E 31/1316
Register summary
- Holder
- Dynamic Metals Limited
- Local government
- Shire of Menzies, City of Kalgoorlie-Boulder
- Application received
- 24 Jan 2022
- Commenced
- 28 Aug 2023
- Expiry
- 27 Aug 2028
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A142991 | 2024 | Estrella Resources Limited | Carr Boyd | <1% | Carr Boyd Project Partial Surrender Report E31/1162, 26 March 2018 to 27 February 2024 |
| A144245 | 2024 | Kaili Gold | Gindalbie | <1% | 8th Annual C92/2019 Combined Annual Report Holey Dam and Canegrass for the period ending 30/06/2024 |
| A145730 | 2024 | Kaili Gold | Canegrass - Gindalbie | <1% | 2024 Final Report Canegrass (Gindalbie) for the period 30/05/2016 to 28/10/2024 |
| A136353 | 2023 | Kaili Gold | Gindalbie | <1% | Gindalbie Project Sixth Annual Technical Report Third Annual Combined Report Holey Dam E27/550 Canegrass 3 |
| A133568 | 2023 | Brockman Mining Limited | East Carr Boyd | <1% | East Carr Boyd Project E31/01272 first and final report for the period ending 28/11/2022 |
217 more reports
| A136066 | 2023 | Kaili Gold | Gindalbie | <1% | Seventh 7th Annual Technical Report Canegrass Project E31/1113 for the period ending 29/05/2023 |
| A132664 | 2022 | Metal Hawk Limited; Western Areas Limited | Emu Lake | <1% | Emu Lake Partial Surrender Report E27/562 for the period 7 September 2016 to 29 August 2022 |
| A129458 | 2022 | Great Boulder Resources Ltd. | Whiteheads | <1% | Partial Surrender for Whiteheads E27/544 for the period 30th of November 2015 to 30th of November 2021 |
| A131902 | 2022 | Kaili Gold | Gindalbie | <1% | Combined Annual Report No: E27/550 and E31/1113 Gindalbie Project for the period ending 30/06/2022.(C92/2019) |
| A126753 | 2021 | Northern Star (Kanowna) Pty Limited | Acra North | 75% | North Acra Annual Report (C39/2018) for the period 28 February 2020 to 27 February 2021 E31/01159,E27/00589 |
| A127803 | 2021 | Kaili Gold | Canegrass | <1% | EL 31/1113 5th Annual Technical Report, Canegrass project for the period 30 May 2020 to 30 May 2021. |
| A127833 | 2021 | Kaili Gold | Canegrass | <1% | Canegrass E31/1113 Partial Surrender Report for the period 30 May 2016 to 30 May 2021 |
| A122547 | 2020 | Northern Star (Kanowna) Pty Limited | Acra | <1% | Acra project C74/2014 for the period 9 December 2018 to 8 December 2019 E 27/00278,E 27/00438,E 27/00491,E 27/ |
| A125166 | 2020 | Metal Hawk Limited | Emu Lake | <1% | Emu Lake Project Combined Report C10/2019 Annual Report for the period ending 31/7/2020 |
| A122466 | 2020 | Zebina Minerals Pty Ltd; Great Boulder Resources Ltd. | Whiteheads | <1% | Annual Report for Whiteheads E27/544 for the period 30th November 2018 to 29th October 2019 |
| A123224 | 2020 | Northern Star (Kanowna) Pty Limited | Acra North | 75% | Acra North C39/2018 Annual Report for the period ending 27/02/2020, E31/01159, E27/00589 |
| A123565 | 2020 | Estrella Resources Limited | Carr Boyd | <1% | Annual Report for the Carr Boyd Project, C434/1995 (E29/982, E29/1012, E31/726, E31/1124, E31/1162, M31/12, M3 |
| A124479 | 2020 | Kaili Gold Pty Ltd | Canegrass | <1% | Fourth Annual Report Canegrass project E31/1113 for the period 30 May 2019 to 29 May 2020 |
| A118926 | 2019 | Northern Star (Kanowna) Pty Limited | Acra | <1% | Acra Project C74/2004 Annual Report for the period 9 December 2017 to 8 December 2018, E27/00278, E27/00438, E |
| A119176 | 2019 | Skryne Hill Pty Ltd | Emu Lake | <1% | Emu Lake E27-531 Surrender Report for the period 2 February 2015 to 19 December 2018 |
| A119482 | 2019 | Northern Star (Kanowna) Pty Limited | Acra North | 75% | Acra North C39/2018 Annual Technical Report for the period 28 February 2018 to 27 February 2019, E31/01159, E2 |
| A119637 | 2019 | Wilson Ws | Gindalbie | <1% | Gindalbie Project E27/544 Annual Mineral Exploration Report For the Period 30th November 2017 to 29th November |
| A121319 | 2019 | Metal Hawk Limited | Emu Lake | <1% | Emu Lake Project E27/562 Annual Technical Report For the Period 7 September 2018 to 6 September 2019 |
| A119422 | 2019 | Apollo Phoenix Resources Pty Ltd | Carr Boyd | <1% | Donated Drillcore NCB0001, NCB0002 and NCB0020 |
| A120160 | 2019 | Estrella Resources Limited | Carr Boyd | <1% | Annual Report for the Carr Boyd Project, C434/1995 (E29/982, E29/1012, E31/726, E31/1124, E31/1162, M31/12, M3 |
| A120445 | 2019 | Kaili Gold Pty Ltd | Canegrass | <1% | 3rd Annual Technical Report for Canegrass Project E31/331 for the period ending 29th May 2019 |
| A116059 | 2018 | Zebina Minerals Pty Ltd | Gindalbie | <1% | Annual Report for E27/544 Gindalbie Project for the period 30 November 2016 to 29 November 2017 |
| A117143 | 2018 | Skryne Hill Pty Ltd | Emu Lake | <1% | Annual Exploration Report Exploration Licence E27/531 Emu Lake Project 1 February 2017 to 31 January 2018 |
| A118079 | 2018 | Cameron Mining Pty Ltd | Binti Binti | <1% | Annual Technical Report E27/00562 Binti Binti Project for the period 7 September 2017 to 6 September 2018 |
| A117335 | 2018 | Kaili Gold Pty Ltd | Canegrass | <1% | Canegrass E31/1113 Second Annual Technical Report For the Period 30 May 2017 to 30 July 2018 |
| A116907 | 2018 | Apollo Phoenix Resources Pty Ltd | Carr Boyd | <1% | Annual Report for the Carr Boyd Project C434/1995 (E29/982, E29/1012, E31/726, E31/1124, M31/12, M31/109 and M |
| A112737 | 2017 | Skryne Hill Pty Ltd | Emu Lake | <1% | Annual Exploration Report for year ending 1st February 2017 Exploration Licence E27/531 Emu Lake Project |
| A115258 | 2017 | Cameron Mining Pty Ltd | Binti Binti | <1% | Annual Technical Report E27/562, Binti Binti Prospect, WA for the period 01/07/2016 - 30/06/2017 |
| A115507 | 2017 | Northern Star (Kanowna) Pty Limited | Acra | <1% | Acra Project Annual Technical Report, C74/2004 for the period 09/12/2016-08/12/2017, E27/00278, E28/01746, E27 |
| A113825 | 2017 | Apollo Phoenix Resources Pty Ltd | Carr Boyd | <1% | C434/1995 Carr Boyd Project Annual Report for the licences E29/555, E31/726, M31/12, M31/109, M31/159 For the |
| A114424 | 2017 | Kaili Gold Pty Ltd | Canegrass | <1% | First Annual Technical Report Canegrass Project E31/1113 North Coolgardie Mineral Field/Yerilla District Weste |
| A114886 | 2017 | Valemore Pty Ltd | East Carr Boyd Rocks | <1% | East Carr Boyd Rocks E31/1120 Final Report for the period 07/09/2016 - 06/09/2017 |
| A107827 | 2016 | Heron Resources Ltd | Kalpini | <1% | Combined Annual Report for the period 27 September 2014 to 26 September 2015, Kalpini Nickel Project, C31/2002 |
| A108147 | 2016 | Pioneer Resources Limited | Acra | 27% | Final Surrender Report for the Acra Project tenement E27/273 for the period 9 December 2008 to 27 November 201 |
| A108724 | 2016 | Skryne Hill Pty Ltd | Emu Lake | <1% | Emu Lake Project Annual Exploration Report For year ending 1st February 2016 Exploration Licence E27/531 |
| A109055 | 2016 | Hawthorn Resources Limited | Whiteheads | 7.3% | E27/175 Whiteheads Annual Report for the period 01 Feb 2015 to 31 Jan 2016 |
| A109156 | 2016 | Salt Lake Mining Pty Ltd | Carr Boyd | <1% | Carr Boyd Project Annual Report C434/1995 For the licences E29/555, E31/726, M31/12, M31/109 and M31/159 For t |
| A104732 | 2015 | Pioneer Resources Ltd | Acra | 10% | Combined Annual Report for the Acra Project C74/2004 (E27/273, E27/278, E27/438, E27/482, E27/491, E27/520, E2 |
| A106941 | 2015 | Hawthorn Resources Limited | Whiteheads Project | 6.8% | C129/2009 Whiteheads Annual Report from 1/2/2014 to 31/1/2015, E27/00175, P27/01769, P27/01770, P27/01771, P27 |
| A105603 | 2015 | Salt Lake Mining Pty Ltd | Carr Boyd | <1% | Carr Boyd Project Annual Report C434/1995 for the licences E29/555, E31/726, M31/12, M31/109, M31/159, For the |
| A101345 | 2014 | Pioneer Resources Ltd | Acra | 13% | Acra Project C74/2004 E27/273, E27/278, E28/1746, E28/2109, P28/1120 Combined Annual Report for the period 9 D |
| A101778 | 2014 | Pioneer Resources Ltd | Mount Jewell | 1.7% | MOUNT JEWELL PROJECT C63/2008 E24/146, E24/149, E24/157, E24/171, P24/4233–4, P24/4654–5, E27/300, E27/333, E2 |
| A101780 | 2014 | Pioneer Resources Ltd | Whitehead Dam | 29% | Whitehead Dam Project E27/335 North East Coolgardie Mineral Field (Kanowna District) Surrender Report for the |
| A102285 | 2014 | Hawthorn Resources Limited | Whiteheads | 5.7% | Combined Group Report C129/2009 Whiteheads E27/175, E27/347, E27/369, P27/1769-1773, P27/1784-1786 ANNUAL REPO |
| A102540 | 2014 | Kalnorth Gold Mines Ltd | Kalpini | 34% | Annual report for the period ending 16 December 2013, Kalpini Project, C106/2010, E27/412, E27/411, E27/339, E |
| A102469 | 2014 | Salt Lake Mining Pty Ltd | Carr Boyd | <1% | Partial Surrender Report Carr Boyd Project C434/1995, E31/726 for the period 3 April 2008 to 2 April 2014 |
| A102584 | 2014 | Salt Lake Mining Pty Ltd | Carr Boyd | <1% | Carr Boyd C434/1995 Project Annual Report for the licences E29/555, E31/726, M31/12, M31/109, M31/159, P31/192 |
| A97808 | 2013 | Australian Nickel Mines Nl | Carr Boyd | <1% | Carr Boyd Project, Annual Report for the period 03/03/2012 to 06/03/2013, E29/555; E31/726; M31/109 & 159; P31 |
| A96975 | 2013 | Pioneer Resources Ltd | Acra | 13% | Combined Annual report for the Acra Project, C74/2004 (E27/273, E27/278, E28/1746, E28/2109 & P28/1120), North |
| A97155 | 2013 | Pioneer Resources Ltd | Mount Jewell | 1.7% | Mount Jewell Project C63/2008 Combined Annual Report for the period 9 January 2012 to 8 January 2013, E24/146. |
| A97534 | 2013 | Xstrata Nickel Australasia Operations Pty Ltd | Emu Lake | <1% | Emu Lake Project, Final Surrender Report for the period 20th December 2007 to 11th January 2013, E27/353-354; |
| A100283 | 2013 | Hawthorn Resources Limited | Whiteheads | <1% | Whiteheads E27/369 Final Report for the period 22 August 2008 - 21 August 2013 |
| A99729 | 2013 | Egf Nickel | Carr Boyd East | 52% | Annual Technical Report Carr Boyd East Project E31/883 Period 3rd July 2012 – 2nd July 2013 |
| A97207 | 2013 | Kalnorth Gold Mines Ltd | Kalpini | 34% | Annual Report for the period 17th December 2011 to 16th December 2012, C106/2010, Kalpini. [E27/411-412, 339 & |
| A97370 | 2013 | Xstrata Nickel Australasia Operations Pty Ltd | Emu Lake | 2.4% | Emu Lake Project Combined Annual Report for E27/84, E27/353, E27/354, E27/434 and P27/1750 - 1751 Ref: C112/19 |
| A98077 | 2013 | Hawthorn Resources Limited | Whiteheads | 5.7% | Whiteheads Project, Annual Report for the period 1st February 2012 to 31st January 2013, P27/1769-1773, 17 |
| A92979 | 2012 | Pioneer Resources Ltd | Mount Jewell | 1.7% | Combined Annual report for the Mount Jewell Project, C63/2008 for the period 9 January 2011 to 8 January 2012 |
| A92374 | 2012 | Everest Minerals Limited | Gindalbie | 4.3% | COMBINED MINERAL EXPLORATION REPORT, Gindalbie Project C152-2010, Licence’s E27/368 & E27/398 Reporting Period |
| A94732 | 2012 | Egf Nickel | Carr Boyd East | 52% | First Annual Technical Report Carr Boyd East Project E31/883 Period 3rd July 2011 – 2nd July 2012 |
| A94565 | 2012 | Condor Metals Ltd | Mount Vetters | <1% | Surrender Report for the period ending 17 April 2012, E27/328 Mount Vetters |
| A93543 | 2012 | Australian Nickel Mines Nl | Carr Boyd | <1% | Carr Boyd Project Annual Report C434/1995 for the licences E29/555, E31/726, M31/12, M31/109, M31/159, and P31 |
| A93905 | 2012 | Hawthorn Resources Limited | Whiteheads | 5.7% | Combined Group Report C129/2009 Whiteheads for the period 1 February 2011 to 31 January 2012 |
| A94234 | 2012 | Jabiru Metals Ltd | Gindalbie | <1% | E27/440, E27/441, Gindalbie Project Combined Annual Report C233/2011 for the period 11th April 2011 to 10th Ap |
| A93062 | 2012 | Carrick Gold Ltd | Kalpini | 34% | Annual report for the period 17 December 2010 to 16 December 2011, Kalpini Project, C106/2010, P27/1739, P27/1 |
| A93317 | 2012 | Pioneer Resources Ltd | Whitehead Dam | 29% | Whitehead Dam Project, Partial Surrender Report for the period 9th January 2007 to 8th January 2012, E27/335. |
| A90095 | 2011 | Xstrata Nickel Australasia Operations Pty Ltd | Emu Lake | 2.5% | Emu Lake Project, Annual Report for the period 1st January 2010 to 31st December 2010, E27/84, 353-354; P27/17 |
| A89139 | 2011 | Heron Resources Ltd | Kalpini | <1% | Combined annual report for the period 27 September 2009 to 26 September 2010, Kalpini Nickel Project, C31/2002 |
| A89289 | 2011 | Pioneer Resources Ltd | SILVER SWAN NORTH WEST | 1.8% | SILVER SWAN NORTH WEST PROJECT, COMBINED ANNUAL TECHNICAL REPORT EXPLORATION LICENCE 24/146, 24/149, 24/157, |
| A93259 | 2011 | Xstrata Nickel Australasia Operations Pty Ltd | Acra | 12% | Acra (JV) Project, Annual Report for the period 9th December 2010 to 8th December 2011, E27/273, 278; E28/1223 |
| A90277 | 2011 | Australian Nickel Mines Nl | Carr Boyd | <1% | Carr Boyd Project, Annual Report for the period 7th March 2010 to 6th March 2011, E29/555; E31/33, 267, 726; M |
| A90383 | 2011 | Hawthorn Resources Limited | Whiteheads 4 | 7.1% | Whiteheads 4 Project, Annual Report for the period 8th February 2010 to 7th February 2011, E27/175 & P27/1783- |
| A90385 | 2011 | Hawthorn Resources Limited | Whiteheads 1 | 7.7% | Whiteheads 1 Project, Annual Report for the period 1st February 2010 to31st January 2011, P27/1940 & E27/369. |
| A93201 | 2011 | Emu Nickel Nl | Emu Lake | 2.4% | Annual Report, Emu Lake Project, Combined Reporting Group C112/199 (E27/084, E27/353, E27/354, E27/434, P27/17 |
| A90681 | 2011 | Condor Metals Ltd | Gindalbie North | <1% | Gindalbie North Project Annual Mineral exploration Report E27/328 for the period 18th April 2010 – 17th April |
| A89850 | 2011 | Xstrata Nickel Australasia Operations Pty Ltd | Acra Joint Venture | 12% | Acra Joint Venture Project, Combined Annual Report for E27/273, E27/278, E28/1223, E28/1746 and P28/1120, Ref: |
| A88784 | 2010 | Te Johnston And Associates Pty Ltd | Gindalbie | 4.3% | Annual Technical Report on E27/368 and E27/398 Combined Report C152/2010 for the period 16/11/2009 to 15/11/20 |
| A85943 | 2010 | Pioneer Resources Ltd | Acra Joint Venture | 27% | ACRA JOINT VENTURE PROJECT E27/273 (C74/2004) PARTIAL SURRENDER REPORT For the Period 22nd December 2005 to 8t |
| A86037 | 2010 | Pioneer Resources Ltd | SILVER SWAN NORTH WEST | 2.6% | Silver Swan North West Project Combined Annual Technical Report Exploration Licence 24/146, 27/335, 27/336, 27 |
| A87333 | 2010 | Hawthorn Resources Limited | Whiteheads | 45% | C129/2009 Whiteheads Final Surrender Report for the period 8 February 2008 to 24 May 2010, Prospecting Licence |
| A85941 | 2010 | Pioneer Resources Ltd | Acra Joint Venture | 12% | ACRA JOINT VENTURE PROJECT C74/2004 (E27/273, E27/278 and E28/1223, E28/1746 and P28/1120) ANNUAL TECHNICAL RE |
| A86196 | 2010 | Condor Nickel Ltd | Lake Emu | 23% | E31/649: Lake Emu, Annual Report for period 24 November 2008 to 23 November 2009 |
| A86297 | 2010 | Quantum Resources Ltd | Whiteheads 4 | 7.1% | Exploration Licence 27/175 and Prospecting Licences 27/1783, 27/1784, 27/1785, and 27/1786. C21/2009 Whitehead |
| A87458 | 2010 | Condor Nickel Ltd | Mount Vetters | <1% | E27/328: Annual Report for the period 18 April 2009 to 17 April 2010 |
| A80944 | 2009 | Pioneer Nickel Ltd | SILVER SWAN NORTH WEST | 2.6% | SILVER SWAN NORTH WEST PROJECT, COMBINED ANNUAL TECHNICAL REPORT, EXPLORATION LICENCE 24/146, 27/335, 27/336, |
| A82048 | 2009 | Pioneer Nickel Ltd | ACRA JOINT VENTURE | 27% | ACRA JOINT VENTURE PROJECT E27/273 (C74/2004) PARTIAL SURRENDER REPORT, For the Period 22nd December 2005 to 1 |
| A82185 | 2009 | Xstrata Nickel Australasia Opertions Pty Ltd | Emu Lake | 2.5% | Emu Lake Project Combined Annual Report for E27/84, E27/353, E27/354 and P27/1750 - 1752 Ref: C112/1996 Report |
| A83080 | 2009 | Condor Nickel Ltd | Mout Vetters | <1% | E27/328: Annual Report for period 18 April 2008 to 17 April 2009 |
| A85025 | 2009 | Heron Resources Ltd | Kalpini | <1% | Kalpini Nickel Project, C31/2002, Combined annual report for the period 27 September 2008 to 26 September 2009 |
| A81641 | 2009 | Pioneer Nickel Ltd | ACRA JOINT VENTURE | 12% | ACRA JOINT VENTURE PROJECT C74/2004 (E27/273, E27/278 and E28/1223, E28/1746 and P28/1120) ANNUAL TECHNICAL RE |
| A82081 | 2009 | Brockman Resources Ltd | CARR BOYD | <1% | CARR BOYD PROJECT C434/1995 – All tenements: E29/555, E31/33, E31/267, E31/726 M31/12, M31/109, M31/159, P29/1 |
| A77402 | 2008 | Jubilee Mines Nl | Acra Joint Venture | 12% | Acra Joint Venture Project Technical Report for the work car ried out by Jubilee Mines NL on E28/273, 278 and |
| A77544 | 2008 | Quantum Resources Ltd | Whiteheads | 7.3% | Exploration Licence 27/175 Whiteheads Annual Report for the period 1 November 2006 to 31 October 2007 |
| A77586 | 2008 | Pioneer Nickel Ltd | Rainbow Dam | 6.5% | Silver Swan North West Project Annual Technical Report Exploration Licence 27/335 and 27/336 For the period 9t |
| A80553 | 2008 | Quantum Resources Ltd | Whiteheads | 7.3% | Exploration Licence 27/175 Whiteheads Project, ANNUAL REPORT FOR THE PERIOD 1 NOVEMBER 2007 to 31 OCTOBER 2008 |
| A77192 | 2008 | Carrick Gold Ltd | E31/649 | 23% | Exploration on E31/649 Annual Report for period ending 23rd November 2007 |
| A77614 | 2008 | Jubilee Mines Nl | Emu Lake | 2.3% | Emu Lake Project Annual Report for Exploration Licences E27/84 And E27/168 Reporting Period 1st January 2007 T |
| A78822 | 2008 | Regal West Pty Ltd | Mount Vetters | <1% | GINDALBIE PROJECT EXPLORATION ON E27/328, REPORT FOR PERIOD ENDING 10th June 2008. |
| A80300 | 2008 | Pioneer Nickel Ltd | Acra - Boomerang Lake | 1.3% | ACRA JOINT VENTURE PROJECT BOOMERANG LAKE C75/2004 ANNUAL TECHNICAL REPORT For the Period 24th September 2007 |
| A80429 | 2008 | Rocky Mountain Minerals Inc | Carr Boyd Mainroad | 96% | Carr Boyd Project, Mainroad Prospect, Annual Report Lease E 31/491 26 July 2007 – 25 July 2008 |
| A80754 | 2008 | Rocky Mountain Minerals Inc | Carr Boyd North, Central and South Prosp | 3.6% | Carr Boyd Project North, Central and South Prospects Annual Report Lease E 31/492, 20 July 2007 – 19 July 2008 |
| A74173 | 2007 | Sir Samuel Mines Nl | Emu Lake | 2.3% | Emu Lake Project Annual Report for Exploration Licences E27/84 and E27/168, Reporting Period 1 January 2006 to |
| A74189 | 2007 | Sir Samuel Mines Nl | Sampson Dam | 27% | Acra Project Sampson Dam E27/273, Technical Report Between the Period 22 December 2005 to 21 December 2006, (A |
| A74568 | 2007 | Quantum Resources Ltd | Whiteheads | 7.3% | Exploration Licence, E27/175, Whiteheads Annual Report for the Period 31st Oct 2005 to 30th Oct 2006. (Kurnalp |
| A75524 | 2007 | Regal West Pty Ltd | Mount Vetters | <1% | Exploration E27/328 Annual Report for Period Ending 17th April 2007 |
| A74237 | 2007 | Carrick Gold Ltd | Gindalbie | 23% | Gindalbie Project E31/649 Annual Report for the Period Ending 23rd November 2006 (Kurnalpi) |
| A74122 | 2007 | Sir Samuel Mines Nl | Boomerang Lake | 3.1% | Acra Joint Venture Project Boomerang Lake E31/519, Partial Surrender Report for Period 9 December 2003 to 8 De |
| A75028 | 2007 | Teck Cominco Australia Pty Ltd | Kalgoorlie East | 93% | ANNUAL REPORT E31/604, Kalgoorlie East Project, Gindalbie Sheet, 10th January 2006 - 9th January 2007. |
| A75065 | 2007 | Teck Cominco Australia Pty Ltd | Kalgoorlie East Project | 93% | Annual Report E31/604, Kalgoorlie East Project, Gindalbie Sheet SH51-10 (3237), 10th January 2006 - 9th Januar |
| A75095 | 2007 | Jubilee Mines Nl | Cain Grass | <1% | Acra Project, Annual Technical Report on E31/575-Canegrass For Work Completed During 24th March 2006 and 23rd |
| A76384 | 2007 | Jubilee Mines Nl | Acra - Boomerang Lake | 1.3% | Acra Joint Venture Project, Boomerang Lake, Annual Report for Exploration Licences E31/519, 575, 579, 581 and |
| A76727 | 2007 | Rocky Mountain Minerals Inc | Carr-Boyd East | 20% | Annual Report for the period 24 July 2006 - 25 July 2007 Carr-Boyd East Project E31/491 and 492 |
| A73884 | 2006 | Sir Samuel Mines Nl | Acra - Boomerang Lake | 2.1% | Acra Joint Venture Project, Annual report for exploration licences E31/519 and E31/579 and P31/1707, Reporting |
| A72364 | 2006 | Jubilee Mines Nl | Emu Lake | 2.3% | Emu Lake Project, Annual Report for Exploration Licences E27/84 and E27/168, Reporting Period 1 January 2005 t |
| A71524 | 2005 | Jubilee Mines Nl | Acra | 2.1% | Acra Joint Venture Project, Annual report for exploration licences E31/519 and E31/579. Reporting period 24th |
| A70407 | 2005 | Image Resources Nl | Emu Lake | 2.3% | Annual report for the period 01/01/04 - 31/12/04 Emu Lake Project, C112/1996, E27/84, E27/168, Gindalbie, Repo |
| A71301 | 2005 | Great Gold Mines Nl | Whiteheads | 7.3% | Exploration Licence E27/175, Whiteheads, Annual Report for the period 31 October 2003 to 30 October 2004, (Kur |
| A68275 | 2004 | Jubilee Mines Nl | Emu Lake | 2.3% | Emu Lake Project, Annual Report Exploration Licences E27/84 & E27/168 for the period 01/01/2003-31/12/2003. |
| A68990 | 2004 | Quantum Resources Ltd | Whiteheads | 2.3% | Exploration Licences ,E27/101, E27/194, E27/200, Mining Licences: M27/152, M27/217, M27/327, C307/1997, Whiteh |
| A68991 | 2004 | Quantum Resources Ltd | Whiteheads | 1.2% | Exploration Licences ,E27/93, 101, 194, 199-201, Mining Licences: M27/152, M27/217, M27/327, Prospecting Licen |
| A69484 | 2004 | Jubilee Mines Nl | Acra | 2.1% | Acra Joint Venture Project, Annual Report for Exporation Licences E31/519 and E31/579 for reporting period 24t |
| A66372 | 2003 | Image Resources Nl | Emu Lake | 2.3% | Annual Report for year ending 31st December 2002 Emu Lake Project E27/84 and 168 Report No 125 |
| A67276 | 2003 | Gutnick Resources Nl | Whiteheads | 2.7% | Exploration Licences:E27/93,101,184, 194,199-201, Mining Licences: M27/152,217,327, prospecting Licences:P27/1 |
| A67251 | 2003 | Gutnick Resources Nl | Whiteheads | 30% | Exploration Licences: E27/109,114,120,174,184, E31/187, GML27/1819, Prospecting Licences:P27/1239-1240,1249,12 |
| A64407 | 2002 | Delta Gold Ltd | Gindalbie South | 92% | Annual And Final Report 25/01/2001 To 24/01/2002. Gindalbie South Project E31/368. Tenement/s E31/368 Mineral |
| A64592 | 2002 | Gutnick Resources Nl | Whitehead | 22% | Exploration Licence: E27/112 'Whitehead' Surrender Report For The Period 24 April 1996 To 24 March 2000 |
| A64496 | 2002 | Outokumpu Exploration Ventures Pty Ltd | Emu Lake | 2.3% | Annual Report For Year Ending 31st December 2001.Exploration Licences 27/84 and 27/168. Report No: EL R40 017. |
| A62578 | 2001 | Delta Gold Ltd | Gindalbie South | 92% | Gindalbie Sourth Project E31/368 Annual Technical Report 25 January 2000 - 24 January 2001. |
| A62679 | 2001 | Croesus Mining Nl | Three Gates | 56% | Three Gates Project, Annual Report for the Period 28 April 2000 to 27 April 2001 on the Tenement E31/470. |
| A62048 | 2001 | Outokumpu Exp Aust Pty Ltd | Emu Lake | 2.3% | Exploration licences 27/84 and 27/168 Emu Lake Project Annual Report for the year ending 31st December 2000. R |
| A59839 | 2000 | Reefton Mining Nl | Gindalbie | <1% | Final Report Annual Report and 50% Surrender Report E27/118 06/10/1996 to 05/10/1999 Gindalbie Project. |
| A59992 | 2000 | Gutnick Resources Nl | Whiteheads | 14% | Exploration Licences E27/93, 101, 112,114, 116-117, 120, 174 184, Mining Leases M27/152, 217, 327, P27/1239-12 |
| A61144 | 2000 | Outokumpu Exp Aust Pty Ltd | Emu Lake | 2.3% | Annual Technical Report E27/84, E27/168 Emu Lake Project, Western Australia. Period Ending: 31 October 1999. G |
| A57850 | 1999 | Aurora Gold (Wa) Pty Ltd | Carr Boyd Rocks | 45% | Annual Technical Report, Carr Boyd Rocks Project, Western Australia, Exploration Licences E27/59, E31/119 & 21 |
| A57442 | 1999 | Mt Kersey Mining Nl | Whiteheads | 54% | 'Whiteheads' Exploration Licence: E27/120 Partial Surrender Report 14/03/1995 - 29/10/1998 |
| A57995 | 1999 | Reefton Mining Nl | Gindalbie | <1% | Partial Surrender Report E27/118 for period 06/10/1994 to 05/10/1998 Gindlabie Project. |
| A57139 | 1999 | Mt Kersey Mining Nl | Lake Emu | 60% | Lake Emu - Exploration Licence:E31/187 13/02/95 - 03/09/98 |
| A58198 | 1999 | Outokumpu Exp Aust Pty Ltd | Emu Lake | 2.3% | Emu Lake Project W.A., Annual Technical Report E27/84, E27/168 31/12/1998 |
| A58553 | 1999 | Mt Kersey Mining Nl | Whitehead | 6.1% | 'Whitehead' P27/1357, 1361-1363 'Kalpini' P27/1364-9 07/01/1998 - 06/01/1999 |
| A59024 | 1999 | Mt Kersey Mining Nl | Whitehead Dam | 19% | Exploration licences E27/93,101, 109, 112, 114, 116,117, 120 ,174,184, E31/187, GML G27/1819, M27/152,217, P27 |
| A59131 | 1999 | Gutnick Resources Nl | Whitehead Dam | 49% | Exploration Licence E27/174 'Whiteheads' Partial Surrender Report for the period 26/02/96-22/07/99 |
| A59130 | 1999 | Gutnick Resources Nl | Whiteheads | 22% | Exploration Licence E27/112 'Whiteheads' Partial Surrender Report for the period 24/03/96-12/08/99 |
| A57324 | 1998 | Aurora Gold Ltd | Carr Boyd Rocks | 45% | Partial Surrender Report Carr Boyd Rocks Project Western Australia Exploration Licence 27/59 (12 July 1990-21 |
| A53833 | 1998 | Reefton Mining Nl | Gindalbie | <1% | Annual Report E27/118, P27/1341, 1342 6th October 1996-5th October 1997 Gindalbie Project. |
| A53842 | 1998 | Fodina Minerals Pty Ltd | Emu Lake | 1.5% | Annual technical report. Emu Lake Project, WA. E27/84,168. E31/144. Year ending 31/12/97. |
| A53983 | 1998 | Mt Kersey Mining Nl | Whiteheads | 21% | Whiteheads Project C307/1997 Joint Annual Report for the period 07/01/97-06/01/98 |
| A56344 | 1998 | Reefton Mining Nl | Gindalbie | <1% | Annual Report on E27/118, P27/1341, 1342; Gindalbie Project, from 6th October 1997 - 5th October 1998, Kanowna |
| A54976 | 1998 | Aurora Gold Ltd | Carr Boyd Rocks | 29% | Partial Relinquishment Report, Carr Boyd Rocks Project Western Australia,Exploration Licence E31/217 for the p |
| A54977 | 1998 | Aurora Gold Ltd | Carr Boyd Rocks | 45% | Carr Boyd Rocks Project , Annual Report for the period 1st January 1997 to 31st December 1997, E27/59, E31/119 |
| A50887 | 1997 | Mt Kersey Mining Nl | Whitehead | 49% | Exploration Licence E27/174 'Whitehead' Annual report for the period 26 February 1996 to 25 February 1997. |
| A51049 | 1997 | Mt Kersey Mining Nl | Whitehead | 54% | E27/120, Whitehead Project, Annual Report for the period 14 March 1996 to 13 March 1997. |
| A51205 | 1997 | Mt Kersey Mining Nl | Whiteheads - Kalpini | 8.6% | Prospecting Licences P27/1369 Tenements worked on: 'Whiteheads/Kalpini' Annual report for the period 25 Novemb |
| A51463 | 1997 | Mt Kersey Mining Nl | Whiteheads | 22% | Exploration Licence E27/112 'Whiteheads' Annual report for the period 24 April 1996 to 23 April 1997 |
| A52949 | 1997 | Aurora Gold (Wa) Pty Ltd | Carr Boyd Rocks | 41% | Carr Boyd Rocks Projhect, Partial Surrender Report for the period 29th April 1992 to !0th September 1997,E31/1 |
| A53724 | 1997 | Gindalbie Gold Nl | Cockatoo Rocks | 3.1% | Cockatoo Rocks Project E31/275 Annual Report for the Period 13/12/1996 to 12/12/1997 |
| A50058 | 1997 | Aurora Gold Ltd | Carr Boyd Rocks | 45% | Annual Technical Report Carr boyd Rocks project - Western Australia Exploration Licences 27/59, 31/119, 31/217 |
| A51050 | 1997 | Mt Kersey Mining Nl | Gindalbie - Whiteheads | 60% | E31/187, Gindalbie - Whiteheads Project, Annual Report for the period 13th February 1996 to 12th February 199 |
| A51207 | 1997 | Mt Kersey Mining Nl | Whiteheads - Gindalbie | 100% | Prospecting Licences P31/1491 Tenements worked on: 'Whiteheads / Kalpini' Annual report for the period 25 Nove |
| A51212 | 1997 | Mt Kersey Mining Nl | Whiteheads - Gindalbie | 100% | Prospecting Licences P31/1492 Tenements worked on 'Whiteheads/Kalpini' Annual report for the period 25 Novembe |
| A50945 | 1997 | Mining Project Investors Pty Ltd | Emu Lake | 1.5% | Annual Technical Report E27/84 and E31/144 Emu Lake Project Western Australia Year ending 31 December 1996 Ref |
| A51214 | 1997 | Mt Kersey Mining Nl | Whiteheads - Kalpini | 41% | P27/1361,Whiteheads - Kalpini Project, Annual Report for the period 25th November 1995 to 24th November 1996. |
| A51215 | 1997 | Mt Kersey Mining Nl | Whiteheads - Gindalbie | 100% | Prospecting Licences P27/1360 Tenements worked on 'Whiteheads/Kalpini' Annual report for the period 25 Novembe |
| A46851 | 1996 | Aurora Gold Ltd | Carr Boyd Rocks | 13% | Carr Boyd Rocks Project, Surrender (Final) Report, For the Period Ending 18 December 1995, Exploration Licence |
| A47469 | 1996 | Aurora Gold Ltd | Gindalbie | 29% | Gindalbie Project, Annual Technical Report for period 14 March 1995 to 13 March 1996, E31/217. |
| A48640 | 1996 | Croesus Mining Nl | Emu Lake | 16% | Emu Lake Project, Annual/ Final Report for period 08/11/1994 to 07/11/1995, E31/99. |
| A48845 | 1996 | Delta Gold Ltd | Kalpini | 5.7% | Kalpini Project, Partial Surrender Report for the period 29th April 1992 to 28th April 1996, E27/89 |
| A49065 | 1996 | Gindalbie Gold Nl | Lake Emu | 60% | Lake Emu Project, Annual Report for the year ending 12th February 1996 , E31/187. |
| A49096 | 1996 | Gindalbie Gold Nl | Lake Emu | 100% | Annual Report, P31/1491, Lake Emu Project for the twelve months ending 24 November 1995 . |
| A49097 | 1996 | Gindalbie Gold Nl | Lake Emu | 100% | Annual Report , P27/1360, Lake Emu Project for the twelve months ending 24 November 1995. |
| A49107 | 1996 | Gindalbie Gold Nl | Three Gates | 8.6% | Annual Technical Report of Mineral Exploration on P27/1369 Three Gates Project for the twelve months ending 24 |
| A49374 | 1996 | Reefton Mining Nl | Gindalbie | <1% | Annual Report E27/118, P27/1341, 1342 from 6th October 1995 - 5th October 1996 M9724 Gindalbie Project Kanowna |
| A50959 | 1996 | Mr Treacy Ja | Gindalbie | 22% | Gindalbie Project, Non-statutory Report: Preliminary Report of Mineral Exploration on E27/112 for the period 2 |
| A46849 | 1996 | Aurora Gold Ltd | Carr Boyd Rocks | 45% | Carr Boyd Rocks Project, Annual Technical Report, For the Period 1 January 1995 to 31 December 1995 E27/59, 29 |
| A49101 | 1996 | Gindalbie Gold Nl | Lake Emu | 100% | Annual Report , P31/1492, Lake Emu Project for the twelve months ending 24 November 1995. |
| A48536 | 1996 | Croesus Mining Nl | Emu Lake | 1.5% | Emu Lake (E27/84 and E31/144) Annual report 1995 Project Status C112/1996 reporting period 01/01/95 to 31/12/9 |
| A48684 | 1996 | Delta Gold Ltd | Kalpini | 5.7% | Kalpini Project, Annual Report for the period 29th April 1995 to 28th April 1996, E27/89. |
| A49066 | 1996 | Gindalbie Gold Nl | Lake Emu | 54% | Lake Emu Project , Annual Report for the year ending 13th March 1996, E27/120. |
| A49098 | 1996 | Gindalbie Gold Nl | Lake Emu | 41% | Annual Report , P27/1361, Lake Emu Project , for the twelve months ending 24 November 1995. |
| A49108 | 1996 | Gindalbie Gold Nl | Wild Dog | 100% | Annual Technical Report of Mineral Exploration on P27/1371 Wild Dog Project for the twelve months ending 19 Oc |
| A49109 | 1996 | Gindalbie Gold Nl | Wild Dog | 100% | Annual Technical Report of Mineral Exploration on P27/1372 Wild Dog Project for the twelve months ending 19 Oc |
| A49110 | 1996 | Gindalbie Gold Nl | Wild Dog | 100% | Annual Technical Report of Mineral Exploration on P27/1373 Wild Dog Project for the twelve months ending 19 Oc |
| A49111 | 1996 | Gindalbie Gold Nl | Wild Dog | 100% | Annual Technical Report of Mineral Exploration on P27/1374 Wild Dog Project for the twelve months ending 19 Oc |
| A44317 | 1995 | Crest Resources Australia Nl | Cockatoo Rocks | 3.1% | Cockatoo Rocks Project, Annual Exploration Report E31/175 for period 25/12/1993 to 24/12/1994. |
| A45384 | 1995 | Crest Resources Australia Nl | Lake Emu | 60% | Lake Emu Project, Non-statutory Report : Interim Exploration Report to March 1995, E31/187. |
| A45589 | 1995 | Aurora Gold Ltd | Carr Boyd Rocks | 41% | Carr Boyd Rocks Project, Annual Report Exploration Licence E31/119 for the period 29th April 1994 to 28th Apri |
| A43189 | 1995 | Cra Exploration Pty Ltd | Gindalbie | 24% | Gindalbie Project, Annual Report E27/59, 61; P27/1222 for period ending 31st December 1994. |
| A44509 | 1995 | Delta Gold Ltd | Kurnalpi | 5.7% | Kurnalpi Project, Annual Report E27/89 for the period 29th April 1994 to 28th April 1995. |
| A44510 | 1995 | Delta Gold Ltd | Kalpini | 5.7% | Partial Surrender Report for the period 29/04/92-28/04/95 Kalpini Project E27/89 |
| A44511 | 1995 | Delta Gold Ltd | Emu Lake | 2.5% | Partial Surrender Report for the period 05/12/91-04/12/94 Emu Lake Project E27/84 |
| A44513 | 1995 | Delta Gold Ltd | Emu Lake | 3.3% | Delta Gold N.L. Annual Report on the Emu Lake Project. For the period 1st April 1994 to 31st March 1995 Teneme |
| A41686 | 1994 | Cra Exploration Pty Ltd | Marsh Dam | 41% | Marsh Dam Project, Annual Report for the period ending 29th April 1994, E31/119. |
| A42951 | 1994 | Delta Gold Ltd | Emu Lake | 16% | Partial Surrender Report for the period 08/11/90-07/11/94 Emu Lake Project E31/99 |
| A41529 | 1994 | Cra Exploration Pty Ltd | Gindalbie | 24% | Gindalbie Project, Partial Surrender Report for the period ending 31st December 1993, E27/59. |
| A41581 | 1994 | Cra Exploration Pty Ltd | Gindalbie | 24% | Gindalbie Project, Annual Report for the period ending 31st December 1993, E27/59, E27/61 & P27/1222. |
| A42128 | 1994 | Delta Gold Ltd | Kurnalpi | 5.7% | Kurnalpi Project, Annual Report for the period 29th April 1993 to 28th April 1994, E27/89. |
| A42907 | 1994 | Cra Exploration Pty Ltd | Gindalbie | 51% | Gindalbie Project, Partial Surrender Report for the period ending 12th July 1994, E27/59. |
| A38705 | 1993 | Delta Gold Ltd | Kalpini | 5.7% | Kalpini Project, Annual Report for the period 29th April 1992 to 28th April 1993, E27/89. |
| A38762 | 1993 | Cra Exploration Pty Ltd | Gindalbie | 24% | Gindalbie (JV) Project, Annual Report for the period ending 31st December 1992, E27/59, E27/61; P27/1222. |
| A38758 | 1993 | Cra Exploration Pty Ltd | Marsh Dam | 41% | Marsh Dam Project, Annual Report for the period ending 29th April 1993, E31/119. |
| A38995 | 1993 | Croesus Mining Nl | Emu Lake | 3.3% | Annual Report for the period 12/91-12/92 Emu Lake Project E27/84 E31/99,144 P27/1192 |
| A41107 | 1993 | Croesus Mining Nl | Emu Lake | 3.3% | Emu Lake Project, Annual Report for the period 23/04/1993 to 11/11/1993, E27/84, E31/99, E31/144, & P27/1192. |
| A35676 | 1992 | Ashton Gold Wa Ltd | Carr Boyd Rocks | 24% | Carr Boyd Rocks Project, Annual Report for the period 1st January 1991 to 31st December 1991, P27/1222 & E27/5 |
| A11745 | 1983 | Esso Australia Ltd | Gindalbie | 8.8% | Gindalbie Project, Final Surrender Report for the period ending 23/03/1983, TR70/7177H; MC27/1897-1907. |
| A9517 | 1981 | Esso Australia Ltd | Gindalbie | 8.8% | Gindalbie Project, Annual Report for the period ending 10/11/1980, TR70/7177H. |
| A10444 | 1981 | Esso Australia Ltd | Gindalbie | 8.8% | Gindalbie Project, Annual Report for the period 12/10/1980 to 11/10/1981, TR70/7177H |
| A2122 | 1971 | Australian Selection Pty Ltd | Marsh Dam | 6.2% | Marsh Dam Project, Non-statutory Report: Report of Investigations for the period 1st September 1969 to 30th A |
| A2422 | 1970 | Lennard Oil Nl | Gindalbie | 5% | Gindalbie Project, Final Surrender Report for the period ending 19th March 1970, MC27/577-580. |
| A81915 | 1753 | Quantum Resources Ltd | WHITEHEADS 3 | 30% | C22/2009 WHITEHEADS 3 PROJECT ANNUAL REPORT FOR THE PERIOD 8 February 2008 TO 7 February 2009, Exploration Lic |
| A81916 | 1753 | Quantum Resources Ltd | WHITEHEADS 4 | 7.1% | C21/2009 WHITEHEADS 4 PROJECT ANNUAL REPORT FOR THE PERIOD 8 February 2008 TO 7 February 2009, Exploration Lic |
| A86708 | 1753 | Xstrata Nickel Australasia Opertions Pty Ltd | Emu Lake | 2.5% | Emu Lake Project Combined Annual Report for E27/84, E27/353, E27/354 and P27/1750 - 1752 Ref: C112/1996 Report |
| A81322 | 1753 | Condor Nickel Ltd | KURNALPI | 23% | KURNALPI PROJECT EXPLORATION ON E31/649 ANNUAL REPORT FOR PERIOD ENDING 23rd November 2008 |
| A82621 | 1753 | Quantum Resources Ltd | Whiteheads | 100% | WHITEHEADS COMBINED REPORT NUMBER: C20/2009 ANNUAL TECHNICAL REPORT FOR THE PERIOD 21/04/2008 to 20/04/2009 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A46809 | 1753 | Reefton Mining Nl | Gindalbie | <1% | Gindalbie Project, Annual Report, Period for 07/10/1994- 06/10/1995, E27/118, P27/1341, 1342. |
| A51609 | 1753 | Mt Kersey Mining Nl | Gindalbie-Whiteheads | 100% | Prospecting Licences P27/1373 'Gindalbie-Whiteheads Project' Annual report for the period 20 October 1995 to 1 |
| A51610 | 1753 | Mt Kersey Mining Nl | Gindalbie-Whiteheads | 100% | Prospecting Licences P27/1374 'Gindalbie-Whiteheads Project' Annual report for the period 20 October 1995 to 1 |
| A51617 | 1753 | Mt Kersey Mining Nl | Gindalbie-Whiteheads | 100% | Prospecting Licence P27/1372 'Gindalbie-Whiteheads Project' Annual report for the period 20 October 1995 to Oc |
| A51618 | 1753 | Mt Kersey Mining Nl | Gindalbie-Whiteheads | 100% | Prospecting Licences P27/1371 'Gindalbie-Whiteheads Project' Annual report for the period 20 October 1995 to 1 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 23 months · 27 Aug 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 31/1316 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 31/1316? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.