E 80/4793
Register summary
- Holder
- Halls Creek Resources Pty Ltd
- Local government
- Shire of Halls Creek
- Application received
- 17 May 2013
- Commenced
- 3 Nov 2014
- Expiry
- 2 Nov 2026
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A153326 | 2026 | Igo Forrestania Limited | McIntosh | <1% | McIntosh Project: E80/5616 Surrender Report for the period ending 19/12/2025 |
| A146193 | 2025 | Auking Mining Limited | Koongie Park | <1% | Partial Surrender Report for E80/5127 Koongie Park Project for the period ending 26/11/2024 |
| A136527 | 2023 | Lycaon Resources Ltd | Gnewing Bore | <1% | Annual Report for E80/5508 Gnewing Bore Project for the period ending 26/07/2023 |
| A132201 | 2022 | Lycaon Resources Ltd | Gnewing Bore | <1% | Annual Report for E80/5508 Gnewing Bore Project for the period ending 26/07/2022 |
| A125979 | 2021 | Hexagon Energy Materials Ltd | Halls Creek | <1% | Partial Surrender E80/4795 Halls Creek Project for the period ending 09/12/2020 |
245 more reports with detail
| A128605 | 2021 | Halls Creek Resources Pty Ltd | P80/1800 (Halls Creek) | <1% | Final Surrender report - P80/1800 Halls Creek Project for the period 3 September 2013 to 2 September 2021 |
| A128606 | 2021 | Halls Creek Resources Pty Ltd | P80/1801 (Halls Creek) | <1% | Final Surrender report - P80/1801 Halls Creek Project for the period 3 September 2020 to 2 September 2021 |
| A123181 | 2020 | Anglo Australian Resources Nl | KOONGIE PARK | <1% | KOONGIE PARK - 2019 COMBINED ANNUAL REPORT - C166/2006 - 1 JANUARY 2019 to 31 DECEMBER 2019 |
| A125289 | 2020 | Halls Creek Resources Pty Ltd | Halls Creek | 27% | Combined Annual Report C124/2014 Halls Creek for the period ending 2/9/2020 |
| A121552 | 2019 | Hexagon Resources Ltd | Halls Creek | 28% | Combined Annual Report for Halls Creek C124/2014 for the period 3 September 2018 to 2 September 2019 |
| A115787 | 2018 | Hexagon Resources Limited | Halls Creek | <1% | Annual Report for the period 10 December 2016 – 9 December 2017, Halls Creek Project, E80/4795 |
| A118463 | 2018 | Hexagon Resources Ltd | Halls Creek | 60% | E80/4793, Halls Creek Project, Voluntary Partial Surrender for the period 3 November 2014 to 1 November 2018 |
| A118464 | 2018 | Hexagon Resources Ltd | Halls Creek | 28% | Combined Annual Report for C124/2014 Halls Creek For the Period 3 September 2017 to 2 September 2018 |
| A111866 | 2017 | Hexagon Resources Limited | Halls Creek | 9.4% | Annual report for the period 7 October 2015 to 6 October 2016, Halls Creek Project, P80/1816 |
| A111869 | 2017 | Hexagon Resources Limited | Halls Creek | 13% | Annual report for the period 7 October 2015 to 6 October 2016, Halls Creek Project, P80/1814 |
| A111870 | 2017 | Hexagon Resources Limited | Halls Creek | <1% | Annual report for the period 10 December 2015 – 9 December 2016, Halls Creek Project, E80/4795 |
| A114854 | 2017 | 3d Resources Ltd | Halls Creek | <1% | Final Surrender Report for E80/3370, E80/3496, & E80/3517 Halls Creek Project for the period 15 August 2007 to |
| A111868 | 2017 | Hexagon Resources Limited | Halls Creek | 8.9% | Annual report for the period 7 October 2015 to 6 October 2016, Halls Creek Project, P80/1815 |
| A115104 | 2017 | Hexagon Resources Ltd | Halls Creek | 59% | Combined Annual Report for the period 3 September 2016 to 2 September 2017, Halls Creek Project, C124/2014, P8 |
| A115391 | 2017 | Hexagon Resources Limited | Halls Creek | 8.9% | Annual Report for the period 7 October 2016 to 6 October 2017, Halls Creek Project, P80/1815 |
| A115387 | 2017 | Hexagon Resources Limited | Halls Creek | 13% | Annual Report for the period 7 October 2016 to 6 October 2017, Halls Creek Project, P80/1814 |
| A115392 | 2017 | Hexagon Resources Limited | Halls Creek | 9.4% | Annual Report for the period 7 October 2016 to 6 October 2017, Halls Creek Project, P80/1816 |
| A107854 | 2016 | Hexagon Resources Ltd | Halls Creek | <1% | Annual Report for the period 10 December 2014 – 9 December 2015 Halls Creek Project – E80/4795 |
| A108566 | 2016 | 3d Resources Ltd | Halls Creek | <1% | Final Surrender Report E80/3938 Halls Creek for the period 23/02/2010 to 05/02/2016 |
| A110202 | 2016 | Hexagon Resources Limited | Halls Creek | 59% | Combined Annual Report for the period 3 September 2015 to 2 September 2016, McIntosh Project, C124/2014, P80/0 |
| A110278 | 2016 | 3d Resources Ltd | HALLS CREEK | <1% | Annual Report C10/2008 "Halls Creek" for the period 15 August 2015 to 14 August 2016, E80/03370, E80/03496, E8 |
| A109245 | 2016 | Ishine International Resources Ltd | Alice Downs | <1% | Alice Downs Project C210/2012, E80/4448, E80/4639 and E80/4619 Final Surrender Report for the period 25/09/201 |
| A110031 | 2016 | 3d Resources Ltd | Halls Creek | <1% | Partial Surrender Report for E80/3370, E80/3496 and E80/3517 HALLS CREEK PROJECT for the period 15 August 2007 |
| A107105 | 2015 | Lamboo Resources Ltd | Halls Creek | 59% | Combined Annual Report for the period 3 September 2014 – 2 September 2015 Halls Creek Project – C124/2014, E80 |
| A107249 | 2015 | Cazaly Resources Ltd | HALLS CREEK | <1% | Combined Annual Technical Report C10/2008 HALLS CREEK COPPER PROJECT E80/3496, E80/3370, E80/3517, E80/3938, E |
| A107405 | 2015 | Ishine International Resources Ltd | Alice Downs | <1% | Alice Downs Project C210/2012 Combined Annual ReportE80/4448, E80/4639 and E80/4619 for the period 25/09/2014 |
| A107426 | 2015 | Lamboo Resources Ltd | Halls Creek | 13% | Annual Report for the period 7 October 2014 to 6 October 2015, Halls Creek Project P80/1814 |
| A107427 | 2015 | Lamboo Resources Ltd | Halls Creek | 8.9% | Annual report for the period 7 October 2014 to 6 October 2015, Halls Creek Project, P80/1815 |
| A107428 | 2015 | Lamboo Resources Ltd | Halls Creek | 9.4% | Annual Report for the period 7 October 2014 – 6 October 2015 Halls Creek Project P80/1816 |
| A100740 | 2014 | Cazaly Resources Ltd | Halls Creek | <1% | Partial Surrender Report Halls Creek Coppper Project E80/3370 for the period 15th September 2007 to 17th Octob |
| A103248 | 2014 | Cazaly Resources Ltd | Halls Creek | <1% | Combined Annual Technical Report C10/2008 Halls Copper Project E80/3496, E80/3370, E80/3517, E80/3938 and M80/ |
| A103788 | 2014 | Lamboo Resources Ltd | Halls Creek | <1% | Halls Creek Project, Annual Report for the period 03/09/2013 to 02/09/2014, P80/1799-1801. [C124/2014] |
| A104017 | 2014 | Ishine International Resources Ltd | Alice Downs | <1% | E80/4448, E80/4619 and E80/4639 Alice Downs Project Annual Report for the period: 01/09/2013 to 31/08/2014 Com |
| A96658 | 2013 | Cazaly Resources Ltd | Halls Creek | <1% | Halls Creek Project, Annual Report for the period ending 14th August 2012, E80/3496, 3370 & 3517. [C10/2008] |
| A100242 | 2013 | Cazaly Resources Ltd | Halls Creek - Mount Angelo | 18% | Department of Mines and Petroleum Co Funded Government - Industry Drilling Program 2013-2014 Final Report Hall |
| A100397 | 2013 | Ishine International Resources Ltd | Alice Downs | <1% | E80/4448, E80/4619 and E80/4639 Alice Downs Project Annual Report for the period: 01/09/2012 to 31/08/2013 (C2 |
| A99928 | 2013 | Cazaly Resources Ltd | Halls Creek | <1% | Halls Creek Project, Annual Report for the period ending 14th August 2013, E80/3496, 3370, 3517, & 3938; M80/2 |
| A93447 | 2012 | 3d Resources Ltd | Halls Creek - Koongie Park | <1% | Halls Creek - Koongie Park Project E80/3370,3517,3496 Annual Report for the Period Ending 14 August 2011 (C10/ |
| A95044 | 2012 | 3d Resources Ltd | Halls Creek | <1% | Halls Creek Project E80/3938 Annual Report for the period ending 22 February 2012 |
| A95955 | 2012 | Ishine International Resources Ltd | Halls Creek | <1% | Halls Creek Project, Annual Report for the period 6th October 2011 to 5th October 2012, E80/4448. |
| A90916 | 2011 | 3d Resources Ltd | Halls Creek | <1% | Halls Creek Project E80/3791, Annual Report for the period Ending 24 February 2011 |
| A89603 | 2011 | 3d Resources Ltd | Halls Creek | 27% | Halls Creek Project – E80/4048 Western Australia Annual Report for the Period Ending 19 November 2010. |
| A89705 | 2011 | 3d Resources Ltd | Halls Creek | 20% | Halls Creek project Annual report for the period ending 14th August 2010 E80/2826, 3370, 3371, 3517, 3641, 36 |
| A90915 | 2011 | 3d Resources Ltd | Halls Creek | <1% | Halls Creek Project E80/3938 WA Annual report for the period ending 22 February 2011 |
| A86766 | 2010 | 3d Resources Ltd | Halls Creek | 27% | Halls Creek Project E80/4048, Annual report for the period ending 19 November 2009 |
| A86945 | 2010 | 3d Resources Ltd | Halls Creek | <1% | Halls Creek Project E80/3791 WA Annual Report for the Period Ending 24 February 2010 |
| A87772 | 2010 | 3d Resources Ltd | Halls Creek | <1% | Halls Creek Project- E80/3870 Annual Report for the Period Ending 31 March 2010 |
| A80725 | 2008 | 3d Resources Ltd | Halls Creek | 19% | Halls Creek Project - E80/2889, 2826, 3370, 3371, 3517,3641, 3646, 3563 ,367 & 3870, Western Australia, Annual |
| A69828 | 2005 | Ashburton Minerals Ltd | Three Sisters | 12% | Three Sisters, Tenements: E80/2904 to E80/2906, Three Sisters Project Annual Report 2004,1 November 2003 to 31 |
| A70728 | 2005 | Pathfinder Exploration Pty Ltd | Tiger | 30% | Tiger Project E80/2594 Western Australia, Annual report for the period ending 15th January 2005 (Gordon Downs) |
| A70803 | 2005 | Ashburton Minerals Ltd | Three Sisters | 34% | E80/2905 Surrender report 2005, (Three Sisters), Reporting period 30 March 2004 to 15 June 2005, C92/2004, (H |
| A70804 | 2005 | Ashburton Minerals Ltd | Three Sisters (Halls Creek gold/nickel/P | 2.9% | E80/2906 Surrender Report 2005 (Three Sisters) Reporting Period: 30 March 2004 to 15 June 2005, C92/2004, (Hal |
| A66975 | 2003 | Burdekin Pacific Ltd | Mount Barrett East | 30% | Mt Barrett East Project E80/2594 East Kimberley WA, Annual Report for the period ending 15 January 2003. |
| A67434 | 2003 | Burdekin Pacific Ltd | Granite | 29% | Granite Project, E80/2131, East Kimberley, WA, Annual Report for the period ending 20 May 2003. |
| A64096 | 2002 | Burdekin Pacific Ltd | Halls Creek | <1% | Halls Creek Project - EL80/2283 East Kimberley, WA First Partial Relinquishment Report. |
| A64236 | 2002 | Burdekin Pacific Ltd | Halls Creek | <1% | Annual Report for the period ending 21st August 2001 Halls Creek Project EL80/2283, East Kimberley, WA. |
| A65605 | 2002 | Burdekin Pacific Ltd | Mount Barrett | 32% | Mt Barrett Project - EL 80/1659. Annual Report For The Period Ending 26th October 2001. All Co-ordinates = AGD |
| A62073 | 2001 | Burdekin Resources Nl | Halls Creek | <1% | Halls Creek Project - EL80/2283 East Kimberley, W.A Annual Report for the period ending 21st August 2000. |
| A62424 | 2001 | Burdekin Resources Nl | Banjo Bore | 9% | Banjo Bore Project - E80/1661 & 1754 East Kimberley W.A, Annual Report For The Period Ending 31st December 200 |
| A62776 | 2001 | Burdekin Resources Nl | Mount Barrett | 32% | Mt. Barrett Project - EL 80/1659 East Kimberley W.A. Annual Report For The Period Ending 26th October 2000 For |
| A63200 | 2001 | Burdekin Pacific Ltd | Granite | 29% | Granite Project - EL 80/2131 East Kimberley, W.A. Annual Report For The Period Ending 20th May 2001. Co-Ordina |
| A60305 | 2000 | Burdekin Resources Nl | Banjo Bore | 2.4% | Banjo Bore East, EL80/1754, East Kimberley, WA, Second Partial Surrender Report |
| A61205 | 2000 | Burdekin Resources Nl | Granite | 29% | Granite Project, Partial Surrender Report for the period ending 20/05/2000, E80/2131. |
| A61254 | 2000 | Burdekin Resources Nl | Granite | 29% | Granite Project, E80/2031, East KImberley, WA, Annual Report for the Period ending 20/05/2000. |
| A59838 | 2000 | Burdekin Resources Nl | Mount Barrett | 32% | Mt. Barrett Project-EL80/1659 East Kimberley WA Annual Report for the period ending 26/10/1999 |
| A61681 | 2000 | Burdekin Resources Nl | Banjo Bore | 9% | Banjo Bore Prospect - E 80/1661 & 1754 East Kimberley, W.A. Annual Report for the period ending 31st December |
| A58359 | 1999 | Burdekin Resources Nl | Banjo Bore | 2.4% | Banjo Bore East E80/1754 East Kimberly W.A 1998 First Partial Surrender Report Period Ending (1999) |
| A58405 | 1999 | Burdekin Resources Nl | Banjo Bore | 9% | Banjo Bore Project E80/1661 &1754 East Kimberly W.A Annual Report For the Period Ending 31/12/1998 |
| A57971 | 1999 | Burdekin Resources Nl | Halls Creek | <1% | Halls Creek Project- E80/2283, Annual Report for the period ending 21/08/1999. |
| A58364 | 1999 | Burdekin Resources Nl | Banjo Bore | 15% | Banjo Bore - El 80/1661 East Kimberly W.A Second Partial Surrender Report Ending Period(1999) |
| A58504 | 1999 | Bhp Minerals Pty Ltd | Mabel Downs | 2.2% | Mabel Downs Joint Venture 03/1998 E80/2102, 2107-2110, 2146-2148 |
| A58506 | 1999 | Bhp Minerals Pty Ltd | Mabel Downs | 2.6% | Mabel Downs Joint Venture - Dixon Range 03/1999 E80/2102, 2107-2109, 2146-2148 |
| A58877 | 1999 | Burdekin Resources Nl | Granite | 29% | Granite Project - EL 80/2131 East Kimberley WA Annual Report for the period ending 20/05/99 |
| A59416 | 1999 | Burdekin Resources Nl | Halls Creek | <1% | Halls Creek Project, E80/2283, East Kimberley WA, Annual Report for the Period Ending 21 August 1999 |
| A54266 | 1998 | Mr Schulda Hg | Mount Barrett | 100% | Mount Barrett Project, Annual report from 02/97-02/98 Mining Lease 80/370. |
| A56065 | 1998 | Burdekin Resources Nl | Granite | 29% | Granite Project - EL80/2131 East Kimberley W.A. Annual Report Period End: 20/05/98 |
| A55198 | 1998 | Burdekin Resources Nl | Banjo Bore | 9% | Banjo Bore Project - EL80/1661, 1754 East Kimberley W.A. Period Ending 31/12/1997 |
| A55939 | 1998 | Burdekin Resources Nl | Banjo Bore | 15% | Banjo Bore Project - EL 80/1661, East Kimberley W.A. Surrender Report For the Period Ending 31/12/97 |
| A50242 | 1997 | Stockdale Prospecting Ltd | Mount Barrett | 32% | Mt Barrett Project Exploration Licence E80/1659 Annual report for the period ending 26/10/96 |
| A51388 | 1997 | Burdekin Resources Nl | Mount Barrett | 32% | Mt. Barrett Project EL80/1659 East Kimberley Western Australia Annual report for the period ending 26th Octobe |
| A51736 | 1997 | Burdekin Resources Nl | Banjo Bore | 9% | Banjo Bore Project - Els 80/1661 & 1754 East Kimberley Annual Report for the period ending 31st Decemebr, 1996 |
| A51854 | 1997 | Mr Schulda Hg | Mount Barrett | 100% | Mount Barrett Project, Annual Report from June 1996 to June 1997,M80/394. |
| A52266 | 1997 | Nickel Ventures Nl | East Kimberley | 17% | East Kimberley Project, Annual Report for period 29/05/1996 to 28/05/1997, E80/2148. |
| A52462 | 1997 | Burdekin Resources Nl | Granite | 29% | Granite Project - EL80/2131, East Kimberley W.A. Annual Report, For the Period Ending: 20/05/1997 |
| A47180 | 1996 | Mr Schulda Hg | Mount Barrett | 100% | Mount Barrett Project, Annual Report from February 1995 to January 1996, M80/370. |
| A48163 | 1996 | Burdekin Resources Nl | Banjo Bore | 9% | Banjo Bore Project - Els 80/1661 & 1754 East Kimberley Annual Report for the period ending 31st Decemebr, 1995 |
| A48469 | 1996 | Mr Schulda Hg | Mount Barrett | 100% | Mount Barrett Project, Annual report From June 1995 to June 1996 Mining Lease M80/394 |
| A47329 | 1996 | Burdekin Resources Nl | Mount Barrett | 32% | Mt. Barrett Project - EL80/1659 East Kimberley Western Australia Annual report for the period ending 26th Octo |
| A43494 | 1995 | Mr Schulda Hg | Mount Barrett | 100% | Mount Barrett Project, Annual Report M 80/370 & M 80/394 for the period February 1994 to January 1995 |
| A43867 | 1995 | Burdekin Resources Nl | Banjo Bore | 9% | Banjo Bore Project - Els 80/1661 & 1754 East Kimberley Annual Report for the period ending 31st Decemebr, 1994 |
| A46382 | 1995 | Anglo Australian Resources Nl | Mother O'Neil | 16% | Partial Surrender Report for the period 1995 Mother O'Neil Project E80/1212 |
| A48377 | 1995 | Anglo Australian Resources Nl | Welden's Creek - Mother O'Neil | 38% | Welden's Creek - Mother O'Neil Exploration Licences EL80/1384 EL80/1212 Combined Annual report 1995 |
| A42476 | 1994 | Anglo Australian Resources Nl | Weldens Creek - Mother O'Neil | 38% | Annual report to October 17, 1993 for the Weldens Creek/Mother O'Neil Tenements (E80/1212 E80/1384) |
| A43063 | 1994 | Money Mining Nl | Mother O'Neil | 16% | Mother O'Neil Exploration Licence EL80/1212 Progress Report 1994 |
| A46750 | 1994 | Anglo Australian Resources Nl | Welden's Creek | 45% | Welden's Creek Exploration Licence EL80/1384 Annual report for the period 23/12/93 to 22/12/94 |
| A38243 | 1993 | Money Mining Nl | Halls Creek | 38% | Annual report for the period 11/90-11/92 Halls Creek Project E80/1212 E80/1384 |
| A29926 | 1990 | Auridiam Nl | Moola Bulla | 100% | Moola Bulla Project, Non-statutory Report : Exploration Summary- 1989 Season, GML 80/151, P80/661, P80/982 & 9 |
| A28272 | 1989 | Auridiam Nl | Moola Bulla | 100% | Summary Report, Moola Bulla, GML80/151, P80/661, P80/982, P80/983, July 1989. |
| A21782 | 1987 | Auridiam Nl | Moola Bulla | 100% | Moola Bulla Project, Non-statutory Report: Exploration Report, June 1987, GML80/151 & P80/661. |
| A19714 | 1987 | Mr Devenish Ce | Moola Bulla | 100% | [Annual] report on Moola Bulla Prospect, 1985, GML80/151 |
| A18684 | 1986 | Devenish Jr | Moola Bulla | 100% | Report on Moola Bulla Prospect, Halls Creek Area, Kimberley Mineral Field, Western Australia |
| A508 | 1986 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Bow River I.P. Profiles, 1968, ( Folder 1), TR70/ 2687H. |
| A13974 | 1984 | Valiant Consolidated Ltd | Koongie Park North | 32% | Koongie Park North Project, Annual & Final Surrender Report for the period 11th March 1983 to 24th May 1984, |
| A10708 | 1982 | Freeport Of Australia Inc | Halls Creek | 100% | Halls Creek Project, Non-statutory Report: Final Report, December 1981, GML80/151. |
| A6894 | 1977 | Pickands Mather & Co Int | Kimberley | <1% | Non-statutory Report : Pickands Mather reconnaissance Drainage Survey of the Kimberleys, February 1977, TR70/2 |
| A6901 | 1977 | Pickands Mather & Co Int | East Kimberley - Ilmars | <1% | East Kimberley - Ilmars Project, Non-statutory Report: Core Analyses, Air Drill Analyses, 1968-1970, TR70/2687 |
| A6902 | 1977 | Pickands Mather & Co Int | East Kimberley - Angelo- Angelo North | <1% | East Kimberley - Angelo- Angelo North Project, Non-statutory Report: Geochemistry Plans & Drill Sections 1968- |
| A6195 | 1976 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Key Maps & Sub Number Indexes: Kimberley TRs 70/2686 & 2687H. |
| A5215 | 1974 | Australian Anglo American Ltd | Halls Creek South - Five Mile Bore | 82% | Halls Creek South Regional Project, Five Mile Bore Prospect, Results of exploration of mineral claims during 1 |
| A16648 | 1974 | Australian Anglo American Ltd | Halls Creek | 82% | Halls Creek Project, Non-statutory Report:Interim Report , Five Mile Bore, February 1974, MC80/4659-4661. |
| A712 | 1971 | Pickands Mather & Co Int | Kimberley - Cummins Range | <1% | Kimberley - Cummins Range Project, Non-statutory Report: Reconnaissance Work in the Cummins Range, March 1971, |
| A760 | 1971 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Re-Evaluation of Bow River 1970, February 1971, TR70/2686 |
| A2441 | 1971 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Annual (Summary) Report 1 November 1971, (1971 Field Season April to October ), TR70/2686-2 |
| A4907 | 1971 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Weekly Drill Hole Reports & Drill Records, DDH B.R. 111-1 |
| A6983 | 1971 | Pickands Mather & Co Int | East Kimberley - Panton Sill | <1% | East Kimberley - Panton Sill Project, Non-statutory Report: Analytical Report Assay Sheets for Rock & Soil Sam |
| A708 | 1971 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Exploration at the Ilmars Prospect 1970, February 1971, TR70 |
| A711 | 1971 | Pickands Mather & Co Int | Ord Crossing - Tickalara Bore | <1% | Ord Crossing - Tickalara Bore Project, Non-statutory Report: Geological Report, Ord Crossing Area, Tickalara A |
| A713 | 1971 | Pickands Mather & Co Int | Kimberley - Koongie Park | <1% | Kimberley - Koongie Park Project, Non-statutory Report: Report on Koongie Park Radioactive Showing , March 197 |
| A761 | 1971 | Pickands Mather & Co Int | Kimberley - Hall's Creek | <1% | Kimberley - Hall's Creek Project: Non-statutory Report; Geological Reconnaissance South of Hall's Creek, March |
| A2224 | 1971 | Pickands Mather & Co Int | Bow River | <1% | Bow River Project, Non-statutory Report: Drilling Programme 1971, August 1971,TR70/2686 & 2687H. |
| A2226 | 1971 | Pickands Mather & Co Int | Kimberley - McIntosh " A " | <1% | Kimberley- McIntosh " A " Project, Non-statutory Report: Report on McIntosh " A " Prospect, July 1971, TR70/26 |
| A2227 | 1971 | Pickands Mather & Co Int | Cummins Range | <1% | Cummins Range Project, Non-statutory Report: Report on Cummins Range Prospect, September 1971, TR70/2686-2687, |
| A2228 | 1971 | Pickands Mather & Co Int | Kimberley - Cummmins Range | <1% | Kimberley - Cummmins Range Project, Non-statutory Report:Cummins Range Costeans, November 1971, TR70/2686-2687 |
| A2229 | 1971 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Laboratory Report on the Beneficiation of Titano Magnetite-Bearing Ga |
| A2230 | 1971 | Pickands Mather & Co Int | Emull | <1% | Emull Project, Non-statutory Report:Report on Preliminary Investigation & Percussion Drilling Programme, Octob |
| A6209 | 1971 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Drill Records & Analysis Sheets for the period to February 1971, TR70 |
| A4764 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Ilmars Prospect, Electromagnetics Inline Configuration A, for the yea |
| A4759 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Bow River I.P. Profiles, July 1970, TR70/2687H. |
| A4765 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Koongie Park Lead I. P. Profiles, 1'-200', May 1970, TR70/2687H. |
| A4773 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Little Mount Isa Drill Records,DDH 401 & 402 , July- August 1970, TR7 |
| A4908 | 1970 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Weekly Drill Hole Reports & Analysis Report Sheets for the p |
| A6903 | 1970 | Pickands Mather & Co Int | Kimberley- Mount Angelo | <1% | Kimberley- Mount Angelo Project, Non-statutory Report; Miscellaneous Plans & Sections, 1966 & 1970, TR70/2687H |
| A6904 | 1970 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Plans & Sections , 1970, TR70/2687H. |
| A517 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Annual Report for the year ending 31/12/1969, TR70/2686, 2687,4658, 5284, 5285, 5286 & 528 |
| A519 | 1970 | Pickands Mather & Co Int | Kimberley -llmars | <1% | Kimberley -llmars Project, Non-statutory Report: Ilmars Report 1969, including Sophie Downs Copper Showing - A |
| A4762 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Wild Dog Creek I.P.Profiles, May 1970 , TR70/2686 & 2687H. |
| A4763 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Golf course I P Profiles, May 1970, TR70/2686 & 2687H. |
| A6208 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Miscellaneous Analysis Report Sheets ( Bullman Copper, Moola Bulla & |
| A6211 | 1970 | Pickands Mather & Co Int | Kimberley - | <1% | Kimberley Project, Non-statutory Report: Golf Course Prospect, D. D. H. 1 (Venture 3 Drillilng), Logs & Assay |
| A6213 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Miscellaneous Analysis Sheets for the period 1965 to August 1970.[Lam |
| A523 | 1969 | Pickands Mather & Co Int | West Kimberley | <1% | West Kimberley Project, Non-statutory Report: Exploration, 1969 Field Season, TR70/2686 & 2687H. |
| A4775 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo Core Analyses 1967-1969; Drill Logs 1967-1969 & Drill Logs |
| A496 | 1969 | Pickands Mather & Co Int | McIntosh Hills - Panton Sill | <1% | McIntosh Hills - Panton Sill Project, Annual Report for the year ending 31/12/1968, TR70/2687H. |
| A512 | 1969 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report, February 1968, TR70/ 2687H. |
| A522 | 1969 | Pickands Mather & Co Int | Kimberley- Bow River | <1% | Kimberley- Bow River Project, Non-statutory Report: Report on 1969 Field Season, [Eastern Basics Exploration], |
| A513 | 1969 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars 1968 I. P. Profiles ( 100' & 200' Dipole), May - June |
| A515 | 1969 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report 1968, Folder No 2, Pocket C & D, February 1969 |
| A516 | 1969 | Pickands Mather & Co Int | Kimberley Area | <1% | Kimberley Area Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1969, TR70/2686 |
| A520 | 1969 | Pickands Mather & Co Int | East Kimberley Project | <1% | East Kimberley Project, Non-statutory Report: Miscellaneous Exploration , 1969 Field Season, TR70/2686 & 2687H |
| A521 | 1969 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Radioactive Exploration, East Kimberley 1969 Field Season, TR70/ |
| A524 | 1969 | Pickands Mather & Co Int | Kimberley - Sophie Downs | <1% | Kimberley - Sophie Downs Project, Non-statutory Report: Sophie Downs, I.P. Profiles, 1969, TR70/2686 & 2687H. |
| A525 | 1969 | Pickands Mather & Co Int | Kimberleys- Bullman | <1% | Kimberleys- Bullman Project, Non-statutory Report: Kimberleys Bullman I.P.Profiles, 1969, TR70/2686 & 2687H. |
| A526 | 1969 | Pickands Mather & Co Int | Kimberley - Angelo Valley | <1% | Kimberley - Angelo Valley Project, Non-statutory Report: Angelo Valley I.P.Profiles, 1969, TR70/2686 & 2687H. |
| A527 | 1969 | Pickands Mather & Co Int | Kimberley - Napier | <1% | Kimberley - Napier Project, Non-statutory Report: Napier I. P. Profiles 1969, TR70/2686 & 2687H. |
| A528 | 1969 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Kimberley -Bow River I.P.Profiles 1969, TR70/2686 & 2687H |
| A529 | 1969 | Pickands Mather & Co Int | Kimberley - Golf Course | <1% | Kimberleys- Golf Course, Non-statutory Report: IP Profiles, 1969, TR70/2686 & 2687H. |
| A6212 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report SheetsOctober 1968 to May 1969 , TR70/2686 & 2687H. |
| A6214 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Miscellaneous Analysis Sheets with Sample Shipment Records, to Octobe |
| A6216 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report Sheets, ( Soil Rock Analysis, 1966-1969, Kimberley Re |
| A505 | 1968 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report: Mt.Angelo I.P Profiles 1968, TR70/2686 & 2687H. |
| A506 | 1968 | Pickands Mather & Co Int | Kimberley- Sophie Downs | <1% | Kimberley-Sophie Downs Project, Non-statutory Report: Sophie Downs I. P. Profiles, 1968, TR70/2686 & 2687H. |
| A6916 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Regional Stream Sediment Survey Maps, Cambridge Gulf, 1964-1968, TR70 |
| A509 | 1968 | Pickands Mather & Co Int | Kimberley- Bow River | <1% | Kimberley- Bow River Project, Non-statutory Report: Bow River I.P.Profiles (Folder 2), 1968, TR70/2687H. |
| A510 | 1968 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: East Kimberley Areas I.P. Profiles, 1968, TR70/ 2687H. |
| A4766 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Black - Bow River I.P. Lines 1966 - 1968, TR70/2687H. |
| A4909 | 1968 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Weekly Drill Records & Analyis Report Sheets, to September 1 |
| A487 | 1968 | Pickands Mather & Co Int | Kimberley - Ilmar's Showing | <1% | Kimberley - Ilmar's Showing Project, Non-statutory Report: Ilmar's Showing I.P. 200 Foot Dipole 1967 & 300 Fo |
| A489 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars - Little Mount Isa | <1% | Kimberley- Ilmars - Little Mount Isa Project, Final Surrender Report, February 1968, TR70/2686 & 2687H. |
| A490 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars- Little Mount Isa | <1% | Kimberley- Ilmars- Little Mount Isa Project, Non-statutory Report: Report on Ilmars & Little Mount Isa Lead-Zi |
| A491 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars - Little Mount Isa | <1% | Kimberley- Ilmars - Little Mount Isa Project, Non-statutory Report: Report on Ilmars & Little Mt Isa "Zinc- Le |
| A492 | 1968 | Pickands Mather & Co Int | Kimberley-Ilmars | <1% | Kimberley-Ilmars Project, Non-statutory Report: Report on Ilmars Showing I.P., 300 Foot Dipole 1966 & 200 Foot |
| A493 | 1968 | Pickands Mather & Co Int | Kimberley Reserves | <1% | Kimberley Reserves Project, Annual Report for the period ending 31/12/1968,TR70/2686 & 2687H. |
| A494 | 1968 | Pickands Mather & Co Int | West Kimberley | <1% | West Kimberley Project, Non-statutory Report: Report on Field work in the West Kimberley for the year ending 3 |
| A495 | 1968 | Pickands Mather & Co Int | Kimberley - Bow River - Salt Lick Creek | <1% | Kimberley - Bow River-Salt Lick Creek- Black Mountain Project, Annual Report for the year ending 31/12/1968, T |
| A497 | 1968 | Pickands Mather & Co Int | Moola Bulla - Little Panton | <1% | Moola Bulla - Little Panton Project, Annual Report for the period ending 31/12/1968, TR70/2686 & 2687H. |
| A498 | 1968 | Pickands Mather & Co Int | Kimberley - Springvale | <1% | Kimberley - Springvale Project, Annual Report for the year ending 31/12/1968, TR70/2686 & 2687H. |
| A500 | 1968 | Pickands Mather & Co Int | Kimberley - Louisa Downs | <1% | Kimberley - Louisa Downs Project, Non-statutory Report: Report on the Louisa Downs Serpentinite, & Nearby Mine |
| A502 | 1968 | Pickands Mather & Co Int | Kimberley - Fletcher Creek-Armanda Sill | <1% | Kimberley - Fletcher Creek-Armanda Sill Project, Non-statutory Report: Follow-up Work in the Fletcher Creek & |
| A504 | 1968 | Pickands Mather & Co Int | Kimberley - Mount Angelo North | <1% | Kimberley - Mt Angelo North Project, Non-statutory Report: Mt Angelo North I.P.Profiles, 1968, TR70/2686 & 268 |
| A507 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars Range | <1% | Kimberley- Ilmars Range Project, Non-statutory Report: Ilmars Range I.P Profiles 1968, TR70/2686 & 2687H. |
| A946 | 1968 | Pickands Mather & Co Int | Kimberley - Lansdowne | <1% | Kimberley - Lansdowne Project, Non-statutory Report: Plans for Lansdowne Area, TR70/2686 & 2687H. |
| A6199 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets, Regional Stream Geochemistry , Series : 42000, February |
| A6200 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets-Regional Stream Geochemistry, Series 43 0000, February 1 |
| A6215 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report Sheets, Soil Rock Analysis to November 1966-1969, TR7 |
| A471 | 1967 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mount Angelo Project, Non-statutory Report: Mt Angelo I.P. 100 & 300 Foot Dipole to June 1967, TR7 |
| A476 | 1967 | Pickands Mather & Co Int | Kimberley - Sophie Downs | <1% | Kimberley - Sophie Downs Project, Non-statutory Report: Report on Sophie Downs Regional Copper Anomaly, Novemb |
| A4905 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimnberley - Bow River Project, Non-statutory Report: Analysis Report Sheets & Daily Drilling Records, B R 10 |
| A474 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Angelo North Project, Non-statutory Report: Brief Exploration Report, November 1967, TR70/2687H. |
| A478 | 1967 | Pickands Mather & Co Int | Kimberley - Grants Creek | <1% | Kimberley - Grants Creek Project, Non-statutory Report:Final Report for the period ending 31/12/1967, TR70/268 |
| A4758 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Angelo-Peko, I.P.Lines, June 1966 & August 1967, TR70/2687H. |
| A4774 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo Weekly Drill Hole Reports:- D.H. 202-209,1966 & 1967, TR70/ |
| A4906 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report:Final Logs, DDH B.R.106-110, to August 1967, TR70/2687H. |
| A6205 | 1967 | Pickands Mather & Co Int | Kimberley -Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report: Series 61, Analysis Report Sheet, for the period to Janua |
| A457 | 1967 | Pickands Mather & Co Int | Kimberley - Gentle Annie | <1% | Kimberley - Gentle Annie Project, Non-statutory Report: Progress Report, March 1967, TR70/2686 & 2687H. |
| A455 | 1967 | Pickands Mather & Co Int | Kimberley- Bow River- Mt Angelo | <1% | Kimberley- Bow River - Mt Angelo Project, Annual Report for the period ending 31/12/1966 (Field Season), TR70/ |
| A459 | 1967 | Pickands Mather & Co Int | Kimberley -Grants Creek | <1% | Kimberley - Grants Creek Project, Non-statutory Report: Progress Report for September / October 1966, March 19 |
| A483 | 1967 | Pickands Mather & Co Int | Kimberley - Margaret River | <1% | Kimberley - Margaret River Project, Non-statutory Report: Margaret River I.P. Survey, 200' Dipole, September 1 |
| A465 | 1967 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report:Mt Angelo Geophysical Report, December 1966, TR70/2686 & 2 |
| A468 | 1967 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: I.P.:& E.M. Results , Ilmars Project, March 1967, TR70/2686 |
| A469 | 1967 | Pickands Mather & Co Int | Kimberley- Ilmars | <1% | Kimberley- Ilmars Project, Non-statutory Report:Progess Report, Ilmars Zinc- Lead - Copper Showing, March 1967 |
| A472 | 1967 | Pickands Mather & Co Int | East Kimberley -West Kimberley | <1% | East Kimberley -West KimberleyProject, Annual Report for the period ending 318/12/1967, TR70/2686 & 2687H. |
| A473 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: 1967 Report on Bow River Air Drill Programme, October 196 |
| A475 | 1967 | Pickands Mather & Co Int | Kimberley - Gentle Annie Creek | <1% | Kimberley - Gentle Annie Creek Project, Non-statutory Report: Final Report 1966, Gentle Annie Creek Area, Apri |
| A477 | 1967 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mount Angelo Project, Non-statutory Report: Diamond Drilling Results at Mt Angelo, December 1967, |
| A484 | 1967 | Pickands Mather & Co Int | Kimberley - Peko Angelo | <1% | Kimberley - Peko Angelo Project, Non-statutory Report: Peko Angelo I.P. 100' Dipole, September 1967, TR70/2686 |
| A479 | 1967 | Pickands Mather & Co Int | Kimberley - Yampi Sound | <1% | Kimberley - Yampi Sound Project, Non-statutory Report: Preliminary Report, Coppermine Inlet Area, October 1967 |
| A480 | 1967 | Pickands Mather & Co Int | Kimberley - Panton River | <1% | Kimberley - Panton River Project, Non-statutory Report: Final Report, Panton River Copper- Zinc-Lead Anomaly, |
| A481 | 1967 | Pickands Mather & Co Int | West Kimberley | <1% | West Kimberley Project, Non-statutory Report: Report on Field Work for the year ending 31/12/1967, TR70/2686 & |
| A482 | 1967 | Pickands Mather & Co Int | Kimberley - Angelo North | <1% | Kimberley - Angelo North Project, Non-statutory Report: Maps, Sections & Diagrams, circa August 1967, TR70/268 |
| A486 | 1967 | Pickands Mather & Co Int | Kimberley - Discovery Yard | <1% | Kimberley - Discovery Yard Project, Non-statutory Report: Discovery Yard I.P. 100 Foot Dipole, August 1967. Tr |
| A488 | 1967 | Pickands Mather & Co Int | Kimberley - Emull | <1% | Kimberley - Emull Project, Non-statutory Report: Emull I.P. Survey, 200 Foot Dipole, September 1967,TR70/2686 |
| A501 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Bow River I.P. 200 Foot Dipole, 1965 & 1967, TR70/2686 & |
| A6197 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry , 40 Series, to December |
| A6198 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry, Series 41 0000, Reruns a |
| A6206 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Exploration Report, Analysis Results on Copper, Nickel, Sulphur & Pho |
| A6210 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report Sheets to October 1967, TR70/2686 & 2687H. |
| A4680 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Report on Saunders Creek Anticline Copper Anomaly, December 1966, TR7 |
| A4674 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: An Extract from Progress Report, September 1966, TR70/2687H. |
| A4675 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Supplementary Report on the Margaret River Gossan, April 1966, TR70/2 |
| A4682 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Report on the Salt Lick Creek Nickel Anomaly & Lissadell - Mt Pitt Go |
| A4756 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo I.P. 300' Di Pole Lines, June 1966, TR70/2687H. |
| A4676 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report:Progress Report on Mount Angelo Copper Showing ( Mt Ramsay 3), April 1 |
| A4684 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report; Final Report, Bow River Copper -Nickel Prospect, November 1966, TR70 |
| A4686 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Brief Geological Report , Bow River I P Lines , July 1966, TR70/2687 |
| A444 | 1966 | Pickands Mather & Co Int | Kimberley - Ding Dong Downs | <1% | Ding Dong Downs Project, Non-statutory Report: Summary Report on Ding Dong Downs Copper, Lead & Zinc Anomaly, |
| A460 | 1966 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report: Geological Report, Mount Angelo Copper Showing, May 1966, |
| A462 | 1966 | Pickands Mather & Co Int | Kimberley - Panton River | <1% | Kimberley - Panton River Project, Non-statutory Report: Preliminary Report of Panton River Copper Anomaly , De |
| A463 | 1966 | Pickands Mather & Co Int | Kimberley- Carr Boyd Range | <1% | Kimberley- Carr Boyd Range Project, Non-statutory Report: Final Report, November 1966, TR70/2686 &2687H. |
| A464 | 1966 | Pickands Mather & Co Int | Kimberley- Bow River | <1% | Kimberley- Bow River Project, Non-statutory Report:Final Report on the Bow River Region, December 1966, TR70/2 |
| A466 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley - Discovery Yard Project, Non-statutory Report: Discovery Yard Copper Anomaly, December 1966, TR70/2 |
| A6203 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets - regional Stream Geochemistry , Series 53 0000, to Janu |
| A1492 | 1965 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Metal Concentrations in Stream Sediment Locations, 1965, TR70/26 |
| A6906 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Regional Geology & Geochemical Anomalies Maps, (circa 1965), TR70/268 |
| A4757 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo. 200' IP Lines, November 1965, TR70/2687H. |
| A6917 | 1965 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Regional Stream Sediment Geochemistry Maps, Lissadell & Derby, |
| A6919 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Stream Sediment Survey Maps, Dixon Range, 1964, TR70/2687H. |
| A6920 | 1965 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Stream Sediment Survey Maps, Mt Ramsay, 1964, TR70/2687H. |
| A6921 | 1965 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Stream Sediment Survey Geochemistry Maps, Gordon Downs & Mt Bann |
| A439 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Annual Report for the year ending 31/12/1964, TR70/2686 & 2687H. |
| A440 | 1965 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley -Bow River Project, Non-statutory Report: Preliminary Report, November 1965. TR70/2686 & 2687H. |
| A441 | 1965 | Pickands Mather & Co Int | Kimberley- Taylor River | <1% | Kimberley - Taylor River Project, Non-statutory Report; Brief Summary Exploration Report on the Taylor River C |
| A442 | 1965 | Pickands Mather & Co Int | Mount Elliza No 1 | <1% | Kimberley - Mount Elliza No 1 Project, Non-statutory Report: Mt Eliza No 1 Tin - Arsenic Anomaly Summary Repor |
| A443 | 1965 | Pickands Mather & Co Int | Kimberley - Carr Boyd Range | <1% | Kimberley - Carr Boyd Range Project, Non-statutory Report: Preliminary Report, Carr Boyd Range Lead Anomaly, N |
| A445 | 1965 | Pickands Mather & Co Int | Kimberley - Five Mile Gossan | <1% | Kimberley - Five Mile Gossan Project,Non-statutory Report: Summary Report, August 1965, TR70/2686 & 2687H. |
| A446 | 1965 | Pickands Mather & Co Int | Kimberley - Me No Savvy | <1% | Kimberley - Me No Savvy Project, Non-statutory Report:Brief Summary Report on Me No Savvy Copper Showing, Aug |
All 274 report numbers over this ground
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 2 months · 2 Nov 2026
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 80/4793 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 80/4793? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.