L 38/62
Register summary
- Holder
- Gsm Mining Company Pty Ltd
- Local government
- Shire of Laverton
- Application received
- 18 Nov 1994
- Commenced
- 17 Feb 1995
- Expiry
- 16 Feb 2030
- Term
- 5 Years (Renewed)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A145852 | 2024 | Mt Weld Mining Pty Ltd | Mount Weld | <1% | Completion of EIS round 28 supported exploration drilling 2024, Mt Weld REE project - Final Report |
| A129997 | 2022 | Matsa Gold Pty Ltd | Hacks Well | <1% | E38/2945 Hacks Well Report on Areas Relinquished 9th December 2021 |
| A132799 | 2022 | Lodestar Minerals Ltd | Jubilee Well | <1% | Annual Report for E38/3054 Jubilee Well for the period ending 12/09/2022 |
| A126029 | 2021 | Gsm Mining Company Pty Ltd | E38/2888 | 1.3% | Compulsory Partial Surrender (40%) of Exploration Licence E38/2888 For the Period 23 January 2015 to 22 Januar |
| A128857 | 2021 | Lodestar Minerals Ltd | Jubilee Well | <1% | Annual Exploration Report Jubilee Well E38/03054 for the period ending 12/09/2021 |
156 more reports
| A122815 | 2020 | Anglogold Ashanti Australia Limited | Sunrise Dam | <1% | Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio |
| A122827 | 2020 | Matsa Resources Limited | Red October | <1% | Red October Group Annual Report C173/2017 for the period ending 31/12/2019 |
| A122902 | 2020 | Mt Weld Mining Pty Limited | Mount Weld | <1% | Mt Weld Rare Earths Project Annual Report on Exploration on tenements M38/58, M38/59, M38/326, M38/327, E38/22 |
| A123791 | 2020 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020 |
| A124126 | 2020 | Anglogold Ashanti Australia Limited | Pink Lady | <1% | CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine |
| A125157 | 2020 | Anglogold Ashanti Australia Limited | Western Ramps | <1% | EIS Round 20 - Western Ramps (Final Report) |
| A119370 | 2019 | Mt Weld Mining Pty Ltd | Mount Weld | <1% | Mount Weld Rare Earths Project Combined Report C56/1999 Exploration on tenements M38/58, M38/59, M38/326, M38/ |
| A118830 | 2019 | Matsa Gold Pty Ltd | Hack Well | <1% | Annual Mineral Exploration Report E38/2945 Hack Well for the period 14 December 2017 to 13 December 2018 |
| A119211 | 2019 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3 |
| A119510 | 2019 | Matsa Resources Limited | Red October | <1% | Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019 |
| A119796 | 2019 | Oro Del Sur Pty Ltd | Laverton | <1% | E38/3054 Annual Technical Report for the period 13 September 2017 to 12 September 2018 |
| A120095 | 2019 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201 |
| A120368 | 2019 | Anglogold Ashanti Australia Limited | Southern Shear - Sunrise Dam | <1% | EIS Southern Shear Zones – SDGM project (R#17) |
| A115637 | 2018 | Australian Potash Limited | Hack Well | <1% | ANNUAL REPORT HACK WELL PROJECT E38/02945 FOR THE PERIOD 14/12/2016 - 13/12/2017 |
| A115940 | 2018 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3 |
| A116142 | 2018 | Mt Weld Mining Pty Ltd | Mount Weld | <1% | Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2015 to 24 November 2016, |
| A116780 | 2018 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018 |
| A112079 | 2017 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016 |
| A114051 | 2017 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2 |
| A111860 | 2017 | Lynas Corporation Limited | Mount Weld | <1% | Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2015 to 24 November 2016, |
| A112076 | 2017 | Australian Potash Limited | Hack Well | <1% | Hack Well Project E38/2945 Annual Report for the period 14/12/2015 to 13/12/2016 |
| A108112 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/ |
| A107882 | 2016 | Mt Weld Mining Pty Ltd | Mount Weld | <1% | Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2014 to 24 November 2015, |
| A108971 | 2016 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | C86/2002 CENTRAL LAVERTON PROJECT COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/04/2015 TO 31/03/2016 |
| A109831 | 2016 | Lynas Corporation Limited | Mount Weld | <1% | Mount Weld E38/2224 Partial Surrender Report for the period 17 August 2010 to 12 August 2016 |
| A104898 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | <1% | Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3 |
| A105466 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063 |
| A105693 | 2015 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Combined Annual Technical Report for the period 01 April 2014 to 31 March 2015, C86/2002, E38 |
| A107077 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 1.6% | Sunrise Dam Project E38/2297 (Empie) Surrender Report for the period 20/10/2010 to 01/09/2015 |
| A101216 | 2014 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201 |
| A104205 | 2014 | Mt Weld Mining Pty Ltd | Mount Weld | <1% | Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2013 to 24 November 2014, |
| A100696 | 2014 | Mt Weld Mining Pty Ltd | Mount Weld | <1% | Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2012 to 24 November 2013, |
| A100990 | 2014 | Gsm Mining Company Pty Ltd | Barnicoat | <1% | Barnicoat Project, Annual Report for the period 01/01/2013 to 31/12/2013, M38/361-362, 483-484; E38/2029 & 203 |
| A101830 | 2014 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39 |
| A102477 | 2014 | Focus Minerals Ltd | Mount Weld | <1% | Mt Weld E38/1652 Annual Report for the period 01/09/2013 to 31/03/2014 |
| A102837 | 2014 | Gsm Mining Company Pty Ltd | Barnicoat | <1% | Barnicoat Project, Final Surrender Report for the period 08/10/2008 to 29/04/2014, E38/2029 & 2035. [C388/1993 |
| A97624 | 2013 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279; |
| A100055 | 2013 | Focus Minerals (Laverton) Pty Ltd | Sunrise | <1% | Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545 |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A96870 | 2013 | Barrick (Granny Smith) Pty Ltd | Barnicoat | <1% | PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483, M38/484 E38/2029, E38/2035 P39/4806 ANNUAL REPORT Pe |
| A92879 | 2012 | Barrick (Granny Smith) Pty Ltd | Barnicoat | <1% | Barnicoat Project, Annual Report for the period 1st January 2011 to 31st December 2011, M38/361-362, 483-484; |
| A92885 | 2012 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995). |
| A95100 | 2012 | Torridon Exploration | Sunrise Dam | <1% | Sunrise Dam Project Combined Annual Exploration Report For The Year To 30th June 2012 C42/2011 For Tenements: |
| A95588 | 2012 | Rubicon Resources Ltd | Laverton | <1% | E38/2224 Annual Technical Report 1st Jan 2012 to 16th August 2012 |
| A96196 | 2012 | Focus Minerals (Laverton) Pty Ltd | Sunrise | <1% | Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797 |
| A92958 | 2012 | Rubicon Resources Ltd | Laverton | <1% | Laverton Project Combined Report C86/2010 E38/2221, 2222, 2224, 2267, 2304, 2306 Annual Report 1st Jan 2011 to |
| A89346 | 2011 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010 |
| A89375 | 2011 | Barrick (Granny Smith) Pty Ltd | Barnicoat | <1% | Project 8362 BARNICOAT PROJECT P39/4806 E38/2029, E38/2035 8/361, M38/362, M38/483, M38/484 Annual Report Peri |
| A89526 | 2011 | Rubicon Resources Ltd | Laverton | <1% | Laverton Project Combined Report C86/2010 2010, Report Period: 1st January 2010 – 31 December 2010 |
| A90565 | 2011 | Crescent Gold Ltd | Childe Harold | <1% | Combined Annual Report on Exploration for the period 01/04/2010 to 31/03/2011; Childe Harold Project; C157/200 |
| A91983 | 2011 | Cove Resources Limited | Sunrise Dam | <1% | Sunrise Dam Project C42/2011 Combined First Annual Report period ending 30 June 2011 for E38/2155, E38/2272 & |
| A85813 | 2010 | Barrick (Australia Pacific) Ltd | Barnicoat | <1% | Project 8362 Barnicoat Project P39/4806 E38/2029, E38/2035 M38/361, M38/362, M38/483, M38/484 Annual Report pe |
| A87437 | 2010 | Crescent Gold Ltd | Childe Harold | <1% | Combined Annual Report C133/2006 Ffor Leases E38/1652, 1ST April 2009 to 31st March 2010 |
| A88423 | 2010 | Cazaly Resources Ltd | Sunrise Dam | 1.3% | Annual Report Sunrise Dam Project E38/2155 For the Period 14 August 2009 to 13 August 2010 |
| A82441 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | <1% | CHILDE HAROLD PROJECT Annual Report E38/1652 For the period 01/04/2008 to 31/03/2009, Group Reporting No. C157 |
| A81076 | 2009 | Anglogold Ashanti Australia Ltd | SUNRISE DAM GROUP | <1% | SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A82274 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | <1% | Childe Harold Project, Partial Surrender Report, E38/1652, blocks Kalgoorlie 749 p, u, y, z, and Kalgoorlie 75 |
| A78902 | 2008 | Jindalee Resources Ltd | Jubilee Well | 2.3% | Jubilee Well Project E38/1730 SURRENDER REPORT Report. Period 11/08/2006 - 12/06/2008 E38_1730_2008S |
| A77574 | 2008 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07 |
| A78425 | 2008 | Metex Resources Ltd | Childe Harold | <1% | CHILDE HAROLD PARTIAL SURRENDER REPORT E38/1652 blocks KALGOORLIE 0750 g,m,r,w; KALGOORLIE 0822 b,g,h,j,m,n, o |
| A74516 | 2007 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31 |
| A75232 | 2007 | Metex Resources Ltd | Childe Harold | <1% | Childe Harold Project, Annual Technical Report for the period 01/04/2006 - 31/03/2007, Group Reporting No C157 |
| A76288 | 2007 | Metex Resources Ltd | Childe Harold | 1.6% | Childe Harold Project, Surrender Report E38/1658, P38/3293 -3295, Group Reporting No. C157/2005, Mount Marga |
| A76156 | 2007 | Jindalee Resources Ltd | Burtville | 2.3% | Burtville Annual Report 2007 11/08/2006 to 11/08/2007 E38/1730 |
| A72825 | 2006 | Metex Resources Ltd | Childe Harold | <1% | W128 Childe Harold E38/1123,1529,1652,1658,P38/3211-3213, Annual Technical Report for the Period 01/04/2005 to |
| A72416 | 2006 | Placer (Granny Smith) Pty Ltd | Mikado | <1% | Mikado Project, Annual Exploration Report for the Period 1 January 2005 to 31 December 2005, C463/1996, (PGS R |
| A72951 | 2006 | Crescent Gold Ltd | Jubilee Well | <1% | Surrender Report, Jubilee Well JV E38/462, Period 21 January 2005 to 20 January 2006, Surrendered 27 January 2 |
| A70514 | 2005 | Placer Dome Asia Pacific Ltd | Mikado | <1% | Mikado Project, Annual Report for the period 01/01/2004 - 31/12/2004 , E38/422, 680, 772, 930, 1126, E38/1205, |
| A70338 | 2005 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M |
| A70566 | 2005 | Anglogold Ashanti Australia Ltd | Laverton | <1% | Annual report for the period 01/01/04 - 31/12/04 Laverton Project, C164/2002, E38/199, 399, 420, 462, 523, E38 |
| A70691 | 2005 | Placer Dome Asia Pacific Ltd | Sunrise - Sunset | <1% | Sunrise - Sunset Project, Annual Report for the period 1st January 2004 to 31st December 2004, P39/3076, P39/3 |
| A68341 | 2004 | Sons Of Gwalia Ltd | Jubilee Well | <1% | Jubilee Well Project Surrender Report for the period 24 Febr uary 1993 to 5 February 2004 C345/1993 E38/449 Re |
| A68435 | 2004 | Placer Dome Asia Pacific Ltd | Sunrise/Sunset | <1% | Sunrise/Sunset Project, P39/3076, P39/3090, P39/3091, P39/3238, P39/3294, P39/3240. Mount Margaret Mineral Fii |
| A68436 | 2004 | Placer Dome Asia Pacific Ltd | Mikado | <1% | Annual report for the period 01/01/2003-31/12/2003 Mikado Project E38/0422, E38/0680, E38/0772, E38/0930, E38/ |
| A68170 | 2004 | Anglogold Australasia Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21 |
| A68195 | 2004 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39 |
| A68313 | 2004 | Anglogold Australia Ltd | Laverton | <1% | Annual Report for the period 01/01/2003-31/12/2003 Laverton Project (C164/2002), E38/1010, E38/1015, E38/1066, |
| A69921 | 2004 | Placer Dome Asia Pacific Ltd | Mikado | <1% | Mikado Project, E38/1205, Partial surrender report for the period 20th July, 2001 to 19th July 2004, C463/1996 |
| A71952 | 2004 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t |
| A66170 | 2003 | Placer (Granny Smith) Pty Ltd | Sunrise-Sunset | <1% | Annual Report on Exploration period ending 30th September 2002 Sunrise-Sunset Project C185/1995: M39/217, P39/ |
| A66171 | 2003 | Placer (Granny Smith) Pty Ltd | Mt Lebanon | <1% | Annual Report on Exploration period ending 31st December 2002 Mt Lebanon Project C463/1996: M38/9, E38/422, E3 |
| A66180 | 2003 | Anglogold Australia Ltd | Jubilee Well | <1% | Annual Report for the period 21 January 2002 to 20 January 2003 ,Jubilee Well JV Project,[C164/2002], E38/462, |
| A66523 | 2003 | Sons Of Gwalia Ltd | Jubilee Well | <1% | Annual Report for the period 24 February 2002 - 23 February 2003 Jubilee Well Project C50/1996: E38/449 |
| A66542 | 2003 | Anglogold Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366, |
| A67737 | 2003 | Anglogold Australia Ltd | Jubilee Well | <1% | Jubilee Well JV, E38/462, E38/523, Partial Surrender Report for the period 21/01/1996- 12/11/2003. |
| A64307 | 2002 | Anglogold Australia Ltd | Jubilee Well | <1% | Annual Report for the period 21 January 2001 to 20 January 2002 Jubilee Well JV E38/462, E38/523 & E338/524. |
| A64321 | 2002 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | <1% | Annual Report on exploration Sunrise-Sunset Project M39/217, P39/3076, 3090-3091, 3119, 3238, 3240, 3294 for t |
| A64488 | 2002 | Anglogold Australia Ltd | Sunrise Dam | <1% | Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144 |
| A64064 | 2002 | Placer (Granny Smith) Pty Ltd | Mt Lebanon P | <1% | Mt Lebanon Project M38/0009, E38/0422, E38/0680, E38/0772 E38/0930, E38/1126, E38/1205, E38/1206, P38/2239 and |
| A62476 | 2001 | Sons Of Gwalia Ltd | Jubilee Well | <1% | Jubilee Well Project Annual Report For The Period 24 February 1999 - 23 February 2000 Tenement: E38/449. |
| A62104 | 2001 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | <1% | Annual Report on exploration Sunrise/Sunset Project M39/217, P39/3075, 3090-3091, 3119, 3238, 3240, 3294 for t |
| A63177 | 2001 | Pan Palladium Ltd | Sunset Strip | 4.4% | Annual Report on Exploration, Sunset Strip project, P38/2828 2829,2830, Ref C2/2001, Mt Margaret Mineral Field |
| A59851 | 2000 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | <1% | Annual Report On Exploration Sunrise-Sunset Project M39/217, P39/3076,3090-3091,3119 For The Period 01/01/1999 |
| A61200 | 2000 | Abador Gold Nl | Sunset Strip | 6.6% | Sunset Strip P38/2829, 38/2830. Mt Morgan Mineral Field Laverton 1:250,000 (SH51-2) Annual Report for 12 month |
| A60182 | 2000 | Acacia Resources Ltd | Jubilee Well | <1% | Jubilee Well J.V; E38/462, E38/523 and E38/524; Annual report for the period 21/01/1999 to 20/01/2000 |
| A60321 | 2000 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999 |
| A61954 | 2000 | Anglogold Australasia Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat |
| A62054 | 2000 | Anglogold Australasia Ltd | Jubilee Well | <1% | Jubilee Well Project E38/462, E38/523 and E38/524 Verification Report, Annual Report for the period 21 January |
| A57593 | 1999 | Acacia Resources Ltd | Jubilee Well | <1% | Acacia Resources Ltd Aurora Gold W.A Ltd Jubilee Well J.V E38/462,523.524 Annual Report For the Period 21/01/1 |
| A58027 | 1999 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | <1% | Sunrise - Sunset Project, Annual Report for the period 1st Janaury 1998 to 31st December 1998, M39/217; P39/ |
| A59057 | 1999 | Sons Of Gwalia Ltd | Jubilee Well | <1% | Jubilee Well JV Project (formerly Sunrise Dam JV Project) Annual report for the period 24/02/98-23/02/99, E38/ |
| A57146 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9 |
| A53829 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997 |
| A54452 | 1998 | Placer (Granny Smith) Pty Ltd | Sunset | <1% | Sunrise/Sunset Project, Mt Margaret Goldfield, W.A. 01/01/97 - 31/12/97 M39/217, P39/3076, 3090-3091, 3119, 32 |
| A54524 | 1998 | Placer (Granny Smith) Pty Ltd | Barnicoat | <1% | Barnicoat Project, [8th] Annual Report 01/01/97 - 31/12/97, P38/2380, P39/3239, 3292-3293, P38/2380, E38/437, |
| A56253 | 1998 | Placer (Granny Smith) Pty Ltd | Davis Well | 1% | Davis Well (E38/482) Surrender Report October 1998. |
| A56263 | 1998 | Sons Of Gwalia Ltd | Sunrise Dam | <1% | Sunrise Dam JV Project Annual report for the period 24/02/97-23/02/98 E38/449 E39/421. |
| A53166 | 1997 | Acacia Resources Ltd | Brumby Well | <1% | Jubilee Well J.V. E38/462, 523, 524 Laverton, North-Eastern Goldfields, Yilgarn W.A. Annual Report, 21/01/97 |
| A50186 | 1997 | Acacia Resources Ltd | Brumby Well | <1% | Jubilee Well Joint Venture E38/462 E38/523 and E38/524 Annual report for the period 21/01/96 to 20/01/97 Repor |
| A50393 | 1997 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report |
| A50913 | 1997 | Placer (Granny Smith) Pty Ltd | Sunset | <1% | Annual report on Exploration Sunrise/ Sunset Project M39/217 P39/3076 P39/3090 to P39/3091 P39/3119 P39/3238 P |
| A51563 | 1997 | Sons Of Gwalia Ltd | Sunrise Dam | <1% | Sunrise Dam Joint Venture Annual report for the year ending 23rd February 1997 Tenements E38/449 E39/421. |
| A51588 | 1997 | Placer (Granny Smith) Pty Ltd | Barnicoat | <1% | Barnicoat Project P38/2380 P38/3239 P38/3291 P38/3292 P38/3293 E38/437 E38/482 E38/494 E38/502 M38/313 M38/361 |
| A51718 | 1997 | Placer (Granny Smith) Pty Ltd | Ophir Bore / Barnicoat | 1.1% | Ophir Bore / Barnicoat Project, Surrender Report P38/2427, July 1997. |
| A51719 | 1997 | Placer (Granny Smith) Pty Ltd | Ophir Bore / Barnicoat | 11% | Ophir Bore / Barnicoat Project, Surrender Report P38/2428, July 1997. |
| A46846 | 1996 | Gasgoyne Gold Mines Nl | Sunrise Dam North | <1% | Sunrise Dam North E38/449 and Sunrise Dam West E39/421 Annual Report for the year to 23 February 1996 |
| A47027 | 1996 | Placer Exploration Ltd | Barnicoat | <1% | Barnicoat Project P38/2380 P38/2396 P39/3239 P39/3291 P39/3292 P39/3293 E38/395 E38/437 E38/482 E38/494 E38/50 |
| A47061 | 1996 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb |
| A47216 | 1996 | Aurora Gold Ltd | Brumby Well | <1% | H468 Brumby Well Project Western Australia Annual Technical Report for the period 21 January 1995 to 20 Januar |
| A47500 | 1996 | Placer Prospecting Pty Ltd | Sunrise/Sunset | <1% | Second Annual report on Exploration Sunrise/Sunset Project M39/217 P39/3076 P39/3090 P39/3091 P39/3238 P39/324 |
| A44129 | 1995 | Gasgoyne Gold Mines Nl | Sunrise Dam North | <1% | Sunrise Dam North Project E38/449 Annual Report for the year to 23 February 1995 |
| A44189 | 1995 | Aurora Gold Ltd | Brumby Well | <1% | Annual Techincal Report Brumby Well Project Western Australia Exploraton Licences 38/462,38/523 and 38/524 For |
| A44303 | 1995 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3 |
| A46533 | 1995 | Gasgoyne Gold Mines Nl | Sunrise Dam North east | <1% | Sunrise Dam North East P38/2590 to P38/2592 Annual report for the year ending 16 August 1995 |
| A43702 | 1995 | Placer Exploration Ltd | Barnicoat | <1% | Barnicoat Project E38/298, 395, 437, 482, 502, 537, 494, P38/2380, 2393-2399 INCL. 2404, 2405, 2408, 2423-2429 |
| A40299 | 1994 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263 |
| A42348 | 1994 | Placer Exploration Ltd | Sunrise | <1% | Annual report on exploration Sunrise M39/217 Mt Margaret Goldfield, WA For the year period 14/02/93 to 30/06/9 |
| A40522 | 1994 | Placer Exploration Ltd | Mount Weld | <1% | Annual Report for the Period 01/01/93 - 31/12/93 Mt Weld/Keringal/Ophir Bore Project |
| A41168 | 1994 | Gasgoyne Gold Mines Nl | Sunrise Dam North | <1% | Annual Report for the Sunrise Dam North Prospect E38/449 ,for the period 01/02/1993 to 10/02/1994. |
| A41227 | 1994 | Aurora Gold Ltd | Brumby Well | <1% | Annual Technical Report Period: 21/01/93 to 21/01/94 Brumby Well Project E38/462, 38/523, 38/524 |
| A42103 | 1994 | Placer Exploration Ltd | Sunset | <1% | Annual Report for the period 06/93-06/94 Sunset Project P39/3090-91,3238-40,3076,& 3119 |
| A38820 | 1993 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263 |
| A39397 | 1993 | Delta Gold Ltd | Sunrise | <1% | Annual Report for the period 14/02/92-13/02/93 Sunrise Project M39/217 |
| A40013 | 1993 | Billiton Australia Pty Ltd | Sunrise West | <1% | Partial surrender report Sunrise West, E39/263 |
| A35400 | 1992 | Poseidon Exploration Ltd | Mount Weld | <1% | Mount Weld Project, Annual Report for the year ending 31/12/1991, E38/163. |
| A36624 | 1992 | Delta Gold Ltd | Sunrise Dam | <1% | Annual report (for the period 02/91-02/92) Sunrise Dam M39/217 July 1992 |
| A36820 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Sunrise Dam Project, Partial Surrender Report July 1992, . E39/174, 206, 229; Surrender Report E39/230. |
| A35603 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2 |
| A32915 | 1991 | Poseidon Ltd | Mount Weld | <1% | Mt Weld Project, Annual Report for the year ending 31/12/1990, E38/163. |
| A33010 | 1991 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230 |
| A33396 | 1991 | Poseidon Ltd | Mount Weld | <1% | Mount Weld Project,1990 Partial Surrender Report, February 1991, E38/163. |
| A33983 | 1991 | Delta Gold Ltd | Sunrise Dam | <1% | Sunrise Dam M39/217 Annual Report for 1990 Project No:374 |
| A30632 | 1990 | Poseidon Ltd | Mount Weld | <1% | Annual report 1989. Mt. Weld Project. E38/163. Laverton Sh51-2 |
| A30847 | 1990 | Freeport Of Australia Inc | Mount Weld | <1% | Mt Weld Project, Annual report, 1988. E38/163 |
| A28729 | 1989 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report ending 30 June 1989, Sunrise Dam Project, E39/174, E39/206, E39/227, E39/229, E39/230, P39/215 |
| A14703 | 1985 | Golconda Minerals Nl | Hack Well | 1.2% | Hack Well Project, Final Surrender Report for the period ending 10/05/1985, E38/24. |
| A14763 | 1984 | Golconda Minerals Nl | Hack Well | 1.4% | Davis Well Prospect _ Exploration Licence38/4, Prospecting Licences 38/72 and 38/73 - Final Report - December, |
| A12968 | 1983 | Golconda Minerals Nl | Davis Well - Hack Well | 1.2% | Davis Well - Hack Well Project, Non-statutory Report: Geological Report, November 1983, E38/4, E38/24; P38/72- |
| A9273 | 1973 | Us Steel International Inc | Ghost Rock | <1% | Ghost Rock Project, Non-statutory Report: 1972 Final Report, March 1973, MC29/1555-1560,1842, 2334-2335, 2337- |
| A3685 | 1973 | International Nickel Aust Ltd | Sunrise Dam | 1.5% | Sunrise Dam Project, Non-statutory Report: Brief Exploration Report for the period 2nd September 1970 to 19th |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A2691 | 1972 | Australian Selection Pty Ltd | Wilga | <1% | Wilga Project, Annual Report for the period ending 31/12/1971, TR70/3747; MC39/62-115, 136-143, 191-219, 911-9 |
| A1366 | 1970 | Australian Selection Pty Ltd | Wilga | <1% | Wilga Area, Annual Report for the year ending 31/12/1969, TR70/3747H; MC39/62-115, 136-143, 191-209, 911-939 & |
| A1365 | 1968 | Australian Selection Pty Ltd | Wilga | <1% | Wilga Project, Non-statutory Report: Annual Report [s] 1966-1968, for the period ending 31/12/1968, TR70/3747, |
| A85886 | 1753 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 3 years · 16 Feb 2030
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 38/62 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 38/62? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.