E 77/3410
Register summary
- Holder
- Harbour Exploration Pty Ltd
- Local government
- Shire of Menzies, Shire of Yilgarn
- Application received
- 18 Aug 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A134752 | 2023 | Ramelius Resources Limited | Marda–Windarling–Evanston | <1% | Final (E77/2067, E77/2150, E77/2247, E77/2248, E77/2686, E77/2687, E77/2273, E77/2276) and Partial (E77/2165) |
| A135986 | 2023 | Dreadnought Resources Ltd | Evanston | <1% | Partial Surrender Report Evanston E77/2416 for the period 3 July 2017 to 19 May 2023 |
| A131350 | 2022 | Ramelius Resources Limited | Evanston South | <1% | Annual Mineral Exploration Report — E77/2687: Evanston South Project for the period ending 22/03/2022. |
| A122740 | 2020 | Ramelius Resources Limited | Evanston | <1% | Annual Report for Combined Reporting Group 100/2015 (Evanston Project) for the period 1 January 2019 to 31 Dec |
| A123793 | 2020 | Arrow (Strickland) Pty Ltd | Evanston | <1% | Evanston Partial Surrender Report E77/2416 for the period ending 22/1/2020 |
101 more reports
| A124159 | 2020 | Arrow (Strickland) Pty Ltd | Evanston | <1% | C111/2017 Evanston Project Annual Report for the period ending 15/05/2020 |
| A120480 | 2019 | Arrow Minerals Ltd | Evanston | <1% | Combined Annual Report for the Evanston Project, C111/2017 for the period 16 May 2018 to 15 May 2019, E77/0240 |
| A117256 | 2018 | Arrow Minerals Ltd | Evanston | <1% | C111/2017 Combined Annual Report for the Evanston Project for the period 16 May 2017 to 15 May 2018, E77/02403 |
| A112237 | 2017 | Black Oak Minerals Limited | Evanston | <1% | Combined Annual Report for the Evanston Project for the period 1 January 2016 to 31 December 2016, C100/2015 |
| A112379 | 2017 | Black Oak Minerals Limited | Evanston | <1% | Final Surrender Report for Exploration Licence E77/1814, Yilgarn Mineral Field, for the period 23 May 2011 to |
| A108499 | 2016 | Black Oak Minerals Limited | Evanston | <1% | Final Surrender Report for Exploration Licence E77/1117, Evanston Project, Yilgarn Mineral Field, for the peri |
| A108496 | 2016 | Black Oak Minerals Limited | Evanston | <1% | Combined Annual Report for the Evanston Project, C100/2015, Yilgarn Mineral Field, for the period 1 January 20 |
| A106669 | 2015 | Black Oak Minerals Limited | Die Hardy | <1% | Combined Annual Report for the Die Hardy Project, C126/2009 (E77/1164, E77/1803, E77/1893, E77/2141, E77/2171, |
| A105150 | 2015 | Black Oak Minerals Limited | Evanston Mine | <1% | Final Surrender Report for Exploration Licences E77/1653‐4, Evanston Mine Project, Yilgarn Mineral Field, for |
| A105429 | 2015 | Black Oak Minerals Limited | Evanston Mine | <1% | Combined Annual Report for the Evanston Mine Project, C47/2004 (E77/1741–2, E77/1814, E77/1911, E77/2024-25, E |
| A105679 | 2015 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Combined Annual Report C81/2005 (Evanston Shear) E77/1117, E77/1321, E77/1322 and M77/1259 For the period 31 J |
| A103171 | 2014 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Combined annual report for the Die Hardy Project, C126/2009 (E77/1164, E77/1803, E77/1893, E77/2017, E77/2141, |
| A101288 | 2014 | Southern Cross Goldfields Ltd | Marda | <1% | Final surrender report for Exploration Licence E77/1293, Yilgarn Mineral Field, for the period 22 November 200 |
| A101405 | 2014 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Annual Report for the period 31 January 2013 to 30 January 2014, Evanston Shear, E77/1117, E77/1295, E77/1321, |
| A101640 | 2014 | Southern Cross Goldfields Ltd | Evanston | <1% | Combined annual report for the Evanston Mine Project, C47/2004 (E77/1505, E77/1653–4, E77/1741–2, E77/1814, E7 |
| A99027 | 2013 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Combined annual report for the Die Hardy Project, C126/2009 (E77/1293, E77/1803, E77/1164, M77/576, M77/824, P |
| A98977 | 2013 | Cliffs Asia Pacific Iron Ore Pty Ltd | Die Hardies | <1% | Final Report for the period 08 May 2013 – 05 July 2013, E77/1304-I Die Hardies Project |
| A97026 | 2013 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Partial Surrender Report E77/1322 (Evanston Shear) For the period 18th January 2007 to 25th February 2013 |
| A97132 | 2013 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Evanston Shear Project, Annual Report for the period 31st January 2012 to 30th January 2013, E77/1117, 1295, 1 |
| A97417 | 2013 | Southern Cross Goldfields Ltd | Evanston Mine | <1% | EVANSTON MINE PROJECT C47/2004 E77/1505, E77/1653–4, E77/1741–2, E77/1814, E77/1911, P77/4101 Yilgarn Mineral |
| A93280 | 2012 | Southern Cross Goldfields Ltd | Evanston Mine | <1% | Evanston Mine Project, Annual Report for the period 1st January 2011 to 31st December 2011, E77/1505, 1653-165 |
| A93497 | 2012 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Annual Report for the period 31 January 2011 to 30 January 2012, Evanston Shear E77/1034, E77/1117, E77/1295, |
| A94510 | 2012 | Cliffs Asia Pacific Iron Ore Pty Ltd | Diemals | <1% | Combined Annual and Final Surrender Report for the period 18th April 2011 to 14th June 2012, E77/1521 |
| A94727 | 2012 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Combined annual report for the Die Hardy Project, C126/2009 (E77/1293, E77/1803, E77/1164, M77/576, M77/824, P |
| A89530 | 2011 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Die Hardy Project, Partial Surrender Report Exploration Licence E77/1293-I Report Period: 22/11/2006 to 21/11 |
| A89692 | 2011 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Annual Report for the period 31 January 2010 to 30 January 2011, Evanston Shear, E77/1034, E77/1117, E77/1295 |
| A91355 | 2011 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Die Hardy Project C126/2009 Combined Annual Report for the Period 1/05/2010 to 30/04/2011, E77/1164, E77/1293, |
| A89878 | 2011 | Southern Cross Goldfields Ltd | Evanston | <1% | Evanston Mine Project Combined Annual Report for the Period 1/01/2010 to 31/12/2010, C47/2004 Tenement Number |
| A85691 | 2010 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Partial Surrender Report Exploration Licence E77/1293-I, Die Hardy (22/11/2006 to 11/11/2009) |
| A86356 | 2010 | Southern Cross Goldfields Ltd | Evanston | <1% | Evanston Mine Project Combined Annual Report for the Period 1/01/2009 to 31/12/2009, C47/2004, E77/1173, E77/1 |
| A86982 | 2010 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Partial Surrender Report for E77/1164 for the Period 28/03/2006 – 18/03/2010 |
| A87364 | 2010 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Die Hardy Project Combined Annual Report for the Period 1 May 2009 to 30 April 2010 |
| A86222 | 2010 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Combined Annual Report C81/2005 (Evanston Shear), E77/1034, E77/1117, E77/1295 and E77/1321, E77/1322 and P77/ |
| A81430 | 2009 | Polaris Metals Nl | EVANSTON | 62% | EVANSTON PROJECT E77/1122-I FINAL REPORT FOR THE PERIOD, 15 JANUARY 2006 – 14 JANUARY 2009 |
| A84407 | 2009 | Southern Cross Goldfields Ltd | Die Hardy | <1% | 2009 Annual Report for Prospecting Licence P77/3459, Die Hardy, Report Period: 9/8/2007 to 8/8/2008 |
| A84408 | 2009 | Southern Cross Goldfields Ltd | Die Hardy | <1% | 2009 Annual Report for Prospecting Licence P77/3459, Die Hardy, Report Period: 9/8/2008 to 8/8/2009 |
| A81593 | 2009 | Southern Goldfields Ltd | Evanston | <1% | 2008 COMBINED ANNUAL REPORT C47/2004 1/1/2008 - 31/12/2008, E77/1140, E77/1173, E77/1196-I, E77/1268-I, P77/34 |
| A81981 | 2009 | Southern Cross Goldfields Ltd | EVANSTON SHEAR | <1% | EVANSTON SHEAR PROJECT E77/1034, E77/1117, E77/1295, E77/1321, E77/1322, P77/3830, COMBINED ANNUAL REPORT FOR |
| A84405 | 2009 | Southern Cross Goldfields Ltd | Die Hardy | <1% | 2008 Annual Report for Prospecting Licence P77/3458, Die Hardy, Report Period: 9/8/2007 to 8/8/2008 |
| A84406 | 2009 | Southern Cross Goldfields Ltd | Die Hardy | <1% | 2008 Annual Report for Prospecting Licence P77/3458, Die Hardy, Report Period: 9/8/2008 to 8/8/2009 |
| A84914 | 2009 | Southern Cross Goldfields Ltd | E77/1173 | <1% | Final Surrender Report for Prospecting Licence E77/1173, Report Period: 13/09/2006 to 04/09/2009 |
| A78112 | 2008 | International Goldfields Ltd | Evanston | <1% | 2007 Combined Annual Report Evanston Project Exploration Licences 77/1034, 77/1117 and Mining Lease 77/576 for |
| A83053 | 2008 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Annual report - 28/03/2008-27/03/2009 |
| A78638 | 2008 | Liberty Gold Nl | Die Hardy | <1% | 2008 ANNUAL REPORT DIE HARDY PROSPECT EXPLORATION LICENCE 77/1164 Period 28/03/2007 to 27/03/2008 |
| A77809 | 2008 | Polaris Metals Nl | Evanston | 37% | Evanston Joint Venture Project 2007 Annual Report Exploration Licences E77/1107 & E77/1122 |
| A78110 | 2008 | International Goldfields Ltd | Evanston | <1% | Evanston Project, Annual Report for the period 18/01/2007 to 17/01/2008, E77/1322. [C80/2005] |
| A80218 | 2008 | Southern Cross Goldfields Ltd | Evanston | <1% | 2008 ANNUAL REPORT EXPLORATION LICENCE E77/1173 13/09/2007-12/09/2008 |
| A74793 | 2007 | Polaris Metals Nl | Evanston | 37% | Evanston Joint Venture Project, 2006 Annual Report, Exploration licences E77/1107 & E77/1122 (Period:15/01/20 |
| A76669 | 2007 | International Goldfields Ltd | Evanston | <1% | 2007 ANNUAL REPORT EVANSTON PROJECT EXPLORATION LICENCE 77/1173 For the Period 13/09/2006 to 12/09/2007 |
| A77482 | 2007 | Polaris Metals Nl | Die Hardy | <1% | DIE HARDY PROJECT, Annual Report for the Period 22nd November 2006 - 21st November 2007 for E77/1293-I Polaris |
| A75228 | 2007 | Transit Holdings Ltd | Die Hardy | <1% | Annual Report for the period 28th March 2006 to 27th March 2007, Die Hardy Project, E77/1164 1:250,000 map she |
| A74892 | 2007 | International Goldfields Ltd | Evanston | <1% | Combined Annual Report for the Reporting Period 31/01/2006 to 30/01/2007, Evanston Project, E77/956, E77/1034, |
| A72962 | 2006 | Polaris Metals Nl | Evanston | 37% | Evanston Joint Venture Project, 2005 Annual Report E77/1107, 1122, Period 15/01/2005 to 15/01/2006, (Polaris M |
| A72631 | 2006 | International Goldfields Ltd | Evanston | <1% | Evanston Project, Annual Report, for the period 31/01/2005 to 30/01/2006, Project, E77/956,1034,1117,1127; M7 |
| A64742 | 2002 | Barranco Resources Nl | Mount Geraldine | 30% | Technical Report E77/566 Period Reported: 29 April 1998 To April 1999 Report Approval: C189/1995 |
| A63174 | 2001 | Evanston Resources Nl | Johnston Range | 1.6% | Johnson Range Combined Annual Report for 2000: E77/503, 556, 633, 637, 679, 680, 704, 720, 725, 761, and 762, |
| A63175 | 2001 | Evanston Resources Nl | Mt Jackson | 12% | Annual Report Tenements: E77/447 & E77/466 Period Reported 01 January 2000 to 31 December 2000. |
| A63052 | 2001 | Barranco Resources Nl | Mount Geraldine | 30% | Mt Geraldine Project Technical Report E77/566 Annual and Final 29 April 2000 to 29 April 2001 C189/1995. |
| A63304 | 2001 | Barranco Resources Nl | Mount Geraldine | 30% | Mt Geraldine Project E77/566 Annual and Final Technical Repo rt for the period 29 April 2000 to 29 April 2001 |
| A57579 | 1999 | Savage Australian Exploration Pty Ltd | Evanston | 12% | Mt Jackson Project Annual Report E77/447,466 Period Reported 01/01/1998 to 31/12/1998 |
| A57584 | 1999 | Savage Australian Exploration Pty Ltd | Johnston Range | 2% | Johnson Range Project, Annual Report, E77/503, 633, 637, 679, 680, 704, 720, 725, 761, 762, P77/3189, and P77/ |
| A57603 | 1999 | Savage Australian Exploration Pty Ltd | Johnson Range | <1% | Johnston Range Project Technical Report E77/680 Third Year Partial Surrender 10 November 1995 to 3 Aapril 1999 |
| A57625 | 1999 | Barclay Holdings Ltd | Die Hardy | 35% | Die Hardy Project Annual Report. 01/01/98-31/12/98. E77/734. P77/3172-3177. |
| A58495 | 1999 | Savage Australian Exploration Pty Ltd | Johnston Range | 46% | E77/633 Fourth Year Partial Surrender Report for the Period 23 February 1995 to 22 July 1999. Johnson Range Pr |
| A53219 | 1998 | Barclay Holdings Ltd | Johnson Range | <1% | Johnson Range Project, E77/680, Annual Report. Reporting Period:10 November 1996 to 9 November 1997. |
| A54093 | 1998 | Barclay Holdings Ltd | Johnston Range / Yarbu | 46% | E77/633 Partial Surrender Report, Reporting Period : 23 Febraury 1995 to 22 February1998. |
| A54094 | 1998 | Barclay Holdings Ltd | Johnston Range - Yarbu | 1.4% | Johnston Range - Yarbu Project, E77/503 ,Partial Surrender Report, Reporting Period :21st July 1993 to 5th May |
| A54690 | 1998 | Barclay Holdings Ltd | Johnston Range | 7.8% | Annual report for the period 11 June 1997 to 10 June 1998, Johnston Range Project, E77/447 |
| A55748 | 1998 | Barclay Holdings Ltd | Johnston Range | 58% | E77/734 Annual Report reporting period: 28 June 1997 to 27 June 1998. |
| A53646 | 1998 | Savage Australian Exploration Pty Ltd | Marda | 30% | Marda Project, Technical Report, 29 April 1994 to 18 December 1997 |
| A54721 | 1998 | Savage Australian Exploration Pty Ltd | Marda | 30% | Marda Project, Partial Surrender Report (4th Year) E77/566 for reporting period 29th April 1994 to 31st March |
| A54091 | 1998 | Barclay Holdings Ltd | Johnston Range | 46% | E77/633 Annual Report for the Period 23 February 1997 to 22 February 1998. Johnson Range Project. |
| A54968 | 1998 | Savage Australian Exploration Pty Ltd | Mount Geraldine | 7.4% | Mt Geraldine Project, Combined Technical Report E77/564-566, 578, 624, 638 30/04/97 - 29/04/98 |
| A55805 | 1998 | Barclay Holdings Ltd | Johnston Range | 1.4% | E77/503 Annual Report for the Period 21 July 1997 to 20 July 1998. Johnson Range Project. |
| A50537 | 1997 | Noble Resources Nl | Evanston | 4.2% | Annual Report for the Evanston Project Combined Report No.281/1995 for the period 1st January 1996 to 31st Dec |
| A51738 | 1997 | Barclay Holdings Ltd | Johnston Range | 7.8% | Annual report for the period 1 January 1997 to 10 June 1997,Johnston Range Project , E77/447. |
| A51772 | 1997 | Savage Australian Exploration Pty Ltd | Mount Geraldine | 7.4% | Mt Geraldine Project Combined Technical Report Tenements E77/564 E77/565 E77/566 E77/578 E77/624 E77/638 Annua |
| A52975 | 1997 | Barclay Holdings Ltd | Johnston Range | 12% | Annual Report for the Period 6 October 1996 to 5 October 1997. Johnson Range Project, E77/466. |
| A47768 | 1996 | Noble Resources Nl | Evanston | 4.4% | Evanston Project [Part 2], for the period 1st January 1995 to 31st December 1995, E77/576, E77/400, E77/466, E |
| A48948 | 1996 | Savage Australian Exploration Pty Ltd | Mount Geraldine | 6% | Mt Geraldine Project Combined Technical Report Tenements E77/564 E77/565 E77/566 E77/567 E77/578 E77/624 E77/6 |
| A47208 | 1996 | Evanston Gold Mines Nl | Pigeon Rocks | <1% | Pigeon Rocks Project, Annual Report November 1995 - February 1996, Exploration on E77/663. |
| A45636 | 1995 | Mim Exploration Pty Ltd | Mount Geraldine | 6.6% | Combined Annual Report for the period ending July 31, 1995 on Mount Geraldine, E77/564, 565, 566, 567, 624 ,63 |
| A41032 | 1994 | Broken Hill Metals Nl | Johnston Range | 12% | Annual Report for the Period 6 October 1992 to 5 October 1993, Johnson Range Project, E77/466 |
| A41505 | 1994 | Broken Hill Metals Nl | Johnston Range | <1% | Annual Report for the Period June 1993 to June 1994, Johnson Range Project, E77/366, E77/405 & E77/503. |
| A42173 | 1994 | Broken Hill Metals Nl | Mount Jackson - Norotel | 12% | Annual Report for the Period 1993 to 1994. Mt Jackson - Noretel JV Project, E77/447 and E77/466. |
| A42515 | 1994 | Samantha Gold Nl | Johnston Range | 12% | Annual Report for the Period 6 October 1992 to 5 October 1993, Johnson Range Project, E77/466 |
| A39530 | 1993 | Broken Hill Metals Nl | Johnston Range | 7.8% | Annual Report Report, Johnson Range Project, E77/447 for the Period 11 June 1992 to 10 June 1993. |
| A42514 | 1993 | Broken Hill Metals Nl | Johnston Range | 7.8% | Annual Report, Johnson Range Project, E77/447 for the Period 11 June 1992 to 10 June 1993. |
| A11960 | 1983 | Nord Resources Pacific Pty Ltd | Evanston | <1% | Annual Report 1982 Mineral Claims 77/7589, 7590, 7601, 7602,7629 and Final Report Temporary Reserve TR 8659H |
| A2689 | 1972 | Laporte Australia Ltd | Barlee - Evanston | 23% | Barlee - Evanston Project, Non-statutory Report: Barlee Region Exploration Programme, February 1972, MC77/2 |
| A2801 | 1972 | Cosmos Exp & Minerals Nl | Pigeon Rocks North | 7.6% | Pigeon Rocks North Project, Non-statutory Report: Progress Report of Detailed Investigations, MC77/3192-3200 & |
| A4085 | 1971 | Mr Prindiville B F | Pigeon Rocks | 3.4% | Pigeon Rocks Project, Non-statutory Report: 1970 Geological Report on BF Prindiville's Nickel Claims in the Pi |
| A4087 | 1971 | Mr Prindiville B F | Pigeon Rocks | 3.5% | Pigeon Rocks Project, Non-statutory Report: Report on Geological Examination on behalf of Spargo Exploration N |
| A3010 | 1971 | Day Dawn Minerals Nl | Olby Rocks - Pigeon Rocks | 100% | Olby Rocks - Pigeon Rocks Project, Non-statutory Report: Preliminary Report on Olby Rocks, January 1971, MC77/ |
| A3009 | 1970 | Analex Pty Ltd | Pidgeon Rocks North & South | 100% | Pidgeon Rocks North & South, Non-statutory Report: Brief Exploration Report, October 1970, MC77/ 2506-2517. (O |
| A4083 | 1970 | Mr Prindiville B F | Pigeon Rocks | 5.1% | Pigeon Rocks Project, Non-statutory Report: Evaluation of Mineral Claims, February 1970, MC77/517-520, 568-575 |
| A81368 | 1753 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Annual Report for the Period 22nd November 2007 – 21st November 2008 for E77/1293 |
| A83051 | 1753 | Southern Cross Goldfields Ltd | E77/1164-I | <1% | 2009 PARTIAL SURRENDER REPORT EXPLORATION LICENCE E77/1164-I FOR THE PERIOD 28/03/2006-27/03/2009 |
| A51910 | 1753 | Barclay Holdings Ltd | Johnston Range | 58% | E77/734 Annual Report Reporting Period: 28 June 1996 to 27 June 1997. |
| A52285 | 1753 | Barclay Holdings Ltd | Johnston Range | 1.4% | Annual Report for the period 21st July 1996 to 20th July 1997 Johnston Range Project ,E77/503. |
| A110164 | Black Oak Minerals Limited | Evanston | <1% | Partial Surrender Report, Exploration Licence E77/1741 (Evanston) for the Period 20/8/2010 - 19/8/2016 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 77/3410 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 77/3410 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.