M 52/251
Register summary
- Holder
- Southern Cross Prospecting Pty Ltd
- Local government
- Shire of Meekatharra
- Application received
- 29 Apr 1991
- Commenced
- 11 Mar 1992
- Expiry
- 10 Mar 2034
- Term
- 21 Years (Renewed)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A123066 | 2020 | Austsino Resources Group Limited | Peak Hill | <1% | Annual Report for the Peak Hill Iron Project C230/2007 for the period ending 31/12/2019, E 52/01557, E 52/0186 |
| A123395 | 2020 | Sandfire Resources Limited | Horseshoe | <1% | C36/2015 Horseshoe Project Combined Annual Report for the period ending 15/02/2020 |
| A125063 | 2020 | Westgold Resources Limited | Horseshoe | <1% | Annual Technical Report M52/00338 Horseshoe Project for the period ending 02/08/2020 |
| A125642 | 2020 | Bryah Resources Limited | Horseshoe South | <1% | Annual Report for Horseshoe South M52/00806 for the period 16 October 2019 to 15 October 2020 |
| A119233 | 2019 | Austsino Resources Group Limited | Peak Hill | <1% | Annual Report for the Peak Hill Iron Project C230/2007 For the Period 1 January 2018 to 31 December 2018, E52/ |
131 more reports
| A119063 | 2019 | Bryah Resources Limited | Horseshoe South | <1% | Annual Report for Horseshoe South M52/00806 for the period 16 October 2017 to 15 October 2018 |
| A119243 | 2019 | Billabong Gold Pty Ltd | Three Rivers | <1% | Annual Mineral Exploration Report for the Three Rivers Group C183/2005 For the Period 1 January 2018 to 31 Dec |
| A121251 | 2019 | Westgold Resources Limited | Horseshoe | <1% | Annual Technical Report 2018, C153/2015 Horseshoe project for the period 3 August 2018 to 2 August 2019 |
| A122115 | 2019 | Bryah Resources Limited | Horseshoe South | <1% | Annual Report for Horseshoe South M52/00806 for the period 16 October 2018 to 15 October 2019 |
| A115660 | 2018 | Independence Group Nl | Bryah Project | 2.8% | E52/3472 Bryah Project Annual Report for the period 06/12/2016 - 05/12/2017 |
| A115961 | 2018 | Desert Resources Ltd | Peak Hill | <1% | Peak Hill Iron Project C230/2007, E52/01557, E52/01860, E52/02368, E52/02993 Annual Report for the period 1 Ja |
| A116042 | 2018 | Billabong Gold Pty Ltd; Independence Group Nl | Three Rivers | <1% | Annual Mineral Exploration Report for the Three Rivers Group C183/2009 For the Period 1 January 2017 to 31 Dec |
| A117939 | 2018 | Westgold Resources Limited | Horseshoe | <1% | Annual Technical Report M52/00338 Horseshoe Project for the period 03/08/2017 - 02/08/2018 |
| A112703 | 2017 | Horseshoe Manganese Pty Ltd | Horseshoe Range | <1% | Horseshoe Range Manganese Project M52/01048 Annual Report for the Period 22nd February 2016 to 21st February 2 |
| A115153 | 2017 | Westgold Resources Limited | Horseshoe | <1% | Annual Technical Report 2017 Horseshoe Project M52/00338 (C153/2015) for the period 3 August 2016 to 2 August |
| A115464 | 2017 | Process Minerals International Pty Ltd | Horseshoe South | <1% | Annual Report for Horseshoe South M52/806 For the Period 6 October 2016 to 15 October 2017 |
| A107726 | 2016 | Process Minerals International Pty Ltd | Horseshoe South | <1% | Annual Report for Horseshoe South M52/806 Annual Report for the period 16/10/2014 to 15/10/2015 |
| A108777 | 2016 | Padbury Mining Limited | Peak Hill | <1% | 2015 Combined Annual Mineral Exploration Report C230/2007, Peak Hill Project, Annual Report for the Period 1 J |
| A109988 | 2016 | Metals X Limited | Horseshoe Range | <1% | Horseshoe Range C153/2015 Final Surrender Report, E52/3005, P52/1257, P52/1259, P52/1340, P52/1341 & P52/1383 |
| A110143 | 2016 | Metals X Limited | Horseshoe | <1% | Annual Mineral Exploration Report 2016, C153/2015 (Horseshoe Project) for the period 3 August 2015 to 2 August |
| A110543 | 2016 | Process Minerals International Pty Ltd | Horseshoe South | <1% | Annual Report for Horseshoe South Project M52/00806 for the period 16/10/2015 to 15/10/2016 |
| A108059 | 2016 | Metals X Limited | Horseshoe | <1% | INTERIM MINERAL EXPLORATION REPORT MINING LEASE M52/338 HORSESHOE PROJECT 1st January 2015 - 2nd August 2015 |
| A108812 | 2016 | Auvex Manganese Limited | Horseshoe Range | <1% | Horseshoe Range Manganese Project M52/1048 Annual Report for the Period 22nd February 2015 to 21st February 20 |
| A104866 | 2015 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Fortnum Project Combined 2014 Annual Technical Report C591/1994 for the period 1 January 2014 to 31 December 2 |
| A105097 | 2015 | Desert Resources Ltd | E52/1860 | <1% | E52/1860 Partial Surrender Report for the period 25/08/2005 – 11/12/2014 |
| A106282 | 2015 | Rni Nl | Horseshoe West | <1% | Surrender Report Horseshoe West Project P52/1338 for the period 26 October 2009 to 26 June 2015 |
| A106283 | 2015 | Rni Nl | Horseshoe West | <1% | Horseshoe West P52/1339 Surrender Report for the period 26 October 2009 to 26 June 2015 |
| A107119 | 2015 | Rni Nl | Horseshoe West | <1% | Horseshoe West P52/1337 Surrender Report for the period 26 October 2009 to 10 September 2015 |
| A104861 | 2015 | Padbury Mining Ltd | Peak Hill | <1% | Peak Hill Project, Annual Report for the period 01/01/2014 to 31/12/2014, E52/1557, 1860, 2368, 2436; P52/1329 |
| A105382 | 2015 | Auvex Manganese Limited; Grosvenor Gold Pty Ltd | Horseshoe Range | <1% | Horseshoe Range Manganese Project M52/1048 Annual Report for the Period 22nd February 2014 to 21st February 20 |
| A107465 | 2015 | Rni Nl | Horseshoe West | 24% | Horseshoe West Project C134/2013 Combined Annual Technical Report for the period 26 October 2014 to 25 October |
| A100913 | 2014 | Padbury Mining Ltd | Peak Hill | <1% | 2013 Annual Repor t C230/2007 For the per iod 01/01/2013 to 31/12/2013 Peak Hi l l Project Western Australia, |
| A101494 | 2014 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Combined Annual Technical Report C591/1994 Fortnum Project for the period 1 January 2013 to 31 December 2013, |
| A102407 | 2014 | Auvex Manganese Limited; Grosvenor Gold Pty Ltd | Horseshoe Range | <1% | Horseshoe Range M52/1048 Annual Report for the Period 22nd February 2013 to 21st February 2014 |
| A104211 | 2014 | Process Minerals International | Horseshoe South | <1% | Horseshoe South Project M52/806 Annual Report for the period 16 Oct 2013 – 15 Oct 2014 |
| A104305 | 2014 | Resource And Investment Nl | Horseshoe West | 28% | Horseshoe West Project, Annual Report for the period 26/10/2013 to 25/10/2014, M52/251; P52/1239, 1257, 1259, |
| A96741 | 2013 | Auvex Manganese Limited | Horseshoe Range | 9.9% | E52/1561 Horseshoe Range Annual Report for the period 6th January 2012 to 5th January 2013 |
| A96769 | 2013 | Auvex Manganese Limited; Naracoota Resources Ltd | Horseshoe Range | <1% | Annual Report for the Period 22nd February 2012 to 21st February 2013, Horseshoe Range M52/1048 |
| A96988 | 2013 | Padbury Mining Ltd | Peak Hill | <1% | Peak Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/1481, 1518, 1557, |
| A96998 | 2013 | Grosvenor Gold Pty Ltd | Fortnum | <1% | ANNUAL TECHNICAL REPORT FOR COMBINED REPORT C591/1994 FORTNUM PROJECT TENEMENT NUMBERS M52/5, M52/6, M52/93, M |
| A97793 | 2013 | Naracoota Resources Ltd | Mount Beasley | 96% | M52/251 Mt Beasley Annual Report for the period 11th March 2012 to 10th March 2013 |
| A98834 | 2013 | Kupang Resources Ltd | Peak Hill | 1.9% | Annual Report E52/1740 Peak Hill Project for the period 12th July 2012 to 11th July 2013 |
| A100232 | 2013 | Peak Hill Manganese Pty Ltd | Horseshoe South Peak Hill | <1% | Annual Report for tenement M52/806 Horseshoe South Peak Hill for the period 16 October 2012 to15 October 2013 |
| A100269 | 2013 | Resource & Investment Nl | Horseshoe West | 28% | Combined Annual Technical Report C134/2013 Horseshoe West for the period 26 October 2012 to 25 October 2013 |
| A93081 | 2012 | Padbury Mining Ltd | Peak Hill - Telecom Hill | <1% | 2011 Annual Report C230/2007 Telecom Hill Project for the period 1 January 2010 – 31 December 2011 |
| A93155 | 2012 | Auvex Manganese Limited | Horseshoe Range | <1% | ANNUAL REPORT FOR THE PERIOD 22nd February 2011 to 21st February 2012 HORSESHOE RANGE M52/1048 |
| A93219 | 2012 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Annual Report C591/1994 2011 Annual Report for the period 1st January 2011 - 31st December 2011 |
| A93600 | 2012 | Naracoota Resources Ltd | Mount Beasley | 96% | M52/251 Mt Beasley Annual Report for the period 11th March 2011 to 10th March 2012 |
| A95947 | 2012 | Naracoota Resources Ltd | Horseshoe Range | <1% | Horseshoe Range Project, Annual Report for the period 26/10/2011 to 25/10/2012, P52/1341. |
| A95948 | 2012 | Naracoota Resources Ltd | Horseshoe Range | <1% | Horseshoe Range Project, Annual Report for the period 26/10/2011 to 25/10/2012, P52/1340. |
| A95949 | 2012 | Naracoota Resources Ltd | Horseshoe Range | <1% | Horseshoe Range Project, Annual Range for the period 26/10/2011 to 25/10/2012, P52/1339. |
| A95950 | 2012 | Naracoota Resources Ltd | Horseshoe Range | <1% | Horseshoe Range Project, Annual Report for the period 26/10/2011 to 25/10/2012, P52/1338. |
| A95951 | 2012 | Naracoota Resources Ltd | Horseshoe Range | <1% | Horseshoe Range Project, Annual Report for the period 26/10/2011to 25/10/2012, P52/1337. |
| A96079 | 2012 | Peak Hill Manganese Pty Ltd | Horseshoe South | <1% | Annual Report for tenement M52/806, Horseshoe South Project Peak Hill for the period 16 October 2011 to 15 Oct |
| A93034 | 2012 | Auvex Manganese Limited | Horseshoe | 9.9% | E52/1561 Horseshoe Annual Report 6th January 2011 to 5th January 2012 |
| A95399 | 2012 | Kupang Resources Ltd | Peak Hill | 1.9% | Annual Report Peak Hill E52/1740 for the period 12th July 2011 to 11th July 2012 |
| A89195 | 2011 | Auvex Resources Ltd | Horseshoe | 9.9% | E52/1561, HORSESHOE ANNUAL REPORT, FOR THE PERIOD 6th January 2010 to 5th January 2011 |
| A89774 | 2011 | Grosvenor Gold Pty Ltd | Fortnum | <1% | C591/1994 Fortnum Project Annual Report for the period 1 jan 2010 to 31st December |
| A91769 | 2011 | Chameleon Mining Nl | PEAK HILL | 1.9% | ANNUAL REPORT FOR CHAMELEON MINING NL E52/1740 PEAK HILL FOR THE PERIOD 12th July 2010 to 11th July 2011 |
| A92198 | 2011 | Peak Hill Manganese Pty Ltd | Horseshoe South | <1% | Annual Report for M52/806 Horseshoe South Peak Hill for the period 16 October 2010 to15 October 2011 |
| A89335 | 2011 | Padbury Mining Ltd | Peak Hill | <1% | Peak Hill Project Annual Report C230/2007 for the period 1 January 2010 - 31 December 2010 |
| A85953 | 2010 | Aurium Resources Ltd | Peak Hill | <1% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007 EXPLORATION LICENCES E52/1481, E52/1518, .... on |
| A86131 | 2010 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Fortnum Project 2009 Annual Report, C591/1994, P52/1147-1160, P52/1169-1172, M52/5-6, M52/93, M52/95-96, M52/9 |
| A88620 | 2010 | Peak Hill Manganese Pty Ltd | Horseshoe South - Peak Hill | <1% | Annual Report for tenement M52/806 Horseshoe South Peak hill for the period 16 October 2009 to 15 October 2010 |
| A87708 | 2010 | Chameleon Mining Nl | Peak Hill | 1.9% | Annual Report E52/1740 Peak Hill for the period 12th July 2009 to 11th July 2010 |
| A81731 | 2009 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Fortnum Project 2008 Annual Report, Period: 1 January 2008 – 31 December 2008, C591/1994, E52/2059 (formerly E |
| A85192 | 2009 | Peak Hill Manganese Pty Ltd | Horseshoe South Peak Hill | <1% | Annual Report for the tenement M52/806 Horseshoe South Peak Hill for the period for the period 16 October 2008 |
| A85390 | 2009 | Auvex Resources Ltd | Horseshoe Range | 9.9% | E52/1561 Horseshoe Range for the period 6th January 2009 to 5th January 2010 |
| A81263 | 2009 | Aurium Resources Ltd | Peak Hill | <1% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007, Consisting of EXPLORATION LICENCES E52/1481, E52 |
| A81330 | 2009 | Chameleon Mining Nl | Horseshoe | 1.9% | E52/1740 “Horseshoe” Partial Surrender Report 12/07/2007 – 11/07/2008 |
| A84397 | 2009 | Chameleon Mining Nl | Horseshoe | 1.9% | E52/1740 “Horseshoe” Mineral Exploration Report 12/07/2008 – 11/07/2009 |
| A77369 | 2008 | Eagle Gold Mines Pty Ltd | Fortnum | <1% | Fortnum Project C591/1994 2007 Annual Report 1 January 2007 - 31 December 2007 E52/1655, E52/1659, E52/1671, E |
| A80414 | 2008 | Peak Hill Manganese Pty Ltd | HORSESHOE SOUTH / PEAK HILL | <1% | ANNUAL REPORT FOR TENEMENT M 52/806 HORSESHOE SOUTH PEAK HILL for the period 16 October 2007 to 15 October 200 |
| A84033 | 2008 | Ore West Ltd | Horseshoe Range | 96% | Annual Report for Horsehoe Range Tenement, M52/251, Peak Hill for the period 11th Mar 2008 to 10th Mar 2009 |
| A78262 | 2008 | Ore West Ltd | Horseshoe Range | 96% | Annual Report for Horseshoe Range Tenement M52/251 Peak Hill for the period 11th March 2007 to 10th March 2008 |
| A74010 | 2007 | Goodz & Associates Gmc Pty Ltd | Horsehoe Range | <1% | Annual Mineral Exploration Report for M52/830 Horseshoe Range Project, Peak Hill, Period 01/01/2006 to 31/12/2 |
| A74648 | 2007 | Gleneagle Gold Ltd | Fortnum | <1% | Fortnum Project 2006 Annual Report (C591/1994) Report Period: 1 January 2006 - 31 December 2006 (Robinson Rang |
| A75254 | 2007 | Quadra Gold Pty Ltd | Horseshoe Range | 96% | Annual Report, For Horseshoe Range Tenement, M52/251, Peak Hill, for the Period 11th March 2006 to 10th March |
| A76744 | 2007 | Peak Hill Manganese Pty Ltd | Peak Hill | <1% | ANNUAL REPORT M52/806 PEAK HILL FOR THE PERIOD 16th October 2006 to 15th October 2007 |
| A71717 | 2006 | Peak Hill Manganese Pty Ltd | Peak Hill | <1% | Annual Report, M52/806 Peak Hill, For the period 16 October 2004 to 15 October 2005. |
| A71950 | 2006 | Gleneagle Gold Ltd | Fortnum | <1% | Fortnum Project 2005 Annual Report, 1 January 2005 to 31 December 2005, Combined Reporting No. C591/1994, (Rob |
| A72677 | 2006 | Gleneagle Gold Ltd | Horseshoe Range | 96% | M52/251 - Horseshoe Range Project Annual Report, 11 March 2005 to 10 March 2006, (Peak Hill). |
| A73831 | 2006 | Peak Hill Manganese Pty Ltd | Peak Hill | <1% | Annual Report, M52/806, Peak Hill, for the period 16 October 2005 to 15 October 2006. |
| A70237 | 2005 | Gleneagle Gold Ltd | Fortnum | <1% | Fortnum Project 2004 Annual Report Reporting Period: 1st Jan uary 2004 to 31st December 2004 Ref.No.: C591/199 |
| A68408 | 2004 | Gleneagle Gold Ltd | Fortnum | <1% | Fortnum Project 2003 Annual Report Reporting Period: 1st Jan uary 2003 to 31st December 2003 Ref.No.: C591/199 |
| A69549 | 2004 | Peak Hill Manganese Pty Ltd | Horseshoe | <1% | Annual report for the period 16/10/03 - 15/10/04, Horseshoe Manganese Project, C99/2004, M52/806, Peak Hill |
| A71662 | 2004 | Peak Hill Manganese Pty Ltd | Horseshoe Range | 3.1% | Relinquishment Report for EL52/1452 ,Horseshoe Range Project, for the period 3 February 2000 to 2 February 200 |
| A66308 | 2003 | Barrick Gold Of Australia Ltd | Plutonic | <1% | Annual Report period 1 January 2002 - 31 December 2002 Project 6490 Marymia Project 6520 Plutonic Project 6523 |
| A66115 | 2003 | Peak Hill Manganese Pty Ltd | Horseshoe | 3.1% | Annual Report for Horseshoe Manganese E52/1452 Peak Hill for the period 3rd February 2002 to 2nd February 2003 |
| A66301 | 2003 | Perilya Ltd | Cassidy | <1% | Annual Report for Cassidy project, the period 01/01/2002 - 31/12/2002 Tenement:M52/338. |
| A64539 | 2002 | Tuart Resources Pty Ltd | Peak Hill | 3.1% | Annual Report For Horseshoe EL52/1452 Peak Hill For The Period 3rd February 2001 to 2nd February 2002. |
| A64278 | 2002 | Perilya Ltd | Fortnum | <1% | Annual Report for Fortnum Project for the period 01/01/2001 - 31/12/2001 project number C591/1994 (formerly M3 |
| A62318 | 2001 | Tuart Resources Pty Ltd | Horseshoe | 3.1% | Annual Report For Horseshoe EL52/1452 Peak Hill. |
| A62422 | 2001 | Perilya Mines Nl | Cassidy | <1% | Annual Report For Cassidy Project For The Period 1 January 2000 To 31 December 2000 Project Number M4391/1 Ten |
| A59904 | 2000 | Perilya Mines Nl | Cassidy | <1% | Annual Report for Cassidy Project for the period 01/01/1999 to 31/12/1999 , M52/338 MLA52/566 |
| A57284 | 1999 | Perilya Mines Nl | Cassidy | <1% | Annual report for the Cassidy Project M52/338 MLA52/566 for period 01/01/98-31/12/98 |
| A53828 | 1998 | Perilya Mines Nl | Cassidy | <1% | Annual report for the Cassidy Project. Period 01/01/97-31/12/97. M52/338,566,614. P52/745. |
| A54032 | 1998 | Mr Caruso Vm | Horseshoe | 96% | Annual Progress Report, ML52/251 10/03/1997 - 09/03/1998 |
| A55345 | 1998 | Resolute Ltd | Marymia Hill | <1% | Marymia Hill Joint Venture, M52/183, 233, 635 Annual Report 01/01/97 - 31/03/98 |
| A53261 | 1997 | Mining And Precision Blasting Services Pty Ltd | Horseshoe Range | 3.1% | Horseshoe Range Project Annual Report Exploration Licence E52/875 Period from 13/10/1996 to 12/10/1997 |
| A50536 | 1997 | Perilya Mines Nl | Cassidy | <1% | Annual report for the Cassidy Project for period 1 January 1996 to 31 December 1996 M52/338 P52/745 MLA52/566 |
| A51538 | 1997 | Grange Resources Nl | Twin Rivers | 2.2% | Twin Rivers Prospect, Annual Report Exploration Licence E52/1014 for the period 02/02/1996 to 01/02/1997. |
| A47430 | 1996 | Perilya Mines Nl | Cassidy | <1% | Annual report for the Cassidy Project for period 1 January 1995 to 31st December 1995 M52/338 P52/535 P52/536 |
| A50086 | 1996 | Mining And Precision Blasting Services Pty Ltd | Horseshoe Range | 1% | Annual Report Exploration Licences E52/875 & E52/887 Period from 13/10/1995 to 12/10/1996 |
| A47974 | 1996 | Mr Caruso Vm | Horseshoe | 96% | Annual report on activities on Mining Lease No. 52/251 (Horseshoe) |
| A48506 | 1996 | Star Resources Pty Ltd | Horseshoe Range | 1% | Horseshoe Range Project, Annual Report for the period 13th October 1994 to 12th October 1995, E52/875 & 887. |
| A49599 | 1996 | Hunter Exploration Nl | Horseshoe | <1% | Annual Reprot on Prospecting Licences P52/753-755 Horseshoe Western Australia Covering the Period 14/10/1995 t |
| A49660 | 1996 | Valiant Consolidated Ltd | Horseshoe | <1% | 1996 Annual report of Activities Mining Lease M52/266 and M52/267 Horseshoe Manganese Mine Peak Hill Mineral F |
| A43872 | 1995 | Perilya Mines Nl | Cassidy | <1% | Annual report for the Cassidy Project for period 1 January 1994 to 31 December 1994, P52/535 P52/536 P52/745; |
| A43909 | 1995 | Mr Caruso Vm | Horseshoe | 96% | (03/94 to 03/95, M52/251, Horseshoe Project) |
| A46190 | 1995 | Valiant Consolidated Ltd | Horseshoe | <1% | Annual report of Activities Mining Lease M52/266 and M52/267 Horseshoe Manganese Mine Peak Hill Mineral Field |
| A40886 | 1994 | Dominion Mining Ltd | Horseshoe Well | <1% | Annual Report for the period 01/01/93-31/12/93 Horseshoe Range Project M52/252,338,434,535-538,614,742-747,778 |
| A38161 | 1993 | Dominion Mining Ltd | Horseshoe Range | <1% | Horseshoe Range Project, Annual Report for the period M52/252 M52/338 P52/535-538 P52/614 P52/742-747. |
| A38078 | 1993 | Dominion Mining Ltd | Goldstream Joint Venture | 96% | Annual report for the period January 1992 to December 1992, M52/251 and GML52/889. Goldstream Joint Venture. |
| A34776 | 1992 | Resolute Resources Ltd | Randall Well | <1% | (R Report for the period to 12/91) Randall Well Project E52/288,320 M52/252-254 Report on exploration to Decem |
| A35118 | 1992 | Dominion Mining Ltd | Goldstream | 96% | Annual report Goldstream Joint Venture M52/11, M52/74, M52/140, P52/287, GML52/889 from March to December 1991 |
| A35437 | 1992 | Dominion Mining Ltd | Horseshoe Range | <1% | Annual Report, Horseshoe Range Project M52/15,30,104,141,174 & 252 ; P52/361,434-435,535-538 & 614, for the pe |
| A37934 | 1992 | Sabminco Nl | Horseshoe | <1% | Annual report for the period ending 10/92 Horseshoe Manganese Project M52/266 M52/267 P52/487 |
| A33977 | 1991 | Dominion Mining Ltd | Goldstream | 96% | Annual Report ,Goldstream Project, for the period 01/03/1990 to 01/02/1991, M52/11 M52/74 M52/140 P52/287 & G |
| A30708 | 1990 | Ross Atkins Mining | Horseshoe Range | <1% | Report on Exploration M52/141 M52/104 M52/30 M52/15 M52/174 P52/361 Horseshoe Range, Peak Hill Mineral Field W |
| A31711 | 1990 | Dominion Mining Ltd | Labouchere | 96% | Labouchere Project GML52/889, M52/11, M52/74, M52/140 and and P52/287 Goldstream JV Area 09/89 to 02/90. |
| A31485 | 1989 | Barrack Exploration Pty Ltd | Horseshoe Range | <1% | Horseshoe Range Trial Pit Mineral Resource Estimate. |
| A31489 | 1989 | Barrack Exploration Pty Ltd | Horseshoe Range | <1% | Horseshoe Range Project Mineral Resource Assessment of the Brilliant Area |
| A31606 | 1989 | Barrack Exploration Pty Ltd | Horseshoe Lights | <1% | Progress Report on Results of Bleg Stream Aquarius and Fiddlers Prospect (E52/50,90; M52/08,64-67,76,86,124) ( |
| A31490 | 1988 | Barrack Mine Management Pty Ltd | Horseshoe Range | <1% | Structural Analysis of the Brilliant and Trial Pit Prospects Horseshoe Range Western Australia Report Number W |
| A32315 | 1988 | Barrack Exploration Pty Ltd | Horseshoe | <1% | Horseshoe Range Project Report on geological Mapping June - July 1988 |
| A31487 | 1988 | Barrack Mine Management Pty Ltd | Hidden Valley - Horseshoe Range | <1% | Hidden Valley - Horseshoe Range, Non-statutory Report: Report on Underground Exploration Programme Hidden Val |
| A31488 | 1988 | Barrack Mine Management Pty Ltd | Brilliant Adit - Horseshoe Range | <1% | Brilliant Adit - Horseshoe Range, Non-statutory Report: Report on Underground Exploration Programme Brilliant |
| A17119 | 1986 | Sovereign Gold Nl | Horseshoe Range | <1% | Horseshoe Range 52/2 Final Report 01/02/1986 SH50-8 |
| A912 | 1967 | Electrolytic Zinc Company Of Australasia Ltd | Horseshoe Lights | <1% | Horseshoe Lights Project, Non-statutory Report: Geological Report, August 1967, TR70/3528H. |
| A911 | 1966 | Electrolytic Zinc Company Of Australasia Ltd | Horseshoe Lights | <1% | Horseshoe Lights Project, Non-statutory Report: Brief Exploration Report. March 1966, TR70/3528H. |
| A40602 | 1753 | Goldstream Mining Nl | Horseshoe | 49% | The Horseshoe prospect, Peak Hill Mineral Field, Western Australia |
| A77495 | 1753 | Greater Pacific Gold Ltd | Peak Hill | <1% | Annual Technical Report on Exploration Licence E52/1860 on the PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
| A52968 | 1753 | Resolute Ltd | Marymia Hill | <1% | Marymia Hill Joint Venture. M52/183, 635 Annual Report. 01/01/1995 - 31/12/1996 |
| A24574 | 1753 | Barrack Exploration Pty Ltd | Horseshoe Range | <1% | Reoprt on Horseshoe Range Project 1987 Programme |
| A50335 | 1753 | Mr Caruso Vm | Horseshoe | 96% | Annual report on activities on Mining Lease No 52/251 (Horseshoe) |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 7 years · 10 Mar 2034
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 52/251 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 52/251? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.