E 28/2526
Register summary
- Holders
- Pumphrey, Andrew Ian, Nexus Gold Pty Ltd
- Part of
- Nexus Minerals Limited (ASX:NXM) as at 2025-06-30
- Local government
- City of Kalgoorlie-Boulder, Shire of Menzies
- Application received
- 23 Feb 2015
- Commenced
- 20 Jan 2016
- Expiry
- 19 Jan 2028
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A145208 | 2024 | Dynamic Metals Limited | Pinnacles West | <1% | Partial Surrender Report for E 28/3138 - Pinnacles West for the period 13 October 2023 to 11 September 2024 |
| A130040 | 2022 | Nexus Minerals Australia Pty Ltd | Pinnacles | 44% | E28/2526 Partial Surrender Report Pinnacles Project for the period ending 21/12/2021. |
| A126380 | 2021 | Element 25 Limited | Pinnacles | 7.4% | Annual Report - C210/2017 - Pinnacles Project for the period ending 04/01/2021 |
| A124593 | 2020 | St Barbara Limited | Pinjin Central | <1% | E28/2447 - Partial Surrender Report for the Period 4 September 2014 to 24 June 2020, Pinjin Central Project |
| A124701 | 2020 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2019 to 30 Jun |
162 more reports
| A124921 | 2020 | Nexus Minerals Limited | Pinnacles | 42% | Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 for the period ending 30/06/2020 |
| A122911 | 2020 | Element 25 Limited | Pinnacles | 4.4% | Annual Report - C210/2017 Pinnacles for the period ending 04/01/2020, E 28/02577, E 28/02701 |
| A124728 | 2020 | Saracen Gold Mines Pty Limited | Carouse Dam | <1% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2019 to 30 June 2020 |
| A125122 | 2020 | St Barbara Limited | South Pinjin | <1% | E28/2447 - Partial Surrender Report South Pinjin for the Period 4 September 2014 to 3 September 2020 |
| A119504 | 2019 | Element 25 Limited | Pinnacles | 4.4% | Annual Report C210/2017 Pinnacles for the period 5 January 2018 to 4 January 2019, E28/02577, E28/02701 |
| A120696 | 2019 | Nexus Minerals Limited | Pinnacles | 42% | Combined Annual Report for Pinnacles Project, C45/2016 for the period 1 July 2018 to 30 June 2019, E 28/02526, |
| A120891 | 2019 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2018 to 30 Jun |
| A120911 | 2019 | Saracen Gold Mines Pty Limited | Carosue Dam | <1% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2018 to 30 June 2019 |
| A116288 | 2018 | Montezuma Mining Company Ltd | PIinnacles | 4.4% | Annual Report C210/2017 Pinnacles For the Period 5 January 2017 to 4 January 2018, E28/02577, E28/02701 |
| A116557 | 2018 | Nexus Minerals Limited | Pinnacles | 100% | Final Surrender Report for Tenement P28/1185, Pinnacles Project for the period For the Period 15 April 2010 to |
| A117529 | 2018 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2017 to 30 Jun |
| A117596 | 2018 | Nexus Minerals Limited | Pinnacles | 42% | Combined Annual Report for Pinnacles Project, C45/2016, 01 July 2017 - 30 June 2018 |
| A117528 | 2018 | Saracen Gold Mines Pty Limited | Carosue Dam | <1% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2017 to 30 June 2018 |
| A114571 | 2017 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2016 to 30 Jun |
| A114725 | 2017 | Nexus Gold Pty Ltd | Pinnacles | 42% | Combined Annual Report for Pinnacles Project, C45/2016 For the Period 1 July 2016 to 30 June 2017, E28/02526, |
| A114597 | 2017 | Saracen Gold Mines Pty Limited | Carosue Dam | <1% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2016 to 30 June 2017, E28/01747.....P31/0202 |
| A108278 | 2016 | Nexus Minerals Ltd | Pinnacles | <1% | Annual Report for Pinnacles Project – Tenement E28/2487 for the period 30th January 2015 to 29th January 2016 |
| A109693 | 2016 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2015 to 30 Jun |
| A109789 | 2016 | Nexus Minerals Limited | Pinnacles | 42% | Combined Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 For the Period 1 July 2015 to |
| A109933 | 2016 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2015 to 30 June 2016 |
| A106702 | 2015 | St Barbara Limited | Away From It All Dam E28/2447 | <1% | Annual Report for the Period 4 September 2014 to 3 September 2015 |
| A106812 | 2015 | Saracen Gold Mines Pty Ltd | Mulgabbie West | <1% | Mulgabbie West Project (C117/1999) Annual Report for the Period 1 July 2014 to 30 June 2015, E31/1009, M28/241 |
| A106872 | 2015 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | Carosue Dam Project (C064/2001) Annual Report for the Period 1 July 2014 to 30 June 2015, E28/1747, M28/166, M |
| A103198 | 2014 | Cazaly Resources Ltd | Carosue Dam | 15% | E31/886, E28/2273 Combined Annual Report C50/2011 for the period 01/07/2013 to 30/06/2014 |
| A103508 | 2014 | Saracen Gold Mines Pty Ltd | Mulgabbie West | <1% | Mulgabbie West Project Annual Report, 1 July 2013 to 30 June 2014, C117/1999; E31/796, E31/1009, M28/241, M28 |
| A103536 | 2014 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | Carosue Dam Project C64/2001 Annual Report for the period 01/07/2013 to 30 June 2014, E28/1747, M28/166, M28/1 |
| A103734 | 2014 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | CAROSUE DAM PROJECT EXPLORATION LICENCE E28/1747 PARTIAL SURRENDER REPORT 04 JULY 2008 TO 03 JULY 2014 |
| A97218 | 2013 | Renaissance Minerals Ltd | Rebecca | <1% | Rebecca Project, Annual Report for the period 26/10/2011 to 25/10/2012, E28/1756-1757, 1850, 1852, 1992, 2037- |
| A99440 | 2013 | Saracen Gold Mines Pty Ltd | Mulgabbie West | 4.1% | Mulgabbie West Project (C117/1999) Annual Report for the period 1 July 2012 to 30 June 2013, E31/796, E31/1009 |
| A99441 | 2013 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | Carosue Dam Project C64/2001Annual Report for the period 1 July 2012 to 30 June 2013 E28/828, E28/1747, M28/16 |
| A97810 | 2013 | Aruma Resources Ltd | Pinnacles Kurnalpi South | <1% | E28/1849 Pinnacles Kurnalpi South Project Final report for the period 9 February 2012 to 10 April 2013 |
| A100147 | 2013 | Cazaly Resources Ltd | Carosue Dam | 20% | E31/886, E28/2049 Combined Annual Report C50/2011 for the period ended 30 June 2013 |
| A92878 | 2012 | Renaissance Minerals Ltd | Rebecca | <1% | Rebecca Project, Annual Report for the period 26/10/2010 to 25/10/2011, E31/920; E28/1756-1757, 1850,1852, 199 |
| A93586 | 2012 | Legacy Iron Ore Ltd | Wallbrook | <1% | Annual Mineral Exploration Report – Wallbrook Project E31/716, 1st February 2011 – 31st January 2012 |
| A95050 | 2012 | Cove Resources Limited | Carosue Dam | 18% | Carosue Dam Project Combined Annual Exploration Report For The Year to 30th June 2012, C50/2011, E31/886, P31/ |
| A93598 | 2012 | Aruma Resources Ltd | Pinnacles South Kurnalpi | <1% | Pinnacles South Kurnalpi E28/1849 Annual report for the year ended 8 February 2012 |
| A95130 | 2012 | Saracen Gold Mines Pty Ltd | Mulgabbie West | <1% | Mulgabbie West Project Annual Report 1 July 2011 to 30 June 2012, C117/1999, E31/796, M28/241, 243, 266, 269, |
| A95372 | 2012 | Saracen Gold Mines Pty Ltd | Carosue Dam Prroject | <1% | CAROSUE DAM PROJECT, ANNUAL REPORT, C064/2001 01 JULY 2011 TO 30 JUNE 2012 |
| A90000 | 2011 | Aruma Resources Ltd | Pinnacles South | <1% | Annual report for the year ended 8 February 2011. Pinnacles South, E28/1849 |
| A89864 | 2011 | Legacy Iron Ore Ltd | Wallbrook | <1% | Annual Mineral Exploration Report Wallbrook Project E 31/716 For the Period 1st February 2010 to 31st January |
| A91960 | 2011 | Cove Resources Limited | Carosue Dam | 18% | Carosue Dam Project C50/2011 Combined First Annual Report period ending 30 June 2011 for E31/886, E31/889, E31 |
| A91293 | 2011 | Saracen Gold Mines Pty Ltd | Mulgabbie West | <1% | Mulgabbie West Project C117/1999 Annual Report for the period 1 July 2010 to 30 June 2011 E31/796, M28/241, M2 |
| A89359 | 2011 | Renaissance Minerals Ltd | Mulgabbie | 10% | E28/1759 Surrender Report for the period 26 June 2008 to 14 December 2010. |
| A91632 | 2011 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | Carosue Dam Project C64/2001 annual report for the period 1 July 2010 to 30 June 2011, E28/828, E28/1747, E31/ |
| A86176 | 2010 | Hemisphere Resources Ltd | Laverton East | <1% | Laverton East C62/2009, P38/3782 - P38/3786, Annual report for the year ended 28 January 2010 |
| A87786 | 2010 | Gryphon Minerals Ltd | Mulgabbie | 10% | E28/1759 Annual Report for the period 26 June 2009 to 25 June 2010. |
| A86231 | 2010 | Legacy Iron Ore Ltd | Wallbrook | <1% | Annual Exploration Report Wallbrook Project E31/716 for the period 1st February 2009 to 31st January 2010 |
| A81411 | 2009 | Carbon Energy Ltd; Magma Metals Ltd | TIBERIUS | 29% | TIBERIUS PROJECT E28/836 ANNUAL TECHNICAL REPORT for the period 01/01/2008 to 31/12/2008, Group Reporting No. |
| A82860 | 2009 | Carbon Energy Ltd | Tiberius | 29% | Tiberius Project, E28/836, Surrender Report for the period 29/05/2000 to 28/05/2009, Group Reporting Number C2 |
| A80607 | 2009 | Jackson Minerals Ltd | Yindi | <1% | Yindi Project E28/1599 Surrender Report, Report Period: 19 February 2007 – 21 November 2008 |
| A81126 | 2009 | Peninsula Minerals Ltd | Pinnacles | 1.8% | Annual Technical Report E28/589, E28/590, E28/1516 GSWA Group reporting Ref Number 17/2006, Pinnacles, 1 Janua |
| A82485 | 2009 | Jackson Minerals Ltd | Wallbrook | <1% | E31/716 Annual Report 01 February 2008 – 31 January 2009 |
| A84423 | 2009 | Gryphon Minerals Ltd | Mulgabbie | 10% | Mulgabbie E28/1759 Annual Report for the period 26 June 2008 to 25 June 2009 |
| A77959 | 2008 | Metex Resources Ltd | Tiberius | 24% | Tiberius Project, E28/836, E28/1658 and P28/1063, Annual technical report for the period 01/01/2007 to 31/12/2 |
| A78589 | 2008 | Peninsula Minerals Ltd | Pinnacles | 1.8% | Pinnacles Annual Technical Report E28/589, E28/590, E28/1516 GSWA Group reporting Ref Number 17/2006 |
| A79749 | 2008 | Saracen Gold Mines Pty Ltd | Mulgabbie West | 19% | ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR Group C117/1999 |
| A79781 | 2008 | Saracen Gold Mines Pty Ltd | Relief Well | 1.4% | RELIEF WELL PROJECT ANNUAL REPORT 03 JULY 2007 TO 02 JULY 2008, E28/898, 981, 1120, Combined reporting C254/1 |
| A78037 | 2008 | Jackson Minerals Ltd | Cowarna | <1% | Yindi Project E28/1599 Annual Report Report Period: 19 February 2007 - 18 February 2008 |
| A78964 | 2008 | Metex Resources Ltd | TIBERIUS | 1.3% | Tiberius Project, E28/1658, P28/1063. Surrender Report for the Period 20/04/2007 to 16/05/2008. Part Group Rep |
| A74364 | 2007 | Metex Resources Ltd | Roe | 3.3% | Roe Project Area E28/620...E28/1598 Annual Technical Report for the Period 01/01/2006 to 31/12/2006 Combined R |
| A75256 | 2007 | Bannerman Resources Ltd | Pinnacles Project | 1.4% | 'Pinnacles Project' E28/589, E28/590, E28/1326, E28/1516, P28/995, Combined Annual Report for the Period 1st J |
| A76639 | 2007 | Saracen Gold Mines Pty Ltd | Relief Well (Mulgabbie) | 1.4% | RELIEF WELL PROJECT ANNUAL REPORT 03 JULY 2006 TO 02 JULY 2007 C254/1993 E28/898, 981, 1120 (Kurnalpi) |
| A76717 | 2007 | Saracen Gold Mines Pty Ltd | Mulgabbie West | 24% | MULGABBIE WEST PROJECT ANNUAL REPORT 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C117/1999 |
| A75518 | 2007 | Yilgarn Mining (Wa) Pty Ltd | Pinjin Project | <1% | Pinjin Project E28/1491 Annual Technical Report for the period ended 3 May 2007 |
| A73030 | 2006 | Yilgarn Mining (Wa) Pty Ltd | Pinjin | <1% | Pinjin Project E28/1491, Annual Technical Report for the Period Ended 3 May 2006, (Kurnalpi). |
| A73246 | 2006 | Saracen Gold Mines Pty Ltd | Mulgabbie West | 24% | Mulgabbie West Project Annual Report, 01 July 2005 to 30 June 2006, E28/553,605-606, CR Group: C117/1999, P2 |
| A71911 | 2006 | Metex Resources Ltd | Roe | 3.2% | Roe Project Area, Annual Technical Report for the Period 01/01/2005 to 31/12/2005, Combined Reporting No. C408 |
| A73003 | 2006 | Heron Resources Ltd | Mac's Dam | 25% | Mac's Dam Project E28/1503, Annual Report, 11 May 2005 to 10 May 2006, (Kurnalpi). |
| A73457 | 2006 | Jackson Gold Ltd | Relief Well (Mulgabbie) | 1.4% | E28/898,981,1120 Relief Well Project, 2006 Annual Report, 3 July 2005 to 2 July 2006, Combined Reporting No. C |
| A70608 | 2005 | Troy Resources Nl | Mulgabbie | 7% | Annual report for the period 29/10/03 - 28/10/04 Mulgabbie JV Project, C117/1999, E28/478, Kurnalpi |
| A70622 | 2005 | Newcrest Mining Ltd | Roe | 3.1% | Annual Report Roe Project for the Period 1/1/2004 to 31/12/2004 Group Reporting No.: C408/1996 Report No: K420 |
| A68963 | 2004 | Sons Of Gwalia Ltd | Mulgabbie West | 21% | Annual report for the period 01/07/2003-30/06/2004 Mulgabbie West Project (C117/1999), E28/553, E28/605-607 E |
| A69063 | 2004 | Peninsula Gold Pty Ltd | Pinnacles Nickel | 1.4% | Exploration Licences E28/589, E28/590, E28/680 & P28/995, The Pinnacles Nickel Project, Combined Annual Explor |
| A69287 | 2004 | Metex Resources Ltd | Roe | 29% | Partial Surrender report for the period 29/05/00-28/05/04 Roe Project E28/836 |
| A68651 | 2004 | Metex Resources Ltd | Roe | 3.6% | 2003 Annual Report for Period 01/01/2003 to 31/12/2003 Roe Project (C408/1996), E28/620, E28/672, E28/720, E28 |
| A69237 | 2004 | Sons Of Gwalia Ltd | Khartoum Dam | 30% | Khartoum Dam Project, Final Surrender Report for the period 05/08/2000 to 19/07/2004, E28/607. |
| A65818 | 2003 | Sons Of Gwalia Ltd | Mulgabbie | 5.8% | Mulgabbie JV Annual Report For The Period 1 October 2001 - 30 September 2002. Tenements: E28/474, E28/476, E28 |
| A65852 | 2003 | Sons Of Gwalia Ltd | Khartoum Dam | 30% | Annual Report for the period 5 August 2001 - 4 August 2002 Khartoum Dam E28/607 Report No 0576-2002-01 |
| A66142 | 2003 | Placer Dome Asia Pacific Ltd | Roe Metex | 3.6% | Annual Report 01/01/2002 - 31/12/2002 Roe Metex JV Project C408/1996: E28/620, 672, 720, 803-04, 810, 833, 836 |
| A66653 | 2003 | Sons Of Gwalia Ltd | Mulgabbie West | 31% | Mulgabbie West Project, Annual Report for the period 21 February 2002 - 20 February 2003, E28/553. |
| A66697 | 2003 | Sons Of Gwalia Ltd | Yindi | <1% | Yindi Project, Annual Report for the period 01 October 2001 - 30 September 2002, C118/1999: E28/812-3, 852, 89 |
| A66990 | 2003 | Sons Of Gwalia Ltd | Gilgarna Rock and Rough Gap | <1% | Yindi Group, Surrender Report for C118/1999 Tenements surrendered between 28 March 2003 and 27 May 2003 C118/1 |
| A67103 | 2003 | Sons Of Gwalia Ltd | Mulgabbie West | 8.5% | Annual Report for the period 1 July 2002 to 30 June 2003 Mulgabbie West Project C117/1999: E28/605-606, P28/93 |
| A67112 | 2003 | Sons Of Gwalia Ltd | Mulgabbie | 7% | Surrender Report 18 October 1993 to 3 July 2003 C114/2002: E28/474,476 Report No. 0579-2003-01 |
| A67297 | 2003 | Sons Of Gwalia Ltd | Khartoum Dam | 30% | Annual Report for the period 5 August 2002 to 4 August 2003 Khartoum Dam Project E28/607 Report No. 0576-2003- |
| A67469 | 2003 | Sons Of Gwalia Ltd | Mulgabbie | 5.8% | Annual Report for the period 1 October 2002 - 30 September 2003 Mulgabbie JV E28/474,476,478 Report No. 0579-2 |
| A67480 | 2003 | Sons Of Gwalia Ltd | Yindi | <1% | Annual Report for the period 1 October 2002 to 30 September 2003 Yindi Project C118/1999: E28/812-813,852,892- |
| A71857 | 2003 | Bannerman Resources Ltd | Pinnacles | 1.6% | Pinnacles Project, E28/589 ,E28/590, E28/1326, P28/995, Combined Annual Report for the period 1 May 2004 to 31 |
| A66986 | 2003 | Kanowna Lights Ltd | Pinnacles | 1.4% | E28/589,590, 680, and 'E' Application E28/1326, P Application P28/995 The Pinnacles Nickel Project, Combined |
| A64192 | 2002 | Delta Gold Ltd | Roe Joint Venture | 4.1% | Roe Joint Venture Project C408/1996 Annual Report 01/01/2001 to 31/12/2001 tenements E28/620, 672, 720, 803, 8 |
| A65144 | 2002 | Kanowna Lights Ltd | Pinnacles nickel/cobalt/diamond/gold exp | 1.4% | Exploration Licences E28/589, E28/590 and E28/680 'The Pinnancles Nickel Project' Combined Annual Exploration |
| A65554 | 2002 | Sons Of Gwalia Ltd | Mulgabbie West | 8.5% | Mulgabbie West Project Area E28/605, E28/606, E28/930-939, P31/1482, P31/1541, P31/1542, P31/1545. 2001/02 Ann |
| A64938 | 2002 | Sons Of Gwalia Ltd | Pinnacles gold exploration | 3.6% | 2001/02 Annual Report For Period 31/03/01 to 30/03/02 Gilgrana Rock E28/974. Report No: 0560-02 |
| A65074 | 2002 | Sons Of Gwalia Ltd | Mulgabbie | 31% | Mulgabbie West Project Area E28/553 2001/02 Annual Report For Period 21/02/01 to 20/02/02 North East Coolgardi |
| A62882 | 2001 | Metex Resources Ltd | Roe | 4.1% | Combined Biannual Technical Report W503 Roe Project E28/620, E28/672, E28/720, E28/803-804, E28/810, E28/833, |
| A63382 | 2001 | Pacmin Mining Corporation Ltd | Carosue Dam | 8.5% | 2000/2001 Annual Report, Carosue Dam Project Area, E28/605, E28/606, P28/930-P28/939, P31/1482, P31/1541, P31/ |
| A63553 | 2001 | Pacmin Mining Corporation Ltd | Northeast Coolgardie | 30% | 2000/01 Annual Report E28/607 report for the period 05/08/00 to 04/08/01 North East Coolgardie Mineral Field, |
| A63872 | 2001 | Sons Of Gwalia Ltd | Mulgabbie | 27% | 2000/01 Annual Report E28/474 Mulgabbie JV report for period 28/10/00 to 27/10/01 North East Coolgardie Minera |
| A63873 | 2001 | Sons Of Gwalia Ltd | Mulgabbie | 7% | 2000/01 Annual Report E28/478 Mulgabbie JV Report for period 29/10/00 to 28/10/01 North East Coolgardie Minera |
| A63878 | 2001 | Sons Of Gwalia Ltd | Pinnacles | <1% | 2000/01 Annual Report Pinnacles Project area P28/911 - P28/914 Combined Report for period 01/10/00 to 30/09/01 |
| A62394 | 2001 | Kanowna Lights Nl | Pinnacles | <1% | The Pinnacles Nickel Project Annual Exploration Progress Report For The Year 1st May, 2000 to 30th April, 2001 |
| A62606 | 2001 | Pacmin Mining Corporation Ltd | Mulgabbie | 31% | Mulgabbie Project, 2000/01 Annual Report E28/553 Report For Period 21/02/00 to 20/02/01. |
| A62648 | 2001 | Pacmin Mining Corporation Ltd | Pinnacles gold exploration | 3.6% | 2000/01 Annual Report E28/974 Report For Period 31/03/00 to 30/03/01 North East Coolgardie Mineral Field Weste |
| A59724 | 2000 | Newcrest Mining Ltd | Mulgabbie | 3.7% | Interim Report, Mulgabbie Joint Venture, E28/476 and 478, for the period 01/01/1998 to 23/09/1998. |
| A60190 | 2000 | Troy Resources Nl | Mulgabbie | 5.2% | Annual Reprot Exploration Licences E28/474,E28/476,E28/478, E28/574 Mulgabbie Project Western Australia 02/01/ |
| A60517 | 2000 | Pacmin Mining Corporation Ltd | Yindi | 70% | 1999/2000 Annual Report P28/937 Report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral Field |
| A60518 | 2000 | Pacmin Mining Corporation Ltd | Yindi | 2.4% | 1999/2000 Annual Report P28/935 Report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral Field |
| A60052 | 2000 | Pacmin Mining Corporation Ltd | E28/553 | 31% | 1999/2000 Annual Report, E28/553, Report for Period 21/02/1999 to 20/02/2000, North East Coolgardie Mineral Fi |
| A60483 | 2000 | Pacmin Mining Corporation Ltd | Yindi | 27% | 1999 to 2000 Annual Report P28/938, Report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral F |
| A60503 | 2000 | Pacmin Mining Corporation Ltd | Yindi | 98% | 1999/2000 Annual Report P28/936 report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral Field |
| A60520 | 2000 | Pacmin Mining Corporation Ltd | Yindi | <1% | 1999/2000 Annual Report P28/933 Report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral Field |
| A61062 | 2000 | Pacmin Mining Corporation Ltd | Carosue Dam | 4.5% | 1999/2000 Annual Report Carosue Dam Project Area E28/605-606 M28/166-168, M31/219-220, P28/930-939, P31/1482, |
| A61265 | 2000 | Kanowna Lights Nl | Pinnacles | 1.4% | Pinnacles Nickel project, Combined Annual Mineral Exploratio Exploration Report May 1st 1999 to April 30th 20 |
| A61303 | 2000 | Pacmin Mining Corporation Ltd | Northeast Coolgardie | 30% | 1999/2000 Annual Report E28/607 for the Period 05/08/99 to 04/08/00 North East Coolgardie Mineral Field, Weste |
| A61405 | 2000 | Pacmin Mining Corporation Ltd | Pinnacles gold exploration | <1% | 1999/2000 Annual Report, Pinnacles, P28/911-914, Report for Period 01/10/1999 to 30/09/2000, North East Coolga |
| A57854 | 1999 | Pacific Mining Corporation Ltd | Mulgabbie West | 31% | Mulgabbie West (JV)Project, Annual Report for the period 21/02/98 - 20/02/99, E28/553. |
| A59033 | 1999 | Kanowna Lights Nl | Pinnacles | 1.4% | Pinnacles Nickel Project Combined Annual Mineral- Exploration report 01/05/98-30/04/99 E28/589 E28/590 E28/680 |
| A56952 | 1998 | Troy Resources Nl | Mulgabbie | 5.8% | Mulgabbie Project - North East Coolgardie Mineral Field W.A. Partial Surrender Report Exploration Licence:28/4 |
| A53498 | 1998 | Newcrest Mining Ltd | Mulgabbie | 3.9% | Combined Annual Report Mulgabbie Joint Venture E28/474,476,478,492 and 574 for the period 01/01/97-31/12/97 Re |
| A54118 | 1998 | Aberfoyle Resources Ltd | Mulgabbie West | 31% | Mulgabbie West (JV) Project, , E28/553 , Annual Report for the period 20/02/97 - 19/02/98. |
| A55268 | 1998 | Kanowna Lights Nl | Pinnacles nickel/cobalt/diamond/gold exp | 1.4% | Pinnacles Nickel Project, 12/12/96 - 30/04/98 E28/589, 590, 680 |
| A55747 | 1998 | Aberfoyle Resources Ltd | Pinnacles gold exploration | <1% | Pinnacles, P28/911-914, Annual Report 01/07/97 - 30/06/98 |
| A56173 | 1998 | Heron Resources Ltd | Mulgabbie | 8.9% | Mulgabbie Project, Annual Report for the period 29/08/1997 to 28/08/1998 , P28/930-939,1482 & 1541-1542; E28/6 |
| A53474 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | 4.2% | E28/372, Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam, E31/94 Anglo Saxon. Annual Report |
| A56807 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | 5.4% | E28/372 Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam Annual Report 07/12/97 - 06/12/98 |
| A50042 | 1997 | Aberfoyle Resources Ltd | Kurnalpi | 4.2% | Kurnalpi (JV) Project, E28/372 E28/374 E28/453 E31/93 E31/94 Annual report for the period 7th December 1995 t |
| A50456 | 1997 | Kanowna Lights Nl | Pinnacles nickel/cobalt/diamond/gold exp | 4.2% | Pinnacles Nickel Project EL28/590 Annual report December 12th to December 1996 |
| A50970 | 1997 | Normandy Exploration Ltd | Madi's Reward | 7.7% | Madi's Reward Project, Final Report for the period 19th July 1996 to 17th March 1997, E28/552. |
| A50030 | 1997 | Zephyr Minerals Nl | Mulgabbie West | 31% | E28/553 ,Annual Report, Mulgabbie West Project for the period ending 20/02/97. |
| A50351 | 1997 | Newcrest Mining Ltd | Mulgabbie | 3.9% | Combined Annual Exploration Report Mulgabbie Joint Venture for E28/474, E28/476, E28/478, E28/574 for the peri |
| A53325 | 1997 | Newcrest Mining Ltd | Mulgabbie | 3.9% | Combined Partial Relinquishment Report Mulgabbie Joint Venture for E28/474,476, 478 & 492 (September 1997). |
| A46680 | 1996 | Cra Exploration Pty Ltd | Kurnalpi East | 3.6% | Annual Report to 7 December 1995 on E31/93 E31/94 E28/372 E28/372 E28/374 E28/433 E28/453 E28/572 Kurnalpi Eas |
| A46428 | 1995 | Maverick Exploration Pty Ltd | Mulgabbie | 2.5% | Mulgabbie Project North East Coolgardie Mineral Field Western Australia Annual Report October 1994 to 9 Octob |
| A46429 | 1995 | Troy Resources Nl | Pinnacles/Nolan Bay gold exploration | 27% | Pinnacles Nolan Bay Project North East Coolgardie Mineral Field Western Australia Exploration Licence E28/474 |
| A46788 | 1995 | Cra Exploration Pty Ltd | Kurnalpi East | 3.3% | Partial Surrender for the period 1995 Kurnalpi East Project E28/372 E28/374 E28/433 E28/453 E31/93 E31/94 |
| A41598 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | 3.8% | First partial relinquishment report to April 1994 on E28/372, 374, 431, 433, E31/93, 94 Kurnalpi East Project |
| A41952 | 1994 | Troy Resources Nl | Kurnalpi gold explorarion | <1% | Annual Report for the period 07/93-07/94 Pinnacles Project P28/754,755,795,796 |
| A42910 | 1994 | Troy Resources Nl | Mulgabbie | 2.5% | Mulgabbie Project North East Coolgardie Mineral Field Western Australia Annual Report 10 October 1993 to 9 Oct |
| A43056 | 1994 | Troy Resources Nl | Pinnacles/Nolan Bay gold exploration | 27% | Pinnacles Nolan Bay Project North East Coolgardie Mineral Field Western Australia Annual report 28 October 199 |
| A43302 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | 3.3% | Annual Report to 7 December 1994 on E31/93-94, E28/372, 374, 433, 442, 453, Kurnalpi East Project. |
| A38331 | 1993 | Mim Exploration Pty Ltd | Kurnalpi gold explorarion | <1% | Annual Report for the period 11/92-08/93 Pinnacles Project P 28/755-756,795-796 |
| A38589 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | 3.2% | Kurnalpi East Project, Annual Report for the period 08/12/1991 to 07/12/1992, E28/372 ,374, 431, 433, 442 & 45 |
| A41041 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | 3.2% | Annual report for the period 08/12/92-07/12/93 Kurnalpi East Project E28/372 E28/374 E28/431 E28/433 E28/442 E |
| A36333 | 1991 | Cra Exploration Pty Ltd | Kurnalpi East | 2.8% | Annual Report for the period 08/12/90-07/12/91 Kurnalpi East Project, E31/92-94 E28/370-374,398,419,431-433,4 |
| A13907 | 1984 | Bp Australia Ltd | Pinnacles Dam | 25% | Pinnacles Dam Project, Annual Report for the period ending 03/05/1984, E28/82, MC28/2700 & 2916; GML28/608-617 |
| A11819 | 1982 | Western Mining Corporation Ltd | Gilgarna Rocks | 19% | Gilgarna Rocks Project, Final Surrender Report for the period 06/08/1979 to 06/09/1982, MC28/2683-2684, 2681-2 |
| A9565 | 1981 | Western Mining Corporation Ltd | Gilgarna Rocks | 22% | Gilgarna Rocks Project, Annual Report for the period 6th August 1979 to 9th December 1980, MC28/2681-2686. |
| A7472 | 1978 | Aquitaine Aust Minerals Pty Ltd | Binti- South Crab | 7% | Binti- South Crab Project, Non-statutory Report: Geophysical Investigations at South Crab Claims (Binti), W.A, |
| A7471 | 1977 | Aquitaine Aust Minerals Pty Ltd | Binti - South Crab | 7% | Binti - South Crab Project, Non-statutory Report: Progress Report, September 1977, MC28/480-488, 517, 1182, 1 |
| A115 | 1972 | Western Mining Corporation Ltd | Gilgarna Rocks | 11% | Gilgarna Rocks Project, Annual Report for the years ending 30th June 1969, 1970, 1971, 1972, MC28/26-27,111-11 |
| A1993 | 1970 | New Broken Hill Consolidated Ltd | Lake Rebecca | 1.8% | Lake Rebecca [JV] Project, Final Surrender Report for the period ending 01/11/1970,TR70/3811; MC28/1448-1452 & |
| A1143 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | 1.6% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st March 1968, TR70/3811H |
| A1144 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | 1.6% | Lake Rebecca Project, Annual Report for the period 18th July 1967 to 30th June 1968, TR70/3811H. |
| A1142 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | 1.6% | Lake Rebecca Project, Non-statutory Report: Report on Investigations for the period 18th July 1967 to 31st Dec |
| A1141 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | 1.6% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st October 1967, TR70/381 |
| A84097 | 1753 | Saracen Gold Mines Pty Ltd | MULGABBIE WEST | <1% | MULGABBIE WEST PROJECT ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009 CR Group: C117/1999 |
| A97183 | 1753 | Legacy Iron Ore Ltd | Wallbrook | <1% | Wallbrook Project, Final Surrender Report for the period 1st February 2008 to 31st January 2013, E31/716. |
| A81546 | 1753 | Saracen Gold Mines Pty Ltd | Mulgabbie | 11% | E28/981, FINAL REPORT, 23 DECEMBER 2005 TO 21 NOVEMBER 2008 |
| A84640 | 1753 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | CAROSUE DAM PROJECT ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009, C064/2001, E28/828, E28/1747, E31/365, M28/166 |
| A87937 | 1753 | Saracen Gold Mines Pty Ltd | CAROSUE DAM/ Whirling Dervish | <1% | CAROSUE DAM PROJECT (C064/2001) ANNUAL REPORT – 01 JULY 2009 TO 30 JUNE 2010, E28/828, E28/1747, E31/365, M28 |
| A87956 | 1753 | Saracen Gold Mines Pty Ltd | Mulgabbie West | <1% | Mulgabbie West Project 1 July 2009 to 30 June 2010, C117/1999, E31/796, M28/241, M28/266, M28/269, M31/295, M |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 16 months · 19 Jan 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 28/2526 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 28/2526? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.