E 28/2556
Register summary
- Holder
- Breaker Resources Nl
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 14 Aug 2015
- Commenced
- 22 Feb 2016
- Expiry
- 21 Feb 2028
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A142921 | 2024 | Kingston Nominees Pty Ltd | Lake Roe West | <1% | Annual Technical Report for the Lake Roe West Project E28/3213 during the Period 04 April 2023 to 03 April 202 |
| A144042 | 2024 | Kingston Nominees Pty Ltd | Lake Roe North | <1% | Annual Technical Report for the Lake Roe North Project E28/3214 during the Period 12 September 2023 to 11 Sept |
| A130013 | 2022 | Breaker Resources Nl | Lake Roe | 56% | Partial Surrender Report for E28/2556 Barling Project for the period ending 21/02/2022 |
| A132906 | 2022 | Solstice Minerals Ltd | Mt Turner | <1% | Partial Surrender Report for E28/2583 Mt Turner for the period ending 20/09/2022. |
| A127994 | 2021 | Breaker Resources Nl | Lake Roe | <1% | Partial Surrender Report for Lake Roe Project E28/2515 For the Period 20 May 2016 to 19 June 2021 |
126 more reports
| A128717 | 2021 | Silver Lake (Integra) Pty Limited | Aldiss | <1% | Final Surrender Report for E28/2229 Aldiss Projectfor the period 5 October 2012 to 10 August 2021 |
| A122506 | 2020 | Silver Lake (Integra) Pty Limited | Aldiss | <1% | Combined Annual Report on Aldiss Project - C63/2000 for the period 6/10/18 to 5/10/19, E28/02229, M28/00043, M |
| A123510 | 2020 | Gold Geological Consulting Pty Ltd | Roe | <1% | Roe Project Annual Report, C28/2000, 1 March 2019 to 28 February 2020 |
| A124559 | 2020 | Breaker Resources Nl | Lake Roe | 15% | Lake Roe Project Co-Funded Drilling Final Report (DAG2019/01562920), R19 |
| A124723 | 2020 | Breaker Resources Nl | Lake Roe | 15% | Lake Roe Project (C46/2016) Annual Report for the period 20 May 2019 to 19 May 2020. E 28/02515,E 28/02551,E 2 |
| A125374 | 2020 | Serendipity Resources Pty Ltd | Yilgani | <1% | Annual Technical Report Yilgani Project E28/2583 for the period 21 September 2019 to 20 September 2020 |
| A123611 | 2020 | Sieveworks Pty Ltd | Sievworks | <1% | Sieveworks E28/2649 Annual Report for the period ending 1/2/2020 |
| A120543 | 2019 | Breaker Resources Nl | Lake Roe | 15% | Lake Roe Project (C46/2016) Annual Report for the period 20 May 2018 to 19 May 2019 E 28/02515,E 28/02551,E 28 |
| A122108 | 2019 | Sumitomo Metal Mining Oceania Pty Ltd | Yindi | <1% | Yindi Project (E28/02533) Annual Report for the Period October 15 2018 to October 14 2019 |
| A121867 | 2019 | Serendipity Resources Pty Ltd | Yilgani | <1% | Annual Technical Report Yilgani Project E28/2583 for the period 21 September 2018 to 20 September 2019 |
| A116229 | 2018 | Carnavale Resources Limited | Roe | <1% | Roe Project C14/2015, E28/02303, E28/02304 Annual Report for the period 4 December 2016 to 3 December 2017 |
| A117242 | 2018 | Breaker Resources Nl | Lake Roe | 15% | Lake Roe Project (C46/2016) 2018 Annual Report for the period 20 May 2017 to 19 May 2018, E28/02515, E28/02551 |
| A118261 | 2018 | Riversgold (Australia) Pty Ltd | Yilgani | <1% | Annual Report for E2802583 Yilgani Project For the Period 21 September 2017 to 20 September 2018 |
| A118274 | 2018 | Sumitomo Metal Mining Oceania Pty Ltd | Yindi | <1% | Yindi Project (E28/02533) Annual Report for the Period October 15 2017 to October 14 2018 |
| A118572 | 2018 | Silver Lake (Integra) Pty Limited | Aldiss | <1% | Combined Annual Report on Aldiss Project - C63/2000 for the period 6/10/17 to 5/10/18, E28/02229, M28/00043, M |
| A112093 | 2017 | Carnavale Resources Limited | Roe | <1% | Roe Project C41/2015 Annual Mineral Exploration Report For the Period 4 December 2015 to 3 December 2016 |
| A114595 | 2017 | Breaker Resources Nl | Lake Roe | 15% | Lake Roe Project C46/2016 Annual Report For the Period 20 May 2016 to 19 May 2017, E28/02515, E28/02551, E28/0 |
| A114837 | 2017 | Breaker Resources Nl | Lake Roe | <1% | Lake Roe Project Co-Funded Drilling Final Report (DAG2016-00840089) For the Period 23 August 2016 to 30 June 2 |
| A115147 | 2017 | Sumitomo Metal Mining Oceania Pty Ltd | Yindi | <1% | Yindi Project (E28/02533) Annual Report for the Period October 15 2016 to October 14 2017 |
| A115201 | 2017 | Riversgold Ltd | Kurnalpi | <1% | Annual Technical Report for: E28/2583-I Kurnalpi Project for the period 21 September 2016 to 20 September 2017 |
| A115225 | 2017 | Silver Lake (Integra) Pty Limited | Aldiss | <1% | Combined Annual Report on Aldiss Project - C63/2000 for the period 6th October 2016 to 2017, E28/02229, E28/02 |
| A108792 | 2016 | Kalnorth Gold Mines Limited | Roe | <1% | Annual Mineral Exploration Report, For the Period 4 December 2014 to 3 December 2015, Roe Project, E28/02303, |
| A109378 | 2016 | Breaker Resources Nl | Lake Roe | 15% | Lake Roe Project C46/2016 Annual Report for the period 20/05/2015 to 19/05/2016, E28/02515, E28/02551, E28/025 |
| A110299 | 2016 | Silver Lake (Integra) Pty Limited | Aldiss | <1% | Combined Annual Report on Aldiss Project C63/2000 for period 6 October 2015 to 5 October 2016, E28/02168, E28/ |
| A110494 | 2016 | Sumitomo Metal Mining Oceania Pty Ltd | Yindi | <1% | Yindi Project (E28/02533) Annual Report for the Period October 15 2015 to October 14 2016 |
| A104959 | 2015 | Kalnorth Gold Mines Ltd | Roe | <1% | Annual Report for the period ending 3 December 2014, Roe Project, E28/2303 |
| A107564 | 2015 | Silver Lake (Integra) Pty Limited | Aldiss | <1% | Combined Annual Report on Aldiss Project – C63/2000 for period 6 October 2014 to 5 October 2015, E28/00469, E |
| A101839 | 2014 | Hd Mining & Investment Pty Ltd | E28/2235 | 2.7% | Final Surrender Report Exploration Licence E28/2235 for the period 5 /12/2012 to 20/03/2014 |
| A104189 | 2014 | Enterprise Uranium Ltd | Ponton | <1% | Ponton Project E28/2333 Surrender Report for the period 25 March 2014 to 7 November 2014 |
| A104250 | 2014 | Silverlake Resources Ltd | Aldiss | <1% | Combined Annual Report on Aldiss Project – C63/2000 for period 6 October 2013 to 5 October 2014, E28/469, E28/ |
| A96226 | 2013 | Integra Mining Ltd | Aldiss | <1% | Aldiss Project, Annual Report for the period 06/10/2011 to 05/10/2012, E28/469-470, 1681, 2113, 2152, 2167-216 |
| A97555 | 2013 | Magma Metals Ltd | Roe | <1% | Roe Project, Annual Report for the period 1st January 2012 to 31st December 2012, E28/1416 & 1659. [C408/1996 |
| A100492 | 2013 | Renaissance Minerals Ltd | E28/2052 | <1% | E28/2052 Surrender Report for the period 2 December 2010 to 15 July 2013 |
| A100609 | 2013 | Silver Lake Resources Ltd | Aldiss | <1% | Combined Annual Report on Aldiss Project – C63/2000 for period 6 October 2012 to 5 October 2013, E28/469, E28/ |
| A96120 | 2012 | Renaissance Minerals Ltd | Yindi | 3% | C 268/2011 - Combined Annual Report on Exploration for the Period 13th July 2011 to 12th July 2012. |
| A92718 | 2012 | Renaissance Minerals Ltd | Mount Hunt | <1% | Mt Hunt Project, Annual Report for the period 2nd December2010 to 1st December 2011, E28/2052. (C268/2011) |
| A93852 | 2012 | Aruma Resources Ltd | Kurnalpi South | 1.3% | Surrender report for the year ended 31 March 2012, E28/1855, Kurnalpi South Project. |
| A92642 | 2012 | Magma Metals Ltd | Roe | <1% | Roe Project, Annual Report for the period 1st January 2011 to 31st December 2011, E28/1659 & 1416. (C408/1996) |
| A92858 | 2012 | Atlas Iron Ltd | Avoca Downs | 60% | Avoca Downs Project, Final Surrender Report for the period 12th December 2007 to 9th February 2012, E28/1667. |
| A88152 | 2011 | Magma Metals Ltd | Roe | <1% | Annual Report for the period 1st January 2010 to 31st December 2010, Roe Project E28/1659, E28/1416 |
| A88937 | 2011 | Wheelbarrow Prospecting Pty Ltd | Avoca Downs | 6.2% | Avoca Downs Project, Annual Report to DMP Period Ending 6 January 2011, E25/338, E28/1667, 1668, 1670, C64/200 |
| A85438 | 2010 | Wheelbarrow Prospecting Pty Ltd | Avoca Downs | 6.2% | Avoca Downs Project E25/338, E28/1667, E28/1668, E28/1670 Annual Report to DMP Period Ending 6 January, 2010, |
| A85573 | 2010 | Magma Metals Ltd | Roe | <1% | Roe Project Annual Report for period 1st January 2009 - 31st December2009, Group Reporting No C408/1996 E28/16 |
| A86395 | 2010 | Hawthorn Resources Limited | Yindana | 5.7% | Exploration Licence E28/1519 Yindana, Annual Report for the period 24 November 2008 to 23 November 2009 |
| A90550 | 2010 | Aruma Resources Ltd | Mount Quin - Kurnalpi South | 1.3% | Exploration Licence E28/1855 Mt Quin Kurnalpi South Project Western Australia, Annual report for the year ende |
| A81444 | 2009 | Hawthorn Resources Limited | YINDANA | <1% | Exploration Licence E28/1073 YINDANA FINAL SURRENDER REPORT FOR THE PERIOD 5 NOVEMBER 2003 TO 4 NOVEMBER 2008 |
| A81851 | 2009 | Wheelbarrow Prospecting Pty Ltd | AVOCA DOWNS | 6.2% | AVOCA DOWNS PROJECT E25/338, E28/1667, E28/1668, E28/1670 ANNUAL TECHNICAL REPORT TO THE DEPARTMENT OF MINES A |
| A84263 | 2009 | Magma Metals Ltd | Roe | <1% | Roe Project, E28/1416, Partial Surrender Report for the period 29/09/2004 to 6/07/2009, Group Reporting Number |
| A77220 | 2008 | Magma Metals Ltd | Roe | 8.6% | Annual report for the period 1st January 2007 to 31st Decemb December 2007,Roe Project, E28/803, E28/1153, E28 |
| A77247 | 2008 | Saracen Gold Mines Pty Ltd | Yindi | <1% | Yindi Project Annual Report 01 OCTOBER 2006 TO 30 SEPTEMBER 2007, C118/1999, E28/892, E28/1062 to E28/1065, E2 |
| A77515 | 2008 | Great Gold Mines Nl | Yindana | <1% | Exploration Licence 28/1073 Yindana Annual Report for the period 5 NOVEMBER 2006 TO 4 NOVEMBER 2007 |
| A77764 | 2008 | Great Gold Mines Nl | Yindana | 5.7% | Exploration Licence 28/1519 Yindana Annual Report for the period 25 November 2006 to 24 November 2007 |
| A80784 | 2008 | Magma Metals Ltd | ROE | 5.4% | ROE PROJECT, ANNUAL REPORT For Period 1st January 2008 – 31st December 2008, Group Reporting No C 408/1996 E28 |
| A74239 | 2007 | Saracen Gold Mines Pty Ltd | Yindi/Carosue Dam | <1% | Yindi Project, Annual Report, 01 October 2005 to 30 Sep 2006 (C118/1999, E28/892, E28/1062, E28/1063, E28/1064 |
| A74364 | 2007 | Metex Resources Ltd | Roe | 5.5% | Roe Project Area E28/620...E28/1598 Annual Technical Report for the Period 01/01/2006 to 31/12/2006 Combined R |
| A74559 | 2007 | Great Gold Mines Nl | Yindana | <1% | Exploration Licence E28/1073 Yindana, Annual Report for the period 5 November 2005 to 4 November 2006 (Kurnalp |
| A74876 | 2007 | Great Gold Mines Nl | Yindana | 5.7% | Exploration Licence 28/1519, Yindana (Project) Annual Report for the Period 24 November 2005 TO 23 November 20 |
| A75084 | 2007 | Saracen Gold Mines Pty Ltd | Yindi | <1% | Partial Surrender Report E28/1062, 16 December 2002 to 15 December 2006 (C118/1999) (Yindi Project). |
| A76576 | 2007 | Metex Resources Ltd | Roe | <1% | Roe Project Area, Partial Surrender Report for the period 29 /09/2004 to 28/09/2007 (Group Reporting Number C4 |
| A71911 | 2006 | Metex Resources Ltd | Roe | 5% | Roe Project Area, Annual Technical Report for the Period 01/01/2005 to 31/12/2005, Combined Reporting No. C408 |
| A70622 | 2005 | Newcrest Mining Ltd | Roe | 4.9% | Annual Report Roe Project for the Period 1/1/2004 to 31/12/2004 Group Reporting No.: C408/1996 Report No: K420 |
| A71127 | 2005 | Great Gold Mines Nl | Yindana | <1% | Exploration Licence 28/1073, Yindana, Annual Report for the period 5 November 2003 to 4 November 2004, (Kurnal |
| A68651 | 2004 | Metex Resources Ltd | Roe | 5.7% | 2003 Annual Report for Period 01/01/2003 to 31/12/2003 Roe Project (C408/1996), E28/620, E28/672, E28/720, E28 |
| A69470 | 2004 | Sons Of Gwalia Ltd | Yindi | <1% | Annual Report for the period 01/10/03 - 30/09/04 Yindi Project, C118/1999, E28/812, E28/813, E28/892, E28/1062 |
| A66142 | 2003 | Placer Dome Asia Pacific Ltd | Roe Metex | 5.7% | Annual Report 01/01/2002 - 31/12/2002 Roe Metex JV Project C408/1996: E28/620, 672, 720, 803-04, 810, 833, 836 |
| A66697 | 2003 | Sons Of Gwalia Ltd | Yindi | 1.7% | Yindi Project, Annual Report for the period 01 October 2001 - 30 September 2002, C118/1999: E28/812-3, 852, 89 |
| A66990 | 2003 | Sons Of Gwalia Ltd | Gilgarna Rock and Rough Gap | 7.5% | Yindi Group, Surrender Report for C118/1999 Tenements surrendered between 28 March 2003 and 27 May 2003 C118/1 |
| A67480 | 2003 | Sons Of Gwalia Ltd | Yindi | 1% | Annual Report for the period 1 October 2002 to 30 September 2003 Yindi Project C118/1999: E28/812-813,852,892- |
| A65834 | 2003 | South Kal Mines Pty Ltd | Roe | 42% | Roe E28/1019 Project. Annual Report For The Period November 16, 2000 To November 15, 2002. Exploration Licence |
| A66624 | 2003 | Placer Dome Asia Pacific Ltd | Roe | 28% | Roe (JV) Project, Partial Surrender Report for the period 15/12/1998 to 14/12/2002 E28/803 & 804, E28/810. [C |
| A64192 | 2002 | Delta Gold Ltd | Roe Joint Venture | 6.5% | Roe Joint Venture Project C408/1996 Annual Report 01/01/2001 to 31/12/2001 tenements E28/620, 672, 720, 803, 8 |
| A62794 | 2001 | Pacmin Mining Corporation Ltd | Yindi | 1.6% | 2001 Final Report E28/623 Report For Period 16/05/97 to 21/03/01. Group Reporting No. C118/1999. |
| A62882 | 2001 | Metex Resources Ltd | Roe | 6.5% | Combined Biannual Technical Report W503 Roe Project E28/620, E28/672, E28/720, E28/803-804, E28/810, E28/833, |
| A62966 | 2001 | Pacmin Mining Corporation Ltd | Pinjin | 14% | 2000/01 Annual Report E28/894 Report For Period 19/05/00 to 18/05/01 Map Sheets: Kurnalpi (SH51-10) 1:250,000 |
| A63754 | 2001 | Sons Of Gwalia Ltd | Yindi | 1.3% | 2000/01 Annual Report Yindi Project Area E28/567, E28/623, E28/812, E28/813 Report for period 01/10/00 to 30/0 |
| A60847 | 2000 | Pacmin Mining Corporation Ltd | Yindi | 1.6% | 1999/2000 Annual Report, E28/623, Report for Period 16/05/1999 to 15/05/2000, North East Coolgardie Mineral Fi |
| A59563 | 2000 | Pacmin Mining Corporation Ltd | Mulgabbie | 1.3% | 1998/1999 Annual Report, Mulgabbie, E28/567,623, Report for Period 01/08/1998 to 31/07/1999, North East Coolga |
| A61804 | 2000 | Pacmin Mining Corporation Ltd | Yindi | 1.3% | 1999/2000 Annual Report Yindi Project Area E28/567, E28/623, E28/812, E28/813 report for the period 01/10/99 t |
| A61917 | 2000 | Pacmin Mining Corporation Ltd | Yindi | 1.6% | 2000 Partial Relinquishment Report Yindi Project Area E28/623 report for period 16/05/97 to 04/09/00, North Ea |
| A57575 | 1999 | Golden Valley Mines Nl | Roe | <1% | Annual Report, Roe Project E28/620,659-660,672,718-720 P28/942-943,P31/1527 For the Period 1/1/98 to 31/12/98 |
| A57815 | 1999 | Metex Resources Nl | Roe | 1.4% | Roe Project, Partial Relinquishment Report for the period 25/03/1996 to 25/03/1999, E28/620. [C408/1996] |
| A54681 | 1998 | Aberfoyle Resources Ltd | Swan Lake | 13% | Swan Lake, E28/504 Annual Report for the period 13th May 1997 to 12th May 1998. |
| A53498 | 1998 | Newcrest Mining Ltd | Mulgabbie | <1% | Combined Annual Report Mulgabbie Joint Venture E28/474,476,478,492 and 574 for the period 01/01/97-31/12/97 Re |
| A53915 | 1998 | Cove Mining Nl | Roe | <1% | Annual Report - Roe Project - Kurnalpi W.A. 01/01/1997 - 31/12/1997 E28/620, 659, R28/660, E28/672, 718-720, P |
| A54290 | 1998 | Eden Creek Pty Ltd | Lake Roe | 13% | Partial Surrender Report ,E28/504 ,Lake Roe WA for the period 13 May 1994 to 06 February 1998 |
| A55417 | 1998 | Aberfoyle Resources Ltd | Claypan | 4.7% | Claypan E28/475 Partial Surrender Report to 15th April 1998. |
| A56002 | 1998 | Heron Resources Ltd | Mulgabbie | 1.3% | Mulgabbie Project Area Exploration Licences 28/567, 612, 613 and 623. Combined Annual Report 1 August 1997 to |
| A50124 | 1997 | Western Mining Corporation Ltd | Swan Lake | 4.7% | Annual Report for the Period 5 November 1995 to 4 November 1996, Swan Lake Project Exploration Licence 28/475 |
| A50304 | 1997 | Aberfoyle Resources Ltd | Blue Duck Dam | 72% | Annual Report, Blue Duck Dam Project, E74/209 , for the period 24/01/97 - 23/01/98. |
| A51603 | 1997 | Aberfoyle Resources Ltd | Swan Lake | 13% | Swan Lake Project, Annual Report E28/504 for the period 13th May 1996 to 12th May 1997. |
| A50253 | 1997 | Cove Mining Nl | Roe | <1% | Annual report Roe Project E28/579 E28/614 E28/620 E31/221 P28/891 to P28/894 P28/915 to P28/922 Kurnalpi 1:250 |
| A50351 | 1997 | Newcrest Mining Ltd | Mulgabbie | <1% | Combined Annual Exploration Report Mulgabbie Joint Venture for E28/474, E28/476, E28/478, E28/574 for the peri |
| A50848 | 1997 | Wmc Resources Ltd | Swan Lake | 4.7% | Swan Lake Project, Annual Report Exploration Licence E28/475 for the period 5th November 1995 to 4th November |
| A51889 | 1997 | Heron Resources Ltd | Mulgabbie | <1% | Mulgabbie Project Exploration Licences 28/567, 28/612, 28/613, Annual Report August 1 1996 to July 31 12 1997. |
| A53165 | 1997 | Aberfoyle Resources Ltd | Claypan | 4.7% | Claypan Project, Annual Report for the period 5th November 1996 to 4th November 1997,E28/475. |
| A53325 | 1997 | Newcrest Mining Ltd | Mulgabbie | <1% | Combined Partial Relinquishment Report Mulgabbie Joint Venture for E28/474,476, 478 & 492 (September 1997). |
| A53914 | 1997 | Cove Mining Nl | Roe | 1.7% | Final Report Roe Project E28/579, 614, 624, 625, 664, P28/891-894, 915-922 and P31/1528-1529, December 1997. |
| A46972 | 1996 | Western Mining Corporation Ltd | Swan Lake | 4.7% | Swan Lake Project, Annual Report for Period 5 November 1994 to 4 November 1995, E28/475. |
| A47871 | 1996 | Aberfoyle Resources Ltd | Blue Duck Dam | 72% | Blue Duck Dam Project, Annual Report for the period 9th March 1995 to 8th March 1996,E28/494. |
| A48271 | 1996 | Aberfoyle Resources Ltd | Swan Lake | 13% | Swan Lake Project, Annual Report for the period 13th May 1995 to 12th May 1996, E28/504. |
| A48833 | 1996 | Metex Resources Nl | Roe | 1.4% | Roe Project E28/620 Kurnalpi 1:250,000 Sheet Western Australia Interim Exploration Report for period 25 March |
| A44465 | 1995 | Western Mining Corporation Ltd | Swan Lake | 4.7% | Swan Lake Project, Annual Report Exploration Licence E28/475 for the period 05/11/1993 to 01/02/1995. |
| A45165 | 1995 | Eden Creek Pty Ltd | Lake Roe | 13% | Lake Roe Project, Annual Report Exploration Licence E28/504 covering the period 13/05/1994 to 12/05/1995. |
| A45832 | 1995 | Troy Resources Nl | Mulgabbie gold exploration | <1% | Yindi Rocks E28/492 Mulgabbie District of Western Australia Annual Report 10 October 1994 to 9 October 1995 |
| A46052 | 1995 | Golden State Resources Nl | Cowarna Rocks/ Karonie | 6.5% | Cowarna Rocks/ Karonie Project, Annual Report E28/507 for the period 1st August 1994 to 31st July 1995. |
| A46788 | 1995 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Partial Surrender for the period 1995 Kurnalpi East Project E28/372 E28/374 E28/433 E28/453 E31/93 E31/94 |
| A43302 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Annual Report to 7 December 1994 on E31/93-94, E28/372, 374, 433, 442, 453, Kurnalpi East Project. |
| A38589 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Kurnalpi East Project, Annual Report for the period 08/12/1991 to 07/12/1992, E28/372 ,374, 431, 433, 442 & 45 |
| A41041 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Annual report for the period 08/12/92-07/12/93 Kurnalpi East Project E28/372 E28/374 E28/431 E28/433 E28/442 E |
| A36333 | 1991 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Annual Report for the period 08/12/90-07/12/91 Kurnalpi East Project, E31/92-94 E28/370-374,398,419,431-433,4 |
| A21649 | 1987 | Bhp Minerals Pty Ltd | Lake Roe | 9.3% | Lake Roe Project, Annual Report for the period 01/02/1986 to 01/02/1987, E28/39. |
| A21850 | 1987 | Bhp Minerals Pty Ltd | Lake Roe | 9.3% | Lake Roe Project, Non-statutory Report: Partial Relinquishment Report for the period ending 16/02/1987, E28/39 |
| A19314 | 1986 | Bhp Minerals Pty Ltd | Lake Roe | 9.3% | Lake Roe, E28/39, Progress [annual] report to February 1986 |
| A4697 | 1974 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: Cowarna I. P. Survey : Lines 158N-164N, 156N-192N ( No 3 Sill)., |
| A4492 | 1972 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: Summary Report, December 1972. |
| A4696 | 1971 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: ( No 1 Sill), Percussion Logs & Drill Hole Sections, 1970/1971. |
| A4698 | 1971 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: I. P. Lines 60N-92N & 128N-174N, to January 1971. |
| A4693 | 1970 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: No 3 Sill, Drill Holes & Logs, November 1970, |
| A4695 | 1970 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: Drill Holes & Logs, ( No 2 Sill) for the year ending 31/12/1970. |
| A80544 | 1753 | Saracen Gold Mines Pty Ltd | YINDI | <1% | YINDI PROJECT ANNUAL REPORT 01 OCTOBER 2007 TO 30 SEPTEMBER 2008, CR GROUP: C118/1999, TENEMENTS: E28/892, E28 |
| A81270 | 1753 | Hawthorn Resources Limited | YINDANA | 5.7% | Exploration Licence 28/1519 YINDANA ANNUAL REPORT FOR THE PERIOD 24 NOVEMBER 2007 TO 23 NOVEMBER 2008 |
| A82479 | 1753 | Hawthorn Resources Limited | YINDANA | 5.7% | Exploration Licence E28/1519 YINDANA PARTIAL SURRENDER REPORT FOR THE PERIOD 24 NOVEMBER 2005 TO 23 NOVEMBER 2 |
| A82565 | 1753 | Magma Metals Ltd | ROE | 96% | ROE PROJECT SURRENDER REPORT FOR EXPLORATION LICENCE E28/1750 Combined C408/1996 FOR PERIOD 3/04/2008 – 2/04/2 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A44665 | 1753 | Abador Gold Nl | Blue Duck Dam | 72% | Blue Duck Dam Project, Annual Report Exploration Licence E28/494 for the period March 1994 to March 1995. |
| A89597 | 1753 | Hawthorn Resources Limited | Yindana | 5.7% | Exploration Licence E28/1519 YINDANA ANNUAL REPORT FOR THE PERIOD 24 NOVEMBER 2009 TO 23 NOVEMBER 2010 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 17 months · 21 Feb 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 28/2556 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 28/2556? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.