E 37/1431
Register summary
- Holder
- Daylight Wa Pty Ltd
- Local government
- Shire of Leonora
- Application received
- 17 Dec 2020
- Commenced
- 30 Aug 2021
- Expiry
- 29 Aug 2026
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A134652 | 2023 | Round Oak Minerals Pty Ltd | Teutonic Bore | <1% | E 37/1278 Partial Surrender Report, Teutonic Bore Project for the period 15 February 2017 to 14 February 2023 |
| A126256 | 2021 | Round Oak Minerals Pty Ltd | Teutonic Bore P | 35% | Partial Surrender Report, Teutonic Bore Project, E37/1161, for the period ending 6 November 2020 |
| A123220 | 2020 | Round Oak Jaguar Pty Ltd; Round Oak Jaguar Project Pty Ltd | Teutonic Bore Project | 3.1% | Combined Annual Report 2019 Teutonic Bore Project C/157/2002 for the period 1 January 2019 to 31 December 2019 |
| A123360 | 2020 | Round Oak Jaguar Pty Ltd | TEUTONIC BORE | <1% | Annual Report E37/1278, Teutonic Bore, 15 February 2019 to 14 February 2020 |
| A125277 | 2020 | Darlot Mining Company Pty Ltd | King of the West | <1% | King of the West E37/1253 Annual Report for the period ending 5/9/2020 |
79 more reports
| A119556 | 2019 | Round Oak Jaguar Project Pty Ltd; Round Oak Jaguar Pty Ltd | Teutonic Bore | 3.1% | C157/2002 Combined Annual Report for Teutonic Bore Project for the period 1 January 2018 to 31 December 2018 |
| A119723 | 2019 | Round Oak Jaguar Pty Ltd | Teutonic Bore | <1% | Annual Report on E37/1278 Teutonic Bore Project for the period 15 February 2018 to 14 February 2019 |
| A121914 | 2019 | Roman Kings Pty Ltd | King of the West | <1% | Annual Report for E37/1253 King of the West for the period 6 September 2018 to 5 September 2019 |
| A116474 | 2018 | Independence Jaguar Pty Ltd | Teutonic Bore | <1% | ANNUAL REPORT ON E37/1278 TEUTONIC BORE PROJECT FOR THE PERIOD 15 FEBRUARY 2017 TO 14 FEBRUARY 2018 |
| A118154 | 2018 | Roman Kings Pty Ltd | King of the West | <1% | Annual Report for E37/1253 King of the West for the period 6 September 2018 to 5 September 2018 |
| A115994 | 2018 | Independence Group Nl | Teutonic Bore | 3.1% | Combined Annual Report C157/2002 Teutonic Bore Project for the period from 1st January 2017 to 31st December 2 |
| A112037 | 2017 | Independence Group Nl | Teutonic Bore | 3% | Combined Annual Report on C157/2002 Teutonic Bore Project for the period 1 January 2016 to 31 December 2016 |
| A115120 | 2017 | Roman Kings Pty Ltd | King of the West | <1% | Annual Report for E37/1253 King of the West Project 6 September 2016 to 5 September 2017 |
| A107737 | 2016 | Independence Group Nl | Teutonic Bore | 3% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2015 to 31 December 2015 |
| A105028 | 2015 | Independence Group Nl | Teutonic Bore | 3.7% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2014 to 31 December 2014, |
| A105027 | 2015 | Independence Group Nl | Teutonic Bore | <1% | [Annual Report] E37/1189 TEUTONIC BORE PROJECT, FOR THE PERIOD 1 JANUARY 2014 TO 31 DECEMBER 2014. |
| A102069 | 2014 | Independence Group Nl | Teutonic Bore | <1% | Final Surrender Report on E37/914, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the |
| A102070 | 2014 | Independence Group Nl | Teutonic Bore | <1% | Final Surrender Report on E37/980, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the |
| A100605 | 2014 | Independence Group Nl | Teutonic Bore | <1% | Final Surrender Report on E37/911, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the |
| A101281 | 2014 | Independence Group Nl | Teutonic Bore | 3.1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2013 to 31 December 2013, |
| A102258 | 2014 | St Barbara Ltd | Leonora | <1% | Annual Mineral Exploration Report - DMP Combined Reporting Group C162/2006 (Leonora) Reporting Period 1 April |
| A102687 | 2014 | Independence Group Nl | Teutonic Bore | <1% | Final Surrender Report on E37/912, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the |
| A97747 | 2013 | Independence Group Nl | Teutonic Bore | 3.1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2012 to 31 December 2012, |
| A98017 | 2013 | St Barbara Ltd | Leonora | <1% | Leonora Project, Annual Report for the period 1st April 2012 to 31st March 2013, E37/670.......E37/964; M36/41 |
| A98608 | 2013 | Independence Group Nl | Teutonic Bore | 3.1% | Teutonic Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E37/258........E37 |
| A100535 | 2013 | Independence Group Nl | Teutonic Bore | 37% | Final Surrender Report on E37/899, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the |
| A100374 | 2013 | Independence Group Nl | Teutonic Bore | <1% | Final Surrender Report on E37/829, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the |
| A100375 | 2013 | Independence Group Nl | Teutonic Bore | <1% | Final Surrender Report on E37/1107, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the |
| A93519 | 2012 | Jabiru Metals Ltd | Teutonic Bore | 3.1% | Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2011 to 31st December 2011 |
| A93822 | 2012 | St Barbara Ltd | Leonora | <1% | Leonora C162/2006 Annual Report for the Period 1 April 2011 to 31 March 2012 |
| A89792 | 2011 | Jabiru Metals Ltd | Teutonic Bore | 4.8% | Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2010 to 31st December 2010 |
| A90352 | 2011 | St Barbara Ltd | Leonora | <1% | Leonora Project, Annual Report for the period 1st April 2010 to 31st March 2011, Tenements as per Combined Rep |
| A86577 | 2010 | Jabiru Metals Ltd | Teutonic Bore | 5.3% | Teutonic Bore Project Combined Annual Report C157/2002, For the period 1st January 2009 to 31st December 2009, |
| A87123 | 2010 | St Barbara Ltd | Leonora | <1% | Annual Report for the Period 1 April 2009 to 31 March 2010, Leonora, C162/2006, E37/235, E37/496, E37/573, E37 |
| A81243 | 2009 | Jabiru Metals Ltd | TEUTONIC BORE | 5.4% | TEUTONIC BORE PROJECT COMBINED ANNUAL REPORT C157/2002 For the period 1st January 2008 to 31st December 2008 |
| A85333 | 2009 | Brumby Resources Ltd | Brilliant Well | <1% | FINAL REPORT FOR E37/887 For the Period 21 July 2008 to 22 September 2009, E37/932 For the Period 18 June 2008 |
| A82914 | 2009 | Brumby Resources Ltd | BRILLIANT WELL JV | <1% | Annual Report E37/820, 831, 799, 887, 932 and 933, For the Period 1 April 2008 to 31 March 2009 BRILLIANT WELL |
| A78149 | 2008 | Jabiru Metals Ltd | Teutonic Bore | <1% | COMBINED ANNUAL REPORT, E37/512, E37/258, E37/319, M37/44, M37/515, M37/1132, M37/1153, P37/4326, P37/6794-P37 |
| A75800 | 2007 | Jabiru Metals Ltd | Charlie Chicks | 25% | Final Surrender Report E37/556 for reporting period 6th July 2000 to 5th July 2007 (Charlie Chicks Project). |
| A74695 | 2007 | Jabiru Metals Ltd | Teutonic Bore | 4.6% | Combined Annual Report Teutonic Bore Project C157/2002 From 18 January 2006 to 17 January 2007 |
| A76173 | 2007 | Rubicon Resources Ltd | Jaguar South | <1% | Annual Technical Report Jaguar South Project E37/829 14th September 2006 to 13th September 2007 |
| A72195 | 2006 | Jabiru Metals Ltd | Heather Bore | 21% | Annual Report, E37/553 (Mt Clifford) & E37/556(Charlie Chicks), Heather Bore Project C72/2001, From 1 January |
| A72388 | 2006 | Jabiru Metals Ltd | Teutonic Bore | <1% | Combined Annual Report E37/258, 512, M37/44,515, 1132, 1153, P37/4326, Teutonic Bore Project, Combined Reporti |
| A72900 | 2006 | Plasia Pty Ltd | Teutonic Bore South | <1% | Annual Technical Report on E37/788 Teutonic Bore South, For the Year Ending 9 June 2006, (Leonora). |
| A70505 | 2005 | Jabiru Metals Ltd | Teutonic Bore | <1% | Combined annual report, E37/258, 501, 512, 691, M37/44, P37/4326, and 6235, Teutonic Bore Project, C157/2002, |
| A70999 | 2005 | Jabiru Metals Ltd | Teutonic Bore | 25% | Annual report E37/556 (Charlie Chicks) Teutonic Bore Project C72/2001, From 1 January 2003 to 31 December 2004 |
| A71284 | 2005 | Great Gold Mines Nl | Teutonic Bore | 4.6% | Exploration Licence 37/599, Teutonic Bore, Annual Report for the period 15 November 2003 to 14 November 2004, |
| A68125 | 2004 | Sons Of Gwalia Ltd | Cambrian | <1% | Cambrian Project, Surrender Report for E37/702, Tenement surrendered on 24 December 2003 |
| A68460 | 2004 | Pilbara Mines Ltd | Teutonic Bore | 25% | Annual report for the period 01/01/2003-31/12/2003 Newmont Teutonic Bore Joint Venture Project E37/556 |
| A68874 | 2004 | Pilbara Mines Ltd | Teutonic Bore | <1% | Exploration Licences E37/258, M37/44, E37/501, E37/691, E37/512, P37/6235, Teutonic Bore Project Combined Annu |
| A69450 | 2004 | Great Gold Mines Nl | Teutonic Bore | 4.6% | Exploration licence: E37/599, Partial surrender report for the period 15 November 2000 to 23 April 2004 (Teuto |
| A68100 | 2004 | Sons Of Gwalia Ltd | Cambrian | 35% | Cambrian Project, Surrender Report for E37/294.(Tenement surrendered on 11 December 2003) |
| A65855 | 2003 | Sons Of Gwalia Ltd | Cambrian | 14% | Annual Report for period 05/06/01 to 04/06/02, C327/1995, Cambrian JV Project , E37/236, E37/281, E37/294, M3 |
| A66964 | 2003 | Pilbara Mines Ltd | Teutonic Bore | <1% | Combined Annual Report for the period ending 17 January 2003 C157/2002 (formerly C417/1994): E37/258, M37/44, |
| A66101 | 2003 | Newmont Australia Ltd | Heather Bore | 7.2% | Annual Report for the period 01/01/2002 to 31/12/2002 Heather Bore Project,C72/2001 E37/319, 553, 556. |
| A66782 | 2003 | Sons Of Gwalia Ltd | Cambrian | <1% | Cambrian Project, Annual Report for the period 1 May 2002 to 30 April 2003ect E37/0702 Report No. 0574-2003-01 |
| A66925 | 2003 | Sons Of Gwalia Ltd | Cambrian | 14% | CAMBRIAN PROJECT ANNUAL REPORT FOR THE PERIOD 5 JUNE 2002 – 4 JUNE 2003 C327/1995, M37/479, E37/236,281,294, |
| A67410 | 2003 | Sons Of Gwalia Ltd | Cambrian | 7.8% | Cambrian Project, Annual Report for the period 9 September 2002 to 8 September 2003, E37/492. |
| A67765 | 2003 | Pacmin Mining Corporation Ltd | Cambrian | 14% | Annual Report for the period 05/06/1999- 04/06/2000 Cambrian Project C327/1995, E37/236, E37/281, E37/294, E37 |
| A68119 | 2003 | Tarmoola Australia Pty Ltd | Cambrian | 7.8% | Cambrian Project, Surrender Report E37/492 - Tenement surrendered on 15th December 2003. |
| A64647 | 2002 | Pilbara Mines Ltd | Teutonic Bore (Wendy's Bore) | <1% | Exploration Licece E37/258 & Prospecting Licence P37/4326 Teutonic Bore (Wendy's Bore) Combined Annual Report |
| A64410 | 2002 | Newmont Yandal Operations Ltd | Heather Bore | 7.2% | Annual Report form the period 1/01/2001 To 31/12/2001. Project Heather Bore E37/319 E37/553 E37/556. |
| A61673 | 2001 | Pilbara Mines Ltd | Teutonic Bore | <1% | Digital Data at November 2000 on P37/4326, E37/258,501,512, M37/44,636,705, Teutonic Bore. |
| A62553 | 2001 | Pilbara Mines Ltd | Teutonic Bore (Wendy's Bore) | <1% | Exploration Licence E37/258 & Prospecting P37/4326, Teutonic Bore (Wendy's Bore) Combined Annual Report for th |
| A63376 | 2001 | Pacmin Mining Corporation Ltd | Cambrian | 14% | 2000/2001 Annual Report Cambrian Project Area - E37/236, E37 /281, E37/294, E37/492, M37/479, P37/4402, P37/44 |
| A57477 | 1999 | Pacific Mining Corporation Ltd | Cambrian | 13% | Annual Report for Cambrian Project for the period ending 04/06/98. E37/236,281,294,409. M37/479. P37/4402,4434 |
| A57072 | 1999 | Goldfields Exploration Pty Ltd | Teutonic Bore | <1% | Teutonic Bore JV 18/01/97 - 17/01/98 E37/258, 282, 353, 373-375, 501, P37/4326, M37/44, MLA37/515, 636, 705 |
| A59344 | 1999 | Pacmin Mining Corporation Ltd | Cambrian | 13% | Cambrian Project, Annual Report for the period 05/06/1998 to 04/06/1999, E37/236,E37/281,E37/294,E37/409,M37/ |
| A50936 | 1997 | Goldfields Exploration Pty Ltd | Teutonic Bore | <1% | Annual Report Teutonic Bore JV E37/247 E37/258 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Technical |
| A51653 | 1997 | Goldfields Exploration Pty Ltd | Wendy's Bore | 1.9% | Partial Surrender Report, Wendy's Bore JV E37/282 , Technical Report for the period 29/01/1993 to 28/01/1997. |
| A49707 | 1996 | Mt Edon Gold Mines Aust Ltd | Leonora | 14% | Leonora Project ( Cambrian JV Tenements) Annual Report for the period ending June 30th 1996, E37/236, 281, 294 |
| A47244 | 1996 | Goldfields Exploration Pty Ltd | Teutonic Bore | <1% | Annual report Teutonic Bore JV E37/247 E37/258 E37/282 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Te |
| A48976 | 1995 | Mt Edon Gold Mines Aust Ltd | Cambrian | 14% | Cambrian (JV) Project, E37/236 E37/281 E37/294 M37/479 P37/4402 P37/4434 and P37/4988, for the period ending J |
| A44162 | 1995 | Pancontinental Gold Operations Pty Ltd | Teutonic Bore | <1% | Teutonic Bore Project, Annual Report for the period ending 17th January 1995, E37/247 E37/258 & E37/282; M37/ |
| A40806 | 1994 | Mim Exploration Pty Ltd | Wendy's Bore | 1.9% | Annual Report Year ending January 1994 Exploration Licence E37/282 Wendy's Bore |
| A42078 | 1994 | Mim Exploration Pty Ltd | Snowy's Well | <1% | Annual Report for the period 07/06/93-06/06/94 Snowy's Well Project E37/258 P37/4326 |
| A41575 | 1994 | Mt Edon Gold Mines Nl | Bundarra | 35% | Annual report for the period 03/93-03/94, Bundarra Project, E37/294. |
| A38711 | 1993 | Mim Exploration Pty Ltd | Teutonic Bore/ Snowys Well | <1% | Annual Report for the period 07/06/92-06/06/93 Teutonic Bore/Snowys Well Project E37/258 |
| A10299 | 1981 | Seltrust Mining Corp Pty Ltd | Teutonic Bore | <1% | Teutonic Bore Project, Non-statutory Report: Report for the period 1st January 1979 to 31st December 1980, MC3 |
| A21875 | 1978 | Australian Selection Pty Ltd | Teutonic Bore | <1% | Teutonic Bore (JV) Project, Non-statutory Report: Progress Report for the period ending 31/12/1978, MC37/4648- |
| A7295 | 1977 | Australian Selection Pty Ltd | Teutonic Bore | 1.2% | Teutonic Bore (JV) Project, Non-statutory Report: Progress Report to 30th September 1977, (Vol 1), MC37/4648-4 |
| A4191 | 1972 | Horizon Explorations Ltd | Deadhorse Well | 28% | Deadhorse Well Project, Non-statutory Report: Final Report, August 1972, MC37/1813-1824 & 1898-1994. |
| A82836 | 1753 | St Barbara Ltd | Leonora | <1% | LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2008 – 31 MARCH 2009 GROUP: C162/2006 TENEMENTS: E37/235, |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- Past expiry date · 29 Aug 2026
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 37/1431 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 37/1431? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.