| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A148766 | 2025 | Mount Ida Lithium Pty Ltd | Mount Ida | 8.5% | Final Surrender Report for P29/2397 – P29/2404 for the period 20 April 2017 to 03 April 2025 |
| A122770 | 2020 | Ora Banda Mining | Mount Ida | <1% | Mt Ida Project C112/2001 Annual Report for the period ending 31/12/2019 |
| A125365 | 2020 | Gazard Investments Pty Ltd | Mount Ida South | 1.2% | Annual Report for Mount Ida South E 29/969 period 10/08/2019 to 9/08/2020 |
| A124712 | 2020 | Alt Resources Limited | Quin Hills | <1% | C143/2005 Quinn Hills Project Combined Annual Report for the period ending 30/06/2020 |
| A120278 | 2019 | Ora Banda Gold Mining Pty Ltd | Mount Ida | 8.5% | Annual Report Mount Ida P29/2397 - 2404 for the period 20 April 2018 to 19 April 2019 |
96 more reports
| A121085 | 2019 | Alt Resources Limited | Mount Ida South | 1.2% | E29/969 Mount Ida South Annual Report for the period 10/08/2018 to 9/08/219. |
| A121635 | 2019 | Bruce Legendre | Ballard | <1% | E30/00472, E29/00991 Ballard Project C 5/2018 Annual Technical Report for the period 5 July 2018 to 4 July 201 |
| A117012 | 2018 | Mt Ida Gold Pty Ltd | Mount Ida | 17% | Annual Report for P29/2400 Mount Ida for the period 20/04/2017 - 19/04/2018 |
| A117013 | 2018 | Mt Ida Gold Pty Ltd | Mount Ida | 9.1% | Annual Report for P29/2401 Mount Ida Project for the period 20 April 2017 to 19 April 2018 |
| A117014 | 2018 | Mt Ida Gold Pty Ltd | Mount Ida | 4.7% | Annual Report for P29/2402 Mount Ida Project for the period 20/04/2017 to 19/04/2018 |
| A117015 | 2018 | Mt Ida Gold Pty Ltd | Mount Ida | 5.3% | Annual Report for P29/2403 Mount Ida Project for the period 20 April 2017 to 19 April 2018 |
| A115700 | 2018 | Enterprise Metals Limited | Ballard | <1% | Ballard Project E30/472 Annual Report For the Period 1 December 2016 to 30 November 2017 |
| A117016 | 2018 | Mt Ida Gold Pty Ltd | Mount Ida | 14% | Annual Report for P29/2404 Mount Ida Project For the Period 20 April 2017 to 19 April 2018 |
| A117009 | 2018 | Mt Ida Gold Pty Ltd | Mount Ida | 5.4% | Annual Report for P29/2397 Mount Ida for the period 20/04/2017 - 19/04/2018 |
| A117010 | 2018 | Mt Ida Gold Pty Ltd | Mount Ida | 8.7% | Annual Report for P29/2398 Mount Ida for the period 20/04/2017 - 19/04/2018 |
| A117011 | 2018 | Mt Ida Gold Pty Ltd | Mount Ida | 2.4% | Annual Report for P29/2399 Mount Ida for the period 20/04/2017 - 19/04/2018 |
| A117908 | 2018 | Alt Resources Limited | Mount Ida South | 1.2% | Mount Ida South E29/969 Annual Report for the period 10/08/2017 to 9/08/2018 |
| A118047 | 2018 | Enterprise Metals Limited | Ballard | <1% | Ballard Project E30/472 & E29/991 Combined Annual Report for the period 05/07/2017 - 04/07/2018 |
| A108022 | 2016 | Eastern Goldfields Limited | Mount Ida | <1% | MT IDA PROJECT Mineral Exploration Report Combined Report C112/2001 For the Period 1/01/2015 – 31/12/2015, E29 |
| A108837 | 2016 | Jupiter Mines Ltd | Mount Ida | 2.1% | Mt Ida Magnetite Project E29/777 Final Surrender Report for the period 15/02/2011 to 11/02/2016 |
| A110177 | 2016 | Eastern Goldfields Limited | Mount Ida | 5.1% | Surrender Report P29/1938-1940, P30/1012-1016, P29/1941-1950 Mount Ida Project For the Period 11 September 200 |
| A110589 | 2016 | Bruce Legendre | Emerald | <1% | Emerald Project E30/472 Annual Report |
| A104676 | 2015 | Jupiter Mines Ltd | Central Yilgarn - Mount Ida - Mount Maso | 2.7% | Annual Report for the period 28-11-2013 to 27-11-2014 Central Yilgarn Iron Project - Mt Ida and Mt Mason C180/ |
| A104852 | 2015 | Swan Gold Mining Ltd | Mount Ida | <1% | Combined C112/2001 Mineral Exploration Report Mt Ida Project for the period 1/01/2014 – 31/12/2014, E29/640.. |
| A107146 | 2015 | Wild Acre Metals Limited | Mount Ida South | <1% | Annual Technical Report C175/2010 - Mt Ida South Project for the Period 1st September 2014 to 31st August 2015 |
| A107499 | 2015 | Jupiter Mines Ltd | Mount Ida | 4.4% | Mt Ida Magnetite Project E29/560-I Final Surrender Report for the period 08/09/2006 to 07/09/2015 |
| A101107 | 2014 | Swan Gold Mining Ltd | Mount Ida | <1% | Mineral Exploration Report Mt Ida Project Combined Report C112/2001 For the Period 1/01/2013 – 31/12/2013, E29 |
| A101594 | 2014 | Jupiter Mines Ltd | Central Yilgarn - Mount Ida - Mount Maso | 2.7% | Central Yilgarn Iron Project C180/2010 (Mt Ida and Mt Mason) Annual Report for the period 28/11/2012 to 27/11/ |
| A105117 | 2014 | Wild Acre Metals Limited | Mount Ida | <1% | Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st September 2013 to 31st August 2014, |
| A96734 | 2013 | Jupiter Mines Ltd | Central Yilgarn - Mount Ida - Mount Maso | 2.7% | Central Yilgarn Iron Ore Project (CYIP) Mt Ida Magnetite Project and Mt Mason DSO Hematite Project C180/2010, |
| A97708 | 2013 | Swan Gold Mining Ltd | Mount Ida | <1% | Mt Ida Project, Annual Report for the period 01/01/2012 to 31/12/2012, E29/561, 660, 640- 644, 647 & E29/659; |
| A98715 | 2013 | Wild Acre Metals Ltd | Mount Ida South | <1% | Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st August 2012 to 31st July 2013, E29/7 |
| A93077 | 2012 | Jupiter Mines Ltd | Mount Ida - Mount Mason | 2.7% | Annual Report for the period 28/11/10 to 27/11/2011, Central Yilgarn Iron Project - Mt Ida and Mt Mason, C180/ |
| A93967 | 2012 | Heron Resources Ltd | Riverina | 3.2% | Final surrender report for the period 26 April 2007 to 19 April 2012, Riverina Project, E29/610 |
| A95369 | 2012 | Wild Acre Metals Limited | Mount Ida South | <1% | Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st August 2011 to 31st July 2012, E29/7 |
| A96605 | 2012 | Jupiter Mines Ltd | Mount Ida | 2.1% | Mt Ida Magnetite Project Partial Surrender Report for E29/777 for the period15/02/11 to 21/12/12 |
| A97770 | 2012 | Jupiter Mines Ltd | Mount Ida | 2.1% | Mt Ida Magnetite Project Partial Surrender Report for E29/777 for the period 15/02/11 to 21/12/12 |
| A89961 | 2011 | Heron Resources Ltd | Riverina | <1% | Annual report for the period 1 February 2010 to 31 January 2011, Riverina Project, C78/2008 |
| A91038 | 2011 | Great Western Exploration Ltd | Walling Rock | <1% | Walling Rock Project – Surrender Report 2011, 29 March 2010 – 28 March 2011 |
| A91684 | 2011 | Wild Acre Metals Limited | Mount Ida South | <1% | Annual Technical Report C175/2010- Mt Ida South Project 1st August 2010 to 31st July 2011, E29/744, 749, 750, |
| A85967 | 2010 | La Mancha Resources Australia Pty Ltd | Mount Ida | <1% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2009 TO 31/12/2009 Tenements: E29/526, 539, 559, 56 |
| A89288 | 2010 | Jupiter Mines Ltd | Mount Ida - Mount Mason | 4.3% | MounT Ida - Mount Mason Annual Report C180/2010, Period 28/11/09 to 27/11/10 |
| A85902 | 2010 | Gibson P R | Salt Well | <1% | Salt Well Project, Menzies District, North Coolgardie Mineral Field, Western Australia P29/2064 Annual Explora |
| A86717 | 2010 | Heron Resources Ltd | RIVERINA | <1% | Riverina Project C78/2008, Annual report for the period 1 February 2009 to 31 January 2010 |
| A86749 | 2010 | La Mancha Resources Australia Pty Ltd | Mount Ida | 8% | Mount Ida Project Final Surrender Report E29/481 for the period 19/08/2004 to 28/01/2010 |
| A88536 | 2010 | Jupiter Mines Ltd | Mount Ida | 4.4% | Mount Ida Project Annual Report E29/560 Period 08/09/09 to 07/09/10 |
| A81393 | 2009 | La Mancha Resources Australia Pty Ltd | MT IDA | <1% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2008 TO 31/12/2008, Tenements: E29/481, 506, 526, 5 |
| A77445 | 2008 | La Mancha Resources Australia Pty Ltd | Mount Ida | <1% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2007 TO 31/12/2007 C112/2001 |
| A80458 | 2008 | La Mancha Resources Australia Pty Ltd | MT IDA | 2.9% | MT IDA PROJECT SURRENDER REPORT E29/133 |
| A77191 | 2008 | Riverina Resources Pty Ltd | Snake Hill | 1% | Surrender Report 7 August 2006 - 13 November 2007 Exploration Licence E30/293 Snake Hill Project |
| A78430 | 2008 | Heron Resources Ltd | Riverina | <1% | Riverina Project, C78/2008 E29/575, E29/586, E29/610, Annual report for the period 1 February 2007 to 31 Janua |
| A76808 | 2007 | La Mancha Resources Australia Pty Ltd | Snake Hill | 1.9% | MT IDA PROJECT E29/133, E29/134 COMBINED ANNUAL REPORT FOR THE PERIOD 16/06/2006 TO 15/06/2007 |
| A76119 | 2007 | Riverina Resources Pty Ltd | Snake Hill | 1% | Annual Technical Reporting 7 August 2006 - 6 August 2007 Snake Hill Project Exploration Licence - E30/293 |
| A76250 | 2007 | Uranium Oil & Gas Ltd | Walling Rocks | <1% | Surrender Report Walling Rocks E29/589 Ending 29 June 2007 |
| A76309 | 2007 | Jupiter Mines Ltd | Mount Ida | 4.4% | Annual Exploration Report for Exploration Licence E29/560 Mt. Ida Iron Ore Project The period 8th September 20 |
| A76801 | 2007 | La Mancha Resources Australia Pty Ltd | Mount Ida | 8% | Mount Ida Project Annual Report for period 19/08/2006 to 18/08/2007 E29/481 |
| A76802 | 2007 | La Mancha Resources Australia Pty Ltd | Snake Hill | 1.9% | Mount Ida Project Combined Annual Report for the period 16/06/2006 to 15/06/2007, Tenements: E29/133, E29/134. |
| A71621 | 2006 | International Goldfields Ltd | Four Corners | 1.9% | Annual Report period ending 16/06/2005 for the Four Corners Project, Tenements E29/133 and E29/134, Combined R |
| A73635 | 2006 | International Goldfields Ltd | Snake Hill | 1.9% | 2006 Combined Annual Report for the Four Corners Project Exploration Licences E29/133, E29/134. (C351/1997) Fo |
| A71617 | 2006 | International Goldfields Ltd | Four Corners | 8% | Annual Report for the period ending 18/08/2005, Four Corners Project, Tenement E29/481, (Menzies). |
| A73664 | 2006 | International Goldfields Ltd | Four Corners | 8% | 2006 Annual Report, Four Corners Project E29/481, For the Period 19/08/2005 to 18/08/2006, (Menzies). |
| A70652 | 2005 | Westex Resources Pty Ltd | Elsie May | 6.4% | Elsie May Project E29/417, Menzies District, North Coolgardie mineral field, WA. Annual report for period 9/3/ |
| A68318 | 2004 | International Goldfields Ltd | Four Corners | 1.9% | Annual Report for the period 17/06/2002-16/06/2003 Four Corners Project, E29/133, E29/134, Combined Report No |
| A69531 | 2004 | International Goldfields Ltd | Four Corners | 1.9% | Annual report for the period ending 16/06/04 Four Corners Project, C351/1997, E29/133, E29/134 |
| A67249 | 2003 | Gutnick Resources Nl | Four Corners | <1% | Exploration Licences: E29/141,E29/150, C351/1997 - Four Corners, Surrender Report for the period 24 January 19 |
| A65020 | 2002 | Barra Resources Ltd | Snake Hill | 2.7% | Annual Technical Reporting 1 July 2001 - 30 June 2002 Exploration Licence E29/290, E30/166 Snake Project River |
| A65676 | 2002 | Mt Kersey Mining Nl | Lake Ballard | <1% | Exploration Licence E29/141 'Lake Ballard JV' Annual Ministerial Submission For Extension Of Term For The Peri |
| A65677 | 2002 | Mt Kersey Mining Nl | Four Corners | <1% | Exploration Licences: E29/141 & 150. Four Corners. Annual Report For The Period 9 August 1997 To 8 August 1998 |
| A65678 | 2002 | Gutnick Resources Nl | Four Corners | <1% | Exploration Licences: E29/141, 150. Four Corners. Joint Annual Report For The Period 9 August 1999 To 8 August |
| A63341 | 2001 | Barra Resources Ltd | Snake Hill | 2.7% | Snake Hill Project Combined Annual Technical Report For Tenements E30/166 and E29/290 Reporting Period: 13th M |
| A63739 | 2001 | Barra Resources Ltd | Snake Hill | 6% | Snake Hill Project Surrender Report for tenement E 29/290 reporting period: 26th August 1996 to 22nd January 2 |
| A63746 | 2001 | Gutnick Resources Nl | Four Corners | 1.4% | Exploration licences: E29/133-134, 141, 150 'C351/1997 - Four Corners' Joint Annual Report for the period 9 Au |
| A61017 | 2000 | Killoran Pty Ltd | Snake Hill | 6% | Snake Hill North Project Partial Surrender Report of Explora tion Licence EL 29/290 5 August 2000 |
| A57405 | 1999 | Mt Kersey Mining Nl | Snake Hill | <1% | Exploration Licence E29/141 'Snake Hill' Partial Surrender Report for the Period 24th January 1992 to 18 Novem |
| A59380 | 1999 | Kookynie Resources Nl | Snake Hill North | 6% | Snake Hill North Project, Annual Report Tenement E29/290, Due on 26 October, 1999, Reporting Period 26 August |
| A56011 | 1998 | Mt Kersey Mining Nl | Snake Hill | <1% | Snake Hill Project, Partial Surrender Report for the period 24th January 1992 to 24th April 1998, E29/141. |
| A56795 | 1998 | Killoran Pty Ltd | Snake Hill North | 6% | Snake Hill North Biennual Report on E29/290 for the twentyfo ur months ending 25/8/1998 |
| A56418 | 1998 | Northling Pty Ltd | Menzies diamond exploration | 4.9% | Annual Report to the Department of Minerals and Energy Western Australia, Exploration Licence EL 29/345 Report |
| A56419 | 1998 | Northling Pty Ltd | Menzies | <1% | Annual Report to the Department of Minerals and energy Western Australia, Exploration Licence EL 30/178 Report |
| A50172 | 1997 | Greater Pacific Gold Nl | Snake Hill | 2.3% | Annual Report on E29/260, 29/261, 29/262 and 30/145 01/01/1995 to 31/01/1997 Snake Hill Area - North Coolgardi |
| A50766 | 1997 | Cra Exploration Pty Ltd | Lake Ballard | <1% | Annual Report to 31 January 1997 on E29/141 & 150 Lake Ballard Project. |
| A49265 | 1996 | Cra Exploration Pty Ltd | Snake Hill | 1.9% | Annual report to 16 June 1996 on E29/133 and E29/134 Snake Hill Project,. |
| A46308 | 1995 | Delta Gold Ltd | Lake Ballard | <1% | Lake Ballard Project ,Annual Report for the Period March 1994 to August 1995, E29/141 & 150. |
| A46627 | 1995 | Stockdale Prospecting Ltd | Ida | <1% | Surrender Report for tenements surrendered on 09/11/95 Ida Project E29/229-230,236-239,244,252 E30/128-130,134 |
| A45472 | 1995 | Cra Exploration Pty Ltd | Snake Hill | 1.9% | ANNUAL REPORT TO 16 JUNE 1995 ON E29/133, 134 SNAKE HILL MENZIES SH5105 W.A |
| A45920 | 1995 | Cra Exploration Pty Ltd | Snake Hill | 1.9% | Partial Surrender Report for the period ending 16/06/95 Snake Hill Project E29/133 E29/134 |
| A41379 | 1994 | Delta Gold Ltd | Lake Ballard | <1% | Lake Ballard Project Annual Report for the Period February 1993 to March 1994 E29/141, 150. |
| A41673 | 1994 | Cra Exploration Pty Ltd | Snake Hill base | 1.9% | Partial Relinquishment Report to 16 June 1994 |
| A41805 | 1994 | Cra Exploration Pty Ltd | Snake Hill | 1.9% | Annual Report for the period 17/06/93-16/06/94 Snake Hill Project E29/133,134 |
| A38576 | 1993 | Delta Gold Ltd | Lake Ballard | <1% | Non-statutory Report : Report on Previous Nickel and Gold Exploration in the Lake Ballard Area ,Exploration Li |
| A39745 | 1993 | Cra Exploration Pty Ltd | Snake Hill | 2.9% | Annual report for the period 17/06/92-16/06/93 Snake Hill Project E29/133, E29/134 |
| A38133 | 1992 | Cra Exploration Pty Ltd | Snake Hill | 1.9% | Annual report for the period 17/06/91-16/06/92 Snake Hill Project E29/133 E29/134 |
| A7536 | 1978 | Esso Australia Ltd | Lake Ballard | <1% | Lake Ballard Project, Non-statutory Report: Annual & Final Report for the year ending 31/12/1977, MC29/2988-30 |
| A6889 | 1977 | Esso Australia Ltd | Lake Ballard | <1% | Lake Ballard Project, Annual Report for the period 01/01/1976-31/12/1976, MC30/1249-1253, 1266-1270; |
| A5386 | 1974 | Barrier Exploration Nl | Davyhurst | <1% | Davyhurst Project report [non-statutory], MC30/1227 ... 30/1385 |
| A3927 | 1973 | Asarco Australia Ltd | Elsie May- Lake Ballard | 1.9% | Elsie May- Lake Ballard Project, Non-statutory Report: Final Report [ Miscellaneous Reports] for period ending |
| A3243 | 1972 | Westralian Nickel Exp Nl | Carr Boyd Rocks | 15% | Carr Boyd Rocks Project, Non-statutory Report: Final Report for the period ending 11/01/1972, MC29/471-472 & 4 |
| A52190 | 1753 | Mt Kersey Mining Nl | Snake Hill | 1.4% | Mt Kersey Mining NL Exploration licences E29/133, E29/134, E29/141, E29/150 Snake Hill C180/1994 Joint Annual |
| A79645 | 1753 | Jupiter Mines Ltd | Mount Ida | 4.4% | MT IDA PROJECT Annual Report E29/560 Period 08/09/07 to 07/09/08 |
| A84480 | 1753 | Jupiter Mines Ltd | MT IDA | 4.4% | MT IDA PROJECT Annual Report E29/560, Period 08/09/08 to 07/09/09 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 20 years · 13 Aug 2046
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 29/222 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 29/222? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.