E 15/1853
Register summary
- Holder
- Karora (Higginsville) Pty Ltd
- Part of
- Westgold Resources Limited (ASX:WGX) as at 2026-06-30
- Local government
- Shire of Coolgardie
- Application received
- 15 Oct 2021
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A151804 | 2025 | Dynamic Metals Limited | Widgie (P 15/6112) | 100% | Annual Exploration Report for P 15/6112 - Widgie Project for the period ending 21/09/2025. |
| A151805 | 2025 | Dynamic Metals Limited | Widgie (P 15/6112) | 100% | Annual Exploration Report for P 15/6112 - Widgie Project for the period ending 21/09/2025. |
| A145518 | 2024 | Dynamic Metals Limited; Mineral Resources Limited | Widgie | 100% | Annual Exploration Report for P 15/6112 - Widgie Project for the period ending 21/09/2024 |
| A145835 | 2024 | Argonaut Resources N.L. | Higginsville | <1% | Partial Surrender Report E 15/01489 Higginsville for the period ending 13/08/2023 |
| A133658 | 2023 | Jindalee Resources Limited | Cowan Hill | <1% | Final Surrender Report E 15/1549 Cowan Hill Project for the period ending 07/10/2022 |
140 more reports
| A133660 | 2023 | Jindalee Resources Limited | Railway | <1% | Final Surrender Report Railway E15/1564 for the period ending 09/10/2022 |
| A137501 | 2023 | Dynamic Metals Limited | Higginsville (P 15/06112) | 100% | Annual Report for Prospecting Licence P 15/06112 Higginsville for the period ending 21/09/2023. |
| A132721 | 2022 | Jindalee Resources Limited | Higginsville | 100% | Annual Report for Exploration Licence P 15/6112 Higginsville Project for the period ending 19/10/2022. |
| A128913 | 2021 | Jindalee Resources Limited | Higginsville | 100% | Annual Report for P15/6112 Higginsville Project for the period ending 21/09/2021 |
| A129010 | 2021 | Jindalee Resources Limited | Cowan Hill | <1% | Annual Report E15/1549 Cowan Hill for the period 10 October 2020 to 9 October 2021 |
| A129011 | 2021 | Jindalee Resources Limited | Railway | <1% | Annual Report E15/1564 Railway for the period 10 October 2020 to 9 October 2021 |
| A125017 | 2020 | Avoca Resources Pty Ltd; Avoca Mining Pty Ltd | Higginsville | 4.8% | Annual Exploration Report, C113/2000 Higginsville Project for the period ending 30 June 2020 |
| A125049 | 2020 | Fortescue Metals Group Ltd | Lake Cowan | <1% | Combined Final Surrender Report for P15/6306, P15/6305, P15/6303, P15/6302, P15/6301, P15/6298 & P15/6299 for |
| A125422 | 2020 | Jindalee Resources Limited | Higginsville | 100% | Annual Technical Report P15/06112 Higginsville Project for the period ending 21/09/2020 |
| A125578 | 2020 | Jindalee Resources Limited | Railway | <1% | Annual Report for E15/1564 Railway Project for the period ending 09/10/2020 |
| A125579 | 2020 | Jindalee Resources Limited | Cowan Hill | <1% | Annual Report for E15/1549 Cowan Hill Project for the period ending 09/10/2020 |
| A123936 | 2020 | Jindalee Resources Limited | Higgnisville | 100% | Annual Report Higginsville P15/6246 for the period ending 8/4/2020 |
| A124313 | 2020 | Argonaut Resources N.L. | Higginsville | <1% | Higginsville Project C86/2017 Annual Report for the period ending 22 May 2020 |
| A122347 | 2020 | Rnc Minerals | Polar Bear | <1% | Combined Annual Mineral Exploration Report, Polar Bear C104/1995 For the Period 2 October 2018 to 1 October 20 |
| A120554 | 2019 | Argonaut Resources N.L. | Higginsville | <1% | Higginsville Project Annual Report (C86/2017) for the period 23 May 2018 to 22 May 2019, P 15/06030,E 15/0148 |
| A119349 | 2019 | Westgold Resources Limited | Higginsville | 100% | Surrender Report P15/5534 Higginsville Project for the period 7 January 2011 to 6 January 2019 |
| A121805 | 2019 | Jindalee Resources Limited | HIGGINSVILLE | 100% | Annual Report for P15/6112 HIGGINSVILLE project for the period 22 September 2018 to 21 September 2019 |
| A121842 | 2019 | Jindalee Resources Limited | Cowan Hill | <1% | Annual Report for Cowan Hill E15/1549 for the period 10 October 2018 to 9 October 2019 |
| A121870 | 2019 | Jindalee Resources Limited | Railway | <1% | Annual Report for E15/1564 Railway Project for the period 10 October 2018 to 9 October 2019 |
| A118930 | 2019 | Westgold Resources Limited | Polar Bear | <1% | Combined Annual Mineral Exploration Report, Polar Bear C104/1995 For the Period 2 October 2017 to 1 October 20 |
| A121174 | 2019 | Avoca Resources Pty Ltd; Avoca Mining Pty Ltd | Higginsville | 4.8% | Annual Exploration Report C113/2000 Higginsville Project for the period 1 July 2018 to 30 June 2019 |
| A117261 | 2018 | Argonaut Resources N.L. | Higginsville | <1% | Higginsville Project C86/2017 Annual Report for the period 23 May 2017 to 22 May 2018, P15/06030, P15/06031, P |
| A118146 | 2018 | Jindalee Resources Limited | Cowan Hill | <1% | E15/1549 Cowan Hill Project Annual Report for the period 10/10/2017 - 09/10/2018 |
| A118147 | 2018 | Jindalee Resources Limited | Railway | <1% | Railway Project E15/1564 Annual Report for the period 10 October 2017 to 9 October 2018 |
| A117167 | 2018 | Westgold Resources Limited | Higginsville | 2.2% | C113/2000 Higginsville Project Surrender Report 2018, P15/5429, P15/5430, P15/5431, P15/5432 and P15/5435 for |
| A117453 | 2018 | Westgold Resources Limited | Higginsville | 4.5% | Annual Exploration Report C113/2000 Higginsville Project For the Period 1 July 2017 to 30 June 2018 |
| A117642 | 2018 | Westgold Resources Limited | Higginsville | <1% | Surrender Report 2018, P15/5433, P15/5434, P15/5437, P15/5438, P15/5439 and P15/5441, Higginsville, 15 July 20 |
| A112460 | 2017 | Westgold Resources Limited | Higginsville | 57% | Final Surrender Report E15/838 for the period 28 September 2004 to 27 January 2017 |
| A114752 | 2017 | Westgold Resources Limited | Higginsville | 4.5% | Annual Exploration Report, C113/2000 Higginsville Project for the period 1 July 2016 to 30 June 2017 |
| A108325 | 2016 | Metals X Limited | Lake Cowan | <1% | Combined Annual Mineral Exploration Report - Lake Cowan 1 February 2015 to 31 January 2016 |
| A109580 | 2016 | Metals X Limited | Higginsville | <1% | Partial Surrender Report E15/828 For the Period 17 November 2014 to 15 July 2016 |
| A109726 | 2016 | Metals X Limited | Higginsville | 5.4% | C113/2000 Higginsville Combined Annual Technical Report for the period 01/07/2015 to 30/06/2016 |
| A109560 | 2016 | Metals X Limited | E15/1281 | <1% | Final Surrender Report E15/1281 for the period 17/08/2011 to 04/08/2016 |
| A109578 | 2016 | Metals X Limited | Lake Cowan | 22% | Final Surrender Report E15/1259 For the Period 11 August 2011 to 2 August 2016 |
| A105080 | 2015 | Metals X Limited | Lake Cowan | <1% | Annual Mineral Exploration Report, C125/2000 Lake Cowan Project for the period 1st February 2014 to 31st Janua |
| A106721 | 2015 | Metals X Limited | Higginsville | 4.1% | Higginsville Project C113/2000 Combined Annual Report for the period ending 30th June 2015 |
| A103322 | 2014 | Metals X Ltd | Higginsville | 4.1% | Higginsville Project C113/2000 Combined Annual Mineral Exploration Report for the period 1st July 2013 to 30th |
| A101416 | 2014 | Metals X Ltd | Lake Cowan | <1% | Lake Cowan Project Annual Mineral Exploration Report, C125/2000 Report Period: 1st February 2013 to 31st Janua |
| A99046 | 2013 | Alacer Gold Corporation | Higginsville | 4.2% | Combined Annual Technical Report C113-2000 for the Higginsville Gold Project 1 July 2012 to 30 June 2013, E15/ |
| A97131 | 2013 | Alacer Gold Corporation | Lake Cowan | <1% | Lake Cowan Project, Annual Report for the period 1st February 2012 to 31st January 2013, E15/810, 949, 951, 95 |
| A95800 | 2012 | Pindan Exploration Company Pty Ltd | Cowan | 9% | Cowan Nickel Project Higginsville Nickel Rights Tenements Annual Report C113/2000 for the period July 1 2011 |
| A94737 | 2012 | Alacer Gold Corporation | Higginsville | 4% | Combined Annual Technical Report C113-2000 for the Higginsville Gold Project 1 July 2011 to 30 June 2012 |
| A93175 | 2012 | Alacer Gold Corporation | Lake Cowan | <1% | Combined Annual Technical Report C125/2000 for the Lake Cowan Project 1 February 2011 to 31 January 2012 |
| A91170 | 2011 | Alacer Gold Pty Ltd | Higginsville | 3.6% | Combined Annual Technical Report C113/2000 for the Higginsville Gold Project 1 July 2010 to 30 June 2011 |
| A91264 | 2011 | Alacer Gold Corporation | Higginsville | <1% | Annual Technical Report for Prospecting Licence 15/5437 for the period 15th July 2010 to 14th July 2011. |
| A86533 | 2010 | Dioro Exploration Nl | Lake Cowan | 2.7% | Combined Annual Exploration Report year ending 31st Janauary 2010, Lake Cowan Project C125/2000, E15/598 M15/1 |
| A86556 | 2010 | Dioro Exploration Nl | Lake Cowan | 7.1% | Lake Cowan E15/598 Surrender Report 19/03/2007 and 17/11/2009 |
| A87723 | 2010 | Avoca Resources Ltd | Higginsville | 5% | Combined Annual Technical Report C113-2000 for the Higginsville Gold Project 1 July 2009 to 30 June 2010 |
| A77596 | 2010 | Dioro Exploration Nl | Lake Cowan | 2.8% | ANNUAL EXPLORATION REPORT LAKE COWAN C125/2000 YEAR ENDING JANUARY 31ST 2008, E15/285, E15/598, E15/605, M15/1 |
| A88197 | 2010 | Avoca Resources Ltd | Chalice | 4.6% | Chalice Project Combined Annual Technical Report C111/2004 E15/740, E15/821, E15/822, E15/828, E15/829, E15/83 |
| A88509 | 2010 | Cazaly Resources Ltd | Higginsville | 43% | Annual and Final Surrender Report Higginsville Project E15/1096 For the Period 13 August 2009 to 22 November 2 |
| A81844 | 2009 | Dioro Exploration Nl | LAKE COWAN | 2.7% | COMBINED ANNUAL EXPLORATION REPORT YEAR ENDING 31st JANUARY 2009, LAKE COWAN PROJECT, C125/2000, E15/598, M |
| A84250 | 2009 | Avoca Resources Ltd | HIGGINSVILLE | 4.9% | COMBINED ANNUAL TECHNICAL REPORT C113-2000 For the HIGGINSVILLE HGP, Tenements: E15/786, E/15/846, E15/932, M1 |
| A84905 | 2009 | Avoca Resources Ltd | Chalice - Higginsville | 6.7% | Annual Technical Report C111/2004, Chalice (and Higginsville) Group Project 1 September 2008 to 31 August 2009 |
| A79305 | 2008 | Avoca Resources Ltd | Higginsville | 4.9% | COMBINED ANNUAL TECHNICAL REPORT C113-2000 For the HIGGINSVILLE PROJECT 1 July 2007 to 30 June 2008 Tenements: |
| A80012 | 2008 | Avoca Resources Ltd | Chalice | 6.7% | ANNUAL TECHNICAL REPORT C111/2004 CHALICE (AND HIGGINSVILLE) GROUP PROJECT |
| A78383 | 2008 | Avoca Resources Ltd | Higginsville | 34% | Annual Exploration Report For the period 26th March 2007 - 25th March 2008 M15/348 |
| A76261 | 2007 | South Kal Mines Pty Ltd | Lake Cowan West | 7.1% | Annual Report for the period 6th September 2006 to 5th September 2007 E15/598 Lake Cowan West Project |
| A76319 | 2007 | Chalice Gold Mines Ltd | Chalice | 6.2% | Chalice (and Higginsville) Group Projects Combined Annual Technical Report C111/2004 For E15/740...E63/873, M1 |
| A75491 | 2007 | Barminco Investments Pty Ltd | Higginsville | 34% | Higginsville Gold Project Exploration Report M15/348 25 March 2006 - 24 March 2007 Mining Lease 15/348 |
| A75835 | 2007 | Avoca Resources Ltd | Higginsville | 4.7% | Combined Annual Technical Report C113-2000 For the Higginsville Project 1 July 2006 to 30 June 2007 Mineral Fi |
| A73881 | 2006 | South Kal Mines Pty Ltd | Lake Cowan | 7.1% | E15/598, Annual Report for the Period 6 September 2005 to 5 September 2006, (Lake Cowan Project, Report No. SK |
| A73608 | 2006 | Chalice Gold Mines Ltd | Chalice | 6.2% | Chalice(& Higginsville) Group Projects, Combined Annual Technical Report C111/2004, For E15/740....E63/873, M1 |
| A73074 | 2006 | Avoca Resources Ltd | Higginsville | 6.3% | Combined Annual Technical Report C113/2000 for the Higginsville Project, 1 July 2005 to 30 June 2006, (Widgiem |
| A72644 | 2006 | Barminco Pty Ltd | Higginsville | 34% | Higginsville Gold Project, Annual Technical Report, 25 March 2002 to 24 March 2003, M15/348, (Widgiemooltha). |
| A72645 | 2006 | Barminco Pty Ltd | Higginsville | 34% | Higginsville Gold Project, Annual Technical Report, 25 March 2003 to 24 March 2004, M15/348, (Widgiemooltha). |
| A72646 | 2006 | Barminco Pty Ltd | Higginsville | 34% | Higginsville Gold Project, Annual Technical Report, 25 March 2004 to 24 March 2005, M15/348, (Widgiemooltha). |
| A72647 | 2006 | Barminco Pty Ltd | Higginsville | 34% | Higginsville Gold Project, Annual Technical Report, 25 March 2005 to 24 March 2006, M15/348, (Widgiemooltha). |
| A70989 | 2005 | Avoca Resources Ltd | Higginsville | 6.7% | Combined annual technical report C113-2000 For the Higginsville Project (E15/160, M15/225, 289, 31, 325, 338, |
| A71448 | 2005 | Equinox Resources Ltd | Chalice | 6.3% | Cowan Nickel Joint Venture, Annual report 2005 C111/2004, Chalice Tenements Higginsville, (Boorabbin). |
| A69235 | 2004 | Goldfields Australasia Pty Ltd | Higginsville | 2.2% | Annual technical report for the Higginsville Project E15/160, E15/226, E15/265, E15/287, M15/31, M15/225, M15/ |
| A67279 | 2003 | Goldfields Australasia Pty Ltd | Higginsville | 2.2% | Annual Technical Report for the Higginsville JV Project for E15/160,226,265,287, M15/31, 225, 289, 325, 338, 3 |
| A67448 | 2003 | Goldfields Australasia Pty Ltd | Higginsville | <1% | Higginsville Project, Final Surrender Report for the period 14th October 1991 to 22nd September 2003, E15/226 |
| A65512 | 2002 | Gold Fields Australasia Pty Ltd | Higginsville | 2.2% | St Ives Gold Mining Company Pty Ltd Combined Annual Report (C113/2000) For The Higginsville Joint Venture. Rep |
| A64687 | 2002 | Barminco Pty Ltd | Higginsville | 34% | Higginsville Gold Project Annual Technical Report 25 March 2001- 24 March 2002 Mining Lease 15/348 Widgiemoolt |
| A61604 | 2001 | Resolute Ltd | Mitchell | 19% | Annual Report Mitchell Project Mining Leases M15/640, M15/64 1 for the period 25 January 1999 to 24 January 20 |
| A61807 | 2001 | Wmc Resources Ltd | Eundynie | 4% | Annual Report for Eundynie Joint Venture mining leases M15/506, M15/580, & M15/597 (C40/2000) (10 June 2000 to |
| A62003 | 2001 | Resolute Ltd | Higginsville | 53% | Annual Report Higginsville Project mining leases M15/225, M15/289, M15/325, M15/338, M15/348, M15/375, M15/528 |
| A63136 | 2001 | Wmc Resources Ltd | Resolute JV | 2.6% | Annual Report (C113/2000) for the Resolute Joint Venture. |
| A63347 | 2001 | Barminco Pty Ltd | Higginsville | 34% | Higginsville Gold Project Annual Technical Report 25 March 2000 - 24 March 2001 Mining Lease 15/348 Widgiemool |
| A61810 | 2001 | Wmc Resources Ltd | Higginsville | 53% | Annual Report for the Higginsville Joint Venture (C492/1994) mining leases M15/225, M15/289, M15/325, M15/338, |
| A62521 | 2001 | Wmc Resources Ltd | Higginsville | 36% | Annual Technical Report For Mining Lease M15/641 For the Period June 9, 2000 to January 24, 2001. |
| A60100 | 2000 | Resolute Ltd | Higginsville | 26% | 3 Year Report, Higginsville 100%, Mining Leases M15/351,352, 732, for the period 01/07/1996 to 30/06/1999. Res |
| A61808 | 2000 | Resolute Ltd | Eundynie | 8.3% | Annual Report Eundynie Project mining leases M15/506, M15/580, M15/597 for the period 01 July 1999 to 9 June 2 |
| A58409 | 1999 | Resolute Ltd | Vine Joint Venture | 62% | Extended Annual Report, Vine Joint Venture Project M15/610 For the Period 10/12/1996 to 30/06/1999 |
| A58412 | 1999 | Resolute Ltd | Fairplay Prospect | 22% | Extended Annual Report Fairplay Prospect, M15/31 for the Period 1/06/1994 to 30/06/1999 |
| A58524 | 1999 | Resolute Ltd | Higginsville 100% | 18% | Higginsville 100% Annual Report Mining Leases:M15/351-352, 620, Prospecting Licence:P15/2714 for the period 01 |
| A58525 | 1999 | Resolute Ltd | Dry Creek - Eundynie | 5.5% | Dry Creek Project Area - Eundynie - Three Year Report Mining Lease: M15/506-507, 580-581, 597-599, 616-617, 62 |
| A57652 | 1999 | Resolute Ltd | Mitchell | 29% | Mitchell Project - Annual Report M15/638-642, M15/665, M15/765 01/02/97 - 31/01/98 |
| A57945 | 1999 | Resolute Ltd | Mitchell | 29% | Mitchell Project M15/638-642, 665, 765 10/02/98 - 31/01/99 |
| A58541 | 1999 | Resolute Ltd | Saturn | 6.1% | Saturn Joint Venture - Extended Annual Report M15/335, 522, 578, 593, 619, 656, 666, 766, 572 01/08/1996 - 31/ |
| A58885 | 1999 | Resolute Ltd | Higginsville | 53% | Annual report Higginsville Project M15/225 M15/289 M15/325 M15/338 M15/348 M15/375 M15/528 for the period 01/0 |
| A56785 | 1998 | Resolute Ltd | Cowan HIll | 2.9% | Surrender Report on Cowan Hill E15/266, M15/810-812, M15/814, M15/924 For the Period 19th January 1992 to 28th |
| A57653 | 1998 | Resolute Ltd | Higginsville | 53% | Higginsville Project M15/225, 289, 325, 328, 348, 375, 528 10/07/97 - 30/06/98 |
| A54019 | 1998 | Resolute Ltd | Cowan Hill | 2.9% | Annual Project Report ,Cowan Hill, E15/266, M15/615, 810-812, 814, 924, For the period 1st january 1997 to 31s |
| A51222 | 1997 | Resolute Ltd | Cowan Hill | 2.9% | Cowan Hill Project, Annual Report E15/266, M15/615,810-812, 814, P15/3119 for the period 19th January 1996 to |
| A51637 | 1997 | Resolute Ltd | Mitchell | 29% | Annual report Mitchell Project M15/638 to M15/642 M15/665 M15/765 for the period 1st Febuary 1996 to 31st Janu |
| A51768 | 1997 | Resolute Ltd | Vine | 62% | Annual report Vine JV Project M15/610 for the period 10th December 1993 to 9th December 1996 Technical Report |
| A47838 | 1996 | Resolute Samantha Ltd | Mitchell Joint Venture | 29% | Mitchell Joint Venture Higginsville Mining Leases M15/638 to M15/642 M15/665 M15/765 for the period 1st Febura |
| A49133 | 1996 | Resolute Samantha Ltd | Dry Creek | 3.6% | Annual report Dry Creek Project Area Eundynie Mining Leases M15/506 M15/507 M15/580 M15/581 M15/598 M15/599 M1 |
| A47103 | 1996 | Resolute Samantha Ltd | Dry Creek | 3.6% | Dry Creek Project Eundynie Mining Leases M15/506 M15/507 M15/580 M15/581 M15/598 M15/599 M15/615 M15/616 and M |
| A47420 | 1996 | Resolute Samantha Ltd | Higginsville | 54% | Annual Progress Report Higginsville C492/194 Mining Leases M15/289 M15/325 M15/338 M15/348 M15/375 M15/528 for |
| A47839 | 1996 | Resolute Samantha Ltd | Cowan Hill | 4.6% | Annual report Cowan Hill Exploration Licence E15/266 Prospecting Licences P15/3119 P15/2968 to P15/2969 P15/29 |
| A46570 | 1995 | Resolute Samantha Ltd | Higginsville | 20% | Annual Report Higginsville 100% Mining Lease M15/351, M51/352, M15/620 Prospecting Lease P15/2714 for the peri |
| A43067 | 1994 | Samantha Gold Nl | Vine Aquarius | 62% | Technical Report Vine Aquarius Joint Venture Higginsville Mining Lease M15/610 for the period 10/12/91 to 09/1 |
| A43104 | 1994 | Samantha Gold Nl | Mitchell | 29% | Progress Report Mitchell Joint Venture Higginsville Mining and Prospecting Leases M15/638 to M15/642 M15/665 P |
| A42561 | 1994 | Mr Goodes Le | Higginsville | 100% | Non-statutory Report: Preliminary Geological Report on Mining Lease M15/487, Higginsville Project, Western Au |
| A40359 | 1994 | Samantha Gold Nl | Cowan Hill | 4.6% | Annual report for the period 17/07/91-18/01/94 Cowan Hill Project E15/266 P15/2968-2969 P15/2974-2975 P15/3119 |
| A39080 | 1993 | Samantha Gold Nl | Dry Creek | 3.6% | Progress Report Dry Creek Joint Venture Eundynie Prospecting Licences P15/1699-1710,P15/1712-1717,P15/1749,P15 |
| A33344 | 1991 | Samantha Gold Nl | Higginsville | 100% | Samantha Gold NL. Higginsville Project Report on Prospecting Licence P15/2714 03/1991 Technical Report No: |
| A30592 | 1990 | Samantha Gold Nl | Higginsville | 24% | Samantha Gold NL Higginsville Project M15/351 M15/352 Technical Report No:320 (1990) |
| A31686 | 1990 | Samantha Gold Nl | Higginsville | 51% | Higginsville Project; 09/89 - 08/90 M15/348,338,375,225,325,326,289,351,352,508,31 Report No:325 |
| A27815 | 1989 | Samantha Exploration Nl | Higginsville | 24% | Australia JV. Higginsville Project. Annual Technical Report. M15/351,352. 02/05/88-01/05/89. |
| A28587 | 1989 | Samantha Exploration Nl | Higginsville | 53% | Higginsville Project 09/88-08/89 Tenements M15/348 M15/338 M15/375 M15/225 M15/325 M15/326 P15/326 M15/289 |
| A27603 | 1989 | Rgc Exploration Pty Ltd | Cowan Hill - Cowan Hill S.W. | <1% | Cowan Hill - Cowan Hill S.W. Project[s] Final Surrender Report for the period 24/07/1985 to 16/12/1990, E15/1 |
| A34772 | 1988 | Eldorado Resources Nl | Polar Bear | 2.2% | Polar Bear Project, Non-statutory Report: Gold exploration Targets in the Polar Bear Peninsula Area, August 19 |
| A21010 | 1987 | Samantha Exploration Nl | Higginsville | 52% | Progress Report Higginsville Joint Venture Coolgardie Mineral Field (M15/66 P15/513 to P15/519 P15/530 to P15/ |
| A20245 | 1987 | Roebuck Resources Nl | Baker- Burbanks | 100% | Baker- Burbanks (JV) Project, Non-statutory Report: a Progress Report, March 1987 (P15/287 to P15/295) |
| A23639 | 1987 | Bp Minerals Aust Pty Ltd | Spargoville | 74% | Spargoville Project, Annual Report for the year ending 31st December 1987, M15/337-338;P15/831-841. |
| A19214 | 1986 | Samantha Exploration Nl | Higginsville | 13% | Higginsville Gold Prospect P15/514 P15/515 O15/519 P15/544 P15/1331 Progress Report Technical Report No. 289 ( |
| A15116 | 1985 | Samantha Exploration Nl | Higginsville | 35% | Higginsville Gold Exploration Project Progress Report August 19848 Technical report NO. 209 (M15/31 M15/66 P15 |
| A15118 | 1985 | Samantha Exploration Nl | Higginsville | 3.8% | Higginsville Gold Project Sons of Erin Joint Venture Progress Report December 1984 Technical Report No. 231 (G |
| A15213 | 1985 | Samantha Exploration Nl | HIGGINSVILLE | 3.3% | HIGGINSVILLE JOINT VENTURE,BREAKAWAY PROSPECT, Pl5-743 FINAL REPORT |
| A16421 | 1985 | Samantha Exploration Nl | Higginsville | 21% | Higginsville Gold Project P15/558 P15/559 P15/560 P15/561 Final Report Technical Report No. 257 |
| A16719 | 1985 | Samantha Exploration Nl | Higginsville | 19% | A Review of the Higginsville Joint Venture October, 1985 (M15/31 M15/66) Technical Report No. 274 |
| A5905 | 1975 | Union Miniere Dev & Mining Corp Ltd | Widgiemooltha | <1% | Widgiemooltha [JV] Project, Non-statutory Report: Final Report for the period to 31st December 1974, MC15/139 |
| A4465 | 1974 | Anaconda Aust Inc | Widgiemooltha | 1.5% | Widgiemooltha (JV) Project, Annual Report for the period ending 31/12/1973, MC15/139.......MC15/4188; MC63/96. |
| A433 | 1971 | Anaconda Aust Inc | Norseman | <1% | Annual report 1970 Temporary Reserves Nos 3508H & 5318H. |
| A20084 | 1971 | Carpentaria Exp Co Pty Ltd | Roper | 8.1% | Final Surrender Report, Roper, June 1971, MC15/326 - 349. |
| A93 | 1970 | International Nickel Aust Ltd | Yilmia | <1% | International Nickel Australia Ltd Annual Report Mineral Claims 1012-1058, 1994 Yilmia Group Coolgardie Goldfi |
| A40 | 1970 | Anaconda Aust Inc | Widgiemooltha/Mount Eaton/West Wannaway | <1% | Annual report 1969 on TR 3508 |
| A348 | 1968 | Anaconda Aust Inc | Norseman | <1% | Annual Report, 1967 on Temporary Reserve No. 3508 |
| A345 | 1966 | Anaconda Aust Inc | Norseman | <1% | Annual report, 1966 on Temporary Reserve No. 3508. |
| A347 | 1966 | Anaconda Aust Inc | Norseman Temporary Reserve 3508 | <1% | Geology of the Mount Thirsty - Hayes Hill area TR3508 Norsemand WA |
| A80316 | 1753 | Dioro Exploration Nl | LAKE COWAN WEST | 7.1% | PARTIAL SURRENDER REPORT E15/598 LAKE COWAN WEST, FOR THE PERIOD 6/9/2005 to 5/9/2008 |
| A43102 | 1753 | Samantha Gold Nl | Higginsville | 46% | Progress Report Higginsville Mining Leases M15/31 M15/225 M15/289 M15/325 M15/348 M15/351 M15/352 M15/375 M15/ |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A43022 | 1753 | Samantha Gold Nl | Dry Creek | 3.6% | Annual report Dry Creek Project area Eundynie Mining Leases M15/506 M15/507 M15/580 M15/581 M15/598 M15/599 M1 |
| A351 | 1753 | Anaconda Aust Inc | Norseman | <1% | Annual Report, 1968 on Temporary Reserve No. 3508. |
| A26045 | 1753 | Samantha Exploration Nl | Higginsville | 53% | Higginsville Project - Coolgardie Mineral Field 09/87-10/88 Tenements M15/348 M15/338 M15/375 M15/225 M15/325 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 15/1853 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 15/1853 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 15/1853? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.