L 53/175
Register summary
- Holder
- Nova Energy Pty Ltd
- Local government
- Shire of Wiluna
- Application received
- 22 Dec 2011
- Commenced
- 25 Aug 2016
- Expiry
- 24 Aug 2037
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A132132 | 2022 | Kimba Resources Pty Ltd | E53/1794 | 1.2% | Partial Surrender Report E53/1794 for the period ending 17/08/2022. |
| A123069 | 2020 | Blackham Resources Limited | Wiluna | <1% | Wiluna Annual Report 2019 |
| A119326 | 2019 | Blackham Resources Limited | Wiluna | <1% | Wiluna C72/2017 Annual Report for the period 1 January 2018 to 31 December 2018 |
| A115891 | 2018 | Blackham Resources Ltd | Matilda | 3.8% | Combined Annual Report: Matilda Project C74/2017 for the period 1 January 2017 to 31 December 2017, E53/01290, |
| A117087 | 2018 | Blackham Resources Limited | Matilda - Lake Way | 6.6% | Matilda - Lake Way E53/01288, E53/01290, E53/01297 Final Surrender Report Matilda Tenements for the period 7 J |
86 more reports
| A116046 | 2018 | Blackham Resources Limited | Wiluna | <1% | Wiluna Project C72/2017 Annual Report for the period 1 January 2017 to 31 December 2017 |
| A112028 | 2017 | Blackham Resources Limited | Wiluna | 2.5% | Combined Annual Report Wiluna Project C14/2012 for the period 01/01/2016 to 31/12/2016 |
| A108455 | 2016 | Blackham Resources Ltd | Wiluna | 2.7% | C14/2012 Combined Annual Report WILUNA PROJECT 1 January 2015 to 31 December 2015 |
| A105085 | 2015 | Blackham Resources Ltd | Matilda | 8.4% | Final Surrender Report P53/1555 to P53/1558 Matilda Gold Project C14/2012 for the period 3 February 2014 to 2 |
| A105185 | 2015 | Blackham Resources Ltd | Wiluna | 3.2% | Combined Annual Report Wiluna Project for the period 1 January 2014 to 31 December 2014 (C14/2012), E53/1290.. |
| A100948 | 2014 | Blackham Resources Ltd | Wiluna | 4% | Wiluna Project, Annual Report for the period 01/01/2012 to 31/12/2013, E53// 1290,1297; M53/24-25, 34, 41, 52- |
| A101705 | 2014 | Blackham Resources Ltd | Wiluna | 9.5% | Partial Surrender Report E53/1290 Wiluna Project For the Period 7 January 2008 to 6 January 2014 |
| A97361 | 2013 | Blackham Resources Ltd | Wiluna | 4.1% | Combined Annual Report WILUNA PROJECT For the Period 1 January 2012 to 31 December 2012, E53/1290, E53/1297, M |
| A94569 | 2012 | Blackham Resources Ltd | Wiluna | 3.4% | Final Surrender Report Wiluna Project For the Period 7 January 2008 to 25 May 2012, E53/1286, 1289,1291,1292, |
| A93240 | 2012 | Blackham Resources Ltd | Wiluna | 4.1% | Combined Annual Report Wiluna Project C14/2012 for the period 1 January 2011 to 31 December 2011 |
| A89756 | 2011 | Minerals And Metals Group Ltd | Wiluna | 6.8% | Combined Annual Report for Period 01/01/2010 to 31/12/2010 Project Wiluna C169/2001 |
| A89757 | 2011 | Minerals And Metals Group Ltd | E53/1003 | 27% | Partial Expiry Report E53/1003 |
| A91242 | 2011 | Minerals And Metals Group Ltd | P53/1344 | 73% | Surrender Report P53/1344, 30 July 2011 |
| A91243 | 2011 | Minerals And Metals Group Ltd | P53/1345 | 43% | Surrender Report P53/1345, 30 July 2011 |
| A90906 | 2011 | Minerals And Metals Group Ltd | E53/1003 | 27% | Final Report E53/1003 |
| A88438 | 2010 | Minerals And Metals Group Ltd | P53/1227 | 11% | Final Report for P53/1227 |
| A85989 | 2010 | Minerals And Metals Group Ltd | Wiluna | 4.9% | Combined Annual Report for the period 01/01/2009 to 31/12/2009, Project Wiluna C169/2001, E 53/845, E 53/854, |
| A86837 | 2010 | Minerals And Metals Group Ltd | Wiluna | 4.5% | Final Report E53/919 |
| A87650 | 2010 | Minerals And Metals Group Ltd | Wiluna | 12% | Final Report for E53/854 |
| A88437 | 2010 | Minerals And Metals Group Ltd | P53/1100 | 100% | Final Report for P53/1100, 01 October 2010 |
| A81802 | 2009 | Oz Minerals Ltd | Wiluna | 4.5% | SECOND PARTIAL SURRENDER REPORT E53/919 |
| A81803 | 2009 | Oz Minerals Ltd | Wiluna | 27% | SECOND PARTIAL SURRENDER REPORT E53/1003 |
| A78271 | 2008 | Oxiana Ltd | Wiluna | 4.5% | PARTIAL SURRENDER REPORT 7th March 2008 E53/919 VOLUME 1 OF 1 Reference:E53_919 Partial Surrender Report.doc |
| A78331 | 2008 | Oxiana Ltd | Wiluna | 27% | Wiluna Project, Partial Surrender Report, March 2008, E53/1003. |
| A78549 | 2008 | Oxiana Ltd | Wiluna | 12% | Partial Surrender Report E53/854 Wiluna Project |
| A77398 | 2008 | Oxiana Ltd | Wiluna | 4% | COMBINED ANNUAL REPORT FOR PERIOD 01/01/2007 TO 31/12/2007 PROJECT WILUNA C169/2001 |
| A81118 | 2008 | Oz Minerals Ltd | WILUNA | 5% | COMBINED ANNUAL REPORT FOR PERIOD 01/01/2008 TO 31/12/2008 PROJECT WILUNA C169/2001, E 53/1003, E 53/1120, E 5 |
| A74391 | 2007 | Agincourt Resources Ltd | Wiluna | 4% | Combined Annual Report for Period 01/01/2006 to 31/12/2007, Wiluna Project C169/2001, (Glengarry). |
| A71900 | 2006 | Agincourt Resources Ltd | Wiluna | 4.1% | Combined Annual Report for period 01/01/2005 to 31/12/2005, Project Wiluna C169/2001, (Glengarry). |
| A70415 | 2005 | Agincourt Resources Ltd | Wiluna | 2.2% | Combined annual report for the period 01/01/04 - 31/12/04 Wiluna Project, C169/2001, E53/259, 399, 536, 609, 6 |
| A68297 | 2004 | Agincourt Resources Ltd | Wiluna | 2.1% | Annual report for the period 01/01/2003-31/12/2003 Wiluna Project (C169/2001), E53/259, E53/399, E53/536, E53/ |
| A66362 | 2003 | Newmont Australia Ltd | Wiluna | 2.5% | Combined Annual Report for period 01/01/2002 to 31/12/2002 Project Wiluna C169/2001: E53/232, 259, 399, 443, 5 |
| A67013 | 2003 | Newmont Yandal Operations Ltd | Wiluna | 8.9% | Surrender Report for the period ending 04/06/2003 ,Wiluna Project. C169/2001 E53/443,232 P53/873. |
| A64797 | 2002 | Newmont Yandal Operations Ltd | Wiluna | 2.6% | Combined Annual Report For Period 01/01/2001 To 31/12/2001 Project Wiluna C169/2001 E53/232, E53/259, 399, 443 |
| A63257 | 2001 | Normandy Yandal Operations Ltd | Wiluna | <1% | Combined Surrender Report On Exploration For Period Ended 5 July 2001 Project C132/1994 Wiluna E53/259, 414, 4 |
| A62229 | 2001 | Normandy Gold Exploration Pty Ltd | Wiluna B | 65% | Annual Report for the period 01/01/2000 to 31/12/2000/, Wiluna B (JV) Project, E53/564 & 565. [C75/1997] |
| A62237 | 2001 | Normandy Yandal Operations Ltd | Wiluna A | 25% | Annual Report for the period 01/01/2000 to 31/12/2000 ,Wiluna A (JV) Project, E53/450; P53/823-824, 845-846 & |
| A62437 | 2001 | Normandy Yandal Operations Ltd | Wiluna nickel | 2.4% | Annual Report on Exploration for period 01/01/2000 to 31/12/2000 |
| A60751 | 2000 | Great Central Mines Ltd | Wiluna - Fimiston [Group B] | 65% | Exploration Licences: E53/564,565, Joint Annual Report: Fimiston JV (Group B) - C75/1997 for the Period 01/01/ |
| A59977 | 2000 | Great Central Mines Ltd | Shell | 7.6% | Mining Lease M53/42, Shell, Surrender Report for the Period 9 July 1986 to 6 january 2000 |
| A60487 | 2000 | Great Central Mines Ltd | Wiluna | 1.1% | Joint Annual Report: Wiluna C132/1994 for the Period 01/01/1999 to 31/12/1999. |
| A58606 | 1999 | Wiluna Mines Ltd | Wiluna | 1.1% | Joint Annual Report For the Period 1/01/1998 to 31/12/1998 E53/259,399,414,443,459,504,506,536,559,609,624,674 |
| A57993 | 1998 | Wiluna Mines Ltd | Wiluna | 25% | Wiluna (JV) Project, E53/450, P53/823- 824, 845-846 & 851,Annual Report for the period 3 August 1997 to 2 Au |
| A54267 | 1998 | Wiluna Mines Ltd | Wiluna | 1.1% | Wiluna Project Annual Report for the period 01/01/97-31/12/97. |
| A54293 | 1998 | Rgc Exploration Pty Ltd | Yandil | 5.3% | Surrender Report , Yandil, E53/362, 429 April 1998. |
| A55204 | 1998 | Great Central Mines Ltd | Wiluna- Fimiston [Group B] | 65% | Wiluna Project, Annual Report [Group B Fimiston JV] for the period 1st January 1997 to 31st December 1997, E5 |
| A50837 | 1997 | Goldfields Exploration Pty Ltd | Perseverence-Yandil | 6.2% | Goldfields Exploration - partial relinquishment report - Perseverance / Yandil Project,E53/429, April 1997. |
| A50912 | 1997 | Wiluna Mines Ltd | Wiluna | 1.4% | Wiluna Project, Annual Report for the year ending 31/12/1996, M53/6............M53/384;E53/399..........E53/62 |
| A51135 | 1997 | Cra Exploration Pty Ltd | Wiluna | <1% | Wiluna (JV) Project, Annual Report for the period ending 31/12/1996 , M53/24, M53/26, M53/42, M53/49, M53/70, |
| A52654 | 1997 | Wiluna Mines Ltd | Sandstone | 25% | Sandstone Project, Combined Annual Report, Group A Fimiston JV for the Period 3 August 1996 to 2 August 1997 P |
| A50521 | 1997 | Rgc Exploration Pty Ltd | Yandil | 1.5% | Annual report, Yandil Project, E53/285 E53/315 E53/327 E53/429 E53/430 E53/511 , for the period 01/01/96 to 31 |
| A47867 | 1996 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project Annual Report for the period 1st January 1995 to 31st December 1995 M53/6..........M53/ 384; P5 |
| A49547 | 1996 | Fimiston Mining Ltd | Wiluna | 29% | Wiluna Project, Annual Report for the period 03/08/1995 to 02/08/1996, E53/450, 564, 565; P53/823, 824, 845, |
| A47747 | 1996 | Cra Exploration Pty Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the period ending 31/12/1995 , M53/24, 26, 42, 49, 70, 71, 74, 78, 92, 113, |
| A48417 | 1996 | Rgc Exploration Pty Ltd | Yandil | <1% | Yandil E51/325 to E51/327, E53/285, E53/315, E53/327, E53/334, E53/335, E53/362, E53/402, E53/429, E53/430, E5 |
| A43660 | 1995 | Rgc Exploration Pty Ltd | Yandil | <1% | Annual Report, Yandil Project,for the period 01/01/94 to 31/12/94, E51/325 to E51/327, E53/285, E53/315, E53/3 |
| A42485 | 1994 | St Francis Mining Nl | Freshwater Well | 68% | Freshwater Well Project, Annual Report for the year ending 31st July 1994, E53/244; M53/360-308. |
| A43377 | 1994 | St Francis Mining Nl | Freshwater Well | 68% | Freshwater Well Project, Final Surrender Report M53/306, 307, 308, & E53/244 for period 1st August 1990 to 19t |
| A43762 | 1994 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project ,Annual Report for the period January 1st 1994 to 31st December 1994, GML53/703 & 752; P53/873; |
| A40888 | 1994 | Rgc Exploration Pty Ltd | Yandil | <1% | Annual Report for the period 01/01/93 to 31/12/93 Yandil Pb project (E51/325 to E51/327, E53/285, E53/315, E53 |
| A42033 | 1994 | Dominion Mining Ltd | Wiluna West | <1% | Wiluna West Project, Annual Report for the period from 16/11/1992 to01/05/1994, P53/782-787, 779-781, 789, 82 |
| A42321 | 1994 | Atlantic Gold Nl | Wiluna | 25% | Wiluna Project, Annual Report for the period 01/08/1993 to 01/08/1994, E53/450; P53/823, P53/824, P53/845, P53 |
| A37813 | 1993 | Rgc Exploration Pty Ltd | Yandil | <1% | Annual Report for the Period 15/08/91 to 28/02/93 Yandil Pb project (E51/325 to E51/327, E53/285, E53/315, E53 |
| A40801 | 1993 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project Annual report for 1993 |
| A38230 | 1993 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project , Annual Report for the period January 1st 1992 to December 31st 1992, E53/245: M53/24-27, 30, |
| A35709 | 1992 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project 1991 Annual report to Department of Mines |
| A32857 | 1991 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the year ending 31/12/1990, E53/53,71, 108, 118, 122 & 245; M53/24........M5 |
| A30256 | 1990 | Asarco Australia Ltd | Wiluna | 2.3% | Wiluna Project, Final Surrender & Partial Surrender Report, March 1990: Surrender for E53/6. M53/51 M53/93 & 9 |
| A30112 | 1990 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project 1989 Annual Report to Mines Department. Asarco Australia Ltd. January 1990. (53 tenements). |
| A20272 | 1987 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project, Non-statutory Report: Cross Section Ore Reserve, Wiluna Project, Western Australia (1986). |
| A8637 | 1979 | Seltrust Mining Corp Pty Ltd | Simpson Bore | 1.3% | Simpson Bore Project, Non-statutory Report: Final Report for the period ending 05/04/1978, MC53/4953-4964. |
| A7437 | 1978 | Asarco Australia Ltd | Simpson | 12% | Simpson Project, Annual Report for the year ending31/12/1977, MC53/4984-4988. |
| A7173 | 1977 | Western Mining Corporation Ltd | Cockarrow | 28% | Cockarrow Project, Non-statutory Report: Terminal Report for the period 1st July 1973 to 19th April 1974, MC53 |
| A7178 | 1977 | Australian Selection Pty Ltd | Wiluna | <1% | Wiluna (JV) Project, Annual Report, June 1977, MC53/4681-4689, 4698-4707, 4725-4729, 4750, 4756, 4761-4777,478 |
| A4384 | 1974 | Western Mining Corporation Ltd | Cockarrow | 38% | Cockarrow Project, Non-statutory Report: Exploration Report for the year ending 30th June 1973, MC53/939-946, |
| A2905 | 1972 | Western Mining Corporation Ltd | Cockarrow - Railway Well | 31% | Cockarrow - Railway Well Project, Annual Report for the year ending 30th June 1972, MC53/939-967, 1635-1636, 1 |
| A1836 | 1971 | Western Mining Corporation Ltd | Cockarrow | 40% | Cockarrow Project, Annual Report for the year ending 30th June 1971, MC53/939-967, 976-995, 1750 & 1752-1757. |
| A1840 | 1971 | Western Mining Corporation Ltd | Deep Bore- Mount Wilkinson - Cockarrow | 32% | Deep Bore- Mount Wilkinson - Cockarrow Project, Annual Report, June 1971, (Location Plans: Wiluna, Lake Way , |
| A2731 | 1970 | Delhi Aust Petroleum Ltd | Wiluna | 1.9% | Wiluna Project, Annual Report: Quarterly Report for the period 01/07/1970-30/09/1970 & Summary 1966-1970 Expl |
| A960 | 1970 | Delhi Aust Petroleum Ltd | Wiluna | 1.9% | Wiluna Project, Non-statutory Report: Quarterly Report(s) for the period 1st April 1969 to 30th June 1969,!st |
| A2770 | 1968 | Delhi Aust Petroleum Ltd | Wiluna | 1.9% | Wiluna Project, Annual Report for the period ending 1st January 1968 to 31st December 1968, TR70/3702H; ML53/7 |
| A959 | 1968 | Delhi Aust Petroleum Ltd | Wiluna | 1.9% | Wiluna Project, Non-statutory Report: Quarterly Reports covering periods:- 01/01/1968 to 31/03/1968, 01/04/196 |
| A957 | 1967 | Delhi Aust Petroleum Ltd | Wiluna | 1.9% | Wiluna Project, Non-statutory Report: Annual Report for the period 29th June 1966 to 28th June 1967, TR70/3702 |
| A958 | 1967 | Delhi Aust Petroleum Ltd | Wiluna | 1.9% | Wiluna Project, Annual Report for the period 1st January 1967 to 31st December 1967, TR70/3702H. |
| A36812 | 1753 | Eon Metals Nl | Wiluna | <1% | Annual Report for the Period 01/07/90 - 30/06/91 Wiluna Project M53/34,41,52-54; L53/26,28,30 |
| A26359 | 1753 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project. 1988 Annual Report. AsarcoAustralia Ltd. E53/35, 108, 118, 120 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 11 years · 24 Aug 2037
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 53/175 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 53/175? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.