L 38/135
Register summary
- Holder
- Regis Resources Limited
- Local government
- Shire of Laverton
- Application received
- 17 Mar 2008
- Commenced
- 21 Aug 2009
- Expiry
- 20 Aug 2030
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A122543 | 2020 | Regis Resources Limited | Little Well | <1% | Final Surrender Report P38/04216,P38/04226,P38/04227,P38/04228,P38/04229,P38/04230,P38/04231,P38/04232,P38/042 |
| A123482 | 2020 | Duketon Mining Limited; Regis Resources Limited | Bandya Hill, Risden Well | 8.9% | Partial Surrender Report E38/2717, Bandya Hill, Risden Well, 5 March 2014 to 27 February 2020 |
| A124074 | 2020 | Regis Resources Limited | Risden Well | 2.1% | Partial Surrender Report for Risden Well West - E38/2714 for the period 2 May 2014 to 23 April 2020 |
| A125545 | 2020 | Regis Resources Ltd; Duketon Mining Limited | Duketon West | 2.1% | Combined Annual Mineral Exploration Report for the Duketon West Project C99/2007 for the period ending 30/09/2 |
| A123846 | 2020 | Regis Resources Limited | Duketon South West | 8.9% | Combined Annual Mineral Exploration Report for Duketon South West E38/2717 for the period ending 31/3/2020 |
84 more reports
| A122082 | 2019 | Duketon Mining Limited | Duketon South West | 4.2% | Surrender Report E38/2892 Duketon South West for the period 19 August 2014 to 18 August 2019 |
| A120150 | 2019 | Duketon Mining Limited | Duketon South West | 6.6% | Group Annual Report - Duketon South West - C14/2017 For the Period 1 April 2018 to 31 March 2019, E38/02717, E |
| A120559 | 2019 | Duketon Mining Limited | Duketon West | 2.1% | Partial Surrender Report E38/2714 Duketon West project (C99/207) for the period 2 May 2014 to 30 April 2019 |
| A121211 | 2019 | Regis Resources Limited | Duketon Central | <1% | Annual Report C95/2016 Duketon Central Project for the period 1 July 2018 to 30 June 2019 |
| A121919 | 2019 | Duketon Mining Limited; Regis Resources Limited | Duketon West | 2.1% | Annual Report - Duketon West C99/2007 for the period 1 October 2018 to 30 September 2019 |
| A116825 | 2018 | Duketon Mining Limited | Duketon South West | 6.6% | Annual Report - C14/2017 Duketon South East For the Period 1 April 2017 to 31 March 2018 |
| A117884 | 2018 | Regis Resources Limited | Duketon Central | <1% | Duketon Central C95/2016 Annual Report for the period 1 July 2017 to 30 June 2018 |
| A118375 | 2018 | Duketon Mining Limited | Duketon West | 2.1% | Annual Report for Duketon West C99/2007 for the period 01/10/2017 - 30/09/2018, E38/01537, E38/01800, L38/0017 |
| A112446 | 2017 | Regis Resources Limited | Duketon Central | <1% | Duketon Central Project C95/2016 Final Surrender Report for the period 01/01/2016 to 08/11/2016 |
| A113936 | 2017 | Duketon Mining Limited | Duketon | 6.6% | Duketon Project Annual Report C14/2017 for the year ending 31 March 2017, E38/02717, E38/02892, E38/03011, E38 |
| A114932 | 2017 | Regis Resources Limited | Duketon Central | <1% | Duketon Central Project C95-2016 Annual Report for the period 1 July 2016 to 30 June 2017 |
| A115297 | 2017 | Duketon Mining Limited | Duketon West | 2% | Annual Report Duketon West C99/2007 For the Period 1 October 2016 to 30 September 2017, E38/01537, E38/01800, |
| A108892 | 2016 | Duketon Mining Limited | Duketon | 8.9% | Duketon E38/2717 Annual Report For the Period 5 March 2015 to 4 March 2016 |
| A110027 | 2016 | Duketon Mining Limited | Bandya Hill | 4.2% | Bandya Hill E38/2892 Annual Report for the period 19/08/2015 to 18/08/2016 |
| A110355 | 2016 | Duketon Mining Limited | Duketon West | 2% | ANNUAL REPORT COMBINED REPORTING GROUP C99/2007 DUKETON WEST PROJECT FOR THE PERIOD 01/10/2015 TO 30/09/2016, |
| A109758 | 2016 | Regis Resources Limited | Duketon Central | <1% | Annual Report For the Period 1 July 2015 to 30 June 2016 DUKETON CENTRAL PROJECT C61/2003 |
| A105564 | 2015 | Duketon Mining Ltd | Duketon | 8.9% | Duketon Project E38/2717, Annual Report for the period 04/03/2014 to 03/03/2015 |
| A106601 | 2015 | Regis Resources Limited | Duketon Central | <1% | C61-2003 2015A Duketon Central Project Annual Report for the period 01/07/2014 - 30/06/2015 |
| A107303 | 2015 | Duketon Mining Ltd | Duketon | 4.2% | E38/2892, Annual Report for the period 19/08/2014 to 18/08/2015 |
| A107473 | 2015 | Duketon Mining Ltd | Duketon West | 1.7% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2014 to 30 Sept 2015, E38/1537 |
| A102988 | 2014 | Regis Resources Ltd | Duketon Central | <1% | Duketon Central Project, Annual Report for the period 01/07/2013 to 30/06/2014, E38/378.........E38/2857; M38/ |
| A104336 | 2014 | Duketon Mining Ltd | Duketon West | 1.5% | Duketon West Project. Annual Report, Combined Reporting No.: C99/2007, for the period 01/10/2013 – 30/09/2014 |
| A98828 | 2013 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2012 to 30 June 2013 Duketon Central Project (C61/2003) E38 |
| A100800 | 2013 | Duketon Mining Ltd | Duketon West | 1.3% | Duketon West Project, Annual Report for the period 01/10/2012 to 30/09/2013, E38/1535, 1537, 1800, 2177, 2206, |
| A94597 | 2012 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2011 to 30 June 2012 Duketon Central Project C61/2003, E38/ |
| A96070 | 2012 | Independence Group Nl; South Boulder Mines Ltd | Duketon West | 1% | Combined Annual Report C99/2007 “Duketon West” E38/1511, 1535, 1537, 1800, 1979, 2177, 2206, 2255, 2661, M38/1 |
| A91193 | 2011 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2010 to 30 June 2011, Duketon Central Project (C61/2003) |
| A89107 | 2011 | South Boulder Mines Ltd | Duketon West | 12% | Duketon West Project, Final Surrender Report for the period to 14/11/2010, E38/1793. ( Part of C99/2007) |
| A92270 | 2011 | South Boulder Mines Ltd | Dukewest | 2.6% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2010 to 30 Sept 2011 |
| A85516 | 2010 | South Boulder Mines Ltd | Duketon West | 2.4% | Final Surrender Report E38/1564, Formerly part of “Duketon West Project” |
| A85587 | 2010 | South Boulder Mines Ltd | Duketon West | 12% | Partial Surrender Report E38/1793 as part of C99/2007, Duketon West Project, For the period to 14/11/2009 |
| A87969 | 2010 | Regis Resources Ltd | Duketon | <1% | C61/2003 Duketon Central: Combined Annual Report On Exploration For The Period 1/07/2009 to 30/06/2010 |
| A88530 | 2010 | South Boulder Mines Ltd | Duketon West | 2.6% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2009 to 30 Sept 2010 |
| A85112 | 2009 | Independence Group Nl; South Boulder Mines Ltd | Duketon | 3.7% | Partial surrender report for the period 1 October 2006 to 30 September 2009 |
| A84137 | 2009 | Regis Resources Ltd | DUKETON CENTRAL | <1% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2008 TO 30/06/2009 PROJECT C61/2003 DUKETON CENTRAL |
| A84963 | 2009 | South Boulder Mines Ltd | Duketon | 3.7% | Exploration Licence E38/1537, Duketon Project, Partial Surrender Report for the period 1st October 2006 to 30t |
| A76989 | 2008 | South Boulder Mines Ltd | Duketon | 1.6% | Combined Annual Report C99/2007, E38/1043,....E38/1801, M38/330, P38/3160....P38/3309, Duketon West, for the p |
| A80474 | 2008 | Independence Group Nl; South Boulder Mines Ltd | Duketon West | 3.1% | Combined Annual Report C99/2007 Duketon West on :-E 38/1499, E 38/1511, E 38/1537, E 38/1548, E 38/1564, E 38/ |
| A79266 | 2008 | Regis Resources Ltd | DUKETON CENTRAL | <1% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2007 TO 30/06/2008 PROJECT C61/2003 DUKETON |
| A85436 | 2008 | South Boulder Mines Ltd | Duketon West | 2.8% | Combined Annual Report C99/2007, Duketon West Project, for the period 1st Oct 2008 to 30th Sept 2009, E38/1499 |
| A75801 | 2007 | Regis Resources Nl | Duketon Central | <1% | Combined Annual Report On Exploration For The Period 1/7/200 5 to 30/6/2006; C61/2003 Duketon Central: E38/378 |
| A73284 | 2006 | Regis Resources Nl | Duketon Central | <1% | Combined Annual Report on exploration for the period 1/07/2005 to 30/06/2006, Project C61/2003 Duketon Central |
| A69760 | 2005 | Newmont Australia Ltd | Duketon | 2.5% | Combined annual report for the period 01/07/03 - 30/06/04 Duketon Central Project, C61/2003, E38/378, E38/379, |
| A70674 | 2005 | Newmont Australia Ltd | Duketon Central | 7.4% | Duketon Central Project,Final Surrender Report for the period to 10/03/2005 , E38/438, E38/567, & E38/585. |
| A70955 | 2005 | Newmont Duketon Pty Ltd | Duketon | <1% | Combined annual report on exploration for the period 1/07/2004 to 30/06/2005, Project C61/2003, Duketon Centra |
| A66304 | 2003 | Newmont Australia Ltd | Murphy Hills | 4.3% | Surrender Report on Exploration for period ended 25/11/2002 Project Murphy Hills C181/1997 E38/573 Report No: |
| A66600 | 2003 | Newmont Australia Ltd | Duketon Belt/Erlistoun | <1% | Combined Annual Report on Exploration for period ended 17/3/2003 Project C16/1996 Erlistoun E38/379, 387, 565, |
| A67536 | 2003 | Newmont Duketon Pty Ltd | Duketon | 4.5% | Interim Combined Annual Report for the period 24/09/2002 to 30/06/2003 Duketon Central Project C61/2003: E38/4 |
| A64531 | 2002 | Newmont Yandal Operations Ltd | Duketon | 3.2% | Duketon Project, Annual Report for the period 1st January 2001 to 31st December 2001, E38/438, 440, 477, 567, |
| A65944 | 2002 | Newmont Australia Ltd | Murphy Hills | 2% | Combined Annual Report on Exploration for period ended 24/9/2002 Project C181/1997 Murphy Hills E38/559 & E38/ |
| A64877 | 2002 | Newmont Australia Ltd | Duketon Belt/Erlistoun | <1% | Combined Annual Report On Exploration For Period Ended 17/3/2002 Project C16/1996 Erlistoun E38/379, 386, 387, |
| A62782 | 2001 | Normandy Yandal Operations Ltd | Duketon | 3.2% | Annual Report for period ended 31 December 2000, E38/438, 440, 477, 567, 5 85, 630, 654 & P38/2715, 2716, 271 |
| A63768 | 2001 | Acm Mines Pty Ltd | Murphy Hills | 2% | Combined Annual Report on exploration for period ended 23/09/2001 Project Murphy Hills E38/559, E38/573 C181/1 |
| A64529 | 2001 | Normandy Yandal Operations Ltd | Little Well | 2.7% | Surrender Report On Exploration For Period Ended 08/05/2001 E38/654 Little Well Project. |
| A62652 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | Exploration Licences: E38/379, 386-7, 404, 565, 649, 651, 653, 843, 1189-92, 1196 Mining Leases: M38/114, 237, |
| A63672 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | Exploration licences: E38/379, 386-387, 404, 565, 649, 651, 653, 789, 843, 1189-1192, 1196. Mining leases: M3 |
| A61966 | 2000 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | C16/1996 - Erlistoun Joint Annual Report for the period 18 March 1999 to 17 March 2000. Gold mining lease: GM |
| A59022 | 1999 | Johnsons Well Mining Nl | Murphy Hills | 4.3% | Exploration licence E38/573, Bandya, PartiaL Surrender Report for the period 12 October 1994 to 24 March 1999 |
| A59200 | 1999 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | Joint Annual Report on the Erlistoun Project, E38/379, 386- 387, 404, 565, 649, 651, 653, 789, M38/114, 237, 2 |
| A57114 | 1999 | Johnsons Well Mining Nl | Murphy Hills | 2% | C181/1997 - Murphy Hills - Joint Annual Report Exploration Licence: E38/559, 573 24/09/97 - 23/09/98 |
| A57134 | 1999 | Johnsons Well Mining Nl | Murphy Hills | 4.3% | Johnson's Well Mining NL E38/573, Bandya. Part of C181/1997 - Murphy Hills, reporting period 24-9 to 23-9. Pa |
| A55392 | 1998 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | Exploration Licences E38/379 E38/386 to E38/387 E38/565 E38/649 E38/651 E38/653 Mining Leases M38/114 M38/237 |
| A53944 | 1997 | Wiluna Mines Ltd | Duketon Project | 3.1% | Duketon Project, 1997 Annual Report Exploration Licence: 38/438, 440, 477, 509, 567, 585, 630, 38/654 Prospect |
| A50344 | 1997 | Aurora Gold Ltd | Duketon | <1% | Duketon Project, Partial Surrender Report, Exploration Licences 38/380, 381, 387 for the Period 13 January 19 |
| A50352 | 1997 | Aurora Gold Ltd | Duketon | <1% | Annual Technical Report, Duketon Project , E38/348 E38/380 E38/381 E38/387 E31/404 E38/430; M38/421 M38/422 an |
| A50419 | 1997 | Wiluna Mines Ltd | Duketon | 3% | Duketon Project, Annual Report for the year ending 31/12/1996, E38/438 ,440, E38/477 E38/509 E38/567 E38/585 E |
| A52786 | 1997 | Johnsons Well Mining Nl | Murphy Hills | 2% | Exploration Licence E38/559 & 573 'Murphy Hills' Annual report for the period 24/09/96-23/09/97 JWM[C181/1997] |
| A46461 | 1996 | Mr Creasy Mg | Murphy Hills | 4.3% | Bandya Annual Report 12-10-94 to 11-10-95, E38/573. |
| A47320 | 1996 | Wiluna Mines Ltd | Duketon | 3.1% | Duketon Project, Annual Report for the period 1st January 1995 to 31st December 1995, E38/438, E38/440, E38/4 |
| A49544 | 1996 | Johnsons Well Mining Nl | Murphy Hills | 4.3% | Johnson's Well Mining NL. E38/573, Bandya, Annual Report For The Period 12-10-1995 to 11-10-1996. |
| A43908 | 1995 | Aurora Gold Ltd | Duketon | <1% | Annual Report, Duketon Project ,E38/348, 380, 381, 387, 404 & 430 for the period 1 January 1994 to 31 December |
| A44346 | 1995 | Wiluna Mines Ltd | Duketon | 3.1% | Duketon Project, Annual Rreport for the period January 1st 1994 to December 31st 1994. E38/438, 440, 477, 509, |
| A47215 | 1995 | Aurora Gold Ltd | Duketon | <1% | Annual Technical Report, Duketon Project, E38/348 E38/380 E38/381 E38/387 E38/404 And E38/430; M38/421 M38/42 |
| A40892 | 1994 | Aurora Gold Ltd | Duketon | <1% | Duketon Project, Partial Surrender Report for E38/348 for the period 28th February 1990 to 28th February 1994; |
| A40945 | 1994 | Aurora Gold Ltd | Duketon | <1% | Annual Report for the Period 01/01/93 - 31/12/93 Duketon Project |
| A38734 | 1993 | Ashton Gold Wa Ltd | Duketon | <1% | Annual Report for the period 01/01/92-31/12/92 Duketon Project P38/2101,2234,2286-2287 E38/348,379-381,387,404 |
| A40430 | 1993 | Asarco Australia Ltd | Duketon Project | 4% | Annual report for the period 01/01/93-31/12/93 Duketon Project E38/438 E38/440 E38/477 E38/509 |
| A35629 | 1992 | Ashton Gold Wa Ltd | Duketon | <1% | Annual Report for 1 January 1991 to 31 December 1991. Duketon Project E38/348, E38/379, E38/380, E38/381, E38/ |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A1113 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | 1.1% | Erlistoun-Baneygo Project, Non-statutory Report: Geological & Geochemical Maps & Magnetic Anomalies, December |
| A1115 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | 1.1% | Erlistoun-Baneygo Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1968, TR70/3 |
| A1116 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | 2.5% | Erlistoun - Baneygo Project, Non-statutory Report: Final Reports 1967 & 1968, TR70/3899 & 4349H. |
| A1117 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project: |
| A1119 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | 1.2% | Erlistoun-Baneygo Project, Non-statutory Report: |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 4 years · 20 Aug 2030
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 38/135 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 38/135? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-28. Compiled by NextMaps. Verify against primary sources before reliance.