NextMaps›WA Tenements›L 47/95

L 47/95

LiveMiscellaneous LicenceShire of East PilbaraWest Pilbara M.F. District
Area
3,576.26ha
Expires
Aug 2043
in 17 years
WAMEX reports
113
WA median is 53
Report drilling
63
of 113 reports
East Pilbara Explore on the live map

Register summary

Holders
Itochu Minerals & Energy Of Australia Pty Ltd, Mitsui Iron Ore Corporation Pty Ltd, Bhp Minerals Pty Ltd
Part of
BHP Group Limited (ASX:BHP) as at 2026-06-30
Local government
Shire of East Pilbara
Application received
27 Sept 2000
Commenced
24 Aug 2001
Expiry
23 Aug 2043
Term
21 Years (Renewed)

Exploration history on this ground

113 historical WAMEX exploration reports intersect L 47/95: 27 report geochemistry or sampling, 59 include a digital data package.
When this ground was worked · 109 of 113 reports dated
11960s
61970s
161980s
161990s
272000s
352010s
82020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A150238 2025 Ammm Resources Pty Ltd E47/4387 Hope Downs North 1 1.9% Annual Report - E47/4387 Hope Downs North 1 for the period ending 08/08/2025.
A148529 2025 Ammm Resources Pty Ltd Hope Downs North 1 1.9% Annual Report - E47/4387 Hope Downs North 1 for the period ending 8/8/2024
A152933 2025 Ammm Resources Pty Ltd E47/4387 Hope Downs North 1 1.9% Final Surrender Report - E47/4387 Hope Downs North 1 for the period ending 18/11/2025.
A136079 2023 Fortescue Metals Group Ltd E47/3432 <1% E47/3432 Final Surrender Report for the period ending 02/06/2023.
A126550 2021 Fortescue Metals Group Ltd Fig Tree 13% E47/3161 Fig Tree Final Surrender Report for the period ending 28/1/2021
108 more reports
A127756 2021 Fmg Pilbara Pty Ltd Fig Tree 15% E47/3263 (Fig Tree) Final Surrender Report for the period 19/12/2017 to 31/05/2021
A123704 2020 Bhp Iron Ore Pty Ltd Ministers Bridge 11% Annual Report for E47/628 - Ministers Bridge - 4 May 2019 to 2 May 2020
A124427 2020 Fortescue Metals Group Ltd Fig Tree 12% Fig Tree E47/3013 Final Surrender for the period ending 23/06/2020
A116486 2018 Bc Iron Limited; Mineral Resources Limited; Australian Abori Yandicoogina <1% C40/2005 – Marillana - Yandicoogina Project Annual Report For The Period 17 February 2017 to 16 February 2018,
A110821 2017 Bhp Billiton Iron Ore Pty Ltd North Flank, Packsaddle, Western Ridge <1% Donated Drill Core – GE2403DG, GE2455DG, PSB0454DG, PSD1204DG, PSB0451DG, PSB0453DG, WSR1302RD
A110819 2017 Fortescue Metals Group Ltd Marillana 12% Annual Report Marillana project E47/3013 For the Period 5 October 2015 to 4 October 2016.
A108109 2016 Iron Valley Pty Ltd Weeli Wolli <1% PARTIAL SURRENDER REPORT For the Period 6 May 2008 to 4 January 2016 WEELI WOLLI E47/1385
A105162 2015 Polaris Metals Pty Ltd Central Pilbara - Wedge 10% Central Pilbara Project E47/2366-I (Wedge Prospect) Final Surrender Report for the Period 6 February 2012 – 13
A105216 2015 Bhp Billiton Iron Ore Pty Ltd Ministers North 11% Annual Report Ministers North E47/682 Reporting Period 4 May 2014 – 3 May 2015
A105867 2015 Polaris Metals Pty Ltd Central Pilbara 3.4% Central Pilbara Project C4/2013 Annual Report for the Period 1 February 2014 – 31 January 2015, M47/1359-I, M4
A106864 2015 Bc Iron Limited Breakaway 38% Final Report E47/2001 Breakaway Project for the period 16/02/2010 to 06/08/2015
A101699 2014 Iron Ore Holdings Ltd Marillana – Yandicoogina <1% ANNUAL REPORT C40/2005–MARILLANA - YANDICOOGINA PROJECT FOR THE PERIOD 17 FEBRUARY 2013 to 16 FEBRUARY 2014
A101741 2014 Bhp Billiton Iron Ore Pty Ltd Ministers North 11% Annual Report Ministers North E47/628 Reporting Period 4 May 2013 – 3 May 2014
A102250 2014 Process Minerals International Central Pilbara 1.6% Final Surrender Report for the period 6 March 2012 to 16 February 2014 for E47/1236-I
A102255 2014 Polaris Metals Pty Ltd Central Pilbara 3.1% Combined – C004/2013 Annual Report for the period 1 February 2013 – 31 January 2014, E47/1236-I, E47/1238-I, E
A102763 2014 Atlas Iron Ltd Packsaddle 13% Packsaddle Project, Final Surrender Report for the period 17/12/2010 to 18/07/2014, E47/2113. [C38/2006]
A105357 2014 Bc Iron Ltd Marillana - Yandicoogina <1% C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2014 to 16 February 2015,
A102836 2014 Nexus Minerals Ltd Hancock Range <1% Hancock Range Project, Annual Report for the period 26/07/2013 to 25/07/2014, E47/2110.
A99243 2013 Nexus Minerals Ltd Hancock Range <1% E47/2110 Hancock Range Project Annual Report for the period 26th July 2012 – 25th July 2013
A97093 2013 Iron Ore Holdings Ltd Marillana-Yandicoogina <1% ANNUAL REPORT C40/2005–MARILLANA - YANDICOOGINA PROJECT FOR THE PERIOD 17 FEBRUARY 2012 to 16 FEBRUARY 2013
A97385 2013 Bhp Billiton Iron Ore Pty Ltd Ministers North 11% Annual Report Ministers North E47/628 Reporting period 4 May 2012 - 3 May 2013
A98330 2013 Process Minerals International Central Pilbara 3.1% Central Pilbara Project, Annual Report for the period 01/02/2012 to 31/01/2013, E47/1236, 1238 & 2366; M47/135
A100523 2013 Atlas Iron Ltd Packsaddle 13% Packsaddle Project E47/2113 Annual Technical Report to the DMP 16 Dec 2013
A93553 2012 Iron Ore Holdings Ltd Marillana – Yandicoogina <1% C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2011 to 16 February 2012
A93265 2012 Midas Resources Ltd Yandicoogina 12% Yandicoogina Project, Final Surrender Report for the period 17/08/2009 to 24/02/2012, E47/1901 & 1958. [C118/2
A93947 2012 Bhp Billiton Iron Ore Pty Ltd Ministers North 11% Annual Report Minister’s North E 47/628 Reporting period 4 May 2011 - 3 May 2012.
A94787 2012 Hemisphere Resources Ltd Hancock Range <1% E47/2110 HANCOCK RANGE ANNUAL REPORT 2012 Report Period: 26th July 2011 – 25th July 2012
A96290 2012 Atlas Iron Ltd Packsaddle 13% Packsaddle Project Annual Report for E47/2113 for the period ending 16 December 2012.
A89881 2011 Iron Ore Holdings Ltd Marillana – Yandicoogina <1% Annual Report, C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2010 to Fe
A91569 2011 Hemisphere Resources Ltd Hancock Range <1% EXPLORATION LICENCE E47/2110 HANCOCK RANGE WESTERN AUSTRALIA ANNUAL REPORT FOR THE YEAR ENDED 25 July 2011
A89697 2011 Midas Resources Ltd Yandicoogina 12% Yandicoogina Project , Annual Report , C118/2010 Tenement: E47/1901-I, E47/1958-I period 25/02/10 to 24/02/11
A90397 2011 Bhp Billiton Iron Ore Pty Ltd Ministers North 11% Ministers North Project, Annual Report for the period 4th May 2010 to 3rd May 2011, E47/628.
A92185 2011 Atlas Iron Ltd Packsaddle 13% Packsaddle Project E47/2113 Annual Technical Report to DMP Period Ending 16 December 2011
A102150 2011 Rio Tinto Exploration Pty Ltd Mesa J - Yandi Junction - Mesa A - Bunga <1% Peth Core Library Drilling Data from Drillholes into Channel Iron Deposits (CID) in the Pilbara Hole J6088- Me
A87343 2010 Rio Tinto Exploration Pty Ltd Leisker East 8.1% Partial Surrender Report for the Period Ending 16 June 2010, E47/1330 Leisker East
A87379 2010 Rio Tinto Exploration Pty Ltd Leisker 3.2% Combined Annual Report (C5/2007 Leisker) for the Period 1 July 2009 to 30 June 2010, E47/1329 Leisker and E47/
A86725 2010 Iron Ore Holdings Ltd Marillana - Yandicoogina <1% C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2009 to February 2010, E4
A87013 2010 Bhp Billiton Iron Ore Pty Ltd Minister's North 11% Annual Report Minister's North E47/0628, Reporting period 4 May 2009 – 3 May 2010
A82190 2009 Iron Ore Holdings Ltd Marillana – Yandicoogina <1% C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2008 to February 2009.
A83024 2009 Rio Tinto Exploration Pty Ltd Leisker 3.2% Combined Annual Report (C5/2007 Leisker) E47/1329 Leisker, E47/1330 Leisker East For the Period 1 July 2008 to
A82525 2009 Bhp Billiton Iron Ore Pty Ltd MINISTER'S NORTH 11% ANNUAL REPORT MINISTER'S NORTH E 47/0628, Reporting period 4 May 2008 - 3 May 2009
A83023 2009 Rio Tinto Exploration Pty Ltd Leisker East 8.1% Partial Surrender Report for the Period Ending 11 June 2009, E47/1330 Leisker East, Western Australia
A77539 2008 Iron Ore Holdings Ltd Yandicoogina <1% Annual Report - E47/1236-1239 Marillana- Yandicoogina Project - For the Period 17 February 2007 to 16 February
A78653 2008 Bhp Billiton Iron Ore Pty Ltd Ministers North 11% ANNUAL REPORT MINISTER'S NORTH E47/0628 Reporting period 4 May 2007 - 3 May 2008
A78740 2008 Iron Ore Holdings Ltd Yandicoogina 1.6% Partial Surrender Report E47/1236 Yandicoogina Project For the Period 17 February 2007 to 16 February 2008
A79274 2008 Rio Tinto Exploration Pty Ltd Pilbara Iron Ore 3.2% Combined Annual Report (C5/2007 Leisker) E47/1329 Leisker, E47/1330 Leisker East For the period 1 July 2007
A74794 2007 Iron Ore Holdings Ltd Yandicoogina <1% Annual Report for Exploration Licences E47/1336 - 1239 Yandicoogina Project, for the Period 17 February 2006 t
A75818 2007 Rio Tinto Exploration Pty Ltd Leisker East 3.2% Annual Report (Combined Report C5/2007) E47/1329 Leisker, E47/1330 Leisker East 1 July 2006 to 30 June 2007 Pi
A75371 2007 Bhp Billiton Iron Ore Pty Ltd Minister's North 11% Annual Report Minister's North E47/0628 Reporting period 4 May 2006 - 3 May 2007
A72197 2006 Iron Ore Holdings Ltd Yandicoogina <1% Annual Report for Exploration licences E47/1236-1239, 17 February 2005 - 16 February 2006, (Yandicoogina Proje
A73122 2006 Rio Tinto Exploration Pty Ltd Leisker East 8.1% First Annual Report for the Period Ending 30 June 2006, E47/1330 Leisker East, Pilbara Iron Ore Programme, Roy
A73654 2006 Hallmark Minerals Nl Yandicoogina 1.2% (HIY) Yandicoogina, Mining Lease ML274SA, West Pilbara Mineral Field, Western Australia, Annual report for the
A70246 2005 Iron Ore Holdings Ltd Yandi <1% Annual report for the period 17 February 2004 to 17 February 2005, E47/1236, E47/1237, E47/1238 and E47/1239,
A68147 2004 Bhp Billiton Iron Ore Pty Ltd Yandi <1% Annual Report, M47/292, Yandi, Period 11/03/2003-10/03/2004.
A68551 2004 Bhp Billiton Iron Ore Pty Ltd Minister's North 11% Annual report for the period 04/05/2003-03/05/2004 Minister's North Project E47/628
A66067 2003 Bhp Billiton Iron Ore Pty Ltd Ministers North 11% Annual Report for the period 4 May 2002 to 3 May 2003 Minister's North E47/628.
A64679 2002 Bhp Billiton Iron Ore Pty Ltd Mount Goldsworthy 11% Annual Report Ministers North E47/628 Period 4 May 2001 To 3 May 2002.
A60394 2000 Bhp Iron Ore Pty Ltd Marillana <1% Annual Report M47/292 Period 11/03/1999 to 10/03/2000 (Barber Rig)
A60399 2000 Pacminex Pty Ltd Yandicoogina <1% Annual Reprot on Exploration to February 1978 Temporary Reserves for Iron 6501H, 6502H, 6504H, Yandicoogina Pr
A60401 2000 Csr Ltd Yandicoogina <1% Density Measurements at Yandicoogina and Yandicoodgina Ore Grade Variability Study (1985, TR70/5604 TR70/6501
A60403 2000 Pacminex Pty Ltd Yandicoogina <1% A Review of the Exploration and Metallurgical testing of the Junction and Weeli Wolli Deposits Yandicoogina Pr
A60404 2000 Csr Ltd Yandicoogina <1% Yankicoogina Iron Ore Project 1980 Drilling Programme and Ore Reserves Calculations in the Mine Block (1980, T
A60715 2000 Csr Ltd Yandicoogina <1% Yandicoogina Iron Ore Project Summary (1983, E47/4 to E47/12 TR70/5201 TR70/5259 TR70/5603 to TR70/5604 TR70/6
A62228 2000 Bhp Iron Ore Pty Ltd Ministers North 5.8% Annual Report E47/628 Ministers North, E47/629 Lamb Creek period 4 May 2000 to 3 May 2001.
A60638 2000 Csr Ltd Yandicoogina <1% CSR Ltd. Yandicoogina Prospect.
A59397 1999 Hamersley Iron Pty Ltd Yandicoogina 1.2% (HIY) Yandicoogina, Mining Lease ML274SA, West Pilbara Mineral Field, WA, Annual Report for the Period 14/10/1
A54184 1998 Bhp Iron Ore Pty Ltd Ministers North 5.8% Annual Report, Ministers North E47/628, Lamb Creek E47/629 04/05/97 - 03/05/98
A56742 1998 Hamersley Iron Pty Ltd Yandicoogina 1.2% (HIY) Yandicoogina, Mining Lease ML 274SA West Pilbara Mineral Field W.A. Annual Report 14/10/97 - 13/10/98
A57498 1998 Bhp Iron Ore Pty Ltd Mac North 5.8% Annual Report Mac North Project. E47/628-629. Period 04/05/98-03/05/99.
A51676 1997 Bhp Iron Ore Pty Ltd Ministers North / Lamb Creek 5.8% Second Compulsory Surrender Report, Ministers North E47/628, Lamb CreekE47/629 for the period 4th May 1993 to
A51677 1997 Bhp Iron Ore Pty Ltd Ministers North 5.8% Annual report Period 4 May 1996 to 3 May 1997 Ministers North E47/629 Lamb Creek E47/629 BHP Iron Ore Pty Ltd
A53188 1997 Hamersley Iron Pty Ltd Yandicoogina Project <1% Annual Report (Combined Mineral Exploration Report), Yandicoogina Project Area - Exploration Licence: 47/4 -
A47744 1996 Bhp Iron Ore Pty Ltd Mount Goldsworthy Area C and Mudlark Wel 5.8% Annual report Period 4 May 1995 to 3 May 1996 Ministers North E47/628 Lamb Creek E47/629 BHP Iron Ore Pty Ltd
A48110 1996 Bhp Iron Ore Pty Ltd Ministers North / Lamb Creek 5.8% Ministers North / Lamb Creek Project, Partial Surrender Report for the period 4th May 1993 to 3rd May 1996, E4
A43947 1994 Bhp Iron Ore Pty Ltd Ministers North 5.8% Annual report period 4 May 1994 to 3 May 1995 Ministers North E47/628 Lamb Creek E47/629
A41062 1994 Bhp Iron Ore Pty Ltd Area C North 5.8% Annual Report for the Period 04/05/93 to 03/05/94 Ministers North / Lamb Creek E47/628, E47/629 BHP Iron Ore P
A43088 1994 Hamersley Iron Pty Ltd Yandicoogina <1% Yandicoolgina Project , Annual Report for the period 8th June 1993 to 7th June 1994, E47/4-12.
A38853 1993 Hamersley Iron Pty Ltd Yandicoogina <1% Annual report for the period 08/06/92-07/06/93 Yandicoogina Project E47/4-12
A35543 1992 Bhp Iron Ore Pty Ltd Mining Area C and Mudlark Well iron ore 1.1% Exploration status report Mining Area 'C' TR3156H (TR70/3156) May 1992 BHP Iron Ore
A37130 1992 Bhp Iron Ore Pty Ltd ML 244 SA - Weeli Wolli <1% Surrender report. Period to 02/05/91. Sections 4, 5, 6 and 21. ML 244 SA
A33354 1991 Bhp Iron Ore Pty Ltd Mount Goldsworthy 1.1% Exploration status report. Mining area 'C' 04/91 TR3156H (TR70/3156) BHP Iron Ore
A29395 1989 Pennant Resources Ltd McCamey's Monster 1.5% Annual report for ML70/266SA McCamey's Monster for the period 11/10/88-10/10/89
A26740 1988 Bhp-Utah Minerals International Yandicoogina 5.9% Yandicoogina(Marillina)Pisoloite Project Reconnaissance Mapping of Basal Stratigraphy;The Weeli Wolli Formatio
A20508 1987 Goldsworthy Mining Ltd Nimingarra 1.1% Nimingarra Project, Non-statutory Report[s]: Quarterly Reports covering the period 01/01/1987 to 31/03/1987,TR
A20722 1987 Bhp Minerals Pty Ltd Central Eastern - Yandicoogina 5.9% Non-statutory Report : Central Eastern -Yandicoogina Assay Results YC 110 - YC 112, YCD 009 YCD 013 - YCD 018,
A20721 1987 Bhp Minerals Pty Ltd Yandicoogina 5.9% Non-statutory Report: The Yandicoogina Central Eastern Iron Pisolite Deposit of Western Australia Stage 1 Dril
A23851 1987 Bhp Minerals Pty Ltd Yandicoogina (Marillana) Eastern Mesa 2 5.9% Yandicoogina (Marillana) Eastern Mesa 2. 12/1987 E47/294
A17480 1986 North Flinders Mines Ltd Newman - Turee Creek 1.1% Newman - Turee Creek Project, Exploration Report for Quarterly Period ended 31st March 1986, TR70/3156H.
A18058 1986 Csr Ltd Yandicoogina <1% Annual report Exploration Licences E47/4 to E47/12 Yandicoogina Project, Pilbara Region, Western Australia for
A19351 1986 Bhp Minerals Pty Ltd Yandicoogina 5.9% Yandicoogina Project, Non-statutory Report: Large Diameter Core Drilling at Yandicoogina, WA, August 1986, TR7
A19352 1986 Bhp Minerals Pty Ltd Yandicoogina 5.9% Yandicoogina Project, Non-statutory Report: Eastern Pisolite Iron Ore Deposit of Western Australia: Stage 1 D
A14967 1985 Goldsworthy Mining Ltd Goldsworthy <1% Goldsworthy Project, Annual Report for the year ending December 31st 1984, TR703156H & E47/13-17.
A17088 1985 Goldsworthy Mining Ltd Goldsworthy 1.1% Goldsworthy Project, Annual Report for the year ending 31/12/1985, TR70/3156H.[Weeli Wolli Springs]
A19347 1985 Bhp Minerals Pty Ltd Yandicoogina 5.9% Yandicoogina Project, Non-statutory Report: Report on the Low Alumina Study 1984, April 1985. TR70/3359H.
A15302 1985 Csr Ltd Yandicoogina <1% Annual report Exploration Licence E47/4 to E47/12 Yandicoogina Project Pilbara Region Western Australia for th
A15303 1985 Csr Ltd Yandicoogina <1% Yandicoogina Project, Non-statutory Report:Paper presented to the Fourth International Iron Ore Symposium, Rom
A60402 1980 Csr Ltd Yandicoogina <1% Yandicoogina Iron Ore Prospect 1979 Drilling programme and ore reserves Calculations in the Initial Mine Block
A7121 1977 Pacminex Pty Ltd Yandicoogina 2.3% Yandicoogina Project, Annual Report for the period ending 31/05/1977,TR70/5604H.
A6454 1976 Pacminex Pty Ltd Yandicoogina 2.3% Yandicoogina Project, Annual Report for the year ending 31/07/1976, TR70/5604H.
A6063 1975 Pacminex Pty Ltd Yandicoogina 2.3% Yandicoogina Project, Annual Report for the year ending 28/07/1975, TR70/5604H.
A3197 1972 Pacminex Pty Ltd Roy Hill 1.2% Roy Hill Project, Non-statutory Report: Report on Geological Exploration, October 1972, TR70/ 5602-5604H.
A968 1972 Western Mining Corporation Ltd Menzies - Comet Vale - Ora Banda <1% Menzies - Comet Vale - Ora Banda Project, Non-statutory Report:
A1379 1970 Pacminex Pty Ltd Hamersley <1% Temporary Reserves for iron ore West Pilbara and Peak Hill Goldfields. Report for the quarter ended 30th June,
A1417 1966 Broken Hill Pty Co Ltd Wilga <1% Wilga Project, Non-statutory Report: Annual & Quarterly Reports for the periods ending 31st December 1966, TR7
A22483 1753 Goldsworthy Mining Ltd Mining Area C 1.1% Annual Exploration Report for year ending 31/12/87 Temporary Reserve T.R. 3156H Mining area 'C' Iron Ore (Mt G
A46438 1753 Hamersley Iron Pty Ltd Yandicoogina <1% Annual report Yandicoogina Project Area Exploration Licences E47/4 to E47/12 8 June 1994 to 7 June 1995 Minera
A49724 1753 Hamersley Iron Pty Ltd Yandicoogina <1% Annual report Yandicoogina Project Area Exploration Licence E47/4 to E47/12 Reporting period 8 June 1995 to 7
A151811 Hamersley Iron Pty Ltd Yandi Braid 1.2% Donated hole geology DD15YBBR0002
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
17 years · 23 Aug 2043
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over L 47/95 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold L 47/95? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.