M 77/1084
Register summary
- Holder
- Barto Gold Mining Pty Ltd
- Local government
- Shire of Yilgarn
- Application received
- 31 May 2004
- Commenced
- 23 Feb 2009
- Expiry
- 22 Feb 2030
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A150718 | 2025 | Golden Horse Minerals Limited | E77/2149 | 8.8% | Partial Surrender Report for E77/2149 for the period ending 23/09/2025. |
| A143323 | 2024 | Riversgold (Australia) Pty Ltd | Bullfinch | <1% | Marvel Loch E77/2418 Partial Surrender Report for the period ending 30/04/2024. |
| A143378 | 2024 | Riversgold Pty Ltd | Bullfinch | <1% | Bullfinch E77/2418 Annual Technical Report for the period ending 30/04/2024 |
| A139374 | 2024 | Riversgold Pty Ltd | Bull Finch | <1% | Annual Report for Bullfinch E77/2418 for the period ending 30/04/2023 |
| A136290 | 2023 | Xantippe Sx Pty Ltd. | E77/2367 | <1% | E77/2367 Partial Surrender Report for the period 5/7/2017 to 04/07/2023 |
148 more reports
| A131660 | 2022 | Mining Equities Pty Ltd | Dalmore | <1% | Annual Report for the Dalmore Project (E77/2418) from 1/5/2021 to 31/4/2022 |
| A128773 | 2021 | Ev Metals Australia Pty Limited | Dalmore | <1% | Dalmore Annual Tenement Report E 77/02418 for the period 1 May 2020 to 30 April 2021. |
| A125078 | 2020 | Barto Gold Mining Pty Ltd | Southern Cross North | <1% | Combined Technical Report C160/2006 Southern Cross North for the period ending 30/06/2020 |
| A124599 | 2020 | Bullfinch Metals | Dalmore | <1% | Annual Report for the Dalmore Project (E77/2418) from 1/5/2019 to 30/4/2020 |
| A125491 | 2020 | Bullseye Mining Limited | Southern Cross | 1.1% | C44/2017 Southern Cross Project Annual Report for the period ending 31/08/2020 |
| A125682 | 2020 | Xantippe Resources Limited | "Ghoorlie" | <1% | Annual report Ghoorlie project C177/2017 for the period 1 August 2019 to 31 July 2020 |
| A120452 | 2019 | Bullfinch Metals | Dalmore | <1% | Annual Report For the Dalmore Project (E77/2418) from 1/5/2018 to 30/4/2019 |
| A121301 | 2019 | Minjar Gold Pty Ltd; Tianye Sxo Gold Mining Pty Ltd | Southern Cross North | <1% | Combined Mineral Exploration Report C160/2006 Southern Cross North Project for the period 1 July 2018 to 30 Ju |
| A122094 | 2019 | Bullseye Mining Limited | Southern Cross | 1.1% | C44/2017 Southern Cross Project Annual Report for the period 1 September 2018 to 31 August 2019 |
| A117500 | 2018 | Minjar Gold Pty Ltd | Southern Cross North | <1% | 2018 C160/2006 Annual Report Southern Cross North, 01 July 2017 - 30 June 2018 |
| A117770 | 2018 | Duketon Consolidated Pty Ltd | Marvel Loch North | <1% | Marvel Loch North E77/2367 Annual Report for the period 05/07/2017 to 04/07/2018 |
| A118398 | 2018 | Bullseye Mining Limited | Southern Cross | 1.1% | C44/2017 Southern Cross Project for the period 01/09/2017 - 31/08/2018 |
| A115283 | 2017 | Bullseye Mining Limited | Southern Cross | 1% | Southern Cross Project C44/2017 Annual Report for the period 1 September 2016 to 31 August 2017, P77/04015, E7 |
| A112600 | 2017 | Bullseye Mining Limited | Marvel Loch North | 8.8% | Marvel Loch North E77/2149 Annual Report for the period 11 March 2016 to 10 March 2017 |
| A114588 | 2017 | Tianye Sxo Gold Mining Pty Ltd; Minjar Gold Pty Ltd | Southern Cross Operations | <1% | Combined Annual Report C160/2006 Southern Cross Operations for the period 1 July 2016 to 30 June 2017 |
| A108767 | 2016 | Bullseye Mining Limited | Marvel Loch North | 8.8% | Annual Report Marvel Loch North E77/2149 Reporting Period 11th March 2015 – 10th March 2016 |
| A109727 | 2016 | Hanking Gold Mining Pty Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2015 to 30 June 2016 |
| A106441 | 2015 | Bullseye Mining Limited | Marvel Loch North | 8.8% | Annual Report Marvel Loch North E77/2149 Reporting Period: 11th March 2014 – 10th March 2015 |
| A106588 | 2015 | Hanking Gold Mining Pty Ltd | Southern Cross North | <1% | Southern Cross North Project C160/2006 Annual Report for the period 01/07/2014 - 30/06/2015 |
| A100943 | 2014 | Southern Cross Goldfields Ltd | Mount Rankin | <1% | Mt Rankin Project, Annual Report for the period 24/10/2012 to 23/10/2013, E77/1289. |
| A101675 | 2014 | Urban Minerals Pty Ltd | Jaccoletti | <1% | Jaccoletti Project Annual Report (Combined Report Group C83/2013) P77/4108, P77/4109, P77/4110 and E77/2016. 1 |
| A96583 | 2013 | Southern Cross Goldfields Ltd | Mount Franklin | <1% | Mt Rankin E77/1289 Yilgarn Mineral Field Annual Report for the period 24 October 2011 to 23 October 2012 |
| A96712 | 2013 | Urban Minerals Pty Ltd | Jaccoletti | <1% | Jaccoletti Project Annual Report Prospecting Licence P77/4108 for the period 16 December 2011 – 15 December 20 |
| A97851 | 2013 | Urban Minerals Pty Ltd | Jaccoletti | <1% | Jaccoletti Project, Annual Report for the period 20th February 2012 to 19th February 2013, P77/2016. |
| A94612 | 2012 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2011 to 30 June 2012, E77/1379......P77/385 |
| A95847 | 2012 | Inca Minerals Ltd | Southern Cross | <1% | Southern Cross Project E77/1898 Annual report for the period ending 02 October 2012 |
| A89102 | 2011 | Renaissance Minerals Ltd | Marvel Loch | <1% | Marvel Loch, Annual Report E77/1289 Marvel Loch for the period 24 October 2009 to 23 October 2010 |
| A92169 | 2011 | Renaissance Minerals Ltd | Marvel Loch | <1% | 2011 Annual Report for E77/1289, 24 October 2010 to 23 October 2011 |
| A91166 | 2011 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2010 to 30 June 2011 |
| A92101 | 2011 | Renaissance Minerals Ltd | Marvel Loch | <1% | Partial Surrender Report for E77/1289 24 October 2007 to 23 October 2011 |
| A89224 | 2011 | Renaissance Minerals Ltd | Marvel Loch | <1% | Marvel Loch, Partial Surrender Report for E77/1289, 24 October 2007 to 23 October 2010 |
| A85624 | 2010 | Gryphon Minerals Ltd | Marvel Loch | <1% | Marvel Loch, Annual Report for the period 24 October 2008 to 23 October 2009 |
| A87644 | 2010 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2009 to 30 June 2010 |
| A81044 | 2009 | Gryphon Minerals Ltd | Marvel Loch | <1% | Marvel Loch, Annual Report for the period 24 October 2007 to 23 October 2008 |
| A82552 | 2009 | Dynasty Metals Australia Ltd | Southern Cross | <1% | Annual Report P 77/3536 Southern Cross for the Period Ending 21/02/2009 |
| A84537 | 2009 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North Project, Annual Report for the Period 1 July 2008 to 30 June 2009, C160/2006, E77/1090, E |
| A74054 | 2007 | Dominion Mining Ltd | Wockallary and Tamarin | <1% | Southern Cross (C177/2006) Group Annual Report, Wockallary E77/1152, Tamarin E77/1156, From 1 October 2005 to |
| A75239 | 2007 | Dominion Mining Ltd | Wockallary | <1% | Partial Surrender Report E77/1152 'Wockallary' From 23 February 2004 to 22 February 2007 Yilgarn Mineral Field |
| A76602 | 2007 | Dominion Mining Ltd | Wockallary | <1% | SURRENDER REPORT E77/1152 'WOCKALLARY' From 23 February 2004 to 20 September 2007 |
| A75920 | 2007 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North Project, Annual Report for the period 1 July 2006 - 30 June 2007, E77/462......M77/17.... |
| A73564 | 2006 | St Barbara Ltd | Jupiter | <1% | Jupiter Project, Annual Report for the Period 16 September 2005 to 15 September 2006, E77/714, M77/86, M77/133 |
| A72816 | 2006 | St Barbara Mines Ltd | Marvel Loch | <1% | Marvel Loch Project, Annual Report for the Period 1 May 2005 to 30 April 2006, Combined Reporting No. C99/2003 |
| A70717 | 2005 | Dominion Mining Ltd | Wockallary | <1% | Annual report E77/1152, Wockallary, From 23 February 2004 to 22 February 2005 (Southern Cross). |
| A70789 | 2005 | St Barbara Mines Ltd | Marvel Loch | <1% | Marvel Loch Project, Annual Report for the period 1st May 2004 to 30th April 2005, M77/7-8, 10, 26, 112-114, 2 |
| A71370 | 2005 | St Barbara Mines Ltd | Jupiter | <1% | Jupiter Project, Annual Report for the period 16th September 2004 to 15th September 2005, (Combined Reporting |
| A67994 | 2004 | Sons Of Gwalia Ltd | May Queen | 16% | May Queen Project, Annual Report for the period 12 April 2003 to 16 September 2003, C66/1998:M77/106, M77/554, |
| A68101 | 2004 | Sons Of Gwalia Ltd | Jaccoletti | <1% | Jaccoletti Project, Annual Report M77/112, M77/358, M77/598 for the period 17 December 2002 to 16 December 200 |
| A68769 | 2004 | Sons Of Gwalia Ltd | Marvel Loch | <1% | Annual report for the period 01/05/2003-30/04/2004 Marvel loch Operations Project(099/2003), M77/7-8, M77/10, |
| A68962 | 2004 | Sons Of Gwalia Ltd | May Queen | <1% | Surrender report for the period 18/01/1993-17/06/2004 May Queen Project M77/571 |
| A69167 | 2004 | Sons Of Gwalia Ltd | May Queen | 3.5% | May Queen Project M77/732 Surrender report for the period 02 March 2000 to 8 July 2004 |
| A69473 | 2004 | Sons Of Gwalia Ltd | Jupiter | <1% | Annual report for the period 16/09/03 - 15/09/04 Jupiter Project,C002/2004, M77/86, M77/133, M77/159, M77/175 |
| A68104 | 2004 | Sons Of Gwalia Ltd | Mary Lena | <1% | Mary Lena Project, Annual ReportM77/555, M77/668, P77/2922 for the period 22 December 2002 to 21 December 200 |
| A68694 | 2004 | Independence Group Nl | Tamarin | <1% | Annual report for the period 16/04/2003-15/04/2004 Tamarin Project E77/1108 |
| A65908 | 2003 | Sons Of Gwalia Ltd | Jaccoletti | <1% | Annual Report for the period 17 December 2001-16 December 2002 Jaccoletti Project, M77/112, M77/358, M77/598. |
| A65911 | 2003 | Sons Of Gwalia Ltd | Mary Lena | <1% | Mary Lena Project, Annual Report for the period 22/12/01-21/12/02. [C195/1996] M77/555, M77/668, P77/2922 . |
| A66663 | 2003 | Sons Of Gwalia Ltd | May Queen | 16% | May Queen Project, Annual Report for the period 12 April 2001-11 April 2003, C66/1998: M77/106, 554, 571, 732 |
| A66944 | 2003 | Sons Of Gwalia Ltd | May Queen | <1% | Surrender Report for C66/1998 Tenement Surrendered on 14 January 2003 May Queen Project M77/781 Report No. 034 |
| A67375 | 2003 | Sons Of Gwalia Ltd | Starfinch | <1% | Starfinch Project, Annual Report for the period 1 August 2002 to 31 July 2003, M77/525,644,2854, [C243/1995] |
| A67571 | 2003 | Sons Of Gwalia Ltd | May Queen | 1.6% | May Queen Project , Annual Report for the period 12th April 2000 to 11th April 2001, M77/571 & 732. [C66/1998] |
| A67610 | 2003 | Sons Of Gwalia Ltd | May Queen | 31% | Surrender Report for C66/1998 Tenements Surrendered on 24 July 2003. May Queen Project M77/106,P77/2920-2921,P |
| A67008 | 2003 | Sons Of Gwalia Ltd | Gatherers | <1% | Gatherers Project, Surrender Report for C390/1995 for the period 23 June 1994 to 20 May 2003, M77/620-621. |
| A63927 | 2002 | Sons Of Gwalia Ltd | Jaccoletti | <1% | Jaccoletti Project , Annual Report for the period 17 December 2000 - 16 December 2001, M77/112, M77/358, M77/5 |
| A64941 | 2002 | Mr Carnicelli N | Delmore | <1% | Report For Period 14/5/01 To 14/5/02 On M77/513 & 77/776 Situated on cleared freehold farmland ' Delmore Proje |
| A65245 | 2002 | Sons Of Gwalia Ltd | Gatherers | <1% | Gatherers Project ,Annual Report For The Period 1/9/01 To 31/8/02, M77/620 & 621. |
| A65110 | 2002 | Sons Of Gwalia Ltd | Starfinch | <1% | Starfinch Project, Annual Report For The Period 1 August 2001 - 31 July 2002, M77/525, M77/644, P77/2854 [C243 |
| A63001 | 2001 | Sons Of Gwalia Ltd | Jaccoletti | <1% | Jaccoletti Project , Annual Report For The Period 17/12/98 - 16/12/2000, M77/112, M77/598, M77/358 |
| A63496 | 2001 | Sons Of Gwalia Ltd | Starfinch | <1% | Starfinch Project ,Annual Report for the period 1 August 2000 - 31 July 2001, M77/525 & 644; P77/2854. |
| A62472 | 2001 | Sons Of Gwalia Ltd | May Queen | 100% | May Queen Surrender Report For The Period 18 April 1997 - 17 April 2001. Tenement: P77/3236. Report No: 0341-5 |
| A63208 | 2001 | Australian Gold Resources Ltd | Southern Cross | <1% | E77/527, E77/533 ,Southern Cross Project, Annual Report C91/1997 for the period 11 May 2000 To 10 May 2001. |
| A59576 | 2000 | Sons Of Gwalia Ltd | Starfinch | <1% | Starfinch Project ,Annual Report for the period 01/08/98 - 31/07/99 M77/525, 644; P77/ 2854 |
| A59995 | 2000 | Sons Of Gwalia Ltd | Mary Lena | <1% | Mary Lena Project Annual report for the period 22/12/1998 to 21/12/1999 Tenements M77/555,M77/668,P77/2922,P77 |
| A60611 | 2000 | Sons Of Gwalia Ltd | May Queen | 15% | May Queen, Annual Report for the Period 12 April 1999 to 11 April 2000, M77/106,554,571,732,781, P77/2920,2921 |
| A61021 | 2000 | Sons Of Gwalia Ltd | Starfinch | <1% | Starfinch Project, Annual Report for the Period 01/08/1999 to 31/07/2000, M77/525,644, P77/2854. |
| A59669 | 2000 | Sons Of Gwalia Ltd | Gatherers | <1% | Gatherers Project, Annual report for the period 01/09/1998 to 31/08/1999, M77/620 & 621. |
| A61226 | 2000 | Sons Of Gwalia Ltd | Frog Rock | <1% | Frog Rock Project, Partial Surrender Report for the period 07/06/1999 to 06/06/2000. E77/708. |
| A61371 | 2000 | Mr Carnicelli Le | Delmore | <1% | Report for Period 14/05/1999 to 14/05/2000 on M77/513 & M77/776, situated on cleared freehold farmland 'Delmor |
| A58335 | 1999 | Sons Of Gwalia Ltd | Mary Lena | <1% | Mary Lena Project, Annual Report For the period 22/12/1997 to 21/12/1998 M77/555,668, P77/2922,3217. |
| A58336 | 1999 | Sons Of Gwalia Ltd | Jaccoletti | <1% | Jaccoletti Project Annual Report For the Period 17/12/1997 to 16/12/1998, M77/112,358,598 |
| A58659 | 1999 | Mr Carnicelli N | Delmore- Jaccoletti West | <1% | Annual Report for period 14/05/98-14/05/99 on M77/513 , 'Delmore' Jaccoletti West Project. |
| A59368 | 1999 | Sons Of Gwalia Ltd | May Queen | 15% | May Queen Project, Annual Report for the Period 12 April 1998 to 11 April, 1999, M77/106, 554, 571, 781, 2763, |
| A57073 | 1999 | Sons Of Gwalia Ltd | Gatherers | <1% | Gatherers Project, Annual Report for 01/09/97 - 31/08/98 M77/620 & 621. |
| A57640 | 1999 | Sons Of Gwalia Ltd | StarFinch | <1% | StarFinch Project M77/525,644,2854 Reporting Period 1/8/97 to 31/7/98 |
| A59421 | 1999 | Sons Of Gwalia Ltd | Frog Rock | <1% | Frog Rock Project, Annual Report for the Period 7-6-98 to 6-6-99, E77/708, 913. |
| A58660 | 1998 | Mr Carnicelli N | Delmore | <1% | Technical Report review of exploration data Jacoletti West Prospect, Marvel Loch and Delmore Project M77/513 M |
| A55254 | 1998 | Mr Carnicelli N | Delmore -Jaccoletti West | <1% | 'Delmore' Jaccoletti West Project, Marvel Loch, Annual Report M77/513 14/05/97 - 14/05/98. |
| A55082 | 1998 | Sons Of Gwalia Ltd | Mary Lena | <1% | Mary Lena Project, Annual Report 22/12/96 - 21/12/97 M77/555, 668, P77/2922, 3217 |
| A56122 | 1998 | Sons Of Gwalia Ltd | Frog Rock | <1% | Frog Rock Project, Annual Report for the Period 7-6-97 to 6-6-98, E77/708. |
| A56592 | 1998 | Mr Carnicelli N | Delmore | <1% | Delmore Project, Annual Report : A Review of Exploration Data,November 1998, [Jacoletti West - Marvel Loch], |
| A56616 | 1998 | Sons Of Gwalia Ltd | Jaccoletti | <1% | Jaccoletti Project, Annual Report for the period 01/12/1996 to 01/12/1997, M77/112, 358 & 598. |
| A56976 | 1998 | Mr Carnicelli N | Delmore | <1% | Delmore Project, Non-statutory Report: Review of Exploration Data, November 1998, M77/513 & 776. |
| A54679 | 1998 | Sons Of Gwalia Ltd | Frog Rock | <1% | Frog Rock Project, Partial Surrender Report for the period 7-6-96 to 6-6-97, E77/708. |
| A55906 | 1998 | Sons Of Gwalia Ltd | May Queen | 15% | May Queen, Annual Report for 12/04/97 - 11/04/98 M77/106, 554, 571, 781, P77/2763, 2920-2921, 2924-2929, P77/3 |
| A56014 | 1998 | Australian Gold Resources Ltd | Southern Cross | <1% | Southern Cross, C91/1997, Exploration Licence:E77/527, 533 Joint Annual report, For the period 11/05/97 - 10/0 |
| A50764 | 1997 | Sons Of Gwalia Ltd | Mary Lena | <1% | Mary Lena Project, Annual Report for the period 22 December 1995 to 21 December 1996 , ML77/555 ML77/668 and |
| A51646 | 1997 | Mr Carnicelli N | Jaccoletti West | <1% | M77/513 Jaccoletti West Exploration Field Season 1996 to 1997 June 1997 |
| A52213 | 1997 | Sons Of Gwalia Ltd | Frog Rock | <1% | Frog Rock Project, Annual Report for the period 7-6-96 to 6-6-97, E77/708. |
| A53910 | 1997 | Sons Of Gwalia Ltd | Starfinch | <1% | Starfinch Project, Annual report for the period 01/08/96-31/07/97 , ML77/525 ML77/644 PL77/2854. |
| A52079 | 1997 | Sons Of Gwalia Ltd | May Queen | 15% | Yilgarn Mineral Field May Queen Project Annual report for the period 12 April 1996 to 11 April 1997 Tenements |
| A52350 | 1997 | Sons Of Gwalia Ltd | Jaccoletti | <1% | Jaccoletti Project, Annual Report for the period 17/12/95 to 16/12/96 M77/112, 358, & 598. |
| A47953 | 1996 | Sons Of Gwalia Ltd | May Queen | 16% | Yilgarn Mineral Field May Queen Project Annual report for the period 12/04/95 to 11/04/96 Tenements: Mining Le |
| A49429 | 1996 | Sons Of Gwalia Ltd | Gatherers | <1% | Gatherers Project ,Annual report for the period 1 September 1995 to 31 August 1996, M77/620 and M77/621. |
| A50368 | 1996 | Sons Of Gwalia Ltd | Starfinch | <1% | Starfinch Project ,Annual report for the period 1 August 1995 to 31 July 1996 Tenements ML77/525 and ML77/644 |
| A44951 | 1995 | Sons Of Gwalia Ltd | May Queen | 16% | Yilgarn Mineral Field May Queen Western Australia Mining Leases M77/106 M77/554 M77/571 Prospecting Licences P |
| A44975 | 1995 | Mr Carnicelli N | Jaccoletti West | <1% | Jaccoletti West Project, Annual Report for the period 14/5/94 to 14/5/95 M77/513. |
| A45790 | 1995 | Sons Of Gwalia Nl | Gatherers | <1% | Gatherers Project, Annual Report for the period 1 September 1994 to 31 August 1995, M77/620 & 621. |
| A44839 | 1995 | Mr Mcdonald Mj | Southern Cross | <1% | Southern Cross project, Exploration Licence E77/533,Annual Report for the period 27 April 1994 to 26 April 199 |
| A45000 | 1995 | Sons Of Gwalia Ltd | Starfinch | <1% | Starfinch Project Annual Report for the period 1 August 1994 to 31 July 1995 M77/525.664,PL77/2854 |
| A47981 | 1995 | Sons Of Gwalia Ltd | Jaccoletti | <1% | Jaccoletti Project , Annual Report for the period 16th December 1994 to 17th December 1995, M77/112 M77/358 & |
| A48129 | 1995 | Sons Of Gwalia Ltd | Mary Lena | <1% | Mary Lena Project, Annual Report for the period 28 October 1994 to 27 October 1995 ,ML77/555 ML77/668 and P77 |
| A41840 | 1994 | Reynolds Yilgarn Gold Operations Ltd | May Queen [West Jacoletti] | <1% | Annual Report for the period 01/09/93-31/08/94, May Queen(West Jaccoletti) Project,M77/620 & 621. |
| A42493 | 1994 | Cambrian Resources Nl | Marvel Loch | <1% | 1994 Annual Report (period 01/08/93 to 31/07/94) Marvel Loch Project M77/525 P77/285 |
| A41033 | 1994 | Reynolds Yilgarn Gold Operations Ltd | May Queen | 16% | Annual report for the period 12/04/93-11/04/94 May Queen Project M77/106 M77/554 M77/571 P77/2763 P77/2871 P7 |
| A39252 | 1993 | Reynolds Yilgarn Gold Operations Ltd | May Queen-Lennenburg West | 16% | Annual Report for the period 12/04/92-11/04/93 May Queen/Lennenburg West Project M77/106,554,571 P77/2763,2871 |
| A39067 | 1993 | Cambrian Resources Nl | Marvel Loch | <1% | Annual report for the period 01/08/92-31/07/93 Marvel Loch Project M77/525 P77/2854 |
| A39730 | 1993 | Broken Hill Metals Nl | May Queen | <1% | Annual report for the period 1992-1993 May Queen Project M77/555 |
| A39732 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Mountain Queen/Jaccoletti Hill | <1% | Annual report for the period 12/92-12/93 Mountain Queen/Jaccoletti Hill Project M77/112 |
| A39736 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Mountain Queen/Jaccoletti Hill | <1% | Report for the period 1993 Mountain Queen/Jaccoletti Hill Project M77/112 |
| A39737 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Mountain Queen/Jaccoletti Hill | <1% | Report for the period 1993 Mountain Queen/Jaccoletti Hill Project M77/112 |
| A40616 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Jaccoletti Hill JV/Beta/Four Threes/Geel | <1% | Report for the period 1993 Jaccoletti Hill JV/Beta/Four Threes/Geelong Project M77/112 |
| A36521 | 1992 | Reynolds Yilgarn Gold Operations Ltd | May Queen | 15% | Annual Report for the period 12/04/91-11/04/92 May Queen Project |
| A34841 | 1991 | Reynolds Yilgarn Gold Operations Ltd | May Queen | 16% | Annual report for the period 12/04/90-11/04/91 May Queen Project M77/106 M77/127 M77/233 M77/248 M77/316 M77/4 |
| A29777 | 1990 | Mawson Pacific Ltd | Jaccoletti | 84% | Jaccoletti Mining Lease; ML77/316 Yilgarn Mineral Field; Annual Report 16/11/88 - 15/11/89 |
| A30641 | 1990 | Mawson Pacific Ltd | North Jaccoletti | 29% | Yilgarn Mineral Field - North Jaccoletti Sept 1990 M77/127, M 77/136, P77/2037, P77/2038, P77/2039 and P77/2 |
| A31186 | 1990 | Cambridge Mining Services | Mountain Queen | <1% | Report on exploration on M77/112 for the period ending 15 December 1989. Cambridge Mining Services Pty Ltd Nev |
| A31925 | 1990 | Mawson Pacific Ltd | North Marvel Loch | 1.5% | ML77/248,315; P77/1367,1925 Yilgarn Mineral Field; North Marvel Loch Tenements |
| A31973 | 1990 | Mawson Pacific Ltd | May Queen | <1% | Yilgarn Mineral Field, WA. May Queen Annual Report. M77/106,279,298,410. 91989-1990). |
| A28230 | 1989 | Mawson Pacific Ltd | Jaccoletti West | 20% | Jaccoletti West Mining Lease. ML77/127 Yilgarn Mineral Field 20/07/88 - 21/07/89 |
| A28267 | 1989 | Mawson Pacific Ltd | Cadonia | 2.4% | Yilgarn Mineral Field. Mining lease M 77/248 02/06/88 - 01/06/89 |
| A29405 | 1989 | Mawson Pacific Ltd | May Queen | 3% | May Queen, M77/298, Yilgarn Mineral Field. Annual report, 16/11/88 to 15/11/89 |
| A23403 | 1988 | Aust Consolidated Minerals Ltd | Marvel Queen | 12% | Marvel Queen Joint Venture. Annual Report to 25/01/88 (M77/127,233,248 P77/1367,1786,1836). |
| A25157 | 1988 | Jingellic Minerals Nl | Mountain Queen | <1% | Annual Report on M77/112 for the period 14/12/87 to 14/12/88 (Mountain Queen Project, Marvel Loch, Southern cr |
| A21182 | 1987 | Mr Muskett R | Mountain Queen | <1% | Geolgocial Report on Diamond Drilling of former GML's77/4434 and GML77/4646 Mountain Queen Gold Mine, Marvel L |
| A25158 | 1987 | Jingellic Minerals Nl | Mountain Queen | <1% | 1987 RAB Drilling Programme. M77/31,112. (Mountain Queen & Omega, Southern Cross). |
| A11830 | 1982 | Bhp Minerals Pty Ltd | Mountain Queen/Marvel Loch | <1% | Report on Exploration and Reserve Circulation Drilling M48-M90. May 1981 - February 1982 |
| A10612 | 1981 | Bhp Minerals Pty Ltd | Mountain Queen/Marvel Loch | <1% | Dampier Joint Venture Mountain Queen Area - Report on Exploration and Drilling July 1980 to April 1981 |
| A5713 | 1975 | Tenneco Australia Inc | Southern Cross | <1% | Southern Cross Project, Non-statutory Report: Appendix B, To accompany Statutory Report [A5493], December 1974 |
| A5493 | 1974 | Tenneco Australia Inc | Southern Cross | <1% | Southern Cross Project, Non-statutory Report, December 1974, MC77/5562 ...77/5743, [See also A5713] |
| A7083 | 1973 | Tenneco Australia Inc | Southern Cross, Greenmount | <1% | Southern Cross Project, Non-statutory Report: Supplementary Report : Assessment of the Southern Cross Area, W. |
| A11666 | 1973 | Tenneco Australia Inc | Southern Cross | <1% | Southern Cross Project, Non-statutory Report: An Assessment of the Southern Cross Area, November 1973, MC77/55 |
| A2462 | 1972 | Anaconda Aust Inc | Coolgardie | 1.7% | Coolgardie Project, Annual Report (Vol 1) for theyear ending 31/12/1971, MC77/1304..................MC77/3007; |
| A2463 | 1972 | Anaconda Aust Inc | Coolgardie | 1.7% | Coolgardie Project, Annual Report (Vol 2) : Plates to accompany Report for year ending 31/12/1971-[ A2462] MC7 |
| A60769 | 1972 | Thiess Bros Pty Ltd | Tailing Dump | <1% | Tailing Dump Prospect Yilgarn Goldfield Western Australia Preliminary Report. (1972. GML77/4250 GML77/4524 MC7 |
| A41586 | 1753 | Mr Carnicelli N | Jaccoletti | <1% | R Report for the period 14/05/93-13/05/94 Jaccoletti Project M77/513 |
| A51644 | 1753 | Australian Gold Resources Ltd | Southern Cross | <1% | Exploration Licences E77/527 and E77/533 'Southern Cross' C191/1997 Joint Annual report for the period 11 May |
| A53019 | 1753 | Mr Carnicelli N | Delmore | <1% | Annual Report, Delmore Project, Jaccoletti West Area, Marvel Loch Yilgarn Mineral Field. M77/776 01/10/96 - 01 |
| A79533 | 1753 | St Barbara Ltd | Southern Cross North | <1% | SOUTHERN CROSS NORTH PROJECT ANNUAL REPORT FOR THE PERIOD 1 JULY 2007 –30 JUNE 2008 C160/2006 |
| A41587 | 1753 | Mr Carnicelli N | Marvel Loch | <1% | R Report for the period 28/07/93-27/07/94 Marvel Loch Project P77/2841 |
| A48115 | 1753 | Australian Gold Resources Ltd | Southern Cross | <1% | Exploration Licence E77/533 'Southern Cross Project' Annual report for the period 27 April 1995 to 26 April 19 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 3 years · 22 Feb 2030
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 77/1084 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 77/1084? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.