M 53/1102
Register summary
- Holder
- So4 Pty Ltd
- Local government
- Shire of Wiluna
- Application received
- 1 Apr 2019
- Commenced
- 10 May 2021
- Expiry
- 9 May 2042
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A151826 | 2025 | Piper Preston Pty Ltd | Lake Way | <1% | E 53/2057 - Partial Surrender Report for Lake Way- [20/02/2019] to [20/04/2025] |
| A123068 | 2020 | Blackham Resources Limited | Lake Way | <1% | Lake Way C73/2017 Annual Report for the period ending 31/12/2019 |
| A123461 | 2020 | Toro Energy Limited | Wiluna | <1% | Wiluna Uranium Project Annual Technical Report C170/2010 For the Period 1 January 2019 to 31 December 2019, E |
| A124145 | 2020 | Salt Lake Potash Limited | Lake Way | 24% | Lake Way Shoreline Paleochannel Drilling (R20) |
| A124423 | 2020 | Piper Preston Pty. Ltd. | Lake Way | 24% | Lake Way Annual Technical Report C30/2019 for the period ending 30/04/2020 |
160 more reports
| A119315 | 2019 | Blackham Resources Limited | Lake Way | <1% | Lake Way C73/2017 Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119643 | 2019 | Toro Energy Ltd | Wiluna | <1% | Wiluna Uranium Project C170/2010 Annual Technical Report for the period 1 January 2018 to 31 December 2018, E5 |
| A116220 | 2018 | Blackham Resources Limited | Lake Way | <1% | Lake Way C73/2017 Annual Report For the Period 1 January 2017 to 31 December 2017 |
| A118500 | 2018 | Salt Lake Potash Limited | Lake Way | 44% | Annual Technical Report E53/1787 for the period 12 October 2017 to 11 October 2018 Lake Way Project |
| A116578 | 2018 | Toro Energy Ltd | Wiluna Uranium | <1% | Wiluna Uranium Project Annual Technical Report, C170/2010, 01 January 2017 to 31 December 2017 |
| A112028 | 2017 | Blackham Resources Limited | Wiluna | <1% | Combined Annual Report Wiluna Project C14/2012 for the period 01/01/2016 to 31/12/2016 |
| A112005 | 2017 | Toro Energy Ltd | Wiluna | <1% | Wiluna Uranium Project C170/2010 Annual Technical Report For the Period 1 January 2016 to 31 December 2016 |
| A108745 | 2016 | Toro Energy Ltd | Wiluna | <1% | Wiluna Uranium Project Annual Technical Report |
| A109161 | 2016 | Toro Energy Ltd | Wiluna | <1% | C170/2010 Final Surrender Report For the Period 3 August 2005 to 26 April 2016 WILUNA URANIUM PROJECT E53/1687 |
| A108455 | 2016 | Blackham Resources Ltd | Wiluna | <1% | C14/2012 Combined Annual Report WILUNA PROJECT 1 January 2015 to 31 December 2015 |
| A109461 | 2016 | Toro Energy Ltd | Wiluna | <1% | Final Surrender Report Wiluna Project C170/2010 for the period 27/12/2012 to 31/05/2016, E53/1296, P53/1371, P |
| A109550 | 2016 | Toro Energy Ltd | Wiluna Uranium Project | <1% | E53/1132 & P53/1372 Final Surrender |
| A105185 | 2015 | Blackham Resources Ltd | Wiluna | <1% | Combined Annual Report Wiluna Project for the period 1 January 2014 to 31 December 2014 (C14/2012), E53/1290.. |
| A107291 | 2015 | Metals X Limited | Wiluna South | 56% | Final Surrender Report, E53/1232 |
| A105506 | 2015 | Metals X Limited | Wiluna South | 56% | Annual Mineral Exploration Report, E53/1232 Wiluna South for the period 09 March 2014 to 08 March 2015 |
| A106427 | 2015 | Toro Energy Limited | Wiluna | <1% | Annual Mineral Exploration Report Wiluna Uranium Project Combined Report 170/2010 for the period January 1st t |
| A100948 | 2014 | Blackham Resources Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the period 01/01/2012 to 31/12/2013, E53// 1290,1297; M53/24-25, 34, 41, 52- |
| A102340 | 2014 | Coalspur Mines Ltd | Lake Way East | 9.2% | Lake Way East Project, Final Surrender Report for the period 06/03/2007 to 02/04/2014, E53/1253. |
| A101925 | 2014 | Metals X Limited | Wiluna South | 56% | Annual Mineral Exploration Report, E53/1232 Wiluna South Project for the period 09 March 2013 to 08 March 2014 |
| A101990 | 2014 | Toro Energy Ltd | Wiluna | <1% | Annual Mineral Exploration Report Wiluna Uranium Project Combined Reporting 170/2010 January 1st to December 3 |
| A102325 | 2014 | Lakeway Resources Pty Ltd | Lake Way | 42% | Lake Way Project E53/1516 For the Period 14 March 2013 to 13 March 2014 |
| A96445 | 2013 | Mpi Nickel Pty Ltd | Honeymoon Well | 2.5% | Annual Report To the Department of Mines and Petroleum For the period 1 January 2012 to 31 December 2012 Honey |
| A97361 | 2013 | Blackham Resources Ltd | Wiluna | <1% | Combined Annual Report WILUNA PROJECT For the Period 1 January 2012 to 31 December 2012, E53/1290, E53/1297, M |
| A97621 | 2013 | Toro Energy Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the period 1st January 2012 to 31st December 2012, E53/1132............E53/1 |
| A97750 | 2013 | Coalspur Mines Ltd | Lake Way East | 9.2% | Annual Technical Report for E53/1253 Lake Way South for the period 6 March 2012 to 5 March 2013 |
| A98348 | 2013 | Alacer Gold Corporation | Wiluna South | 56% | Wiluna South Project Combined Annual Technical Report C143/2002, E53/1232, for the Period 1 May 2012 to 30 Apr |
| A98738 | 2013 | Lakeway Resources Pty Ltd | Lake Way | 42% | Lake Way Project E53/1516 For the Period 14 March 2012 to 13 March 2013 |
| A92721 | 2012 | Mpi Nickel Pty Ltd | Honeymoon Well | 2.4% | Honeymoon Well Project, Annual Report for the period 1st January 2011 to 31st December 2011, E53/1243-1244; |
| A92922 | 2012 | Avoca Resources Ltd | Wiluna South | 56% | WILUNA SOUTH PROJECT Exploration Licence 53/1232 Partial Surrender Report for the Period 9th March 2007 to 29t |
| A93539 | 2012 | Toro Energy Ltd | Wiluna | <1% | Annual Mineral Exploration Report Wiluna Uranium Project January 1st to December 31st 2011, Combined Reporting |
| A93682 | 2012 | Coalspur Mines Ltd | Lake Way East | 9.2% | Annual report for the period 6 March 2011 to 5 March 2012, Lake Way South Project E53/1253 |
| A94117 | 2012 | Lakeway Resources Pty Ltd | Lake Way | 42% | Lake Way E53/1516 For the Period 14 March to 13 March 2012 |
| A94119 | 2012 | Alacer Gold Corporation | Wiluna South | 56% | WILUNA SOUTH PROJECT Combined Annual Technical Report C143/2002 E53/1232 for the Period 1 May 2011 to 30 April |
| A93240 | 2012 | Blackham Resources Ltd | Wiluna | <1% | Combined Annual Report Wiluna Project C14/2012 for the period 1 January 2011 to 31 December 2011 |
| A93829 | 2012 | Norilsk Nickel Australia Ltd | Honeymoon Well | 66% | Partial Surrender Report Honeymoon Well Project E53/1244 for the period 13 March 2007 - 12 March 2012 |
| A94108 | 2012 | Coalspur Mines Ltd | Lake Way East | 9.2% | Partial Surrender report for the period 6 March 2007 to 5 March 2012, Lake Way South Project E53/1253 |
| A94261 | 2012 | Mpi Nickel Pty Ltd | Honeymoon Well | 66% | Final Report on Honeymoon Well E53/1244 for the period 13 March 2007 to 11 June 2012 |
| A89493 | 2011 | Norilsk Nickel Australia Ltd | THE HONEYMOON WELL | 2.1% | ANNUAL REPORT ON EXPLORATION, THE HONEYMOON WELL PROJECT FOR THE PERIOD 1 JANUARY 2010 TO 31 DECEMBER 2010 W |
| A89756 | 2011 | Minerals And Metals Group Ltd | Wiluna | <1% | Combined Annual Report for Period 01/01/2010 to 31/12/2010 Project Wiluna C169/2001 |
| A89783 | 2011 | Toro Energy Ltd | Wiluna | <1% | Annual Mineral Exploration Report, Wiluna Uranium Project January 1st to December 31st 2010 Combined Reporting |
| A89986 | 2011 | Coalspur Mines Ltd | Lake Way South | 9.2% | Lake Way South Project, Annual Report for the period 6th March 2010 to 5th March 2011, E53/1253. |
| A90931 | 2011 | Avoca Resources Ltd | Wiluna South | 56% | Wiluna South Project Combined Annual Technical Report C143/2002, E53/1232, for the Period 1 May 2010 to 30 Apr |
| A91082 | 2011 | Toro Energy Ltd | Firestrike | <1% | Annual Mineral Exploration Report Firestrike May 1st 2010 to April 30th 2011, Combined Reporting No C47/2007 |
| A85865 | 2010 | Minerals And Metals Group Ltd | Wiluna | 75% | Final Report P53/1212 |
| A85989 | 2010 | Minerals And Metals Group Ltd | Wiluna | <1% | Combined Annual Report for the period 01/01/2009 to 31/12/2009, Project Wiluna C169/2001, E 53/845, E 53/854, |
| A86166 | 2010 | Norilsk Nickel Australia Ltd | Honeymoon Well | 2.1% | ANNUAL REPORT ON EXPLORATION THE HONEYMOON WELL PROJECT, FOR THE PERIOD 1 JANUARY 2009 TO 31 DECEMBER 2009, WI |
| A86614 | 2010 | Coalspur Mines Ltd | Lake Way East | 9.2% | Annual report for the period 6 March 2009 to 5 March 2010, Lake Way East Project E53/1253 |
| A87310 | 2010 | Avoca Resources Ltd | Wiluna South | 56% | Wiluna South Project Combined Annual Technical Report C143/2002 (E53/1232 and P53/1270) for the Period 1 May 2 |
| A87413 | 2010 | Toro Energy Ltd | Firestrike | <1% | Combined Annual Technical Report for Period: 1st May 2009 to 30th April 2010 Firestrike Project, Exploration |
| A87888 | 2010 | Toro Energy Ltd | Wiluna | 3.2% | Surrender Report E53/1168 Wiluna Project |
| A82170 | 2009 | Whinnen Resources Ltd | LAKE WAY | <1% | Annual Report for the Period 17 January 2008 to 16 January 2009, Lake Way E53/1337 |
| A82759 | 2009 | Oz Minerals Ltd | Lake Way Area (Warren Bore) | 3.2% | Partial Surrender Report E53/1168 |
| A81676 | 2009 | Norilsk Nickel Australia Ltd | HONEYMOON WELL | 2.1% | ANNUAL REPORT ON EXPLORATION THE HONEYMOON WELL PROJECT, FOR THE PERIOD 1 JANUARY 2008 TO 31 DECEMBER 2008, WI |
| A82690 | 2009 | Avoca Resources Ltd | WILUNA SOUTH | 55% | WILUNA SOUTH PROJECT EXPLORATION LICENCES 53/1010, E53/1232 and PROSPECTING LICENCE 53/1270, COMBINED TECHNICA |
| A82816 | 2009 | Liberty Resources Limited | LAKE WAY | <1% | Combined Annual Report, Lake Way Project, C47/2007 for the period 1 May 2008 to 30 April 2009 |
| A82841 | 2009 | Liberty Resources Limited | Lake Way | <1% | Partial Surrender E53/1181 LAKE WAY PROJECT July 2009 |
| A85210 | 2009 | Minerals And Metals Group Ltd | Wiluna | 2.9% | Final Report P53/1023 |
| A77857 | 2008 | Norilsk Nickel Australia Ltd | East Honeymoon Well | <1% | Annual Report on Exploration The Honeymoon Well Project For the period 1 January 2007 to 31 December 2007 Comb |
| A78667 | 2008 | Liberty Resources Limited | Lake Way | <1% | Combined Annual Report LAKE WAY PROJECT C47/2007 For the Period 1 May 2007 to 30 April 2008 E53/1181, E53/1221 |
| A78868 | 2008 | Norilsk Nickel Australia Ltd | Honeymoon Well | 66% | ANNUAL REPORT ON E53/1244 HONEYMOON WELL PROJECT FOR THE PERIOD 13 MARCH 2007 TO 12 MARCH 2008 WILUNA MINERAL |
| A77398 | 2008 | Oxiana Ltd | Wiluna | <1% | COMBINED ANNUAL REPORT FOR PERIOD 01/01/2007 TO 31/12/2007 PROJECT WILUNA C169/2001 |
| A78158 | 2008 | Xenolith Resources Limited | Lake Way East | 9.2% | Annual report for the period 6 March 2007 to 5 March 2008, Lake East Project E53/1253. |
| A79129 | 2008 | Avoca Resources Ltd | WILUNA SOUTH | 55% | WILUNA SOUTH PROJECT EXPLORATION LICENCES 53/1010, E53/1232 and PROSPECTING LICENCE 53/1270 Combined Technica |
| A81118 | 2008 | Oz Minerals Ltd | WILUNA | <1% | COMBINED ANNUAL REPORT FOR PERIOD 01/01/2008 TO 31/12/2008 PROJECT WILUNA C169/2001, E 53/1003, E 53/1120, E 5 |
| A74391 | 2007 | Agincourt Resources Ltd | Wiluna | <1% | Combined Annual Report for Period 01/01/2006 to 31/12/2007, Wiluna Project C169/2001, (Glengarry). |
| A74667 | 2007 | Mpi Mines Ltd | East Honeymoon Well | <1% | Annual Report on Exploration The Honeymoon Well Project for the period 1 January 2006 to 31 December 2006 Comb |
| A75395 | 2007 | Rhodes Resources Pty Ltd | Lake Way | <1% | Combined Annual Report Lake Way Project C47/2007 For the period 1 May 2006 to 30 April 2007 Tenements:E53/1181 |
| A75617 | 2007 | Avoca Resources Ltd | Wiluna South | 55% | Wiluna South Project Exploration Licences 53/1010 and Prospecting Licence 53/1113, Combined Technical Report ( |
| A75741 | 2007 | Avoca Resources Ltd | Wiiluna South | <1% | Surrender Report E 53/1012 for period 1 May 2002 to 30 April 2007 (Wiluna South Project). |
| A71900 | 2006 | Agincourt Resources Ltd | Wiluna | <1% | Combined Annual Report for period 01/01/2005 to 31/12/2005, Project Wiluna C169/2001, (Glengarry). |
| A72017 | 2006 | Mpi Mines Ltd | East Honeymoon Well | <1% | First Report - Annual Report on the Honeymoon Well Project, For the period 1 January 2005 to 31 December 2005, |
| A73039 | 2006 | Avoca Resources Ltd | Wiluna | 54% | Wiluna South Project Exploration Licences E53/1010,1012, Prospecting Licence P53/1113, Combined Technical Repo |
| A73267 | 2006 | Allarrow Pty Ltd | Lake Way | <1% | Annual Mineral Exploration Report, E53/1132, 12/07/2005 to 11/07/2006, (Lake Way Project, Wiluna). |
| A73388 | 2006 | Agincourt Resources Ltd | Wiluna | 75% | Surrender Report, E53/877, (Wiluna Project, Surrendered on 1 June 2006). |
| A70195 | 2005 | Mpi Mines Pty Ltd | East Honeymoon Well | <1% | Annual Report on the Honeymoon Well project for the period 1 January 2004 to 31 December 2004 Combined Reporti |
| A70415 | 2005 | Agincourt Resources Ltd | Wiluna | <1% | Combined annual report for the period 01/01/04 - 31/12/04 Wiluna Project, C169/2001, E53/259, 399, 536, 609, 6 |
| A71051 | 2005 | Avoca Resources Ltd | Wiluna South Gold | 54% | Wiluna South Gold Project, Exploration licences 53/1010, 1012 and Prospecting licence 53/1113. Combined techni |
| A68297 | 2004 | Agincourt Resources Ltd | Wiluna | <1% | Annual report for the period 01/01/2003-31/12/2003 Wiluna Project (C169/2001), E53/259, E53/399, E53/536, E53/ |
| A68552 | 2004 | Mining Project Investors Pty Ltd | East Honeymoon Well | <1% | Annual Combined Technical Report Honeymoon Well Project Wilu na District Period: 1st January 2003 to 31st Dece |
| A69573 | 2004 | Avoca Resources Ltd | Wiluna South | 54% | Wiluna South Gold Project, Exploration Licences E53/1010, E53/1012 and Prospecting Licence P53/1113, Combined |
| A66362 | 2003 | Newmont Australia Ltd | Wiluna | <1% | Combined Annual Report for period 01/01/2002 to 31/12/2002 Project Wiluna C169/2001: E53/232, 259, 399, 443, 5 |
| A66769 | 2003 | Avoca Resources Ltd | Wiluna South | 54% | Wiluna South Gold Project, E53/1010, 1012 and P53/1113, Combined Technical Report (C143/2002)for the period |
| A67013 | 2003 | Newmont Yandal Operations Ltd | Wiluna | <1% | Surrender Report for the period ending 04/06/2003 ,Wiluna Project. C169/2001 E53/443,232 P53/873. |
| A64419 | 2002 | Outokumpu Exp Aust Pty Ltd | East Honeymoon Well | <1% | Annual Exploration Report For Year Ending 31st December 2001 Mining Leases 53/35, 53/36, 53/55, 53/100 Explora |
| A64797 | 2002 | Newmont Yandal Operations Ltd | Wiluna | <1% | Combined Annual Report For Period 01/01/2001 To 31/12/2001 Project Wiluna C169/2001 E53/232, E53/259, 399, 443 |
| A61998 | 2001 | Wmc Resources Ltd | Lake Way | 18% | Exploration license: E53/408 Annual Report for the period 8 December 1999 to 7 December 2000 (Sir Samuel SG 51 |
| A61999 | 2001 | Wmc Resources Ltd | Lake Way | 21% | Exploration license: E53/409 Annual Report for the period 8 December 1999 to 7 December 2000 (Sir Samuel, SG 5 |
| A62490 | 2001 | Normandy Yandal Operations Ltd | Wiluna | 2.7% | Combined Annual Report On Exploration For Period 1/01/2000 To 31/12/2000 Project Wiluna C118-1993 E53/232, 240 |
| A63154 | 2001 | Normandy Yandal Operations Ltd | Wiluna | 4.7% | Combined Final Surrender Report On Exploration For Period 26/09/90 to 21/06/01 Projects Wiluna C118/1993 E53-2 |
| A63855 | 2001 | Wmc Resources Ltd | LAKE WAY | 20% | Exploration licenses E53/408 and E53/409 Final Surrender Report for the period 8.12.1992 to 17.08.2001, Wiluna |
| A63894 | 2001 | Outokumpu Mining Australia Pty Ltd | Abercromby | <1% | Abercromby Project, Annual Report for the year ending 30th April 2001,E53/447;P53/759. |
| A62437 | 2001 | Normandy Yandal Operations Ltd | Wiluna nickel | <1% | Annual Report on Exploration for period 01/01/2000 to 31/12/2000 |
| A61064 | 2000 | Outokumpu Exp Aust Pty Ltd | Lakeway | 7.2% | Lakeway Project E53/313, Final Surrender Report for Period 18th December 1991 to 20th August 1999. |
| A60013 | 2000 | Acclaim Uranium Nl | Abercromby Well | <1% | Annual Report on Group Reporting Area C169/1999 E53/447 & P53/759 Abercromby Well For the period 23/05/1999 to |
| A60487 | 2000 | Great Central Mines Ltd | Wiluna | <1% | Joint Annual Report: Wiluna C132/1994 for the Period 01/01/1999 to 31/12/1999. |
| A57782 | 1999 | Outokumpu Exp Aust Pty Ltd | Honeymoon Well | 1.8% | Honeymoon Well Project 31/12/98 Mining Lease:53/35-36, 55. 100, 380, 397 etc |
| A58545 | 1999 | Acclaim Uranium Nl | Abercromby Well | <1% | Abercromby Well 23/05/98 - 22/05/99 E53/447, 759 |
| A58579 | 1999 | Wmc Resources Ltd | Mount Keith | 20% | Mount Keith Operations, Partial Relinquishement report to for E53/408 and E53/409, for period 8/12/1992 to 8/0 |
| A57725 | 1999 | Wmc Resources Ltd | Mount Keith | 8.4% | Mount Keith Operations Annual Report 30/03/1999 E53/408-412, 545 |
| A58606 | 1999 | Wiluna Mines Ltd | Wiluna | <1% | Joint Annual Report For the Period 1/01/1998 to 31/12/1998 E53/259,399,414,443,459,504,506,536,559,609,624,674 |
| A59054 | 1999 | Eagle Mining Corp Nl | Wiluna | 2.7% | Annual Report for C118/1993, Wiluna Project , E53/232,240, 277,286,405,735, P53/833-840 for the period 1 Janua |
| A59269 | 1999 | Acclaim Uranium Nl | Centipede | <1% | Acclaim Uranium NL, Centipede Uranium Deposit, WA, Ore Resource Estimate, April, 1999 M53/224, 336, 447, P53/7 |
| A54063 | 1998 | Wmc Resources Ltd | Mount Keith | 4.9% | Mount Keith Operations - Annual Report (Wobbly Bore Area) E53/408-412, 436, 438-440, 545, 01/01/1997 - 31/12/1 |
| A54267 | 1998 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project Annual Report for the period 01/01/97-31/12/97. |
| A55227 | 1998 | Outokumpu Exp Aust Pty Ltd | Abercromby tion | <1% | Abercromby (JV) Project, Annual Report for the year ending 30/04/1998 ,E53/447; P53/759. |
| A53648 | 1998 | Eagle Mining Corp Nl | Wiluna | 2.3% | Annual Report - Wiluna Project Area, 01/01/1997 - 31/12/1997 E53/232, 240, 277, 286, 339, 405, P53/833-840 |
| A59307 | 1997 | Wiluna Mines Ltd | Lake Way- Centipede | <1% | Lake Way and Centipede Project[s], Non-statutory Report: Summary Geological Report on Uranium Deposits, M53/38 |
| A50912 | 1997 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the year ending 31/12/1996, M53/6............M53/384;E53/399..........E53/62 |
| A51135 | 1997 | Cra Exploration Pty Ltd | Wiluna | <1% | Wiluna (JV) Project, Annual Report for the period ending 31/12/1996 , M53/24, M53/26, M53/42, M53/49, M53/70, |
| A51295 | 1997 | Cra Exploration Pty Ltd | Lakeway | 7.1% | Annual report to 1 January 1997 on E53/313 E53/397 Lakeway SG51-09 Wiluna, SG51-13 Sir Samuel Western Australi |
| A50676 | 1997 | Eagle Mining Corp Nl | Wiluna | 2.3% | Annual report on the Wiluna Project Area E53/232 E53/240 E53/277 E53/286 E53/339 E53/405 P53/833 to P53/840 in |
| A51728 | 1997 | Rio Tinto Exploration Pty Ltd | Abercromby Well | <1% | Annual Technical Report for the period ending 30/04/97 on E53/447 and P53/759, Abercromby Well Project. |
| A53356 | 1997 | Wiluna Mines Ltd | Lake Way- Centipede | <1% | The Lake Way and Centipede Project [s],Non-statutory Report: Summary Report for the period ending 31/12/1997, |
| A46547 | 1996 | Cra Exploration Pty Ltd | Lakeway 2 & 3 | 4.8% | Lakeway 2 & 3 Project, Partial Surrender Report E53/313 & 314 for period ending 18th December 1995. |
| A47410 | 1996 | Eagle Mining Corp Nl | Wiluna | 2.3% | Annual Report , Wiluna Project , E53/232 E53/240 E53/277 E53/286 E53/339 E53/405 P53/833 to P53/840 inclusive |
| A47867 | 1996 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project Annual Report for the period 1st January 1995 to 31st December 1995 M53/6..........M53/ 384; P5 |
| A47747 | 1996 | Cra Exploration Pty Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the period ending 31/12/1995 , M53/24, 26, 42, 49, 70, 71, 74, 78, 92, 113, |
| A48065 | 1996 | Cra Exploration Pty Ltd | Lakeway | 4.6% | Annual report to 1 January 1996 on E53/313 E53/314 E53/396 E53/397 Lakeway SG51-09 Wiluna SG51-13 Sir Samuel, |
| A48586 | 1996 | Wmc Resources Ltd | Mount Keith | 9% | Mount Keith Project, (Lake Way Exploration Area), Partial Surrender Report for the period 8th December 1992 to |
| A48625 | 1996 | Cra Exploration Pty Ltd | Abercromby Well | <1% | Annual Report for the period ending 30/04/96, E53/447 & P53/759, Abercromby Well Project. |
| A44206 | 1995 | Cra Exploration Pty Ltd | Lakeway | 4.5% | Annual Report to 18 December 1994 on E53/313,314,395-397 Lakeway, Project. |
| A45041 | 1995 | Western Mining Corporation Ltd | Mount Keith | 4% | Mt Keith Nickel Project Annual report 01/01/94 to 31/12/94 |
| A45803 | 1995 | Cra Exploration Pty Ltd | Abercromby Well | <1% | Annual Report for the period ending 30/04/95, P53/759, Abercromby Well Project. |
| A46283 | 1995 | Cra Exploration Pty Ltd | Lakeway 2 and 3 | 4.8% | Partial Surrender Report for the period ending 18/12/94, Lakeway Project, E53/313-314. |
| A46667 | 1995 | Eagle Mining Corp Nl | Lake Way | <1% | Partial Surrender Report for the period 26/05/91-06/02/95 Lake Way Project E53/232 |
| A45804 | 1995 | Cra Exploration Pty Ltd | Abercromby Well | <1% | Annual Report for the period ending 30/04/95 , E53/447, Abercromby Well Project. |
| A40154 | 1994 | Cra Exploration Pty Ltd | Lakeway | 4.5% | Lakeway Project, Annual Report for the period 19/12/92-18/12/93 Lakeway Project E53/313 E53/314 E53/395-397. |
| A43762 | 1994 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project ,Annual Report for the period January 1st 1994 to 31st December 1994, GML53/703 & 752; P53/873; |
| A44275 | 1994 | Eagle Mining Corp Nl | Wiluna | 1.3% | Wiluna Joint Venture,Annual Report on Wiluna ProjectArea (E53/232,E53/240,E53/277,E53/286,E53/317,E53/339,E53/ |
| A38105 | 1993 | Cra Exploration Pty Ltd | Lakeway | 4.8% | Annual report for the period 19/12/91-18/12/92 Lake Way Project E53/313 E53/314 |
| A38700 | 1993 | Western Mining Corporation Ltd | Mount Keith | 8.1% | Annual Report for the period 01/01/92-31/12/92 Mt Keith Project |
| A40801 | 1993 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project Annual report for 1993 |
| A36606 | 1992 | Hunter Resources Ltd | Lake Way | <1% | Lake Way Project, E53/232 Annual Report for the Period to 26/05/92. |
| A20272 | 1987 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project, Non-statutory Report: Cross Section Ore Reserve, Wiluna Project, Western Australia (1986). |
| A11268 | 1982 | Delhi Int Oil Corporation | Lake Way | 18% | Lake Way (JV) Project, Annual Report for the period ending 31/12/1981, MC53/3357-3358, 3360-3367, 3374, 3377, |
| A59308 | 1982 | Wiluna Mines Ltd | Centipede | 1.2% | Centipede Project , Non-statutory Report: Status Report on the Centipede Uranium Prospect, May 1982 M53/224. |
| A11269 | 1981 | Delhi Int Oil Corporation | Lake Way | 18% | Lake Way Project, Non-statutory Report: Environmental Review & Management Programme, Draft Environmental Impac |
| A8776 | 1980 | Esso Exploration Aust Inc | Abercromby Well | <1% | Abercromby Well Project, Annual Report for the period ending 31/12/1979 , MC53/4806........MC53/5387. |
| A8867 | 1980 | Wyoming Mineral Corporation | Lake Way | 29% | Lake Way Project, Annual Report, March 1980, ( 1979 Field Work), MC53/3357-3358, 3360-3367, 3374, 3377, 3380, |
| A9531 | 1980 | Wyoming Mineral Corporation | Lake Way | 29% | Lake Way Project, Non-statutory Report: A Summary Report following a Further Examination of the Ore Reserves a |
| A9533 | 1980 | Wyoming Mineral Corporation | Lake Way | 29% | Lake Way Project, Non-statutory Report: Lake Way Joint Venture, Phase 3, Metallurgical Tests, December 1980, M |
| A8123 | 1979 | Esso Exploration Aust Inc | Abercromby Well | <1% | Annual Report for the period 1978 Abercromby Well Project MC53/4806-4828 |
| A8224 | 1979 | Esso Exploration Aust Inc | Centipede | 20% | Centipede Project, Annual Report for the period ending 31/12/1978, MC53/4890-4897, 5255-5281, 5229-5249, 5322- |
| A8734 | 1979 | Esso Exploration Aust Inc | Centipede | 25% | Centipede Project, Annual Report for the year ending 31/12/1979, MC53/4890-4897, 5153-5140, 5147-5149, 5152, 5 |
| A7757 | 1978 | Wyoming Mineral Corporation | Lake Way | 22% | Lake Way Project, Annual Report for the year ending 31/12/1977, (Field Season), April 1978, MC53/3357-3358, 33 |
| A7539 | 1978 | Esso Exploration Aust Inc | Centipede | 14% | Centipede Project, Annual Report for the year ending 31/12/1977, MC53/4890-4897. |
| A6925 | 1977 | Wyoming Mineral Corporation | Lake Way | 31% | Lake Way Project, Annual Report for the year ending 31/12/1976, (Field Work) : Part A , The Report , April 197 |
| A6524 | 1976 | International Nickel Aust Ltd | Abercromby Well | <1% | Annual Report for the period 07/07/75 to 31/12/75, Abercromby Well Project MC53/4806-4828. |
| A3835 | 1973 | Amax Exploration Aust Inc | Wiluna | 2.5% | Wiluna Project, Non-statutory Report: Final Report, June 1973, MC53/7-10, 17-60, 527-568,571-572, 3164-3221, |
| A2731 | 1970 | Delhi Aust Petroleum Ltd | Wiluna | 2.6% | Wiluna Project, Annual Report: Quarterly Report for the period 01/07/1970-30/09/1970 & Summary 1966-1970 Expl |
| A960 | 1970 | Delhi Aust Petroleum Ltd | Wiluna | 2.6% | Wiluna Project, Non-statutory Report: Quarterly Report(s) for the period 1st April 1969 to 30th June 1969,!st |
| A2770 | 1968 | Delhi Aust Petroleum Ltd | Wiluna | 2.6% | Wiluna Project, Annual Report for the period ending 1st January 1968 to 31st December 1968, TR70/3702H; ML53/7 |
| A959 | 1968 | Delhi Aust Petroleum Ltd | Wiluna | 2.6% | Wiluna Project, Non-statutory Report: Quarterly Reports covering periods:- 01/01/1968 to 31/03/1968, 01/04/196 |
| A957 | 1967 | Delhi Aust Petroleum Ltd | Wiluna | 2.6% | Wiluna Project, Non-statutory Report: Annual Report for the period 29th June 1966 to 28th June 1967, TR70/3702 |
| A958 | 1967 | Delhi Aust Petroleum Ltd | Wiluna | 2.6% | Wiluna Project, Annual Report for the period 1st January 1967 to 31st December 1967, TR70/3702H. |
| A41130 | 1753 | Western Mining Corporation Ltd | Mount Keith | 4.6% | Annual Report for the Period 01/01/93 - 31/12/93 Mt Keith Nickel Project |
| A54820 | 1753 | Outokumpu Exp Aust Pty Ltd | Honeymoon Well | 1.5% | Honeymoon Well Project, Annual Report Year Ending: 31/12/97 Mining Lease: 53/35, 36, 55, 100, 380, 381, |
| A41328 | 1753 | Orpheus Geoscience Pty Ltd | Wiluna | 2.3% | Annual report for the period 01/01/93- 31/12/93 Wiluna JV Project E53/232 E53/240 E53/277 E53/286 E53/317 E53/ |
| A44466 | 1753 | Eagle Mining Corp Nl | Nimary | <1% | Wiluna Joint Venture Annual Report on the Nimary Project Area (E53/219,E53/273,E53/311,E53/324,E53/346,E53/372 |
| A48724 | 1753 | Wmc Resources Ltd | Mount Keith | 2.7% | Mt Keith Nickel Project Various Tenements (Refer Table 1) C467/1996 Annual report 01/01/95 to 31/12/95 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 16 years · 9 May 2042
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 53/1102 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 53/1102? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.