NextMaps›WA Tenements›L 28/63

L 28/63

LiveMiscellaneous LicenceCity of Kalgoorlie-BoulderKurnalpi District
Area
7,761.986ha
Expires
Apr 2040
in 14 years
WAMEX reports
137
WA median is 53
Report drilling
76
of 137 reports
Kalgoorlie-Boulder Explore on the live map

Register summary

Holder
Northern Star (Carosue Dam) Pty Ltd
Part of
Northern Star Resources Ltd (ASX:NST) as at 2026-06-30
Local government
City of Kalgoorlie-Boulder
Application received
16 Jan 2018
Commenced
17 Apr 2019
Expiry
16 Apr 2040
Term
21 Years

Exploration history on this ground

137 historical WAMEX exploration reports intersect L 28/63: 51 report geochemistry or sampling, 84 include a digital data package.
When this ground was worked · 129 of 137 reports dated
41960s
11970s
11980s
261990s
462000s
382010s
132020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A153315 2026 Kalgoorlie Mining Associates Pty Ltd E28/2998 13% Partial Surrender Report for E28/2998 for the period ending 25/09/2025
A138719 2024 Native Mineral Resources Pty Ltd ARCOONA 1.5% ARCOONA E31/1203 Annual Report for the period ending 18/11/2023.
A145208 2024 Dynamic Metals Limited Pinnacles West 13% Partial Surrender Report for E 28/3138 - Pinnacles West for the period 13 October 2023 to 11 September 2024
A133554 2023 Native Metals Pty Ltd Arcoona 1.5% Arcoona E 31/1203 Annual Report for the period 19th November 2021 to 18 November 2022
A130040 2022 Nexus Minerals Australia Pty Ltd Pinnacles 17% E28/2526 Partial Surrender Report Pinnacles Project for the period ending 21/12/2021.
132 more reports
A129122 2021 Native Mineral Resources Pty Ltd Arcoona 1.5% Arcoona E 31/1203 Annual Report for the period 19th November 2020 to 18 November 2021
A126380 2021 Element 25 Limited Pinnacles 15% Annual Report - C210/2017 - Pinnacles Project for the period ending 04/01/2021
A124593 2020 St Barbara Limited Pinjin Central <1% E28/2447 - Partial Surrender Report for the Period 4 September 2014 to 24 June 2020, Pinjin Central Project
A124701 2020 St Barbara Limited Pinjin Central <1% Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2019 to 30 Jun
A124921 2020 Nexus Minerals Limited Pinnacles 19% Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 for the period ending 30/06/2020
A122911 2020 Element 25 Limited Pinnacles 9.1% Annual Report - C210/2017 Pinnacles for the period ending 04/01/2020, E 28/02577, E 28/02701
A124728 2020 Saracen Gold Mines Pty Limited Carouse Dam 1.9% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2019 to 30 June 2020
A125122 2020 St Barbara Limited South Pinjin <1% E28/2447 - Partial Surrender Report South Pinjin for the Period 4 September 2014 to 3 September 2020
A119504 2019 Element 25 Limited Pinnacles 9.1% Annual Report C210/2017 Pinnacles for the period 5 January 2018 to 4 January 2019, E28/02577, E28/02701
A120696 2019 Nexus Minerals Limited Pinnacles 19% Combined Annual Report for Pinnacles Project, C45/2016 for the period 1 July 2018 to 30 June 2019, E 28/02526,
A120891 2019 St Barbara Limited Pinjin Central <1% Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2018 to 30 Jun
A120911 2019 Saracen Gold Mines Pty Limited Carosue Dam 1.9% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2018 to 30 June 2019
A116288 2018 Montezuma Mining Company Ltd PIinnacles 9.1% Annual Report C210/2017 Pinnacles For the Period 5 January 2017 to 4 January 2018, E28/02577, E28/02701
A117529 2018 St Barbara Limited Pinjin Central <1% Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2017 to 30 Jun
A117596 2018 Nexus Minerals Limited Pinnacles 19% Combined Annual Report for Pinnacles Project, C45/2016, 01 July 2017 - 30 June 2018
A117528 2018 Saracen Gold Mines Pty Limited Carosue Dam 1.8% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2017 to 30 June 2018
A114571 2017 St Barbara Limited Pinjin Central <1% Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2016 to 30 Jun
A114725 2017 Nexus Gold Pty Ltd Pinnacles 19% Combined Annual Report for Pinnacles Project, C45/2016 For the Period 1 July 2016 to 30 June 2017, E28/02526,
A114597 2017 Saracen Gold Mines Pty Limited Carosue Dam 1.8% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2016 to 30 June 2017, E28/01747.....P31/0202
A108278 2016 Nexus Minerals Ltd Pinnacles 68% Annual Report for Pinnacles Project – Tenement E28/2487 for the period 30th January 2015 to 29th January 2016
A109693 2016 St Barbara Limited Pinjin Central <1% Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2015 to 30 Jun
A109789 2016 Nexus Minerals Limited Pinnacles 19% Combined Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 For the Period 1 July 2015 to
A109933 2016 Saracen Gold Mines Pty Ltd Carosue Dam 1.8% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2015 to 30 June 2016
A106702 2015 St Barbara Limited Away From It All Dam E28/2447 <1% Annual Report for the Period 4 September 2014 to 3 September 2015
A106812 2015 Saracen Gold Mines Pty Ltd Mulgabbie West <1% Mulgabbie West Project (C117/1999) Annual Report for the Period 1 July 2014 to 30 June 2015, E31/1009, M28/241
A106872 2015 Saracen Gold Mines Pty Ltd Carosue Dam 4.4% Carosue Dam Project (C064/2001) Annual Report for the Period 1 July 2014 to 30 June 2015, E28/1747, M28/166, M
A101928 2014 Ausrich Resources Pty Ltd Gindalbie <1% E28/2136, Gindalbie Project , Annual Report for the period 07/03/ 2013 to 06/03/2014.
A103198 2014 Cazaly Resources Ltd Carosue Dam 7.5% E31/886, E28/2273 Combined Annual Report C50/2011 for the period 01/07/2013 to 30/06/2014
A103508 2014 Saracen Gold Mines Pty Ltd Mulgabbie West <1% Mulgabbie West Project Annual Report, 1 July 2013 to 30 June 2014, C117/1999; E31/796, E31/1009, M28/241, M28
A103536 2014 Saracen Gold Mines Pty Ltd Carosue Dam 4.4% Carosue Dam Project C64/2001 Annual Report for the period 01/07/2013 to 30 June 2014, E28/1747, M28/166, M28/1
A103734 2014 Saracen Gold Mines Pty Ltd Carosue Dam 6.1% CAROSUE DAM PROJECT EXPLORATION LICENCE E28/1747 PARTIAL SURRENDER REPORT 04 JULY 2008 TO 03 JULY 2014
A99440 2013 Saracen Gold Mines Pty Ltd Mulgabbie West <1% Mulgabbie West Project (C117/1999) Annual Report for the period 1 July 2012 to 30 June 2013, E31/796, E31/1009
A99441 2013 Saracen Gold Mines Pty Ltd Carosue Dam 3.8% Carosue Dam Project C64/2001Annual Report for the period 1 July 2012 to 30 June 2013 E28/828, E28/1747, M28/16
A97007 2013 Ausrich Resources Pty Ltd Kurnalpi <1% E28/2136-I KURNALPI PROJECT Annual Report for the period: 07th March 2012 to 06th March 2013
A100147 2013 Cazaly Resources Ltd Carosue Dam 8% E31/886, E28/2049 Combined Annual Report C50/2011 for the period ended 30 June 2013
A93586 2012 Legacy Iron Ore Ltd Wallbrook 2.5% Annual Mineral Exploration Report – Wallbrook Project E31/716, 1st February 2011 – 31st January 2012
A95050 2012 Cove Resources Limited Carosue Dam 7.2% Carosue Dam Project Combined Annual Exploration Report For The Year to 30th June 2012, C50/2011, E31/886, P31/
A95130 2012 Saracen Gold Mines Pty Ltd Mulgabbie West <1% Mulgabbie West Project Annual Report 1 July 2011 to 30 June 2012, C117/1999, E31/796, M28/241, 243, 266, 269,
A95372 2012 Saracen Gold Mines Pty Ltd Carosue Dam Prroject 2.7% CAROSUE DAM PROJECT, ANNUAL REPORT, C064/2001 01 JULY 2011 TO 30 JUNE 2012
A89864 2011 Legacy Iron Ore Ltd Wallbrook 2.5% Annual Mineral Exploration Report Wallbrook Project E 31/716 For the Period 1st February 2010 to 31st January
A91960 2011 Cove Resources Limited Carosue Dam 7.2% Carosue Dam Project C50/2011 Combined First Annual Report period ending 30 June 2011 for E31/886, E31/889, E31
A91293 2011 Saracen Gold Mines Pty Ltd Mulgabbie West <1% Mulgabbie West Project C117/1999 Annual Report for the period 1 July 2010 to 30 June 2011 E31/796, M28/241, M2
A89359 2011 Renaissance Minerals Ltd Mulgabbie <1% E28/1759 Surrender Report for the period 26 June 2008 to 14 December 2010.
A91632 2011 Saracen Gold Mines Pty Ltd Carosue Dam 2.7% Carosue Dam Project C64/2001 annual report for the period 1 July 2010 to 30 June 2011, E28/828, E28/1747, E31/
A87786 2010 Gryphon Minerals Ltd Mulgabbie <1% E28/1759 Annual Report for the period 26 June 2009 to 25 June 2010.
A86231 2010 Legacy Iron Ore Ltd Wallbrook 2.5% Annual Exploration Report Wallbrook Project E31/716 for the period 1st February 2009 to 31st January 2010
A81126 2009 Peninsula Minerals Ltd Pinnacles 7.7% Annual Technical Report E28/589, E28/590, E28/1516 GSWA Group reporting Ref Number 17/2006, Pinnacles, 1 Janua
A82485 2009 Jackson Minerals Ltd Wallbrook 2.5% E31/716 Annual Report 01 February 2008 – 31 January 2009
A84423 2009 Gryphon Minerals Ltd Mulgabbie <1% Mulgabbie E28/1759 Annual Report for the period 26 June 2008 to 25 June 2009
A78395 2008 Saracen Gold Mines Pty Ltd Mulgabbie 23% E28/1120 Relief Well Project Partial Surrender Report 18 December 2003 to 17 December 2007
A78589 2008 Peninsula Minerals Ltd Pinnacles 7.7% Pinnacles Annual Technical Report E28/589, E28/590, E28/1516 GSWA Group reporting Ref Number 17/2006
A79749 2008 Saracen Gold Mines Pty Ltd Mulgabbie West 16% ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR Group C117/1999
A79781 2008 Saracen Gold Mines Pty Ltd Relief Well 4.8% RELIEF WELL PROJECT ANNUAL REPORT 03 JULY 2007 TO 02 JULY 2008, E28/898, 981, 1120, Combined reporting C254/1
A75256 2007 Bannerman Resources Ltd Pinnacles Project 6% 'Pinnacles Project' E28/589, E28/590, E28/1326, E28/1516, P28/995, Combined Annual Report for the Period 1st J
A76639 2007 Saracen Gold Mines Pty Ltd Relief Well (Mulgabbie) 4.8% RELIEF WELL PROJECT ANNUAL REPORT 03 JULY 2006 TO 02 JULY 2007 C254/1993 E28/898, 981, 1120 (Kurnalpi)
A76717 2007 Saracen Gold Mines Pty Ltd Mulgabbie West 18% MULGABBIE WEST PROJECT ANNUAL REPORT 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C117/1999
A73246 2006 Saracen Gold Mines Pty Ltd Mulgabbie West 18% Mulgabbie West Project Annual Report, 01 July 2005 to 30 June 2006, E28/553,605-606, CR Group: C117/1999, P2
A72066 2006 Jackson Gold Ltd Mulgabbie 23% Mulgabbie E28/1120, 2005 Annual Report, 18 December 2004 to 17 December 2005, (Kurnalpi).
A73457 2006 Jackson Gold Ltd Relief Well (Mulgabbie) 4.8% E28/898,981,1120 Relief Well Project, 2006 Annual Report, 3 July 2005 to 2 July 2006, Combined Reporting No. C
A102268 2005 Ausrich Resources Pty Ltd Gindalbie <1% E28/2136, Gindalbie Project, Final Surrender Report for the period 07/03/ 2012 to 06/03/2014.
A70087 2005 Jackson Gold Ltd Mulgabbie 23% Mulgabbie Project - E28/1120, Annual Report,Reporting period 18/12/03 - 17/12/04. (Kurnalpi)
A68963 2004 Sons Of Gwalia Ltd Mulgabbie West 17% Annual report for the period 01/07/2003-30/06/2004 Mulgabbie West Project (C117/1999), E28/553, E28/605-607 E
A69063 2004 Peninsula Gold Pty Ltd Pinnacles Nickel 5.9% Exploration Licences E28/589, E28/590, E28/680 & P28/995, The Pinnacles Nickel Project, Combined Annual Explor
A68282 2004 Sons Of Gwalia Ltd Old Plough Dam 1.6% Old Plough Dam Project, Partial Surrender Report for the period 27/04/2000 to 04/02/2004, E28/799. [C117/1999
A69237 2004 Sons Of Gwalia Ltd Khartoum Dam 26% Khartoum Dam Project, Final Surrender Report for the period 05/08/2000 to 19/07/2004, E28/607.
A69324 2004 Sons Of Gwalia Ltd Mulgabbie West gold exploration 1.6% Surrender report for the period 27/04/00 - 24/08/04 Old Plough Dam Project, E28/799
A65852 2003 Sons Of Gwalia Ltd Khartoum Dam 26% Annual Report for the period 5 August 2001 - 4 August 2002 Khartoum Dam E28/607 Report No 0576-2002-01
A66653 2003 Sons Of Gwalia Ltd Mulgabbie West 23% Mulgabbie West Project, Annual Report for the period 21 February 2002 - 20 February 2003, E28/553.
A67103 2003 Sons Of Gwalia Ltd Mulgabbie West 7.7% Annual Report for the period 1 July 2002 to 30 June 2003 Mulgabbie West Project C117/1999: E28/605-606, P28/93
A67297 2003 Sons Of Gwalia Ltd Khartoum Dam 26% Annual Report for the period 5 August 2002 to 4 August 2003 Khartoum Dam Project E28/607 Report No. 0576-2003-
A71857 2003 Bannerman Resources Ltd Pinnacles 6.6% Pinnacles Project, E28/589 ,E28/590, E28/1326, P28/995, Combined Annual Report for the period 1 May 2004 to 31
A66788 2003 Sons Of Gwalia Ltd Old Plough Dam 1.6% Annual Report for the period 27 April 2002 to 26 April 2003 Old Plough Dam JV Project E28/799 Report No. 0580-
A66986 2003 Kanowna Lights Ltd Pinnacles 6% E28/589,590, 680, and 'E' Application E28/1326, P Application P28/995 The Pinnacles Nickel Project, Combined
A65144 2002 Kanowna Lights Ltd Pinnacles nickel/cobalt/diamond/gold exp 6% Exploration Licences E28/589, E28/590 and E28/680 'The Pinnancles Nickel Project' Combined Annual Exploration
A65554 2002 Sons Of Gwalia Ltd Mulgabbie West 7.7% Mulgabbie West Project Area E28/605, E28/606, E28/930-939, P31/1482, P31/1541, P31/1542, P31/1545. 2001/02 Ann
A65074 2002 Sons Of Gwalia Ltd Mulgabbie 23% Mulgabbie West Project Area E28/553 2001/02 Annual Report For Period 21/02/01 to 20/02/02 North East Coolgardi
A65224 2002 Sons Of Gwalia Ltd Mulgabbie West 1.6% E28/799 2001/02 Annual Report For Period 27/04/01 to 26/04/02 North East Coolgardie Mineral Field Western Aust
A63382 2001 Pacmin Mining Corporation Ltd Carosue Dam 7.7% 2000/2001 Annual Report, Carosue Dam Project Area, E28/605, E28/606, P28/930-P28/939, P31/1482, P31/1541, P31/
A63553 2001 Pacmin Mining Corporation Ltd Northeast Coolgardie 26% 2000/01 Annual Report E28/607 report for the period 05/08/00 to 04/08/01 North East Coolgardie Mineral Field,
A62394 2001 Kanowna Lights Nl Pinnacles 12% The Pinnacles Nickel Project Annual Exploration Progress Report For The Year 1st May, 2000 to 30th April, 2001
A62606 2001 Pacmin Mining Corporation Ltd Mulgabbie 23% Mulgabbie Project, 2000/01 Annual Report E28/553 Report For Period 21/02/00 to 20/02/01.
A63383 2001 Pacmin Mining Corporation Ltd Mulgabbie West 1.6% 2000/2001 Annual Report E28/799 Report for period 27/04/00 to 26/04/01 North East Coolgardie Mineral Field, We
A60504 2000 Pacmin Mining Corporation Ltd Yindi 14% 1999/2000 Annual Report P28/939 Report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral Field
A60517 2000 Pacmin Mining Corporation Ltd Yindi 85% 1999/2000 Annual Report P28/937 Report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral Field
A60518 2000 Pacmin Mining Corporation Ltd Yindi 2.4% 1999/2000 Annual Report P28/935 Report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral Field
A60052 2000 Pacmin Mining Corporation Ltd E28/553 23% 1999/2000 Annual Report, E28/553, Report for Period 21/02/1999 to 20/02/2000, North East Coolgardie Mineral Fi
A60483 2000 Pacmin Mining Corporation Ltd Yindi 1.1% 1999 to 2000 Annual Report P28/938, Report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral F
A60503 2000 Pacmin Mining Corporation Ltd Yindi 81% 1999/2000 Annual Report P28/936 report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral Field
A60520 2000 Pacmin Mining Corporation Ltd Yindi <1% 1999/2000 Annual Report P28/933 Report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral Field
A61062 2000 Pacmin Mining Corporation Ltd Carosue Dam 4.1% 1999/2000 Annual Report Carosue Dam Project Area E28/605-606 M28/166-168, M31/219-220, P28/930-939, P31/1482,
A61265 2000 Kanowna Lights Nl Pinnacles 6% Pinnacles Nickel project, Combined Annual Mineral Exploratio Exploration Report May 1st 1999 to April 30th 20
A61303 2000 Pacmin Mining Corporation Ltd Northeast Coolgardie 26% 1999/2000 Annual Report E28/607 for the Period 05/08/99 to 04/08/00 North East Coolgardie Mineral Field, Weste
A57854 1999 Pacific Mining Corporation Ltd Mulgabbie West 23% Mulgabbie West (JV)Project, Annual Report for the period 21/02/98 - 20/02/99, E28/553.
A59021 1999 Gutnick Resources Nl Solawulf 31% Solawulf Project, Partial Surrender Report for the period 26th August 1994 to 8th March 1999, E28/548.
A59033 1999 Kanowna Lights Nl Pinnacles 6% Pinnacles Nickel Project Combined Annual Mineral- Exploration report 01/05/98-30/04/99 E28/589 E28/590 E28/680
A54118 1998 Aberfoyle Resources Ltd Mulgabbie West 23% Mulgabbie West (JV) Project, , E28/553 , Annual Report for the period 20/02/97 - 19/02/98.
A55068 1998 Goldfields Exploration Pty Ltd Festival Dam 19% Annual Report E28/611 Festival Dam 30/04/1997 to 29/04/1998
A55268 1998 Kanowna Lights Nl Pinnacles nickel/cobalt/diamond/gold exp 6% Pinnacles Nickel Project, 12/12/96 - 30/04/98 E28/589, 590, 680
A55750 1998 Mt Kersey Mining Nl Solawulf 31% Solawulf Project, Partial Surrender Report for the period 26th August 1994 to 24th April 1998, E28/548.
A56173 1998 Heron Resources Ltd Mulgabbie 8.1% Mulgabbie Project, Annual Report for the period 29/08/1997 to 28/08/1998 , P28/930-939,1482 & 1541-1542; E28/6
A56845 1998 Mt Kersey Mining Nl Mulgabbie 5.1% E28/513-14, 527-28, 548-50, 795-96 'C114/1995 - Mulgabbie' Joint Annual Report for the period 26 August 1997 t
A53474 1998 Aberfoyle Resources Ltd Kurnalpi East 3.2% E28/372, Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam, E31/94 Anglo Saxon. Annual Report
A56807 1998 Aberfoyle Resources Ltd Kurnalpi East 4.2% E28/372 Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam Annual Report 07/12/97 - 06/12/98
A50042 1997 Aberfoyle Resources Ltd Kurnalpi 3.2% Kurnalpi (JV) Project, E28/372 E28/374 E28/453 E31/93 E31/94 Annual report for the period 7th December 1995 t
A50456 1997 Kanowna Lights Nl Pinnacles nickel/cobalt/diamond/gold exp 18% Pinnacles Nickel Project EL28/590 Annual report December 12th to December 1996
A50970 1997 Normandy Exploration Ltd Madi's Reward 1.2% Madi's Reward Project, Final Report for the period 19th July 1996 to 17th March 1997, E28/552.
A50030 1997 Zephyr Minerals Nl Mulgabbie West 23% E28/553 ,Annual Report, Mulgabbie West Project for the period ending 20/02/97.
A49034 1996 Mim Exploration Pty Ltd Scottiwulf Dome 5.3% Annual Report on exploration carried out during 1995/6 on E28/513, 514, 527, 528, 548, 549, 550 Scottiwulf Dom
A46680 1996 Cra Exploration Pty Ltd Kurnalpi East 2.8% Annual Report to 7 December 1995 on E31/93 E31/94 E28/372 E28/372 E28/374 E28/433 E28/453 E28/572 Kurnalpi Eas
A51095 1996 Omen Pty Ltd The Old Plough Dam 19% The Old Plough Dam Project, Exploration and Evaluation Report for the period 11th November 1996 to 10th Decem
A45607 1995 Tulloch Resources Nl Scottiwulf Dome 5.3% Scottiwulf Dome Project, Annual Report E28/513, 514, 527, 548, 549, 550 for the period 26 August 1994 to 25 Au
A45632 1995 Tulloch Resources Nl Scottiwulf Dome 5.3% Non-statutory Report: Aeromagnetic interpretation of the Scottiwulf Dome and environs.01/01/1995
A46788 1995 Cra Exploration Pty Ltd Kurnalpi East 2.5% Partial Surrender for the period 1995 Kurnalpi East Project E28/372 E28/374 E28/433 E28/453 E31/93 E31/94
A41598 1994 Cra Exploration Pty Ltd Kurnalpi East 2.9% First partial relinquishment report to April 1994 on E28/372, 374, 431, 433, E31/93, 94 Kurnalpi East Project
A43302 1994 Cra Exploration Pty Ltd Kurnalpi East 2.5% Annual Report to 7 December 1994 on E31/93-94, E28/372, 374, 433, 442, 453, Kurnalpi East Project.
A38589 1993 Cra Exploration Pty Ltd Kurnalpi East 2.4% Kurnalpi East Project, Annual Report for the period 08/12/1991 to 07/12/1992, E28/372 ,374, 431, 433, 442 & 45
A41041 1993 Cra Exploration Pty Ltd Kurnalpi East 2.4% Annual report for the period 08/12/92-07/12/93 Kurnalpi East Project E28/372 E28/374 E28/431 E28/433 E28/442 E
A36333 1991 Cra Exploration Pty Ltd Kurnalpi East 2.1% Annual Report for the period 08/12/90-07/12/91 Kurnalpi East Project, E31/92-94 E28/370-374,398,419,431-433,4
A13907 1984 Bp Australia Ltd Pinnacles Dam 16% Pinnacles Dam Project, Annual Report for the period ending 03/05/1984, E28/82, MC28/2700 & 2916; GML28/608-617
A1993 1970 New Broken Hill Consolidated Ltd Lake Rebecca 3.1% Lake Rebecca [JV] Project, Final Surrender Report for the period ending 01/11/1970,TR70/3811; MC28/1448-1452 &
A1143 1968 New Broken Hill Consolidated Ltd Lake Rebecca 3.1% Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st March 1968, TR70/3811H
A1144 1968 New Broken Hill Consolidated Ltd Lake Rebecca 3.1% Lake Rebecca Project, Annual Report for the period 18th July 1967 to 30th June 1968, TR70/3811H.
A1142 1967 New Consolidated Gold Fields Aust Ltd Lake Rebecca 3.1% Lake Rebecca Project, Non-statutory Report: Report on Investigations for the period 18th July 1967 to 31st Dec
A1141 1967 New Consolidated Gold Fields Aust Ltd Lake Rebecca 3.1% Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st October 1967, TR70/381
A84097 1753 Saracen Gold Mines Pty Ltd MULGABBIE WEST <1% MULGABBIE WEST PROJECT ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009 CR Group: C117/1999
A97183 1753 Legacy Iron Ore Ltd Wallbrook 2.5% Wallbrook Project, Final Surrender Report for the period 1st February 2008 to 31st January 2013, E31/716.
A84640 1753 Saracen Gold Mines Pty Ltd Carosue Dam 2.7% CAROSUE DAM PROJECT ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009, C064/2001, E28/828, E28/1747, E31/365, M28/166
A87937 1753 Saracen Gold Mines Pty Ltd CAROSUE DAM/ Whirling Dervish 2.7% CAROSUE DAM PROJECT (C064/2001) ANNUAL REPORT – 01 JULY 2009 TO 30 JUNE 2010, E28/828, E28/1747, E31/365, M28
A87956 1753 Saracen Gold Mines Pty Ltd Mulgabbie West <1% Mulgabbie West Project 1 July 2009 to 30 June 2010, C117/1999, E31/796, M28/241, M28/266, M28/269, M31/295, M
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
A44114 1753 Tulloch Resources Nl Scottiwulf Dome 5.3% Scottiwulf Dome Project, Non-statutory Report: Preliminary Report, 01/01/1995, E28/513, 514, 527-528, 548- 550
A52540 1753 Mt Kersey Mining Nl Scottiwulf Dome 5.3% E28/513-4, 527-8, 548-550 'Scottiwulf Dome' C114/1995 Joint Annual Report for the period 24 August 1996 to 23
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
14 years · 16 Apr 2040
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over L 28/63 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold L 28/63? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.