NextMapsWA TenementsE 80/3907

E 80/3907

LiveExploration LicenceShire of Halls CreekKimberley M.F. District
Area
930ha
Expires
Dec 2026
in 3 months
WAMEX reports
224
WA median is 53
Report drilling
46
of 224 reports
Halls Creek Explore on the live map

Register summary

Holder
Mcintosh Resources Pty Ltd
Local government
Shire of Halls Creek
Application received
16 Mar 2007
Commenced
3 Dec 2008
Expiry
2 Dec 2026
Term
5 Years (Extended)

Exploration history on this ground

224 historical WAMEX exploration reports intersect E 80/3907: 113 report geochemistry or sampling, 52 include a digital data package.
When this ground was worked · 216 of 224 reports dated
1171960s
361970s
111980s
61990s
192000s
212010s
62020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A154337 2026 Igo Forrestania Limited McIntosh <1% Final Surrender E80/5461 McIntosh for the period ending 20/2/2026
A147492 2025 Future Metals Nl Alice Downs Corridor & Panton North (V1) <1% EIS Venture 1 Cofunded Ground Gravity within the Alice Downs Corridor and Panton North
A144203 2024 Future Metals Nl Panton West <1% Co-Funded Drilling Report Panton West Project (R27)
A145491 2024 Igo Newsearch Pty Ltd McIntosh <1% E80/5461 McIntosh Partial Surrender Report for the period ending 8/11/2024
A128372 2021 Kimberley Granite Holdings Pty Ltd Argyle <1% Annual Report for E80/5036 Argyle Project for the period ending 17/09/2021
219 more reports
A125226 2020 Mcintosh Resources Pty Ltd McIntosh 1.4% Combined Annual report C191/2010 "McIntosh" for the period 1/9/2019 to 31/8/2020
A121480 2019 Mcintosh Resources Pty Ltd McIntosh 1.4% Combined Annual report C191/2010 "McIntosh" for the period 1/9/2018 to 31/8/2019 for the McIntosh project.
A121766 2019 Kimberley Granite Holdings Pty Ltd Argyle Black <1% Annual Report for Argyle Black E80/5036 for the period 18 September 2018 to 17 September 2019
A118326 2018 Mineral Resources Limited McIntosh 1.5% McIntosh Project C191/2010 Combined Annual Report for the period 1 September 2017 to 31 August 2018
A118634 2018 Kimberley Granite Holdings Pty Ltd Argyle <1% Annual Mineral Exploration Report for the Argyle Black Dimension Stone Project on E80/5036 - Reporting Year 18
A115042 2017 Hexagon Resources Limited McIntosh 1.5% Combined Annual Report for the period 1 September 2016 to 31 August 2017, McIntosh Project, C191/2010, E80/038
A109938 2016 Hexagon Resources Limited McIntosh <1% Surrender Report for tenement E80/4396 McIntosh Project for the period 2 August 2011 to 21 July 2016
A110224 2016 Hexagon Resources Limited McIntosh 1.5% Combined Annual Report for the period 1 September 2015 to 31 August 2016, McIntosh Project, C191/2010, E80/038
A107106 2015 Lamboo Resources Ltd McIntosh 1.5% Combined Annual report for the period 1 September 2014 to 31 August 2015, McIntosh Project, C191/2010, E80/386
A104389 2014 Lamboo Resources Ltd McIntosh <1% Annual Report -15th November 2013 to 14th November 2014, McIntosh Project, E80/4733
A103702 2014 Lamboo Resources Ltd McIntosh 4.3% Combined Annual Report, McIntosh Project C191/2010, E80/3864, E80/3906-7, E80/3928, E80/4396 and E80/4688, for
A100704 2013 Lamboo Resources Ltd Mcintosh <1% Interim Report, McIntosh Graphite Project, E80/3864, E80/3906-7, E80/3928 and E80/4396, for Co-Funded Drilling
A99726 2013 Lamboo Resources Ltd McIntosh 4.3% Combined Annual Report, McIntosh Project C191/2010, E80/3864, E80/3906-7, E80/3928, E80/4396 and E80/4688, fo
A92775 2012 Pathfinder Exploration Pty McIntosh 5.2% McIntosh Project Reporting E80/3864, 3906, 3907, 3928 & 4396 Western Australia Annual Report for the Period En
A95472 2012 Lamboo Resources Ltd McIntosh 5.2% Combined Annual Report, McIntosh Project C191/2010, E80/3864, E80/3906-7, E80/3928 and E80/4396, for the perio
A96179 2012 Pindan Exploration Company Pty Ltd East Kimberley <1% East Kimberley [JV] Project, Final Surrender Report for the period 16th February 2010 to 28th August 2012, E80
A90194 2011 Pindan Exploration Company Pty Ltd East Kimberley <1% East Kimberley (JV) Project, Annual Report for the period 16th February 2010 to 15th February 2011, E80/2290,
A90208 2011 Pathfinder Exploration Pty Ltd McIntosh 100% McIntosh Project - E80/3907, Western Australia, Annual Report for the Period Ending 2nd December 2010. (C191/2
A91904 2011 Pindan Exploration Company Pty Ltd East Kimberley <1% Full Surrender Report P80/1742
A86571 2010 Pathfinder Exploration Pty Ltd McIntosh 100% McIntosh Project E80/3907, Western Australia, Annual Report for the period Ending 2nd December 2009
A88297 2010 Pathfinder Exploration Pty Ltd McIntosh <1% McIntosh Project - E80/3928 Western Australia Annual Report for the Period Ending 1st June 2010.
A86767 2010 Pindan Exploration Company Pty Ltd East Kimberley <1% Annual Report, East Kimberley Joint Venture Project; (Combined Report Number C89/2009) for the period 16 Febru
A79324 2008 Thundelarra Exploration Ltd Panton North <1% Annual Report, Panton North Project E80/2290, for the period 24 June 2007 to 23 June 2008, East Kimberley
A80379 2008 Thundelarra Exploration Ltd TOGO NORTH JOINT VENTURE <1% Annual Report, Togo North Project E80/2574, for the period 27 October 2007 to 26 October 2008, East Kimberley
A76723 2007 Thundelarra Exploration Ltd TOGO NORTH JOINT VENTURE <1% ANNUAL REPORT TOGO NORTH JOINT VENTURE E80/2574 FOR THE PERIOD 27 OCTOBER 2006 TO 26 OCTOBER 2007 EAST KIMBERL
A74543 2007 Thundelarra Exploration Ltd Togo North <1% Togo North Joint Venture Project E80/2574 Annual Report for the Period 27th Oct 2005 to 26th Oct 2006 (Dixon R
A75878 2007 Thundelarra Exploration Ltd Panton North <1% Annual Report Panton North Project E80/2290 for the Period 24 June 2006 to 23 June 2007 East Kimberley Mineral
A72372 2006 Thundelarra Exploration Ltd Togo North <1% Annual Report, Togo North Joint Venture E80/2574, For the Period 27 October 2004 to 26 October 2005, (Thundela
A72891 2006 Thundelarra Exploration Ltd West McIntosh and Togo 5.1% Annual Report, West McIntosh & Togo Projects E80/2565 and E80/2579, Combined Reporting No. C45/2002, For the P
A73171 2006 Thundelarra Exploration Ltd McIntosh <1% Annual Report, Panton North Project E80/2290 for the Period 24 June 2005 to 23 June 2006, (Thundelarra Report
A74459 2006 Thundelarra Exploration Ltd West McIntosh & Togo 5.1% Annual Report, West McIntosh & Togo Projects E80/2565,2579, Combined Reporting No. C45/2002, For the Period 15
A71668 2006 Thundelarra Exploration Ltd Panton North <1% Annual Report Panton North Project E80/2290, For the period 24 June 2004 to 23 June 2005, East Kimberley Miner
A69977 2005 Thundelarra Exploration Ltd West McIntosh and Togo 5.1% Annual report for the period 15/03/04 - 14/03/05 West McIntosh and Togo Projects, C45/2002, E80/2565, E80/2579
A67985 2004 Thundelarra Exploration Ltd West McIntosh/Togo 5.1% Annual Report for the period 15/03/2003- 14/03/2004 West McIntosh & Togo Projects (C45/2002), E80/2565, E80/25
A69709 2004 Thundelarra Exploration Ltd Panton North <1% Annual report for the period 24/06/03 - 23/06/04 Panton North Project, E80/2290, East Kimberley mineral field
A67713 2003 Thundelarra Exploration Ltd Panton North <1% Annual report for the period 24 June 2002-23 June 2003 Panton North Project E80/2290
A65492 2002 Thundelarra Exploration Ltd McIntosh PGE/Au/BM/Big Ben/Alice Hill <1% Annual Report Panton North Project E80/2290 For The Period 24 June 2001 To 23 June 2002
A66625 2002 Platinum Australia Ltd West McIntosh and Togo PGE 5.1% Annual Report for the period 15 March 2002 to 14 March 2003 West McIntosh & Togo PGE Project E80/2565 and 2579
A63212 2001 Thundelarra Exploration Ltd Panton North <1% Annual Report Panton North Project E80/2290 For The Period 24 June 1999 To 23 June 2001.
A60376 2000 Kimberley Gold Pty Ltd McIntosh 24% Surrender Report for the Exploration Report E80/2293, from 11/11/1997 to 08/03/2000, McIntosh Project, Halls C
A60446 2000 Kimberley Mining Nl McIntosh <1% Annual Report for Exploration Licence E80/2290 McIntosh Project for the period endinc 23 June 1999 McIntosh 1
A55363 1998 Mr Legendre Br McIntosh Hills 24% Geological Report Exploration Licence E80/2293 McIntosh Hills Kimberley Mineral Field
A47833 1996 Helix Resources Nl Mabel Hill <1% Mabel Hill Project, Partial Relinquishment Report, April 1996, E80/1827.
A48293 1996 Platinum Mines Of Aust Pty Ltd McIntosh 24% McIntosh Project, Non-statutory Report: Geological Report, 5th April 1996, E80/1665.
A48839 1996 Helix Resources Nl Mabel Hill <1% Mabel Hill Project, Annual Report for the year ending 18th July 1996, E80/1827.
A44374 1995 Victory Gold Mines Nl McIntosh 24% McIntosh Platinum Project Kimberley Mineral Field W.A,
A45517 1995 Helix Resources Nl Mabel Hill / East Kimberley <1% Mabel Hill / East Kimberley Project, First Annual Report E80/1827 for year ending 18th July 1995.
A29518 1989 Geopeko Melon 6.3% Annual report on E80/122 (Melon). For period 4/10/88 to 3/10/89
A21873 1987 Geopeko E80/122 6.3% Annual report on E80/122 for period 4/10/86 to 3/10/87
A508 1986 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley - Bow River Project, Non-statutory Report: Bow River I.P. Profiles, 1968, ( Folder 1), TR70/ 2687H.
A24173 1986 Freeport Of Australia Inc Alice Downs/Springvale 6.3% Alice Downs JV annual report. EL80/122. 4/10/85 - 3/10/86
A16587 1985 Freeport Of Australia Inc Alice Downs 6.3% Alice Downs Joint Venture Annual Report Exploration Licence E80/122, 4 October 1984 - 3 October 1985
A14567 1984 Freeport Of Australia Inc Alice Downs 6.3% Alice Downs Joint Venture- Annual Report. Exploration Licence E80/122 4 October 1983- 3 October 1984
A13696 1984 Freeport Of Australia Inc Alice Downs/Springvale 21% McIntosh/Alice Downs Joint venture Annual Report Mineral Claims 80/9533-36, 10329-39, 11076, 11077, 11100-1110
A10757 1982 Australian Anglo American Ltd Mabel Hill 4% Mabel Hill Project, Non-statutory Report: Final Report for the period ending 14th April 1981, MC80/5292-5293.
A11359 1982 Inco Australia Ltd McIntosh - Alice Downs 18% McIntosh - Alice Downs Project, Annual Report for the period ending 31/12/1981, ( 1981 Field Season), MC80/953
A12222 1982 Inco Australia Ltd McIntosh (Alice Downs) 18% Annual Report
A9674 1981 Gem Exp & Minerals Ltd Mount Remarkable <1% Mount Remarkable Project, Non-statutory Report: Detrital Casserite & Scheelite Results, Gemex 1980 Programme,
A8463 1979 Australian Anglo American Ltd Mini M- Togo 5 72% Mini M- Togo 5 Project, Non-statutory Report: Final Report, May 1979, MC80/5986-5992.
A8462 1978 Australian Anglo American Ltd Mabel Hill 4% Mabel Hill Project, Non-statutory Report: Exploration Report, December 1978, MC80/5292 & 5293.
A6894 1977 Pickands Mather & Co Int Kimberley <1% Non-statutory Report : Pickands Mather reconnaissance Drainage Survey of the Kimberleys, February 1977, TR70/2
A6901 1977 Pickands Mather & Co Int East Kimberley - Ilmars <1% East Kimberley - Ilmars Project, Non-statutory Report: Core Analyses, Air Drill Analyses, 1968-1970, TR70/2687
A6902 1977 Pickands Mather & Co Int East Kimberley - Angelo- Angelo North <1% East Kimberley - Angelo- Angelo North Project, Non-statutory Report: Geochemistry Plans & Drill Sections 1968-
A6195 1976 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Key Maps & Sub Number Indexes: Kimberley TRs 70/2686 & 2687H.
A712 1971 Pickands Mather & Co Int Kimberley - Cummins Range <1% Kimberley - Cummins Range Project, Non-statutory Report: Reconnaissance Work in the Cummins Range, March 1971,
A760 1971 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley - Bow River Project, Non-statutory Report: Re-Evaluation of Bow River 1970, February 1971, TR70/2686
A2441 1971 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Annual (Summary) Report 1 November 1971, (1971 Field Season April to October ), TR70/2686-2
A4907 1971 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley - Bow River Project, Non-statutory Report: Weekly Drill Hole Reports & Drill Records, DDH B.R. 111-1
A6983 1971 Pickands Mather & Co Int East Kimberley - Panton Sill <1% East Kimberley - Panton Sill Project, Non-statutory Report: Analytical Report Assay Sheets for Rock & Soil Sam
A708 1971 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: Exploration at the Ilmars Prospect 1970, February 1971, TR70
A711 1971 Pickands Mather & Co Int Ord Crossing - Tickalara Bore <1% Ord Crossing - Tickalara Bore Project, Non-statutory Report: Geological Report, Ord Crossing Area, Tickalara A
A713 1971 Pickands Mather & Co Int Kimberley - Koongie Park <1% Kimberley - Koongie Park Project, Non-statutory Report: Report on Koongie Park Radioactive Showing , March 197
A761 1971 Pickands Mather & Co Int Kimberley - Hall's Creek <1% Kimberley - Hall's Creek Project: Non-statutory Report; Geological Reconnaissance South of Hall's Creek, March
A2224 1971 Pickands Mather & Co Int Bow River <1% Bow River Project, Non-statutory Report: Drilling Programme 1971, August 1971,TR70/2686 & 2687H.
A2226 1971 Pickands Mather & Co Int Kimberley - McIntosh " A " <1% Kimberley- McIntosh " A " Project, Non-statutory Report: Report on McIntosh " A " Prospect, July 1971, TR70/26
A2227 1971 Pickands Mather & Co Int Cummins Range <1% Cummins Range Project, Non-statutory Report: Report on Cummins Range Prospect, September 1971, TR70/2686-2687,
A2228 1971 Pickands Mather & Co Int Kimberley - Cummmins Range <1% Kimberley - Cummmins Range Project, Non-statutory Report:Cummins Range Costeans, November 1971, TR70/2686-2687
A2229 1971 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Laboratory Report on the Beneficiation of Titano Magnetite-Bearing Ga
A2230 1971 Pickands Mather & Co Int Emull <1% Emull Project, Non-statutory Report:Report on Preliminary Investigation & Percussion Drilling Programme, Octob
A6209 1971 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Drill Records & Analysis Sheets for the period to February 1971, TR70
A4764 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Ilmars Prospect, Electromagnetics Inline Configuration A, for the yea
A4759 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Bow River I.P. Profiles, July 1970, TR70/2687H.
A4765 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Koongie Park Lead I. P. Profiles, 1'-200', May 1970, TR70/2687H.
A4773 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Little Mount Isa Drill Records,DDH 401 & 402 , July- August 1970, TR7
A4908 1970 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: Weekly Drill Hole Reports & Analysis Report Sheets for the p
A6903 1970 Pickands Mather & Co Int Kimberley- Mount Angelo <1% Kimberley- Mount Angelo Project, Non-statutory Report; Miscellaneous Plans & Sections, 1966 & 1970, TR70/2687H
A6904 1970 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley - Bow River Project, Plans & Sections , 1970, TR70/2687H.
A517 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Annual Report for the year ending 31/12/1969, TR70/2686, 2687,4658, 5284, 5285, 5286 & 528
A519 1970 Pickands Mather & Co Int Kimberley -llmars <1% Kimberley -llmars Project, Non-statutory Report: Ilmars Report 1969, including Sophie Downs Copper Showing - A
A4762 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Wild Dog Creek I.P.Profiles, May 1970 , TR70/2686 & 2687H.
A4763 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Golf course I P Profiles, May 1970, TR70/2686 & 2687H.
A6208 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Miscellaneous Analysis Report Sheets ( Bullman Copper, Moola Bulla &
A6211 1970 Pickands Mather & Co Int Kimberley - <1% Kimberley Project, Non-statutory Report: Golf Course Prospect, D. D. H. 1 (Venture 3 Drillilng), Logs & Assay
A6213 1970 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Miscellaneous Analysis Sheets for the period 1965 to August 1970.[Lam
A523 1969 Pickands Mather & Co Int West Kimberley <1% West Kimberley Project, Non-statutory Report: Exploration, 1969 Field Season, TR70/2686 & 2687H.
A4775 1969 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Mt Angelo Core Analyses 1967-1969; Drill Logs 1967-1969 & Drill Logs
A496 1969 Pickands Mather & Co Int McIntosh Hills - Panton Sill <1% McIntosh Hills - Panton Sill Project, Annual Report for the year ending 31/12/1968, TR70/2687H.
A512 1969 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report, February 1968, TR70/ 2687H.
A522 1969 Pickands Mather & Co Int Kimberley- Bow River <1% Kimberley- Bow River Project, Non-statutory Report: Report on 1969 Field Season, [Eastern Basics Exploration],
A513 1969 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: Ilmars 1968 I. P. Profiles ( 100' & 200' Dipole), May - June
A515 1969 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report 1968, Folder No 2, Pocket C & D, February 1969
A516 1969 Pickands Mather & Co Int Kimberley Area <1% Kimberley Area Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1969, TR70/2686
A520 1969 Pickands Mather & Co Int East Kimberley Project <1% East Kimberley Project, Non-statutory Report: Miscellaneous Exploration , 1969 Field Season, TR70/2686 & 2687H
A521 1969 Pickands Mather & Co Int East Kimberley <1% East Kimberley Project, Non-statutory Report: Radioactive Exploration, East Kimberley 1969 Field Season, TR70/
A524 1969 Pickands Mather & Co Int Kimberley - Sophie Downs <1% Kimberley - Sophie Downs Project, Non-statutory Report: Sophie Downs, I.P. Profiles, 1969, TR70/2686 & 2687H.
A525 1969 Pickands Mather & Co Int Kimberleys- Bullman <1% Kimberleys- Bullman Project, Non-statutory Report: Kimberleys Bullman I.P.Profiles, 1969, TR70/2686 & 2687H.
A526 1969 Pickands Mather & Co Int Kimberley - Angelo Valley <1% Kimberley - Angelo Valley Project, Non-statutory Report: Angelo Valley I.P.Profiles, 1969, TR70/2686 & 2687H.
A527 1969 Pickands Mather & Co Int Kimberley - Napier <1% Kimberley - Napier Project, Non-statutory Report: Napier I. P. Profiles 1969, TR70/2686 & 2687H.
A528 1969 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley - Bow River Project, Non-statutory Report: Kimberley -Bow River I.P.Profiles 1969, TR70/2686 & 2687H
A529 1969 Pickands Mather & Co Int Kimberley - Golf Course <1% Kimberleys- Golf Course, Non-statutory Report: IP Profiles, 1969, TR70/2686 & 2687H.
A6212 1969 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Analysis Report SheetsOctober 1968 to May 1969 , TR70/2686 & 2687H.
A6214 1969 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Miscellaneous Analysis Sheets with Sample Shipment Records, to Octobe
A6216 1969 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Analysis Report Sheets, ( Soil Rock Analysis, 1966-1969, Kimberley Re
A505 1968 Pickands Mather & Co Int Kimberley - Mount Angelo <1% Kimberley - Mt Angelo Project, Non-statutory Report: Mt.Angelo I.P Profiles 1968, TR70/2686 & 2687H.
A506 1968 Pickands Mather & Co Int Kimberley- Sophie Downs <1% Kimberley-Sophie Downs Project, Non-statutory Report: Sophie Downs I. P. Profiles, 1968, TR70/2686 & 2687H.
A6916 1968 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Regional Stream Sediment Survey Maps, Cambridge Gulf, 1964-1968, TR70
A509 1968 Pickands Mather & Co Int Kimberley- Bow River <1% Kimberley- Bow River Project, Non-statutory Report: Bow River I.P.Profiles (Folder 2), 1968, TR70/2687H.
A510 1968 Pickands Mather & Co Int East Kimberley <1% East Kimberley Project, Non-statutory Report: East Kimberley Areas I.P. Profiles, 1968, TR70/ 2687H.
A4766 1968 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Mt Black - Bow River I.P. Lines 1966 - 1968, TR70/2687H.
A4909 1968 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: Weekly Drill Records & Analyis Report Sheets, to September 1
A487 1968 Pickands Mather & Co Int Kimberley - Ilmar's Showing <1% Kimberley - Ilmar's Showing Project, Non-statutory Report: Ilmar's Showing I.P. 200 Foot Dipole 1967 & 300 Fo
A489 1968 Pickands Mather & Co Int Kimberley- Ilmars - Little Mount Isa <1% Kimberley- Ilmars - Little Mount Isa Project, Final Surrender Report, February 1968, TR70/2686 & 2687H.
A490 1968 Pickands Mather & Co Int Kimberley- Ilmars- Little Mount Isa <1% Kimberley- Ilmars- Little Mount Isa Project, Non-statutory Report: Report on Ilmars & Little Mount Isa Lead-Zi
A491 1968 Pickands Mather & Co Int Kimberley- Ilmars - Little Mount Isa <1% Kimberley- Ilmars - Little Mount Isa Project, Non-statutory Report: Report on Ilmars & Little Mt Isa "Zinc- Le
A492 1968 Pickands Mather & Co Int Kimberley-Ilmars <1% Kimberley-Ilmars Project, Non-statutory Report: Report on Ilmars Showing I.P., 300 Foot Dipole 1966 & 200 Foot
A493 1968 Pickands Mather & Co Int Kimberley Reserves <1% Kimberley Reserves Project, Annual Report for the period ending 31/12/1968,TR70/2686 & 2687H.
A494 1968 Pickands Mather & Co Int West Kimberley <1% West Kimberley Project, Non-statutory Report: Report on Field work in the West Kimberley for the year ending 3
A495 1968 Pickands Mather & Co Int Kimberley - Bow River - Salt Lick Creek <1% Kimberley - Bow River-Salt Lick Creek- Black Mountain Project, Annual Report for the year ending 31/12/1968, T
A497 1968 Pickands Mather & Co Int Moola Bulla - Little Panton <1% Moola Bulla - Little Panton Project, Annual Report for the period ending 31/12/1968, TR70/2686 & 2687H.
A498 1968 Pickands Mather & Co Int Kimberley - Springvale <1% Kimberley - Springvale Project, Annual Report for the year ending 31/12/1968, TR70/2686 & 2687H.
A500 1968 Pickands Mather & Co Int Kimberley - Louisa Downs <1% Kimberley - Louisa Downs Project, Non-statutory Report: Report on the Louisa Downs Serpentinite, & Nearby Mine
A502 1968 Pickands Mather & Co Int Kimberley - Fletcher Creek-Armanda Sill <1% Kimberley - Fletcher Creek-Armanda Sill Project, Non-statutory Report: Follow-up Work in the Fletcher Creek &
A504 1968 Pickands Mather & Co Int Kimberley - Mount Angelo North <1% Kimberley - Mt Angelo North Project, Non-statutory Report: Mt Angelo North I.P.Profiles, 1968, TR70/2686 & 268
A507 1968 Pickands Mather & Co Int Kimberley- Ilmars Range <1% Kimberley- Ilmars Range Project, Non-statutory Report: Ilmars Range I.P Profiles 1968, TR70/2686 & 2687H.
A946 1968 Pickands Mather & Co Int Kimberley - Lansdowne <1% Kimberley - Lansdowne Project, Non-statutory Report: Plans for Lansdowne Area, TR70/2686 & 2687H.
A6199 1968 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets, Regional Stream Geochemistry , Series : 42000, February
A6200 1968 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets-Regional Stream Geochemistry, Series 43 0000, February 1
A6215 1968 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Analysis Report Sheets, Soil Rock Analysis to November 1966-1969, TR7
A471 1967 Pickands Mather & Co Int Kimberley - Mount Angelo <1% Kimberley - Mount Angelo Project, Non-statutory Report: Mt Angelo I.P. 100 & 300 Foot Dipole to June 1967, TR7
A476 1967 Pickands Mather & Co Int Kimberley - Sophie Downs <1% Kimberley - Sophie Downs Project, Non-statutory Report: Report on Sophie Downs Regional Copper Anomaly, Novemb
A4905 1967 Pickands Mather & Co Int Kimberley - Bow River <1% Kimnberley - Bow River Project, Non-statutory Report: Analysis Report Sheets & Daily Drilling Records, B R 10
A474 1967 Pickands Mather & Co Int Kimberley <1% Angelo North Project, Non-statutory Report: Brief Exploration Report, November 1967, TR70/2687H.
A478 1967 Pickands Mather & Co Int Kimberley - Grants Creek <1% Kimberley - Grants Creek Project, Non-statutory Report:Final Report for the period ending 31/12/1967, TR70/268
A4758 1967 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Angelo-Peko, I.P.Lines, June 1966 & August 1967, TR70/2687H.
A4774 1967 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Mt Angelo Weekly Drill Hole Reports:- D.H. 202-209,1966 & 1967, TR70/
A4906 1967 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley - Bow River Project, Non-statutory Report:Final Logs, DDH B.R.106-110, to August 1967, TR70/2687H.
A6205 1967 Pickands Mather & Co Int Kimberley -Mount Angelo <1% Kimberley - Mt Angelo Project, Non-statutory Report: Series 61, Analysis Report Sheet, for the period to Janua
A457 1967 Pickands Mather & Co Int Kimberley - Gentle Annie <1% Kimberley - Gentle Annie Project, Non-statutory Report: Progress Report, March 1967, TR70/2686 & 2687H.
A455 1967 Pickands Mather & Co Int Kimberley- Bow River- Mt Angelo <1% Kimberley- Bow River - Mt Angelo Project, Annual Report for the period ending 31/12/1966 (Field Season), TR70/
A459 1967 Pickands Mather & Co Int Kimberley -Grants Creek <1% Kimberley - Grants Creek Project, Non-statutory Report: Progress Report for September / October 1966, March 19
A483 1967 Pickands Mather & Co Int Kimberley - Margaret River <1% Kimberley - Margaret River Project, Non-statutory Report: Margaret River I.P. Survey, 200' Dipole, September 1
A465 1967 Pickands Mather & Co Int Kimberley - Mount Angelo <1% Kimberley - Mt Angelo Project, Non-statutory Report:Mt Angelo Geophysical Report, December 1966, TR70/2686 & 2
A468 1967 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: I.P.:& E.M. Results , Ilmars Project, March 1967, TR70/2686
A469 1967 Pickands Mather & Co Int Kimberley- Ilmars <1% Kimberley- Ilmars Project, Non-statutory Report:Progess Report, Ilmars Zinc- Lead - Copper Showing, March 1967
A472 1967 Pickands Mather & Co Int East Kimberley -West Kimberley <1% East Kimberley -West KimberleyProject, Annual Report for the period ending 318/12/1967, TR70/2686 & 2687H.
A473 1967 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley - Bow River Project, Non-statutory Report: 1967 Report on Bow River Air Drill Programme, October 196
A475 1967 Pickands Mather & Co Int Kimberley - Gentle Annie Creek <1% Kimberley - Gentle Annie Creek Project, Non-statutory Report: Final Report 1966, Gentle Annie Creek Area, Apri
A477 1967 Pickands Mather & Co Int Kimberley - Mount Angelo <1% Kimberley - Mount Angelo Project, Non-statutory Report: Diamond Drilling Results at Mt Angelo, December 1967,
A484 1967 Pickands Mather & Co Int Kimberley - Peko Angelo <1% Kimberley - Peko Angelo Project, Non-statutory Report: Peko Angelo I.P. 100' Dipole, September 1967, TR70/2686
A479 1967 Pickands Mather & Co Int Kimberley - Yampi Sound <1% Kimberley - Yampi Sound Project, Non-statutory Report: Preliminary Report, Coppermine Inlet Area, October 1967
A480 1967 Pickands Mather & Co Int Kimberley - Panton River <1% Kimberley - Panton River Project, Non-statutory Report: Final Report, Panton River Copper- Zinc-Lead Anomaly,
A481 1967 Pickands Mather & Co Int West Kimberley <1% West Kimberley Project, Non-statutory Report: Report on Field Work for the year ending 31/12/1967, TR70/2686 &
A482 1967 Pickands Mather & Co Int Kimberley - Angelo North <1% Kimberley - Angelo North Project, Non-statutory Report: Maps, Sections & Diagrams, circa August 1967, TR70/268
A486 1967 Pickands Mather & Co Int Kimberley - Discovery Yard <1% Kimberley - Discovery Yard Project, Non-statutory Report: Discovery Yard I.P. 100 Foot Dipole, August 1967. Tr
A488 1967 Pickands Mather & Co Int Kimberley - Emull <1% Kimberley - Emull Project, Non-statutory Report: Emull I.P. Survey, 200 Foot Dipole, September 1967,TR70/2686
A501 1967 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley - Bow River Project, Non-statutory Report: Bow River I.P. 200 Foot Dipole, 1965 & 1967, TR70/2686 &
A6197 1967 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry , 40 Series, to December
A6198 1967 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry, Series 41 0000, Reruns a
A6206 1967 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Exploration Report, Analysis Results on Copper, Nickel, Sulphur & Pho
A6210 1967 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Analysis Report Sheets to October 1967, TR70/2686 & 2687H.
A4680 1966 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Report on Saunders Creek Anticline Copper Anomaly, December 1966, TR7
A4674 1966 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: An Extract from Progress Report, September 1966, TR70/2687H.
A4675 1966 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Supplementary Report on the Margaret River Gossan, April 1966, TR70/2
A4682 1966 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Report on the Salt Lick Creek Nickel Anomaly & Lissadell - Mt Pitt Go
A4756 1966 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Mt Angelo I.P. 300' Di Pole Lines, June 1966, TR70/2687H.
A4676 1966 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report:Progress Report on Mount Angelo Copper Showing ( Mt Ramsay 3), April 1
A4684 1966 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report; Final Report, Bow River Copper -Nickel Prospect, November 1966, TR70
A4686 1966 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Brief Geological Report , Bow River I P Lines , July 1966, TR70/2687
A444 1966 Pickands Mather & Co Int Kimberley - Ding Dong Downs <1% Ding Dong Downs Project, Non-statutory Report: Summary Report on Ding Dong Downs Copper, Lead & Zinc Anomaly,
A460 1966 Pickands Mather & Co Int Kimberley - Mount Angelo <1% Kimberley - Mt Angelo Project, Non-statutory Report: Geological Report, Mount Angelo Copper Showing, May 1966,
A462 1966 Pickands Mather & Co Int Kimberley - Panton River <1% Kimberley - Panton River Project, Non-statutory Report: Preliminary Report of Panton River Copper Anomaly , De
A463 1966 Pickands Mather & Co Int Kimberley- Carr Boyd Range <1% Kimberley- Carr Boyd Range Project, Non-statutory Report: Final Report, November 1966, TR70/2686 &2687H.
A464 1966 Pickands Mather & Co Int Kimberley- Bow River <1% Kimberley- Bow River Project, Non-statutory Report:Final Report on the Bow River Region, December 1966, TR70/2
A466 1966 Pickands Mather & Co Int Kimberley <1% Kimberley - Discovery Yard Project, Non-statutory Report: Discovery Yard Copper Anomaly, December 1966, TR70/2
A6203 1966 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets - regional Stream Geochemistry , Series 53 0000, to Janu
A1492 1965 Pickands Mather & Co Int East Kimberley <1% East Kimberley Project, Non-statutory Report: Metal Concentrations in Stream Sediment Locations, 1965, TR70/26
A6906 1965 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Regional Geology & Geochemical Anomalies Maps, (circa 1965), TR70/268
A4757 1965 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Mt Angelo. 200' IP Lines, November 1965, TR70/2687H.
A6917 1965 Pickands Mather & Co Int East Kimberley <1% East Kimberley Project, Non-statutory Report: Regional Stream Sediment Geochemistry Maps, Lissadell & Derby,
A6919 1965 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Stream Sediment Survey Maps, Dixon Range, 1964, TR70/2687H.
A6920 1965 Pickands Mather & Co Int East Kimberley <1% East Kimberley Project, Non-statutory Report: Stream Sediment Survey Maps, Mt Ramsay, 1964, TR70/2687H.
A6921 1965 Pickands Mather & Co Int East Kimberley <1% East Kimberley Project, Non-statutory Report: Stream Sediment Survey Geochemistry Maps, Gordon Downs & Mt Bann
A439 1965 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Annual Report for the year ending 31/12/1964, TR70/2686 & 2687H.
A440 1965 Pickands Mather & Co Int Kimberley - Bow River <1% Kimberley -Bow River Project, Non-statutory Report: Preliminary Report, November 1965. TR70/2686 & 2687H.
A441 1965 Pickands Mather & Co Int Kimberley- Taylor River <1% Kimberley - Taylor River Project, Non-statutory Report; Brief Summary Exploration Report on the Taylor River C
A442 1965 Pickands Mather & Co Int Mount Elliza No 1 <1% Kimberley - Mount Elliza No 1 Project, Non-statutory Report: Mt Eliza No 1 Tin - Arsenic Anomaly Summary Repor
A443 1965 Pickands Mather & Co Int Kimberley - Carr Boyd Range <1% Kimberley - Carr Boyd Range Project, Non-statutory Report: Preliminary Report, Carr Boyd Range Lead Anomaly, N
A445 1965 Pickands Mather & Co Int Kimberley - Five Mile Gossan <1% Kimberley - Five Mile Gossan Project,Non-statutory Report: Summary Report, August 1965, TR70/2686 & 2687H.
A446 1965 Pickands Mather & Co Int Kimberley - Me No Savvy <1% Kimberley - Me No Savvy Project, Non-statutory Report:Brief Summary Report on Me No Savvy Copper Showing, Aug
A447 1965 Pickands Mather & Co Int Kimberley - Lamboo No 1 <1% Kimberley - Lamboo No 1 Project, Non-statutory Report: Summary Report on Lamboo no 1 Copper Showing, December
A448 1965 Pickands Mather & Co Int Kimberley - New Lamboo <1% Kimberley - New Lamboo Project, Non-statutory Report: New Lamboo Copper Nickel Anomaly, December 1965, TR70/26
A449 1965 Pickands Mather & Co Int Kimberley - McClintock Range <1% Kimberley - McClintock Range Project, Non-statutory Report: McClintock Range Tin Anomaly Follow-up, August 196
A450 1965 Pickands Mather & Co Int Kimberley -McClintock- Cummins Ranges <1% Kimberley -McClintock- Cummins Ranges Project, Non-statutory Report: McClintock & Cummins Ranges Tin Anomaly F
A454 1965 Pickands Mather & Co Int Kimberley - Margaret River Gossan <1% Kimberley - Margaret River Gossan Project, Non-statutory Report: Brief Summary Report, August 1965, TR70/2686
A1488 1965 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Plates: Stream Sediment Sample Locations, 1965, TR70/2686 & 2687H.
A6202 1965 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry , Series 51 0000, to Octo
A6204 1965 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets- Regional Stream Geochemistry, Series 54 0000, to 16/08/
A6905 1964 Pickands Mather & Co Int East Kimberley <1% East Kimberley Project, Non-statutory Report:Miscellanous Geoleogical & Geochemistry Plans 1964, , TR70/2687H.
A438 1964 Pickands Mather & Co Int Kimberley - Halls Creek <1% Kimberley - Halls Creek Project, Annual Report for the period 1st july 1963 to 30th June 1964, TR70/2686 & 268
A6201 1964 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report: Assay Sheets- Regional Stream Geochemistry , Series 44 0000, Re-runs
A39962 1962 Peko Mines Nl Halls Creek <1% Halls Creek Project, Non-statutory Report: Report on Geophysical Surveys in the Halls Creek District , WA, Nov
A947 1753 Pickands Mather & Co Int Kimberley <1% Kimberley Project, Non-statutory Report:Plans: Mt Elma- Mt Krauss - Mt Cummins - Mt Amherst Areas: [250,000 Mo
A485 1753 Pickands Mather & Co Int Kimberley - Mount Angelo <1% Kimberley - Mount Angelo Project, Non-statutory Report: Mt Angelo I.P. 100 Foot Dipole, June 1967, TR70/2686 &
A503 1753 Pickands Mather & Co Int Kimberley- Angelo Valley <1% Kimberley- Angelo Valley Project, Non-statutory Report: Angelo Valley I.P. Profiles, September 1968, TR70/2686
A499 1753 Pickands Mather & Co Int Kimberley - Mabel Downs- Violet Valley <1% Kimberley - Mabel Downs- Violet Valley Project, Annual Report for the year ending 31/12/1968, TR70/2686 & 2687
A514 1753 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report 1968, Folder No 1, Pocket A & B, February 1969
A518 1753 Pickands Mather & Co Int Kimberley - Ilmars <1% Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report 1969, including Sophie Downs Copper Showing -
A710 1753 Pickands Mather & Co Int Kimberley - Halls Creek <1% Kimberley - Halls Creek Project, Non-statutory Report:Geological Report , Halls Creek Area, Moola Bulla Copper
A945 1753 Pickands Mather & Co Int Kimberley - Lansdowne <1% Kimberley - Lansdowne Project, Non-statutory Report: Plans for the Lansdowne Area. (Undated), Tr70/2686 & 2687
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
3 months · 2 Dec 2026
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 80/3907 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 80/3907? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.