NextMaps›WA Tenements›L 39/109

L 39/109

LiveMiscellaneous LicenceShire of LavertonMt. Morgans District
Area
14.7ha
Expires
Oct 2041
in 15 years
WAMEX reports
76
WA median is 53
Report drilling
64
of 76 reports
Laverton Explore on the live map

Register summary

Holder
Gsm Mining Company Pty Ltd
Local government
Shire of Laverton
Application received
27 Oct 1998
Commenced
15 Oct 1999
Expiry
14 Oct 2041
Term
21 Years (Renewed)

Exploration history on this ground

76 historical WAMEX exploration reports intersect L 39/109: 36 report geochemistry or sampling, 61 include a digital data package.
When this ground was worked · 74 of 76 reports dated
21970s
11980s
181990s
202000s
272010s
62020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A129997 2022 Matsa Gold Pty Ltd Hacks Well <1% E38/2945 Hacks Well Report on Areas Relinquished 9th December 2021
A122815 2020 Anglogold Ashanti Australia Limited Sunrise Dam <1% Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio
A122827 2020 Matsa Resources Limited Red October <1% Red October Group Annual Report C173/2017 for the period ending 31/12/2019
A123791 2020 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020
A124126 2020 Anglogold Ashanti Australia Limited Pink Lady <1% CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine
71 more reports
A125157 2020 Anglogold Ashanti Australia Limited Western Ramps <1% EIS Round 20 - Western Ramps (Final Report)
A118830 2019 Matsa Gold Pty Ltd Hack Well <1% Annual Mineral Exploration Report E38/2945 Hack Well for the period 14 December 2017 to 13 December 2018
A119211 2019 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3
A119510 2019 Matsa Resources Limited Red October <1% Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019
A120095 2019 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201
A120368 2019 Anglogold Ashanti Australia Limited Southern Shear - Sunrise Dam <1% EIS Southern Shear Zones – SDGM project (R#17)
A115637 2018 Australian Potash Limited Hack Well <1% ANNUAL REPORT HACK WELL PROJECT E38/02945 FOR THE PERIOD 14/12/2016 - 13/12/2017
A115940 2018 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3
A116780 2018 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018
A112079 2017 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016
A114051 2017 Gsm Mining Company Pty Ltd Central Laverton <1% CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2
A112076 2017 Australian Potash Limited Hack Well <1% Hack Well Project E38/2945 Annual Report for the period 14/12/2015 to 13/12/2016
A108112 2016 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/
A108971 2016 Gsm Mining Company Pty Ltd Central Laverton <1% C86/2002 CENTRAL LAVERTON PROJECT COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/04/2015 TO 31/03/2016
A104898 2015 Anglogold Ashanti Australia Ltd Sunrise Dam Group <1% Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3
A105693 2015 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton Combined Annual Technical Report for the period 01 April 2014 to 31 March 2015, C86/2002, E38
A104805 2015 Gsm Mining Company Pty Ltd Barnicoat <1% BARNICOAT PROJECT COMBINED ANNUAL TECHNICAL REPORT (C388/1993) FOR THE PERIOD 01 JANUARY 2014 – 31 DECEMBER 20
A101216 2014 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201
A100990 2014 Gsm Mining Company Pty Ltd Barnicoat <1% Barnicoat Project, Annual Report for the period 01/01/2013 to 31/12/2013, M38/361-362, 483-484; E38/2029 & 203
A102837 2014 Gsm Mining Company Pty Ltd Barnicoat <1% Barnicoat Project, Final Surrender Report for the period 08/10/2008 to 29/04/2014, E38/2029 & 2035. [C388/1993
A96848 2013 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995)
A96870 2013 Barrick (Granny Smith) Pty Ltd Barnicoat <1% PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483, M38/484 E38/2029, E38/2035 P39/4806 ANNUAL REPORT Pe
A97044 2013 Barrick (Granny Smith) Pty Ltd Barnicoat 2.1% Barnicoat Project, Final Surrender Report for the 16th January 2009 to 14th January 2013, P39/4806. [C388/199
A92879 2012 Barrick (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project, Annual Report for the period 1st January 2011 to 31st December 2011, M38/361-362, 483-484;
A92885 2012 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995).
A89346 2011 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010
A89375 2011 Barrick (Granny Smith) Pty Ltd Barnicoat <1% Project 8362 BARNICOAT PROJECT P39/4806 E38/2029, E38/2035 8/361, M38/362, M38/483, M38/484 Annual Report Peri
A85813 2010 Barrick (Australia Pacific) Ltd Barnicoat <1% Project 8362 Barnicoat Project P39/4806 E38/2029, E38/2035 M38/361, M38/362, M38/483, M38/484 Annual Report pe
A81076 2009 Anglogold Ashanti Australia Ltd SUNRISE DAM GROUP <1% SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3
A77574 2008 Anglogold Ashanti Australia Ltd Sunrise Dam <1% SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07
A78009 2008 Barrick Gold Of Australia Ltd Barnicoat <1% Project 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483 Annual Report Period 1 January 2007 - 31 December 200
A81090 2008 Barrick (Granny Smith) Pty Ltd Barnicoat <1% PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483 ANNUAL REPORT Period 1 January 2008 – 31 December 200
A74516 2007 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31
A74557 2007 Barrick Gold Of Australia Ltd Barnicoat <1% Barnicoat Project M38/361,362,483 C388/1993 Annual Report for the Period 1st Jan 2006 to 31st Dec 2006 Report
A72164 2006 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project, E38/494,M38/361,362,483, P39/3239,3291-3293, Mount Margaret Mineral Field, Annual Explorati
A70338 2005 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M
A70688 2005 Placer Dome Asia Pacific Ltd Barnicoat <1% Barnicoat Project, M38/361, M38/362, M38/483, E38/494, P39/3239, P39/3291, P39/3292, P39/3293, Mount Margaret
A68271 2004 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project, Annual Exploration Report M38/361-362, M38/ 483; E38/494; P39/3239, P39/ 3291-3293 for the
A68170 2004 Anglogold Australasia Ltd Sunrise Dam <1% Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21
A71952 2004 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t
A65899 2003 Placer (Granny Smith) Pty Ltd Barnicoat <1% Combined Annual Mineral Exploration Report for the period 1 January 2002 to 31 December 2002 Barnicoat Project
A66542 2003 Anglogold Australia Ltd Sunrise Dam <1% Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366,
A64488 2002 Anglogold Australia Ltd Sunrise Dam <1% Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144
A64258 2002 Placer (Granny Smith) Pty Ltd Barnicoat <1% Annual Report on exploration for the period 1 January 2001 to 31 December 2001 Barnicoat Project P39/3239, 329
A62105 2001 Placer (Granny Smith) Pty Ltd Barnicoat <1% Annual Report on exploration Barnicoat Project P39/3239, 3291, 3292, 3293; E38/494; M38/361, 362, 483 1 Januar
A60543 2000 Placer (Granny Smith) Pty Ltd Barnicoat <1% Annual Report on Exploration, Barnicoat Project, P39/3239,32 3291-3293,E38/494,M38/361,362,483, Mt Margaret Go
A60321 2000 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999
A61954 2000 Anglogold Australasia Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat
A57772 1999 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project-P39/3239, 3291-3293, E38/494, M38/361-362, M38/483 for the period 01/01/98 - 31/12/98
A57146 1998 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9
A53829 1998 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997
A54524 1998 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project, [8th] Annual Report 01/01/97 - 31/12/97, P38/2380, P39/3239, 3292-3293, P38/2380, E38/437,
A50393 1997 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report
A51588 1997 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project P38/2380 P38/3239 P38/3291 P38/3292 P38/3293 E38/437 E38/482 E38/494 E38/502 M38/313 M38/361
A47027 1996 Placer Exploration Ltd Barnicoat <1% Barnicoat Project P38/2380 P38/2396 P39/3239 P39/3291 P39/3292 P39/3293 E38/395 E38/437 E38/482 E38/494 E38/50
A47061 1996 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb
A44303 1995 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3
A43702 1995 Placer Exploration Ltd Barnicoat <1% Barnicoat Project E38/298, 395, 437, 482, 502, 537, 494, P38/2380, 2393-2399 INCL. 2404, 2405, 2408, 2423-2429
A40299 1994 Billiton Australia Pty Ltd Sunrise Dam <1% Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263
A41746 1994 Placer Exploration Ltd Barnicoat <1% Annual Report for the period 11/02/93-10/02/94 Barnicoat Project E38/494
A42103 1994 Placer Exploration Ltd Sunset <1% Annual Report for the period 06/93-06/94 Sunset Project P39/3090-91,3238-40,3076,& 3119
A38820 1993 Billiton Australia Pty Ltd Sunrise Dam <1% Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263
A40012 1993 Billiton Australia Pty Ltd Sunrise Central <1% Partial surrender report, Sunrise Central, E39/229.
A36820 1992 Billiton Australia Pty Ltd Sunrise Dam <1% Sunrise Dam Project, Partial Surrender Report July 1992, . E39/174, 206, 229; Surrender Report E39/230.
A35603 1992 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2
A33010 1991 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230
A28729 1989 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report ending 30 June 1989, Sunrise Dam Project, E39/174, E39/206, E39/227, E39/229, E39/230, P39/215
A2691 1972 Australian Selection Pty Ltd Wilga <1% Wilga Project, Annual Report for the period ending 31/12/1971, TR70/3747; MC39/62-115, 136-143, 191-219, 911-9
A1366 1970 Australian Selection Pty Ltd Wilga <1% Wilga Area, Annual Report for the year ending 31/12/1969, TR70/3747H; MC39/62-115, 136-143, 191-209, 911-939 &
A85886 1753 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
15 years · 14 Oct 2041
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over L 39/109 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold L 39/109? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.