NextMaps›WA Tenements›E 04/2451

E 04/2451

PendingExploration LicenceShire of Derby-West KimberleyWest Kimberley M.F. District
Area
44,330ha
Applied
June 2016
10 years ago
WAMEX reports
249
WA median is 53
Report drilling
40
of 249 reports
Derby-West Kimberley Explore on the live map

Register summary

Holder
Baracus Pty Ltd
Local government
Shire of Derby-West Kimberley
Application received
30 June 2016

Exploration history on this ground

249 historical WAMEX exploration reports intersect E 04/2451: 133 report geochemistry or sampling, 47 include a digital data package.
When this ground was worked · 238 of 249 reports dated
931960s
371970s
221980s
131990s
262000s
232010s
242020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A154751 2026 Richenda Developments Pty Ltd Heracles 3.3% Heracles Project Final Surrender Report E04/2425 for the period ending 06/03/2026.
A146327 2025 Igo Limited Wombarella <1% E04/2486 Partial Relinquishment Wombarella for the period ending 10/12/2024.
A146418 2025 Buxton Resources Limited; Igo Newsearch Pty Ltd Sentinel - E04/2614 <1% Final Surrender Report Sentinel E04/2614 for the period ending 10/01/2025
A147799 2025 Igo Limited Wombarella <1% E04/2612 Final Surrender Report Wombarella for the period ending 06/01/2025.
A147802 2025 Igo Limited Wombarella <1% Wombarella E04/2617 Final Surrender Report for the period ending 6/1/2025
244 more reports
A147855 2025 Igo Limited Wombarella <1% Wombarella E04/2480 Final Surrender Report for the period ending 23/01/2025
A148914 2025 Richenda Developments Pty Ltd Heracles 3.3% Dyson Creek E04/02425 Annual Report for the period ending 07/05/2025
A143268 2024 Kimberley Minerals Limited Heracles 3.3% Partial Surrender Report Heracles Project E04/02425 for the period 8 March 2018 to 7 March 2024
A143267 2024 Kimberley Minerals Limited Heracles 3.3% Annual Report Technical Heracles Project E04/02425 for the period ending 07/03/2024
A145227 2024 Igo Limited Mount Joseph South <1% Voluntary Partial Surrender – E04/2462 Mount Joseph South Project for the period ending 10/09/2024
A137796 2023 Igo Limited Mount Joseph South <1% Mount Joseph South E04/2462 Partial Surrender Report for the period ending 8/9/2023
A137803 2023 Buxton Resources Limited Wombarella <1% Partial Relinquishment E04/2480 Wombarella for the period ending 13/09/2023
A135597 2023 Kimberley Minerals Limited Heracles 3.3% Heracles Annual Technical Report E04/2425 for the period ending 07/03/2023.
A130402 2022 Igo Ltd Sentinel <1% E04/2408 Voluntary Partial Surrender Sentinel Project for the period ending 21/02/2022.
A130966 2022 Kimberley Metals Ltd Richenda 3.3% Richenda Project Annual Technical Report E04/2425 for the period ending 07/03/2022.
A126113 2021 Igo Limited Wombarella Creek East <1% Annual Report E04/2612 Wombarella Creek East Project for the period ending 06/01/2021
A126114 2021 Igo Limited Wombarella Creek West <1% Annual Report E04/2617 Wombarella Creek West for the period ending 06/01/2021
A127633 2021 Kimberley Minerals Ltd Richenda 3.3% Richenda Annual Technical Report E04/02425 for the period ending 07/03/2021
A127712 2021 Olynthos Group Pty Ltd Wombarella <1% Annual Report for E04/2659 Wombarella Project for the period ending 27/05/2021
A122444 2020 Igo Newsearch Pty Ltd Sentinel <1% Annual Report, Sentinel Project C164/2019 for the period 7 February 2019 to 31 October 2019
A122535 2020 Elderberry Resources Pty Ltd; Igo Newsearch Pty Ltd Bull Hole <1% Annual Report, Bull Hole Prospect E04/2486 for the period 11 December 2018 to 10 December 2019
A124198 2020 Kimberley Minerals Ltd Richenda 3.3% Annual Technical Report Richenda Project E04/02425 for the period ending 07/03/2020
A125272 2020 Igo Limited Mount Joseph South <1% E04/2462 Mount Joseph South Annual Report For the Period 11 September 2019 to 10 September 2020
A125329 2020 Igo Limited Ruins <1% Annual Report Ruins Project E04/2480 for the period ending 13/09/2020
A119982 2019 Buxton Resources Limited Sentinel <1% Annual Report Sentinel Project E04/2408 for the period 16 March 2018 to 15 March 2019
A120030 2019 Kimberley Minerals Ltd Richenda 3.3% Richenda Abrasives Project E04/02425 Annual Technical Report for the period 8 March 2018 to 7 March 2019
A121633 2019 Independence Group Nl Mount Joseph South <1% Annual Report, Mount Joseph South Prospect, E04/2462 for the period 11 September 2018 to 10 September 2019
A121653 2019 Independence Group Nl Ruins <1% Annual Report Ruins Project E04/2480 for the period 14 September 2018 to 13 September 2019
A116730 2018 Buxton Resources Limited Sentinel <1% Sentinel Project E04/02408 Annual Report for the period 16/03/2017 - 15/03/2018
A118198 2018 Buxton Resources Ltd Ruins <1% Ruins Project E04/2480 Annual Report for the period 14/09/2017 - 13/09/2018
A118229 2018 Baracus Pty Ltd Mount Joseph South <1% Mount Joseph South E04/02462 Annual Report for the period 11/09/2017 - 17 June 2018
A114427 2017 Kimberley Precious Metals Pty Ltd Fairfield <1% E04/2377 Exploration Licence Exploration Report - Fairfield - 30 March 2016 to 29 March 2017
A113833 2017 Buxton Resources Limited Sentinel <1% Sentinel Project E04/2408 Annual Report for the period 16/03/2016 to 15/03/2017
A114700 2017 Kimberley Quarry Pty Ltd Kimberley <1% Final Surrender M04/2130 Kimberley Black Granite Project for the period 11 June 2016 to 10 June 2017
A109153 2016 Western Barite Pty Ltd Mount Amy 92% Surrender Report MOUNT AMY E04/2304 For the Period 08/09/2014 to 28/01/2016
A110198 2016 Kimberley Quarry Pty Ltd Kimberley Quarry <1% C149/2012 Annual Mineral Exploration Report For the Period 11 June 2015 to 10 June 2016, E04/02121, E04/02130
A106259 2015 Kimberley Quarry Pty Ltd Kimberley <1% Kimberley Black Granite Project Annual Mineral Exploration Report C149/2012 (E04/2121, E04/2130) for the perio
A101022 2014 Joystone Australia Pty Ltd Joy's Reward <1% Joy's Reward Project, Annual Report for the period 04/12/2012 to 03/12/2013, E04/2158.
A101486 2014 Baracus Pty Ltd Fairfield <1% Fairfield Project E04/2154 Final Surrender Report 18 December 2012 – 4 November 2013
A99316 2013 Kimberley Quarry Pty Ltd Kimberley Black Granite <1% Kimberley Black Granite Project, Annual Report for the period 11/06/2012 to 10/06/2013, E04/2121 & 2130. [ C14
A94713 2012 Arc Pty Ltd Napier Downs 10% Final Surrender Report For The Period 18 March 2008 to 21 May 2012 Napier Downs Project E04/1444
A90577 2011 Arc Pty Ltd Napier Downs 10% Partial Surrender Report For The Period 18 March 2008 to 17 March 2011, Napier Downs Project E04/1444
A91564 2011 Ling M E04/1599 9.1% Annual Exploration Report for E 04 / 1599 for the period 13th September 2010 to 13th September 2011
A90576 2011 Arc Pty Ltd Napier Downs 10% Annual Report For The Period 18 March 2010 to 17 March 2011 Napier Downs Project E04/1444
A87165 2010 Arc Pty Ltd Napier Downs 10% Annual Report For The Period 18 March 2009 to 17 March 2010 Napier Downs Project E04/1444
A87860 2010 Sibraa K Mount Broome 9.1% E04/1599 Mount Broome Annual Report for the period August 2009 to August 2010
A88376 2010 Rey Resources Ltd Napier Downs 52% Surrender Report, Napier Downs E04/1957, 27 July 2010 to 15 November 2010
A82966 2009 Arc Pty Ltd Napier Downs 10% ANNUAL REPORT For The Period 18 March 2008 to 17 March 2009 NAPIER DOWNS PROJECT E04/1444 WEST KIMBERLEY MINER
A80814 2009 Blina Diamonds Nl Blina 2.2% Surrender Report for Exploration Licence E04/1092, E04/1654, P04/239 and P04/240, Report Period: 25 November 1
A82263 2009 Blina Diamonds Nl BLINA <1% BLINA PROJECT - C420/1995 COMBINED ANNUAL REPORT FOR THE PERIOD 24 FEBRUARY 2008 TO 23 FEBRUARY 2009, E04/0726
A77622 2008 Timespan Holdings Pty Ltd Mount Wynne Creek 9.2% Mount Wynne Creek Project, Annual Report 2007, [C127/2000], REPORTING PERIOD: 1st January 2007 to 31st Decembe
A78176 2008 Waterford Bay Pty Ltd Richenda River 7.3% Richenda River Project, Partial Surrender Report for the period 24th August 2004 to 23rd October 2007, E04/11
A78119 2008 Wolsog Pty Ltd Fairfield <1% FAIRFIELD BLACK GRANITE DEPOSIT ANNUAL REPORT Reporting Period: 07.12.2006 - 06.12.07 Exploration Licence 04/1
A78171 2008 Mr Sullivan M Richenda River 7.3% Richenda River Project, Annual Report for the period 24th August 2006 to 23rd August 2007, E14/1177.
A78278 2008 Blina Diamonds Nl Blina <1% BLINA PROJECT - C420/1995, FOR THE PERIOD 24 FEBRUARY 2007 TO 23 FEBRUARY 2008 COMBINED ANNUAL REPORT (Lennard
A74960 2007 Blina Diamonds Nl Blina <1% Blina Project - C420/1995, Combined Annual Report for the Period 24 February 2006 to 23 February 2007, West Ki
A75322 2007 Timespan Holdings Pty Ltd Napier 9.1% Napier Annual Report 2006, Reporting Period: 1st January 2006 to 31st December 2006. Vol 1 of 1. Dept of MPR R
A74029 2007 Dale & Associates Richenda River 7.3% Richenda River Project, Annual Report for the period 24th August 2005 to 23rd August 2005, E04/1177.
A74433 2007 Wolsog Pty Ltd Fairfield <1% Fairfield Black Granite Deposit, Annual Report, (E04/1413, Period 07/12/05 to 06/12/06, Lennard River).
A72095 2006 Conquest Mining Ltd Napier Range 1.8% Napier Range Project, Final Surrender Report for the period 12th November 1999 to 11th November 2005, E04/110
A72069 2006 Conquest Mining Ltd Napier 1.6% E04/1103,1104,1107,M04/395, Napier Annual Report 2006, 1 January 2005 to 31 December 2005, Combined Reporting
A72738 2006 Blina Diamonds Nl Blina <1% Blina Project C420/1995, For the Period 24 February 2005 to 23 February 2006, (Annual Report, Lennard River).
A70092 2005 Conquest Mining Ltd Napier Range 1.6% Napier Range Project, Annual Report for the period 01/01/2004 to 31/12/2004, E04/1103, E04/1104, E04/1107; P04
A69963 2005 Blina Diamonds Ltd Ellendale <1% Combined Annual Report for Exploration Licences E04/801, E04/911, E04/1062, E04/1092 & E04/1093 (Ellendale Pr
A68131 2004 Kimberley Diamond Company Nl Ellendale <1% Annual Report for the period 01/01/2003-31/12/2003 Ellendale Project(C215/1998),E04/801,E04/911,E04/1062, E04/
A69029 2004 Conquest Mining Ltd Napier Range 1.6% Napier Range Project, Annual Report for the period 27/02/2003 to 28/02/2004, E04/1103, E04/1107 & P04/199. [C
A65896 2003 Conquest Mining Ltd Napier Range - Ellendale 1.6% Napier Range - Ellendale Project[s], Annual Report for the period 11th November 2001 to 10th November 2002, E
A66392 2003 Kimberley Diamond Company Nl Ellendale 2.2% Partial Surrender Report for Exploration License E04/1092 for the period 25 November 1999 to 24 November 2002
A66543 2003 Kimberley Diamond Company Nl Ellendale <1% Combined Annual Report for the period 01 January 2002 to 31 December 2002 Ellendale Project C215/1998: E04/801
A64069 2002 Conquest Mining Nl Napier Range 1.6% Annual Technical Report tenements E04/1103, 1104, 1107 and P04/199 combined reporting status - C127/2000, Napi
A62028 2001 Ellendale Resources Nl Ellendale 2.2% Annual Report reporting period 25th November 1999 to 24th November 2000 tenement E04/1092 Ellendale Project.
A61927 2001 Conquest Mining Nl Napier Range 1.6% Napier Range Project, Annual Report for the period 01/01/2000 to 31/12/2000, E04/1103-1104, 1107 & P04/199. [C
A64038 2001 Kimberley Diamond Company Nl Ellendale 2.2% Annual Report for the exploration licence E04/1092 for the period 25 November 2000 to 24 November 2001, West K
A53372 1998 Renison Ltd Richenda 11% Surrender Report for period 14/10/96 to 27/08/97, Richenda Project, E04/718, 1042-1050.
A54437 1998 Conquest Exploration Nl Napier Range 3.4% Napier Range Project, Final Surrender Report for the period 23rd December 1993 to 22nd December 1997, E04/86
A49788 1997 Rgc Exploration Pty Ltd Richenda 11% Annual Report for Period 14/10/1995-13/10/1996 Richenda Project E04/718, 1042, 1044, 1045, 1047, 1048, 1049 an
A51266 1997 Conquest Mines Nl Napier Range 1.8% Napier Range Project, Annual Report for the period 4th February 1996 to 3rd February 1997, E04/857 & 861.
A48474 1996 Conquest Mines Nl Napier Range 1.8% Napier Range Project, Annual Report for the period 23/12/1995 to 03/02/1996, E04/857 & E04/861.
A51267 1996 Conquest Exploration Nl Napier Range 3.4% Napier Range Project, Partial Surrender Report for the period 23rd December 1993 to 22nd December 1996, E04/86
A44636 1995 Conquest Mines Nl Napier Range 1.8% Napier Range Project, Annual Report for the period 1st February1994 to 1st February 1995, E04/857, & for th
A43220 1995 Western Reefs Ltd Napier 22% Napier Project, Annual Report Exploration Licences E04/814, 830, 831; Exploration Licence Application E04/958
A41578 1994 Dominion Mining Ltd Richenda - Lilly Waterhole 6.7% Richenda - Lilly Waterhole Project[s], Annual Report for the period covering 20/05/93-10/06/1994, E04/811 &
A39374 1993 Teedale Pty Ltd Carpenters Gap 12% Annual Report for the period 08/92-08/93 Carpenters Gap Project E04/775
A38110 1993 Marymia Exploration Nl Wombarella <1% Wombarella Project, Final Surrender Report for period ending 10th May 1992, E04/676.
A36372 1992 Stone Palace Pty Ltd Wombarella Creek 3.1% Wombarella Creek Project, Annual Report on E04/6262 for period 14/12/89 to 13/12/91.
A30700 1990 Metana Minerals Nl Napier Downs 28% Napier Downs Project, Annual Report for the period ending 31st December 1989, E04/590.
A28799 1989 Kimberley Granite Resources Pty Ltd Fairfield "Black Granite" <1% Report on drilling programme, May 1989, Fairfield "Black Granite", Kimberley, WA
A28800 1989 Kimberley Granite Resources Pty Ltd Black Granite <1% Update of activities to May 1989, Black Granite Mining Project, E04/529, M04/199
A31139 1989 Parry Corp Wombarella 54% Report on Visit to Wombarella, 28th October to 2nd November, 1989 (Wombarella Creek E04/240 E04/242)
A27146 1989 Kimberley Granite Resources Pty Ltd Fairfield 37% Memorandum, Mineral exploration of the Fairfield Project West Kimberley, WA
A28797 1989 Kimberley Granite Resources Pty Ltd Fairfield 37% A geological survey of the Fairfield Project Area
A28798 1989 Kimberley Granite Resources Pty Ltd Fairfield 37% Fairfield Project , Non-statutory Report: A Geochemical Survey of the Fairfield Project Area, June 1989, E04/4
A24160 1988 Parry Corp Black Granite Project 54% Black Granite Project No.728-87607 Annual report - 1987 including progress report for December 1987 (E4/240 to
A25463 1988 Billiton Australia Pty Ltd Napier Range 1.4% Napier Range(JV) Project, Final Surrender Report, November 1988, E04/56
A27145 1988 Kimberley Granite Resources Pty Ltd Fairfield Station 37% Testing and advanced evaluation of the black granite resource near Fairfield Station, E04/529, E04/485, E04/4
A28796 1988 Kimberley Granite Resources Pty Ltd Fairfield <1% Report on drilling programme, 1988, Fairfield "Black Granite", Kimberley, WA, E04/477, 485 & 529.
A20227 1987 Parry Corp Black Granite 54% Notice of intent Black Granite project
A20244 1987 Billiton Australia Pty Ltd Napier Range <1% Napier Range Joint Venture Annual report for 1986 EL's EL04/2 EL04/22 EL04/56 - West Kimberley Billiton Austra
A17450 1986 Parry Corporation Ltd Wombarella Creek 45% Report on 'Black Granite' and 'Kimberley Pearl' properties in the Wombarella Creek area, West Kimberley Distri
A18790 1986 Parry Corp Wombarella 79% Wombarella field visit Parry Corporation / Sumitomo / Sekigahara July 16th-19th 1986 (Additional reports on Ma
A15276 1985 Shell Australia Ltd Napier Range 1.4% Napier Range Project, Annual Report for the period ending 31/12/1984, E04/56.
A14028 1984 Western Mining Corporation Ltd Mount Joseph 5.4% Mount Joseph Project, (2nd Annual) & Final Surrender Report for the period 15th June 1982 to 14th June 1984,
A14347 1984 Shell Australia Ltd Napier Range 1.4% Napier Range Project, Non-statutory Report: Summary Report for the period 09/11/1983 to 30/09/1984, E04/56.
A12191 1983 The Shell Company Of Australia Ltd Meda 12% Meda (JV) Project, Final Report for the period 01/01/1982 to 31/12/1982, MC04/6468-6513, 7013-7027, & 9040-905
A12587 1983 Western Mining Corporation Ltd Mount Joseph 5.4% Mt Joseph Project, Annual Report for the period ending 14th June 1983, E04/1.
A14346 1983 Shell Australia Ltd Napier Range 1.4% Napier Range Project, Annual Report for the period ending 09/09/1983, E04/56.
A9722 1981 Shell Company Of Australia Ltd Meda 12% Meda (JV) Project, Annual Report for the period 01/01/1980 to 31/12/1980, MC04/6468-6513, 7013-7027,9040-9055.
A10400 1981 Richenda Minerals Pty Ltd Turtle Creek <1% Turtle Creek Project, Non-statutory Report: Report on Exploration , September 1981, TR70/7679.
A8363 1977 Cra Exploration Pty Ltd Ellendale 2.1% Ellendale Project, Non-statutory Report: Air Photo Plans Indexes, May 1977. (No Tenements listed)
A6894 1977 Pickands Mather & Co Int Kimberley <1% Non-statutory Report : Pickands Mather reconnaissance Drainage Survey of the Kimberleys, February 1977, TR70/2
A6195 1976 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Key Maps & Sub Number Indexes: Kimberley TRs 70/2686 & 2687H.
A4389 1974 Western Mining Corporation Limited Richenda River 1.8% Richenda River Project, Non-statutory Report: Percussion Drillilng Data, January 1974. TR70/5678 & 5751H; MC04
A4390 1974 Western Mining Corporation Limited Richenda River 1.8% Richenda River Project, Non-statutory Report: Miscellaneous Plans/Sheets, Geophysical & Geochemistry, February
A4391 1974 Western Mining Corporation Limited Richenda River 1.8% Richenda River Project, Non-statutory Report: Computer Dumps of Drainage Survey & Soil Sampling, January 1974,
A4632 1974 Esso Australia Ltd Kongorow 35% Kongorow Project, Non-statutory Report:Final Report, March 1974, TR70/5891H.
A3818 1973 Placer Prospecting ( Australia) Pty Ltd Chedda Cliffs 1.1% Chedda Cliffs Project, Progress Report June 1973, MC04/1552-1554 & 1578-1579.
A4239 1973 Western Mining Corporation Ltd Richenda River 1.8% Richenda River (JV) Project, Non-statutory Report: Progress Report for the year ending 31/12/1973, TR70/5678
A60470 1973 Placer Prospecting Pty Ltd Chedda Cliffs 1.1% Progress report Chedda Cliffs Project West Kimberleys, Western Australia. (TR70/2686, 1973)
A60575 1973 Placer Prospecting Pty Ltd Napier Range 1.1% Report on the Napier Range Between Yammera Gap and the Barker River, Fitzroy, Western Australia. Project 63 (T
A60418 1972 Placer Prospecting Pty Ltd Fitzroy Project 63 1.1% Review of Exploration Fitzroy Project 63, 12 April to 7 June 1972
A3277 1972 Pickands Mather & Co Int Napier Range 1.1% Napier Range Project, Non-statutory Report: Exploration Report, November 1972, TR70/2686H.
A712 1971 Pickands Mather & Co Int Kimberley - Cummins Range <1% Kimberley - Cummins Range Project, Non-statutory Report: Reconnaissance Work in the Cummins Range, March 1971,
A760 1971 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley - Bow River Project, Non-statutory Report: Re-Evaluation of Bow River 1970, February 1971, TR70/2686
A2229 1971 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Laboratory Report on the Beneficiation of Titano Magnetite-Bearing Ga
A2441 1971 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Annual (Summary) Report 1 November 1971, (1971 Field Season April to October ), TR70/2686-2
A708 1971 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: Exploration at the Ilmars Prospect 1970, February 1971, TR70
A711 1971 Pickands Mather & Co Int Ord Crossing - Tickalara Bore <1% Ord Crossing - Tickalara Bore Project, Non-statutory Report: Geological Report, Ord Crossing Area, Tickalara A
A713 1971 Pickands Mather & Co Int Kimberley - Koongie Park <1% Kimberley - Koongie Park Project, Non-statutory Report: Report on Koongie Park Radioactive Showing , March 197
A2224 1971 Pickands Mather & Co Int Bow River <1% Bow River Project, Non-statutory Report: Drilling Programme 1971, August 1971,TR70/2686 & 2687H.
A761 1971 Pickands Mather & Co Int Kimberley - Hall's Creek <1% Kimberley - Hall's Creek Project: Non-statutory Report; Geological Reconnaissance South of Hall's Creek, March
A2226 1971 Pickands Mather & Co Int Kimberley - McIntosh " A " <1% Kimberley- McIntosh " A " Project, Non-statutory Report: Report on McIntosh " A " Prospect, July 1971, TR70/26
A2227 1971 Pickands Mather & Co Int Cummins Range <1% Cummins Range Project, Non-statutory Report: Report on Cummins Range Prospect, September 1971, TR70/2686-2687,
A2228 1971 Pickands Mather & Co Int Kimberley - Cummmins Range <1% Kimberley - Cummmins Range Project, Non-statutory Report:Cummins Range Costeans, November 1971, TR70/2686-2687
A2230 1971 Pickands Mather & Co Int Emull <1% Emull Project, Non-statutory Report:Report on Preliminary Investigation & Percussion Drilling Programme, Octob
A6209 1971 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Drill Records & Analysis Sheets for the period to February 1971, TR70
A4760 1970 Pickands Mather & Co Int Kimberley 1.1% Kimberley Project, Non-statutory Report: Napier Range I.P. Profiles, June to August 1970, TR70/2686H.
A4761 1970 Pickands Mather & Co Int Kimberley 1.1% Kimberley Project, Non-statutory Report: Conglomerate Ridge (Napier) IP Line No 18, June 1970, TR70/2686H.
A4762 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Wild Dog Creek I.P.Profiles, May 1970 , TR70/2686 & 2687H.
A4763 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Golf course I P Profiles, May 1970, TR70/2686 & 2687H.
A707 1970 Pickands Mather & Co Int West Kimberley - Napier Range 1.1% West Kimberley - Napier Range Project, Non-statutory Report: Exploration Report for the year ending 31/12/1970
A517 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Annual Report for the year ending 31/12/1969, TR70/2686, 2687,4658, 5284, 5285, 5286 & 528
A519 1970 Pickands Mather & Co Int Kimberley -llmars <1% Kimberley -llmars Project, Non-statutory Report: Ilmars Report 1969, including Sophie Downs Copper Showing - A
A6208 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Miscellaneous Analysis Report Sheets ( Bullman Copper, Moola Bulla &
A6211 1970 Pickands Mather & Co Int Kimberley - <1% Kimberley Project, Non-statutory Report: Golf Course Prospect, D. D. H. 1 (Venture 3 Drillilng), Logs & Assay
A6213 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Miscellaneous Analysis Sheets for the period 1965 to August 1970.[Lam
A511 1969 Pickands Mather & Co Int West Kimberleys 1.1% West Kimberleys Project, Non-statutory Report: West Kimberleys I.P. Profiles 1968,September 1968, TR70/2686H.
A526 1969 Pickands Mather & Co Int Kimberley - Angelo Valley <1% Kimberley - Angelo Valley Project, Non-statutory Report: Angelo Valley I.P.Profiles, 1969, TR70/2686 & 2687H.
A513 1969 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: Ilmars 1968 I. P. Profiles ( 100' & 200' Dipole), May - June
A515 1969 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report 1968, Folder No 2, Pocket C & D, February 1969
A516 1969 Pickands Mather & Co Int Kimberley Area <1% Kimberley Area Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1969, TR70/2686
A520 1969 Pickands Mather & Co Int East Kimberley Project <1% East Kimberley Project, Non-statutory Report: Miscellaneous Exploration , 1969 Field Season, TR70/2686 & 2687H
A521 1969 Pickands Mather & Co Int East Kimberley <1% East Kimberley Project, Non-statutory Report: Radioactive Exploration, East Kimberley 1969 Field Season, TR70/
A523 1969 Pickands Mather & Co Int West Kimberley <1% West Kimberley Project, Non-statutory Report: Exploration, 1969 Field Season, TR70/2686 & 2687H.
A524 1969 Pickands Mather & Co Int Kimberley - Sophie Downs <1% Kimberley - Sophie Downs Project, Non-statutory Report: Sophie Downs, I.P. Profiles, 1969, TR70/2686 & 2687H.
A525 1969 Pickands Mather & Co Int Kimberleys- Bullman <1% Kimberleys- Bullman Project, Non-statutory Report: Kimberleys Bullman I.P.Profiles, 1969, TR70/2686 & 2687H.
A527 1969 Pickands Mather & Co Int Kimberley - Napier <1% Kimberley - Napier Project, Non-statutory Report: Napier I. P. Profiles 1969, TR70/2686 & 2687H.
A528 1969 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley - Bow River Project, Non-statutory Report: Kimberley -Bow River I.P.Profiles 1969, TR70/2686 & 2687H
A529 1969 Pickands Mather & Co Int Kimberley - Golf Course <1% Kimberleys- Golf Course, Non-statutory Report: IP Profiles, 1969, TR70/2686 & 2687H.
A6212 1969 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Analysis Report SheetsOctober 1968 to May 1969 , TR70/2686 & 2687H.
A6214 1969 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Miscellaneous Analysis Sheets with Sample Shipment Records, to Octobe
A6216 1969 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Analysis Report Sheets, ( Soil Rock Analysis, 1966-1969, Kimberley Re
A505 1968 Pickands Mather & Co Int Kimberley - Mount Angelo <1% Kimberley - Mt Angelo Project, Non-statutory Report: Mt.Angelo I.P Profiles 1968, TR70/2686 & 2687H.
A506 1968 Pickands Mather & Co Int Kimberley- Sophie Downs <1% Kimberley-Sophie Downs Project, Non-statutory Report: Sophie Downs I. P. Profiles, 1968, TR70/2686 & 2687H.
A6916 1968 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Regional Stream Sediment Survey Maps, Cambridge Gulf, 1964-1968, TR70
A487 1968 Pickands Mather & Co Int Kimberley - Ilmar's Showing <1% Kimberley - Ilmar's Showing Project, Non-statutory Report: Ilmar's Showing I.P. 200 Foot Dipole 1967 & 300 Fo
A489 1968 Pickands Mather & Co Int Kimberley- Ilmars - Little Mount Isa <1% Kimberley- Ilmars - Little Mount Isa Project, Final Surrender Report, February 1968, TR70/2686 & 2687H.
A490 1968 Pickands Mather & Co Int Kimberley- Ilmars- Little Mount Isa <1% Kimberley- Ilmars- Little Mount Isa Project, Non-statutory Report: Report on Ilmars & Little Mount Isa Lead-Zi
A491 1968 Pickands Mather & Co Int Kimberley- Ilmars - Little Mount Isa <1% Kimberley- Ilmars - Little Mount Isa Project, Non-statutory Report: Report on Ilmars & Little Mt Isa "Zinc- Le
A492 1968 Pickands Mather & Co Int Kimberley-Ilmars <1% Kimberley-Ilmars Project, Non-statutory Report: Report on Ilmars Showing I.P., 300 Foot Dipole 1966 & 200 Foot
A493 1968 Pickands Mather & Co Int Kimberley Reserves <1% Kimberley Reserves Project, Annual Report for the period ending 31/12/1968,TR70/2686 & 2687H.
A494 1968 Pickands Mather & Co Int West Kimberley <1% West Kimberley Project, Non-statutory Report: Report on Field work in the West Kimberley for the year ending 3
A495 1968 Pickands Mather & Co Int Kimberley - Bow River - Salt Lick Creek <1% Kimberley - Bow River-Salt Lick Creek- Black Mountain Project, Annual Report for the year ending 31/12/1968, T
A497 1968 Pickands Mather & Co Int Moola Bulla - Little Panton <1% Moola Bulla - Little Panton Project, Annual Report for the period ending 31/12/1968, TR70/2686 & 2687H.
A498 1968 Pickands Mather & Co Int Kimberley - Springvale <1% Kimberley - Springvale Project, Annual Report for the year ending 31/12/1968, TR70/2686 & 2687H.
A500 1968 Pickands Mather & Co Int Kimberley - Louisa Downs <1% Kimberley - Louisa Downs Project, Non-statutory Report: Report on the Louisa Downs Serpentinite, & Nearby Mine
A502 1968 Pickands Mather & Co Int Kimberley - Fletcher Creek-Armanda Sill <1% Kimberley - Fletcher Creek-Armanda Sill Project, Non-statutory Report: Follow-up Work in the Fletcher Creek &
A504 1968 Pickands Mather & Co Int Kimberley - Mount Angelo North <1% Kimberley - Mt Angelo North Project, Non-statutory Report: Mt Angelo North I.P.Profiles, 1968, TR70/2686 & 268
A507 1968 Pickands Mather & Co Int Kimberley- Ilmars Range <1% Kimberley- Ilmars Range Project, Non-statutory Report: Ilmars Range I.P Profiles 1968, TR70/2686 & 2687H.
A946 1968 Pickands Mather & Co Int Kimberley - Lansdowne <1% Kimberley - Lansdowne Project, Non-statutory Report: Plans for Lansdowne Area, TR70/2686 & 2687H.
A6199 1968 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets, Regional Stream Geochemistry , Series : 42000, February
A6200 1968 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets-Regional Stream Geochemistry, Series 43 0000, February 1
A6215 1968 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Analysis Report Sheets, Soil Rock Analysis to November 1966-1969, TR7
A471 1967 Pickands Mather & Co Int Kimberley - Mount Angelo <1% Kimberley - Mount Angelo Project, Non-statutory Report: Mt Angelo I.P. 100 & 300 Foot Dipole to June 1967, TR7
A476 1967 Pickands Mather & Co Int Kimberley - Sophie Downs <1% Kimberley - Sophie Downs Project, Non-statutory Report: Report on Sophie Downs Regional Copper Anomaly, Novemb
A457 1967 Pickands Mather & Co Int Kimberley - Gentle Annie <1% Kimberley - Gentle Annie Project, Non-statutory Report: Progress Report, March 1967, TR70/2686 & 2687H.
A455 1967 Pickands Mather & Co Int Kimberley- Bow River- Mt Angelo <1% Kimberley- Bow River - Mt Angelo Project, Annual Report for the period ending 31/12/1966 (Field Season), TR70/
A459 1967 Pickands Mather & Co Int Kimberley -Grants Creek <1% Kimberley - Grants Creek Project, Non-statutory Report: Progress Report for September / October 1966, March 19
A483 1967 Pickands Mather & Co Int Kimberley - Margaret River <1% Kimberley - Margaret River Project, Non-statutory Report: Margaret River I.P. Survey, 200' Dipole, September 1
A465 1967 Pickands Mather & Co Int Kimberley - Mount Angelo <1% Kimberley - Mt Angelo Project, Non-statutory Report:Mt Angelo Geophysical Report, December 1966, TR70/2686 & 2
A468 1967 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: I.P.:& E.M. Results , Ilmars Project, March 1967, TR70/2686
A469 1967 Pickands Mather & Co Int Kimberley- Ilmars <1% Kimberley- Ilmars Project, Non-statutory Report:Progess Report, Ilmars Zinc- Lead - Copper Showing, March 1967
A472 1967 Pickands Mather & Co Int East Kimberley -West Kimberley <1% East Kimberley -West KimberleyProject, Annual Report for the period ending 318/12/1967, TR70/2686 & 2687H.
A473 1967 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley - Bow River Project, Non-statutory Report: 1967 Report on Bow River Air Drill Programme, October 196
A475 1967 Pickands Mather & Co Int Kimberley - Gentle Annie Creek <1% Kimberley - Gentle Annie Creek Project, Non-statutory Report: Final Report 1966, Gentle Annie Creek Area, Apri
A477 1967 Pickands Mather & Co Int Kimberley - Mount Angelo <1% Kimberley - Mount Angelo Project, Non-statutory Report: Diamond Drilling Results at Mt Angelo, December 1967,
A484 1967 Pickands Mather & Co Int Kimberley - Peko Angelo <1% Kimberley - Peko Angelo Project, Non-statutory Report: Peko Angelo I.P. 100' Dipole, September 1967, TR70/2686
A479 1967 Pickands Mather & Co Int Kimberley - Yampi Sound <1% Kimberley - Yampi Sound Project, Non-statutory Report: Preliminary Report, Coppermine Inlet Area, October 1967
A480 1967 Pickands Mather & Co Int Kimberley - Panton River <1% Kimberley - Panton River Project, Non-statutory Report: Final Report, Panton River Copper- Zinc-Lead Anomaly,
A481 1967 Pickands Mather & Co Int West Kimberley <1% West Kimberley Project, Non-statutory Report: Report on Field Work for the year ending 31/12/1967, TR70/2686 &
A482 1967 Pickands Mather & Co Int Kimberley - Angelo North <1% Kimberley - Angelo North Project, Non-statutory Report: Maps, Sections & Diagrams, circa August 1967, TR70/268
A486 1967 Pickands Mather & Co Int Kimberley - Discovery Yard <1% Kimberley - Discovery Yard Project, Non-statutory Report: Discovery Yard I.P. 100 Foot Dipole, August 1967. Tr
A488 1967 Pickands Mather & Co Int Kimberley - Emull <1% Kimberley - Emull Project, Non-statutory Report: Emull I.P. Survey, 200 Foot Dipole, September 1967,TR70/2686
A501 1967 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley - Bow River Project, Non-statutory Report: Bow River I.P. 200 Foot Dipole, 1965 & 1967, TR70/2686 &
A6197 1967 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry , 40 Series, to December
A6198 1967 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry, Series 41 0000, Reruns a
A6206 1967 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Exploration Report, Analysis Results on Copper, Nickel, Sulphur & Pho
A6210 1967 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Analysis Report Sheets to October 1967, TR70/2686 & 2687H.
A4677 1966 Pickands Mather & Co Int Kimberley 1.1% Kimberley Project, Non-statutory Report:Follow up work in the Secure Bay Area, West Kimberley, June 1966, TR70
A444 1966 Pickands Mather & Co Int Kimberley - Ding Dong Downs <1% Ding Dong Downs Project, Non-statutory Report: Summary Report on Ding Dong Downs Copper, Lead & Zinc Anomaly,
A460 1966 Pickands Mather & Co Int Kimberley - Mount Angelo <1% Kimberley - Mt Angelo Project, Non-statutory Report: Geological Report, Mount Angelo Copper Showing, May 1966,
A462 1966 Pickands Mather & Co Int Kimberley - Panton River <1% Kimberley - Panton River Project, Non-statutory Report: Preliminary Report of Panton River Copper Anomaly , De
A463 1966 Pickands Mather & Co Int Kimberley- Carr Boyd Range <1% Kimberley- Carr Boyd Range Project, Non-statutory Report: Final Report, November 1966, TR70/2686 &2687H.
A464 1966 Pickands Mather & Co Int Kimberley- Bow River <1% Kimberley- Bow River Project, Non-statutory Report:Final Report on the Bow River Region, December 1966, TR70/2
A466 1966 Pickands Mather & Co Int Kimberley <1% Kimberley - Discovery Yard Project, Non-statutory Report: Discovery Yard Copper Anomaly, December 1966, TR70/2
A6203 1966 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets - regional Stream Geochemistry , Series 53 0000, to Janu
A942 1965 Pickands Mather & Co Int Kimberley - Yampi - Charnley 1.1% Kimberley - Yampi - Charnley Project, Non-statutory Report: Plans for the Yampi & Charnley Areas (Undated), TR
A6906 1965 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Regional Geology & Geochemical Anomalies Maps, (circa 1965), TR70/268
A6918 1965 Pickands Mather & Co Int Kimberley 1.1% Kimberley Project, Non-statutory Report: Stream Sediment Survery Maps, Lennard River & Landsdowne, 1964, TR70/
A439 1965 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Annual Report for the year ending 31/12/1964, TR70/2686 & 2687H.
A440 1965 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley -Bow River Project, Non-statutory Report: Preliminary Report, November 1965. TR70/2686 & 2687H.
A441 1965 Pickands Mather & Co Int Kimberley- Taylor River <1% Kimberley - Taylor River Project, Non-statutory Report; Brief Summary Exploration Report on the Taylor River C
A442 1965 Pickands Mather & Co Int Mount Elliza No 1 <1% Kimberley - Mount Elliza No 1 Project, Non-statutory Report: Mt Eliza No 1 Tin - Arsenic Anomaly Summary Repor
A443 1965 Pickands Mather & Co Int Kimberley - Carr Boyd Range <1% Kimberley - Carr Boyd Range Project, Non-statutory Report: Preliminary Report, Carr Boyd Range Lead Anomaly, N
A445 1965 Pickands Mather & Co Int Kimberley - Five Mile Gossan <1% Kimberley - Five Mile Gossan Project,Non-statutory Report: Summary Report, August 1965, TR70/2686 & 2687H.
A446 1965 Pickands Mather & Co Int Kimberley - Me No Savvy <1% Kimberley - Me No Savvy Project, Non-statutory Report:Brief Summary Report on Me No Savvy Copper Showing, Aug
A447 1965 Pickands Mather & Co Int Kimberley - Lamboo No 1 <1% Kimberley - Lamboo No 1 Project, Non-statutory Report: Summary Report on Lamboo no 1 Copper Showing, December
A448 1965 Pickands Mather & Co Int Kimberley - New Lamboo <1% Kimberley - New Lamboo Project, Non-statutory Report: New Lamboo Copper Nickel Anomaly, December 1965, TR70/26
A449 1965 Pickands Mather & Co Int Kimberley - McClintock Range <1% Kimberley - McClintock Range Project, Non-statutory Report: McClintock Range Tin Anomaly Follow-up, August 196
A450 1965 Pickands Mather & Co Int Kimberley -McClintock- Cummins Ranges <1% Kimberley -McClintock- Cummins Ranges Project, Non-statutory Report: McClintock & Cummins Ranges Tin Anomaly F
A454 1965 Pickands Mather & Co Int Kimberley - Margaret River Gossan <1% Kimberley - Margaret River Gossan Project, Non-statutory Report: Brief Summary Report, August 1965, TR70/2686
A943 1965 Pickands Mather & Co Int Kimberley - Lennard River- Charnley- Der 1.1% Kimberley - Lennard River- Charney- Derby Project, Non-statutory Report: Plans for Lennard River , Charnley &
A944 1965 Pickands Mather & Co Int Kimberley - Lennard River 1.1% Kimberley - Lennard River Project, Non-statutory Report: Plans for the Lennard River Area. (Undated), TR70/268
A1488 1965 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Plates: Stream Sediment Sample Locations, 1965, TR70/2686 & 2687H.
A1492 1965 Pickands Mather & Co Int East Kimberley <1% East Kimberley Project, Non-statutory Report: Metal Concentrations in Stream Sediment Locations, 1965, TR70/26
A6202 1965 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry , Series 51 0000, to Octo
A6204 1965 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets- Regional Stream Geochemistry, Series 54 0000, to 16/08/
A438 1964 Pickands Mather & Co Int Kimberley - Halls Creek <1% Kimberley - Halls Creek Project, Annual Report for the period 1st july 1963 to 30th June 1964, TR70/2686 & 268
A6201 1964 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets- Regional Stream Geochemistry , Series 44 0000, Re-runs
A17434 1753 Shell Company Australia Ltd Napier Range <1% 1985 Annual report Napier Range Joint Venture E04/2 E04/22 E04/56 West Kimberley. Billiton Report No. 08.3127
A42687 1753 Precious Metals Aust Ltd Richenda 2.5% Annual report for the period 21/06/93-22/06/94 Richenda Project E04/815
A84259 1753 Sibraa K Mount Broome 9.1% E04/1599 Mount Broome, Annual Report for the period Aug 2008 to Aug 2009
A103003 1753 Kimberley Quarry Pty Ltd Kimberley Black Granite <1% Annual Mineral Exploration Report C149/2012 (E04/2121, E04/2130) 11 June 2013 to 10 June 2014. [Kimberley Bla
A485 1753 Pickands Mather & Co Int Kimberley - Mount Angelo <1% Kimberley - Mount Angelo Project, Non-statutory Report: Mt Angelo I.P. 100 Foot Dipole, June 1967, TR70/2686 &
A499 1753 Pickands Mather & Co Int Kimberley - Mabel Downs- Violet Valley <1% Kimberley - Mabel Downs- Violet Valley Project, Annual Report for the year ending 31/12/1968, TR70/2686 & 2687
A503 1753 Pickands Mather & Co Int Kimberley- Angelo Valley <1% Kimberley- Angelo Valley Project, Non-statutory Report: Angelo Valley I.P. Profiles, September 1968, TR70/2686
A514 1753 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report 1968, Folder No 1, Pocket A & B, February 1969
A518 1753 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report 1969, including Sophie Downs Copper Showing -
A710 1753 Pickands Mather & Co Int Kimberley - Halls Creek <1% Kimberley - Halls Creek Project, Non-statutory Report:Geological Report , Halls Creek Area, Moola Bulla Copper
A945 1753 Pickands Mather & Co Int Kimberley - Lansdowne <1% Kimberley - Lansdowne Project, Non-statutory Report: Plans for the Lansdowne Area. (Undated), Tr70/2686 & 2687
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 04/2451 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 04/2451 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 04/2451? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-28. Compiled by NextMaps. Verify against primary sources before reliance.