NextMaps›WA Tenements›M 45/775

M 45/775

LiveMining LeaseShire of East PilbaraMarble Bar District
Area
662.65ha
Expires
Apr 2037
in 11 years
WAMEX reports
111
WA median is 53
Report drilling
71
of 111 reports
East Pilbara Explore on the live map

Register summary

Holder
Greatland Exploration Pty Ltd
Part of
Greatland Resources Limited (ASX:GGP) as at 2026-06-30
Local government
Shire of East Pilbara
Application received
14 Oct 1997
Commenced
28 Apr 2016
Expiry
27 Apr 2037
Term
21 Years

Exploration history on this ground

111 historical WAMEX exploration reports intersect M 45/775: 52 report geochemistry or sampling, 64 include a digital data package.
When this ground was worked · 108 of 111 reports dated
21970s
61980s
381990s
312000s
202010s
112020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A149283 2025 Antipa Minerals Ltd. Paterson South Group 1.8% Partial Surrender Report E45/5312 Paterson South Group for the period ending 12/5/2025
A138384 2024 Encounter Resources Limited East Thomson’s Dome <1% East Thomson’s Dome Final Surrender Report, E45/3446, P45/2750, P45/2751, P45/2752 and P45/3032eriod ending 30
A134945 2023 Encounter Resources Limited East Thomson’s Dome <1% East Thomson’s Dome C158/2016 Combined Annual Exploration Report E45/3446, P45/2750, P45/2751, P45/2752 and P4
A132457 2022 Newcrest Mining Limited Telfer 2% Partial Surrender Mineral Exploration Report for Telfer Mine Group Exploration Licence 45/3447 for the Period
A130541 2022 Encounter Paterson Pty Ltd East Thomson’s Dome <1% East Thomson’s Dome C158/2016 Combined Annual Exploration Report for the period ending 01/03/2022.
106 more reports
A126904 2021 Hamelin Resources Pty Ltd East Thomson's Dome <1% East Thomson's Dome Annual Report C158/2016 for the period 2 March 2020 to 1 March 2021
A124170 2020 Antipa Minerals Ltd. Colonel 1.8% Colonel E45/5312 Annual Technical Report for the period ending 12/05/2020
A123532 2020 Antipa Minerals Ltd. Paterson <1% Paterson Project C108/2015 Annual Technical Report 1 April 2019 to 31 March 2020 for Exploration Licences E45/
A124417 2020 Newcrest Mining Limited Telfer Regional 2% Exploration Licence 45/3425 Partial Surrender Report for the period: 23 June 2014 to 22 June 2020
A122760 2020 Newcrest Mining Limited Telfer <1% C348/1995 - Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2019
A123518 2020 Hamelin Resources Pty Ltd East Thomson's Dome <1% East Thomson's Dome Annual Report, C158/2016, 2 March 2019 to 1 March 2020
A119140 2019 Newcrest Mining Limited Telfer <1% C348/1995 Telfer Mine Group Annual Report for C348/1995 for the period 1 January 2018 to 31 December 2018
A120583 2019 Antipa Minerals Ltd. Paterson <1% Paterson Project - 2018 Annual Report (C108/2015) for the period 01/04/2018-31/03/2019
A119910 2019 Hamelin Resources Pty Ltd East Thomson's Dome <1% C158/2016 East Thomsons's Dome Annual Report For the Period 2 March 2018 to 1 March 2019, E45/03446, P45/02750
A120217 2019 Antipa Minerals Ltd. Paterson <1% Paterson Project - E45/2529 - voluntary partial surrender for the Period 1 April 2015 to 31 March 2019
A117008 2018 Antipa Minerals Ltd. Paterson <1% Paterson Project - C108/2015 - Partial Surrender Report For the Period 15 April 2015 to 11 April 2018, E45/025
A116604 2018 Hamelin Resources Pty Ltd East Thomson's Dome <1% East Thomson's Dome Annual Combined Report C158/2016, 02 March 2017 to 01 March 2018
A115962 2018 Newcrest Mining Limited Telfer <1% C348/1995 - Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2017.
A118363 2018 Encounter Resources Limited East Thompson’s Dome <1% FINAL REPORT, East Thompson’s Dome, Paterson Province, DAG2018/01112576 (R#16)
A116999 2018 Antipa Minerals Ltd. Paterson <1% Paterson Project C108/2015 Annual Report for the period 01/04/2017 - 31/03/2018, E45/02524, E45/02525, E45/025
A112122 2017 Newcrest Mining Limited Telfer <1% C348/1995 - Telfer Mine Project Combined Annual Technical Report For the Period 1 January 2016 to 31 December
A114183 2017 Antipa Minerals Ltd. Paterson <1% Paterson Project C108/2015 Annual Report For the Period 1 April 2016 to 31 March 2017, E45/02524, E45/02525, E
A112722 2017 Hamelin Resources Pty Ltd East Thomson Dome <1% East Thomson Annual Report C158/2016 for the period 02/03/2016 to 1 March 2017, E 45/03446, P 45/02750, P 45/0
A108067 2016 Newcrest Mining Limited Telfer <1% ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015 TELFER C348/1995 - TELFER MINE GROUP - COMBINE
A109118 2016 Antipa Minerals Ltd. Paterson <1% Paterson Project - Annual Report C108/2015, E45/2524-2529 for the period 01 April 2015 to 31 March 2016
A104881 2015 Newcrest Mining Ltd Telfer <1% C348/1995 - Telfer Mine Group Annual Technical Report for the year ending 31/12/2014, E45/975.....P45/2861
A101199 2014 Newcrest Mining Ltd Telfer <1% C348/1995 - TELFER MINE GROUP ANNUAL TECHNICAL REPORT YEAR ENDING 31ST DECEMBER 2013 E45/975, E45/1070, E45/11
A97052 2013 Newcrest Mining Ltd Telfer <1% Telfer Project, Annual Report for the period 1st January 2012 to 31st December 2012, E45/975.......E45/3255; M
A93130 2012 Newcrest Mining Ltd Telfer <1% Telfer Project, Annual Report for the period 1st January 2011 to 31st December 2011, E45/975..................
A89730 2011 Newcrest Mining Ltd Telfer <1% C348/1995 - Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2010
A86296 2010 Newcrest Mining Ltd Telfer <1% C348/1995 - Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2009, E45/975, E45/1070
A81226 2009 Newcrest Mining Ltd TELFER <1% C348/1995 - TELFER MINE GROUP ANNUAL TECHNICAL REPORT YEAR ENDING 31ST DECEMBER 2008. E45/1070, 1168, E45/170
A77533 2008 Newcrest Mining Ltd Telfer / Connaughtons Dome gold <1% Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2007 ML45/6-11, ML45/33, E45/1168,
A74413 2007 Newcrest Mining Ltd Telfer <1% Annual Technical Report, Telfer Mine Group, Ref. No: C348/1995, Period Ending 31st December 2006 (Paterson Ra
A74415 2007 Newcrest Mining Ltd Telfer / Connaughtons Dome <1% Telfer Project, Annual Technical Report, Surge Tank, Ref No: C350/1995, Period Ending 31st December 2006. (P
A71871 2006 Newcrest Mining Ltd Telfer / Connaughtons Dome <1% Annual Technical Report, Telfer Mine Group, C348/1995, Period ending 31 December 2005, (E45/1168,1705,M45/6-9,
A71873 2006 Newcrest Mining Ltd Telfer / Connaughtons Dome <1% Telfer Project, Annual Technical Report, Surge Tank Group, C350/1995, Period ending 31 December 2005, (M45/209
A71795 2006 Barrick Gold Of Australia Ltd Northwest Telfer <1% Project 6131 Northwest Telfer JV Project (Barrick Gold Of Au stralia Farmin) E45/854....P45/2460 Annual Report
A70009 2005 Newcrest Mining Ltd Telfer <1% Annual technical report for the period 01/01/04 - 31/12/04 Telfer Project, Telfer mine group, C348/1995, E45/1
A70011 2005 Newcrest Mining Ltd Telfer <1% Annual technical report for the period 01/01/04 - 31/12/04 Telfer Project, Surge Tank group, C350/1995, M45/20
A70117 2005 Barrick Gold Of Australia Ltd Project 6131 Northwest Telfer JV <1% Project 6131 Northwest Telfer JV Project (Barrick Gold Of Au stralia Farmin) E45/854.....P45/2460 Annual Repor
A68095 2004 Newcrest Mining Ltd Telfer <1% Telfer Project, Annual Technical Report, Surge Tank Group M45/209-211,( Ref No: C350/1995), for period ending
A68092 2004 Newcrest Mining Ltd Telfer <1% Annual Technical Report, Telfer Mine Group, (Ref, No: C348/1995), for period ending 31st December 2003.M45/6 (
A68292 2004 Mount Burgess Mining Nl Telfer <1% Annual Report Telfer for the period 1 January 2003 to 31 Dec ember 2003 (C348/93), E45/1218....M45/662
A66092 2003 Newcrest Mining Ltd Telfer <1% Annual Technical Report Telfer Mine Group C348/1995 period ending 31st December 2002 M45/6, M45/7, M45/8, M45/
A66297 2003 Mount Burgess Mining Nl Telfer <1% Telfer Project, Annual Report for the period 1 January 2002 to 31 December 2002 Telfer C348/1993: South Camp D
A66094 2003 Newcrest Mining Ltd Telfer <1% Annual Technical Report Surge Tank Group C350/1995 period ending 31st December 2002 M45/209, M45/210 & M45/211
A64527 2002 Newcrest Mining Ltd Telfer <1% Annual Technical Report Ref No: C348/1995 Period Ending 31st December 2001. Telfer Mine Group ML45/6 Main Dome
A64338 2002 Mount Burgess Mining Nl Telfer <1% Annual Report, Telfer Project, Period 1 January 2001 - 31 December 2001. South Camp Dome E45/ 1654, 1218 East
A64297 2002 Newcrest Mining Ltd Telfer <1% Telfer Project Department of Minerals and Energy Annual Technical Report ref no: C35/1995 period ending 31st D
A61904 2001 Normandy Gold Exploration Pty Ltd Cove <1% Cove (JV) Project, Annual Report for the period 1 January 2000 to 31 December 2000, E45/854, M45/542, M45/543,
A61905 2001 Normandy Gold Exploration Pty Ltd Yeneena <1% Annual Report on exploration for the period 1 January 2000 to 31 December 2000 Yeneena Project Combined Annual
A61909 2001 Normandy Gold Exploration Pty Ltd Yeneena <1% Final Surrender Report on exploration for the period 7 August 1998 to 23 January 2001 Yeneena Project - Lamil
A62074 2001 Newcrest Mining Ltd Telfer <1% Annual Technical Report period ending 31st December 2000 Telfer Mine Group ML45/6 Main Dome, ML45/7 West Dome,
A62267 2001 Newcrest Mining Ltd Surge Tank <1% Annual Technical Report to the Department of Minerals and Energy period ending 31st December 2000 Surge Tank G
A60060 2000 Newcrest Mining Ltd Surge Tank <1% Annual Report to the Department of Minerals and Energy, Ref No:c351/1995, Period ending 31/12/1999, Surge Tank
A60061 2000 Newcrest Mining Ltd Telfer/ Mt Isa 30% Annual Report to the Department of Minerals and Energy, Ref No:M8621, E45/1306, 27/11/1998 to 26/11/1999, Part
A60173 2000 Newcrest Mining Ltd Telfer <1% Annual Technical Report Ref No: C348/1995 Period Ending 31/12/1999 Telfer Mine Group ML45/6 Main Dome ML45/7 W
A60196 2000 Normandy Gold Ltd Telfer/Cove/Isdell/Yeneena <1% Annual Report on Exploration for the Period 01/01/1999 to 31/12/1999 Cove JV Area (Part of the Isadell Joint V
A60197 2000 Normandy Gold Ltd Yeneena <1% Annual Report on Exploration for the Period 01/01/1999 to 31/12/1999 Yeneena Project Combined Annual Report Is
A61284 2000 Normandy Gold Exploration Pty Ltd Yeneena <1% Annual Report on Exploration for the Period 1 August 1999 to 31 July 2000, Yeneena Project, Lamil Group Combin
A61377 2000 Normandy Gold Exploration Pty Ltd Camp Dome South <1% Final Surrender Report on Exploration for the Period 10 September 1996 to 8 September 2000. Camp Dome South P4
A59339 1999 Normandy Gold Ltd Yeneena <1% Annual Report on Exploration for the Period 1 August 1998 to 31 July 1999, Yeneena Project, Lamil Group Combin
A56993 1999 Newcrest Mining Ltd Thomson's Extended 30% Annual Report, Telfer/Mt Isa Joint Venture Project, E45/1306 , 27/11/97 - 26/11/98.
A62709 1999 Normandy Gold Exploration Pty Ltd Cove <1% Annual Report On Exploration For The Period 1 January 1999 To 31 December 1999. Cove JV Area (Part Of Isdell J
A57611 1999 Newcrest Mining Ltd Surge Tank <1% Surge Tank Group ML45/209-211 31/12/1998
A57618 1999 Newcrest Mining Ltd Telfer <1% Telfer Mine Group - Annual Technical Report 31/12/1998 E45/1168, 1705, M45/06-09, 11
A57776 1999 Normandy Gold Ltd Paterson <1% Combined Annual Report - Isdell Joint Venture 01/01/98 - 31/12/98 E45/1217-1218, 1227, 1234
A57786 1999 Normandy Gold Ltd Cove <1% Cove JV Area - Isdell Joint Venture 01/01/98 - 31/12/98 E45/854, M45/542-545
A53830 1998 Newcrest Mining Ltd Telfer - Mount Isa 30% Telfer - Mount Isa (JV) Project, Partial Surrender Report E45/1306, for the period 27/11/1992 to 26/11/1997.
A53831 1998 Newcrest Mining Ltd M8621/3: Thomson's Extended gold explora 30% Part of Telfer/Mt Isa Joint Venture. Annual report E45/1306 M45/775. 27/11/96-26/11/97.
A56240 1998 Newcrest Mining Ltd Telfer - Mount Isa 30% Telfer - Mount Isa (JV) Project, Partial Surrender Report for the period 27/11/1992 to 26/11/1998, E45/1306,
A56241 1998 Newcrest Mining Ltd Wilkie Borefield <1% Wilkie Borefield Tenement - E45/1168 10/1998
A53774 1998 Newcrest Mining Ltd Telfer <1% Annual Technical Report for period ending 31/12/97 Telfer Mine Group ML45/6 Main Dome ML45/7 West Dome ML45/8
A54531 1998 Mount Burgess Mining Nl South Camp Dome <1% Camp Dome South: E45/1218, Kaliranu: E45/1234, East Tim's Dome: E45/1217, Arrowhead: E45/1227, Wilki: E45/1535
A54532 1998 Mount Burgess Gold Mining Company N.L. Cove <1% Cove (JV) Project, Annual Report for the year ending 01/12/19997, E45/854, M45/542-545.
A53789 1998 Newcrest Mining Ltd Surge Tank <1% Annual Technical Report period ending 31/12/97 Surge Tank Group ML45/209-211
A50509 1997 Mount Burgess Mining Nl Camp Dome South <1% Annual technical report for the year ending December 1996 Camp Dome South Project: E45/1218, 1654; P45/2367,23
A50905 1997 Newcrest Mining Ltd West Dome 30% West Dome (JV) Project, Annual Report for the period 27/11/1995 to 26/11/1996, E45/1306.
A50250 1997 Newcrest Mining Ltd Surge Tank <1% Annual Technical Report period ending 31st December 1996 Surge Tank ML45/209 ML45/210 ML45/211
A50324 1997 Newcrest Mining Ltd Telfer <1% Annual Technical Report to the Department of Mines period ending 31st December 1996. Telfer Mine group ML45/6
A50540 1997 Mount Burgess Gold Mining Company N.L. Cove <1% Cove (JV) Project, Annual Report for the year ending 1st December 1996 , E45/854 ;M45/542 to M45/545.
A47885 1996 Mim Exploration Pty Ltd Camp Dome South <1% Annual progress on exploration carried out during 1995 on exploration licence E45/1218, Camp Dome South JV, Pa
A47056 1996 Mim Exploration Pty Ltd Cove <1% Cove (JV) Project, Annual Report for the period ending 1st December 1995, E45/854; M45/542 to M45/545.
A47088 1996 Newcrest Mining Ltd Telfer Connaughtons Dome <1% Report No. 30/1017 Annual Technical report period ending 31st December 1995 ML45/6 Main Dome South, ML45/7 Wes
A47091 1996 Newcrest Mining Ltd Telfer Connaughtons Dome <1% Annual Technical Report period ending 31st December 1995 Mining Leases M45/209 to M45/211 Surge Tank Group
A47880 1996 Mim Exploration Pty Ltd Thomson's Extended 30% Annual progress report on exploration carried out from November 27, 1994 to November 26, 1995 on E45/1306, Tho
A43646 1995 Mim Exploration Pty Ltd Cove <1% Cove (JV) Project, Annual Report for the period ending 1st December 1994 , E45/854; M45/542-5.
A44743 1995 Mim Exploration Pty Ltd Paterson <1% Annual Progress Report on Exploration carried out during 1994 on Exploration Licences E45/1217,E45/1218,E45/12
A44250 1995 Mim Exploration Pty Ltd Cove <1% Cove (JV) Project, Annual Report for the period ending 1st December 1994, E45/854; M45/542-545.
A44993 1995 Newcrest Mining Ltd Wilkie Borefield <1% Report No. 30/967 Annual Technical Report period ending 31st December 1994 Exploration Licence E45/1168 Wilkie
A43334 1995 Mim Exploration Pty Ltd Thomson's Extended 30% Annual progress report to March 25 1995 on exploration carried out on E45/1306 Thomson's Extended Project.
A43793 1995 Newcrest Mining Ltd Surge Tank <1% Report No. 30/959 Annual Technical Report period ending 31st December 1994 Mining Leases M45/209 to M45/211 Su
A40327 1994 Mim Exploration Pty Ltd Cove <1% Cove (JV) Project, Annual Report for the period 21/07/92-31/12/93, E45/854; M45/542-545.
A42076 1994 Newcrest Mining Ltd Wilkie Borefield <1% Annual Report for the period 31/12/92-31/12/93 Wilkie Borefield Project E45/1168
A40805 1994 Mim Exploration Pty Ltd Thomson's Extended 30% Thomson's Extended Project, Annual Report for the year ending 25th March 1994, E45/1306.
A39723 1993 Mount Burgess Mining Nl Telfer <1% Annual Report for the period 09/08/92-08/08/93 ,Telfer Project, E45/1218
A36487 1992 Newcrest Mining Ltd Surge Tank <1% Annual technical report for period ending 03/02/92 Surge Tank Project M45/209 M45/210 M45/211
A37600 1992 Newcrest Mining Ltd Malu West <1% Annual Technical Report for Period ending 31/12/92 Miscelaneous Group E45/1248A,979,1168; M45/460
A30578 1990 Newmont Australia Ltd Surge Tank <1% Mining leases 45/209, 210, 211 03/02/1990
A22896 1988 Newmont Australia Ltd Surge Tank <1% Surge Tank Project, Annual Report for the period ending 03/02/1988, M45/209-211.[Telfer]
A21113 1987 Newmont Australia Ltd Surge Tank <1% Annual report Mining Leases M45/209 M45/210 M45/211 Surge Tank Group
A19284 1986 Battle Mountain Australia Inc Trotman Hills <1% Trotman Hills Project, Third progress [annual] report, From January 1 1986 to December 31 1986, E45/328...471
A16605 1985 Duval Mining Australia Ltd Trotman Hills <1% Trotman Hills Project, Annual Report for the period 01/01/1985 to 31/12/1985, E45/328-331, 333-34, 349 ,367, 3
A15374 1985 Duval Mining Australia Ltd Trotman Hills- Carr Boyd <1% Trotman Hills - Carr Boyd (JV) Project [s], Non-statutory Report: First Progress Report for the period ending
A16599 1984 Duval Mining Australia Ltd Trotman Hills <1% Trotman Hills Project, Annual Report for the period ending 31st December 1984, (Field Seasons), E45/328-331, 3
A7890 1978 Geopeko Bill's Claim- Protos 8 67% Bill's Claim- Protos 8 Project, Annual Report, June1978, MC45/7668.
A7263 1977 Geopeko Paterson Range <1% Paterson Range Project, Non-statutory Report: Geology Plans [undated].
A16301 1753 Occidental Minerals Corp M2415/0: Paterson Province uranium/coppe <1% M2415/0: Paterson Province uranium/copper-lead-zinc exploration
A37599 1753 Newcrest Mining Ltd Surge Tank <1% Annual Technical Report for Period ending 31/12/92 Surge Tank Project M45/209-211
A26833 1753 Newmont Australia Ltd Surge Tank <1% Annual Technical Report for The Period Ending 03/02/89 Surge Tank Group; M45/209,210,211
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
11 years · 27 Apr 2037
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over M 45/775 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold M 45/775? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.