P 39/6564
Register summary
- Holder
- Stone, Eldon Andrew
- Local government
- Shire of Leonora
- Application received
- 21 Jan 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A135977 | 2023 | Anglogold Ashanti Australia Limited | Butcher Well | <1% | Butcher Well JV (E39/1410) Partial Surrender Report for the period 23/07/2009 to 22/07/2023 |
| A136222 | 2023 | Anglogold Ashanti Australia Limited | Otway Project (E39/1697) | <1% | Otway Project (E39/1697) Final Surrender Report to the Department of Mines, Industry Regulation and Safety for |
| A128442 | 2021 | Anglogold Ashanti Australia Limited; Northern Star Resources | Butcher Well | <1% | Butcher Well JV (E39/1410) Partial Surrender Report to the Department of Mines, Industry Regulation and Safety |
| A128444 | 2021 | Anglogold Ashanti Australia | Otway | 18% | Otway Project (E39/1912) Final Surrender Report to the Department of Mines, Industry Regulation and Safety for |
| A122817 | 2020 | Anglogold Ashanti Australia Limited | Otway | <1% | Otway (C145/2018) Annual Group Report for the period ending 31/12/2019 |
85 more reports
| A122816 | 2020 | Anglogold Ashanti Australia Limited | Butcher Well | <1% | Butcher Well (C8/2016) Annual Group Report for the period ending 31/12/2019 |
| A119201 | 2019 | Anglogold Ashanti Australia Limited | Otway | <1% | Otway Group (C145/2018) Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119199 | 2019 | Anglogold Ashanti Australia Limited | Butcher Well | <1% | Butcher Well (C8/2016) Annual Report for the period 1 January 2018 to 31 December 2018 |
| A115940 | 2018 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3 |
| A115966 | 2018 | Anglogold Ashanti Australia Limited | Butcher Well | <1% | Butcher Well (C8/2016) Group Report to the Department of Mines, Industry Regulation and Safety For the Period |
| A112079 | 2017 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016 |
| A112355 | 2017 | Saracen Gold Mines Pty Ltd; Anglogold Ashanti Australia Limi | Butcher Well | <1% | Butcher Well Project (C8/2016) – Volume I Annual Report for the Period 1 January to 31 December 2016, E38/0312 |
| A108112 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/ |
| A108161 | 2016 | Saracen Gold Mines Pty Ltd | Butcher Well - Mount Minnie- Mount Flore | <1% | VOL 1 - Butcher Well Project (C345/1993) Annual Report for the Period 1 January 2015 to the 31 December 2015, |
| A108266 | 2016 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mount Howe Project (C222/2007) Annual Report for the Period 1 January 2015 to the 31 December 2015, E31/949, E |
| A104898 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | <1% | Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3 |
| A105466 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063 |
| A105467 | 2015 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mt Howe Project C222/2007 Annual Report for the period 01/01/2014 - 31/12/2014, E31/926-I......P39/4977-I |
| A101216 | 2014 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201 |
| A101784 | 2014 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mt Howe Project C222/2007 Annual Report for the period 01/01/2013 to 31/12/2013, E31/926 I......P39/5036-I |
| A101830 | 2014 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39 |
| A97466 | 2013 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | MT HOWE PROJECT ANNUAL REPORT 01 JANUARY 2012 TO 31 DECEMBER 2012 CR GROUP: C222/2007. |
| A97624 | 2013 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279; |
| A100359 | 2013 | Hawthorn Resources Limited | Yundamindera - Mount Florence | 18% | Exploration Licence E39/1350 , Yundamindera - Mount Florence Project, Annual Report for the period 29 July 20 |
| A93583 | 2012 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 1 January 2011 to 31 December 2011 |
| A93045 | 2012 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007, Annual Report, 1st January 2011 – 31 December 2011 |
| A94245 | 2012 | Midas Resources Ltd | Butcher Well | <1% | Butcher Well E39/1499 Relinquishment Report to the Department of Mines and Petroleum for E39/1499 for the peri |
| A95857 | 2012 | Hawthorn Resources Limited | Yundamindera - Mount Florence | 18% | E39/1350, Yundamindera - Mt Florence Project, Annual Report for the period 29th July 2011 to 28th July 2012. |
| A89855 | 2011 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project Annual Report for the period 01 January 2010 to December 2010 |
| A91060 | 2011 | Midas Resources Ltd | Butcher Well | <1% | Butcher Well E39/1499 Annual Report to the Department of Mines and Petroleum for the period 22/06/10 to 21/06/ |
| A91996 | 2011 | Hawthorn Resources Limited | Yundamindera - Mount Florence | 18% | E39/1350 Yundamindera - Mount Florence Project, Annual Report for the period 29 July 2010 to 28 July 2011. |
| A89379 | 2011 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007 2010, 1st January 2010 – 31 December 2010 |
| A93446 | 2011 | Ling M | P39/5033 | <1% | Mineral exploration Report for Prospecting License P39/5033, 2010-2011 |
| A86442 | 2010 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2009 TO 31 DECEMBER 2009 (C345/1993) |
| A88760 | 2010 | Ling M | P39/5033 | <1% | MINERAL EXPLORATION REPORT FOR PROSPECTING LICENCE P39/5033 2009-2010 |
| A86118 | 2009 | Rubicon Resources Ltd | Mount Howe | <1% | Combined Annual Technical Report Mt Howe Project, 1st January 2009 – 31 December 2009, E39/1132, 1182, 1317, 1 |
| A78034 | 2008 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2007 TO 31 DECEMBER 2007 CR GROUP: C345/1993 TENEMENTS: E38/1678 |
| A78141 | 2008 | Minara Resources Ltd | Murrin Murrin East | <1% | TR1415 MURRIN MURRIN EAST PROJECT, ELEVENTH COMBINED ANNUAL TECHNICAL REPORT C354/1997 |
| A74902 | 2007 | Minara Resources Ltd | Murrin Murrin East | <1% | Murrin Murrin East Project Tenth, Combined Annual Technical Report C354/1997, for the Period 1 March 2006 TO 2 |
| A75083 | 2007 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher'S Well Project, Annual Report, 01 January 2006 to 31 December 2006. (C345/1993) |
| A72256 | 2006 | Minara Resources Ltd | Eucalyptus / Murrin Murrin East | <1% | Eucalyptus /Murrin Murrin East Project, Ninth Combined Annual Technical Report C354/1997, For the Period 1 Mar |
| A71147 | 2005 | Minara Resources Ltd | Camelback | <1% | TR1386 Camelback Project, Twelth Annual Technical Report (E39/374), for the period 20 August 2004 to 19 August |
| A69663 | 2005 | Sons Of Gwalia Ltd | Butcher Well | <1% | Annual report for the period 01/01/04 - 31/12/04 Butcher Well Project, C345/1993, P38/3083, P39/3939, E38/449 |
| A68195 | 2004 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39 |
| A67427 | 2003 | Anaconda Operations Pty Ltd | Camelback | <1% | Tenth Annual Report for the period 20 August 2002 to 19 August 2003 Camelback Project E39/374 TR1312 |
| A66524 | 2003 | Sons Of Gwalia Ltd | Butcher Well | <1% | Annual Report for the period 1 January 2002 - 31 December 2002 Butcher Well C345/1993: E39/325, 328, 344, 423, |
| A64638 | 2002 | Anaconda Nickel Ltd | Camelback | <1% | Technical Report 1251 E39/374, M39/720, M39/800, M39/801 Camelback Project Eight Annual Technical Report For p |
| A65603 | 2002 | Anaconda Nickel Ltd | Camelback | <1% | Technical Report 1280 E39/374, M39/720, M39/800, M39/801. Camelback Project. Ninth Annual Technical Report For |
| A64070 | 2002 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 1st January 2001 to 31st December 2001, E39/325, 328, 344, |
| A62854 | 2001 | Sons Of Gwalia Ltd | Camelback / Butcher Well / Linden | <1% | Butcher Well Annual Report For The Period 1 January 2000 - 31 December 2000. Tenements E39/173, E39/325, E39/3 |
| A61790 | 2000 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Annual Report for the Period 01/01/1999 to 31/12/1999. E39/173,325,328,344,384,423,475,532, M39/1 |
| A61380 | 2000 | Anaconda Nickel Ltd | Camelback | <1% | Technical Report 905 E39/374 Camelback Project Seventh Annual Technical Report for the period 20th August 1999 |
| A59148 | 1999 | Anaconda Nickel Ltd | Camelback | <1% | Camelback Project, E39/374, Sixth Annual Technical Report for the Period 20th August 1998 to 19th August 1999 |
| A58497 | 1999 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well JV - 01/01/98 - 31/12/98 M39/118-120, 165-166, 230-232 E39/173, 281, 325, 328, 344, 384, 423, 475 |
| A54584 | 1998 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project Combined Annual Technical Report For period 01/01/97-31/12/97 Ref:C345/93 Tenements E39/1 |
| A56201 | 1998 | Homestake Gold Of Australia Ltd | Camelback Bore | <1% | Camelback Bore - Project 460 Annual Report 20/08/97 - 19/08/98 Technical Report No:759, E39/374 |
| A52508 | 1997 | Plutonic Operations Ltd | Camelback Bore | <1% | Project 460 - Camelback Bore, E39/374 Annual Report. 20/08/1996 - 19/08/1997 Technical Report No: 647, |
| A53120 | 1997 | Plutonic Operations Ltd | Camelback Bore | <1% | Camelback Bore Project, Partial Surrender Report, December 1997, E39/374 |
| A50531 | 1997 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project Combined Annual Technical Report for period 1st January 1996 to 31st December 1996 Teneme |
| A47727 | 1996 | Sons Of Gwalia Ltd | Camelback-Butcher Well | <1% | Butcher Well Gold Project Combined Annual Technical Report for period 1st January 1995 to 31st December 1995 R |
| A49565 | 1996 | Sons Of Gwalia Ltd | Mount Florence | 3.6% | Partial Surrender Mount Florence Project E39/384 Relinquishment Report for the Period Ending 11 October 1996 |
| A46564 | 1996 | Mount Burgess Mining Nl | Mount Florence | 3.6% | Mount Florence Gold Project Annual Technical Report for period ending October 11, 1995 Tenement E39/384 |
| A49566 | 1996 | Sons Of Gwalia Ltd | Mount Florence | 3.6% | Mount Florence Project Annual Technical Report for the period ending 11 October 1996 Tenements E39/384 Report |
| A45800 | 1995 | Dominion Mining Ltd | Camelback Bore | <1% | Annual Report 'Camel Back Bore' E39/374 From 20 August 1994 to 19 August 1995 |
| A43925 | 1995 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project, Combined Annual Report E39/173, 281, 323, 325, 328 & 344, M39/118-120, 165-166, 230-232 |
| A40601 | 1994 | Mount Burgess Mining Nl | Camelback, Butcher Well, Linden | <1% | Butcher Well Project, Annual report for period 1 January 1993 to 31 December 1993, C345/93 |
| A43162 | 1994 | Mount Burgess Mining Nl | Mount Florence | 3.6% | Mount Florence Gold Project Annual Technical Report, For the period ending October 11,1994 Tenement E39/384. |
| A42793 | 1994 | Dominion Mining Ltd | Camelback Bore | <1% | Annual report 'Camelback' E39/374 from 20 August 1993 to August 1994 |
| A37888 | 1993 | Mount Burgess Mining Nl | Butcher Well | <1% | Annual Report for the Period 16/12/91 - 15/12/92 Butcher Well/Enigmatic/Hronsky Project M39/165-166 |
| A37329 | 1992 | Mim Exploration Pty Ltd | Butcher Well | <1% | Annual Report for the period 15/02/91 to 15/02/93 Butcher Well Project M39/165 M39/166 MIM Exploration Pty Ltd |
| A32493 | 1991 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well JV Project. Annual Technical Report for period 16/12/89-15/12/90. M39/165-166 |
| A29849 | 1990 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project, Annual Report for period 16th December 1988 to 15th December 1989, M39/165 & 166. |
| A28627 | 1989 | Billiton Australia Pty Ltd | Tin Dog North | <1% | 1988 Annual report E39/72 P39/1131 - Tin Dog North Report No: 08.4493 |
| A9551 | 1980 | Swan Resources Ltd | Camel Back Range | <1% | Camel Back Range Project, Annual Report for the period ending 22/11/1980, TR70/7218H. |
| A3932 | 1973 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Final Report for the period 1st July 1972 to 30th June 1973, TR70/37 |
| A3618 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Miscellaneous Maps (1-20), for the period ending 31/12/1972, TR70/3 |
| A2782 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1971, TR70/3730 & 5279H. |
| A2829 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1972, TR70/3730H. |
| A941 | 1971 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1970, TR70/3730H & 5279H. |
| A271 | 1970 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1969, TR70/3730H. |
| A1122 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Appendix 2:Annual Report, June 30th 1969, TR70/3730H; Report on the |
| A1123 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Annual Report for the period ending 30th June 1969, TR70/3730H. A Re |
| A1121 | 1969 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report:;Volume 1: Report on the Induced Polarization & Resistivity Survey on |
| A270 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Report on the Induced Polarisation & Resistivity Survey on the Deep |
| A269 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1968, TR70/3730H. |
| A268 | 1967 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1967, TR70/3730H. |
| A81890 | 1753 | Saracen Gold Mines Pty Ltd | BUTCHER WELL | <1% | BUTCHER WELL PROJECT (C345/1993), ANNUAL REPORT – 01 JANUARY 2008 TO 31 DECEMBER 2008, E38/1678, E39/173, E39/ |
| A84840 | 1753 | Hawthorn Resources Limited | YUNDAMINDERA | 18% | Exploration Licence E39/1350 YUNDAMINDERA ANNUAL REPORT FOR THE PERIOD 29 JULY 2008 TO 28 JULY 2009. |
| A88235 | 1753 | Hawthorn Resources Limited | Yundamindera - Mount Florence | 18% | E39/1350 ,Yundamindera - Mt Florence Project, Annual Report for the period 29th July 2009 to 28th July 2010. |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. P 39/6564 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over P 39/6564 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold P 39/6564? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.