E 08/3819
Register summary
- Holder
- Beau Resources Pty Ltd
- Local government
- Shire of Ashburton
- Application received
- 4 July 2025
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A138225 | 2024 | Wyloo Metals Pty Ltd | Minderoo South | <1% | Final Surrender Report for E08/2815, E08/2819 and E08/2895 Minderoo South for the period ending 13/11/2023. |
| A138228 | 2024 | Wyloo Metals Pty Ltd | E 08 / 2537 Partial Surrender | <1% | Partial Surrender Report for E08/2537 for the period ending 19/10/2023. |
| A142989 | 2024 | Jowin Capital Pty Ltd | Henry River Dimension Stone | 8.3% | E08/2601 Partial Surrender Report for the period 26 March 2018 to 25 March 2024 |
| A143842 | 2024 | Wyloo Metals Pty Ltd | Minderoo South - E08/2537 and E08/2571 | <1% | Partial Surrender Report for E08/2537 and E08/2571 Minderoo South for the period ending 27/06/2024. |
| A133519 | 2023 | Wyloo Metals Pty Ltd | Minderoo East | 3.9% | Final Report for E08/2822 Minderoo East Project for the period ending 29/11/2022 |
167 more reports
| A133523 | 2023 | Wyloo Metals Pty Ltd | Minderoo East | 27% | Partial Surrender Report for Minderoo East E08/2771 for the period ending |
| A134821 | 2023 | Wyloo Metals Pty Ltd | Minderoo East | 36% | Final Report for E 08/2771, E08/2901, E08/2902 and E08/2903 Minderoo East for the period ending 13/04/2023. |
| A130489 | 2022 | Wyloo Metals Pty Ltd | Minderoo East | <1% | Final Report for E08/3084 and E08/2882 Minderoo East for the period ending 14/04/2022. |
| A130603 | 2022 | Wyloo Metals Pty Ltd | Minderoo South | <1% | Partial surrender report for E08/3036, E08/2775, E08/2787, E08/2537 and E08/2571 Minderoo South for the period |
| A130607 | 2022 | Wyloo Metals Pty Ltd | Minderoo East | 9.6% | Partial surrender report for E08/3068, E08/2814, E08/2876, E08/2895,E08/2993, E08/2822 and E08/2771 Minderoo E |
| A131439 | 2022 | Wyloo Metals Pty Ltd | E08/2878 | 46% | Final Surrender Report for E08/2878 for the period 26 October 2018 to 19 May 2022 |
| A126293 | 2021 | Wyloo Metals Pty Ltd | Mount Danvers | 3.9% | Partial Surrender Report on Exploration Licence 08/2822 Mount Danvers Project for the period 06/06/2019 - 07/0 |
| A126305 | 2021 | Wyloo Metals Pty Ltd | Henry River | 33% | Partial Surrender Report on Exploration Licence 08/2993 Henry River Project for the period ending 07/01/2021 |
| A123076 | 2020 | Squadron Resources Pty Ltd | Minderoo East | 9% | Minderoo East Project - Combined Annual Report C88/2019 for the period 26 October 2018 to 31 December 2019 |
| A123244 | 2020 | Squadron Resources Pty Ltd | Henry River | 15% | Henry River Project - Combined Annual Report C89/2019, 26 October 2018 to 31 December 2019 |
| A123267 | 2020 | Squadron Resources Pty Ltd | Minderoo South | <1% | Minderoo South Project - Annual Report C80/2018, 1 Janaury 2019 to 31 December 2019 |
| A123750 | 2020 | Pilbara Stone Holdings Pty Ltd | Hooley Camp Hill | 8.3% | Annual Mineral Exploration Report for E08/2601, Hooley Camp Hill Dolomite Project for the period ending 25/3/2 |
| A125244 | 2020 | Wyloo Metals Pty Ltd | Minderoo South | <1% | Partial Relinquishment Report C80/2018 for the period ending 17/08/2020, E08/02537, E08/02571, E08/02682, E08/ |
| A125245 | 2020 | Wyloo Metals Pty Ltd | Minderoo East | 7.8% | Minderoo East Partial Relinquishment Report C171/2020 for the period ending 08/10/2020 |
| A125540 | 2020 | Mt Alexander Iron Ore Pty Ltd | Mount Alexander | <1% | Mount Alexander C90/2010 Annual Report for year ending 31 August 2020, E08/01987, R08/00001 |
| A124808 | 2020 | Zenith Minerals Limited | Mount Alexander | <1% | Mt Alexander Project – E 08/1972, Final Report for the period ending 20/04/2020 |
| A119468 | 2019 | Tungsten Mining Nl | Kilba | 75% | ANNUAL REPORT FOR KILBA PROJECT C158/2017 FOR THE PERIOD 22 JANUARY 2018 TO 21 JANUARY 2019, E08/2139, E08/278 |
| A119524 | 2019 | Squadron Resources Pty Ltd | Minderoo South | <1% | Annual Report on the Minderoo South Project C80/2018 for the Period 1st January to 31st December 2018 |
| A120846 | 2019 | Pilbara Stone Holdings Pty Ltd | Hooley Camp Hill | 8.3% | Annual Mineral Exploration Report for E80/2601, Hooley Camp Hill Dolomite Project for the period 26 March 2018 |
| A116226 | 2018 | Squadron Resources | Henry River | <1% | Annual Report on the Henry River Project, C54/2012 for the Period 1st January 2017 to 31st December 2017, E08/ |
| A116826 | 2018 | Squadron Resources Pty Ltd | Mount Fraser | <1% | ANNUAL REPORT ON THE MOUNT FRASER PROJECT C76/2015 FOR THE PERIOD 01/04/2017 - 31/03/2018, E08/02537, E08/0257 |
| A118073 | 2018 | Squadron Resources | Henry River | 4.2% | Surrender Report on Exploration Licences 08/2099 and 08/2381 for the Period 1 January 2017 to 15 August 2018 |
| A112412 | 2017 | Squadron Resources Pty Ltd | Henry River | 4.2% | Annual Report on Henry River Project C54/2012 for the period 01/01/2016 - 31/12/2016, E08/02099, E08/02381 |
| A113967 | 2017 | Bc Iron Limited | Mount Fraser | <1% | C76/2015 Mt Fraser - Combined Annual Report For The Period 1 April 2016 to 31 March 2017, E08/2537, E08/2544, |
| A114604 | 2017 | Tungsten Mining Nl | Moodong Well | 100% | ANNUAL REPORT FOR MOODONG WELL E08/2139 (FORMERLY MT ALEXANDER) FOR THE PERIOD 5 JULY 2016 to 4 JULY 2017 |
| A108980 | 2016 | Bc Iron Limited | Mount Fraser | <1% | Mt Fraser - Combined Annual Report For The Period 1 April 2015 to 31 March 2016 (E08/2537, E08/2544, and E08/2 |
| A108369 | 2016 | Squadron Resources Pty Ltd | Henry River | 4.2% | ANNUAL REPORT ON THE HENRY RIVER PROJECT, C54/2012 |
| A108596 | 2016 | Tungsten Mining Nl | Mount Alexander | 2.5% | Annual Report for Mt Alexander Project for the period 23 January 2015 to 22 January 2016, M8/286, M8/287, M8/3 |
| A108746 | 2016 | Squadron Resources Pty Ltd | Henry River | 4.3% | Partial Surrender Report for E08/2099 (Henry RIver) for the period 4 May 2011 to 29 April 2016 |
| A109754 | 2016 | Tungsten Mining Nl | Moodong Well | 100% | ANNUAL REPORT FOR MOODONG WELL E08/2139 FOR THE PERIOD 5 JULY 2015 to 4 JULY 2016 |
| A110150 | 2016 | Zenith Minerals Limited | Mount Alexander | 63% | Mount Alexander E08/1410 Final Surrender Report For the Period 21 March 2006 to 8 September 2016 |
| A110156 | 2016 | Zenith Minerals Limited | Mount Alexander | <1% | Mt Alexander Project C90/2010 Annual Report for Year Ending 31 august 2016, E08/01972, E08/01987, R08/00001 |
| A104785 | 2015 | Gti Resources Ltd | Henry River | 78% | FINAL SURRENDER REPORT HENRY RIVER PROJECT E08/2098 19th December 2011 to 28th January 2014 |
| A105015 | 2015 | Zenith Minerals Limited | Mount Alexander | <1% | Mt Alexander Project, C90/2010, E08/1972-I Partial Surrender Report for the period 21 April 2010 to 16 Februar |
| A105016 | 2015 | Zenith Minerals Limited | Mount Alexander | 100% | Mt Alexander Project, C90/2010, E08/2046 Partial Surrender Report for the period 21 January 2011 to 16 Februar |
| A105017 | 2015 | Zenith Minerals Limited | Mount Alexander | <1% | Mt Alexander Project, C90/2010, E08/1987 Partial Surrender Report 23 February 2010 to 16 February 2015 |
| A106281 | 2015 | Tungsten Mining Nl | Moodong Well | 100% | Annual Report for Moodong Well E08/2139 for the period 05/07/2014 to 04/07/2015 |
| A106434 | 2015 | Gti Resources Ltd | Henry River | 4.2% | Henry River Project E08/2099 & E08/2381 Combined Annual Report C54/2012 for the period 1st January 2014 to 31s |
| A106613 | 2015 | Zenith Minerals Limited | Mt Alexander Project | 19% | Annual Report for Year ending 31 August 2015 |
| A106615 | 2015 | Zenith Minerals Limited | Mount Alexander | 100% | Mount Alexander E08/2046 - Final Surrender Report for the period 21/01/2011 to 21/08/2015 |
| A107175 | 2015 | Rising Mining Holdings Pty Ltd | Gulu Gulu | 9% | GULU GULU PROJECT ASHBURTON MINERAL FIELD FINAL REPORT 2015 Exploration Licence 08/2056 |
| A107556 | 2015 | Pilbara Stone Pty Ltd | Ballard Well | 35% | M08/114 Ballard Well Project, Annual Mineral Exploration Report for the period 6th October 2014 – 5th October |
| A101605 | 2014 | Gti Resources Ltd | Henry River | 31% | Combined Annual Report, Henry River Project C54/2012 for the period 1st January 2013 to 31st December 2013, E0 |
| A102047 | 2014 | Zenith Minerals Limited | Mount Alexander North | <1% | Mt Alexander North Project, E08/1987, Annual Report for Year Ending 22 February 2014 |
| A102101 | 2014 | Tungsten Mining Nl | Mount Alexander | 2.5% | Annual Report for Mount Alexander Project C30/2011 M8/286, M8/287, M8/314 & E08/2207 for the period 23 January |
| A102729 | 2014 | Kalamazoo Resources Pty Ltd | West Ashburton [Mt Minnie] | <1% | West Ashburton [Mt Minnie] Project, Annual Report for the period 07/06/2013 to 06/06/2014, E08/2216. |
| A103057 | 2014 | Tungsten Mining Nl | Mount Alexander | 100% | Mount Alexander Project, Annual Report for the period 05/07/2013 to 04/07/2014, E08/2139. |
| A103766 | 2014 | Zenith Minerals Limited | Mount Alexander | 20% | Mt Alexander Project, CR90/2010, E08/1410-I, E08/1972- I, E08/2046, E08/1987, Annual Report Year ending 31 Aug |
| A102088 | 2014 | Tungsten Mining Nl | Mount Alexander | <1% | Final Surrender Report , E08/2382, Mount Alexander Project, for the period 27/12/2012 – 06/12/2013. |
| A102089 | 2014 | Tungsten Mining Nl | Mount Alexander | <1% | Final Surrender Report, E08/2383, Mount Alexander Project for the period 27/12/2012 – 06/12/2013. |
| A102114 | 2014 | Gti Resources Ltd | Henry River | 4.2% | Final Surrender Report, Henry River Project, E08/1792 , for the period 16th July 2009 to the 16th April 2014. |
| A103089 | 2014 | Rising Mining Holdings Pty Ltd | Gulu Gulu | 9% | Gulu Gulu Project Exploration Licence 08/2056 Annual Report for the period 20/07/2013 – 19/07/2014 |
| A104265 | 2014 | Zenith Minerals Limited | Mount Alexander | <1% | Mt Alexander Project, C90/2010, E08/1972-I, E08/1987, Partial Surrender Report for the period 1 September 2013 |
| A96672 | 2013 | Wombat Resources Ltd | Cambridge Creek | <1% | Cambridge Creek Project, Final Surrender Report for the period 4th June 2009 to 5th November 2012, E08/1834. [ |
| A97246 | 2013 | Gti Resources Ltd | Henry River | 44% | Combined Annual Report C54/2012 1 January– 31 December 2012 Henry River Project E08/2098 - E08/2099 |
| A98923 | 2013 | Tungsten Mining Nl | Mount Alexander | 100% | Mount Alexander Project E08/2139 Annual Report for the period 5 July 2012 to 4 July 2013 |
| A99148 | 2013 | Zenith Minerals Limited | Mount Alexander | 25% | Mt Alexander Project, CR90/2010, E08/1410-I, E08/1972- I, E08/2046, Annual Report Year ending 31 August 2013 |
| A100111 | 2013 | Hargreaves M R | Ballard Well | <1% | Annual Exploration Report for Ballard Well Project Located on Exploration License E08/2086 for the period 29/0 |
| A100115 | 2013 | Pilbara Stone Pty Ltd | Ballard Well | 35% | Annual Report Mineral Exploration M08/114 Ballard Well Reporting Period 1st October 2012 to 30th September 201 |
| A102194 | 2013 | United Uranium Ltd | Mount Danvers | 4.8% | Mt Danvers Project E08/2341 Annual Report for Year Ending 2014 |
| A96423 | 2013 | Hargreaves M R | Ballard Well | <1% | Annual Exploration Report for Ballard Well Project Located on Exploration License E08/2086 Period : 29/9/20 |
| A97428 | 2013 | Ridge Resources | Mount Alexander | <1% | Tenement: E08/1987 Ashburton Mineral Field, Nanutarra ANNUAL REPORT 2012 TECHNICAL REPORT FOR THE PERIOD 23rd |
| A97891 | 2013 | Tungsten Mining Nl | Mount Alexander | 2.5% | Mt Alexander Project, Annual Report for the period 23rd April 2012 to 22nd April 2013, M08/286-287 & M08/314; |
| A98054 | 2013 | United Uranium Ltd | Mount Danvers | 4.8% | Mt Danvers Project, Annual Report for the period 16/05/2012 to 15/058/2013, E08/2341. |
| A98649 | 2013 | Rising Mining Holdings Pty Ltd | Gulu Gulu | 9% | Gulu Gulu Project Annual Report Exploration Licence 08/2056 for the period ended 19/07/2013 |
| A98759 | 2013 | Kalamazoo Resources Pty Ltd | West Ashburton - Mount Minnie | <1% | WEST ASHBURTON PROJECT (MT MINNIE) ANNUAL REPORT to the Department of Mines and Petroleum for the Period 07/06 |
| A100239 | 2013 | United Uranium Ltd | Mount Danvers | 4.8% | Progress Report Mt Danvers Project E08/2341 Report on Phase 1 RC Drilling September 2013 (round 6) |
| A100403 | 2013 | Artemis Resources Ltd | Cambridge Creek – Hooley West | 4.2% | Cambridge Creek – Hooley West Project, E08/1792 , Annual Report for the period 4th October 2012 to 3rd October |
| A92500 | 2012 | Hargreaves M R | Ballard Well | <1% | Annual Exploration Report Ballard Well Project Exploration Report for calender year 2011 Exploration License E |
| A92634 | 2012 | Pilbara Stone Pty Ltd | Ballard Well | 35% | Annual Report Ballard Well M08/114, 1st of October 2010 – 30th of September 2011 |
| A92685 | 2012 | Artemis Resources Ltd | Cambridge Creek | 13% | ANNUAL REPORT For The Period 4 October 2010 to 3 October 2011 CAMBRIDGE CREEK PROJECT, E08/1561, E08/1792 & E0 |
| A93026 | 2012 | Sm3-W Pty Ltd | Mount Alexander | 10% | Mount Alexander Project, Annual Technical Report for the period ended 22 January 2012.C30/2011, M08/286, M08/2 |
| A93757 | 2012 | Ridge Resources | Mount Alexander | <1% | Annual Report Mt Alexander Project, E08/1987 for the period 23/02/2011 to 22/02/2012 |
| A94803 | 2012 | Tungsten West Nl | Mount Alexander | 100% | Mount Alexander Project E08/2139 Annual Report for the period 5 July 2011 to 4 July 2012 |
| A95110 | 2012 | Wombat Resources Pty Ltd | Cambridge Creek | 19% | Cambridge Creek E08/1561 Surrender Report, 4th October 2007 to 9th August 2012 |
| A95385 | 2012 | Zenith Minerals Limited | Mount Alexander | 25% | Mt Alexander Project, CR90/2010, E08/1410-I, E08/1972-I, E08/2046, Annual Report Year ending 31 August 2012 |
| A94377 | 2012 | Gti Resources Ltd | Henry River | 4.3% | Annual Report 4 May 2011 to 3 May 2012 Henry River Project E08/2099 |
| A95461 | 2012 | Rico Resources Ltd | Uaroo | <1% | Annual Report Exploration completed in the Uaroo Project E08/1939 for the period 12/08/2011 to 13/08/2012 |
| A95853 | 2012 | Pilbara Stone Pty Ltd | Ballard Well | 35% | Annual Report Ballard Well M08/114 for the period 1st of October 2011 – 30th of September 2012 |
| A96162 | 2012 | Artemis Resources Ltd | Cambridge Creek | 4.2% | Cambridge Creek Project, Annual Report for the period 4th October 2011 to 3rd October 2012, E08/1792,2014 & 2 |
| A89832 | 2011 | Sm3-W Pty Ltd | Mount Alexander | 10% | Mt Alexander Project M08/286, M08/287 and M08/314 Annual Technical Report to DMP Period Ending 22 January 2011 |
| A91095 | 2011 | Rising Mining Holdings Pty Ltd | Gulu Gulu | 9% | Gulu Gulu Project Exploration Licence 08/2056, Reporting Period: 20/07/2010 – 20/07/2011 |
| A91512 | 2011 | Rico Resources Ltd | Uaroo | <1% | Annual Technical Report on E8/1939, Uaroo, located in the West Pilbara Region of Western Australia, for the pe |
| A91693 | 2011 | Zenith Minerals Limited | Mount Alexander | 25% | Mt Alexander Project, CR90/2010, E08/1410-I, E08/1972- I, E08/2046, Annual Report Year ending 31 August 2011 |
| A91888 | 2011 | Uranex Nl | Mount Danvers | 22% | Mount Danvers Project Final Surrender Report EL 08/1977 & EL 08/2045 |
| A88858 | 2011 | Artemis Resources Ltd | Cambridge Creek | 13% | Annual Report , Cambridge Creek Project, E08/1561, E08/1792, E08/1834, for the period 04/10/2009 to 03/10/201 |
| A90674 | 2011 | Groote Resources Ltd | Mount Alexander | <1% | Annual Report 2011, Mt Alexander Project, E08/1987 Report Period: 23/02/2010 to 22/02/2011 |
| A85589 | 2010 | Gti Resources Ltd | Cambridge Creek | 19% | Annual Report, 4th October 2008 to 3rd October 2009, Cambridge Creek Project E08/1561 |
| A87041 | 2010 | Zinc Co Australia Limited | Mount Alexander | 63% | Partial Surrender Report 2010, Mt Alexander Project, E08/1410 |
| A88260 | 2010 | Zinc Co Australia Limited | Mount Alexander | 24% | Mt Alexander Project, CR90/2010, Annual Report Year ending 31 August 2010 |
| A82196 | 2009 | Mt Alexander Resources Pty Ltd | Mt Alexander | 63% | Partial Surrender Report for E 08/1410 for the period 21 March 2006 to 20 March 2009 |
| A82615 | 2009 | Yellow Rock Resources Ltd | Nanutarra | 4.8% | ANNUAL TECHNICAL REPORT on EXPLORATION LICENCE E08/1710 FOR THE YEAR ENDING 20 MAY 2009 |
| A84235 | 2009 | Dynasty Metals Australia Ltd | Glen Florrie | <1% | Final Report E 08/1621, Glen Florrie for the Period Ending 14/02/2009 |
| A84775 | 2009 | Mt Alexander Resources Pty Ltd | MOUNT ALEXANDER | 54% | COMBINED ANNUAL REPORT C 51/2006 MOUNT ALEXANDER PROJECT E08/1074, E08/1410, E08/1411, P08/469 AND P08/470 (AL |
| A80668 | 2009 | Toro Energy Ltd | GILBA BORE | 53% | GILBA BORE PROJECT EL 08/1640 Final Report for the Period 21st March 2007 to 20th March 2008. |
| A82094 | 2009 | Gondwana Resources Ltd | Moodong Well | 68% | ANNUAL REPORT Moodong Well Project Tenement E08/1577, Ashburton Mineral Field, Period covered to 5th February |
| A82171 | 2009 | Whinnen Resources Ltd | WHITE RING | 1.8% | FINAL REPORT E08/1559 WHITE RING PROJECT |
| A84676 | 2009 | Pegasus Metals Ltd | Hooley | 38% | Hooley Project Surrender Report; Combined Report C87/2009 E08/1556; E08/1591; E08/1797, Report Period: 28 Augu |
| A85097 | 2009 | Pilbara Stone Pty Ltd | Ballard Well Black Granite | 35% | Annual report for the period 6/10/2009-5/10/2009 for E08/114 Ballard Well Balck Granite. |
| A77559 | 2008 | Whinnen Resources Ltd | White Ring | 1.8% | Annual Report E08/1559 White Ring Project For the Period 12th February 2007 to 11th February 2008 |
| A78231 | 2008 | Toro Mining Pty Ltd | Gilba Bore | 53% | GILBA BORE PROJECT EL08/1640 Annual Report for the Period 21st March 2007 to 20th March 2008 |
| A78264 | 2008 | Dynasty Metals Australia Ltd | Glen Florrie | <1% | Glen Florrie E08/1621 Annual Report Period Ending 15 February 2008 File name: E08/1621_2008A.pdf |
| A78329 | 2008 | Gondwana Resources Ltd | Moodong Well | 68% | Annual Report Moodong Well Project Tenement E08/1577 Period covered to 5th February 2008 |
| A79828 | 2008 | Pegasus Metals Ltd | Hooley North | 17% | Annual Report for the Period 28 August 2007 to 27 August 2008, Hooley North Project E08/1591 |
| A79827 | 2008 | Pegasus Metals Ltd | Hooley | 38% | Annual Report for the Period 28 August 2007 to 27 August 2008, Hooley Project, E08/1556. |
| A80013 | 2008 | Mt Alexander Resources Pty Ltd | Mount Alexander | 54% | COMBINED ANNUAL REPORT C 51/2006 MOUNT ALEXANDER PROJECT E08/1074, E08/1410, E08/1411, P08/469 AND P08/470 (AL |
| A80134 | 2008 | Gti Resources Ltd | Cambridge Creek | 19% | Annual Report, Period 4th October 2007 to 3rd October 2008, Cambridge Creek Project E08/1561 |
| A76307 | 2007 | Pegasus Metals Ltd | Hooley | 38% | Annual Report for the period 28 August 2006 to 27 August 2007 Hooley Project E08/1556 |
| A76308 | 2007 | Pegasus Metals Ltd | Hooley North | 17% | Annual Report for the period 28 August 2006 to 27 August 2007 Hooley North Project E08/1591 |
| A76326 | 2007 | Mt Alexander Resources Pty Ltd | Mount Alexander | 54% | Combined Annual Report C51/2006 Mount Alexander Project E08/1074, E08/1410, E08/1411, P08/469 AND P08/470 For |
| A73180 | 2006 | Mr Pember R | Ashburton | 50% | Exploration Report E08/1307, (Annual Report for Period 02/09/04 to 01/09/05, Wyloo). |
| A73579 | 2006 | Mt Alexander Resources Pty Ltd | Mount Alexander | 54% | Combined Annual Report C51/2006, Mount Alexander Project E08/1074,1410-1411,P08/469-470, For the Period 1 Sept |
| A71890 | 2006 | Breamlea Pty Ltd | Moodang Well | 73% | Moodang Well Prospect, Exploration Licence E08/1074, Annual Report for period ended 31 August 2005, (Wyloo). |
| A69827 | 2005 | Mr Pember R | Ashburton | 50% | Ashburton Project, Mineral Exploration Report 2004, (Annual report for the period 31/08/03 - 01/09/04) E08/130 |
| A69830 | 2005 | Breamlea Pty Ltd | Moodong Well | 73% | Annual report for the peroid 01/09/03 - 31/08/04 Moodong Well Project, E08/1074, Wyloo |
| A66267 | 2003 | Exco Resources (Wa) Pty Ltd | Nanutarra | 7% | ANNUAL REPORT (E08/1162) FOR THE PERIOD 18TH DECEMBER 2001 TO 17TH DECEMBER 2002 AND SURRENDER REPORT (E08/118 |
| A65888 | 2003 | Adelaide Prospecting Pty Ltd | Moodong Well | 73% | Annual Report for 12 months to 31 August 2001. E08/1074 Moodong Well. |
| A66738 | 2003 | Mr Macdonald Sa | Mount Alexander | 13% | E08/1094, Mt Alexander, Annual Technical Report for the 12 months 01/09/01 - 31/08/02. |
| A66739 | 2003 | Adelaide Prospecting Pty Ltd | Moodong Well | 73% | Annual Report for 12 months to 31 August 2002 E08/1074 Moodong Well |
| A67338 | 2003 | Exco Resources (Wa) Pty Ltd | Nanutarra | 14% | Surrender Report for the period 18 Dec 2000 to 13 Feb 2003 Nanutarra Project C138/2002: E8/1162,1182 |
| A67905 | 2003 | Adelaide Prospecting Pty Ltd | Moodong Well | 73% | Annual Report for the period 01/09/2002-31/08/2003 Moodong Well Project E08/1074 |
| A64218 | 2002 | Wmc Resources Ltd | Nanutarra | 7% | Annual Report For The Period 18 December 2000 to 17 December 2001 Nanutarra JV Project All Tenements Explorati |
| A65729 | 2002 | Mr Mcdonald Lg | White Rocks | <1% | Annual Mineral Exploration Report E08/1224. White Rocks - For The Period 18/8/2001 To 16/8/2002. |
| A62996 | 2001 | Mr Macdonald Sa | Mount Alexander | 13% | Mt Alexander E08/1094 Annual Technical Report For The 12 Months 1/9/99 - 31/8/00. |
| A63010 | 2001 | Adelaide Prospecting Pty Ltd | Moodong Well | 73% | E08/1074 Moodong Well Annual Report For 12 Months To 31 August 2000. |
| A63459 | 2001 | Rio Tinto Exploration Pty Ltd | Hooley Camp | 43% | First Annual and Final Report for the period ending 23rd July 2001. E08/1159 Hooley Camp, Capricorn Base Metal |
| A53339 | 1998 | Rgc Exploration Pty Ltd | Pingandy | <1% | Surrender Report Pingandy Project ( Glen Florrie sub-project) E08/866 and 868. |
| A52110 | 1997 | Mr Risinger Je | Moodong Well | 75% | Moodong Well Proeject, Annual Report for the period 15th March 1996 to 14th March 1997, E08/693A |
| A48894 | 1996 | Mr Risinger Je | Moodong Well | 75% | Moodong Well Project, Annual Report for period 15th March 1995 to 14th March 1996, E08/693A. |
| A47106 | 1996 | Mr Risinger Je | Moodong Well | 75% | Moodong Well Project, Annual Report Reporting Period : 15 March 1994 to 14 March 1995, Exploration Licence 08/ |
| A45210 | 1995 | Mr Macdonald Sa | Mount Alexander | <1% | Mount Alexander Project, Annual Report Mining Lease M08/140 for the year ended 26th June 1995. |
| A46954 | 1995 | Australian Marble & Granite Ltd | Len Florrie / Maroonah | 6.9% | Annual report for the period 22 December 1994 to 21 December 1995 E8/734, E8/735 and E8/646. Ashburton Mineral |
| A42164 | 1994 | Mim Exploration Pty Ltd | Mount Alexander | 30% | Mt Alexander Project, Final Surrender Report for the period ending 27/06/1994, E08/306. |
| A42608 | 1994 | Mr Dutton Sm | Glen Florrie- Wyloo- Cheela | 1.5% | Annual Report for the period 06/93-06/94 Glen Florrie- Wyloo- Cheela Project E08/584 |
| A43380 | 1994 | Australian Marble & Granite Ltd | (Dolerite) Dyke | 19% | Glen Florrie Black Granite, (Dolerite) Dyke Project, Quarry Development and Dimension Stone Production Operati |
| A43926 | 1994 | Mr Pinniger Wh | Glen Florrie / Maroonah | 35% | Glen Florrie / Maroonah Project, Annual Report for Mining Lease M08/114 for the year ending 06/10/94. |
| A37604 | 1993 | Mim Exploration Pty Ltd | Mount Alexander | 30% | Mount Alexander Project, Partial Surrender Report for the period 12/03/1989 to 11/03/1992, E08/306. |
| A37605 | 1993 | Mim Exploration Pty Ltd | Mount Alexander | 30% | Mount AlexanderProject, 1991/1992 Annual Report, January 1993, E08/306. |
| A36714 | 1992 | Bhp Minerals Pty Ltd | North Gascoyne | 4.3% | E08/404-415. Northern Gascoyne Province. Relinquishment report |
| A36728 | 1992 | Mr Pinniger Wh | Glen Florrie | 7.1% | Glen Florrie Project, Annual Report 30/4/1991 to 30/4/1992, E08/153, 251, 309, 441, 607, M08/51, 56, 82, 114. |
| A39694 | 1992 | Mr Dutton Sm | Glen Florrie | 1.5% | Annual Report for the period 06/92-06/93 Glen Florrie Project E08/584 |
| A65713 | 1990 | Thiess Contractors Pty Ltd | Glen Florrie | 30% | 1990 Report E08/153 & M08/51 on Diamond Drilling Programme ( Glen Florrie Project), 'Black Granite' Deposit At |
| A32892 | 1990 | Mr Pinniger Wh | Glen Florrie | 30% | Non-statutory Report; Preliminary Feasibility study for a proposed trial quarry on E08/153 Glenflorrie Station |
| A21174 | 1987 | Cyprus Minerals Australia Co | Mount Alexander | 24% | Mount Alexander (JV) Project, Annual Report for the year ending 31/12/1987, E08/128 & M08/35. |
| A17216 | 1986 | Cyprus Minerals Australia Co | Mount Alexander | 18% | Mt Alexander Project, Annual (Final) Report for the period 12th February 1985 to 10th January 1986, E08/35. |
| A17416 | 1986 | Mr Macdonald Sa | Mount Alexander - Love's Find | 29% | Mt Alexander - Love's Find Project, Annual Report , March 1986, P08/171-180. |
| A15029 | 1985 | Amoco Minerals Aust Co | Mount Alexander | 18% | Mt Alexander Project, Annual Report for period to February 11,1985, E08/35. |
| A11669 | 1982 | Amax Australia Ltd | Mount Alexander | 18% | Final Report on Exploration Mt. Alexander Temporary Reserve 6752H, Ashnurton Goldfield- Western Australia |
| A10326 | 1981 | Amax Iron Ore Corporation | Mount Alexander | 18% | Annual Report on Exploration Mt Alexander Temporary Reserve 6752H, Ashburton Goldfield, Western Australia. |
| A9692 | 1981 | Amax Iron Ore Corporation | Mount Alexander | 18% | Annual Report on Exploration Mt Alexander Temporary Reserve 6752H Ashburton Goldfield, Western Australia. |
| A9853 | 1981 | Australia & New Zealand Exp Co | Mount Alexander | 29% | Mt Alexander Project, Annual Report for the period 01/01/1980 to 31/12/1980, MC08/2212-2215, 2227-2228, 2237, |
| A8725 | 1980 | Amax Iron Ore Corporation | Mount Alexander | 18% | Annual Report on Exploration Mt Alexander Temporary Reserve 6752H Ashburton Goldfield, Western Australia |
| A8870 | 1980 | Cra Exploration Pty Ltd | Middalya | <1% | Middalya Project, Non-statutory Report: Final Report, March 1990, MC08/2687-2694, 2699-2712, 2358-2361, MC09/2 |
| A8996 | 1980 | Cra Exploration Pty Ltd | Middalya | 3.2% | Middalya Project, 1979 Annual Report , March 1980, MC08/2873-2876, 2199-2216, 2797-2798, 2808-2820, 2714-2715, |
| A7962 | 1978 | Esso Australia Ltd | Nanutarra | 18% | Nanutarra Project, Non-statutory Report:Final Report, August 1978, TR70/6568H. |
| A6874 | 1977 | Australia & New Zealand Exp Co | Mount Alexander | 29% | Mt Alexander Project, Annual Report for the year ending 31/12/1976, MC08/2212-2215, 2227-2228, 2237 & 2359. |
| A6251 | 1976 | Australia & New Zealand Exp Co | Mount Alexander | 29% | Mount Alexander Project: [Annual] Report for the period 1st January 1974 to December 31st 1975, MC08/2212-22 |
| A6476 | 1976 | Afmeco Pty Ltd | Wongida Well | 8.9% | Wongida Well Project, Annual Report for the year ending 31/12/1976, TR70/5783H. |
| A5684 | 1975 | Dampier Mining Co Ltd | Hooley Camp | 100% | Hooley Camp Project, Annual Report for the period ending 31/12/1974, MC08/2226, 2265-2266 & 2330-2331. |
| A5838 | 1975 | Afmeco Pty Ltd | Mudong Well | 68% | Mudong Well, Gascoyne Bangemall area, TR5942 Field work report, 1975 annual report |
| A5904 | 1975 | Afmeco Pty Ltd | Glen Florrie Station | 8.9% | Glen Florrie Station Project, Annual Report for the year ending 31/12/1975, TR70/5783H.( Field Work in The Gol |
| A5098 | 1974 | Broken Hill Pty Co Ltd | Wyloo | 5.9% | Temporary reserve 5761H, Wyloo, Final report on exploration undertaken from 4th May 1973 to 3rd May 1974 [ TR7 |
| A5177 | 1974 | Afmeco Pty Ltd | Gascoyne - Bangemall - Wongida | 8.9% | Gascoyne Bangemall area, TR 5783H, Field work report, 1974 Annual report, TR70/5783 |
| A7119 | 1753 | Afmeco Pty Ltd | Wongida Well | 8.9% | Wongida Well Project, Final Surrender Report: Results of the 1976 Drilling Programme, July 1977, TR70/5783H. |
| A82834 | 1753 | Yellow Rock Resources Ltd | Nanutarra | 4.8% | FINAL TECHNICAL REPORT on EXPLORATION LICENCE E08/1710 ON THE Yanrey Sheet SF 50-9 in the 1:250,000 Series For |
| A105361 | Tungsten Mining Nl | Mount Alexander | 2.5% | Mount Alexander Project C30/2011 (M8/286, M8/287, M8/314 & E08/2207) Annual Report for the period 23 January 2 | |
| A134430 | Tungsten Mining Nl | Kilba | 7.1% | Annual Report for Kilba Project C158/2017 for the period ending 21/01/2023. E08/2780 & M08/314 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 08/3819 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 08/3819 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 08/3819? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.