L 38/223
Register summary
- Holder
- Gsm Mining Company Pty Ltd
- Local government
- Shire of Laverton
- Application received
- 25 Sept 2012
- Commenced
- 17 June 2013
- Expiry
- 16 June 2034
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A140595 | 2024 | Catalina Resources Ltd | Laverton | 72% | Annual Report E38/3726 Laverton Project for the period ending 30/03/2024 |
| A144242 | 2024 | Catalina Resources Ltd | Laverton | 72% | Final Report E38/3726 Laverton Project for the period 31/03/2023 to 07/08/2024 |
| A145852 | 2024 | Mt Weld Mining Pty Ltd | Mount Weld | 28% | Completion of EIS round 28 supported exploration drilling 2024, Mt Weld REE project - Final Report |
| A135830 | 2023 | Gsm Mining Company Pty Ltd | Prendergast Shear | <1% | Partial Surrender Report Prendergast Shear E38/3204 for the period ending 09/07/2023 |
| A129997 | 2022 | Matsa Gold Pty Ltd | Hacks Well | 10% | E38/2945 Hacks Well Report on Areas Relinquished 9th December 2021 |
198 more reports
| A130329 | 2022 | Gsm Mining Company Pty Ltd | E38/3180, E38/3181 | 47% | Surrender of Exploration Licenses E38/3180, E38/3181 for the period ending 19/03/2022. |
| A132799 | 2022 | Lodestar Minerals Ltd | Jubilee Well | 2.8% | Annual Report for E38/3054 Jubilee Well for the period ending 12/09/2022 |
| A126029 | 2021 | Gsm Mining Company Pty Ltd | E38/2888 | 48% | Compulsory Partial Surrender (40%) of Exploration Licence E38/2888 For the Period 23 January 2015 to 22 Januar |
| A128857 | 2021 | Lodestar Minerals Ltd | Jubilee Well | 2.8% | Annual Exploration Report Jubilee Well E38/03054 for the period ending 12/09/2021 |
| A122827 | 2020 | Matsa Resources Limited | Red October | 3% | Red October Group Annual Report C173/2017 for the period ending 31/12/2019 |
| A122902 | 2020 | Mt Weld Mining Pty Limited | Mount Weld | 27% | Mt Weld Rare Earths Project Annual Report on Exploration on tenements M38/58, M38/59, M38/326, M38/327, E38/22 |
| A123791 | 2020 | Gsm Mining Company Pty Ltd | Central Laverton | 7.7% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020 |
| A123995 | 2020 | Gsm Mining Company Pty Ltd | Prendergast Shear | <1% | Prendergast Shear Project C160/2017 Annual Technical Report for the period ending 31/03/2020 |
| A124132 | 2020 | Focus Minerals (Laverton) Pty Limited | Carey | 45% | Carey C88/2014 Annual Technical Report for the period ending 31/03/2020 |
| A124711 | 2020 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168 Annual Report for the period ending 30/06/2020 |
| A119370 | 2019 | Mt Weld Mining Pty Ltd | Mount Weld | 27% | Mount Weld Rare Earths Project Combined Report C56/1999 Exploration on tenements M38/58, M38/59, M38/326, M38/ |
| A120369 | 2019 | Gsm Mining Company Pty Ltd | Prendergast Shear | <1% | Prendergast Shear Project C160/2017 Annual Technical Report for the period 1 April 2018 to 31 March 2019 |
| A118830 | 2019 | Matsa Gold Pty Ltd | Hack Well | 10% | Annual Mineral Exploration Report E38/2945 Hack Well for the period 14 December 2017 to 13 December 2018 |
| A119510 | 2019 | Matsa Resources Limited | Red October | 2.9% | Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019 |
| A119796 | 2019 | Oro Del Sur Pty Ltd | Laverton | 2.8% | E38/3054 Annual Technical Report for the period 13 September 2017 to 12 September 2018 |
| A120095 | 2019 | Gsm Mining Company Pty Ltd | Central Laverton | 7.7% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201 |
| A120662 | 2019 | Focus Minerals (Laverton) Pty Limited | Carey | 41% | Carey project C88/2014 Annual Technical Report for the period 1 April 2018 to 31 March 2019, E 38/02872,P 38/0 |
| A120929 | 2019 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168/2001 Combined Annual Report For the Period 1 July 2018 to 30 June 2019, E38/01935, E38/03 |
| A116879 | 2018 | Gsm Mining Company Pty Ltd | Prendergast Shear | <1% | Prendergast Shear Project C160/2017 Annual Report for the period 1 April 2017 to 31 March 2018, E38/03095, E38 |
| A115637 | 2018 | Australian Potash Limited | Hack Well | 10% | ANNUAL REPORT HACK WELL PROJECT E38/02945 FOR THE PERIOD 14/12/2016 - 13/12/2017 |
| A116142 | 2018 | Mt Weld Mining Pty Ltd | Mount Weld | 26% | Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2015 to 24 November 2016, |
| A116401 | 2018 | Ucabs Pty Ltd | Mount Weld | 1.3% | Exploration Report Mount Weld Prospect M38/360 for the period 01/01/2017 - 31/12/2017 |
| A116780 | 2018 | Gsm Mining Company Pty Ltd | Central Laverton | 7.2% | Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018 |
| A117034 | 2018 | Focus Minerals (Laverton) Pty Limited | Carey | 41% | Carey C88/2014 Annual Technical Report for the period 01/04/2017 - 31/03/2018, E38/02872, P38/04099, P38/04100 |
| A117575 | 2018 | Gsm Mining Company Pty Ltd | Wallaby | <1% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT, C168/2001, 01 JULY 2017 - 30 JUNE 2018 |
| A114051 | 2017 | Gsm Mining Company Pty Ltd | Central Laverton | 6.9% | CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2 |
| A114106 | 2017 | Focus Minerals (Laverton) Pty Limited | CAREY | 41% | Carey Project C88/2014 Combined Annual Report For the Period 1 April 2016 to 31 March 2017, E38/02872, E38/028 |
| A114580 | 2017 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168/2001 Combined Annual Technical Report for the period 1 July 2016 to 30 June 2017, E38/012 |
| A111860 | 2017 | Lynas Corporation Limited | Mount Weld | 26% | Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2015 to 24 November 2016, |
| A112076 | 2017 | Australian Potash Limited | Hack Well | 10% | Hack Well Project E38/2945 Annual Report for the period 14/12/2015 to 13/12/2016 |
| A112492 | 2017 | Ucabs Pty Ltd | Mount Weld | 1.3% | EXPLORATION REPORT MOUNT WELD PROSPECT MINING LEASE: M38/360 For the period 1st January 2016 to n31st December |
| A108451 | 2016 | Ucabs Pty Ltd | Mount Weld | <1% | Combined Mineral Exploration Report Mt Weld Prospect (GSWA Ref C202/2008) Mining Lease: M38/360, Prospecting L |
| A109737 | 2016 | Gsm Mining Company Pty Ltd | Wallaby | <1% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT (C168/2001) FOR THE PERIOD 01 JULY 2015 – 30 JUNE 2015 |
| A107882 | 2016 | Mt Weld Mining Pty Ltd | Mount Weld | 26% | Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2014 to 24 November 2015, |
| A108971 | 2016 | Gsm Mining Company Pty Ltd | Central Laverton | 7.5% | C86/2002 CENTRAL LAVERTON PROJECT COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/04/2015 TO 31/03/2016 |
| A109072 | 2016 | Focus Minerals (Laverton) Pty Limited | Carey | 41% | Carey Project C88/2014 Combined Annual Report for the period 01/04/2015 to 31/03/2016, E38/02872, E38/02873, P |
| A109831 | 2016 | Lynas Corporation Limited | Mount Weld | 41% | Mount Weld E38/2224 Partial Surrender Report for the period 17 August 2010 to 12 August 2016 |
| A105693 | 2015 | Gsm Mining Company Pty Ltd | Central Laverton | 8.8% | Central Laverton Combined Annual Technical Report for the period 01 April 2014 to 31 March 2015, C86/2002, E38 |
| A106502 | 2015 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168/2001 Annual Report for the period 1 July 2014 to 30 June 2015, E38/01211, E38/01935, E39/ |
| A104805 | 2015 | Gsm Mining Company Pty Ltd | Barnicoat | 3.2% | BARNICOAT PROJECT COMBINED ANNUAL TECHNICAL REPORT (C388/1993) FOR THE PERIOD 01 JANUARY 2014 – 31 DECEMBER 20 |
| A105213 | 2015 | Ucabs Pty Ltd | Mount Weld | <1% | COMBINED MINERAL EXPLORATION REPORT MT WELD PROSPECT (GSWA REF. C202/2008) MINING LEASE: M38/360 PROSPECTING |
| A103028 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project, Partial Surrender Report for the period 29/05/2008 to 28/05/2014, E38/1935; E39/1260. [C168/2 |
| A104205 | 2014 | Mt Weld Mining Pty Ltd | Mount Weld | 26% | Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2013 to 24 November 2014, |
| A100696 | 2014 | Mt Weld Mining Pty Ltd | Mount Weld | 26% | Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2012 to 24 November 2013, |
| A100990 | 2014 | Gsm Mining Company Pty Ltd | Barnicoat | 9.7% | Barnicoat Project, Annual Report for the period 01/01/2013 to 31/12/2013, M38/361-362, 483-484; E38/2029 & 203 |
| A101607 | 2014 | Ucabs Pty Ltd | Mount Weld | <1% | COMBINED MINERAL EXPLORATION REPORT MT WELD PROSPECT ( GSW A REF. C202/2008) MINING LEASE: M38/360 PROSPECTING |
| A102477 | 2014 | Focus Minerals Ltd | Mount Weld | 23% | Mt Weld E38/1652 Annual Report for the period 01/09/2013 to 31/03/2014 |
| A102837 | 2014 | Gsm Mining Company Pty Ltd | Barnicoat | 9.9% | Barnicoat Project, Final Surrender Report for the period 08/10/2008 to 29/04/2014, E38/2029 & 2035. [C388/1993 |
| A103165 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project Combined Annual Technical Report (C168/2001) for the period 1 July 2013 to 30 June 2014, P38/3 |
| A99045 | 2013 | Barrick (Australia Pacific) Ltd | Wallaby | <1% | Wallaby Project Annual Report for the period 1 July 2012 – 30 June 2013, P38/3666.......M38/1137 |
| A100055 | 2013 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 11% | Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545 |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 1.2% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A96870 | 2013 | Barrick (Granny Smith) Pty Ltd | Barnicoat | 9.6% | PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483, M38/484 E38/2029, E38/2035 P39/4806 ANNUAL REPORT Pe |
| A97390 | 2013 | Ucabs Pty Ltd | Mount Weld | <1% | Combined Mineral Exploration Report Mt Weld Prospect C202/2008 for the period 1st January 2012 to 31st Decembe |
| A98692 | 2013 | Focus Minerals (Laverton) Pty Ltd | Mount Weld | 2.7% | Mount Weld Project, C321/2011, Combined Annual Report, 01/04/2012 to 31/03/2013, E38/0812....P38/3766 |
| A92509 | 2012 | Ucabs Pty Ltd | Mount Weld | <1% | Combined Mineral Exploration Report Mount Weld Prospect C202/2008 for the period 1st January 2011 to 31st Dece |
| A94717 | 2012 | Barrick (Granny Smith) Pty Ltd | Wallaby | <1% | PROJECT 8855 WALLABY PROJECT P38/3666, P39/4976 E38/1211, E38/1935, E39/1260 M38/560, M38/593, M38/690, M38/69 |
| A92879 | 2012 | Barrick (Granny Smith) Pty Ltd | Barnicoat | 9.6% | Barnicoat Project, Annual Report for the period 1st January 2011 to 31st December 2011, M38/361-362, 483-484; |
| A92885 | 2012 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 1.1% | Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995). |
| A94269 | 2012 | Crescent Gold Ltd | Mount Weld | 2.7% | Combined Annual Report on Exploration for the period 01/04/2011 to 31/03/2012; Mount Weld Project; C321/2011 |
| A95100 | 2012 | Torridon Exploration | Sunrise Dam | 37% | Sunrise Dam Project Combined Annual Exploration Report For The Year To 30th June 2012 C42/2011 For Tenements: |
| A95588 | 2012 | Rubicon Resources Ltd | Laverton | 41% | E38/2224 Annual Technical Report 1st Jan 2012 to 16th August 2012 |
| A96196 | 2012 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 11% | Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797 |
| A92958 | 2012 | Rubicon Resources Ltd | Laverton | 13% | Laverton Project Combined Report C86/2010 E38/2221, 2222, 2224, 2267, 2304, 2306 Annual Report 1st Jan 2011 to |
| A89425 | 2011 | Ucabs Pty Ltd | Mount Weld | <1% | Annual Report for the Mount Weld Prospect, for the period 1st January 2010 to 31st December 2010, M38/1039-104 |
| A89346 | 2011 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 1.6% | Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010 |
| A89375 | 2011 | Barrick (Granny Smith) Pty Ltd | Barnicoat | 9.6% | Project 8362 BARNICOAT PROJECT P39/4806 E38/2029, E38/2035 8/361, M38/362, M38/483, M38/484 Annual Report Peri |
| A89526 | 2011 | Rubicon Resources Ltd | Laverton | 13% | Laverton Project Combined Report C86/2010 2010, Report Period: 1st January 2010 – 31 December 2010 |
| A90167 | 2011 | Crescent Gold Ltd | Central Laverton | 16% | Combined Annual Report on Exploration for the period 01/01/2010 to 31/12/2010, Central Laverton Project C133/2 |
| A90565 | 2011 | Crescent Gold Ltd | Childe Harold | 23% | Combined Annual Report on Exploration for the period 01/04/2010 to 31/03/2011; Childe Harold Project; C157/200 |
| A91080 | 2011 | Barrick (Granny Smith) Pty Ltd | Wallaby | <1% | PROJECT 8855 WALLABY PROJECT ANNUAL REPORT Period 1 July 2010 – 30 June 2011 TECHNICAL REPORT No. 1437 GSWA Re |
| A91983 | 2011 | Cove Resources Limited | Sunrise Dam | 37% | Sunrise Dam Project C42/2011 Combined First Annual Report period ending 30 June 2011 for E38/2155, E38/2272 & |
| A85813 | 2010 | Barrick (Australia Pacific) Ltd | Barnicoat | 9.6% | Project 8362 Barnicoat Project P39/4806 E38/2029, E38/2035 M38/361, M38/362, M38/483, M38/484 Annual Report pe |
| A86031 | 2010 | Ucabs Pty Ltd | Mount Weld | <1% | Combined Mineral Exploration Report, Mount Weld Prospect (C202/2008), Mining Leases: M38/1039-1040, M38/360, M |
| A87437 | 2010 | Crescent Gold Ltd | Childe Harold | 23% | Combined Annual Report C133/2006 Ffor Leases E38/1652, 1ST April 2009 to 31st March 2010 |
| A87654 | 2010 | Barrick (Australia Pacific) Ltd | Lake Carey | <1% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260 P39/4976, Annual Report, Period 1 July 2009 – 30 |
| A88423 | 2010 | Cazaly Resources Ltd | Sunrise Dam | 44% | Annual Report Sunrise Dam Project E38/2155 For the Period 14 August 2009 to 13 August 2010 |
| A86734 | 2010 | Crescent Gold Ltd | Central Laverton | 1.7% | Central Laverton Combined AnnualL Report C133/2006, E38/0812, M38/0376, P38/3609, P38/3710, E38/1349, M38/0377 |
| A82441 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | 23% | CHILDE HAROLD PROJECT Annual Report E38/1652 For the period 01/04/2008 to 31/03/2009, Group Reporting No. C157 |
| A81076 | 2009 | Anglogold Ashanti Australia Ltd | SUNRISE DAM GROUP | 6.7% | SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A81707 | 2009 | Crescent Gold Ltd | Central Laverton | 1.9% | Central Laverton Combined Annual report C133/2006, 1st January 2008 to 31st December 2008 |
| A82274 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | 23% | Childe Harold Project, Partial Surrender Report, E38/1652, blocks Kalgoorlie 749 p, u, y, z, and Kalgoorlie 75 |
| A84116 | 2009 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | LAKE CAREY PROJECT E38/1211, E38/1935, E39/1260, M38/675, M38/677 ANNUAL REPORT PERIOD 1 JUL 2008 – 30 JUN 200 |
| A78902 | 2008 | Jindalee Resources Ltd | Jubilee Well | 50% | Jubilee Well Project E38/1730 SURRENDER REPORT Report. Period 11/08/2006 - 12/06/2008 E38_1730_2008S |
| A77574 | 2008 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 6.7% | SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07 |
| A78009 | 2008 | Barrick Gold Of Australia Ltd | Barnicoat | 3.2% | Project 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483 Annual Report Period 1 January 2007 - 31 December 200 |
| A78425 | 2008 | Metex Resources Ltd | Childe Harold | 23% | CHILDE HAROLD PARTIAL SURRENDER REPORT E38/1652 blocks KALGOORLIE 0750 g,m,r,w; KALGOORLIE 0822 b,g,h,j,m,n, o |
| A79308 | 2008 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260, M38/675, M38/677 Annual Report Period 1 July 200 |
| A79832 | 2008 | Ucabs Pty Ltd | Mount Weld | 1.3% | Geological Report on the MT Weld Prospect for M 38/360 Mt. Margaret Gold Field for the period 31 August 2007 |
| A81090 | 2008 | Barrick (Granny Smith) Pty Ltd | Barnicoat | 3.2% | PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483 ANNUAL REPORT Period 1 January 2008 – 31 December 200 |
| A74516 | 2007 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 6.7% | Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31 |
| A74557 | 2007 | Barrick Gold Of Australia Ltd | Barnicoat | 3.2% | Barnicoat Project M38/361,362,483 C388/1993 Annual Report for the Period 1st Jan 2006 to 31st Dec 2006 Report |
| A75232 | 2007 | Metex Resources Ltd | Childe Harold | 24% | Childe Harold Project, Annual Technical Report for the period 01/04/2006 - 31/03/2007, Group Reporting No C157 |
| A76288 | 2007 | Metex Resources Ltd | Childe Harold | 31% | Childe Harold Project, Surrender Report E38/1658, P38/3293 -3295, Group Reporting No. C157/2005, Mount Marga |
| A76687 | 2007 | Adelaide Prospecting Pty Ltd | Laverton | <1% | Report on a Geogemical Soil Sampling Programme Laverton Prospecting Licences 38/3224-3230 (inc) |
| A75538 | 2007 | Metex Resources Ltd | Childe Harold | 23% | Childe Harold Project P38/3211-3213 Surrender Report for the period 15/04/2005 to 22/05/2007 |
| A76156 | 2007 | Jindalee Resources Ltd | Burtville | 50% | Burtville Annual Report 2007 11/08/2006 to 11/08/2007 E38/1730 |
| A76557 | 2007 | Ucabs Pty Ltd | Mount Weld | 1.3% | Geological Report on the Mt Weld Prospect For M38/360 MT. MARGARET GOLD FIELD WESTERN AUSTRALIA |
| A76830 | 2007 | Metex Resources Ltd | Childe Harold | 20% | CHILDE HAROLD PROJECT E38/1529 SURRENDER REPORT for the period 23/09/2005 to 01/11/2007 (Group Reporting Numbe |
| A72825 | 2006 | Metex Resources Ltd | Childe Harold | 21% | W128 Childe Harold E38/1123,1529,1652,1658,P38/3211-3213, Annual Technical Report for the Period 01/04/2005 to |
| A72935 | 2006 | Crescent Gold Ltd | Brumby Well | 58% | Surrender Report, Brumby Well E38/399, Period 27 October 2005 to 26 October 2006, Surrendered 4 January 2006, |
| A72952 | 2006 | Crescent Gold Ltd | Jubilee Well | 4.3% | Surrender Report, Jubilee Well JV E38/523, Period 19 July 2005 to 18 July 2006, Surrendered 27 January 2006, ( |
| A72953 | 2006 | Crescent Gold Ltd | Jubilee Well | 89% | Surrender Report, Jubilee Well JV E38/524, Period 5 August 2005 to 4 August 2006, Surrendered 27 January 2006, |
| A73489 | 2006 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447-448,E39/387,389,M38/675,677, Annual Exploration Report for the Period 1 July 2005 t |
| A72164 | 2006 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.8% | Barnicoat Project, E38/494,M38/361,362,483, P39/3239,3291-3293, Mount Margaret Mineral Field, Annual Explorati |
| A72416 | 2006 | Placer (Granny Smith) Pty Ltd | Mikado | 5.8% | Mikado Project, Annual Exploration Report for the Period 1 January 2005 to 31 December 2005, C463/1996, (PGS R |
| A72714 | 2006 | Ucabs Pty Ltd | Mount Weld | 1.3% | Geological Report on the Mt Weld Prospect for M38/360, (Annual Report, Period 01/09/2004 to 31/08/2005, Lavert |
| A72951 | 2006 | Crescent Gold Ltd | Jubilee Well | 33% | Surrender Report, Jubilee Well JV E38/462, Period 21 January 2005 to 20 January 2006, Surrendered 27 January 2 |
| A70514 | 2005 | Placer Dome Asia Pacific Ltd | Mikado | 5.8% | Mikado Project, Annual Report for the period 01/01/2004 - 31/12/2004 , E38/422, 680, 772, 930, 1126, E38/1205, |
| A71318 | 2005 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, E38/447,E38/448,E39/387,E39/389,M38/675, M38/677, Mount Margaret Mineral Field Western Aus |
| A70338 | 2005 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 6.7% | Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M |
| A70566 | 2005 | Anglogold Ashanti Australia Ltd | Laverton | 15% | Annual report for the period 01/01/04 - 31/12/04 Laverton Project, C164/2002, E38/199, 399, 420, 462, 523, E38 |
| A70688 | 2005 | Placer Dome Asia Pacific Ltd | Barnicoat | 1.8% | Barnicoat Project, M38/361, M38/362, M38/483, E38/494, P39/3239, P39/3291, P39/3292, P39/3293, Mount Margaret |
| A68271 | 2004 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.8% | Barnicoat Project, Annual Exploration Report M38/361-362, M38/ 483; E38/494; P39/3239, P39/ 3291-3293 for the |
| A68436 | 2004 | Placer Dome Asia Pacific Ltd | Mikado | 5.8% | Annual report for the period 01/01/2003-31/12/2003 Mikado Project E38/0422, E38/0680, E38/0772, E38/0930, E38/ |
| A69089 | 2004 | Placer Dome Asia Pacific Ltd | Lake Carey | <1% | Lake Carey Project, Annual exploration report for the period 1st July 2003 to 30th June 2004 |
| A68313 | 2004 | Anglogold Australia Ltd | Laverton | 6.5% | Annual Report for the period 01/01/2003-31/12/2003 Laverton Project (C164/2002), E38/1010, E38/1015, E38/1066, |
| A68591 | 2004 | Anglogold Australia Ltd | Brumby Well | 19% | Surrender Report for the Period 27 October 1991 to 19 Februa ry 2004 Brumby Well M38/430 |
| A69921 | 2004 | Placer Dome Asia Pacific Ltd | Mikado | 13% | Mikado Project, E38/1205, Partial surrender report for the period 20th July, 2001 to 19th July 2004, C463/1996 |
| A71952 | 2004 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 6.7% | Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t |
| A65899 | 2003 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.8% | Combined Annual Mineral Exploration Report for the period 1 January 2002 to 31 December 2002 Barnicoat Project |
| A66147 | 2003 | Anglogold Australia Ltd | Brumby Well | 58% | Annual Report for the period 1 January 2002 to 31 December 2002 Brumby Well [C346/1996]: E38/399, M38/430 & M3 |
| A66168 | 2003 | Anglogold Australia Ltd | Davis Well | 17% | Final Surrender Report for the period 18 December 1996 to 21 November 2002 Davis Well E38/885 Report No: WA 12 |
| A66171 | 2003 | Placer (Granny Smith) Pty Ltd | Mt Lebanon | 5.8% | Annual Report on Exploration period ending 31st December 2002 Mt Lebanon Project C463/1996: M38/9, E38/422, E3 |
| A66180 | 2003 | Anglogold Australia Ltd | Jubilee Well | 30% | Annual Report for the period 21 January 2002 to 20 January 2003 ,Jubilee Well JV Project,[C164/2002], E38/462, |
| A67248 | 2003 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Annual Exploration Report for the period 1 July 2002 to 30 June 2003 Lake Carey Project C401/1996: E38/447,448 |
| A67737 | 2003 | Anglogold Australia Ltd | Jubilee Well | 28% | Jubilee Well JV, E38/462, E38/523, Partial Surrender Report for the period 21/01/1996- 12/11/2003. |
| A64307 | 2002 | Anglogold Australia Ltd | Jubilee Well | 30% | Annual Report for the period 21 January 2001 to 20 January 2002 Jubilee Well JV E38/462, E38/523 & E338/524. |
| A65163 | 2002 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/483 M38/675, & M38/677 Verification report for the |
| A66390 | 2002 | Ucabs Pty Ltd | Golden Ring | 1.3% | Report on a Geochemical Soil Sampling Programme 30/8/01 - 30/8/02 Golden Ring Prospect M38/360 |
| A64064 | 2002 | Placer (Granny Smith) Pty Ltd | Mt Lebanon P | 5.8% | Mt Lebanon Project M38/0009, E38/0422, E38/0680, E38/0772 E38/0930, E38/1126, E38/1205, E38/1206, P38/2239 and |
| A64258 | 2002 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.8% | Annual Report on exploration for the period 1 January 2001 to 31 December 2001 Barnicoat Project P39/3239, 329 |
| A64621 | 2002 | Anglogold Australia Ltd | Davis Well | 17% | Davis Well E38/885 Annual Report for the period 18 December 2000 to 17 December 2001. Report No: WA 11874 DME |
| A62105 | 2001 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.8% | Annual Report on exploration Barnicoat Project P39/3239, 3291, 3292, 3293; E38/494; M38/361, 362, 483 1 Januar |
| A63512 | 2001 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/ 483, M38/677, M38/690, M38/691 & M38/692 Mount Ma |
| A63781 | 2001 | Ucabs Pty Ltd | Laverton | 1.3% | Laverton Project, Annual Report for the period 01/08/2000 to 01/08/2001,M38/360. |
| A63177 | 2001 | Pan Palladium Ltd | Sunset Strip | 28% | Annual Report on Exploration, Sunset Strip project, P38/2828 2829,2830, Ref C2/2001, Mt Margaret Mineral Field |
| A64280 | 2001 | Anglogold Australia Ltd | Brumby Well | 58% | Annual Report for the period 1 January 2001 to 31 December 2001 Brumby Well E38/399, M38/430 & M38/431 .[C348/ |
| A59715 | 2000 | Ucabs Pty Ltd | Mt Weld | 1.3% | Annual Report for Mining lease No M38/360 on the Mt Weld Prospect, Mt Margaret Goldfield, Western Australia. |
| A60543 | 2000 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.8% | Annual Report on Exploration, Barnicoat Project, P39/3239,32 3291-3293,E38/494,M38/361,362,483, Mt Margaret Go |
| A61200 | 2000 | Abador Gold Nl | Sunset Strip | 42% | Sunset Strip P38/2829, 38/2830. Mt Morgan Mineral Field Laverton 1:250,000 (SH51-2) Annual Report for 12 month |
| A61692 | 2000 | Anglogold Australasia Ltd | Davis Well | 17% | Davis Well Project E38/885 Verification Report - Annual Report for the period 18 December 1999 to 17 December |
| A59985 | 2000 | Acacia Resources Ltd | Davis Well | 17% | Davis Well Project E38/885 Annual Report for the Period 18/12/1998 to 19/12/1999 Report No.08.10152 1:250,000 |
| A59993 | 2000 | Acacia Resources Ltd | Brumby Well | 58% | Brumby Well Project E38/399,M38/430 & 431 Annual Report for the Period 01/01/1999 to 31/12/1999 Report No.08.1 |
| A60182 | 2000 | Acacia Resources Ltd | Jubilee Well | 30% | Jubilee Well J.V; E38/462, E38/523 and E38/524; Annual report for the period 21/01/1999 to 20/01/2000 |
| A61259 | 2000 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, E38/447,448,457,E39/389,483,M38/675,677, 690-692, Annual Report for the period ending 30t |
| A62054 | 2000 | Anglogold Australasia Ltd | Jubilee Well | 30% | Jubilee Well Project E38/462, E38/523 and E38/524 Verification Report, Annual Report for the period 21 January |
| A57772 | 1999 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.8% | Barnicoat Project-P39/3239, 3291-3293, E38/494, M38/361-362, M38/483 for the period 01/01/98 - 31/12/98 |
| A59288 | 1999 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447,448,457,387,389,483, Annual Report for the period ending 30/06/1999. |
| A57593 | 1999 | Acacia Resources Ltd | Jubilee Well | 30% | Acacia Resources Ltd Aurora Gold W.A Ltd Jubilee Well J.V E38/462,523.524 Annual Report For the Period 21/01/1 |
| A56966 | 1998 | Acacia Resources Ltd | Davis Well | 17% | Davis Well E38/885 Report No:08-9818, 1998 Annual Report 18/12/97 - 17/12/98 |
| A57721 | 1998 | Acacia Resources Ltd | Brumby Well | 58% | Brumby Well - E38/399, M38/430-431 01/01/98 -31/12/98 |
| A54524 | 1998 | Placer (Granny Smith) Pty Ltd | Barnicoat | 8.2% | Barnicoat Project, [8th] Annual Report 01/01/97 - 31/12/97, P38/2380, P39/3239, 3292-3293, P38/2380, E38/437, |
| A56250 | 1998 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Fifth Annual report on Exploration period e |
| A56253 | 1998 | Placer (Granny Smith) Pty Ltd | Davis Well | 44% | Davis Well (E38/482) Surrender Report October 1998. |
| A53028 | 1997 | Acacia Resources Ltd | Davis Well | 17% | Davis Well project, Annual Report for the period 18/12/1996 to 17/12/1997, E38/885. |
| A53144 | 1997 | Acacia Resources Ltd | Brumby Well | 58% | Brumby Well, Annual Report 01/01/97 - 31/12/97 E38/399, M38/430, 431 |
| A53166 | 1997 | Acacia Resources Ltd | Brumby Well | 30% | Jubilee Well J.V. E38/462, 523, 524 Laverton, North-Eastern Goldfields, Yilgarn W.A. Annual Report, 21/01/97 |
| A50186 | 1997 | Acacia Resources Ltd | Brumby Well | 30% | Jubilee Well Joint Venture E38/462 E38/523 and E38/524 Annual report for the period 21/01/96 to 20/01/97 Repor |
| A51588 | 1997 | Placer (Granny Smith) Pty Ltd | Barnicoat | 7.9% | Barnicoat Project P38/2380 P38/3239 P38/3291 P38/3292 P38/3293 E38/437 E38/482 E38/494 E38/502 M38/313 M38/361 |
| A51718 | 1997 | Placer (Granny Smith) Pty Ltd | Ophir Bore / Barnicoat | <1% | Ophir Bore / Barnicoat Project, Surrender Report P38/2427, July 1997. |
| A51719 | 1997 | Placer (Granny Smith) Pty Ltd | Ophir Bore / Barnicoat | 77% | Ophir Bore / Barnicoat Project, Surrender Report P38/2428, July 1997. |
| A52163 | 1997 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Mount Margaret Mineral Field Western Austra |
| A49079 | 1996 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 and E39/483 Mount Margaret Mineral Field Western A |
| A47027 | 1996 | Placer Exploration Ltd | Barnicoat | 7.6% | Barnicoat Project P38/2380 P38/2396 P39/3239 P39/3291 P39/3292 P39/3293 E38/395 E38/437 E38/482 E38/494 E38/50 |
| A47216 | 1996 | Aurora Gold Ltd | Brumby Well | 30% | H468 Brumby Well Project Western Australia Annual Technical Report for the period 21 January 1995 to 20 Januar |
| A50357 | 1996 | Acacia Resources Ltd | Brumby Well | 58% | Brumby Well E38/399 M38/430 and M38/431 Annual report for the period 01/01/96 to 31/12/96 Acacia Resources Lim |
| A44189 | 1995 | Aurora Gold Ltd | Brumby Well | 30% | Annual Techincal Report Brumby Well Project Western Australia Exploraton Licences 38/462,38/523 and 38/524 For |
| A44535 | 1995 | Acacia Resources Ltd | Brumby Well | 58% | Brumby Well Project, E38/399, Annual Report for the period 1/01/1994 to 1/01/1995 (February 1995) |
| A45235 | 1995 | Placer Exploration Ltd | Lake Carey | <1% | The Lake Carey project E38/447, E38/448, E38/457, E39/387, E39/389, E39/400, P39/2797, P39/2798, P38/2799, P39 |
| A43702 | 1995 | Placer Exploration Ltd | Barnicoat | 7.4% | Barnicoat Project E38/298, 395, 437, 482, 502, 537, 494, P38/2380, 2393-2399 INCL. 2404, 2405, 2408, 2423-2429 |
| A47826 | 1995 | Acacia Resources Ltd | Brumby Well | 58% | Brumby Well Project, E38/399, Annual Report for the period 01/01/95 to 31/12/95. |
| A42133 | 1994 | Placer Exploration Ltd | Lake Carey | <1% | Annual Report for the period 01/07/93-30/06/94 Lake Carey Peroject E38/447-448,457 E39/387,389,400,2797-2801 |
| A40432 | 1994 | Billiton Australia Pty Ltd | Brumby Well | 58% | Annual report for the period 01/01/93-31/12/93 Brumby Well Project, E38/399. |
| A40522 | 1994 | Placer Exploration Ltd | Mount Weld | 8.6% | Annual Report for the Period 01/01/93 - 31/12/93 Mt Weld/Keringal/Ophir Bore Project |
| A41227 | 1994 | Aurora Gold Ltd | Brumby Well | 30% | Annual Technical Report Period: 21/01/93 to 21/01/94 Brumby Well Project E38/462, 38/523, 38/524 |
| A38898 | 1993 | Billiton Australia Pty Ltd | Brumby Well | 58% | Annual Report for the period 01/01/92-31/12/92 Brumby Well Project E38/399 |
| A39256 | 1993 | Placer Exploration Ltd | Island | <1% | Annual Report for the period 09/08/92-08/08/93 The Island Project E38/447-448 E39/387 P38/2433-2439 |
| A35400 | 1992 | Poseidon Exploration Ltd | Mount Weld | 23% | Mount Weld Project, Annual Report for the year ending 31/12/1991, E38/163. |
| A32915 | 1991 | Poseidon Ltd | Mount Weld | 23% | Mt Weld Project, Annual Report for the year ending 31/12/1990, E38/163. |
| A33396 | 1991 | Poseidon Ltd | Mount Weld | 23% | Mount Weld Project,1990 Partial Surrender Report, February 1991, E38/163. |
| A30632 | 1990 | Poseidon Ltd | Mount Weld | 23% | Annual report 1989. Mt. Weld Project. E38/163. Laverton Sh51-2 |
| A30847 | 1990 | Freeport Of Australia Inc | Mount Weld | 23% | Mt Weld Project, Annual report, 1988. E38/163 |
| A25505 | 1988 | Csr Ltd | Mount Weld | <1% | Mount Weld, Annual report, November 1988, E38/12, P38/657 |
| A20780 | 1987 | Csr Ltd | Mount Weld | <1% | Thirs annual report on exploration, E38/12 and P38/657, Mount Weld Prospect, May 1987 |
| A21774 | 1987 | Csr Ltd | Mount Weld | <1% | Mt Weld Project, Annual Report for the period 28th June 1986 to 27th June 1987, E38/12 & P38/657. |
| A16188 | 1985 | Csr Ltd | Mount Weld | <1% | Mount Weld Project, (2nd) Annual Report for the period ending 27/06/1985, E38/12. |
| A14703 | 1985 | Golconda Minerals Nl | Hack Well | 21% | Hack Well Project, Final Surrender Report for the period ending 10/05/1985, E38/24. |
| A14287 | 1984 | Csr Ltd | Mount Weld | <1% | Mt Weld Project, (1st) Annual Report for the period ending 27/06/1984, E38/12. |
| A14763 | 1984 | Golconda Minerals Nl | Hack Well | 56% | Davis Well Prospect _ Exploration Licence38/4, Prospecting Licences 38/72 and 38/73 - Final Report - December, |
| A12968 | 1983 | Golconda Minerals Nl | Davis Well - Hack Well | 30% | Davis Well - Hack Well Project, Non-statutory Report: Geological Report, November 1983, E38/4, E38/24; P38/72- |
| A9965 | 1981 | Noranda Australia Ltd | Brook Tank | 6.1% | Brook Tank Project, Annual Report for the period 01/01/1980 to 31/12/1980, MC38/7775-7781. |
| A12282 | 1978 | Amoco Minerals Aust Co | Mount Weld | <1% | Mount Weld Project, Final Surrender ( Evaluatiion) Report, November 1978, MC38/7324-7329,7392-7393, 7415-7434. |
| A5157 | 1974 | Utah Development Co Ltd | Nine Mile Hills | <1% | Final [surrender] report on exploration, Nine Mile Hills area, At December 31 1973, MC38/62 ... MC38/179 |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A85886 | 1753 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 4.3% | Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A81084 | 1753 | Ucabs Pty Ltd | Mt Weld | <1% | Combined Geological Report on the Mt Weld Prospect for P38/3224 to P38/2230 and M38/463, C202/2008, Mt Margare |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 8 years · 16 June 2034
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 38/223 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 38/223? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.