NextMaps›WA Tenements›L 38/62

L 38/62

LiveMiscellaneous LicenceShire of LavertonMt. Margaret District
Area
176.4ha
Expires
Feb 2030
in 3 years
WAMEX reports
161
WA median is 53
Report drilling
117
of 161 reports
Laverton Explore on the live map

Register summary

Holder
Gsm Mining Company Pty Ltd
Local government
Shire of Laverton
Application received
18 Nov 1994
Commenced
17 Feb 1995
Expiry
16 Feb 2030
Term
5 Years (Renewed)

Exploration history on this ground

161 historical WAMEX exploration reports intersect L 38/62: 64 report geochemistry or sampling, 108 include a digital data package.
When this ground was worked · 159 of 161 reports dated
11960s
51970s
41980s
461990s
442000s
482010s
112020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A145852 2024 Mt Weld Mining Pty Ltd Mount Weld <1% Completion of EIS round 28 supported exploration drilling 2024, Mt Weld REE project - Final Report
A129997 2022 Matsa Gold Pty Ltd Hacks Well <1% E38/2945 Hacks Well Report on Areas Relinquished 9th December 2021
A132799 2022 Lodestar Minerals Ltd Jubilee Well <1% Annual Report for E38/3054 Jubilee Well for the period ending 12/09/2022
A126029 2021 Gsm Mining Company Pty Ltd E38/2888 1.3% Compulsory Partial Surrender (40%) of Exploration Licence E38/2888 For the Period 23 January 2015 to 22 Januar
A128857 2021 Lodestar Minerals Ltd Jubilee Well <1% Annual Exploration Report Jubilee Well E38/03054 for the period ending 12/09/2021
156 more reports
A122815 2020 Anglogold Ashanti Australia Limited Sunrise Dam <1% Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio
A122827 2020 Matsa Resources Limited Red October <1% Red October Group Annual Report C173/2017 for the period ending 31/12/2019
A122902 2020 Mt Weld Mining Pty Limited Mount Weld <1% Mt Weld Rare Earths Project Annual Report on Exploration on tenements M38/58, M38/59, M38/326, M38/327, E38/22
A123791 2020 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020
A124126 2020 Anglogold Ashanti Australia Limited Pink Lady <1% CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine
A125157 2020 Anglogold Ashanti Australia Limited Western Ramps <1% EIS Round 20 - Western Ramps (Final Report)
A119370 2019 Mt Weld Mining Pty Ltd Mount Weld <1% Mount Weld Rare Earths Project Combined Report C56/1999 Exploration on tenements M38/58, M38/59, M38/326, M38/
A118830 2019 Matsa Gold Pty Ltd Hack Well <1% Annual Mineral Exploration Report E38/2945 Hack Well for the period 14 December 2017 to 13 December 2018
A119211 2019 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3
A119510 2019 Matsa Resources Limited Red October <1% Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019
A119796 2019 Oro Del Sur Pty Ltd Laverton <1% E38/3054 Annual Technical Report for the period 13 September 2017 to 12 September 2018
A120095 2019 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201
A120368 2019 Anglogold Ashanti Australia Limited Southern Shear - Sunrise Dam <1% EIS Southern Shear Zones – SDGM project (R#17)
A115637 2018 Australian Potash Limited Hack Well <1% ANNUAL REPORT HACK WELL PROJECT E38/02945 FOR THE PERIOD 14/12/2016 - 13/12/2017
A115940 2018 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3
A116142 2018 Mt Weld Mining Pty Ltd Mount Weld <1% Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2015 to 24 November 2016,
A116780 2018 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018
A112079 2017 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016
A114051 2017 Gsm Mining Company Pty Ltd Central Laverton <1% CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2
A111860 2017 Lynas Corporation Limited Mount Weld <1% Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2015 to 24 November 2016,
A112076 2017 Australian Potash Limited Hack Well <1% Hack Well Project E38/2945 Annual Report for the period 14/12/2015 to 13/12/2016
A108112 2016 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/
A107882 2016 Mt Weld Mining Pty Ltd Mount Weld <1% Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2014 to 24 November 2015,
A108971 2016 Gsm Mining Company Pty Ltd Central Laverton <1% C86/2002 CENTRAL LAVERTON PROJECT COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/04/2015 TO 31/03/2016
A109831 2016 Lynas Corporation Limited Mount Weld <1% Mount Weld E38/2224 Partial Surrender Report for the period 17 August 2010 to 12 August 2016
A104898 2015 Anglogold Ashanti Australia Ltd Sunrise Dam Group <1% Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3
A105466 2015 Saracen Gold Mines Pty Ltd Butcher Well <1% Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063
A105693 2015 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton Combined Annual Technical Report for the period 01 April 2014 to 31 March 2015, C86/2002, E38
A107077 2015 Anglogold Ashanti Australia Ltd Sunrise Dam 1.6% Sunrise Dam Project E38/2297 (Empie) Surrender Report for the period 20/10/2010 to 01/09/2015
A101216 2014 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201
A104205 2014 Mt Weld Mining Pty Ltd Mount Weld <1% Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2013 to 24 November 2014,
A100696 2014 Mt Weld Mining Pty Ltd Mount Weld <1% Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2012 to 24 November 2013,
A100990 2014 Gsm Mining Company Pty Ltd Barnicoat <1% Barnicoat Project, Annual Report for the period 01/01/2013 to 31/12/2013, M38/361-362, 483-484; E38/2029 & 203
A101830 2014 Saracen Gold Mines Pty Ltd Butcher Well <1% Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39
A102477 2014 Focus Minerals Ltd Mount Weld <1% Mt Weld E38/1652 Annual Report for the period 01/09/2013 to 31/03/2014
A102837 2014 Gsm Mining Company Pty Ltd Barnicoat <1% Barnicoat Project, Final Surrender Report for the period 08/10/2008 to 29/04/2014, E38/2029 & 2035. [C388/1993
A97624 2013 Saracen Gold Mines Pty Ltd Butcher Well <1% Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279;
A100055 2013 Focus Minerals (Laverton) Pty Ltd Sunrise <1% Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545
A96848 2013 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995)
A96870 2013 Barrick (Granny Smith) Pty Ltd Barnicoat <1% PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483, M38/484 E38/2029, E38/2035 P39/4806 ANNUAL REPORT Pe
A92879 2012 Barrick (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project, Annual Report for the period 1st January 2011 to 31st December 2011, M38/361-362, 483-484;
A92885 2012 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995).
A95100 2012 Torridon Exploration Sunrise Dam <1% Sunrise Dam Project Combined Annual Exploration Report For The Year To 30th June 2012 C42/2011 For Tenements:
A95588 2012 Rubicon Resources Ltd Laverton <1% E38/2224 Annual Technical Report 1st Jan 2012 to 16th August 2012
A96196 2012 Focus Minerals (Laverton) Pty Ltd Sunrise <1% Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797
A92958 2012 Rubicon Resources Ltd Laverton <1% Laverton Project Combined Report C86/2010 E38/2221, 2222, 2224, 2267, 2304, 2306 Annual Report 1st Jan 2011 to
A89346 2011 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010
A89375 2011 Barrick (Granny Smith) Pty Ltd Barnicoat <1% Project 8362 BARNICOAT PROJECT P39/4806 E38/2029, E38/2035 8/361, M38/362, M38/483, M38/484 Annual Report Peri
A89526 2011 Rubicon Resources Ltd Laverton <1% Laverton Project Combined Report C86/2010 2010, Report Period: 1st January 2010 – 31 December 2010
A90565 2011 Crescent Gold Ltd Childe Harold <1% Combined Annual Report on Exploration for the period 01/04/2010 to 31/03/2011; Childe Harold Project; C157/200
A91983 2011 Cove Resources Limited Sunrise Dam <1% Sunrise Dam Project C42/2011 Combined First Annual Report period ending 30 June 2011 for E38/2155, E38/2272 &
A85813 2010 Barrick (Australia Pacific) Ltd Barnicoat <1% Project 8362 Barnicoat Project P39/4806 E38/2029, E38/2035 M38/361, M38/362, M38/483, M38/484 Annual Report pe
A87437 2010 Crescent Gold Ltd Childe Harold <1% Combined Annual Report C133/2006 Ffor Leases E38/1652, 1ST April 2009 to 31st March 2010
A88423 2010 Cazaly Resources Ltd Sunrise Dam 1.3% Annual Report Sunrise Dam Project E38/2155 For the Period 14 August 2009 to 13 August 2010
A82441 2009 Carbon Energy Ltd CHILDE HAROLD <1% CHILDE HAROLD PROJECT Annual Report E38/1652 For the period 01/04/2008 to 31/03/2009, Group Reporting No. C157
A81076 2009 Anglogold Ashanti Australia Ltd SUNRISE DAM GROUP <1% SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3
A82274 2009 Carbon Energy Ltd CHILDE HAROLD <1% Childe Harold Project, Partial Surrender Report, E38/1652, blocks Kalgoorlie 749 p, u, y, z, and Kalgoorlie 75
A78902 2008 Jindalee Resources Ltd Jubilee Well 2.3% Jubilee Well Project E38/1730 SURRENDER REPORT Report. Period 11/08/2006 - 12/06/2008 E38_1730_2008S
A77574 2008 Anglogold Ashanti Australia Ltd Sunrise Dam <1% SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07
A78425 2008 Metex Resources Ltd Childe Harold <1% CHILDE HAROLD PARTIAL SURRENDER REPORT E38/1652 blocks KALGOORLIE 0750 g,m,r,w; KALGOORLIE 0822 b,g,h,j,m,n, o
A74516 2007 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31
A75232 2007 Metex Resources Ltd Childe Harold <1% Childe Harold Project, Annual Technical Report for the period 01/04/2006 - 31/03/2007, Group Reporting No C157
A76288 2007 Metex Resources Ltd Childe Harold 1.6% Childe Harold Project, Surrender Report E38/1658, P38/3293 -3295, Group Reporting No. C157/2005, Mount Marga
A76156 2007 Jindalee Resources Ltd Burtville 2.3% Burtville Annual Report 2007 11/08/2006 to 11/08/2007 E38/1730
A72825 2006 Metex Resources Ltd Childe Harold <1% W128 Childe Harold E38/1123,1529,1652,1658,P38/3211-3213, Annual Technical Report for the Period 01/04/2005 to
A72416 2006 Placer (Granny Smith) Pty Ltd Mikado <1% Mikado Project, Annual Exploration Report for the Period 1 January 2005 to 31 December 2005, C463/1996, (PGS R
A72951 2006 Crescent Gold Ltd Jubilee Well <1% Surrender Report, Jubilee Well JV E38/462, Period 21 January 2005 to 20 January 2006, Surrendered 27 January 2
A70514 2005 Placer Dome Asia Pacific Ltd Mikado <1% Mikado Project, Annual Report for the period 01/01/2004 - 31/12/2004 , E38/422, 680, 772, 930, 1126, E38/1205,
A70338 2005 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M
A70566 2005 Anglogold Ashanti Australia Ltd Laverton <1% Annual report for the period 01/01/04 - 31/12/04 Laverton Project, C164/2002, E38/199, 399, 420, 462, 523, E38
A70691 2005 Placer Dome Asia Pacific Ltd Sunrise - Sunset <1% Sunrise - Sunset Project, Annual Report for the period 1st January 2004 to 31st December 2004, P39/3076, P39/3
A68341 2004 Sons Of Gwalia Ltd Jubilee Well <1% Jubilee Well Project Surrender Report for the period 24 Febr uary 1993 to 5 February 2004 C345/1993 E38/449 Re
A68435 2004 Placer Dome Asia Pacific Ltd Sunrise/Sunset <1% Sunrise/Sunset Project, P39/3076, P39/3090, P39/3091, P39/3238, P39/3294, P39/3240. Mount Margaret Mineral Fii
A68436 2004 Placer Dome Asia Pacific Ltd Mikado <1% Annual report for the period 01/01/2003-31/12/2003 Mikado Project E38/0422, E38/0680, E38/0772, E38/0930, E38/
A68170 2004 Anglogold Australasia Ltd Sunrise Dam <1% Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21
A68195 2004 Sons Of Gwalia Ltd Butcher Well <1% Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39
A68313 2004 Anglogold Australia Ltd Laverton <1% Annual Report for the period 01/01/2003-31/12/2003 Laverton Project (C164/2002), E38/1010, E38/1015, E38/1066,
A69921 2004 Placer Dome Asia Pacific Ltd Mikado <1% Mikado Project, E38/1205, Partial surrender report for the period 20th July, 2001 to 19th July 2004, C463/1996
A71952 2004 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t
A66170 2003 Placer (Granny Smith) Pty Ltd Sunrise-Sunset <1% Annual Report on Exploration period ending 30th September 2002 Sunrise-Sunset Project C185/1995: M39/217, P39/
A66171 2003 Placer (Granny Smith) Pty Ltd Mt Lebanon <1% Annual Report on Exploration period ending 31st December 2002 Mt Lebanon Project C463/1996: M38/9, E38/422, E3
A66180 2003 Anglogold Australia Ltd Jubilee Well <1% Annual Report for the period 21 January 2002 to 20 January 2003 ,Jubilee Well JV Project,[C164/2002], E38/462,
A66523 2003 Sons Of Gwalia Ltd Jubilee Well <1% Annual Report for the period 24 February 2002 - 23 February 2003 Jubilee Well Project C50/1996: E38/449
A66542 2003 Anglogold Australia Ltd Sunrise Dam <1% Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366,
A67737 2003 Anglogold Australia Ltd Jubilee Well <1% Jubilee Well JV, E38/462, E38/523, Partial Surrender Report for the period 21/01/1996- 12/11/2003.
A64307 2002 Anglogold Australia Ltd Jubilee Well <1% Annual Report for the period 21 January 2001 to 20 January 2002 Jubilee Well JV E38/462, E38/523 & E338/524.
A64321 2002 Placer (Granny Smith) Pty Ltd Sunrise - Sunset <1% Annual Report on exploration Sunrise-Sunset Project M39/217, P39/3076, 3090-3091, 3119, 3238, 3240, 3294 for t
A64488 2002 Anglogold Australia Ltd Sunrise Dam <1% Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144
A64064 2002 Placer (Granny Smith) Pty Ltd Mt Lebanon P <1% Mt Lebanon Project M38/0009, E38/0422, E38/0680, E38/0772 E38/0930, E38/1126, E38/1205, E38/1206, P38/2239 and
A62476 2001 Sons Of Gwalia Ltd Jubilee Well <1% Jubilee Well Project Annual Report For The Period 24 February 1999 - 23 February 2000 Tenement: E38/449.
A62104 2001 Placer (Granny Smith) Pty Ltd Sunrise - Sunset <1% Annual Report on exploration Sunrise/Sunset Project M39/217, P39/3075, 3090-3091, 3119, 3238, 3240, 3294 for t
A63177 2001 Pan Palladium Ltd Sunset Strip 4.4% Annual Report on Exploration, Sunset Strip project, P38/2828 2829,2830, Ref C2/2001, Mt Margaret Mineral Field
A59851 2000 Placer (Granny Smith) Pty Ltd Sunrise - Sunset <1% Annual Report On Exploration Sunrise-Sunset Project M39/217, P39/3076,3090-3091,3119 For The Period 01/01/1999
A61200 2000 Abador Gold Nl Sunset Strip 6.6% Sunset Strip P38/2829, 38/2830. Mt Morgan Mineral Field Laverton 1:250,000 (SH51-2) Annual Report for 12 month
A60182 2000 Acacia Resources Ltd Jubilee Well <1% Jubilee Well J.V; E38/462, E38/523 and E38/524; Annual report for the period 21/01/1999 to 20/01/2000
A60321 2000 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999
A61954 2000 Anglogold Australasia Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat
A62054 2000 Anglogold Australasia Ltd Jubilee Well <1% Jubilee Well Project E38/462, E38/523 and E38/524 Verification Report, Annual Report for the period 21 January
A57593 1999 Acacia Resources Ltd Jubilee Well <1% Acacia Resources Ltd Aurora Gold W.A Ltd Jubilee Well J.V E38/462,523.524 Annual Report For the Period 21/01/1
A58027 1999 Placer (Granny Smith) Pty Ltd Sunrise - Sunset <1% Sunrise - Sunset Project, Annual Report for the period 1st Janaury 1998 to 31st December 1998, M39/217; P39/
A59057 1999 Sons Of Gwalia Ltd Jubilee Well <1% Jubilee Well JV Project (formerly Sunrise Dam JV Project) Annual report for the period 24/02/98-23/02/99, E38/
A57146 1998 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9
A53829 1998 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997
A54452 1998 Placer (Granny Smith) Pty Ltd Sunset <1% Sunrise/Sunset Project, Mt Margaret Goldfield, W.A. 01/01/97 - 31/12/97 M39/217, P39/3076, 3090-3091, 3119, 32
A54524 1998 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project, [8th] Annual Report 01/01/97 - 31/12/97, P38/2380, P39/3239, 3292-3293, P38/2380, E38/437,
A56253 1998 Placer (Granny Smith) Pty Ltd Davis Well 1% Davis Well (E38/482) Surrender Report October 1998.
A56263 1998 Sons Of Gwalia Ltd Sunrise Dam <1% Sunrise Dam JV Project Annual report for the period 24/02/97-23/02/98 E38/449 E39/421.
A53166 1997 Acacia Resources Ltd Brumby Well <1% Jubilee Well J.V. E38/462, 523, 524 Laverton, North-Eastern Goldfields, Yilgarn W.A. Annual Report, 21/01/97
A50186 1997 Acacia Resources Ltd Brumby Well <1% Jubilee Well Joint Venture E38/462 E38/523 and E38/524 Annual report for the period 21/01/96 to 20/01/97 Repor
A50393 1997 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report
A50913 1997 Placer (Granny Smith) Pty Ltd Sunset <1% Annual report on Exploration Sunrise/ Sunset Project M39/217 P39/3076 P39/3090 to P39/3091 P39/3119 P39/3238 P
A51563 1997 Sons Of Gwalia Ltd Sunrise Dam <1% Sunrise Dam Joint Venture Annual report for the year ending 23rd February 1997 Tenements E38/449 E39/421.
A51588 1997 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project P38/2380 P38/3239 P38/3291 P38/3292 P38/3293 E38/437 E38/482 E38/494 E38/502 M38/313 M38/361
A51718 1997 Placer (Granny Smith) Pty Ltd Ophir Bore / Barnicoat 1.1% Ophir Bore / Barnicoat Project, Surrender Report P38/2427, July 1997.
A51719 1997 Placer (Granny Smith) Pty Ltd Ophir Bore / Barnicoat 11% Ophir Bore / Barnicoat Project, Surrender Report P38/2428, July 1997.
A46846 1996 Gasgoyne Gold Mines Nl Sunrise Dam North <1% Sunrise Dam North E38/449 and Sunrise Dam West E39/421 Annual Report for the year to 23 February 1996
A47027 1996 Placer Exploration Ltd Barnicoat <1% Barnicoat Project P38/2380 P38/2396 P39/3239 P39/3291 P39/3292 P39/3293 E38/395 E38/437 E38/482 E38/494 E38/50
A47061 1996 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb
A47216 1996 Aurora Gold Ltd Brumby Well <1% H468 Brumby Well Project Western Australia Annual Technical Report for the period 21 January 1995 to 20 Januar
A47500 1996 Placer Prospecting Pty Ltd Sunrise/Sunset <1% Second Annual report on Exploration Sunrise/Sunset Project M39/217 P39/3076 P39/3090 P39/3091 P39/3238 P39/324
A44129 1995 Gasgoyne Gold Mines Nl Sunrise Dam North <1% Sunrise Dam North Project E38/449 Annual Report for the year to 23 February 1995
A44189 1995 Aurora Gold Ltd Brumby Well <1% Annual Techincal Report Brumby Well Project Western Australia Exploraton Licences 38/462,38/523 and 38/524 For
A44303 1995 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3
A46533 1995 Gasgoyne Gold Mines Nl Sunrise Dam North east <1% Sunrise Dam North East P38/2590 to P38/2592 Annual report for the year ending 16 August 1995
A43702 1995 Placer Exploration Ltd Barnicoat <1% Barnicoat Project E38/298, 395, 437, 482, 502, 537, 494, P38/2380, 2393-2399 INCL. 2404, 2405, 2408, 2423-2429
A40299 1994 Billiton Australia Pty Ltd Sunrise Dam <1% Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263
A42348 1994 Placer Exploration Ltd Sunrise <1% Annual report on exploration Sunrise M39/217 Mt Margaret Goldfield, WA For the year period 14/02/93 to 30/06/9
A40522 1994 Placer Exploration Ltd Mount Weld <1% Annual Report for the Period 01/01/93 - 31/12/93 Mt Weld/Keringal/Ophir Bore Project
A41168 1994 Gasgoyne Gold Mines Nl Sunrise Dam North <1% Annual Report for the Sunrise Dam North Prospect E38/449 ,for the period 01/02/1993 to 10/02/1994.
A41227 1994 Aurora Gold Ltd Brumby Well <1% Annual Technical Report Period: 21/01/93 to 21/01/94 Brumby Well Project E38/462, 38/523, 38/524
A42103 1994 Placer Exploration Ltd Sunset <1% Annual Report for the period 06/93-06/94 Sunset Project P39/3090-91,3238-40,3076,& 3119
A38820 1993 Billiton Australia Pty Ltd Sunrise Dam <1% Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263
A39397 1993 Delta Gold Ltd Sunrise <1% Annual Report for the period 14/02/92-13/02/93 Sunrise Project M39/217
A40013 1993 Billiton Australia Pty Ltd Sunrise West <1% Partial surrender report Sunrise West, E39/263
A35400 1992 Poseidon Exploration Ltd Mount Weld <1% Mount Weld Project, Annual Report for the year ending 31/12/1991, E38/163.
A36624 1992 Delta Gold Ltd Sunrise Dam <1% Annual report (for the period 02/91-02/92) Sunrise Dam M39/217 July 1992
A36820 1992 Billiton Australia Pty Ltd Sunrise Dam <1% Sunrise Dam Project, Partial Surrender Report July 1992, . E39/174, 206, 229; Surrender Report E39/230.
A35603 1992 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2
A32915 1991 Poseidon Ltd Mount Weld <1% Mt Weld Project, Annual Report for the year ending 31/12/1990, E38/163.
A33010 1991 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230
A33396 1991 Poseidon Ltd Mount Weld <1% Mount Weld Project,1990 Partial Surrender Report, February 1991, E38/163.
A33983 1991 Delta Gold Ltd Sunrise Dam <1% Sunrise Dam M39/217 Annual Report for 1990 Project No:374
A30632 1990 Poseidon Ltd Mount Weld <1% Annual report 1989. Mt. Weld Project. E38/163. Laverton Sh51-2
A30847 1990 Freeport Of Australia Inc Mount Weld <1% Mt Weld Project, Annual report, 1988. E38/163
A28729 1989 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report ending 30 June 1989, Sunrise Dam Project, E39/174, E39/206, E39/227, E39/229, E39/230, P39/215
A14703 1985 Golconda Minerals Nl Hack Well 1.2% Hack Well Project, Final Surrender Report for the period ending 10/05/1985, E38/24.
A14763 1984 Golconda Minerals Nl Hack Well 1.4% Davis Well Prospect _ Exploration Licence38/4, Prospecting Licences 38/72 and 38/73 - Final Report - December,
A12968 1983 Golconda Minerals Nl Davis Well - Hack Well 1.2% Davis Well - Hack Well Project, Non-statutory Report: Geological Report, November 1983, E38/4, E38/24; P38/72-
A9273 1973 Us Steel International Inc Ghost Rock <1% Ghost Rock Project, Non-statutory Report: 1972 Final Report, March 1973, MC29/1555-1560,1842, 2334-2335, 2337-
A3685 1973 International Nickel Aust Ltd Sunrise Dam 1.5% Sunrise Dam Project, Non-statutory Report: Brief Exploration Report for the period 2nd September 1970 to 19th
A6945 1973 Kennecott Exp Aust Pty Ltd Erlistoun <1% Aeromag- Raw Data
A2691 1972 Australian Selection Pty Ltd Wilga <1% Wilga Project, Annual Report for the period ending 31/12/1971, TR70/3747; MC39/62-115, 136-143, 191-219, 911-9
A1366 1970 Australian Selection Pty Ltd Wilga <1% Wilga Area, Annual Report for the year ending 31/12/1969, TR70/3747H; MC39/62-115, 136-143, 191-209, 911-939 &
A1365 1968 Australian Selection Pty Ltd Wilga <1% Wilga Project, Non-statutory Report: Annual Report [s] 1966-1968, for the period ending 31/12/1968, TR70/3747,
A85886 1753 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
3 years · 16 Feb 2030
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over L 38/62 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold L 38/62? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.