NextMapsWA TenementsL 45/788

L 45/788

LiveMiscellaneous LicenceShire of East PilbaraMarble Bar District
Area
447.17ha
Expires
Feb 2047
in 20 years
WAMEX reports
100
WA median is 53
Report drilling
25
of 100 reports
East Pilbara Explore on the live map

Register summary

Holder
Pilbara Energy Company Pty Ltd
Local government
Shire of East Pilbara
Application received
8 Feb 2024
Commenced
13 Feb 2026
Expiry
12 Feb 2047
Term
21 Years

Exploration history on this ground

100 historical WAMEX exploration reports intersect L 45/788: 79 report geochemistry or sampling, 61 include a digital data package.
When this ground was worked · 98 of 100 reports dated
11960s
11970s
81980s
161990s
202000s
462010s
62020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A133559 2023 Calidus Resources Limited Warrawoona <1% Partial Surrender Report for E45/4666 Warrawoona for the period ending 23/12/2022
A135310 2023 Keras (Pilbara) Gold Pty Ltd Warrawoona <1% Partial Surrender Report for E45/4622 Warrawoona for the period ending 04/05/2023.
A132928 2022 Atlas Iron Pty Ltd Corunna Downs - E45/4889 <1% Final Surrender Report for E45/4889 Corunna Downs for the Period of 18/10/2017 to 12/10/2022
A122837 2020 Calidus Resources Limited Warrawoona <1% Annual Report C30/2007 Warrawoona Project for the period ending 31/12/2019
A122608 2020 Atlas Iron Pty Ltd Corunna <1% Corunna Downs Combined Annual Report (C94/2011) for the Period 01 January 2019 to 31 December 2019, E45/03320,
95 more reports
A122722 2020 Haoma Mining Nl; Elazac Mining Pty Ltd Marble Bar 2.8% Annual Report For C281/1997 (Marble Bar) for the period 1 December 2018 to 30 November 2019
A119029 2019 Atlas Iron Limited Corunna Downs <1% Corunna Downs Combined Annual Report (C94/2011) For the Period 01 January 2018 to 31 December 2018, E45/03320,
A119134 2019 Haoma Mining Nl; Elazac Mining Pty Ltd Marble Bar <1% Marble Bar C281/1997 Annual Report for the period 1 December 2017 to 30 November 2018
A119726 2019 Calidus Resources Limited Warrawoona <1% Annual Report C30/2007 Warrawoona Project For the Period 1 January 2018 to 31 December 2018
A120990 2019 Haoma Mining Nl E45/3655 27% Annual Report E45/3655 for the period 4 July 2018 to 3 July 2019
A116463 2018 Calidus Resources Limited Warrawoona <1% Annual Report C30/2007 Warrawoona Project for the period 1 January 2017 to 31 December 2017, M45/00552, M45/00
A116119 2018 Atlas Iron Limited Corunna Downs <1% Corunna Downs Combined Annual Report (C94/2011) For the Period 01 January 2017 to 31 December 2017, E45/03320,
A116692 2018 Haoma Mining Nl Marble Bar <1% Marble Bar Project C281/1997 Annual Report for the period 1 December 2016 to 30 November 2017
A117623 2018 Haoma Mining Nl E45/3655 27% Annual Report on E45/3655, 04 July 2017 - 03 July 2018
A112524 2017 Haoma Mining Nl Marble Bar <1% Marble Bar Project C281/1997 Annual Report for the period 01/12/2015 to 30/11/2016, E45/03940....P45/02958
A112638 2017 Nullagine Gold Pty Ltd Marble Bar 10% Final Surrender Report P45/2586 Marble Bar for the period 19 July 2013 to 1 March 2017
A113889 2017 Nullagine Gold Pty Ltd Marble Bar <1% Final Surrender Report for Exploration Licence E45/3678 For the Period 15 November 2011 to 24 February 2017
A113998 2017 Beatons Creek Gold Pty Ltd Warrawoona <1% Combined Annual Mineral Exploration Report: Warrawoona Project C237/2011 for the period 17 March 2016 to 16 Ma
A114623 2017 Haoma Mining Nl Fieldings Ridge 27% Fieldings Ridge E45/3655 Annual Report For the Period 4 July 2016 to 3 July 2017
A114842 2017 Haoma Mining Nl Marble Bar 17% P45/2878 Final Surrender Report for the period 13 August 2013 to 3 October 2017
A107866 2016 Fortescue Metals Group Ltd Corunna <1% C119/2011 Corunna Tin Final Surrender Report for the period 17 July 2013 to 13 July 2015, E 45/03767, E 45/041
A108308 2016 Haoma Mining Nl Marble Bar Group 2 1.1% Marble Bar Project Annual Report C281/1997 for the period 1 December 2014 to 30 November 2015
A108029 2016 Haoma Mining Nl Warrawoona 2.5% E45/1249 Final Surrender Report
A108297 2016 Nullagine Gold Pty Ltd Marble Bar <1% Combined Annual Mineral Exploration Report Marble Bar Project For Combined Reporting Group C121/2012 Report Pe
A110003 2016 Haoma Mining Nl Fieldings Ridge 27% FIELDINGS RIDGE E45/3655 Annual Report for the period 4 July 2015 to 3 July 2016
A104755 2015 Haoma Mining Nl Marble Bar 1.1% C281/1997 Marble Bar Project, Group 2, Annual Report for the Period 1 December 2013 – 30 November 2014, E45/12
A105146 2015 Fortescue Metals Group Ltd Corunna Tin <1% Combined Annual Mineral Exploration Report for the Period 01 January 2014 to 31 December 2014, C119/2011, Coru
A105373 2015 Nullagine Gold Pty Ltd Marble Bar <1% Combined Annual Mineral Exploration Report Marble Bar Project For combined reporting group C121/2012 During th
A106500 2015 Haoma Mining Nl Fieldings Ridge 27% ANNUAL REPORT For the Period 4 July 2014 to 3 July 2015 FIELDINGS RIDGE E45/3655
A101205 2014 Haoma Mining Nl Marble Bar 1.5% Marble Bar Project C281/1997 Group 2 Annual Report for the period 1 December 2012 to 30 November 2013, E45/124
A101801 2014 Nullagine Gold Pty Ltd Marble Bar <1% Marble Bar Project, Annual Report for the period 01/01/2013 to 31/12/2013, E45/3674-3676, 3678, 3717 & 4169; P
A102152 2014 Interquip Pty Ltd Sandy Well 11% Final Surrender Report, Sandy Well Project, E45/2755,for the period 30 March 2007 to 29 March 2014.
A103213 2014 Haoma Mining Nl Fieldings Ridge 27% E45/3655 Fieldings Ridge Project Annual Report for the period 4 July 2013 to 3 July 2014
A96316 2013 Haoma Mining Nl Marble Bar <1% Marble Bar Project, Annual Report for the period 01/12/2011 to 30/11/2012, E45/1249, 1273 & 1869; M45/14......
A98024 2013 Interquip Pty Ltd Sandy Well 11% Annual Report Sandy Well E45/2755 East Pilbara Shire Western Australia For the period 30 March 2012 to 29 Marc
A96834 2013 Mithril Resources Ltd Cutting Creek 1 - Cutting Creek 2 <1% E45/3470 and E45/3471 Cutting Creek 1 and 2, Combined Annual Report, year ending 30 November 2012
A97366 2013 Nullagine Gold Pty Ltd Marble Bar <1% Marble Bar Project, Annual Report for the period 01/01/2012 to 31/12/2012, E45/3674-3676, E45/3678 & E45/3717;
A98903 2013 Haoma Mining Nl Fieldings Ridge 27% E45/3655 Fieldings Ridge Annual Report for the period 4 July 2012 to 3 July 2013
A92772 2012 Mithril Resources Ltd Cutting Creek 1 - Cutting Creek 2 <1% E45/3470 and E45/3471 Cutting Creek 1 and Cutting Creek 2 Year 1 Combined Annual Report for the period 27 Octo
A93903 2012 Haoma Mining Nl Marble Bar <1% C281/1997 Marble Bar Project (Group 2) Annual Report for the Period 1December 2010 – 30 November 2011, Marble
A95318 2012 Haoma Mining Nl Fieldings Ridge 27% Exploration Licence E45/3655 Fieldings Ridge Annual Report for the period 4 July 2011 to 3 July 2012
A94558 2012 Interquip Pty Ltd Sandy Well 11% Annual Report Sandy Well E45/2755 For the period 30th March 2011 to 29th March 2012
A89862 2011 Haoma Mining Nl Marble Bar <1% Marble Bar (Group 2), Annual Report for the Period 1 December 2009 – 30 November 2010, C281/1997
A90446 2011 Interquip Pty Ltd Sandy Well 11% Sandy Well Project, Annual Report for the period ending 29th March 2011, E45/2755.
A90448 2011 Interquip Pty Ltd Sandy Well 11% Sandy Well Project, Partial Surrender Report for the period 30th March 2007 to 26th March 2011, E45/2755.
A91094 2011 Arc Pty Ltd Corunna Downs <1% Final Surrender Report for the period 1 May 2006 to 30 April 2011 Corunna Downs Project E45/2560
A91096 2011 Arc Pty Ltd Corunna Downs <1% Annual Report for the period 1 May 2010 to 30 April 2011, Corunna Downs Project E45/2560
A87843 2010 Arc Pty Ltd Corunna Downs <1% Partial Surrender Report For the Period 1 May 2006 to 13 May 2010 Corunna Downs Project Exploration Licence 45
A86464 2010 Haoma Mining Nl Marble Bar (Group 2) <1% Marble Bar (Group 2) Annual Report for the Period 1 December 2007 – 30 November 2008
A87105 2010 Interquip Pty Ltd Sandy Well 11% Annual Report, Sandy Well, E45/2755, East Pilbara Shire, Western Australia, Reporting Period ending 29/03/2010
A87106 2010 Interquip Pty Ltd Sandy Well 11% Partial Surrender Report,Sandy Well E45/2755, East Pilbara Shire, Western Australia, Reporting Period ending 2
A87398 2010 Arc Pty Ltd Corunna Downs <1% ANNUAL REPORT For the Period 1 May 2009 to 30 April 2010 CORUNNA DOWNS PROJECT EXPLORATION LICENCE 45/2560 PIL
A83099 2009 Interquip Pty Ltd Sandy Well 11% Annual Report E45/2755 For Period Ending 16 June 2009
A84008 2009 Arc Pty Ltd CORUNNA DOWNS <1% Annual Report For the Period 1 May 2008 to 30 April 2009, Corunna Downs Project Exploration Licence 45/2560 Pi
A84085 2009 Arc Pty Ltd CORUNNA DOWNS <1% PARTIAL SURRENDER REPORT FOR THE PERIOD TO 30TH APR 2009, CORUNNA DOWNS PROJECT, EXPLORATION LICENCE 45/2560,
A79088 2008 Arc Pty Ltd Corunna <1% ANNUAL REPORT For the Period 1 May 2007 to 30 April 2008 CORUNNA DOWNS PROJECT Exploration Licence 45/2560 Pil
A78048 2008 Haoma Mining Nl Marble Bar <1% MARBLE BAR (Group 2) ANNUAL REPORT FOR THE PERIOD 1 DECEMBER 2006 - 30 NOVEMBER 2007, GROUP: CMER281/1997 TENE
A74735 2007 Haoma Mining Nl Marble Bar (Group 2) 1.1% Marble Bar (Group 2) Project C281/1997 Annual Report for the Period 1 Dec 2006 - 30 Nov 2006 Report No.03-02-2
A75925 2007 Vgs Pty Ltd Corunna Downs <1% Annual Report for the period 1 May 2006 to 30 April 2007 Corunna Downs Project Exploration Licence 45/2560
A72192 2006 Haoma Mining Nl Fortuna/Salgash 2.5% Fortuna/Salgash Project E45/2145, Surrender Report 2005, Combined Reporting No. C281/1997, (Haoma Report No. 0
A72844 2006 Haoma Mining Nl Marble Bar (Group 2) 1.6% Marble Bar(Group 2), Annual Report for the Period 1 December 2004 to 30 November 2005, Combined Reporting No.
A69739 2005 Haoma Mining Nl Fortuna- Salgash 2.5% E45/1249, Fortuna- Salgash Project, Partial Surrender Report for the period 15/09/1992 to 10/08/2004.
A70559 2005 Haoma Mining Nl Marble Bar (Group 2) 1.1% Annual report for the period 01/12/03 - 30/11/04 Marble Bar (Group 2) Project, C281/1997, E45/1249, 1273, E45/
A68392 2004 Haoma Mining Nl Marble Bar <1% Annual Report for the period 01/12/2002-30/11/2003 Marble Bar Project M45/235, M45/296, M45/655, M45/76, M45/
A68837 2004 Haoma Mining Nl Fortuna - Salgash 2.5% Tenement E45/2145 - Fortuna/ Salgash - Pilbara region Marble Bar 1:250 000 sheet, partial surrender report (15
A66284 2003 Haoma Mining Nl Marble Bar <1% Annual Report for the period ending November 30th 2002 Marble Bar - Group 2 C281/1997: E45/1249, 1273, 1615, 2
A67148 2003 Elazac Mining Pty Ltd Fortuna Salgash 2.5% Partial Surrender of E45/2145 Fortuna/ Salgash Project
A64172 2002 Haoma Mining Nl Marble Bar <1% Annual Report for period ending November 30, 2001 Group 2 tenements - Marble Bar M45/235; M45/296; M45/655; M4
A64303 2002 De Beers Australia Exploration Ltd North Shaw <1% Final Report for exploration licence 45/2190.
A62138 2001 Haoma Mining Nl Marble Bar <1% Annual Report For The Period Ending November 2000. Marble Bar SF50-08. Tenements: 45/1249, E45/1273, E45/1606,
A63488 2001 De Beers Australia Exploration Ltd North Shaw <1% North Shaw Annual Report for exploration licence 45/2190. Reporting Period to 6-8-2001.
A60049 2000 Haoma Mining Nl Marble Bar <1% Annual Report For The Period Ending November 1999. Marble Bar SF50-08. Tenements: E45/1249, E45/1273, E451607,
A57524 1999 Haoma Mining Nl Marble Bar (Group 2) <1% Marble Bar Group 2 Annual report for the period ending 11/98 Marble Bar SF50-08
A58651 1999 Stockdale Prospecting Ltd Marble Bar <1% Elazac Haoma Mining JV Project E45/1249, 1607-1608, 1615 10/1998
A57470 1998 Haoma Mining Nl Marble Bar <1% Addendum to Surrender Report for the period ending January 1999, tenements: E45/1604-05, E45/1618 & 1648, Grou
A54110 1998 Haoma Mining Nl Marble Bar (Group 2) <1% Group 2 Marble Bar Annual Report for the Period Ending November 1997 Marble Bar SF50-8.
A50399 1997 Mr Nowland Pj Butcher Well 1.7% Butcher Well Project, Surrender Report on Exploration Licence E45/1467 from 15/03/1996 to 30/10/1996.
A52156 1997 Haoma Mining Nl Marble Bar (Group 2) <1% Annual report for period ending 30/11/96 Group 2:Marble Bar
A48896 1996 Cra Exploration Pty Ltd Marble Bar <1% Annual Exploration Report for E45/1559 Marble Bar 2 Year Ending 13/08/1996 Marble Bar SF50-08 Western Australi
A52157 1996 Bhp Minerals Pty Ltd Bamboo Creek <1% Bamboo Creek Project Final Report CR8769 September 1996
A44145 1995 Mr Nowland Pj Butcher Well 1.7% Butcher Well Project, Annual Report E45/1467 for period March 1994 to March 1995.
A52158 1995 Wmc Resources Ltd Marble Bar <1% Technical Report 14/05/95-21/09/95 Marble Bar Project Report No:3 Mickey's Find/Normay E45/1556 E45/1903 M45/6
A52159 1995 Wmc Resources Ltd Marble Bar <1% Technical Report 14/05/95-21/09/95 Marble Bar Project Mickey's Find/Normay E45/1556 E45/1903 M45/665 M45/650 E
A40455 1994 Fortuna Nl Fieldings Gully 11% Annual report for the period 02/93-02/94 Fielding's Gully Projedt E45/954 M45/521
A42266 1994 Fortuna Nl Wymans Well 2.5% Annual Report for the period 15/09/93-14/09/94 Wymans Well Project E45/1249
A38016 1993 Fortuna Nl Fieldings Gully 11% Annual report for the period 02/92-02/93 Fielding's Gully Gold Project E45/954 E45/521
A39412 1993 Fortuna Nl Wymans Well 2.5% Annual Report for the period 09/92-09/93 Wymans Well Project E45/1249
A35765 1992 Mim Exploration Pty Ltd Nardoo 4.3% Nardoo Project,1990/1991 Annual & Final Surrender Report, March 1992, E45/950.
A24742 1988 Randolph Holdings Pty Ltd Fielding's Ridge 8.8% Fielding's Ridge, Report on sampling, October 1987, P45/1174-1179
A19930 1987 Carr Boyd Minerals Ltd Camel Creek 14% Annual report, Camel Creek Prospect, P45/1031 and P45/1032, Period 18/10/85 to 17/10/86
A20906 1987 Kennecott Exp Aust Pty Ltd Fieldings Ridge 8.8% Annual report, Fieldings Ridge Prospect, P45/1174 to 45/1179, July 1987
A17233 1985 Alcoa Of Australia Ltd Fielding's Ridge 8.5% Fielding's Ridge Project, Non-statutory Report: Final Explorarion Report for period ending 31/12/1985, P45/44
A14134 1984 Bp Minerals Aust Pty Ltd Coronation Ridge <1% Coronation Ridge Project, Annual Report for the period ending 31st March 1984, GML45/1717-1724; MC45/9809-9809
A15559 1984 Callina Nl Just In Time 5.1% The Just In Time Gold Prospect, Pilbara Goldfield. P.Ls 45/107 to 45/126. November 1983 - September 1984
A13438 1983 Alcoa Of Australia Ltd Fieldings Gully 8.7% Fieldings Gully Project, Non-statutory Report: Exploration of Mineral Claims,July 1983, MC45/8773-8777;PA45/31
A11357 1982 International Nickel Aust Ltd Glen Herring <1% Glen Herring Project, Non-statutory Report: Final Report for the period 31st January 1981 to 30th January 1982
A4189 1970 Bamboo Creek Gold Mines Nl Fielding's Gully - Split Rock 5.9% Fielding Gully - Split Rock Project, Non-statutory Report: Prospectus Report : The Geology of the Fielding's G
A9721 1969 Bamboo Creek Gold Mines Nl Fielding's Gully 29% Fielding's Gully Project, Annual Report, May 1969, MC45/1004-1006, 1013-1018 & 1020.
A81837 1753 Haoma Mining Nl MARBLE BAR (Group 2) <1% MARBLE BAR (Group 2) ANNUAL REPORT FOR THE PERIOD 1 DECEMBER 2007 – 30 NOVEMBER 2008
A105966 Archean Biosphere Drilling Project 1.6% Archean Biosphere Drilling Project 2003 and 2004. Drillhole locations and Drill Logs ABDP1-ABDP6 inclusive. AB
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
20 years · 12 Feb 2047
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over L 45/788 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold L 45/788? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.