E 28/3621
Register summary
- Holder
- Nex Wongatha Jv Pty Ltd
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 16 Sept 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A153315 | 2026 | Kalgoorlie Mining Associates Pty Ltd | <1% | Partial Surrender Report for E28/2998 for the period ending 25/09/2025 | |
| A153315 | 2026 | Kalgoorlie Mining Associates Pty Ltd | <1% | Partial Surrender Report for E28/2998 for the period ending 25/09/2025 | |
| A153315 | 2026 | Kalgoorlie Mining Associates Pty Ltd | <1% | Partial Surrender Report for E28/2998 for the period ending 25/09/2025 | |
| A153315 | 2026 | Kalgoorlie Mining Associates Pty Ltd | <1% | Partial Surrender Report for E28/2998 for the period ending 25/09/2025 | |
| A145208 | 2024 | Dynamic Metals Limited | 30% | Partial Surrender Report for E 28/3138 - Pinnacles West for the period 13 October 2023 to 11 September 2024 |
245 more reports
| A145208 | 2024 | Dynamic Metals Limited | 30% | Partial Surrender Report for E 28/3138 - Pinnacles West for the period 13 October 2023 to 11 September 2024 | |
| A145208 | 2024 | Dynamic Metals Limited | 30% | Partial Surrender Report for E 28/3138 - Pinnacles West for the period 13 October 2023 to 11 September 2024 | |
| A145208 | 2024 | Dynamic Metals Limited | 30% | Partial Surrender Report for E 28/3138 - Pinnacles West for the period 13 October 2023 to 11 September 2024 | |
| A126380 | 2021 | Element 25 Limited | <1% | Annual Report - C210/2017 - Pinnacles Project for the period ending 04/01/2021 | |
| A126380 | 2021 | Element 25 Limited | <1% | Annual Report - C210/2017 - Pinnacles Project for the period ending 04/01/2021 | |
| A126380 | 2021 | Element 25 Limited | <1% | Annual Report - C210/2017 - Pinnacles Project for the period ending 04/01/2021 | |
| A126380 | 2021 | Element 25 Limited | <1% | Annual Report - C210/2017 - Pinnacles Project for the period ending 04/01/2021 | |
| A122238 | 2020 | Aruma Resources Limited | <1% | ANNUAL REPORT for C197/2017 "BEOWULF", 8 OCTOBER 2018 TO 7 OCTOBER 2019 | |
| A122238 | 2020 | Aruma Resources Limited | <1% | ANNUAL REPORT for C197/2017 "BEOWULF", 8 OCTOBER 2018 TO 7 OCTOBER 2019 | |
| A122238 | 2020 | Aruma Resources Limited | <1% | ANNUAL REPORT for C197/2017 "BEOWULF", 8 OCTOBER 2018 TO 7 OCTOBER 2019 | |
| A122238 | 2020 | Aruma Resources Limited | <1% | ANNUAL REPORT for C197/2017 "BEOWULF", 8 OCTOBER 2018 TO 7 OCTOBER 2019 | |
| A122911 | 2020 | Element 25 Limited | <1% | Annual Report - C210/2017 Pinnacles for the period ending 04/01/2020, E 28/02577, E 28/02701 | |
| A122911 | 2020 | Element 25 Limited | <1% | Annual Report - C210/2017 Pinnacles for the period ending 04/01/2020, E 28/02577, E 28/02701 | |
| A122911 | 2020 | Element 25 Limited | <1% | Annual Report - C210/2017 Pinnacles for the period ending 04/01/2020, E 28/02577, E 28/02701 | |
| A122911 | 2020 | Element 25 Limited | <1% | Annual Report - C210/2017 Pinnacles for the period ending 04/01/2020, E 28/02577, E 28/02701 | |
| A124137 | 2020 | Kalnorth Gold Mines Limited | 4.1% | Kurnalpi Project C101-2011 Annual report for the period 14 April 2019 to 13 April 2020 | |
| A124137 | 2020 | Kalnorth Gold Mines Limited | 4.1% | Kurnalpi Project C101-2011 Annual report for the period 14 April 2019 to 13 April 2020 | |
| A124137 | 2020 | Kalnorth Gold Mines Limited | 4.1% | Kurnalpi Project C101-2011 Annual report for the period 14 April 2019 to 13 April 2020 | |
| A124137 | 2020 | Kalnorth Gold Mines Limited | 4.1% | Kurnalpi Project C101-2011 Annual report for the period 14 April 2019 to 13 April 2020 | |
| A118757 | 2019 | Aruma Resources Limited | <1% | Annual Report for C197/2017 Beowulf Project for the period 8 October 2017 to 7 October 2018, E28/01900, E28/01 | |
| A118757 | 2019 | Aruma Resources Limited | <1% | Annual Report for C197/2017 Beowulf Project for the period 8 October 2017 to 7 October 2018, E28/01900, E28/01 | |
| A118757 | 2019 | Aruma Resources Limited | <1% | Annual Report for C197/2017 Beowulf Project for the period 8 October 2017 to 7 October 2018, E28/01900, E28/01 | |
| A118757 | 2019 | Aruma Resources Limited | <1% | Annual Report for C197/2017 Beowulf Project for the period 8 October 2017 to 7 October 2018, E28/01900, E28/01 | |
| A119504 | 2019 | Element 25 Limited | <1% | Annual Report C210/2017 Pinnacles for the period 5 January 2018 to 4 January 2019, E28/02577, E28/02701 | |
| A119504 | 2019 | Element 25 Limited | <1% | Annual Report C210/2017 Pinnacles for the period 5 January 2018 to 4 January 2019, E28/02577, E28/02701 | |
| A119504 | 2019 | Element 25 Limited | <1% | Annual Report C210/2017 Pinnacles for the period 5 January 2018 to 4 January 2019, E28/02577, E28/02701 | |
| A119504 | 2019 | Element 25 Limited | <1% | Annual Report C210/2017 Pinnacles for the period 5 January 2018 to 4 January 2019, E28/02577, E28/02701 | |
| A116288 | 2018 | Montezuma Mining Company Ltd | <1% | Annual Report C210/2017 Pinnacles For the Period 5 January 2017 to 4 January 2018, E28/02577, E28/02701 | |
| A116288 | 2018 | Montezuma Mining Company Ltd | <1% | Annual Report C210/2017 Pinnacles For the Period 5 January 2017 to 4 January 2018, E28/02577, E28/02701 | |
| A116288 | 2018 | Montezuma Mining Company Ltd | <1% | Annual Report C210/2017 Pinnacles For the Period 5 January 2017 to 4 January 2018, E28/02577, E28/02701 | |
| A116288 | 2018 | Montezuma Mining Company Ltd | <1% | Annual Report C210/2017 Pinnacles For the Period 5 January 2017 to 4 January 2018, E28/02577, E28/02701 | |
| A106460 | 2015 | Kalnorth Gold Mines Limited | 1.9% | ANNUAL REPORT, For the Period 14 April 2014 to 13 April 2015, KURNALPI, Kurnalpi Project [C101/2011] | |
| A106460 | 2015 | Kalnorth Gold Mines Limited | 1.9% | ANNUAL REPORT, For the Period 14 April 2014 to 13 April 2015, KURNALPI, Kurnalpi Project [C101/2011] | |
| A106460 | 2015 | Kalnorth Gold Mines Limited | 1.9% | ANNUAL REPORT, For the Period 14 April 2014 to 13 April 2015, KURNALPI, Kurnalpi Project [C101/2011] | |
| A106460 | 2015 | Kalnorth Gold Mines Limited | 1.9% | ANNUAL REPORT, For the Period 14 April 2014 to 13 April 2015, KURNALPI, Kurnalpi Project [C101/2011] | |
| A103198 | 2014 | Cazaly Resources Ltd | 6.1% | E31/886, E28/2273 Combined Annual Report C50/2011 for the period 01/07/2013 to 30/06/2014 | |
| A103198 | 2014 | Cazaly Resources Ltd | 6.1% | E31/886, E28/2273 Combined Annual Report C50/2011 for the period 01/07/2013 to 30/06/2014 | |
| A103198 | 2014 | Cazaly Resources Ltd | 6.1% | E31/886, E28/2273 Combined Annual Report C50/2011 for the period 01/07/2013 to 30/06/2014 | |
| A103198 | 2014 | Cazaly Resources Ltd | 6.1% | E31/886, E28/2273 Combined Annual Report C50/2011 for the period 01/07/2013 to 30/06/2014 | |
| A103481 | 2014 | Kalnorth Gold Mines Ltd | 1.8% | Combined Annual report for the period ending 13 April 2014, C101/2011, Kurnalpi Project E28/1477...P28/1255 | |
| A103481 | 2014 | Kalnorth Gold Mines Ltd | 1.8% | Combined Annual report for the period ending 13 April 2014, C101/2011, Kurnalpi Project E28/1477...P28/1255 | |
| A103481 | 2014 | Kalnorth Gold Mines Ltd | 1.8% | Combined Annual report for the period ending 13 April 2014, C101/2011, Kurnalpi Project E28/1477...P28/1255 | |
| A103481 | 2014 | Kalnorth Gold Mines Ltd | 1.8% | Combined Annual report for the period ending 13 April 2014, C101/2011, Kurnalpi Project E28/1477...P28/1255 | |
| A98422 | 2013 | Kalnorth Gold Mines Ltd | 3.3% | Annual report for the period ending 13 April 2013, Kurnalpi Project, C101/2011 for the period 14 April 2012 – | |
| A98422 | 2013 | Kalnorth Gold Mines Ltd | 3.3% | Annual report for the period ending 13 April 2013, Kurnalpi Project, C101/2011 for the period 14 April 2012 – | |
| A98422 | 2013 | Kalnorth Gold Mines Ltd | 3.3% | Annual report for the period ending 13 April 2013, Kurnalpi Project, C101/2011 for the period 14 April 2012 – | |
| A98422 | 2013 | Kalnorth Gold Mines Ltd | 3.3% | Annual report for the period ending 13 April 2013, Kurnalpi Project, C101/2011 for the period 14 April 2012 – | |
| A98489 | 2013 | Kalnorth Gold Mines Ltd | 100% | Surrender report for the period 21 April 2008 – 20 April 2013, Kurnalpi Project, E28/1787 | |
| A98489 | 2013 | Kalnorth Gold Mines Ltd | 100% | Surrender report for the period 21 April 2008 – 20 April 2013, Kurnalpi Project, E28/1787 | |
| A98489 | 2013 | Kalnorth Gold Mines Ltd | 100% | Surrender report for the period 21 April 2008 – 20 April 2013, Kurnalpi Project, E28/1787 | |
| A98489 | 2013 | Kalnorth Gold Mines Ltd | 100% | Surrender report for the period 21 April 2008 – 20 April 2013, Kurnalpi Project, E28/1787 | |
| A94230 | 2012 | Carrick Gold Ltd | 4.6% | Annual Report for the period 14 April 2011 to 13 April 2012, Kurnalpi Project, C101/2011 Kurnalpi | |
| A94230 | 2012 | Carrick Gold Ltd | 4.6% | Annual Report for the period 14 April 2011 to 13 April 2012, Kurnalpi Project, C101/2011 Kurnalpi | |
| A94230 | 2012 | Carrick Gold Ltd | 4.6% | Annual Report for the period 14 April 2011 to 13 April 2012, Kurnalpi Project, C101/2011 Kurnalpi | |
| A94230 | 2012 | Carrick Gold Ltd | 4.6% | Annual Report for the period 14 April 2011 to 13 April 2012, Kurnalpi Project, C101/2011 Kurnalpi | |
| A91069 | 2011 | Carrick Gold Ltd | 100% | Kurnalpi Project Annual Mineral Exploration Report E28/1787 for the period 21st April 2010 – 20th April 2011 | |
| A91069 | 2011 | Carrick Gold Ltd | 100% | Kurnalpi Project Annual Mineral Exploration Report E28/1787 for the period 21st April 2010 – 20th April 2011 | |
| A91069 | 2011 | Carrick Gold Ltd | 100% | Kurnalpi Project Annual Mineral Exploration Report E28/1787 for the period 21st April 2010 – 20th April 2011 | |
| A91069 | 2011 | Carrick Gold Ltd | 100% | Kurnalpi Project Annual Mineral Exploration Report E28/1787 for the period 21st April 2010 – 20th April 2011 | |
| A86795 | 2010 | Heron Resources Ltd | 23% | Surrender Report for the period 3 May 2007 to 24 March 2010, Arcoona Project, E28/1607 (Part of Kalpini C28/20 | |
| A86795 | 2010 | Heron Resources Ltd | 23% | Surrender Report for the period 3 May 2007 to 24 March 2010, Arcoona Project, E28/1607 (Part of Kalpini C28/20 | |
| A86795 | 2010 | Heron Resources Ltd | 23% | Surrender Report for the period 3 May 2007 to 24 March 2010, Arcoona Project, E28/1607 (Part of Kalpini C28/20 | |
| A86795 | 2010 | Heron Resources Ltd | 23% | Surrender Report for the period 3 May 2007 to 24 March 2010, Arcoona Project, E28/1607 (Part of Kalpini C28/20 | |
| A87460 | 2010 | Condor Nickel Ltd | 100% | E28/1787: Annual Report for the period 21 April 2009 to 20 April 2010 | |
| A87460 | 2010 | Condor Nickel Ltd | 100% | E28/1787: Annual Report for the period 21 April 2009 to 20 April 2010 | |
| A87460 | 2010 | Condor Nickel Ltd | 100% | E28/1787: Annual Report for the period 21 April 2009 to 20 April 2010 | |
| A87460 | 2010 | Condor Nickel Ltd | 100% | E28/1787: Annual Report for the period 21 April 2009 to 20 April 2010 | |
| A81126 | 2009 | Peninsula Minerals Ltd | 6.1% | Annual Technical Report E28/589, E28/590, E28/1516 GSWA Group reporting Ref Number 17/2006, Pinnacles, 1 Janua | |
| A81126 | 2009 | Peninsula Minerals Ltd | 6.1% | Annual Technical Report E28/589, E28/590, E28/1516 GSWA Group reporting Ref Number 17/2006, Pinnacles, 1 Janua | |
| A81126 | 2009 | Peninsula Minerals Ltd | 6.1% | Annual Technical Report E28/589, E28/590, E28/1516 GSWA Group reporting Ref Number 17/2006, Pinnacles, 1 Janua | |
| A81126 | 2009 | Peninsula Minerals Ltd | 6.1% | Annual Technical Report E28/589, E28/590, E28/1516 GSWA Group reporting Ref Number 17/2006, Pinnacles, 1 Janua | |
| A83082 | 2009 | Carrick Gold Ltd | 100% | E28/1787: Annual Report for period 21 April 2008 to 20 April 2009 | |
| A83082 | 2009 | Carrick Gold Ltd | 100% | E28/1787: Annual Report for period 21 April 2008 to 20 April 2009 | |
| A83082 | 2009 | Carrick Gold Ltd | 100% | E28/1787: Annual Report for period 21 April 2008 to 20 April 2009 | |
| A83082 | 2009 | Carrick Gold Ltd | 100% | E28/1787: Annual Report for period 21 April 2008 to 20 April 2009 | |
| A85025 | 2009 | Heron Resources Ltd | 6.5% | Kalpini Nickel Project, C31/2002, Combined annual report for the period 27 September 2008 to 26 September 2009 | |
| A85025 | 2009 | Heron Resources Ltd | 6.5% | Kalpini Nickel Project, C31/2002, Combined annual report for the period 27 September 2008 to 26 September 2009 | |
| A85025 | 2009 | Heron Resources Ltd | 6.5% | Kalpini Nickel Project, C31/2002, Combined annual report for the period 27 September 2008 to 26 September 2009 | |
| A85025 | 2009 | Heron Resources Ltd | 6.5% | Kalpini Nickel Project, C31/2002, Combined annual report for the period 27 September 2008 to 26 September 2009 | |
| A85154 | 2009 | Heron Resources Ltd | 40% | Surrender report for the period 1 September 2004 to 12 September 2009, Mooree Hill Project, E28/1187 | |
| A85154 | 2009 | Heron Resources Ltd | 40% | Surrender report for the period 1 September 2004 to 12 September 2009, Mooree Hill Project, E28/1187 | |
| A85154 | 2009 | Heron Resources Ltd | 40% | Surrender report for the period 1 September 2004 to 12 September 2009, Mooree Hill Project, E28/1187 | |
| A85154 | 2009 | Heron Resources Ltd | 40% | Surrender report for the period 1 September 2004 to 12 September 2009, Mooree Hill Project, E28/1187 | |
| A78589 | 2008 | Peninsula Minerals Ltd | 6.1% | Pinnacles Annual Technical Report E28/589, E28/590, E28/1516 GSWA Group reporting Ref Number 17/2006 | |
| A78589 | 2008 | Peninsula Minerals Ltd | 6.1% | Pinnacles Annual Technical Report E28/589, E28/590, E28/1516 GSWA Group reporting Ref Number 17/2006 | |
| A78589 | 2008 | Peninsula Minerals Ltd | 6.1% | Pinnacles Annual Technical Report E28/589, E28/590, E28/1516 GSWA Group reporting Ref Number 17/2006 | |
| A78589 | 2008 | Peninsula Minerals Ltd | 6.1% | Pinnacles Annual Technical Report E28/589, E28/590, E28/1516 GSWA Group reporting Ref Number 17/2006 | |
| A79813 | 2008 | Vale Exploration Pty Ltd | 40% | Kalpini Nickel Project Tenement E28/1187 Partial Surrender Report, 13 SEPTEMBER 2004 – 11 SEPTEMBER 2008, C31/ | |
| A79813 | 2008 | Vale Exploration Pty Ltd | 40% | Kalpini Nickel Project Tenement E28/1187 Partial Surrender Report, 13 SEPTEMBER 2004 – 11 SEPTEMBER 2008, C31/ | |
| A79813 | 2008 | Vale Exploration Pty Ltd | 40% | Kalpini Nickel Project Tenement E28/1187 Partial Surrender Report, 13 SEPTEMBER 2004 – 11 SEPTEMBER 2008, C31/ | |
| A79813 | 2008 | Vale Exploration Pty Ltd | 40% | Kalpini Nickel Project Tenement E28/1187 Partial Surrender Report, 13 SEPTEMBER 2004 – 11 SEPTEMBER 2008, C31/ | |
| A80185 | 2008 | Vale Inco Australia Limited Partnership | 7.2% | KALPINI NICKEL PROJECT, COMBINED ANNUAL REPORT – C31/2002 27 SEPTEMBER 2007 – 26 SEPTEMBER 2008 | |
| A80185 | 2008 | Vale Inco Australia Limited Partnership | 7.2% | KALPINI NICKEL PROJECT, COMBINED ANNUAL REPORT – C31/2002 27 SEPTEMBER 2007 – 26 SEPTEMBER 2008 | |
| A80185 | 2008 | Vale Inco Australia Limited Partnership | 7.2% | KALPINI NICKEL PROJECT, COMBINED ANNUAL REPORT – C31/2002 27 SEPTEMBER 2007 – 26 SEPTEMBER 2008 | |
| A80185 | 2008 | Vale Inco Australia Limited Partnership | 7.2% | KALPINI NICKEL PROJECT, COMBINED ANNUAL REPORT – C31/2002 27 SEPTEMBER 2007 – 26 SEPTEMBER 2008 | |
| A75256 | 2007 | Bannerman Resources Ltd | 4.7% | 'Pinnacles Project' E28/589, E28/590, E28/1326, E28/1516, P28/995, Combined Annual Report for the Period 1st J | |
| A75256 | 2007 | Bannerman Resources Ltd | 4.7% | 'Pinnacles Project' E28/589, E28/590, E28/1326, E28/1516, P28/995, Combined Annual Report for the Period 1st J | |
| A75256 | 2007 | Bannerman Resources Ltd | 4.7% | 'Pinnacles Project' E28/589, E28/590, E28/1326, E28/1516, P28/995, Combined Annual Report for the Period 1st J | |
| A75256 | 2007 | Bannerman Resources Ltd | 4.7% | 'Pinnacles Project' E28/589, E28/590, E28/1326, E28/1516, P28/995, Combined Annual Report for the Period 1st J | |
| A75795 | 2007 | Inco Australia Ltd | 40% | Kalpini Project Tenement E28/1187 North East Coolgardie Mineral Field Partial Surrender Report for the Period | |
| A75795 | 2007 | Inco Australia Ltd | 40% | Kalpini Project Tenement E28/1187 North East Coolgardie Mineral Field Partial Surrender Report for the Period | |
| A75795 | 2007 | Inco Australia Ltd | 40% | Kalpini Project Tenement E28/1187 North East Coolgardie Mineral Field Partial Surrender Report for the Period | |
| A75795 | 2007 | Inco Australia Ltd | 40% | Kalpini Project Tenement E28/1187 North East Coolgardie Mineral Field Partial Surrender Report for the Period | |
| A76729 | 2007 | Inco Australia Ltd | 7.1% | KALPINI NICKEL PROJECT, C31/2002, COMBINED ANNUAL REPORT 27 SEPTEMBER 2006 - 26 SEPTEMBER 2007 TENEMENTS: E2 | |
| A76729 | 2007 | Inco Australia Ltd | 7.1% | KALPINI NICKEL PROJECT, C31/2002, COMBINED ANNUAL REPORT 27 SEPTEMBER 2006 - 26 SEPTEMBER 2007 TENEMENTS: E2 | |
| A76729 | 2007 | Inco Australia Ltd | 7.1% | KALPINI NICKEL PROJECT, C31/2002, COMBINED ANNUAL REPORT 27 SEPTEMBER 2006 - 26 SEPTEMBER 2007 TENEMENTS: E2 | |
| A76729 | 2007 | Inco Australia Ltd | 7.1% | KALPINI NICKEL PROJECT, C31/2002, COMBINED ANNUAL REPORT 27 SEPTEMBER 2006 - 26 SEPTEMBER 2007 TENEMENTS: E2 | |
| A72895 | 2006 | Heron Resources Ltd | 22% | Kurnalpi Project, C76/2005. E28/1013,1108,1187,1295,P28/1004-1005, Northeast Coolgardie Mineral Field, Annual | |
| A72895 | 2006 | Heron Resources Ltd | 22% | Kurnalpi Project, C76/2005. E28/1013,1108,1187,1295,P28/1004-1005, Northeast Coolgardie Mineral Field, Annual | |
| A72895 | 2006 | Heron Resources Ltd | 22% | Kurnalpi Project, C76/2005. E28/1013,1108,1187,1295,P28/1004-1005, Northeast Coolgardie Mineral Field, Annual | |
| A72895 | 2006 | Heron Resources Ltd | 22% | Kurnalpi Project, C76/2005. E28/1013,1108,1187,1295,P28/1004-1005, Northeast Coolgardie Mineral Field, Annual | |
| A72931 | 2006 | Heron Resources Ltd | 57% | Kurnalpi Project E28/1013,1187, Combined Reporting No. C76/2005, Annual Report, 01 May 2004 to 30 April 2005. | |
| A72931 | 2006 | Heron Resources Ltd | 57% | Kurnalpi Project E28/1013,1187, Combined Reporting No. C76/2005, Annual Report, 01 May 2004 to 30 April 2005. | |
| A72931 | 2006 | Heron Resources Ltd | 57% | Kurnalpi Project E28/1013,1187, Combined Reporting No. C76/2005, Annual Report, 01 May 2004 to 30 April 2005. | |
| A72931 | 2006 | Heron Resources Ltd | 57% | Kurnalpi Project E28/1013,1187, Combined Reporting No. C76/2005, Annual Report, 01 May 2004 to 30 April 2005. | |
| A69063 | 2004 | Peninsula Gold Pty Ltd | 20% | Exploration Licences E28/589, E28/590, E28/680 & P28/995, The Pinnacles Nickel Project, Combined Annual Explor | |
| A69063 | 2004 | Peninsula Gold Pty Ltd | 20% | Exploration Licences E28/589, E28/590, E28/680 & P28/995, The Pinnacles Nickel Project, Combined Annual Explor | |
| A69063 | 2004 | Peninsula Gold Pty Ltd | 20% | Exploration Licences E28/589, E28/590, E28/680 & P28/995, The Pinnacles Nickel Project, Combined Annual Explor | |
| A69063 | 2004 | Peninsula Gold Pty Ltd | 20% | Exploration Licences E28/589, E28/590, E28/680 & P28/995, The Pinnacles Nickel Project, Combined Annual Explor | |
| A69263 | 2004 | Avoca Resources Ltd | 10% | Roe South JV Project, Exploration Licences E28/886, E28/1012, Annual report for the period 13/06/2003-12/06/2 | |
| A69263 | 2004 | Avoca Resources Ltd | 10% | Roe South JV Project, Exploration Licences E28/886, E28/1012, Annual report for the period 13/06/2003-12/06/2 | |
| A69263 | 2004 | Avoca Resources Ltd | 10% | Roe South JV Project, Exploration Licences E28/886, E28/1012, Annual report for the period 13/06/2003-12/06/2 | |
| A69263 | 2004 | Avoca Resources Ltd | 10% | Roe South JV Project, Exploration Licences E28/886, E28/1012, Annual report for the period 13/06/2003-12/06/2 | |
| A70312 | 2004 | Heron Resources Ltd | 21% | Pinnacles South Prospect, E28/1108, Northeast Coolgardie Mineral Field, Kurnalpi/Mulgabbie, Annual 15/12/03 - | |
| A70312 | 2004 | Heron Resources Ltd | 21% | Pinnacles South Prospect, E28/1108, Northeast Coolgardie Mineral Field, Kurnalpi/Mulgabbie, Annual 15/12/03 - | |
| A70312 | 2004 | Heron Resources Ltd | 21% | Pinnacles South Prospect, E28/1108, Northeast Coolgardie Mineral Field, Kurnalpi/Mulgabbie, Annual 15/12/03 - | |
| A70312 | 2004 | Heron Resources Ltd | 21% | Pinnacles South Prospect, E28/1108, Northeast Coolgardie Mineral Field, Kurnalpi/Mulgabbie, Annual 15/12/03 - | |
| A66263 | 2003 | Kanowna Lights Ltd | 46% | Pinnacles Nickel Project, Exploration Licence E28/680, Partial Surrender Report, (GSWA M9254/1) (March 2003), | |
| A66263 | 2003 | Kanowna Lights Ltd | 46% | Pinnacles Nickel Project, Exploration Licence E28/680, Partial Surrender Report, (GSWA M9254/1) (March 2003), | |
| A66263 | 2003 | Kanowna Lights Ltd | 46% | Pinnacles Nickel Project, Exploration Licence E28/680, Partial Surrender Report, (GSWA M9254/1) (March 2003), | |
| A66263 | 2003 | Kanowna Lights Ltd | 46% | Pinnacles Nickel Project, Exploration Licence E28/680, Partial Surrender Report, (GSWA M9254/1) (March 2003), | |
| A66986 | 2003 | Kanowna Lights Ltd | 20% | E28/589,590, 680, and 'E' Application E28/1326, P Application P28/995 The Pinnacles Nickel Project, Combined | |
| A66986 | 2003 | Kanowna Lights Ltd | 20% | E28/589,590, 680, and 'E' Application E28/1326, P Application P28/995 The Pinnacles Nickel Project, Combined | |
| A66986 | 2003 | Kanowna Lights Ltd | 20% | E28/589,590, 680, and 'E' Application E28/1326, P Application P28/995 The Pinnacles Nickel Project, Combined | |
| A66986 | 2003 | Kanowna Lights Ltd | 20% | E28/589,590, 680, and 'E' Application E28/1326, P Application P28/995 The Pinnacles Nickel Project, Combined | |
| A67245 | 2003 | Placer Dome Asia Pacific Ltd | 10% | Roe South Project, Annual Report for the period 13/06/2002 to 12/06/2003 E28/886,1012. Placer Report No. WA03. | |
| A67245 | 2003 | Placer Dome Asia Pacific Ltd | 10% | Roe South Project, Annual Report for the period 13/06/2002 to 12/06/2003 E28/886,1012. Placer Report No. WA03. | |
| A67245 | 2003 | Placer Dome Asia Pacific Ltd | 10% | Roe South Project, Annual Report for the period 13/06/2002 to 12/06/2003 E28/886,1012. Placer Report No. WA03. | |
| A67245 | 2003 | Placer Dome Asia Pacific Ltd | 10% | Roe South Project, Annual Report for the period 13/06/2002 to 12/06/2003 E28/886,1012. Placer Report No. WA03. | |
| A71857 | 2003 | Bannerman Resources Ltd | 5.2% | Pinnacles Project, E28/589 ,E28/590, E28/1326, P28/995, Combined Annual Report for the period 1 May 2004 to 31 | |
| A71857 | 2003 | Bannerman Resources Ltd | 5.2% | Pinnacles Project, E28/589 ,E28/590, E28/1326, P28/995, Combined Annual Report for the period 1 May 2004 to 31 | |
| A71857 | 2003 | Bannerman Resources Ltd | 5.2% | Pinnacles Project, E28/589 ,E28/590, E28/1326, P28/995, Combined Annual Report for the period 1 May 2004 to 31 | |
| A71857 | 2003 | Bannerman Resources Ltd | 5.2% | Pinnacles Project, E28/589 ,E28/590, E28/1326, P28/995, Combined Annual Report for the period 1 May 2004 to 31 | |
| A64587 | 2002 | Gutnick Resources Nl | 60% | Mining Licence: M28/98 'Kurnalpi' Surrender Report for the Period 10 December 1994 To 4 February 2000. | |
| A64587 | 2002 | Gutnick Resources Nl | 60% | Mining Licence: M28/98 'Kurnalpi' Surrender Report for the Period 10 December 1994 To 4 February 2000. | |
| A64587 | 2002 | Gutnick Resources Nl | 60% | Mining Licence: M28/98 'Kurnalpi' Surrender Report for the Period 10 December 1994 To 4 February 2000. | |
| A64587 | 2002 | Gutnick Resources Nl | 60% | Mining Licence: M28/98 'Kurnalpi' Surrender Report for the Period 10 December 1994 To 4 February 2000. | |
| A65144 | 2002 | Kanowna Lights Ltd | 20% | Exploration Licences E28/589, E28/590 and E28/680 'The Pinnancles Nickel Project' Combined Annual Exploration | |
| A65144 | 2002 | Kanowna Lights Ltd | 20% | Exploration Licences E28/589, E28/590 and E28/680 'The Pinnancles Nickel Project' Combined Annual Exploration | |
| A65144 | 2002 | Kanowna Lights Ltd | 20% | Exploration Licences E28/589, E28/590 and E28/680 'The Pinnancles Nickel Project' Combined Annual Exploration | |
| A65144 | 2002 | Kanowna Lights Ltd | 20% | Exploration Licences E28/589, E28/590 and E28/680 'The Pinnancles Nickel Project' Combined Annual Exploration | |
| A65171 | 2002 | Auriongold Ltd | 10% | Roe South Project Annual Report 13/06/2001 - 12/06/2002 E28/886, E28/1012. Mineral Field Kurnalpi | |
| A65171 | 2002 | Auriongold Ltd | 10% | Roe South Project Annual Report 13/06/2001 - 12/06/2002 E28/886, E28/1012. Mineral Field Kurnalpi | |
| A65171 | 2002 | Auriongold Ltd | 10% | Roe South Project Annual Report 13/06/2001 - 12/06/2002 E28/886, E28/1012. Mineral Field Kurnalpi | |
| A65171 | 2002 | Auriongold Ltd | 10% | Roe South Project Annual Report 13/06/2001 - 12/06/2002 E28/886, E28/1012. Mineral Field Kurnalpi | |
| A65216 | 2002 | Gutnick Resources Nl | 25% | Arcoona Project, Partial Surrender Report for the period 23rd December 1993 to 11th June 2000, E28/508. | |
| A65216 | 2002 | Gutnick Resources Nl | 25% | Arcoona Project, Partial Surrender Report for the period 23rd December 1993 to 11th June 2000, E28/508. | |
| A65216 | 2002 | Gutnick Resources Nl | 25% | Arcoona Project, Partial Surrender Report for the period 23rd December 1993 to 11th June 2000, E28/508. | |
| A65216 | 2002 | Gutnick Resources Nl | 25% | Arcoona Project, Partial Surrender Report for the period 23rd December 1993 to 11th June 2000, E28/508. | |
| A62394 | 2001 | Kanowna Lights Nl | 8.3% | The Pinnacles Nickel Project Annual Exploration Progress Report For The Year 1st May, 2000 to 30th April, 2001 | |
| A62394 | 2001 | Kanowna Lights Nl | 8.3% | The Pinnacles Nickel Project Annual Exploration Progress Report For The Year 1st May, 2000 to 30th April, 2001 | |
| A62394 | 2001 | Kanowna Lights Nl | 8.3% | The Pinnacles Nickel Project Annual Exploration Progress Report For The Year 1st May, 2000 to 30th April, 2001 | |
| A62394 | 2001 | Kanowna Lights Nl | 8.3% | The Pinnacles Nickel Project Annual Exploration Progress Report For The Year 1st May, 2000 to 30th April, 2001 | |
| A62865 | 2001 | Kurnalpi Gold Nl | <1% | Annual Exploration Report Year Ending March 17th 2000 E28/534 'Wyo Well' Kurnalpi Mining Centre WA. | |
| A62865 | 2001 | Kurnalpi Gold Nl | <1% | Annual Exploration Report Year Ending March 17th 2000 E28/534 'Wyo Well' Kurnalpi Mining Centre WA. | |
| A62865 | 2001 | Kurnalpi Gold Nl | <1% | Annual Exploration Report Year Ending March 17th 2000 E28/534 'Wyo Well' Kurnalpi Mining Centre WA. | |
| A62865 | 2001 | Kurnalpi Gold Nl | <1% | Annual Exploration Report Year Ending March 17th 2000 E28/534 'Wyo Well' Kurnalpi Mining Centre WA. | |
| A59950 | 2000 | Gutnick Resources Nl | 36% | E28/508,561,779, C105/1998 Arcoona Joint Annual Report for the period 10 January 1999 to 9 January 2000 | |
| A59950 | 2000 | Gutnick Resources Nl | 36% | E28/508,561,779, C105/1998 Arcoona Joint Annual Report for the period 10 January 1999 to 9 January 2000 | |
| A59950 | 2000 | Gutnick Resources Nl | 36% | E28/508,561,779, C105/1998 Arcoona Joint Annual Report for the period 10 January 1999 to 9 January 2000 | |
| A59950 | 2000 | Gutnick Resources Nl | 36% | E28/508,561,779, C105/1998 Arcoona Joint Annual Report for the period 10 January 1999 to 9 January 2000 | |
| A60902 | 2000 | Kurnalpi Gold Nl | 11% | Surrender Report WYO Well E28/533 M8571 C466/1994 July 2000 | |
| A60902 | 2000 | Kurnalpi Gold Nl | 11% | Surrender Report WYO Well E28/533 M8571 C466/1994 July 2000 | |
| A60902 | 2000 | Kurnalpi Gold Nl | 11% | Surrender Report WYO Well E28/533 M8571 C466/1994 July 2000 | |
| A60902 | 2000 | Kurnalpi Gold Nl | 11% | Surrender Report WYO Well E28/533 M8571 C466/1994 July 2000 | |
| A61265 | 2000 | Kanowna Lights Nl | 20% | Pinnacles Nickel project, Combined Annual Mineral Exploratio Exploration Report May 1st 1999 to April 30th 20 | |
| A61265 | 2000 | Kanowna Lights Nl | 20% | Pinnacles Nickel project, Combined Annual Mineral Exploratio Exploration Report May 1st 1999 to April 30th 20 | |
| A61265 | 2000 | Kanowna Lights Nl | 20% | Pinnacles Nickel project, Combined Annual Mineral Exploratio Exploration Report May 1st 1999 to April 30th 20 | |
| A61265 | 2000 | Kanowna Lights Nl | 20% | Pinnacles Nickel project, Combined Annual Mineral Exploratio Exploration Report May 1st 1999 to April 30th 20 | |
| A57443 | 1999 | Mt Kersey Mining Nl | 68% | Exploration Licence:E28/528 :Beowulf" (Part on C114/1995- Mulgabbie Joing Report Formally called Scottiwulf Do | |
| A57443 | 1999 | Mt Kersey Mining Nl | 68% | Exploration Licence:E28/528 :Beowulf" (Part on C114/1995- Mulgabbie Joing Report Formally called Scottiwulf Do | |
| A57443 | 1999 | Mt Kersey Mining Nl | 68% | Exploration Licence:E28/528 :Beowulf" (Part on C114/1995- Mulgabbie Joing Report Formally called Scottiwulf Do | |
| A57443 | 1999 | Mt Kersey Mining Nl | 68% | Exploration Licence:E28/528 :Beowulf" (Part on C114/1995- Mulgabbie Joing Report Formally called Scottiwulf Do | |
| A57444 | 1999 | Mt Kersey Mining Nl | 12% | Exploration Licence: E28/513 "GuineaWulf" (Part of C114/1995-Mulgabbie Joint Report, Formally Called Scottiwul | |
| A57444 | 1999 | Mt Kersey Mining Nl | 12% | Exploration Licence: E28/513 "GuineaWulf" (Part of C114/1995-Mulgabbie Joint Report, Formally Called Scottiwul | |
| A57444 | 1999 | Mt Kersey Mining Nl | 12% | Exploration Licence: E28/513 "GuineaWulf" (Part of C114/1995-Mulgabbie Joint Report, Formally Called Scottiwul | |
| A57444 | 1999 | Mt Kersey Mining Nl | 12% | Exploration Licence: E28/513 "GuineaWulf" (Part of C114/1995-Mulgabbie Joint Report, Formally Called Scottiwul | |
| A58173 | 1999 | Mt Kersey Mining Nl | 86% | Arcoona Project, Partial Surrender Report for the period 16th November 1994 to 15th November 1998, E28/561. | |
| A58173 | 1999 | Mt Kersey Mining Nl | 86% | Arcoona Project, Partial Surrender Report for the period 16th November 1994 to 15th November 1998, E28/561. | |
| A58173 | 1999 | Mt Kersey Mining Nl | 86% | Arcoona Project, Partial Surrender Report for the period 16th November 1994 to 15th November 1998, E28/561. | |
| A58173 | 1999 | Mt Kersey Mining Nl | 86% | Arcoona Project, Partial Surrender Report for the period 16th November 1994 to 15th November 1998, E28/561. | |
| A58303 | 1999 | Mt Kersey Mining Nl | 36% | E28/508, 561, 779 All tenement worked on 'C105/1998-Arcoona' Joint Annual Report for the period 10 January Dec | |
| A58303 | 1999 | Mt Kersey Mining Nl | 36% | E28/508, 561, 779 All tenement worked on 'C105/1998-Arcoona' Joint Annual Report for the period 10 January Dec | |
| A58303 | 1999 | Mt Kersey Mining Nl | 36% | E28/508, 561, 779 All tenement worked on 'C105/1998-Arcoona' Joint Annual Report for the period 10 January Dec | |
| A58303 | 1999 | Mt Kersey Mining Nl | 36% | E28/508, 561, 779 All tenement worked on 'C105/1998-Arcoona' Joint Annual Report for the period 10 January Dec | |
| A58431 | 1999 | Heron Resources Ltd | 7.1% | Kalpini Project Exploration Licences 27/76,129,170,426 & 459 Prospecting Licences 27/1448 to 1453 North East C | |
| A58431 | 1999 | Heron Resources Ltd | 7.1% | Kalpini Project Exploration Licences 27/76,129,170,426 & 459 Prospecting Licences 27/1448 to 1453 North East C | |
| A58431 | 1999 | Heron Resources Ltd | 7.1% | Kalpini Project Exploration Licences 27/76,129,170,426 & 459 Prospecting Licences 27/1448 to 1453 North East C | |
| A58431 | 1999 | Heron Resources Ltd | 7.1% | Kalpini Project Exploration Licences 27/76,129,170,426 & 459 Prospecting Licences 27/1448 to 1453 North East C | |
| A58527 | 1999 | North Ltd | 10% | Report No. WA2000/1S, Annual Mineral Exploration Report for the Period 1 April 1998 to 31 March 1999 by North | |
| A58527 | 1999 | North Ltd | 10% | Report No. WA2000/1S, Annual Mineral Exploration Report for the Period 1 April 1998 to 31 March 1999 by North | |
| A58527 | 1999 | North Ltd | 10% | Report No. WA2000/1S, Annual Mineral Exploration Report for the Period 1 April 1998 to 31 March 1999 by North | |
| A58527 | 1999 | North Ltd | 10% | Report No. WA2000/1S, Annual Mineral Exploration Report for the Period 1 April 1998 to 31 March 1999 by North | |
| A58826 | 1999 | Gutnick Resources Nl | 25% | E28/508 ,Arcoona Project, ' Partial Surrender Report for the period 23 December 1993 to 9 May 1999. | |
| A58826 | 1999 | Gutnick Resources Nl | 25% | E28/508 ,Arcoona Project, ' Partial Surrender Report for the period 23 December 1993 to 9 May 1999. | |
| A58826 | 1999 | Gutnick Resources Nl | 25% | E28/508 ,Arcoona Project, ' Partial Surrender Report for the period 23 December 1993 to 9 May 1999. | |
| A58826 | 1999 | Gutnick Resources Nl | 25% | E28/508 ,Arcoona Project, ' Partial Surrender Report for the period 23 December 1993 to 9 May 1999. | |
| A59020 | 1999 | Gutnick Resources Nl | 2% | Hawkwulf Project, Partial Surrender Report for the period 19th August 1994 to 8th March 1999, E28/550. | |
| A59020 | 1999 | Gutnick Resources Nl | 2% | Hawkwulf Project, Partial Surrender Report for the period 19th August 1994 to 8th March 1999, E28/550. | |
| A59020 | 1999 | Gutnick Resources Nl | 2% | Hawkwulf Project, Partial Surrender Report for the period 19th August 1994 to 8th March 1999, E28/550. | |
| A59020 | 1999 | Gutnick Resources Nl | 2% | Hawkwulf Project, Partial Surrender Report for the period 19th August 1994 to 8th March 1999, E28/550. | |
| A59033 | 1999 | Kanowna Lights Nl | 20% | Pinnacles Nickel Project Combined Annual Mineral- Exploration report 01/05/98-30/04/99 E28/589 E28/590 E28/680 | |
| A59033 | 1999 | Kanowna Lights Nl | 20% | Pinnacles Nickel Project Combined Annual Mineral- Exploration report 01/05/98-30/04/99 E28/589 E28/590 E28/680 | |
| A59033 | 1999 | Kanowna Lights Nl | 20% | Pinnacles Nickel Project Combined Annual Mineral- Exploration report 01/05/98-30/04/99 E28/589 E28/590 E28/680 | |
| A59033 | 1999 | Kanowna Lights Nl | 20% | Pinnacles Nickel Project Combined Annual Mineral- Exploration report 01/05/98-30/04/99 E28/589 E28/590 E28/680 | |
| A59134 | 1999 | Gutnick Resources Nl | 5.3% | E28/393, 397, 434-435, M28/94, 98-101, 103, 105-106, 111, 14 1, P28/839-840 'C305/1997-Kurnalpi' Joint Annual | |
| A59134 | 1999 | Gutnick Resources Nl | 5.3% | E28/393, 397, 434-435, M28/94, 98-101, 103, 105-106, 111, 14 1, P28/839-840 'C305/1997-Kurnalpi' Joint Annual | |
| A59134 | 1999 | Gutnick Resources Nl | 5.3% | E28/393, 397, 434-435, M28/94, 98-101, 103, 105-106, 111, 14 1, P28/839-840 'C305/1997-Kurnalpi' Joint Annual | |
| A59134 | 1999 | Gutnick Resources Nl | 5.3% | E28/393, 397, 434-435, M28/94, 98-101, 103, 105-106, 111, 14 1, P28/839-840 'C305/1997-Kurnalpi' Joint Annual | |
| A53841 | 1998 | Fodina Minerals Pty Ltd | 11% | Annual Technical Report E27/76 and E28/426, Acra Project, Western Australia, For the Period 1 January 1997 to | |
| A53841 | 1998 | Fodina Minerals Pty Ltd | 11% | Annual Technical Report E27/76 and E28/426, Acra Project, Western Australia, For the Period 1 January 1997 to | |
| A53841 | 1998 | Fodina Minerals Pty Ltd | 11% | Annual Technical Report E27/76 and E28/426, Acra Project, Western Australia, For the Period 1 January 1997 to | |
| A53841 | 1998 | Fodina Minerals Pty Ltd | 11% | Annual Technical Report E27/76 and E28/426, Acra Project, Western Australia, For the Period 1 January 1997 to | |
| A54088 | 1998 | Mt Kersey Mining Nl | 86% | Exploration Licence E28/561 'Arcoona' Annual Report for the period 16 November 1996 to 15 November 1997 | |
| A54088 | 1998 | Mt Kersey Mining Nl | 86% | Exploration Licence E28/561 'Arcoona' Annual Report for the period 16 November 1996 to 15 November 1997 | |
| A54088 | 1998 | Mt Kersey Mining Nl | 86% | Exploration Licence E28/561 'Arcoona' Annual Report for the period 16 November 1996 to 15 November 1997 | |
| A54088 | 1998 | Mt Kersey Mining Nl | 86% | Exploration Licence E28/561 'Arcoona' Annual Report for the period 16 November 1996 to 15 November 1997 | |
| A54806 | 1998 | Kurnalpi Gold Nl | 4.6% | Tenement Group M8571 Wyo Well Project Annual Report for the period 1/1/1997 to 31/12/1997 (E28/533, E28/534) | |
| A54806 | 1998 | Kurnalpi Gold Nl | 4.6% | Tenement Group M8571 Wyo Well Project Annual Report for the period 1/1/1997 to 31/12/1997 (E28/533, E28/534) | |
| A54806 | 1998 | Kurnalpi Gold Nl | 4.6% | Tenement Group M8571 Wyo Well Project Annual Report for the period 1/1/1997 to 31/12/1997 (E28/533, E28/534) | |
| A54806 | 1998 | Kurnalpi Gold Nl | 4.6% | Tenement Group M8571 Wyo Well Project Annual Report for the period 1/1/1997 to 31/12/1997 (E28/533, E28/534) | |
| A55268 | 1998 | Kanowna Lights Nl | 20% | Pinnacles Nickel Project, 12/12/96 - 30/04/98 E28/589, 590, 680 | |
| A55268 | 1998 | Kanowna Lights Nl | 20% | Pinnacles Nickel Project, 12/12/96 - 30/04/98 E28/589, 590, 680 | |
| A55268 | 1998 | Kanowna Lights Nl | 20% | Pinnacles Nickel Project, 12/12/96 - 30/04/98 E28/589, 590, 680 | |
| A55268 | 1998 | Kanowna Lights Nl | 20% | Pinnacles Nickel Project, 12/12/96 - 30/04/98 E28/589, 590, 680 | |
| A55701 | 1998 | Mt Kersey Mining Nl | 2% | Exploration Licence E28/550, Hawkwulf, Partial Surrender Report for the period 19th August 1994 to 24th April | |
| A55701 | 1998 | Mt Kersey Mining Nl | 2% | Exploration Licence E28/550, Hawkwulf, Partial Surrender Report for the period 19th August 1994 to 24th April | |
| A55701 | 1998 | Mt Kersey Mining Nl | 2% | Exploration Licence E28/550, Hawkwulf, Partial Surrender Report for the period 19th August 1994 to 24th April | |
| A55701 | 1998 | Mt Kersey Mining Nl | 2% | Exploration Licence E28/550, Hawkwulf, Partial Surrender Report for the period 19th August 1994 to 24th April | |
| A56119 | 1998 | Mt Kersey Mining Nl | 7.2% | Joint Annual report for the period 02/04/97-01/04/98. Kurnalpi Project. E28/393,397. M28/94,98-101,106,111. P2 | |
| A56119 | 1998 | Mt Kersey Mining Nl | 7.2% | Joint Annual report for the period 02/04/97-01/04/98. Kurnalpi Project. E28/393,397. M28/94,98-101,106,111. P2 | |
| A56119 | 1998 | Mt Kersey Mining Nl | 7.2% | Joint Annual report for the period 02/04/97-01/04/98. Kurnalpi Project. E28/393,397. M28/94,98-101,106,111. P2 | |
| A56119 | 1998 | Mt Kersey Mining Nl | 7.2% | Joint Annual report for the period 02/04/97-01/04/98. Kurnalpi Project. E28/393,397. M28/94,98-101,106,111. P2 | |
| A56429 | 1998 | Mt Kersey Mining Nl | 25% | Exploration Licence E28/508 'Arcoona' Partial Surrender Report for the period 23 December 1993 to 09/07/1998 | |
| A56429 | 1998 | Mt Kersey Mining Nl | 25% | Exploration Licence E28/508 'Arcoona' Partial Surrender Report for the period 23 December 1993 to 09/07/1998 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 28/3621 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 28/3621 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 28/3621? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.