G 59/38
Register summary
- Holder
- Karara Mining Limited
- Local government
- Shire of Perenjori
- Application received
- 8 Sept 2006
- Commenced
- 29 Aug 2008
- Expiry
- 28 Aug 2029
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A125309 | 2020 | Sinosteel Midwest Corporation Limited | Blue Hills Range | 4.1% | Blue Hills Range Tenement Group Annual Report Combined Report Group C4/2001, M59/595, M59/596, L59/62, L59/137 |
| A123937 | 2020 | Karara Mining Limited | Karara | 12% | Karara Annual Technical Report C82/2007 for the period ending 30/4/2020 |
| A124862 | 2020 | Raptor Resources Ltd | Jasper Hill West | 3.5% | Jasper Hill West Project Surrender Report E59/02052 for the period ending 16/10/2019 |
| A119090 | 2019 | Raptor Resources Limited | Jasper Hill West | 3.5% | Jasper Hill West Project E59/02052 for the period 17 October 2017 to 16 October 2018 |
| A120282 | 2019 | Karara Mining Limited | Karara | 12% | Karara Iron Ore Project C82/2007 Annual Technical Report for the period 01/05/2018 to 30/04/2019 |
119 more reports
| A121637 | 2019 | Sinosteel Midwest Corporation Limited | Blue Hills | 4.1% | Annual Report Combined Report Group C4/2001 Blue Hills Project for the period 10 September 2018 to 9 September |
| A118171 | 2018 | Sinosteel Midwest Corporation Limited | Blue Hills Range | 4.1% | Blue Hills Range Tenement Group Annual Report Combined Report Group C4/2001 M59/595, M59/596, L59/62, L59/137, |
| A115909 | 2018 | Raptor Resources Limited | Jasper Hill West | 3.5% | Jasper Hill West Project Annual Technical Report E59/2052 for the period 17/10/2016 - 16/10/2017 |
| A117055 | 2018 | Karara Mining Limited | Karara | 12% | Karara Iron Ore Project C82/2007 Annual Report for the period 01/05/2017 - 30/04/2018, E59/00817, E59/01068, E |
| A117165 | 2018 | Minjar Gold Pty Ltd | Minjar West | <1% | Minjar West E59/1210 Final Report for the period 26/10/2006 to 10/05/2018 |
| A117795 | 2018 | Fortescue Metals Group Ltd | Mungada Well | <1% | E59/1360 Mungada Well Final Surrender for the period 5 June 2008 to 4 June 2018 |
| A110786 | 2017 | Raptor Resources Limited | Jasper Hill West | 3.5% | Annual Technical Report Jasper Hill West Project 17 Oct 2015 to 16 Oct 2016 - E59/2052 |
| A114142 | 2017 | Karara Mining Limited | Karara | 12% | Karara Iron Project - Combined Reporting C82/2007 For the Period 1 July 2016 to 30 June 2017, M59/00644, M59/0 |
| A114308 | 2017 | Minjar Gold Pty Ltd | Minjar West | <1% | Minjar West Project C118/2016 Annual Report For the Period 1 May 2016 to 30 April 2017, E59/01203, E59/01210, |
| A115019 | 2017 | Sinosteel Midwest Corporation Limited | Blue Hills Range | <1% | Blue Hills Range Tenement Group, Annual Combined Reporting Group C4/2001 for the period 10 September 2016 to 9 |
| A108974 | 2016 | Minjar Gold Pty Ltd | Karara | <1% | Combined Annual Technical Report C82/2007 KARARA PROJECT Tenements: E59/1070, E59/1136, E59/1139, E59/1140, E5 |
| A108089 | 2016 | Raptor Resources Ltd | Jasper Hill West | 3.5% | Annual Technical Report Jasper Hill West Project for the period 17 October 2014 to 16 October 2015 |
| A109238 | 2016 | Karara Mining Ltd | Karara | 12% | KARARA IRON PROJECT Combined Reporting Group No: C82/2007 Annual Report to the Department of Mines and Petrole |
| A109556 | 2016 | Fortescue Metals Group Ltd | Mungada Well | <1% | E59/1360 (Mungada Well) Annual Report for the period 05/06/2015 to 04/06/2016 |
| A110132 | 2016 | Sinosteel Midwest Corporation Limited | Blue Hills | <1% | Blue Hills Range Tenement Group, Annual Report, Combined Report Group C4/2001 For the Period 10 September 2015 |
| A105938 | 2015 | Gindalbie Metals Ltd; Minjar Gold Pty Ltd | Karara | 4.7% | Karara Iron Project C82/2007 Annual Report to the Department of Mines and Petroleum for the period 01/05/15 to |
| A105698 | 2015 | Gindalbie Metals Ltd | Karara | <1% | Karara Project C82/2007 Combined Annual Report for the period 01/05/2014 to 30/04/2015, E59/1070, E59/1136, E5 |
| A106163 | 2015 | Fortescue Metals Group Ltd | Mungada Well | <1% | E59/1360 Mungada Well Annual Report for the period 5 June 2014 to 4 June 2015 |
| A107145 | 2015 | Sinosteel Midwest Corporation Limited | Blue Hills | 4.1% | Blue Hills Tenement Group; Annual report; Combined Reporting Group |
| A102180 | 2014 | Gindalbie Metals Ltd; Karara Iron Ltd | Karara | 1.1% | Final Surrender Report for the period 24/02/2009 to 23/02/2014, E59/1496, E59/1497, E59/1498, E59/1499, E59/15 |
| A102270 | 2014 | Gindalbie Metals Ltd; Minjar Gold Pty Ltd | Karara | 4.6% | Karara Iron Project C82/2007 Annual Report for the period 01/05/13 to 30/04/2014, E59/817-I, E59/1068-I, E59/1 |
| A101485 | 2014 | Karara Mining Ltd | E59/1138 | 3.5% | Final Surrender Report E59/1138 for the period 28/10/2005 and 25/02/2014 |
| A102720 | 2014 | Fortescue Metals Group Ltd | Mungada Well | <1% | Annual Mineral Exploration Report: E59/1360 Mungada Well for the period 05 June 2013 to 04 June 2014 |
| A103823 | 2014 | Sinosteel Midwest Corporation Limited | Blue Hills | 4.1% | Blue Hills Range Tenement Group Annual Report Combined Report Group C4/2001 Leases P59/1875, L59/62, M59/595 & |
| A98329 | 2013 | Gindalbie Metals Ltd | Karara | 3% | Karara Project, Annual Report for the period 01/05/2012 to 30/04/2013, C82/2007. |
| A99771 | 2013 | Gindalbie Metals Ltd | Karara | 82% | Final Surrender Report M59/729 [for the period ended 18 September 2013] |
| A98995 | 2013 | Fortescue Metals Group Ltd | Jasper Hill - Mungada Well | <1% | Annual Report for the Period 05 June 2012 to 04 June 2013, E59/1360 Jasper Hill / Mungada Well |
| A99728 | 2013 | Sinosteel Midwest Corporation Limited | Blue Hills Range | <1% | Blue Hills Range Tenement Group Annual Report Combined Report Group C4/2001 Leases P59/1875, M59/595 & M59/596 |
| A95454 | 2012 | Sinosteel Midwest Corporation Ltd | Blue Hills | 4.1% | Blue Hills Project, Annual Report for the period 10th September 2011 to 9th September 2012, M59/595-596; L59/ |
| A94032 | 2012 | Karara Mining Ltd | Karara | 2.7% | Karara Project C82/2007 Annual Report for the period 01/05/11 to 30/04/12. |
| A94671 | 2012 | Fortescue Metals Group Ltd | Jasper Hill | <1% | Annual report for the period 05 June 2011 to 04 June 2012, Jasper Hill Project |
| A88906 | 2011 | Sinosteel Midwest Corporation Ltd | Blue Hills Range | <1% | Blue Hills Range Project, Final Surrender Report for the period 28th May 2004 to 23rd November 2010, E59/1059. |
| A90773 | 2011 | Karara Mining Ltd | Karara | 2.7% | Karara Iron Project C82/2007, Annual Report to the Department of Mines and Petroleum for the period 01/05/10 t |
| A90936 | 2011 | Fortescue Metals Group Ltd | Jasper Hill | <1% | Annual report for the period 5 June 2010 to 4 June 2011 E59/1360 |
| A91808 | 2011 | Sinosteel Midwest Corporation Ltd | Blue Hills Range | <1% | Blue Hills Range Tenement Group Annual Report Combined Report Group C4/2001 Leases P59/1875, M59/595 & M59/596 |
| A87070 | 2010 | Karara Mining Ltd | Karara | 5.2% | Karara Iron Ore Project Annual Combined Report for the period 30/04/2009 - 01/05/2010 E 59/817-I, E 59/1068-I, |
| A87407 | 2010 | Fortescue Metals Group Ltd | Jasper Hill | <1% | Annual report for the period 05 June 2009 to 04 June 2010, Jasper Hill Project |
| A88656 | 2010 | Sinosteel Midwest Corporation Ltd | Blue Hills Range | <1% | Blue Hills Range Tenement Group Annual Report Combined Report Group C4/2001 10 September 2009 – 9 September 20 |
| A82654 | 2009 | Gindalbie Metals Ltd | Karara | <1% | KARARA IRON ORE PROJECT, MINJAR GOLD E59/1070, E59/1136, E59/1139, E59/1203, E59/1210, M59/379, M59/380 2008 A |
| A82655 | 2009 | Karara Mining Ltd | Karara | 13% | 2009 COMBINED ANNUAL REPORT FOR E59/817, E59/ 1068, E59/1138, E59/1170, M59/ 644, M59/ 645, M59/ 649, M59/ 650 |
| A82807 | 2009 | Fortescue Metals Group Ltd | Jasper Hill | <1% | Annual Report for the Period 05 June 2008 to 04 June 2009, Jasper Hill Project E59/1360 |
| A84478 | 2009 | Sinosteel Midwest Corporation Ltd | Blue Hills Range | <1% | Blue Hills Range Tenement Group Annual Report, Combined Report Group C4/2001 Leases E59/1059, E59/1175, M59/59 |
| A78825 | 2008 | Karara Mining Ltd | Karara | 13% | 2008 COMBINED ANNUAL REPORT FOR E59/817, E59/1068, E59/1138, E59/1170, M59/644, M59/645, M59/649, M59/650 FOR |
| A77733 | 2008 | Monarch Gold Mining Company Ltd | Yalgoo | <1% | E59/1210 2006/07 ANNUAL REPORT FOR PERIOD 26/10/06 to 25/10/07 . |
| A78628 | 2008 | Karara Management Services Pty Ltd | Karara iron ore | <1% | Karara Iron Ore Project M59/721 Mineralisation Report Karara Magnetite Project/ Karara Hematite Project Yalgoo |
| A78627 | 2008 | Karara Management Services Pty Ltd | Karara iron ore | 28% | E59/817 2008 REPORT IN SUPPORT OF APPLICATION OF EXTENSION OF TERM |
| A79551 | 2008 | Midwest Corporation Ltd | Blue Hills Range | <1% | Blue Hills Range Tenement Group Annual Report Combined Report Group C4/2001 Leases E59/971, E59/1059, E59/1175 |
| A74320 | 2007 | Gindalbie Metals Ltd | E59/1068 | <1% | E59/1068, 2005/06 Annual Report for Period 11/11/05 to 10/11/06, (Perenjori). |
| A75532 | 2007 | Karara Management Services Pty Ltd | Karara | 13% | 2007 Combined Annual Report for E59/817,E59/1068,E59/1138, E59/1170,M59/644,M59/645,M59/649,M59/650, For the p |
| A76386 | 2007 | Midwest Corporation Ltd | Blue Hill Range | <1% | Blue Hills Range Tenement Group, Annual Report Combined Report Group C4/2001 Leases E59/971, E59/1059, E59/ 11 |
| A73637 | 2006 | Monarch Gold Mining Company Ltd | Minjar South | 8.8% | Minjar South Project Area. 2005/06 Annual Report for the period 01/06/05 to 31/05/06. Combined Reporting Group |
| A73744 | 2006 | Gindalbie Metals Ltd | Minjar South | 8.8% | Minjar South Project Area, 2005/06 Annual Report for Period 01/06/05 to 31/05/06, Combined Reporting No. C21/2 |
| A73158 | 2006 | Gindalbie Metals Ltd | Rothsay | <1% | Rothsay Project, Annual Report for the period 11/11/2004 to 10/11/2005, E59/1068. |
| A73592 | 2006 | Midwest Corporation Ltd | Blue Hills Range | <1% | Blue Hills Range Tenement Group, Combined Report Group C4/2001, Lease E59/971, E59/1059, E59/1175, M59/595 and |
| A71452 | 2005 | Midwest Corporation Ltd | Blue Hills | <1% | Blue Hills tenement group, Annual report, Combined report group C4/2001, Leases E59/971,E59/1059,E59/1175,M59/ |
| A70783 | 2005 | Midwest Corporation Ltd | Blue Hills West | <1% | Blue Hills West Annual report, Lease E59/1059, 28 May 2004 - 27 May 2005 (Morawa). |
| A71289 | 2005 | Gindalbie Metals Ltd | Minjar South | 7.2% | Minjar South Project Area, E59/519,632,671,723,817,849-850, 1021,1023,1047, M59/431,552, P59/1599,1611-1612, 2 |
| A69048 | 2004 | Gindalbie Gold Nl | Minjar South | 6.1% | Annual report for the period 01/06/03 - 31/05/04 Minjar South Project, C21/2002 |
| A69391 | 2004 | Midwest Corporation Ltd | Blue Hills | <1% | Annual exploration report for the period 10/09/03 - 09/09/04 Blue Hills Project, C4/2001, E59/462, E59/902 |
| A65803 | 2003 | Gindalbie Gold Nl | Minjar South | 9% | Minjar South Project , E59/403, E59/486, E59/519, E59/632 , E59/671, E59/817, E59/849, E59/850. 2001/02 Annual |
| A67494 | 2003 | Midwest Corporation Ltd | Blue Hill | <1% | Combined Annual Report for the period 10 September 2002 to 9 September 2003 Blue Hills Tenement Group C4/2001: |
| A67759 | 2003 | Gindalbie Gold Nl | Minjar South | 5.9% | Annual report for the period 01/06/2002 - 31/05/2003 Minjar South Project. Group Reporting No. C21/2002 |
| A65416 | 2002 | Kingstream Steel Ltd | Blue Hills | <1% | Blue Hills Project, Annual Report for the period 10th September 2001 to 9th September 2002, E59/462 & 902. [ C |
| A62123 | 2001 | Gindalbie Gold Nl | Minjar South | <1% | Annual Report for the period ended 31 July 2000, Minjar South Project, E59/486, E59/519, E59/403, E59/632, E5 |
| A63612 | 2001 | Kingstream Steel Ltd | Blue Hills | <1% | Blue Hills tenemnet group Annual Report C4/2001, Exploration Leases - 59/462 & 59/902 10 September 2000 - 9 Se |
| A63702 | 2001 | Australian Gold Resources Ltd | Minjar | <1% | Verification Report Minjar exploration licence E59/884 Annual Report for the period 25 July 2000 to 24 July 20 |
| A61327 | 2000 | Kingstream Steel Ltd | Blue Hills | <1% | Blue Hills, Annual Report, Exploration Lease, E59/462, 10 September 1999 to 9 September 2000. |
| A59193 | 1999 | Normandy Gold Ltd | Minjar South | <1% | Minjar South Project, Annual Report for the period ending 31/07/1999, E59/486, 519, 403, 632, 671. |
| A59245 | 1999 | Kingstream Steel Ltd | Blue Hills | <1% | Blue Hills Annual Report Exploration Lease E59/462, 10 September 1998 to 9 September 1999, due 10 November 199 |
| A53893 | 1998 | Normandy Exploration Ltd | Blue Hill | 14% | Blue Hill Project, Final & Surrender Report for period ending 13th January 1998, E59/423. |
| A56083 | 1998 | Normandy Exploration Ltd | Minjar | 2.1% | Combined Annual report on Exploration for the period ended 31/07/98 Minjar South E59/399 M59/373 M59/374 M59/3 |
| A56377 | 1998 | An Feng Kingstream Steel Ltd | Blue Hills | <1% | Blue Hills Annual Report Exploration Licence: EL59/00462 10/09/97 - 09/09/98 |
| A52007 | 1997 | Aztec Mining Co Ltd | Minjar | 1.9% | Combined Annual report on Exploration for period ended 31 July 1997 Minjar South M59/373 M59/374 M59/375 M59/3 |
| A52078 | 1997 | Wakefield Holdings Pty Ltd | West Rothsay | <1% | West Rothsay Project, Annual Report for the period 4th July 1996 to 3rd July 1997, E59/683. |
| A52574 | 1997 | Aztec Mining Co Ltd | Rothsay | <1% | Rothsay Project, Partial Surrender Report for the period ending 2nd September 1997, E59/403. |
| A49749 | 1996 | Normandy Exploration Ltd | Blue Hill | 14% | Blue Hill Project, Partial Surrender Report for the period ending 24 September 1996, E59/423 |
| A48951 | 1996 | Aztec Mining Co Ltd | Minjar South | 1.9% | Combined Annual report on Exploration for period ended 31 July 1996 Minjar South M59/373 M59/374 M59/375 M59/3 |
| A44732 | 1995 | Posgold Ltd | North Rothsay - Minjar | <1% | Annual Report on E59/519, North Rothsay- Minjar Project ,for the period ended 9 November, 1994. |
| A44886 | 1995 | Aztec Mining Co Ltd | Blue Hill | 14% | Partial Surrender Report. E59/423, Blue Hill, Minjar, for the period ending 25/4/95 |
| A44756 | 1995 | Aztec Mining Co Ltd | Blue Hill- Minjar | 14% | Annual Report for E59/423, Blue Hill - Minjar Project, WA. 18/12/93 to 17/12/94 |
| A44963 | 1995 | Aztec Mining Co Ltd | RothsayMinjar | <1% | Partial surrender report on E59/403, Rothsay, Minjar Project, for period ending 13/4/95 |
| A46060 | 1995 | Dominion Mining Ltd | Windaning Hill | 29% | Annual Report Windaning Hill E59/490 from 17/03/1994 to 16/03/1995. |
| A41189 | 1994 | Dominion Mining Ltd | Windaning Hill | 29% | Annual Report Windaning Hill E59/490 from 17/03/1993 to 16/03/1994. |
| A42147 | 1994 | Aztec Mining Co Ltd | Blue Hill | 14% | Blue Hill Project, Annual Report for the period 18/12/1992 to 17/12/1993, E59/423. |
| A42503 | 1994 | Kingstream Resources Nl | Blue Hills | <1% | Annual Report for the period 09/92-09/93 Blue Hills Project E59/462 |
| A42842 | 1994 | Aztec Mining Co Ltd | Rothsay - Minjar | <1% | Annual report on E59/403, Rothsay - Minjar Project for the period 15th August 1993 to 14th August 1994. |
| A44776 | 1994 | Mining & Resource Technology Pty Ltd | Blue Hill Range / Koolanooka | <1% | Blue Hill Range/ Koolanooka Project, Statement of Pre-source Mineralisation at Koolanooka and Blue Hills, 19th |
| A38155 | 1993 | Aztec Mining Co Ltd | Blue Hill | 14% | Blue Hill Project. Annual [Progress] Report for the period 18th December 1991 to 20th April 1993, E59/423. |
| A39625 | 1993 | Aztec Mining Co Ltd | Rothsay | <1% | Annual Report to Department of Minerals and Energy WA E59/403 Rothsay 15/08/1991 to 30/09/1993 |
| A37146 | 1992 | Placer Exploration Ltd | Mungada | 15% | Mungada Project, Annual Report for the year ending 21st August 1992, E59/316. |
| A34287 | 1991 | Placer Exploration Ltd | Mungada | 15% | Mungada Project, (2nd) Annual Report for the period 22nd August 1990 to 21st August 1991, E59/316. |
| A31233 | 1990 | Placer Exploration Ltd | Mungada | 15% | Mungada Project, (1st) Annual Report for the period 22nd August 1989 to 21st August 1990, E59/316. |
| A31930 | 1990 | Dalrymple Resources Nl | Blue Hill Range | 5.1% | Blue Hill Range Project, Annual Report for the period ended 3rd October 1990, E59/186. |
| A33107 | 1990 | Dalrymple Resources Nl | Blue Hill | 5.1% | Blue Hill Project, Final Surrender Report to 3rd October 1990, E59/186. |
| A28909 | 1989 | Dalrymple Resources Nl | Blue Hill Range | 5.1% | Blue Hill Range, E59/186, Annual report for period ended 3rd October 1989 |
| A29255 | 1989 | Taylor & Associates | Karara Station | 6.1% | Karara Station, Annual report on exploration for E59/194 during 1989 for the Dampwerwah Hills area |
| A26272 | 1988 | Billiton Australia Pty Ltd | Blue Hill Range | 5.1% | Annual Report, Blue Hill Range, E59/186. |
| A18402 | 1986 | Greenbushes Tin Ltd | Red Hill | 3.5% | Final (surrender) report on E59/78, Red Hill, to 1986 |
| A15136 | 1985 | Cra Exploration Pty Ltd | Karara | 11% | Karara Project, Final Surrender Report for the period ending 02/11/1984, E59/25. |
| A17440 | 1985 | Greenbushes Tin Ltd | Red Hill | 3.5% | Red Hill Project, Annual Report for the period ending 27/12/1985, E59/78. |
| A14331 | 1984 | Cra Exploration Pty Ltd | Karara | 11% | Karara Project, Annual Report for the period 14/06/1983 to 13/06/1984, E59/25. |
| A7612 | 1978 | Geopeko | Rothsay | 13% | Rothsay Project, Annual Report for the year ending 31/12/1977, TR70/6442H. |
| A8070 | 1978 | Geopeko | Rothsay | 13% | Rothsay Project, Non-statutory Report: Final Report, December 1978, TR70/6442H. |
| A17203 | 1977 | North Flinders Mines Ltd | Yilgarn -Yalgoo | <1% | Yilgarn -Yalgoo Project, Non-statutory Report: Reconnaissance Report on Copper-Zinc Massive Sulphide Target A |
| A16368 | 1976 | North Flinders Mines Ltd | Yilgarn | <1% | Yilgarn Project, Non-statutory Report: Summary of Activities for Quarterly period ending 30th June 1976 [Mt G |
| A16765 | 1976 | North Flinders Mines Ltd | Mount Gibson-Yalgoo | <1% | Mount Gibson-Yalgoo Project, Non-statutory Report; Notes on Photogeological Base Maps of Central-Western porti |
| A16768 | 1976 | North Flinders Mines Ltd | Mount Gibson-Yalgoo | <1% | Mount Gibson-Yalgoo Project, Non-statutory Report: Notes on Preliminary Investigation of Aeromagnetic Anomalie |
| A2106 | 1972 | Western Mining Corporation Ltd | Blue Hills | 7.7% | Blue Hills Project, Non-statutory Report: Preliminary Feasibility Study, January 1972, TR70/2633 & 2634H. |
| A2396 | 1972 | Kennecott Exp Aust Pty Ltd | Fields Find | 3.6% | Fields Find Project, Non-statutory Report: Final Report ( Paynes Find Examination) , April 1972, TR70/3800H. |
| A743 | 1971 | Western Mining Corporation Ltd | Blue Hills | 7.7% | Blue Hills Project, Non-statutory Report: Ground Magnetometer Profiles, March 1971, TR70/2633 & 2634H.. |
| A3801 | 1971 | Western Mining Corporation Ltd | Blue Hills - Mungada | 7.7% | Blue Hills - Mungada Project, Non-statutory Report:Exploration Report on Iron Ore Reserves : Assay Ledger Sh |
| A3603 | 1971 | Western Mining Corporation Ltd | Blue Hills - Mungada | 7.7% | Blue Hills - Mungada Project, Non-statutory Report: Exploration Report on Iron Ore Reserves, October 1971, TR7 |
| A121 | 1969 | Geotechnics (Aust) Pty Ltd | Fields Find | 1.1% | Fields Find Project, Non-statutory Report: Summary of Geological & Geohpysical Investigations, March 1969, TR7 |
| A1561 | 1967 | Western Mining Corporation Ltd | Koolanooka | 5.1% | Koolanooka Project, Non-statutory Report: Plans: Geology, part Perenjori & part Ninghan Sheets; 8 Geology Shee |
| A737 | 1965 | Western Mining Corporation Ltd | Blue Hills | 7.7% | Blue Hills Project, Non-statutory Report: 1964-1965 Quarterly Reports to February 1965, TR70/2633 & 2634. |
| A5084 | 1961 | Western Mining Corporation Ltd | Yalgoo - Thundelarra - Perenjori - Field | 5.1% | Geological reconnaissance for iron ore in the Yalgoo Goldfield, [Non-statutory report, TR70/1973, 70/2633, 70/ |
| A16471 | 1753 | Western Mining Corporation Ltd | Blue Hills | 6.2% | Blue Hills |
| A50022 | 1753 | Kingstream Resources Nl | Blue Hills | <1% | Blue Hills Annual report Exploration Lease E59/462 9 September 1995 to 9 September 1996 |
| A53047 | 1753 | An Feng Kingstream Steel Ltd | Blue Hills | <1% | Blue Hills Annual Report Exploration Lease EL59/00462 09/09/96-10/09/97 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 3 years · 28 Aug 2029
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over G 59/38 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold G 59/38? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.