clifford Project, Non-statutory Report: I P Profiles & Resistivity Surveys, 1969 & 1970, Tr70/
A14481 1970 Western Mining Corporation Ltd Kurrajong- Mount Clifford 3.2% Kurrajong - Mt Clifford Project, Non-statutory Report: Percussion Drilling, June 1969 to June 1970, TR70/3755,
A14486 1970 Western Mining Corporation Ltd Mount Clifford 3.2% Mount Clifford Project, Non-statutory Report: Kurrjong Ironstones Computer Printout, Master Files 1& 2, 1972.
A14488 1970 Western Mining Corporation Ltd Mount Clifford 3.2% Mount Clifford Project, Non-statutory Report: Ground Magnetometer Profiles, [Areas A,B & C] 1969 & 1970, TR70/
A79 1969 Western Mining Corporation Ltd Mount Clifford - Kurrajong 3.2% Mt Clifford -Kurrajong Project, Non-statutory Report:Report :- Induced Polarization & Resistivity Survey, Augu
A14479 1969 Western Mining Corporation Ltd Mount Clifford 3.2% Mount Clifford Project, Non-statutory Report: Annual Report:- Ground Magnetometer Profiles [ Box 1],1968-1969,
A839 1968 Western Mining Corporation Ltd Kurrajong - Wildara 3.2% Kurrajong - Wildara Project, Non-statutory Report: Base Metals & Ground Magnetic Profiles, to March 1968, TR70
A838 1967 Western Mining Corporation Ltd Kurrajong 3.2% Kurrajong Project, Non-statutory Report: Kurrajong Area, [List of maps], Bundarra, Cudmore, Lawlers, Bannockbu
A79068 1753 Gme Resources Ltd Mount Fouracre 100% MT FOURACRE PROJECT E37/845 SURRENDER REPORT, Reporting Period: 20 February 2007 to 22 April 2008
A82836 1753 St Barbara Ltd Leonora <1% LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2008 – 31 MARCH 2009 GROUP: C162/2006 TENEMENTS: E37/235,
A12932 1753 Southern Goldfields Ltd Mount Fouracre 45% Mt Fouracre Non-statutory Report
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
Past expiry date · 6 Sept 2026
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 37/1437 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 37/1437? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.